JP2004062708A - Plant control system, plant control method, and plant information providing method - Google Patents
Plant control system, plant control method, and plant information providing method Download PDFInfo
- Publication number
- JP2004062708A JP2004062708A JP2002222350A JP2002222350A JP2004062708A JP 2004062708 A JP2004062708 A JP 2004062708A JP 2002222350 A JP2002222350 A JP 2002222350A JP 2002222350 A JP2002222350 A JP 2002222350A JP 2004062708 A JP2004062708 A JP 2004062708A
- Authority
- JP
- Japan
- Prior art keywords
- information
- building
- plant
- control
- supply pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 39
- 230000005672 electromagnetic field Effects 0.000 claims description 19
- 230000010365 information processing Effects 0.000 claims description 15
- 239000012530 fluid Substances 0.000 claims description 12
- 230000005540 biological transmission Effects 0.000 claims description 6
- 230000001939 inductive effect Effects 0.000 claims 3
- 238000004891 communication Methods 0.000 abstract description 33
- 238000010276 construction Methods 0.000 abstract description 4
- 230000003247 decreasing effect Effects 0.000 abstract 2
- 230000005684 electric field Effects 0.000 description 8
- 238000005516 engineering process Methods 0.000 description 7
- 238000010586 diagram Methods 0.000 description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 6
- 239000004020 conductor Substances 0.000 description 5
- 239000002184 metal Substances 0.000 description 5
- 238000012544 monitoring process Methods 0.000 description 4
- 229910000831 Steel Inorganic materials 0.000 description 3
- 239000000446 fuel Substances 0.000 description 3
- 238000012423 maintenance Methods 0.000 description 3
- 230000007257 malfunction Effects 0.000 description 3
- 239000000523 sample Substances 0.000 description 3
- 239000010959 steel Substances 0.000 description 3
- 238000012360 testing method Methods 0.000 description 3
- 238000009825 accumulation Methods 0.000 description 2
- 239000003570 air Substances 0.000 description 2
- 238000012546 transfer Methods 0.000 description 2
- 230000002238 attenuated effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000002035 prolonged effect Effects 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/418—Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS] or computer integrated manufacturing [CIM]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/02—Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Quality & Reliability (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- Arrangements For Transmission Of Measured Signals (AREA)
- Testing And Monitoring For Control Systems (AREA)
- Near-Field Transmission Systems (AREA)
Abstract
Description
【0001】
【発明の属する技術分野】
本発明は、プラント制御システム,プラント制御方法及びプラント情報提供方法に関する。
【0002】
【従来の技術】
プラント制御では、建物内の各設備の情報と、それらに付帯する各計測器の情報と、前記各設備及び各計測器の情報を用いて各設備の運転状態やプロセス量を制御,監視する。このような技術は例えば特開平10−307606号公報に記載されている。各装置の制御信号等の通信網は、前記建物内の各設備と、各計測装置と、各装置間を、ケーブルを接続して構成されていた。また、新たに設備の追加,計測器の追加,装置の増設を行う際にも、情報を授受するためのケーブルを布設し、通信網に接続する必要があった。
【0003】
【発明が解決しようとする課題】
上記従来の技術では、各情報を授受するためには、場合によっては数万本ともなるケーブルを布設する必要があり、費用負担が大きいことのみならず、ケーブル布設工事の完了まで建物内の各設備,各装置の試験が開始できない。
【0004】
さらに近年、プラント規模の大型化や、制御システムの高度化に伴う情報量の増加もあいまって、ケーブル布設本数が増加し、ケーブル布設工事期間,試験工程が長期化する傾向にある。
【0005】
また、プラント内設備の追加,計測器の追加,装置の追加,増設を行う際にも、新たにケーブルを布設する必要があり、かつ、作業員の安全確保,作業工程の確保を検討しなければならない。
【0006】
ところで、近年、無線LANが注目を浴びている。この無線LANを用いてプラントを遠隔制御すると、ネットワーク部を無線LANで置き換えることとなるが、必然的に高周波電波を使用することとなり、プラント機器の誤動作を招く恐れがある。また、建屋内では、壁等の障害物に電波が遮られる傾向が強く、プラント制御のような高度の信頼性が要求されるものには、誤動作の心配が解消できず、実質的に適用が不可能であった。
【0007】
本発明の目的は、プラントの運転,監視,保守等にシステムの制御の情報を確実に授受でき、尚且つ、ケーブル布設工事の費用負担を大幅に低減することが可能なプラント制御システム及びプラント制御方法を提供することにある。或いは、外部より必要とされるプラントの情報を与えることが可能なプラント情報提供方法を提供することにある。
【0008】
【課題を解決するための手段】
上記目的の少なくとも1つを達成するため、本発明では、プラント運転状態を示す運転状態信号を受取ってプラント制御の制御信号を生成し、建造物の導電性構造体,導電性の流体物供給管或いは導電性の電力供給管に高周波電流を誘起し、被誘起体を伝播路として作用させて電磁界を発生させ、運転状態信号の授受を、あるいは制御信号の授受を電磁界を利用するように構成した。
【0009】
或いは、建造物の導電性構造体,導電性の流体物供給管或いは導電性の電力供給管に高周波電流を誘起し、被誘起体を伝播路として作用させて電磁界を発生させ、さらに、プラントが格納される建屋の外に情報処理装置を配置し、制御装置と情報処理装置は電磁界を利用して情報を授受するように構成した。
【0010】
或いは、第1の建屋内に第1の制御装置を、第2の建屋内に第2の制御装置を配置し、第1の制御装置と第2の制御装置は有線で情報を授受し、第1の建屋内或いは第2の建屋内に、建造物の導電性構造体,導電性の流体物供給管或いは導電性の電力供給管に高周波電流を誘起し、被誘起体を伝播路として作用させて電磁界を発生させ、第1の制御装置と第2の制御装置は有線を利用すると共に発生した電磁界を利用して情報を授受するように構成した。
【0011】
或いは、建造物の導電性構造体,導電性の流体物供給管或いは導電性の電力供給管に高周波電流を誘起し、被誘起体を伝播路として作用させて電磁界を発生させ、プラント運転状態を示す運転状態信号の授受を電磁界を利用してなし、運転状態から情報を選択するように構成した。
【0012】
ここで、「授受」とは、例えば、「制御装置」から「情報処理装置」に情報を送る場合を含む。このように「授受」とは双方向であるもののみならず、一方向のものを含む。すなわち、情報を送る側は「授」がなされ、情報を受ける側は
「受」がなされると解釈する。
【0013】
【発明の実施の形態】
以下、エバネセント通信を用いた建物内情報提供について実施例を図面に基づいて説明する。
【0014】
まず、エバネセント通信技術の概略を説明する。エバネセント通信技術とは、無線通信路である空中伝播に用いる高周波電界のモードに、エバネセントモードを用いるものである。エバネセントモードとは、金属面で取り囲まれた導波管の形状,寸法で定まるカットオフ周波数以下の高周波数を用い、管の長さ方向に指数関数状に減衰する高周波電界によって電気エネルギーを伝えるモードである。多くの導波管では、カットオフ周波数を上回る周波数を用い、導波管の長さ方向に位相変化しながら、振幅が周期的に変化する進行波を伝播させることが知られている。エバネセントモードでは位相変化を起こさないため、指数関数状に振幅が単調減衰する安定した電場が得られることに特徴がある。
【0015】
エバネセント通信技術は、建物を導波管と見立て、建物内部にエバネセントモードを形成する。
(1)建物壁に注入された高周波電流が、壁内の鉄骨(導電性構造体),電線管(導電性の電力供給管),ガス・水道等の流体管(導電性の流体物供給管)などを誘起する。
(2)建物内で電気的に接続された鉄骨,電線管などが給電路(伝播路)として作用し、この高周波電流が各部屋の壁までエネルギーを伝える。
(3)部屋を取り囲む壁が、電磁波を発生させ、次の2つの物理現象によってエバネセント波を室内に作り出す。
(a)導波管の注入面として動作し、壁面に垂直な方向に指数的に減衰するエバネセント波を作り出す。
(b)電導体の表面に誘電体が接触した「2層表面波線路」を形成し、誘電体の中を壁面に平行方向に高周波電流が進行波として伝播し、誘電体の表面から室内に向かう壁面に垂直な方向に指数関数的に減衰するエバネセント波を作り出す。
【0016】
上記(3)(a)の電磁波挙動は、導波管のカットオフ周波数以下でのエバネセントモードであり、
「The feynman Lectures on Physics Vol.III, Chapter3 “Wave Guide”,
Feynman, Leighton and Sands, Addision−Wesley Publishing Company(1995)」に解説がある。
【0017】
上記(3)(b)の電磁波挙動は、電導体と誘電体とを組み合わせた表面波線路からのエバネセント波であり、「稲垣直樹著、“電気・電子学生のための電磁波工学”,丸善(1980)」に解説がある。
【0018】
エバネセント通信技術では、短波帯近傍の高周波を用いることにより、建物内部に所定の空中電界強度を得られ、見通しの遮られた個々の部屋への通信が可能となる。また、建物固有のカットオフ周波数以下での運用によって、建物外部への空中電界の漏洩がないため、建物毎、構造物・配管などで囲まれた空間毎に独立した通信環境を確立することが可能となる。
【0019】
図1は、上記説明のエバネセン通信の概略を、さらに詳細に説明するものであり、エバネセント通信を用いた建物内情報収集の実施例を表した図である。
【0020】
建物1は、鉄骨などの構造物2が機械的に接合されたものであり、構造物2が電気的にも接続されたものとなっている。さらに、建物1の壁内,床・天井間もしくは部屋内には、水道管93,電線管・ケーブルトレイ・ダクトなどの電導体94など、金属製のものが配置されている。
【0021】
つまり、プラントなどの構造物や配管などの金属製のもので囲われた空間であれば良いし、金属製のもので閉じて囲われていなくても、大体の周囲を囲われているものでも十分である。
【0022】
アクセスポイント(以下、親局と称す)は、建物構造物2,水道管93,電線管・ケーブルトレイ・ダクトなどの電導体94に対して高周波電流を注入し、建物1内の各部屋にエバネセントモードの電場を形成する為の電気エネルギー供給器10(以下、エキサイタと称す)と、データ・制御信号等の情報を電気エネルギーと相互変換するためのハブ11から構成されている。ハブ11は、通常LANや無線リングRANなどの、有線あるいは無線による外部ネットワークシステム97によって、建物内あるいは建物外の、通信システムあるいはサーバと接続されている。
【0023】
建物1内の各部屋には、クライアント(以下、子局と称す)がエバネセントモードの空中線電界とエネルギー交換するアンテナ(以下、プローブと称す)が接続された端末12として配置されている。図1の端末12は、ネットワークシステム97と接続された通信システムあるいはサーバとの間でデータ交換を行い、それ自身が利用者へのサービスを完結するようなデータ通信・処理機能を有する計算機システムとなっているものでも、建物1内の各設備,各計測器,各装置にプローブを内蔵しただけのものであっても、建物1内の各設備,各計測器,各装置からの信号を有線で受取ってそれらをまとめて送信するものであっても良い。
【0024】
ここで図5を用いて、プラントの制御を説明する。ここでは、蒸気発電プラントを例として挙げている。水,燃料,空気をボイラ101に供給する。ボイラ
101で発生する蒸気は蒸気流量調節弁19で調節され、図示しない蒸気供給管、さらに、蒸気流量制御弁15を順に通って、タービン102に供給される。蒸気でタービン102が回転され、回転力は図示しない発電機に伝達される。発電機で発電される電力は系統に供給される。蒸気圧力検出器17は蒸気圧力を、蒸気温度検出器18は蒸気温度を検出それぞれ検出し、その検出値は、ボイラ制御装置24に入力される。ボイラ制御装置24は蒸気圧力及び蒸気温度に基づいて、水,燃料,空気の供給量を制御する。
【0025】
ボイラ101からの蒸気によってタービン102は回転エネルギーを発生する。回転数検出器13はタービンの回転数を、蒸気温度検出器14はタービン内蒸気温度を検出それぞれ検出し、その検出値は、タービン制御装置16に入力される。タービン制御装置16はタービン回転数及び蒸気温度に基づいて、蒸気流量制御弁15を制御し、タービン回転数が一定となるように制御する。
【0026】
なお、図示しない発電機は、図示しない発電機制御装置の発電機出力指令に基づいて発電機出力要求信号により制御される。なお、これら、ボイラ制御装置
24,タービン制御装置16及び発電機制御装置(図示せず)は互いに情報を授受して協調して制御を行っている。
【0027】
ここで、蒸気圧力検出器17で検出される蒸気圧力、蒸気温度検出器18で検出される蒸気温度を、回転数検出器13で検出されるタービンの回転数,蒸気温度検出器14で検出されるタービン内蒸気温度を総称して運転状態信号と総称する。ボイラ制御装置24,タービン制御装置16及び発電機制御装置(図示せず)からプラントを制御するために出される信号を制御信号と総称する。
【0028】
図2は、エバネセント通信技術を用いた建物内の情報の流れを表した図である。なお、上記図5と符号が同じ個所は同じ意味を持つ。そのため、同じ符号が付しているものについては、適宜、説明を省略する。また、図2では、タービン制御について説明している。しかしながら、以下の説明は、図2に示されるタービン制御でも良く、或いは、図5に示されるタービン制御とボイラ制御に跨るものにも適用され得るのはもちろんである。
【0029】
金属製の構造物2で構成される建物1は、エキサイタ10,ハブ11,端末
12と、回転数検出器13,蒸気温度検出器14,蒸気流量制御弁15をはじめとする建物1内の各計測器と、制御装置16をはじめとする各装置などで構成されている。エバネセント通信技術を用いて収集された情報は、ハブ11を経由し、通常LANや無線リングRANなどのネットワークシステム97を介して、サーバなどの情報集積手段20(或いは、情報処理装置と称す。以下同様。)に接続され、通信システムなどの情報配信手段21,ネットワークシステム97を介して、需要家31に供給される。
【0030】
前述のように、建物1はエキサイタ10によってエバネセントモードの電場を形成し、建物1内の各計測器,各装置からの情報が、エキサイタ10とハブ11で構成される親局に送信される。親局への情報送信方法は、建物内の各計測器と各装置、それぞれ自身がプローブを内蔵し、それぞれ自身のみの情報を送信する方法であっても、建物内を網羅するように範囲を分けて有線または無線通信を用いて情報を収集し、いくつかに分かれた範囲それぞれの情報を送信する方法であっても良い。
【0031】
建物1で収集された各情報は、ハブ11と、有線または無線による外部ネットワークシステム97を介して、サーバなどの情報集積手段20に集積される。情報集積手段20に集積された各情報は、通信システムなどの情報配信手段21により、需要家31に提供される。ここで、情報集積手段20と、情報配信手段
21は分かれている必要はなく、情報集積配信手段としてひとつになっているものでも良い。
【0032】
需要家31は、建物1内の運転監視,物流管理,在庫管理,防災等の各システム、及び、それらのデータ記録装置や、保守サービス会社,警備会社等の、建物内の情報を必要とするシステム,装置,会社等が該当する。
【0033】
情報提供サービスのブロックを図3に示す。
【0034】
まず、情報提供サービスを行うものは、建物内、あるいは、複数の建物を有線または無線の外部ネットワークで接続したそれぞれの建物内の情報を、エバネセント通信などの無線通信を用いた通信網を構築して情報を収集できるよう、該建物の所有者と契約を交わす。
【0035】
その契約を交わす際、情報の重要度,需要家への提供必要度、等の条件で、情報に格付け,区分を行い、収集した情報の提供先の限定を行う。この契約を行うことにより、収集した情報の機密性を保つことが可能となる。また、情報を収集するにあたり、建物の所有者より課金されることも考えられるので、その場合は課金方式,課金率等についても契約を交わす。
【0036】
また、情報提供サービスを行うものは、需要家31それぞれと契約を交わしてそれぞれの需要家が必要な情報や、該情報の提供形態などを決定した上で、情報配信手段21を用いて需要家31に提供し、その内容に応じて課金方法を決める。提供情報の決定については、建物の所有者と交わした契約に基づき、情報提供サービスを行うものが提供の可否を判断し、決定しても良いし、建物の所有者が判断し、決定しても良い。さらに、需要家が利用する条件,情報使用先の限定等を契約で交わし、情報の機密性を保つ。
【0037】
ここで、情報配信手段21の行う限定は下記のとおりである。
【0038】
【0039】
すなわち、中央給電所は、表示(監視)のために、運転監視として、情報配信手段21から情報を受取るが、その情報は、発電機出力及び発電電力量に限定される。すなわち、情報配信手段は情報を選別し他の情報を中央給電所に与えることは無い。したがって、中央給電所は、情報配信手段21を介して、発電機出力及び発電電力量に相当する要求を送る。
【0040】
同様に、携帯端末12は現場操作のために、現場リモート操作として、各設備運転状況,ボイラの各プロセス量,タービンの各プロセス量,発電機の各プロセス量を情報配信手段21から受取る。情報配信手段21はその他の情報を携帯端末12に与えることは無い。なお、携帯端末12は各設備運転状況,ボイラの各プロセス量,タービンの各プロセス量及び発電機の各プロセス量を制御するための制御信号を、情報配信手段21を介して送る。
【0041】
また、データ収録装置は、発電機出力,ボイラの各プロセス量,タービンの各プロセス量発電機の各プロセス量に加え、気象条件を記録する。
【0042】
さらに、外部の保守サービス会社には、設備の不調情報,ボイラの各プロセス量,タービンの各プロセス量及び発電機の各プロセス量の情報が送られる。情報配信手段21は他の情報は制限して送ることは無い。
【0043】
収集した情報を提供するまでのブロックを図4に示す。
【0044】
情報提供サービスを行うものは、情報集積手段20に収集された情報を、情報処理機能22を用いて、需要家31それぞれが必要とする情報のみに編集する。情報処理機能22は、必要な情報のみに編集するのみならず、アナログ入力信号をコンパレータによりON−OFF信号に変換する機能,アナログ入力信号をデジタル信号に変換する機能等を有する。情報処理機能22は、それ自身が独立しているものでも、情報集積手段20、あるいは、情報配信手段21、あるいは、情報集積手段20と情報配信手段21が一つにまとまった情報集積配信手段と、統合されているものでも良い。
【0045】
情報提供サービスを行うものは、情報処理機能22により編集された情報を、リアルタイムの情報が必要とされる場合には、外部ネットワークや通信システムなどの情報配信手段21を介して、需要家31に提供し、保存された情報が必要とされる場合には、光ディスクをはじめとする記憶装置23を介して、需要家
31に提供する。
【0046】
情報提供サービスの課金方法として、建物内の情報を収集する際に交わした契約に基づく情報の格付け,収集された各情報の利用率,提供する情報量,情報の提供形態などにより、あらかじめ課金する金額を決定しておき、それらより算出された費用を需要家に課金する方法が挙げられる。また、リアルタイムに提供する情報の場合は、基本料を設定して回線の使用状況で課金する方法,月額一定で課金する方法があり、また、これら以外の方法であっても構わない。
【0047】
第2の実施例を図6を用いて説明する。上記実施例と異なる部分のみ説明する。すなわち、他の部分は上記実施例と同様である。図6に示されるように、端末12と、回転数検出器13,蒸気温度検出器14,蒸気流量制御弁15及びタービン制御装置16は互いに有線にてつながれており、いわゆる一般的なLANで通信を行っている。
【0048】
なお、回転数検出器13及び蒸気温度検出器14の等の運転状態信号に基づいてタービン制御装置16が蒸気流量制御弁等を制御する制御信号を発するが、この実施例では、運転状態信号と制御信号の両方を有線LAN通信としているが、もちろん、一方を上記説明のエバネセント通信としても良い。
【0049】
図7では、さらに、蒸気圧力検出器17,蒸気温度検出器18,燃料流量調節弁19及びボイラ制御装置24は互いに有線にてつながれており、いわゆる一般的なLANで通信を行っている。なお、運転状態信号と制御信号の一方をエバネセント通信とできるのは、図6に示す実施例と同様である。
【0050】
以上の情報提供サービスを提供する為のシステム,ネットワークを構築することにより、建物1内のケーブル本数を大幅に削減し、ケーブル工事費用の低減することが可能となるのみならず、新たに設備の追加,計測器の追加,装置の増設を行うことも容易となる。
【0051】
また、ケーブル布設工事の期間が大幅に短縮されることにもなり、建物内の各設備,各計測器,各装置等が、設置,据付けされれば、すぐに試験が開始でき、大幅な工程短縮となる。
【0052】
さらに、需要家もリアルタイムの情報、あるいは、保存された情報など、必要な時に、必要な情報を安価に入手することが可能となる。
【0053】
【発明の効果】
本発明によれば、ケーブル本数の大幅削減,ケーブル工事費用の低減,工程短縮を図ることができる。或いは、外部より必要とされるプラントの情報を与えることが可能となる。
【図面の簡単な説明】
【図1】
エバネセント通信を用いた建物内情報収集の実施例。
【図2】エバネセント通信技術を用いた建物内の情報の流れ図。
【図3】情報提供サービスのブロック図。
【図4】収集した情報を提供するまでのブロック図。
【図5】他の実施例の建物内の情報の流れ図。
【図6】さらに他の実施例の建物内の情報の流れ図。
【図7】さらに他の実施例の建物内の情報の流れ図。
【符号の説明】
1…建物、2…構造物、10…エキサイタ、11…ハブ、12…端末、13…回転数検出器、14…蒸気温度検出器、15…蒸気流量制御弁、16…制御装置、20…情報集積手段、21…情報配信手段、22…情報処理機能、23…記憶装置、31…需要家、93…水道管、94…電導体、97…ネットワークシステム。[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a plant control system, a plant control method, and a method for providing plant information.
[0002]
[Prior art]
In the plant control, the operating state and process amount of each facility are controlled and monitored using the information on each facility in the building, the information on each measuring instrument attached thereto, and the information on each facility and each measuring instrument. Such a technique is described in, for example, JP-A-10-307606. A communication network for control signals and the like of each device is configured by connecting cables between each facility in the building, each measuring device, and each device. In addition, when a new equipment is added, a measuring instrument is added, or a device is added, it is necessary to lay a cable for transmitting and receiving information and connect the cable to a communication network.
[0003]
[Problems to be solved by the invention]
In the above-mentioned conventional technology, in order to exchange each information, it is necessary to lay tens of thousands of cables in some cases, which is not only costly but also increases the cost of the cable laying work. Testing of equipment and devices cannot be started.
[0004]
Further, in recent years, the number of cables laid has increased due to an increase in the amount of information associated with an increase in the size of a plant and an advanced control system, and the cable laying work period and the test process have tended to be prolonged.
[0005]
Also, when adding equipment in the plant, adding measuring instruments, adding or adding equipment, it is necessary to lay new cables, and the safety of workers and the securing of work processes must be considered. Must.
[0006]
In recent years, wireless LANs have been receiving attention. If the plant is remotely controlled using the wireless LAN, the network unit is replaced with the wireless LAN. However, a high-frequency radio wave is inevitably used, which may cause a malfunction of plant equipment. Also, in buildings, there is a strong tendency for radio waves to be blocked by obstacles such as walls, and in applications that require a high degree of reliability, such as plant control, concerns about malfunctions cannot be eliminated, and practical application is not possible. It was impossible.
[0007]
An object of the present invention is to provide a plant control system and a plant control system capable of reliably transmitting and receiving system control information for plant operation, monitoring, maintenance, etc., and significantly reducing the cost of cable laying work. It is to provide a method. Another object of the present invention is to provide a plant information providing method capable of providing externally required plant information.
[0008]
[Means for Solving the Problems]
In order to achieve at least one of the above objects, according to the present invention, an operation state signal indicating a plant operation state is received, a control signal for plant control is generated, and a conductive structure of a building and a conductive fluid supply pipe are provided. Alternatively, a high-frequency current is induced in a conductive power supply pipe, an induced body acts as a propagation path to generate an electromagnetic field, and the transmission / reception of an operation state signal or the transmission / reception of a control signal is performed using the electromagnetic field. Configured.
[0009]
Alternatively, a high-frequency current is induced in a conductive structure of a building, a conductive fluid supply pipe or a conductive power supply pipe, and the induced body acts as a propagation path to generate an electromagnetic field. The information processing device is arranged outside the building where is stored, and the control device and the information processing device are configured to exchange information using an electromagnetic field.
[0010]
Alternatively, the first control device is disposed in the first building, the second control device is disposed in the second building, the first control device and the second control device exchange information by wire, and In the first building or the second building, a high-frequency current is induced in the conductive structure of the building, the conductive fluid supply pipe or the conductive power supply pipe, and the induced body acts as a propagation path. The first control device and the second control device transmit and receive information using the generated electromagnetic field while using a wire.
[0011]
Alternatively, a high-frequency current is induced in a conductive structure of a building, a conductive fluid supply pipe or a conductive power supply pipe, and the induced body acts as a propagation path to generate an electromagnetic field, thereby causing a plant operating state. The transmission and reception of the operation state signal indicating the above is performed using an electromagnetic field, and information is selected from the operation state.
[0012]
Here, “transfer” includes, for example, a case where information is transmitted from the “control device” to the “information processing device”. As described above, the term “transfer” includes not only two-way communication but also one-way communication. In other words, it is interpreted that the side sending the information is "give" and the side receiving the information is "give".
[0013]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, an embodiment of providing information in a building using evanescent communication will be described with reference to the drawings.
[0014]
First, an outline of the evanescent communication technology will be described. The evanescent communication technique uses an evanescent mode as a mode of a high-frequency electric field used for air propagation that is a wireless communication path. The evanescent mode is a mode in which electrical energy is transmitted by a high-frequency electric field that attenuates exponentially along the length of the tube, using a high frequency below the cutoff frequency determined by the shape and dimensions of the waveguide surrounded by a metal surface. It is. It is known that many waveguides use a frequency higher than the cutoff frequency to propagate a traveling wave whose amplitude changes periodically while changing the phase in the length direction of the waveguide. Since the evanescent mode does not cause a phase change, it is characterized in that a stable electric field whose amplitude is monotonously attenuated in an exponential function is obtained.
[0015]
Evanescent communication technology treats a building as a waveguide and creates an evanescent mode inside the building.
(1) A high-frequency current injected into a building wall is used to transmit a steel pipe (conductive structure), a conduit (conductive power supply pipe), a fluid pipe such as a gas or water supply (conductive fluid supply pipe) in the wall. ).
(2) Steel frames, conduits, and the like, which are electrically connected in the building, act as power supply paths (propagation paths), and this high-frequency current transmits energy to the walls of each room.
(3) The wall surrounding the room generates an electromagnetic wave, and generates an evanescent wave in the room by the following two physical phenomena.
(A) Operates as an injection surface of a waveguide and generates an evanescent wave that attenuates exponentially in a direction perpendicular to the wall surface.
(B) A "two-layer surface wave line" in which a dielectric is in contact with the surface of the conductor is formed, and a high-frequency current propagates as a traveling wave in the dielectric in a direction parallel to the wall surface, and enters the room from the surface of the dielectric. Creates an evanescent wave that decays exponentially in the direction perpendicular to the wall toward which it goes.
[0016]
The electromagnetic wave behavior of the above (3) (a) is an evanescent mode below the cutoff frequency of the waveguide,
"The feeman Lectures on Physics Vol. III, Chapter 3" Wave Guide ",
See Feynman, Lefton and Sands, Addition-Wesley Publishing Company (1995).
[0017]
The electromagnetic wave behavior in (3) and (b) above is an evanescent wave from a surface wave line combining a conductor and a dielectric, and is described in “Naoki Inagaki,“ Electromagnetic Wave Engineering for Electrical and Electronic Students ”, Maruzen ( 1980) ".
[0018]
In the evanescent communication technology, by using a high frequency in the vicinity of a short wave band, a predetermined aerial electric field intensity can be obtained inside a building, and communication with each room whose line of sight is blocked becomes possible. In addition, by operating below the cutoff frequency specific to the building, there is no leakage of the aerial electric field to the outside of the building, so that an independent communication environment can be established for each building and each space surrounded by structures and pipes. It becomes possible.
[0019]
FIG. 1 is a diagram for explaining the outline of the evanescent communication described above in further detail, and is a diagram showing an embodiment of information collection in a building using evanescent communication.
[0020]
The building 1 is a structure in which a
[0021]
In other words, it is sufficient if the space is enclosed by a metal object such as a structure such as a plant or piping, or even if it is not enclosed and enclosed by a metal object, it can be an object that is almost surrounded It is enough.
[0022]
An access point (hereinafter, referred to as a master station) injects a high-frequency current into a
[0023]
In each room in the building 1, a client (hereinafter, referred to as a slave station) is disposed as a terminal 12 to which an antenna (hereinafter, referred to as a probe) that exchanges energy with an evanescent mode antenna electric field is connected. The terminal 12 shown in FIG. 1 exchanges data with a communication system or server connected to the
[0024]
Here, the control of the plant will be described with reference to FIG. Here, a steam power plant is taken as an example. Water, fuel and air are supplied to the
[0025]
The steam from the
[0026]
The generator (not shown) is controlled by a generator output request signal based on a generator output command from a generator control device (not shown). The
[0027]
Here, the steam pressure detected by the
[0028]
FIG. 2 is a diagram illustrating a flow of information in a building using the evanescent communication technology. The parts having the same reference numerals as those in FIG. 5 have the same meaning. Therefore, the description of the components denoted by the same reference numerals will be appropriately omitted. FIG. 2 illustrates turbine control. However, the following description may, of course, be applied to the turbine control shown in FIG. 2, or to the turbine control and the boiler control shown in FIG. 5.
[0029]
The building 1 composed of the
[0030]
As described above, the building 1 forms an evanescent mode electric field by the
[0031]
Information collected in the building 1 is accumulated in the information accumulation means 20 such as a server via the
[0032]
The
[0033]
FIG. 3 shows a block diagram of the information providing service.
[0034]
First, those that provide information provision services construct a communication network using wireless communication such as evanescent communication by using information in a building or in each building where multiple buildings are connected by a wired or wireless external network. A contract with the owner of the building to collect the information.
[0035]
When the contract is made, the information is classified and classified based on the importance of the information, the necessity of providing the information to the customer, and the like, and the provision destination of the collected information is limited. By making this contract, the confidentiality of the collected information can be maintained. In collecting information, it is conceivable that the building owner may charge a fee. In such a case, a contract is also made with respect to a charging method, a charging rate, and the like.
[0036]
In the information providing service, a contract is made with each of the
[0037]
Here, the limitations performed by the information distribution means 21 are as follows.
[0038]
[0039]
That is, the central power supply station receives information from the information distribution means 21 for display (monitoring) as operation monitoring, but the information is limited to the generator output and the generated power amount. That is, the information distribution means does not select the information and does not provide other information to the central power supply station. Therefore, the central power supply station sends a request corresponding to the generator output and the generated power amount via the
[0040]
Similarly, the
[0041]
The data recording device records the weather conditions in addition to the generator output, each process amount of the boiler, each process amount of the turbine, and each process amount of the generator.
[0042]
Further, information on equipment malfunction, each process amount of the boiler, each process amount of the turbine, and information of each process amount of the generator are sent to an external maintenance service company. The information distribution means 21 does not transmit other information with restriction.
[0043]
FIG. 4 shows a block until the collected information is provided.
[0044]
The information providing service edits the information collected by the information collecting means 20 into only information required by the
[0045]
The information providing service provides the information edited by the information processing function 22 to the
[0046]
As a charging method for the information providing service, charging is performed in advance based on a rating of information based on a contract signed when collecting information in the building, a usage rate of the collected information, an amount of information to be provided, an information providing form, and the like. There is a method in which the amounts are determined, and the cost calculated from the amounts is charged to the customer. In the case of information provided in real time, there are a method of setting a basic fee and charging based on the use status of the line, a method of charging a fixed monthly fee, and a method other than these.
[0047]
A second embodiment will be described with reference to FIG. Only parts different from the above embodiment will be described. That is, other portions are the same as those in the above-described embodiment. As shown in FIG. 6, the terminal 12, the
[0048]
It should be noted that the
[0049]
In FIG. 7, the
[0050]
By constructing a system and network for providing the above information providing services, not only can the number of cables in the building 1 be significantly reduced and the cost of cable construction be reduced, but also new facilities can be installed. It becomes easy to add more, add measuring instruments, and add more devices.
[0051]
In addition, the time required for cable laying work is greatly reduced, and once the equipment, measuring instruments, and devices in the building are installed and installed, the test can be started immediately, and a large number of processes can be performed. It will be shortened.
[0052]
Further, the customer can obtain necessary information at a low cost when necessary, such as real-time information or stored information.
[0053]
【The invention's effect】
ADVANTAGE OF THE INVENTION According to this invention, the number of cables can be reduced sharply, cable construction cost can be reduced, and a process can be shortened. Alternatively, it is possible to provide information on a plant required from outside.
[Brief description of the drawings]
FIG.
An example of information collection in a building using evanescent communication.
FIG. 2 is a flow chart of information in a building using evanescent communication technology.
FIG. 3 is a block diagram of an information providing service.
FIG. 4 is a block diagram up to providing collected information.
FIG. 5 is a flow chart of information in a building according to another embodiment.
FIG. 6 is a flow chart of information in a building according to still another embodiment.
FIG. 7 is a flow chart of information in a building according to still another embodiment.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 ... Building, 2 ... Structure, 10 ... Exciter, 11 ... Hub, 12 ... Terminal, 13 ... Rotation speed detector, 14 ... Steam temperature detector, 15 ... Steam flow control valve, 16 ... Control device, 20 ... Information Integration means, 21 information distribution means, 22 information processing function, 23 storage device, 31 consumer, 93 water pipe, 94 electric conductor, 97 network system.
Claims (10)
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2002222350A JP2004062708A (en) | 2002-07-31 | 2002-07-31 | Plant control system, plant control method, and plant information providing method |
CNA031220959A CN1472609A (en) | 2002-07-31 | 2003-04-24 | Factory running system and method and information supply thereof |
KR1020030052555A KR20040012534A (en) | 2002-07-31 | 2003-07-30 | Plant control system, plant control method and plant information providing method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2002222350A JP2004062708A (en) | 2002-07-31 | 2002-07-31 | Plant control system, plant control method, and plant information providing method |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2004062708A true JP2004062708A (en) | 2004-02-26 |
Family
ID=30437688
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2002222350A Pending JP2004062708A (en) | 2002-07-31 | 2002-07-31 | Plant control system, plant control method, and plant information providing method |
Country Status (3)
Country | Link |
---|---|
JP (1) | JP2004062708A (en) |
KR (1) | KR20040012534A (en) |
CN (1) | CN1472609A (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4743508B2 (en) * | 2005-11-29 | 2011-08-10 | 横河電機株式会社 | Plant control system |
JP7206063B2 (en) * | 2018-07-09 | 2023-01-17 | 三菱重工業株式会社 | Plant operation method, controller and program |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0389089A (en) * | 1989-08-30 | 1991-04-15 | Matsushita Electric Ind Co Ltd | Device for detecting opening and closing of gas valve |
JPH0439483A (en) * | 1990-06-04 | 1992-02-10 | Kubota Corp | Underground buried pipe |
JPH05116871A (en) * | 1991-10-25 | 1993-05-14 | Toshiba Erebeeta Technos Kk | Indicator for information of elevator cage |
JPH09200872A (en) * | 1996-01-24 | 1997-07-31 | Toshiba Corp | Plant monitor and control equipment |
JP2000278189A (en) * | 1999-03-25 | 2000-10-06 | Yasuto Takeuchi | Indoor radio system utilizing space under floor as propagation means |
JP2000286759A (en) * | 1999-03-30 | 2000-10-13 | Tokyo Densetsu Service Kk | Method for induction type information transmission in telephone tunnel and its system |
JP2002006941A (en) * | 2000-06-22 | 2002-01-11 | Ishikawajima Harima Heavy Ind Co Ltd | Process control system |
JP2002509307A (en) * | 1997-12-16 | 2002-03-26 | エー・ティー・エル モニターズ リミテッド | Telemetry system |
-
2002
- 2002-07-31 JP JP2002222350A patent/JP2004062708A/en active Pending
-
2003
- 2003-04-24 CN CNA031220959A patent/CN1472609A/en active Pending
- 2003-07-30 KR KR1020030052555A patent/KR20040012534A/en not_active Application Discontinuation
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0389089A (en) * | 1989-08-30 | 1991-04-15 | Matsushita Electric Ind Co Ltd | Device for detecting opening and closing of gas valve |
JPH0439483A (en) * | 1990-06-04 | 1992-02-10 | Kubota Corp | Underground buried pipe |
JPH05116871A (en) * | 1991-10-25 | 1993-05-14 | Toshiba Erebeeta Technos Kk | Indicator for information of elevator cage |
JPH09200872A (en) * | 1996-01-24 | 1997-07-31 | Toshiba Corp | Plant monitor and control equipment |
JP2002509307A (en) * | 1997-12-16 | 2002-03-26 | エー・ティー・エル モニターズ リミテッド | Telemetry system |
JP2000278189A (en) * | 1999-03-25 | 2000-10-06 | Yasuto Takeuchi | Indoor radio system utilizing space under floor as propagation means |
JP2000286759A (en) * | 1999-03-30 | 2000-10-13 | Tokyo Densetsu Service Kk | Method for induction type information transmission in telephone tunnel and its system |
JP2002006941A (en) * | 2000-06-22 | 2002-01-11 | Ishikawajima Harima Heavy Ind Co Ltd | Process control system |
Also Published As
Publication number | Publication date |
---|---|
CN1472609A (en) | 2004-02-04 |
KR20040012534A (en) | 2004-02-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103038606B (en) | Intelligent core engine | |
JP6011987B2 (en) | Remote meter reading system, relay master station | |
EP1850500B1 (en) | Data recording and control system with wireless data transmission and electrical power distribution networks and method therefor | |
JP5576498B2 (en) | Power management system and power management method | |
US20030218549A1 (en) | Powerline communications system for providing multiple services to isolated power generating plants | |
EP1369975A2 (en) | Monitoring and control system for a power distribution panel switchgear | |
Judge et al. | Secure transmission lines monitoring and efficient electricity management in ultra-reliable low latency industrial internet of things | |
JP7132988B2 (en) | housing | |
US9129517B2 (en) | Method and apparatus for collecting data from automatic meter reading for smart power grid | |
JP2004062708A (en) | Plant control system, plant control method, and plant information providing method | |
KR101194567B1 (en) | Home Network System based on Machine to Machine Communication and Using Method thereof | |
Adebisi et al. | Narrowband PLC channel modelling for smart grid applications | |
KR20140076037A (en) | Demand-side distributed power generation integrated energy management | |
KR102174594B1 (en) | Smart gateway system | |
CN105490710B (en) | A kind of cable tunnel communication system based on LTE WiMAX | |
JP2004030496A (en) | Device and method for process control | |
JP5346222B2 (en) | Remote meter reading system | |
CN203868703U (en) | Pipeline monitoring system based on meshed optical fiber sensor | |
CN206818830U (en) | A kind of extra-high video sensor drawn game portion discharge on-line monitoring system | |
JP2016539531A (en) | In-house management of home area network | |
JP2007011675A (en) | Central monitoring system | |
US20120327791A1 (en) | Apparatus and method for enhancing wireless mesh network communications | |
JP2004030495A (en) | Measurement method and measurement system | |
CN103968257A (en) | Pipeline monitoring system based on meshing optical fiber sensor and method of pipeline monitoring system | |
JP2004236056A (en) | Power line carrier communication system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20040212 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20050926 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20051004 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20051205 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20060104 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20060306 |
|
RD01 | Notification of change of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7421 Effective date: 20060419 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20061121 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20070410 |