JP2004090412A - Method and apparatus for connecting mold for weather strip - Google Patents

Method and apparatus for connecting mold for weather strip Download PDF

Info

Publication number
JP2004090412A
JP2004090412A JP2002254651A JP2002254651A JP2004090412A JP 2004090412 A JP2004090412 A JP 2004090412A JP 2002254651 A JP2002254651 A JP 2002254651A JP 2002254651 A JP2002254651 A JP 2002254651A JP 2004090412 A JP2004090412 A JP 2004090412A
Authority
JP
Japan
Prior art keywords
mold
sponge rubber
rubber composition
cavity
temperature
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2002254651A
Other languages
Japanese (ja)
Inventor
Takashi Fujiwara
藤原 孝志
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kinugawa Rubber Industrial Co Ltd
Original Assignee
Kinugawa Rubber Industrial Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kinugawa Rubber Industrial Co Ltd filed Critical Kinugawa Rubber Industrial Co Ltd
Priority to JP2002254651A priority Critical patent/JP2004090412A/en
Publication of JP2004090412A publication Critical patent/JP2004090412A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C44/00Shaping by internal pressure generated in the material, e.g. swelling or foaming ; Producing porous or cellular expanded plastics articles
    • B29C44/34Auxiliary operations
    • B29C44/60Measuring, controlling or regulating

Landscapes

  • Moulds For Moulding Plastics Or The Like (AREA)
  • Injection Moulding Of Plastics Or The Like (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To suppress generation of defects such as press deformation or short shot when a sponge rubber composition is charged into a cavity to obtain a product. <P>SOLUTION: A method for connecting a mold for a weather strip comprises facing the end part of an extrusion molding part of the weather strip to a cavity of a mold and setting it, charging an unvulcanized sponge rubber composition into the cavity, and simultaneously performing vulcanization molding of a mold molding part and connecting with the extrusion molding part in the mold. In this method, a mold temperature detected by a temperature sensor is fed back to an operating part in which an correlation equation between the mold temperature and the volume increase ratio by expansion of the sponge rubber composition is stored in advance, and an appropriate amount of the unvulcanized sponge rubber composition charged in the cavity is calculated. By charging the calculated appropriate amount of the unvulcanized sponge rubber composition into the cavity, generation of press deformation and the short shot caused by excess or shortage of the amount of charging of the unvulcanized sponge rubber composition into the cavity is suppressed. <P>COPYRIGHT: (C)2004,JPO

Description

【0001】
【発明の属する技術分野】
本発明は、ウエザーストリップの押出し成形部を金型のキャビテイ内にセットした後に、キャビテイ内に未加硫のスポンジゴム組成物を注入し、型成形部の加硫成形と、押出し成形部との接続を金型内で同時進行的に行なうウエザーストリップの型接続方法及び装置に関するものである。
【0002】
【従来の技術】
上記ウエザーストリップの型接続方法において、ウエザーストリップは、断面形状等が複雑で、金型の形状も複雑になっているために、脱型作業に長時間を要し、脱型時における金型の温度低下が大きい。特に、型成形部がスポンジゴムの場合は、ソリッドゴムの場合に比べて脱型時に破れ易いことから、脱型作業を慎重に行なうことが要求されるので金型が開いている時間が長くなり、金型の温度の低下が著しい。このため、作業現場では、金型の温度の低下を見込んで、金型の温度の設定を必要以上に高くする傾向がある。
【0003】
未加硫スポンジゴム組成物の、加硫と平行して進行する発泡に伴う体積増加は、金型の温度に大きく影響されるため、金型の温度が変動すると、体積増加の相違によって、所謂ショートや押出し成形部の押され不良が誘発される。
【0004】
因みに、表1に示すスポンジゴムの代表的な配合例及びこの配合例から発泡剤及び発泡助剤を除いたソリッドゴムの体積と、金型温度と、の関係を試験したところ、図6に示すような結果が得られた。
【0005】
【表1】

Figure 2004090412
【0006】
なお、試験方法は、渦巻型キャビテイの中心に2±0.005gに秤量した未加硫生地をピストンで注入し、3.0分経過した後に金型を開き、渦巻型キャビテイのどの位置まで注入生地の先端が達しているかを計測するという手法を採った。
【0007】
図6に破線で示すように、発泡剤及び発泡助剤を配合しないソリッドゴムの場合に、その体積は、金型温度の影響を殆ど受けることは無いが、発泡剤及び発泡助剤を配合したスポンジゴムの場合には、金型温度170℃の場合の体積に対して、金型温度190℃の場合の体積は、約5%増しになった。このことから、仮に金型温度170℃を基準にして材料の注入量を決めれば、金型温度190℃の場合には所謂「押され」による変形が発生しやすく、逆に金型温度190℃を基準にして材料の注入量を決めれば、金型温度170℃の場合には所謂「ショート」による不良が発生しやすくなることが容易に推測される。
【0008】
上記ショートや押され等の不良対策として、特開2000−229330に「ウエザーストリップの接続方法」が開示されている。この方法は、押出し成形部の基底部に予め逃げ孔を凹設し、注入材料は常に多めに仕込み、そのオーバーフロー分を、上記逃げ孔に収容することで、ショートや押され不良を防止するとともにオーバーフローの切除作業も廃止するという内容である。
【0009】
また、特開2001−239565には、注入ノズル部の圧力を検出し、注入アクチュエーター動作にフィードバックして、注入動作を停止させることでキャビテイへの充填量を調整する方法が開示され、特開平11−129297には、金型温度を検出した上で、注入圧力を補正する方法等が開示されている。更に、特開平6−46930には、標準材料のフロー値から成形材料の予熱温度を演算して求める制御手段などが開示されている。
【0010】
【発明が解決しようとする課題】
ところで、上記特開2000−229330の方法は、押出し成形部の断面形状による制約が大きく、薄肉形状では、十分な開口部を有する逃げ孔を設けることができない。更に、スポンジゴムのように、金型に注入した後に発泡反応が生じ、体積が急激に増大する場合には、逃げ孔にオーバーフロー分を収容することは事実上不可能で、押されが発生する。
【0011】
また、特開2001−239565にあっては、スポンジゴムの大幅な体積増加は、注入完了後に生じるために、注入動作中のノズル圧力を検出しても無意味である。そもそもスポンジゴムの場合には、体積増加分を加味して、キャビテイ容積よりも少な目に注入するので、キャビテイ内圧の初期上昇は殆どみられない。
【0012】
特開平11−129297は、注入圧と、スポンジゴムの体積増加率には殆ど相関がないために、制御の効果が見出せない。
【0013】
特開平6−46930においては、予熱温度のコントロールは極めて難しい。また、スポンジゴム等は、一般的に熱伝導性が小さいために、注入までの短時間で目的の温度にすることは事実上不可能である。
【0014】
本発明は、上記従来例の問題点を解決することを目的になされたものであり、特に、キャビテイ内にスポンジゴム組成物を注入して製品を得る際に生じる押されやショートの不良等の発生を抑制することを目的とする。
【0015】
【課題を解決するための手段】
請求項1の発明は、ウエザーストリップの押出し成形部の端部を金型のキャビテイに臨ませてセットした後に、キャビテイ内に未加硫のスポンジゴム組成物を注入し、型成形部の加硫成形と、押出し成形部との接続を金型内で同時進行的に行なうウエザーストリップの型接続方法において、
金型温度を、金型温度とスポンジゴム組成物の発泡による体積増加率との相関関係を予め記憶させた演算部にフィードバックして、キャビテイ内へ注入する未加硫のスポンジゴム組成物の適正量を算出し、算出した適正量の未加硫のスポンジゴム組成物をキャビテイ内へ注入することにより、
キャビテイ内への未加硫のスポンジゴム組成物の注入量が、加硫成形時の金型温度により変動する適性注入量に対し、過不足となることが原因で起こる押されやショートの不良の発生を抑制した。
【0016】
請求項2の発明は、金型と、該金型のキャビテイ内に未加硫のスポンジゴム組成物を供給する供給手段と、上記金型の型閉め及び型開きを行なう金型開閉手段と、を備えたウエザーストリップの型接続装置であって、
上記供給手段を、上記金型の温度を検出する温度センサと、該温度センサによって検出された金型の温度をフィードバックすることにより予め記憶させてある金型の温度と未加硫のスポンジゴム組成物の発泡による体積増加率の相関関係に上記温度センサによって検出した金型の温度を当てはめて未加硫のスポンジゴム組成物の適正な供給量を算定する制御装置と、該制御装置により算定された量の未加硫のスポンジゴム組成物を金型のキャビテイ内に供給する注入機構と、で構成し、
温度センサによって検出した金型の温度を制御装置にフィードバックすることにより算出された量の未加硫のスポンジゴム組成物を上記注入機構で金型のキャビテイ内に供給する構成にした。
【0017】
【発明の実施の形態】
本発明のウエザーストリップの型接続方法は、ウエザーストリップの押出し成形部の端部を金型のキャビテイに臨ませてセットした後、キャビテイ内に未加硫のスポンジゴム組成物を注入し、型成形部の加硫成形と、押出し成形部との接続を金型内で同時進行的に行なうようになっている。そして、未加硫スポンジゴムの加硫と平行して発泡に伴う体積増加が進行する。
【0018】
金型の温度は、温度センサで検出され、検出された金型温度は、金型温度とスポンジゴム組成物の発泡による体積増加率との相関関係を予め記憶させた演算部にフィードバックされてキャビテイ内へ注入する未加硫のスポンジゴム組成物の適正量が算出され、該算出された適正量の未加硫のスポンジゴム組成物をキャビテイ内へ注入することにより、スポンジゴム組成物の注入量に過不足が生じるのを防止して、スポンジゴム組成物の注入量が、加硫成形時の金型温度により変動する適性注入量に対し、過不足となることが原因で起こる押されやショートの不良の発生を未然に防止するようになっている。
【0019】
図1は、本発明のウエザーストリップの型接続装置1を示す。ウエザーストリップの型接続装置1は、金型2と、該金型2内に未加硫のスポンジゴム組成物を供給する供給手段3と、上記金型2の型閉め及び型開きを行なう金型開閉手段4と、を備えている。
【0020】
上記金型2は、固定側金型21と可動側金型22とからなっている。上記固定側金型21と可動側金型22は、金型開閉手段4に構成されている上下の熱盤23,24に取付けられていて、これら熱盤23,24により加熱されるようになっている。
【0021】
図2に拡大して示すように、上記固定側金型21と可動側金型22との間には、キャビテイ25及び該キャビテイ25内に一端を臨ませた状態で押出し成形部41(図4参照)を組付けるための一対の押出し成形部組付部26、26が設けられている。
【0022】
図3に示すように、上記供給手段3は、上記金型2の温度を検出する温度センサ31と、該温度センサ31によって検出された金型2の温度をフィードバックすることにより予め記憶させてある金型の温度と未加硫のスポンジゴム組成物の発泡による体積増加率の相関関係式に当てはめて未加硫のスポンジゴム組成物の適正な供給量を算定する制御装置32と、該制御装置32により算定された量の未加硫のスポンジゴム組成物を金型2のキャビテイ25内に供給する注入機構33と、を備えている。
【0023】
上記温度センサ31は、金型2の内部(キャビテイ25に近い部分)の温度を検出するために、可動側金型22に設けた穴27に挿入した状態で取付けられている。
【0024】
上記制御装置32は、CPU(中央演算処理装置)を備えていて、上記温度センサ31で検出した金型2の温度に基づいて最適なスポンジゴム組成物の供給量を算定するとともに、注入機構33の駆動を制御するようになっている。
【0025】
上記注入機構33は、金型2のキャビテイ25内に未加硫のスポンジゴム組成物を供給する計量及び注入シリンダ34と、該計量及び注入シリンダ34にポッパー35から未加硫のスポンジゴム組成物を供給する搬送スクリュー36と、搬送スクリュー36を回転駆動するモータ37及び駆動回路38と、上記計量及び注入シリンダ34を駆動する油圧モータ39と、を備えている。
【0026】
なお、40は搬送スクリュー36と注入シリンダ34繋部に設けられたスポンジゴム租生物の逆止弁である。
【0027】
上記計量及び注入シリンダ34は、位置検出センサ41を備えている。該位置検出センサ41は、搬送スクリュー36により計量及び注入シリンダ34内に供給されてきた未加硫のスポンジゴム組成物の位置(量)を監視していて、適正量に達すると、上記モータ37を停止させて未加硫のスポンジゴム組成物の供給をストップさせるとともに、上記逆止弁40が閉じられるようになっている。
【0028】
また、上記金型開閉手段4には、油圧シリンダ又はエアーシリンダが用いられていて、上記下部の熱盤24を介して可動側金型22を昇降させるようになっている。
【0029】
次に、上記ウエザーストリップの型接続装置1を使用してのウエザーストリップの型接続方法について説明する。
【0030】
予め、金型温度と型成形に使用されるスポンジゴム組成物の発泡による体積増加率との相関関係を上記制御装置32の演算用CPUにインプットしておく。そして、図4に示すように、金型2に押出し成形部42をセットすることにより、上記ウエザーストリップの型接続装置1の使用準備が終了した状態、即ち、スタンバイ状態になる。なお、28は、金型2の材料注入口である。
【0031】
そして、図5のフローチャート図に示すように、サイクルが開始されると同時に、温度センサ31により金型2の温度が検出される。(ステップ1)
検出された金型2の温度は、上記制御装置32のCPUにフィードバックされて、スポンジゴム組成物の供給量が算定される。(ステップ2)
スポンジゴム組成物の供給量が算定されると上記制御装置32のCPUにより上記モータ37が起動し、搬送スクリュー36が回転して、上記計量及び注入シリンダ34に未発泡のスポンジゴム組成物が供給チャージされて行く。(ステップ3)
そして、供給された未発泡のスポンジゴム組成物が規定のチャージ量、つまり算定された供給量に達したか否かが判定される。(ステップ4)
規定のチャージ量に達すると上記モータ37が停止して上記計量及び注入シリンダ34への未発泡のスポンジゴム組成物が供給が停止される。(ステップ5)
未発泡のスポンジゴム組成物が供給が停止されると上記金型開閉手段4により型締めが開始される。(ステップ6)
そして、型締めが完了したか否かが検出される。(ステップ7)
型締めが完了したことが検出されると、上記計量及び注入シリンダ34による未発泡のスポンジゴム組成物の金型2への注入が開始される。(ステップ8)
そして、未発泡のスポンジゴム組成物の金型2への注入が完了したか否かが判定される。(ステップ9)
注入が完了したことが検出されると、加硫が開始される。(ステップ10)
そして、加硫が完了したか否かが検出される。(ステップ11)
加硫が完了すると型開きが開始される。(ステップ12)
そして、型開きが完了したか否かが検出される。(ステップ13)ことが検出される。
【0032】
型開きが完了したことが検出されると金型から製品が取出され、サイクルは終了して次のサイクルが開始される。
【0033】
実験例
上記本発明の方法によりスポンジゴム製のウエザーストリップの成形実験を行なったところ、表2に示すような実験結果が得られた。
【0034】
【表2】
Figure 2004090412
【0035】
なお、比較例1は、金型温度170℃を基準にして生地の注入量を決めてこれを変更しない場合であり、比較例2は、金型温度190℃を基準にして生地の注入量を決めてこれを変更しない場合である。また、キャビテイ内への実注入量を測定することは困難であるので、フリーショットを行ない、この生地重量を測定することで実注入重量とした。
【0036】
表2からも明らかなように、比較例1においては、金型温度190℃において、「押され」による変形が発生が見られ、比較例2においては、金型温度170℃の場合には「ショート」、180℃の場合には「ややショート」による不良が見られたが、本発明の方法によれば、上記比較例1や比較例2に見られた「押され」や「ショート」による不良の発生は、全く見られなかった。なお、本実施例はウエザーストリップ同士の型接続成形の場合について説明したが、スポンジゴム単体からなる型成形および本実施例以外のスポンジゴム成形装置への適用が可能である。
【0037】
【発明の効果】
本発明のウエザーストリップの型接続方法及び装置には次に述べるような効果がある。
(1)請求項1のウエザーストリップの型接続方法は、金型温度に適応した量の未加硫のスポンジゴム組成物をキャビテイ内へ注入するので、キャビテイ内への未加硫のスポンジゴム組成物の供給が、加硫成形時の金型温度により変動する適性注入量に対し過不足となることが原因で起こる「押され」や「ショート」による成形不良の発生を防止することができる。また、押出し成形部に対する加工等が不要になるので、その形状設計の自由度が増加する。
(2)請求項2のウエザーストリップの型接続装置は、温度センサによって検出された金型の温度を制御装置(演算用CPU)にフィードバックすることにより、その金型温度に適応した未加硫のスポンジゴム組成物の供給量を即座に算定することができる。そして、上記算定された量の未加硫のスポンジゴム組成物を注入機構により、金型のキャビテイ内に供給することができる。
【図面の簡単な説明】
【図1】ウエザーストリップの型接続装置の概略を示す側面図。
【図2】要部の拡大図。
【図3】供給手段の概略を示す説明図。
【図4】金型に押出し成形部を組付けた状態の斜視図。
【図5】フローチャート図。
【図6】実験結果を示す表図。
【符号の説明】
1…ウエザーストリップの型接続装置、2…金型、3…供給手段、4…金型開閉手段、25…キャビテイ、31…温度センサ、32…制御装置、33…注入機構。[0001]
TECHNICAL FIELD OF THE INVENTION
According to the present invention, after setting the extruded portion of the weather strip in the cavity of the mold, an unvulcanized sponge rubber composition is injected into the cavity, and the vulcanization molding of the molded portion and the extrusion molding portion are performed. The present invention relates to a method and an apparatus for connecting a weatherstrip in which a connection is simultaneously made in a mold.
[0002]
[Prior art]
In the above-described method of connecting the mold to the weather strip, since the weather strip has a complicated cross-sectional shape and the like, and the shape of the mold is also complicated, it takes a long time to remove the mold, and the mold is removed at the time of removal. Large temperature drop. In particular, when the molded part is made of sponge rubber, it is more likely to be broken during demolding than when solid rubber is used. The temperature of the mold is remarkably reduced. For this reason, at the work site, there is a tendency that the setting of the mold temperature is set higher than necessary in anticipation of the decrease in the mold temperature.
[0003]
The volume increase of the unvulcanized sponge rubber composition due to foaming proceeding in parallel with vulcanization is greatly affected by the temperature of the mold. Shorts and push failures of the extruded parts are induced.
[0004]
Incidentally, when the relationship between the typical compounding example of the sponge rubber shown in Table 1 and the volume of the solid rubber excluding the foaming agent and the foaming aid from the compounding example and the mold temperature was tested, the results are shown in FIG. Such a result was obtained.
[0005]
[Table 1]
Figure 2004090412
[0006]
The test method was as follows. Unvulcanized dough weighed to 2 ± 0.005 g was injected into the center of the spiral cavity using a piston, and after 3.0 minutes had elapsed, the mold was opened and any position of the spiral cavity was injected. The technique of measuring whether the tip of the cloth has reached was adopted.
[0007]
As shown by the broken line in FIG. 6, in the case of a solid rubber containing no foaming agent and foaming aid, the volume is hardly affected by the mold temperature, but the foaming agent and foaming aid are blended. In the case of sponge rubber, the volume at a mold temperature of 190 ° C. was increased by about 5%, compared to the volume at a mold temperature of 170 ° C. From this fact, if the injection amount of the material is determined based on the mold temperature of 170 ° C., when the mold temperature is 190 ° C., deformation due to so-called “push” easily occurs, and conversely, the mold temperature of 190 ° C. If the injection amount of the material is determined on the basis of the above, it is easily presumed that when the mold temperature is 170 ° C., a defect due to a so-called “short” tends to occur.
[0008]
JP-A-2000-229330 discloses a "method of connecting a weather strip" as a measure against defects such as short-circuiting and pressing. In this method, a relief hole is previously recessed at the base of the extrusion molding part, the injection material is always prepared in a relatively large amount, and the overflow portion is accommodated in the relief hole, thereby preventing short-circuit and pushing failure and It also means that the work of removing overflows will be abolished.
[0009]
Japanese Patent Application Laid-Open No. 2001-239565 discloses a method of detecting the pressure of an injection nozzle section, feeding the pressure to an injection actuator operation, and stopping the injection operation to adjust the filling amount in the cavity. No. 129297 discloses a method of correcting the injection pressure after detecting the mold temperature. Further, Japanese Patent Application Laid-Open No. 6-46930 discloses a control means for calculating and calculating a preheating temperature of a molding material from a flow value of a standard material.
[0010]
[Problems to be solved by the invention]
By the way, in the method of Japanese Patent Application Laid-Open No. 2000-229330, the cross-sectional shape of the extruded portion is largely restricted, and a thin-walled shape cannot provide a relief hole having a sufficient opening. Furthermore, when a foaming reaction occurs after injection into a mold, such as sponge rubber, and the volume increases rapidly, it is practically impossible to accommodate the overflow in the escape hole, and a push occurs. .
[0011]
Further, in Japanese Patent Application Laid-Open No. 2001-239565, since a large volume increase of the sponge rubber occurs after the completion of the injection, it is meaningless to detect the nozzle pressure during the injection operation. In the first place, in the case of sponge rubber, since the injection is made smaller than the volume of the cavity in consideration of the volume increase, the initial rise in the internal pressure of the cavity is hardly observed.
[0012]
In JP-A-11-129297, there is almost no correlation between the injection pressure and the volume increase rate of the sponge rubber, so that no control effect can be found.
[0013]
In JP-A-6-46930, it is extremely difficult to control the preheating temperature. In addition, sponge rubber and the like generally have low thermal conductivity, and it is practically impossible to reach a target temperature in a short time before injection.
[0014]
The present invention has been made for the purpose of solving the problems of the above-described conventional example, and in particular, it is possible to inject a sponge rubber composition into a cavity and obtain a product such as a push or a short circuit which occurs when a product is obtained. The purpose is to suppress the occurrence.
[0015]
[Means for Solving the Problems]
According to the first aspect of the present invention, an unvulcanized sponge rubber composition is injected into the cavity after the end of the extruded portion of the weather strip is set facing the cavity of the mold, and the vulcanization of the molded portion is performed. In a method for connecting a molding and a weather strip in which a connection with an extrusion molding part is simultaneously and progressively performed in a mold,
The mold temperature is fed back to an arithmetic unit in which the correlation between the mold temperature and the volume increase rate due to foaming of the sponge rubber composition is stored in advance, and the appropriateness of the unvulcanized sponge rubber composition to be injected into the cavity is adjusted. By calculating the amount, by injecting the calculated appropriate amount of unvulcanized sponge rubber composition into the cavity,
The injection amount of the unvulcanized sponge rubber composition into the cavity is less than the appropriate injection amount that fluctuates depending on the mold temperature during vulcanization molding. The occurrence was suppressed.
[0016]
The invention of claim 2 is a mold, supply means for supplying an unvulcanized sponge rubber composition into the cavity of the mold, mold opening and closing means for closing and opening the mold, A weather strip type connection device comprising:
A temperature sensor for detecting the temperature of the mold, and a mold temperature and an unvulcanized sponge rubber composition stored in advance by feeding back the temperature of the mold detected by the temperature sensor. A control device for calculating the appropriate supply amount of the unvulcanized sponge rubber composition by applying the temperature of the mold detected by the temperature sensor to the correlation of the volume increase rate due to foaming of the product, and An unvulcanized sponge rubber composition into the mold cavity.
The amount of the unvulcanized sponge rubber composition calculated by feeding back the temperature of the mold detected by the temperature sensor to the control device is supplied into the cavity of the mold by the injection mechanism.
[0017]
BEST MODE FOR CARRYING OUT THE INVENTION
The method for connecting a mold of a weather strip according to the present invention comprises the steps of: setting an end of an extruded portion of the weather strip toward a cavity of a mold; injecting an unvulcanized sponge rubber composition into the cavity; The vulcanization molding of the portion and the connection with the extrusion molding portion are simultaneously performed in the mold. Then, the volume increase accompanying foaming proceeds in parallel with the vulcanization of the unvulcanized sponge rubber.
[0018]
The temperature of the mold is detected by a temperature sensor, and the detected mold temperature is fed back to an arithmetic unit in which a correlation between the mold temperature and a volume increase rate due to foaming of the sponge rubber composition is fed back to the arithmetic unit, and the cavity temperature is detected. An appropriate amount of the unvulcanized sponge rubber composition to be injected into the inside is calculated, and the calculated appropriate amount of the unvulcanized sponge rubber composition is injected into the cavity, thereby injecting the sponge rubber composition. In order to prevent excess or deficiency from occurring, the injection amount of the sponge rubber composition is more than the appropriate injection amount that fluctuates depending on the mold temperature during vulcanization molding, but the pressing or shorting caused by the excess or deficiency is caused. The occurrence of defects is prevented beforehand.
[0019]
FIG. 1 shows a weather strip mold connecting device 1 according to the present invention. The weather strip mold connecting device 1 includes a mold 2, supply means 3 for supplying an unvulcanized sponge rubber composition into the mold 2, and a mold for closing and opening the mold 2. Opening / closing means 4.
[0020]
The mold 2 includes a fixed mold 21 and a movable mold 22. The fixed-side mold 21 and the movable-side mold 22 are mounted on upper and lower heating plates 23 and 24 provided in the mold opening / closing means 4 and are heated by these heating plates 23 and 24. ing.
[0021]
As shown in FIG. 2 in an enlarged manner, between the fixed mold 21 and the movable mold 22, a cavity 25 and an extruded portion 41 (FIG. 4) with one end facing the cavity 25. (See FIG. 2) is provided.
[0022]
As shown in FIG. 3, the supply means 3 is stored in advance by feeding back a temperature sensor 31 for detecting the temperature of the mold 2 and a temperature of the mold 2 detected by the temperature sensor 31. A control unit 32 for calculating an appropriate supply amount of the unvulcanized sponge rubber composition by applying to a correlation equation between a mold temperature and a volume increase rate due to foaming of the unvulcanized sponge rubber composition, and the control unit And an injection mechanism 33 for supplying the unvulcanized sponge rubber composition in the amount calculated by 32 into the cavity 25 of the mold 2.
[0023]
The temperature sensor 31 is attached in a state of being inserted into a hole 27 provided in the movable mold 22 in order to detect the temperature inside the mold 2 (a part close to the cavity 25).
[0024]
The control device 32 includes a CPU (Central Processing Unit), calculates the optimal supply amount of the sponge rubber composition based on the temperature of the mold 2 detected by the temperature sensor 31, and controls the injection mechanism 33. Is controlled.
[0025]
The injection mechanism 33 includes a metering and injection cylinder 34 for supplying an unvulcanized sponge rubber composition into the cavity 25 of the mold 2, and an unvulcanized sponge rubber composition from the popper 35 to the metering and injection cylinder 34. , A motor 37 and a drive circuit 38 for driving the transport screw 36 to rotate, and a hydraulic motor 39 for driving the metering and injection cylinder 34.
[0026]
Reference numeral 40 denotes a check valve for sponge rubber contaminants provided at a connection between the transport screw 36 and the injection cylinder 34.
[0027]
The metering and injection cylinder 34 has a position detection sensor 41. The position detection sensor 41 monitors the position (amount) of the unvulcanized sponge rubber composition supplied into the measuring and pouring cylinder 34 by the transport screw 36, and when the amount reaches an appropriate amount, the motor 37 Is stopped to stop the supply of the unvulcanized sponge rubber composition, and the check valve 40 is closed.
[0028]
A hydraulic cylinder or an air cylinder is used for the mold opening / closing means 4, and the movable mold 22 is moved up and down via the lower heating plate 24.
[0029]
Next, a method of connecting a weatherstrip using the above-described weatherstrip connection device 1 will be described.
[0030]
The correlation between the mold temperature and the rate of volume increase due to foaming of the sponge rubber composition used for the molding is input to the calculation CPU of the control device 32 in advance. Then, as shown in FIG. 4, by setting the extrusion molding portion 42 in the mold 2, the preparation for using the weather strip mold connection device 1 is completed, that is, a standby state is set. Reference numeral 28 denotes a material injection port of the mold 2.
[0031]
Then, as shown in the flowchart of FIG. 5, the temperature of the mold 2 is detected by the temperature sensor 31 at the same time when the cycle is started. (Step 1)
The detected temperature of the mold 2 is fed back to the CPU of the control device 32 to calculate the supply amount of the sponge rubber composition. (Step 2)
When the supply amount of the sponge rubber composition is calculated, the motor 37 is started by the CPU of the control device 32, the conveying screw 36 is rotated, and the unfoamed sponge rubber composition is supplied to the metering and injection cylinder 34. Going charged. (Step 3)
Then, it is determined whether or not the supplied unfoamed sponge rubber composition has reached a prescribed charge amount, that is, the calculated supply amount. (Step 4)
When the prescribed charge amount is reached, the motor 37 is stopped, and the supply of the unfoamed sponge rubber composition to the metering and injection cylinder 34 is stopped. (Step 5)
When the supply of the unfoamed sponge rubber composition is stopped, the mold opening / closing means 4 starts mold clamping. (Step 6)
Then, it is detected whether or not the mold clamping has been completed. (Step 7)
When the completion of the mold clamping is detected, the injection of the unfoamed sponge rubber composition into the mold 2 by the above-mentioned metering and injection cylinder 34 is started. (Step 8)
Then, it is determined whether or not the injection of the unfoamed sponge rubber composition into the mold 2 is completed. (Step 9)
When it is detected that the injection is completed, vulcanization is started. (Step 10)
Then, it is detected whether or not the vulcanization has been completed. (Step 11)
When vulcanization is completed, mold opening is started. (Step 12)
Then, it is detected whether or not the mold opening has been completed. (Step 13) is detected.
[0032]
When it is detected that the mold opening is completed, the product is removed from the mold, the cycle ends, and the next cycle starts.
[0033]
Experimental Example A molding experiment of a sponge rubber weather strip was performed by the method of the present invention, and the experimental results shown in Table 2 were obtained.
[0034]
[Table 2]
Figure 2004090412
[0035]
Comparative Example 1 is a case where the dough injection amount is determined based on the mold temperature of 170 ° C. and is not changed, and Comparative Example 2 is a case where the dough injection amount is determined based on the mold temperature of 190 ° C. This is the case when you decide and do not change this. In addition, since it is difficult to measure the actual injection amount into the cavity, a free shot was performed, and the weight of the dough was measured to obtain the actual injection weight.
[0036]
As is clear from Table 2, in Comparative Example 1, deformation due to “push” was observed at a mold temperature of 190 ° C., and in Comparative Example 2, when the mold temperature was 170 ° C. In the case of “short” and 180 ° C., a defect due to “slightly short” was observed. However, according to the method of the present invention, the “push” and “short” observed in Comparative Example 1 and Comparative Example 2 described above. No failure was observed. Although the present embodiment has been described with respect to the case of die connection molding between weather strips, the present invention can be applied to molding of sponge rubber alone and to a sponge rubber molding apparatus other than the present embodiment.
[0037]
【The invention's effect】
The weather strip mold connecting method and apparatus of the present invention has the following effects.
(1) In the method for connecting a weather strip mold according to claim 1, since an unvulcanized sponge rubber composition in an amount adapted to the mold temperature is injected into the cavity, the unvulcanized sponge rubber composition in the cavity is injected. It is possible to prevent the occurrence of molding failure due to “push” or “short” caused by the fact that the supply of the material is too much or less than the appropriate injection amount that fluctuates depending on the mold temperature during vulcanization molding. In addition, since there is no need to process the extruded portion, the degree of freedom in shape design is increased.
(2) The weather strip mold connecting device according to the second aspect of the invention feeds back the temperature of the mold detected by the temperature sensor to the control device (CPU for calculation), so that the unvulcanized mold adapted to the mold temperature is obtained. The supply amount of the sponge rubber composition can be calculated immediately. Then, the calculated amount of the unvulcanized sponge rubber composition can be supplied into the mold cavity by the injection mechanism.
[Brief description of the drawings]
FIG. 1 is a side view schematically showing a weather strip mold connecting device.
FIG. 2 is an enlarged view of a main part.
FIG. 3 is an explanatory view schematically showing a supply unit.
FIG. 4 is a perspective view showing a state where an extrusion-molded portion is assembled to a mold.
FIG. 5 is a flowchart.
FIG. 6 is a table showing experimental results.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 ... Weather strip type | mold connection apparatus, 2 ... Die, 3 ... Supply means, 4 ... Die opening / closing means, 25 ... Cavity, 31 ... Temperature sensor, 32 ... Control device, 33 ... Injection mechanism.

Claims (2)

ウエザーストリップの押出し成形部の端部を金型のキャビテイ内に臨ませてセットした後に、キャビテイ内に未加硫のスポンジゴム組成物を注入し、型成形部の加硫成形と、押出し成形部との接続を金型内で同時進行的に行なうウエザーストリップの型接続方法において、
金型温度を、金型温度とスポンジゴム組成物の発泡による体積増加率との相関関係を予め記憶させた演算部にフィードバックして、上記金型のキャビテイ内へ注入する未加硫のスポンジゴム組成物の適正量を算出し、算出した適正量の未加硫のスポンジゴム組成物を上記金型のキャビテイ内へ注入することを特徴とするウエザーストリップの型接続方法。
After setting the end of the extruded portion of the weather strip facing the cavity of the mold, an unvulcanized sponge rubber composition is injected into the cavity, and the vulcanization molding of the molded portion and the extrusion molding portion are performed. In the method of connecting a weatherstrip that simultaneously and successively connects with a mold in a mold,
The mold temperature is fed back to an arithmetic unit in which the correlation between the mold temperature and the volume increase rate due to foaming of the sponge rubber composition is stored in advance, and the unvulcanized sponge rubber to be injected into the cavity of the mold. A method for connecting a weatherstrip to a mold, comprising calculating an appropriate amount of the composition, and injecting the calculated unvulcanized sponge rubber composition into the cavity of the mold.
金型と、該金型のキャビテイ内に未加硫のスポンジゴム組成物を供給する供給手段と、上記金型の開閉及び型締めを行なう金型開閉手段と、を備えたウエザーストリップの型接続装置であって、
上記供給手段は、上記金型の温度を検出する温度センサと、該温度センサによって検出された金型の温度をフィードバックすることにより予め記憶させてある金型の温度と未加硫のスポンジゴム組成物の発泡による体積増加率の相関関係式に上記温度センサによって検出した金型の温度を当てはめて上記金型のキャビテイへの未加硫のスポンジゴム組成物の適正な供給量を算定する制御装置と、該制御装置により算定された量の未加硫のスポンジゴム組成物を上記金型のキャビテイ内に供給する注入機構と、を備えていることを特徴とするウエザーストリップの型接続装置。
Mold connection of a weather strip comprising a mold, supply means for supplying an unvulcanized sponge rubber composition into the cavity of the mold, and mold opening / closing means for opening / closing and clamping the mold. A device,
The supply means includes: a temperature sensor for detecting the temperature of the mold; and a temperature of the mold and an unvulcanized sponge rubber composition stored in advance by feeding back the temperature of the mold detected by the temperature sensor. A control device for calculating an appropriate supply amount of an unvulcanized sponge rubber composition to the cavity of the mold by applying the temperature of the mold detected by the temperature sensor to the correlation equation of the volume increase rate due to foaming of the article. And a pouring mechanism for supplying an unvulcanized sponge rubber composition in an amount calculated by the control device into the cavity of the mold.
JP2002254651A 2002-08-30 2002-08-30 Method and apparatus for connecting mold for weather strip Pending JP2004090412A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002254651A JP2004090412A (en) 2002-08-30 2002-08-30 Method and apparatus for connecting mold for weather strip

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002254651A JP2004090412A (en) 2002-08-30 2002-08-30 Method and apparatus for connecting mold for weather strip

Publications (1)

Publication Number Publication Date
JP2004090412A true JP2004090412A (en) 2004-03-25

Family

ID=32060371

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002254651A Pending JP2004090412A (en) 2002-08-30 2002-08-30 Method and apparatus for connecting mold for weather strip

Country Status (1)

Country Link
JP (1) JP2004090412A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101534653B1 (en) * 2013-11-15 2015-07-27 주식회사 화승알앤에이 Manufacturing Method for Rubber Weather Strip and System adopting the same
EP2632678B1 (en) * 2010-10-25 2019-03-13 The R & D Factory Ltd Methods and apparatus for processing polymers

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2632678B1 (en) * 2010-10-25 2019-03-13 The R & D Factory Ltd Methods and apparatus for processing polymers
KR101534653B1 (en) * 2013-11-15 2015-07-27 주식회사 화승알앤에이 Manufacturing Method for Rubber Weather Strip and System adopting the same

Similar Documents

Publication Publication Date Title
JP4244809B2 (en) Foam injection molding method
JPH0825437A (en) Injection molding method and machine
JPH09123241A (en) Injection controlling method for screw preplasticating type injection molding machine
JP2006082300A (en) Rubber injection molding machine and rubber product manufacturing method
JP2004090412A (en) Method and apparatus for connecting mold for weather strip
JP4889574B2 (en) Control method of injection molding machine
JP2899188B2 (en) Mold clamping force control device
JP2590082Y2 (en) Injection molding equipment
JP2002018889A (en) Controlling method for semiconductor molding apparatus
JP3293425B2 (en) Injection low pressure molding method and apparatus
JP5531814B2 (en) Injection molding method
JP3265923B2 (en) Injection compression molding method and apparatus
JP3711940B2 (en) Injection molding method
US20230278270A1 (en) Injection molding machine for foam molding and method for molding foam molded product
JP2004066691A (en) Injection molding method and apparatus
JP2602189Y2 (en) Injection molding equipment
JPH11138611A (en) Injection molding device and controlling method thereof
JP3875060B2 (en) Pressure holding control method for injection molding machine
JP2006248036A (en) Injection molding method of rubber molded product
JPH07117087A (en) Injection and compression molding apparatus
JP3746992B2 (en) Injection press release method of injection molding machine
JP2001191374A (en) Method for measurement of screw type injection unit
JP3193236B2 (en) Injection molding equipment
JP2023151351A (en) Injection molding machine controller, injection molding machine, and injection molding machine control method
JPH11245271A (en) Injection control method of injection molding machine