JP2004037262A - Target tracking system - Google Patents

Target tracking system Download PDF

Info

Publication number
JP2004037262A
JP2004037262A JP2002194963A JP2002194963A JP2004037262A JP 2004037262 A JP2004037262 A JP 2004037262A JP 2002194963 A JP2002194963 A JP 2002194963A JP 2002194963 A JP2002194963 A JP 2002194963A JP 2004037262 A JP2004037262 A JP 2004037262A
Authority
JP
Japan
Prior art keywords
observation
vector
target
covariance matrix
smoothing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2002194963A
Other languages
Japanese (ja)
Other versions
JP3750855B2 (en
Inventor
Akio Yamaya
山家 明男
Hidehiko Fujii
藤井 秀彦
Ryoji Maekawa
前川 良二
Masayoshi Ito
系 正義
Yoshio Kosuge
小菅 義夫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP2002194963A priority Critical patent/JP3750855B2/en
Publication of JP2004037262A publication Critical patent/JP2004037262A/en
Application granted granted Critical
Publication of JP3750855B2 publication Critical patent/JP3750855B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Radar Systems Or Details Thereof (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To precisely maintain a tracking state, even when all regions where targets exist can not be observed simultaneously. <P>SOLUTION: Tracking processing is performed at each observation time of day or at each observation region, by providing a second delay means 10 for delaying a smoothed vector and a smoothing error covariance matrix, and an extraporation processing means 11 for extraporation-predicting these delayed outputs up to the current observation time, and performing tracking (gate) processing 13 using either a predicted vector or an extraporation-predicted vector. Consequently, precise tracking processing can be performed even when observed vectors of all the targets can not obtained at identical time. In addition, it is unnecessary to wait for observed vectors of all the targets to arrive, even in the same sampling section. <P>COPYRIGHT: (C)2004,JPO

Description

【0001】
【発明の属する技術分野】
この発明は、レーダ等のセンサから得られる複数の移動体目標の追尾を行う目標追尾装置に関するものである。
【0002】
【従来の技術】
センサによって得られる複数の目標を、その位置の観測値に基づいて追尾するために、各目標の前時刻の運動諸元にもとづく推定演算の結果により、現時刻における目標の位置を予測し、さらに各目標に対する現時刻の観測値の存在期待領域(ゲート)を算出して、上記ゲート内に実際に取得された観測値と各目標との対応を判定(得られた観測目標が真に予測した目標と一致しているか否か)する相関処理が行われる。
【0003】
ここで、実際の観測時には、センサが目標の観測値以外の誤信号を検出したり、逆に目標の観測に失敗して目標の観測値が得られなかったりすることがある。また、複数の目標が密集していると、一つの目標のゲート内に、複数の目標の観測値が得られる場合がある。このような状況においても、各目標を見失うことなく、正しく追尾を維持していくためには、どの観測値がどの目標のものであるかの判定(相関処理)を精度良く行う必要がある。
【0004】
図5は例えば、T.E.Fortmann, Y.Bar−Shalom and M.Scheffe,“Mul ti−TargetTracking Using Joint Probabilistic Data Association”,Proceedings of the 1980 IEEE Conference on Decision and Controlの中で“Joint Probabilistic Data Association”として示された従来の目標追尾装置の構成図である。
【0005】
図5において、1は目標を観測し目標の位置情報を観測値として出力(任意の時間間隔でデータをサンプリング)する目標観測装置(具体例としては例えばレーダ装置)、3は予測処理部2(後述)の算出した予測ベクトル(予測位置と予測速度ベクトル)と予測誤差共分散を使用して観測値から追尾目標の存在確率分布を表す残差共分散行列を算出し、目標の存在の可能性のある領域(目標存在領域)の中にある観測値を追尾目標と相関の可能性があるとして選択するゲート処理部である。
4は観測値と追尾目標との対応付けの相関仮説を生成し、追尾目標の存在確率分布に基づいて各相関仮説の成立する確率を仮説信頼度として算出し、さらに、各観測値が各追尾目標と相関する確率を探知データ相関信頼度として算出する相関処理部、5は上記探知データ相関信頼度と、上記ゲート処理部3からの残差ベクトル(目標の観測位置ベクトルと予測位置ベクトルの差ベクトル)および残差共分散行列と、予測処理部2からの予測誤差共分散行列とに基づいて、現サンプリング時刻の目標位置、速度等の推定値である平滑ベクトルおよび平滑誤差共分散行列を算出する平滑処理部で、これらは外部に出力され図示しない表示装置などで利用される。
【0006】
6は平滑ベクトルおよび平滑誤差共分散を次サンプリング時刻まで保持する遅延回路である。2は現サンプリング時刻より1サンプリング時刻前に算出し、遅延回路6から遅延して出力された平滑ベクトルと平滑誤差共分散行列を基に、現時刻の目標位置、速度の推定値である予測ベクトルと、予測誤差の評価量である予測誤差共分散行列を算出する予測処理部である。
【0007】
図5のものの動作を説明する前に、目標追尾装置7に実装された追尾アルゴリズムの理論的な前提となる運動モデルおよび観測モデルについて述べる。
今、L個の目標cを追尾しているとする。目標c(c=1,2,...,L)の運動モデルを次式で定義する。
【0008】
【数1】

Figure 2004037262
【0009】
状態ベクトルの真値は、例えばx−y−z直交座標系における位置と速度からなる場合、次式のように書くことが出来る。なお、Tは行列の転置を意味する。
【0010】
【数2】
Figure 2004037262
【0011】
状態ベクトルの推移行列は次式で与えられる。I(n)はn行n列の単位ベクトルである。
【0012】
【数3】
Figure 2004037262
【0013】
駆動雑音ベクトルは、平均と共分散行列が次式を満たす6変量白色正規分布に従う。
【0014】
【数4】
Figure 2004037262
【0015】
目標観測装置1による、目標cよりの探知データである観測ベクトルを表現した観測モデルを次式で定義する。
【0016】
【数5】
Figure 2004037262
【0017】
観測雑音ベクトルは、平均と共分散行列が次式を満たす3変量白色正規分布に従う。
【0018】
【数6】
Figure 2004037262
【0019】
時刻tkまでに得られた観測ベクトル全体の集合をZ kと表す。M kをZ kに対応する時刻tkまでの観測ベクトル数の情報とする。
【0020】
なお、誤信号(クラッタなどの追尾目標以外からの信号)は空間に一様分布し、誤信号から得られる観測ベクトルの個数はポアソン分布に従うとし、時刻tkにおける単位体積あたりの平均個数をβFT kと設定する。
【0021】
次に、図5のものの動作を説明する。
以下の説明で、Pr[.]は確率、Pr[.|.]は条件付き確率、E[.]は平均、
E[.|.]は条件付き平均を表す。
時刻tkにおいて、目標観測装置1から観測ベクトルzk,j (j = 1,2,...)が入力されると、予測処理部2に遅延回路6からすべての目標に対する前時刻tk−1の平滑ベクトルと平滑誤差共分散行列が入力され、次式に従って、各目標cの現時刻tkに対する予測ベクトルと予測誤差共分散行列を算出する。
【0022】
【数7】
Figure 2004037262
【0023】
次にゲート処理部3が、各目標の予測ベクトルと予測誤差共分散行列を入力とし、各目標対応の観測ベクトルの存在確率分布である残差共分散行列を算出する。存在確率分布に対して所定のしきい値を設定し、これを越える範囲より求めた目標存在領域をゲートと呼ぶ。
【0024】
【数8】
Figure 2004037262
【0025】
次に、各目標ごとにその目標のゲート内に存在するすべての観測ベクトルを選びだすことにより、各目標に相関可能な観測ベクトルを決定する。すなわち、各目標cに対して次式を満たす観測ベクトルを選択する。
【0026】
【数9】
Figure 2004037262
【0027】
現時刻tkにおいて、全目標(L個)に対して、ゲート処理部3で選択された観測ベクトルの集合を次のように表す。
【0028】
【数10】
Figure 2004037262
【0029】
次に、相関処理部で各目標と観測ベクトルとの相関に関する仮説を洗い出す。複数の目標が近接していたり、目標以外からの不要信号も発生するような環境では、どの観測ベクトルがどの目標のものであるのかを判定する必要がある。
目標追尾におけるこの機能を相関と言う。ここで、相関の仮説とは、得られた観測ベクトルと追尾目標とを1対1に対応づけたものである。仮説の総数をIk個とし、仮説の全体を以下のように表す。
【0030】
【数11】
Figure 2004037262
【0031】
各仮説は、以下のように行列表示する。行列の各要素は1または0である。ただし、下記行列の第1列(L=0)は観測ベクトルが不要信号であることを示すための列である。
【0032】
【数12】
Figure 2004037262
【0033】
各仮説の行列は以下の3つの基準を同時に満たすものをすべて導出する。
1 観測ベクトルが目標のソフトウェアゲート内に存在する場合のみ両者を対応づけることができる。
2 各追尾目標には高々1つの観測ベクトルが相関する。
3 各観測ベクトルには1つの追尾目標または不要信号が対応する。
【0034】
例えば、2目標を追尾していて、時刻tkで、目標1のゲート内に観測ベクトルz1、z2を得て、目標2のゲート内にz2を得た場合を考える。なお。z2は目標1のゲート内にも目標2のゲート内にも入っているという状況である。この状況で相関の仮説を洗い出すと以下の4つの仮説が得られる。
【0035】
【数13】
Figure 2004037262
【0036】
仮説1が表しているのは、目標1が観測ベクトルz1と相関し、目標2が観測ベクトルz2と相関するという仮説である。
仮説2が表しているのは、目標1が観測ベクトルz2と相関し、目標2は相関する観測ベクトルがなく、観測ベクトルz1は不要信号であるという仮説である。
仮説3が表しているのは、目標1は相関する観測ベクトルがなく、目標2が観測ベクトルz2と相関し、観測ベクトルz1は不要信号であるという仮説である。
仮説4が表しているのは、2目標とも相関する観測ベクトルがなく、観測ベクトルはz1,z2とも不要信号であるという仮説である。
このようにして得られた各仮説に対して、追尾目標の識別を次式で定義する。
【0037】
【数14】
Figure 2004037262
【0038】
これは追尾目標が探知されたか否かの識別結果を示し、仮説における目標への観測ベクトルの関連付けに応じて次式の値となる。
【0039】
【数15】
Figure 2004037262
【0040】
また、仮説における観測ベクトルの識別を式(22)で定義する。
次式は、観測ベクトルが追尾目標からの信号であるか、不要信号であるかの識別結果を示し、仮説における観測ベクトルの関連付けに応じて次式の値となる。
【0041】
【数16】
Figure 2004037262
【0042】
また、各仮説において、不要信号よりの観測ベクトルの総数を式(24)で表す。
【0043】
【数17】
Figure 2004037262
【0044】
各仮説の成立する確率(仮説信頼度)を次式に基づいて算出する。
【0045】
【数18】
Figure 2004037262
【0046】
続いて、上記仮説信頼度を用いて、各観測ベクトルが追尾目標と相関する確率を探知データ相関信頼度として以下のように計算する。
【0047】
【数19】
Figure 2004037262
【0048】
次に、平滑処理部5において、予測処理部2より予測誤差共分散行列を入力し、ゲート処理部3より残差ベクトルと残差共分散行列を入力し、相関処理部4より探知データ相関信頼度を入力し、各目標の平滑ベクトルおよび平滑誤差共分散行列を次式に従い算出する。この結果は外部に出力されて図示しない表示装置などで利用される。
【0049】
【数20】
Figure 2004037262
【0050】
なお、ゲート内に探知データを捕えられなかった目標については、平滑処理部5において次式を実行し、予測処理の結果をそのまま平滑結果とする。この処理をメモリトラックと呼ぶ。
【0051】
【数21】
Figure 2004037262
【0052】
以上のように算出された平滑ベクトルおよび平滑誤差共分散行列は、外部へ出力され、図示しない表示システムなどにより追尾目標の特性として表示されるとともに、上記に説明した以後の処理に用いるため、遅延回路6に入力され保持される。
【0053】
目標観測装置1から全目標を観測した観測ベクトルが入力されるたびに、上記一連の動作を追尾終了まで繰り返す。
【0054】
【発明が解決しようとする課題】
従来の目標追尾装置においては、各サンプリング時刻において全追尾目標が同時に観測されることを想定してシステムが構成されている。しかし実際には、目標の存在する領域全体を同時には観測できない場合があり、その場合には、例えば、目標存在領域を覆うために目標存在領域を複数に分割して、レーダビームをこの分割領域ごとに照射し、その照射領域ごとに時分割に観測値が得られる。このように、全追尾目標の観測値が時分割に得られることは従来の目標追尾装置では想定していないので、このような場合には、精度よく追尾状態を維持することが出来ないと言う課題があった。
この発明は上記のような課題を解決するためになされたもので、追尾処理に必要な観測情報が同一時刻に得られない場合にも、精度良く追尾を維持できる目標追尾装置を得ることを目的としている。
【0055】
【課題を解決するための手段】
この発明の目標追尾装置は、任意の時間間隔で複数の目標の位置を空間内で観測し、前記各観測ごとに前記目標の位置観測値を出力する目標観測手段、
入力されたデータを用いて前記空間内における前記目標の位置の存在確率分布を算出し、前記位置観測値の内から前記存在確率の高い領域の中にある前記位置観測値を選択して、その残差ベクトルと残差共分散行列とを出力するゲート処理手段、
前記選択した位置観測値と前記目標の位置との相関仮説を生成するとともに、前記残差共分散行列に基づいて各相関仮説の成立する確率を仮説信頼度として算出し、さらに、各観測値が各目標の位置と相関する確率を探知データ相関信頼度として算出する相関処理手段、
少なくとも前記探知データ相関信頼度と、前記残差ベクトルおよび残差共分散行列とを用いて、現観測時刻の前記目標の位置と速度の推定値である平滑ベクトルと、平滑誤差の評価量である平滑誤差共分散行列とを算出し、外部に出力する平滑処理手段、
前記平滑処理手段の出力を次の観測時刻まで保持し、遅延して出力する第1の遅延手段、
前記第1の遅延手段から出力される前記位置観測値の平滑ベクトルと前記平滑誤差共分散を基に、現観測時刻の予測ベクトル、および予測誤差共分散行列を算出する予測処理手段、
前記第1の遅延手段の出力した前記平滑ベクトルと前記平滑誤差共分散行列とを保持し遅延して出力する第2の遅延手段、
前記第2の遅延手段の出力した前記平滑ベクトルと前記平滑誤差共分散行列を現観測時刻まで外挿予測し、外挿予測ベクトルおよび外挿予測誤差共分散行列を算出する外挿処理手段、
前記予測処理手段の算出した前記予測ベクトルと予測誤差共分散行列、または前記外挿処理手段の算出した前記外挿予測ベクトルと外挿予測誤差共分散行列とのいずれか一方を前記ゲート処理手段と前記平滑処理手段とに入力する第2の入力手段とを備えたものである。
【0056】
また、任意の時間間隔で複数の目標の位置を空間内で観測し、前記各観測ごとに前記目標の位置観測値を出力する目標観測手段、
入力されたデータを用いて前記空間内における前記目標の位置の存在確率分布を算出し、前記位置観測値の内から前記存在確率の高い領域の中にある前記位置観測値を選択して、その残差ベクトルと残差共分散行列とを出力するゲート処理手段、
前記選択した位置観測値と前記目標の位置との相関仮説を生成するとともに、前記残差共分散行列に基づいて各相関仮説の成立する確率を仮説信頼度として算出し、さらに、各観測値が各目標の位置と相関する確率を探知データ相関信頼度として算出する相関処理手段、
少なくとも前記探知データ相関信頼度と、前記残差ベクトルおよび残差共分散行列とを用いて、現観測時刻の前記目標の位置と速度の推定値である平滑ベクトルと、平滑誤差の評価量である平滑誤差共分散行列とを算出し、外部に出力する平滑処理手段、
前記平滑処理手段の出力を次の観測時刻まで保持し、遅延して出力する第1の遅延手段、
前記第1の遅延手段から出力される前記位置観測値の平滑ベクトルと前記平滑誤差共分散を基に、現観測時刻の予測ベクトル、および予測誤差共分散行列を算出する予測処理手段、
前記第1の遅延手段から出力された前記平滑ベクトルと前記平滑誤差共分散行列とを分離して出力する第1の入力手段、
前記平滑誤差共分散行列を現サンプリング区間内の任意の時刻まで外挿処理を行い外挿予測誤差共分散行列を算出する誤差共分散外挿処理手段、
前記平滑ベクトルと前記誤差共分散行列とを保持し遅延して出力する第2の遅延手段、
前記第2の遅延手段の出力した前記平滑ベクトルを現観測時刻まで外挿予測し、外挿予測ベクトルを算出する位置外挿処理手段、
前記予測処理手段からの予測ベクトルと上記誤差共分散外挿処理手段からの外挿予測誤差共分散行列、または、上記位置外挿処理手段からの外挿予測ベクトルと上記第2の遅延手段からの外挿予測誤差共分散行列のいずれか一方を前記ゲート処理手段と前記平滑処理手段とに入力する第2の入力手段を備えたものである。
【0057】
また、任意の時間間隔で複数の目標の位置を空間内で観測し、前記各観測ごとに前記目標の位置観測値を出力する目標観測手段、
入力されたデータを用いて前記空間内における前記目標の位置の存在確率分布を算出し、前記位置観測値の内から前記存在確率の高い領域の中にある前記位置観測値を選択して、その残差ベクトルと残差共分散行列とを出力するゲート処理手段、
前記選択した位置観測値と前記目標の位置との相関仮説を生成するとともに、前記残差共分散行列に基づいて各相関仮説の成立する確率を仮説信頼度として算出し、さらに、各観測値が各目標の位置と相関する確率を探知データ相関信頼度として算出する相関処理手段、
少なくとも前記探知データ相関信頼度と、前記残差ベクトルおよび残差共分散行列とを用いて、現観測時刻の前記目標の位置と速度の推定値である平滑ベクトルと、平滑誤差の評価量である平滑誤差共分散行列とを算出し、外部に出力する平滑処理手段、
前記平滑処理手段の出力を次の観測時刻まで保持し、遅延して出力する第1の遅延手段、
前記第1の遅延手段から出力される前記位置観測値の平滑ベクトルと前記平滑誤差共分散を基に、現観測時刻の予測ベクトル、および予測誤差共分散行列を算出する予測処理手段、
前記平滑ベクトルと平滑誤差共分散行列とを現サンプリング区間内の任意の時刻まで外挿予測し、外挿予測ベクトルおよび外挿予測誤差共分散行列を算出する外挿処理手段、
前記外挿予測ベクトルおよび外挿予測誤差共分散行列を保持する第2の遅延手段、
前記外挿処理手段または前記第2の遅延手段のいずれか一方から出力した前記外挿予測ベクトルと前記外挿予測誤差共分散行列を前記ゲート処理手段および前記平滑処理手段に入力する第2の入力手段を備えたものである。
【0058】
また、前記目標観測手段が異なる時刻に観測した複数の観測値を蓄積してから出力する観測値蓄積手段、
前記複数の観測値に対して、これらが同一時刻に得られたとみなすための1つの観測時刻を決定する観測時刻決定手段を備えたものである。
【0059】
【発明の実施の形態】
従来の目標追尾装置では、サンプリング時刻tkにおいて、全追尾目標を同一時刻に観測した観測ベクトルが同時に得られると想定していた。本発明の目標追尾装置は、これをより現実的な場合に対応するために、全追尾目標が時分割に観測され、観測値が入力されるたびに目標追尾装置が動作するように構成する。このために、時刻について以下の記述を導入する。
目標観測装置は、時刻tkから時刻tk+1の1サンプリング区間で全目標を観測する。1サンプリング区間は一定間隔でなくてもよい。追尾目標数や必要な追尾精度に応じて変えてもよい。目標観測装置は1サンプリング区間の間に全追尾目標を観測するために、目標が存在すると思われる領域(追尾目標の周辺)をUk個の領域に分けて順に観測するとする。このとき、時刻tkから時刻tk+1の間における各領域ごとの観測時刻をtk,u、(u=1,2,...,Uk)と書く。例えば、目標観測装置がレーダであれば、追尾目標の周辺にUk本のレーダビームを順に照射して全追尾目標を観測したと考える。このとき、時刻に関して次式が成立するとする。
なお、記述の都合上tk,0=tk−1,Uk−1とする。
【0060】
【数22】
Figure 2004037262
【0061】
実施の形態1.
図1はこの発明の実施の形態1の目標追尾装置の構成を示す構成図である。
図1において、1は移動体の位置を観測するセンサである目標観測装置(目標観測手段)、17は目標追尾装置である。
目標追尾装置17内において、8は現観測時刻より1観測時刻前に算出しておいた第1の遅延回路からの平滑ベクトルおよび平滑誤差共分散を基に現観測時刻の目標位置、速度の推定値である予測ベクトルおよび予測誤差の評価量である予測誤差共分散を算出する予測処理部(予測処理手段)、9は第1の遅延回路16より入力される平滑ベクトルと平滑誤差共分散行列を第2の遅延回路10に入力する第1の入力部、10は第1の入力部9から送られてくる平滑ベクトルおよび平滑誤差共分散行列を保持する第2の遅延回路(第2の遅延手段)である。
11は第2の遅延回路10からの平滑ベクトルおよび平滑誤差共分散行列を現観測時刻まで外挿予測する外挿処理部(外挿処理手段)、12は、予測処理部8あるいは外挿処理部11のいずれかからの外挿予測ベクトルおよび外挿予測誤差共分散行列をゲート処理部13および平滑処理部15に入力する第2の入力部(第2の入力手段)、13は外挿予測ベクトルおよび外挿予測誤差共分散を使用して追尾目標の存在確率分布を表す残差共分散行列を算出し、目標の存在の可能性のある領域(目標存在領域)の中にある観測値を追尾目標と相関の可能性があるとして選択するゲート処理部(ゲート処理手段)である。
14は観測値と追尾目標との対応付けの相関仮説を生成し、追尾目標の存在確率分布に基づいて各相関仮説の成立する確率を仮説信頼度として算出し、さらに、各観測値が各追尾目標と相関する確率を探知データ相関信頼度として算出する相関処理部(相関処理手段)、15は上記探知データ相関信頼度と、ゲート処理部13からの残差ベクトル(目標の観測位置ベクトルと予測位置ベクトルの差ベクトル)および残差共分散行列と、予測処理部8からの予測誤差共分散行列と、第2の入力部12からの外挿予測誤差共分散行列とに基づいて、現観測時刻の目標位置、速度等の推定値である平滑ベクトルおよび平滑誤差の評価量である平滑誤差共分散行列を算出する平滑処理部(平滑処理手段)、16は平滑ベクトルおよび平滑誤差共分散を次の観測時刻まで保持する第1の遅延回路(第1の遅延手段)である。
【0062】
次に、動作について説明する。
運動モデルおよび観測モデルは従来技術で説明したものと同じ設定を使用する。ただし、サンプリング時刻tkのかわりに観測時刻tk,uを用いるため、従来技術の運動モデルと観測モデルにおける添字のkおよびk−1を、それぞれk,uおよびk,u−1と置き換える。
観測時刻tk,uにおいて、目標観測装置1から観測ベクトルzk,u,j (j = 1,2,...)が入力されると、予測処理部8に第1の遅延回路16からすべての目標に対する前観測時刻tk,u−1の平滑ベクトルと平滑誤差共分散行列が入力され、次式に従って、各目標cの現観測時刻tk,uに対する予測ベクトルと予測誤差共分散行列を算出する。
【0063】
【数23】
Figure 2004037262
【0064】
次に、第1の入力部9は、現観測時刻が現サンプリング区間tk〜tk+1
において1回目の観測ベクトルの入力時刻である場合(u=1の場合)、第1の遅延回路16からの平滑ベクトルと平滑誤差共分散行列を第2の遅延回路10に入力する。2回目以降(u=2,3,...,Uk)の場合は、何も出力しない。すなわち、第2の遅延回路10の内容は変化しない。なお、第2の遅延回路10には前サンプリング区間の最後の観測時刻tk−1,uk−1における平滑ベクトルと平滑誤差共分散行列が格納されていることになる。
【0065】
次に、外挿処理部11に第2の遅延回路10からすべての目標の平滑ベクトルと平滑誤差共分散行列が入力され、次式に従って、各目標cの現観測時刻tk,uに対する外挿予測ベクトルと外挿予測誤差共分散行列を算出する。
【0066】
【数24】
Figure 2004037262
【0067】
次に、第2の入力部12は、現観測時刻が現サンプリング区間tk〜tk+1において、1回目の観測ベクトルの入力時刻である場合(u=1の場合)、予測処理部8からの予測ベクトルと予測誤差共分散行列を出力する。2回目以降(u=2,3,...,Ukの場合は、外挿処理部11からの外挿予測ベクトルと外挿予測誤差共分散行列を出力する。なお、u=1の場合の外挿予測ベクトルおよび外挿予測誤差共分散行列の式はu=1のときに出力する予測ベクトルおよび予測誤差共分散行列の式と同一となるので、ここで出力される予測ベクトルおよび予測誤差共分散行列をすべて外挿予測ベクトルおよび外挿予測誤差共分散行列と言うことにする。
【0068】
次にゲート処理部13が、各目標の外挿予測ベクトルと外挿予測誤差共分散行列を入力とし、各目標対応の観測ベクトルの存在確率分布である残差共分散行列を算出する。
【0069】
【数25】
Figure 2004037262
【0070】
次に、各目標ごとにその目標のゲート内に存在するすべての観測ベクトルを選びだすことにより、各目標に相関可能な観測ベクトルを決定する。すなわち、各目標cに対して次式を満たす観測ベクトルを選択する。
【0071】
【数26】
Figure 2004037262
【0072】
現観測時刻tk,u,jにおいて、全目標(L個とする)に対してゲート処理部13で選択された観測ベクトルの集合を次のように表す。
【0073】
【数27】
Figure 2004037262
【0074】
次に、相関処理部で各目標と観測ベクトルとの相関に関する仮説を洗い出す。仮説の総数をIk,u個とし、仮説の全体を以下のように表す。
【0075】
【数28】
Figure 2004037262
【0076】
各仮説は、以下のように行列表示する。行列の各要素は1または0である。ただし、下記行列の第1列(l=0)は観測ベクトルが不要信号であることを示すための列である。
【0077】
【数29】
Figure 2004037262
【0078】
各仮説の行列は以下の3つの基準を同時に満たすものをすべて導出する。
1 観測ベクトルが目標のソフトウェアゲート内に存在する場合のみ両者を対応づけることができる。
2 各追尾目標には高々1つの観測ベクトルが相関する。
3 各観測ベクトルには1つの追尾目標または不要信号が対応する。
【0079】
例えば、2目標を追尾していて、観測時刻tk,uで、目標1のゲート内に観測ベクトルz1,z2を得て、目標2のゲート内にz2を得た場合を考える。(即ち、z2は目標1のゲート内にも目標2のゲート内にも入っているという状況である)この状況で相関の仮説を洗い出すと以下の4つの仮説が得られる。
【0080】
【数30】
Figure 2004037262
【0081】
仮説1が表しているのは、目標1が観測ベクトルz1と相関し、目標2が観測ベクトルz2と相関するという仮説である。
仮説2が表しているのは、目標1が観測ベクトルz2と相関し、目標2は相関する観測ベクトルがなく、観測ベクトルz1は不要信号であるという仮説である。仮説3が表しているのは、目標1は相関する観測ベクトルがなく、目標2が観測ベクトルz2と相関し、観測ベクトルz1は不要信号であるという仮説である。仮説4が表しているのは、2目標とも相関する観測ベクトルがなく、観測ベクトルはz1,z2とも不要信号であるという仮説である。
このようにして得られた各仮説に対して、追尾目標の識別を次式で定義する。
【0082】
【数31】
Figure 2004037262
【0083】
これは追尾目標が探知されたか否かの識別結果を示し、仮説における目標への観測ベクトルの関連付けに応じて次式の値となる。
【0084】
【数32】
Figure 2004037262
【0085】
また、仮説における観測ベクトルの識別を次式で定義する。
【0086】
【数33】
Figure 2004037262
【0087】
これは観測ベクトルが追尾目標からの信号か不要信号かの識別結果を示し、仮説における観測ベクトルの関連付けに応じて次式の値となる。
【0088】
【数34】
Figure 2004037262
【0089】
また、各仮説において、不要信号よりの観測ベクトルの総数を次式で表す。
【0090】
【数35】
Figure 2004037262
【0091】
各仮説の成立する確率(仮説信頼度)を次式に基づいて算出する。
【0092】
【数36】
Figure 2004037262
【0093】
続いて、上記仮説信頼度を用いて、各観測ベクトルが追尾目標と相関する確率を探知データ相関信頼度として以下のように計算する。
【0094】
【数37】
Figure 2004037262
【0095】
次に、平滑処理部8において、予測処理部8より予測誤差共分散行列を入力し、ゲート処理部13より残差ベクトルと残差共分散行列を入力し、相関処理部14より探知データ相関信頼度を入力し、第2の入力部12から外挿予測共分散行列を入力し、現観測時刻における各目標の平滑ベクトルおよび平滑誤差共分散行列を次式に従い算出する。
【0096】
【数38】
Figure 2004037262
【0097】
なお、ゲート内に探知データを捕えられなかった目標については、平滑処理部15において次式を実行し、予測処理の結果をそのまま平滑結果とする。
この処理をメモリトラックと呼ぶ。
【0098】
【数39】
Figure 2004037262
【0099】
以上のように算出された平滑ベクトルおよび平滑誤差共分散行列は第1の遅延回路16に保持される。
目標観測装置1から観測ベクトルが入力されるたびに、上記一連の動作を追尾終了まで繰り返す。
【0100】
以上説明した本発明の実施の形態1の目標追尾装置によれば、観測時刻ごと、すなわち観測領域ごとに追尾処理を実行するようにしたので、全目標の観測ベクトルが同一時刻に得られない場合でも精度良く追尾処理を実行することが可能である。また、同一サンプリング区間であっても、観測時刻ごとに追尾処理を行うので、全目標の観測ベクトルが到着するのを待つ必要がない。
また、同一サンプリング区間では、ゲートを外挿処理により算出するようにしたので、ゲートの急激な変動を抑え、追尾維持の失敗を防ぐことができる。
【0101】
なお、実施の形態1では、観測時刻ごとに全追尾目標の追尾処理を行っているが、観測した領域の近傍に存在する目標のみを選んで追尾処理を実行するように構成することも容易に可能である。
【0102】
実施の形態2.
以下に、実施の形態2の目標追尾装置を図2により説明する。
実施の形態1の図1と同様の構成部分は同じ符合を付して、再度の説明を省略する。
【0103】
18は、第1の遅延回路16より入力される平滑ベクトルと平滑誤差共分散行列とを分離して出力し、平滑ベクトルを第2の遅延回路20に入力し、平滑誤差共分散行列を誤差共分散外挿処理部19に入力する第1の入力部(第1の入力手段)、19は第1の入力部18より送られてくる平滑誤差共分散行列の外挿処理を行う誤差共分散外挿処理部(誤差共分散外挿処理手段)、20は第1の入力部18および誤差共分散外挿処理部19からそれぞれ送られてくる平滑ベクトルおよび外挿予測誤差共分散行列を保持する第2の遅延回路、21は第2の遅延回路20からの平滑ベクトルを現観測時刻まで外挿予測する位置外挿処理部(位置外挿処理手段)、22は予測処理部8からの外挿予測ベクトルと誤差共分散外挿処理部19からの外挿予測誤差共分散行列、あるいは位置外挿処理部21からの外挿予測ベクトルと第2の遅延回路20からの外挿予測誤差共分散行列のいずれかをゲート処理部13および平滑処理部15に入力する第2の入力部である。
【0104】
次に動作について説明する。
第1の入力部18、誤差共分散外挿処理部19、第2の遅延回路20、位置外挿処理部21、第2の入力部22以外のものは実施の形態1の図1のものと動作が同じなので、その説明を省略する。
【0105】
第1の入力部18は、現観測時刻が現サンプリング区間tk〜tk+1において1回目の観測ベクトルの入力時刻である場合(u=1の場合)、第1の遅延回路16からの平滑ベクトルを第2の遅延回路20に入力し、平滑誤差共分散行列を誤差共分散外挿処理部19に入力する。2回目以降(u=2,3,...,Ukの場合)は、何も出力しない。すなわち、第2の遅延回路20の内容は変化しない。
【0106】
誤差共分散外挿処理部19は、第1の入力部18からの平滑誤差共分散行列を現サンプリング区間tk〜tk+1のある時刻(例えば以下のように設定する)まで外挿し、第2の入力部22および第2の遅延回路20に出力する。
本誤差共分散外挿処理部19は第1の入力部18より平滑誤差共分散行列が入力された場合のみ動作する。
【0107】
【数40】
Figure 2004037262
【0108】
第2の遅延回路20は第1の入力部18から送られてくる平滑ベクトルと誤差共分散外挿処理部19から送られてくる外挿予測誤差共分散行列を1サンプリング期間保持する。
【0109】
位置外挿処理部21は、第2の遅延回路から送られてくる平滑ベクトルを運動モデルに従って現観測時刻まで外挿し、外挿予測ベクトルを算出する。算出式は実施の形態1の式(38)と同じである。
【0110】
第2の入力部22は、現観測時刻が現サンプリング区間tk〜tk+1において1回目の観測ベクトルの入力時刻である場合(u=1の場合)、予測処理部8からの予測ベクトルと誤差共分散外挿処理部19からの外挿予測誤差共分散行列とを出力する。2回目以降(u=2,3,...,Ukの場合)は、位置外挿処理部21からの外挿予測ベクトルと第2の遅延回路20からの外挿予測誤差共分散行列を出力する。
【0111】
以降の処理では、現サンプリング区間(tk〜tk+1)における外挿予測誤差共分散行列および残差共分散行列は観測時刻によらず一定の値を持つ。よって、それぞれの実施の形態1の式を以下のように読み替える。
【0112】
【数41】
Figure 2004037262
【0113】
以上説明した本発明の実施の形態2の目標追尾装置によれば、観測時刻ごと、すなわち観測領域ごとに追尾処理を実行するようにしたので、全目標の観測ベクトルが同一時刻に得られない場合でも精度良く追尾処理を実行することが可能である。また、同一サンプリング区間であっても、観測時刻ごとに追尾処理を行うので、全目標の観測ベクトルが到着するのを待つ必要がない。
【0114】
同一サンプリング区間では、ゲートの大きさを固定するようにしたので、ゲートあるいはゲインの急激な変動により追尾維持の失敗が起こることを防ぐことができる。
【0115】
観測時刻ごとに実行する外挿処理を状態ベクトルの外挿のみとしたので、演算量を減らすことができる。
【0116】
なお、実施の形態2でも、観測時刻ごとに全追尾目標の追尾処理を行っているが、観測した領域の近傍に存在する目標のみを選んで追尾処理を実行するように構成することも容易に可能である。
【0117】
実施の形態3.
以下に、実施の形態3の目標追尾装置を図3により説明する。
実施の形態1の図1と同じ構成部分は同じ符合を付して、再度の説明を省略する。
【0118】
24は、第1の遅延回路16より入力される平滑ベクトルと平滑誤差共分散行列を外挿処理部25に入力する第1の入力部、25は第1の入力部24からの平滑ベクトルおよび平滑誤差共分散行列を現サンプリング区間のある時刻まで外挿予測し、外挿予測ベクトルおよび外挿予測誤差共分散行列を算出する外挿処理部、26は外挿処理部25から送られてくる外挿予測ベクトルおよび外挿予測誤差共分散行列を保持する第2の遅延回路、27は外挿処理部25からの外挿予測ベクトルと外挿予測誤差共分散行列、あるいは第2の遅延回路26からの外挿予測ベクトルと外挿予測誤差共分散行列のいずれかをゲート処理部13および平滑処理部15に入力する第2の入力部である。
【0119】
次に動作について説明する。第1の入力部24、外挿処理部25、第2の遅延回路26、第2の入力部27以外は実施の形態1と動作が同じであるため、第1の入力部24、外挿処理部25、第2の遅延回路26、第2の入力部27についてのみ説明する。
【0120】
第1の入力部24は、現観測時刻が現サンプリング区間tk〜tk+1において1回目の観測ベクトルの入力時刻である場合(u=1)の場合、第1の遅延回路16からの平滑ベクトルと平滑誤差共分散行列を外挿処理部25に入力する。2回目以降(u=2,3,...,Ukの場合)は、何も出力しない。
【0121】
外挿処理部25は第1の入力部24からのすべての目標の平滑ベクトルと平滑誤差共分散行列を現サンプリング区間tk〜tk+1のある時刻(例えば以下のように設定する)まで外挿して外挿予測ベクトルと外挿予測誤差共分散行列を算出し、第2の入力部27および第2の遅延回路26に出力する。本外挿処理部25は第1の入力部24からの入力があった場合のみ動作する。
【0122】
【数42】
Figure 2004037262
【0123】
なお、第2の遅延回路26には外挿予測ベクトルと外挿予測誤差共分散行列が格納されていることになる。
【0124】
次に、第2の入力部27は、現観測時刻が現サンプリング区間tk〜tk+1において1回目の観測ベクトルの入力時刻である場合(u=1)の場合、外挿処理部25からの外挿予測ベクトルと外挿予測誤差共分散行列を出力する。2回目以降(u=2,3,...,Uk)の場合は、第2の遅延回路26からの外挿予測ベクトルと外挿予測誤差共分散行列を出力する。
【0125】
実施の形態3の目標追尾装置によれば、観測時刻ごと、すなわち観測領域ごとに追尾処理を実行するようにしたので、全目標の観測ベクトルが同一時刻に得られない場合でも精度良く追尾処理を実行することが可能である。また、同一サンプリング区間であっても、観測時刻ごとに追尾処理を行うので、全目標の観測ベクトルが到着するのを待つ必要がない。
また、同一サンプリング区間では、ゲートの位置と大きさを固定するようにしたので、ゲートあるいはゲインの変動により追尾維持の失敗が起こることを防ぐことができる。
【0126】
外挿処理の実行を1サンプリング区間に1回にしたので、演算量を減らすことができる。
【0127】
なお、実施の形態3でも、観測時刻ごとに全追尾目標の追尾処理を行っているが、観測した領域の近傍に存在する目標のみを選んで追尾処理を実行するように構成することも容易に可能である。
【0128】
実施の形態4.
以下に、この発明の実施の形態4の目標追尾装置について説明する。
図4はこの発明の実施の形態4を示す構成図である。ここでは例として実施の形態1の図1の構成に適用した場合を説明するが、本実施の形態は図2、図3の構成のものにも同様に適用することが出来る。図4において実施の形態1の図1と同様の構成部分は同じ符合を付して、再度の説明を省略する。
【0129】
29は目標観測装置1から送られてくる観測値をある程度蓄積してから目標追尾装置に入力する観測値蓄積部(観測値蓄積手段)である。
30は観測値蓄積部29から送られてくる観測値に対して、これらが同一時刻に得られたとみなし、その1つの観測時刻を決定する観測時刻決定部(観測時刻決定手段)である。
【0130】
次に動作について説明する。観測値蓄積部29、観測時刻決定部30以外の部部は実施の形態1の図1のものと構成/動作が同じであるため、観測値蓄積部29、観測時刻決定部30についてのみ説明する。
【0131】
観測値蓄積部29は、目標観測装置1から送られてくる観測値を複数の観測時刻分蓄積しておいて目標追尾装置に入力する。なお、いつ観測されたものかの観測時刻も観測値といっしょに蓄積する。サンプリング区間をまたがっては蓄積しないものとする。蓄積する観測値の数は、観測時刻の数で決めてもよいし、観測値自体の数で決めてもよい。
【0132】
観測時刻決定部30は、観測値蓄積部29から送られてくる観測値を受けて、複数の観測時刻にまたがる観測値をある1時刻に得られたとみなし、そのみなしの観測時刻を決定する。以後、目標追尾装置31はこの観測時刻に従って動作する。みなしの観測時刻は、例えば、複数の観測時刻の平均値や中間値とする。
【0133】
実施の形態4の目標追尾装置31によれば、観測時刻ごと、すなわち観測領域ごとに追尾処理を実行するようにしたので、全目標の観測ベクトルが同一時刻に得られない場合でも精度良く追尾処理を実行することが可能である。
【0134】
複数の観測時刻にまたがる観測値をまとめて処理するようにしたので、蓄積する観測値の数を決めることで演算量を調整することが可能となる。
【0135】
なお、実施の形態4では、観測時刻ごとに全追尾目標の追尾処理を行っているが、観測した領域の近傍に存在する目標のみを選んで追尾処理を実行するように構成することも容易に可能である。
【0136】
【発明の効果】
実施の形態1の目標追尾装置によれば、観測時刻ごと、すなわち観測領域ごとに追尾処理を実行するようにしたので、全目標の観測ベクトルが同一時刻に得られない場合でも精度良く追尾処理を実行することが可能である。また、同一サンプリング区間であっても、観測時刻ごとに追尾処理を行うので、全目標の観測ベクトルが到着するのを待つ必要がない。
また、同一サンプリング区間では、ゲートを外挿処理により算出するようにしたので、ゲートの急激な変動を抑え、追尾維持の失敗を防ぐことができる。
【0137】
実施の形態2の目標追尾装置によれば、観測時刻ごと、すなわち観測領域ごとに追尾処理を実行するようにしたので、全目標の観測ベクトルが同一時刻に得られない場合でも精度良く追尾処理を実行することが可能である。また、同一サンプリング区間であっても、観測時刻ごとに追尾処理を行うので、全目標の観測ベクトルが到着するのを待つ必要がない。また、同一サンプリング区間では、ゲートの大きさを固定するようにしたので、ゲートあるいはゲインの急激な変動により追尾維持の失敗が起こることを防ぐことができる。更に、観測時刻ごとに実行する外挿処理を状態ベクトルの外挿のみとしたので、演算量を減らすことができる。
【0138】
実施の形態3の目標追尾装置によれば、観測時刻ごと、すなわち観測領域ごとに追尾処理を実行するようにしたので、全目標の観測ベクトルが同一時刻に得られない場合でも精度良く追尾処理を実行することが可能である。また、同一サンプリング区間であっても、観測時刻ごとに追尾処理を行うので、全目標の観測ベクトルが到着するのを待つ必要がない。
また、同一サンプリング区間では、ゲートの位置と大きさを固定するようにしたので、ゲートあるいはゲインの変動により追尾維持の失敗が起こることを防ぐことができる。更に、外挿処理の実行を1サンプリング区間に1回にしたので、演算量を減らすことができる。
【0139】
実施の形態4の目標追尾装置によれば、観測時刻ごと、すなわち観測領域ごとに追尾処理を実行するようにしたので、全目標の観測ベクトルが同一時刻に得られない場合でも精度良く追尾処理を実行することが可能である。また、複数の観測時刻にまたがる観測値をまとめて処理するようにしたので、蓄積する観測値の数を決めることで演算量を調整することが可能となる。
【図面の簡単な説明】
【図1】本発明の実施の形態1の目標追尾装置の構成図である。
【図2】本発明の実施の形態2の目標追尾装置の構成図である。
【図3】本発明の実施の形態3の目標追尾装置の構成図である。
【図4】本発明の実施の形態4の目標追尾装置の構成図である。
【図5】従来の目標追尾装置の構成図である。
【符号の説明】
1 目標観測装置、    8 予測処理部、
9、18、24 第1の入力部、
10、20、26 第2の遅延回路、
11、25 外挿処理部、    12、22 第2の入力部、
13 ゲート処理部、   14 相関処理部、
15 平滑処理部、    16 第1の遅延回路、
29 観測値蓄積部、    30 観測時刻決定部。[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a target tracking device that tracks a plurality of moving object targets obtained from a sensor such as a radar.
[0002]
[Prior art]
In order to track a plurality of targets obtained by sensors based on the observed value of the position, the target position at the current time is predicted based on the result of the estimation calculation based on the motion parameters of the previous time of each target. Calculate the expected existence area (gate) of the current time observation value for each target, and determine the correspondence between the observation value actually acquired in the gate and each target (the obtained observation target is truly predicted) Correlation processing is performed to determine whether or not the target is met.
[0003]
Here, during actual observation, the sensor may detect an erroneous signal other than the target observation value, or the target observation value may not be obtained because the target observation fails. In addition, when a plurality of targets are densely packed, observation values of a plurality of targets may be obtained within one target gate. Even in such a situation, in order to correctly maintain tracking without losing sight of each target, it is necessary to accurately determine which observation value is for which target (correlation processing).
[0004]
FIG. E. Fortmann, Y.M. Bar-Shalom and M.M. Scheffe, “Multi-TargetTracking Using Joint Probabilistic Data Association”, Proceedings of the 1980s, and “Joint as a Proportion of Profession of Declaration”
[0005]
In FIG. 5, 1 is a target observation device (specifically, for example, a radar device) that observes a target and outputs target position information as observation values (samples data at an arbitrary time interval), and 3 is a prediction processing unit 2 ( The residual covariance matrix that represents the probability distribution of the tracking target is calculated from the observed values using the predicted vector (predicted position and predicted velocity vector) and the prediction error covariance calculated later, and the possibility of the presence of the target. This is a gate processing unit that selects an observation value in a certain area (target existence area) as having a possibility of correlation with the tracking target.
4 generates a correlation hypothesis for the correspondence between the observed value and the tracking target, calculates the probability that each correlation hypothesis is established based on the existence probability distribution of the tracking target, and further, each observation value for each tracking A correlation processing unit that calculates the probability of correlation with the target as detection data correlation reliability, 5 is the detection data correlation reliability and the residual vector from the gate processing unit 3 (the difference between the target observed position vector and the predicted position vector). Based on the vector) and residual covariance matrix and the prediction error covariance matrix from the prediction processing unit 2, a smooth vector and a smooth error covariance matrix, which are estimated values of the target position and velocity at the current sampling time, are calculated. These are output to the outside and used in a display device (not shown).
[0006]
A delay circuit 6 holds the smooth vector and the smooth error covariance until the next sampling time. 2 is a prediction vector which is calculated one sampling time before the current sampling time, and is an estimate of the target position and speed at the current time, based on the smoothed vector and the smoothing error covariance matrix output after delay from the delay circuit 6 And a prediction processing unit that calculates a prediction error covariance matrix that is an evaluation amount of the prediction error.
[0007]
Before describing the operation of the one shown in FIG. 5, a motion model and an observation model, which are theoretical assumptions of the tracking algorithm implemented in the target tracking device 7, will be described.
Assume that L targets c are being tracked. A motion model of the target c (c = 1, 2,..., L) is defined by the following equation.
[0008]
[Expression 1]
Figure 2004037262
[0009]
The true value of the state vector can be written as the following equation, for example, when it consists of the position and velocity in the xyz orthogonal coordinate system. T means transposition of the matrix.
[0010]
[Expression 2]
Figure 2004037262
[0011]
The state vector transition matrix is given by: I (n) is a unit vector of n rows and n columns.
[0012]
[Equation 3]
Figure 2004037262
[0013]
The driving noise vector follows a hexavariate white normal distribution whose mean and covariance matrix satisfy
[0014]
[Expression 4]
Figure 2004037262
[0015]
An observation model representing an observation vector that is detection data from the target c by the target observation device 1 is defined by the following equation.
[0016]
[Equation 5]
Figure 2004037262
[0017]
The observation noise vector follows a trivariate white normal distribution whose mean and covariance matrix satisfy the following equation.
[0018]
[Formula 6]
Figure 2004037262
[0019]
A set of all observation vectors obtained up to time tk is represented as Zk. Let M k be information on the number of observation vectors up to time tk corresponding to Z k.
[0020]
Note that erroneous signals (signals other than tracking targets such as clutter) are uniformly distributed in space, the number of observation vectors obtained from the erroneous signals follows a Poisson distribution, and the average number per unit volume at time tk is βFT k And set.
[0021]
Next, the operation of FIG. 5 will be described.
In the following description, Pr [. ] Is the probability, Pr [. |. ] Is a conditional probability, E [. ] Is average,
E [. |. ] Represents a conditional average.
When the observation vector zk, j (j = 1, 2,...) Is input from the target observation apparatus 1 at time tk, the prediction processing unit 2 receives the previous time tk−1 for all targets from the delay circuit 6. A smooth vector and a smooth error covariance matrix are input, and a prediction vector and a prediction error covariance matrix for each target c with respect to the current time tk are calculated according to the following equations.
[0022]
[Expression 7]
Figure 2004037262
[0023]
Next, the gate processing unit 3 receives the prediction vector of each target and the prediction error covariance matrix as input, and calculates a residual covariance matrix that is an existence probability distribution of the observation vector corresponding to each target. A predetermined threshold value is set for the existence probability distribution, and a target existence area obtained from a range exceeding this is called a gate.
[0024]
[Equation 8]
Figure 2004037262
[0025]
Next, by selecting all the observation vectors existing in the target gate for each target, an observation vector that can be correlated with each target is determined. That is, an observation vector that satisfies the following expression is selected for each target c.
[0026]
[Equation 9]
Figure 2004037262
[0027]
At the current time tk, the set of observation vectors selected by the gate processing unit 3 for all targets (L) is expressed as follows.
[0028]
[Expression 10]
Figure 2004037262
[0029]
Next, a hypothesis regarding the correlation between each target and the observed vector is identified by the correlation processing unit. In an environment where a plurality of targets are close to each other or unnecessary signals other than the target are generated, it is necessary to determine which observation vector belongs to which target.
This function in target tracking is called correlation. Here, the correlation hypothesis is a one-to-one correspondence between the obtained observation vector and the tracking target. The total number of hypotheses is Ik, and the whole hypothesis is expressed as follows.
[0030]
## EQU11 ##
Figure 2004037262
[0031]
Each hypothesis is displayed in a matrix as follows. Each element of the matrix is 1 or 0. However, the first column (L = 0) of the following matrix is a column for indicating that the observation vector is an unnecessary signal.
[0032]
[Expression 12]
Figure 2004037262
[0033]
Each hypothesis matrix is derived to satisfy all of the following three criteria simultaneously.
1 The two can be associated only when the observation vector exists in the target software gate.
2 At most one observation vector correlates with each tracking target.
3 One tracking target or unnecessary signal corresponds to each observation vector.
[0034]
For example, let us consider a case where two targets are tracked, observation vectors z1 and z2 are obtained in the target 1 gate, and z2 is obtained in the target 2 gate at time tk. Note that. In this situation, z2 is in both the target 1 gate and the target 2 gate. In this situation, the following four hypotheses can be obtained by identifying correlation hypotheses.
[0035]
[Formula 13]
Figure 2004037262
[0036]
Hypothesis 1 represents the hypothesis that target 1 correlates with observation vector z1 and target 2 correlates with observation vector z2.
Hypothesis 2 represents the hypothesis that target 1 is correlated with observation vector z2, target 2 has no correlated observation vector, and observation vector z1 is an unnecessary signal.
Hypothesis 3 represents the hypothesis that target 1 has no correlated observation vector, target 2 correlates with observation vector z2, and observation vector z1 is an unnecessary signal.
Hypothesis 4 represents the hypothesis that there is no observation vector that correlates with the two targets, and that both the observation vectors z1 and z2 are unnecessary signals.
For each hypothesis thus obtained, identification of the tracking target is defined by the following equation.
[0037]
[Expression 14]
Figure 2004037262
[0038]
This indicates an identification result of whether or not the tracking target has been detected, and is a value of the following expression according to the association of the observation vector to the target in the hypothesis.
[0039]
[Expression 15]
Figure 2004037262
[0040]
Further, the identification of the observation vector in the hypothesis is defined by Expression (22).
The following equation shows the identification result of whether the observation vector is a signal from the tracking target or an unnecessary signal, and takes the value of the following equation according to the association of the observation vector in the hypothesis.
[0041]
[Expression 16]
Figure 2004037262
[0042]
Further, in each hypothesis, the total number of observation vectors from unnecessary signals is expressed by Expression (24).
[0043]
[Expression 17]
Figure 2004037262
[0044]
The probability (hypothesis reliability) that each hypothesis is established is calculated based on the following equation.
[0045]
[Expression 18]
Figure 2004037262
[0046]
Subsequently, using the hypothesis reliability, the probability that each observation vector correlates with the tracking target is calculated as detection data correlation reliability as follows.
[0047]
[Equation 19]
Figure 2004037262
[0048]
Next, in the smoothing processing unit 5, the prediction error covariance matrix is input from the prediction processing unit 2, the residual vector and the residual covariance matrix are input from the gate processing unit 3, and the detection data correlation reliability is input from the correlation processing unit 4. The degree is input, and the smoothing vector and smoothing error covariance matrix of each target are calculated according to the following equations. This result is output to the outside and used in a display device (not shown).
[0049]
[Expression 20]
Figure 2004037262
[0050]
For the target for which detection data is not captured in the gate, the smoothing processing unit 5 executes the following equation and uses the prediction processing result as it is as the smoothing result. This process is called a memory track.
[0051]
[Expression 21]
Figure 2004037262
[0052]
The smoothing vector and smoothing error covariance matrix calculated as described above are output to the outside, displayed as tracking target characteristics by a display system (not shown), etc., and are used for the subsequent processing described above. It is input and held in the circuit 6.
[0053]
Each time an observation vector that observes all targets is input from the target observation device 1, the above series of operations is repeated until the end of tracking.
[0054]
[Problems to be solved by the invention]
In the conventional target tracking device, the system is configured on the assumption that all tracking targets are observed simultaneously at each sampling time. However, in reality, there are cases where the entire area where the target is present cannot be observed at the same time. Irradiation is performed every time, and observation values are obtained in time division for each irradiation region. Thus, since it is not assumed in the conventional target tracking device that the observed values of all tracking targets are obtained in a time-sharing manner, in such a case, the tracking state cannot be accurately maintained. There was a problem.
The present invention has been made to solve the above-described problems, and an object of the present invention is to provide a target tracking device that can maintain tracking with high accuracy even when observation information necessary for tracking processing cannot be obtained at the same time. It is said.
[0055]
[Means for Solving the Problems]
The target tracking device of the present invention observes the positions of a plurality of targets in a space at arbitrary time intervals, and outputs target position observation values for each observation,
Calculating the existence probability distribution of the target position in the space using the input data, selecting the position observation value in the region having the high existence probability from the position observation values, Gate processing means for outputting a residual vector and a residual covariance matrix;
A correlation hypothesis between the selected position observation value and the target position is generated, and a probability that each correlation hypothesis is established is calculated as a hypothesis reliability based on the residual covariance matrix. Correlation processing means for calculating the probability of correlation with the position of each target as detection data correlation reliability;
A smoothing vector that is an estimated value of the target position and velocity at the current observation time, and an evaluation amount of a smoothing error, using at least the detection data correlation reliability, the residual vector, and the residual covariance matrix A smoothing means for calculating a smoothing error covariance matrix and outputting the same to the outside;
First delay means for holding the output of the smoothing processing means until the next observation time and outputting the delayed output;
Prediction processing means for calculating a prediction vector at the current observation time and a prediction error covariance matrix based on the smooth vector of the position observation value output from the first delay means and the smooth error covariance;
Second delay means for holding and outputting the smoothed vector and the smoothing error covariance matrix output from the first delay means with a delay;
Extrapolation processing means for extrapolating the smoothing vector and the smoothing error covariance matrix output from the second delay means to the current observation time, and calculating an extrapolation prediction vector and an extrapolation prediction error covariance matrix;
One of the prediction vector and prediction error covariance matrix calculated by the prediction processing means, or the extrapolation prediction vector and extrapolation prediction error covariance matrix calculated by the extrapolation processing means, and the gate processing means And a second input means for inputting to the smoothing means.
[0056]
Further, target observation means for observing the positions of a plurality of targets in a space at arbitrary time intervals and outputting the target position observation value for each observation,
Calculating the existence probability distribution of the target position in the space using the input data, selecting the position observation value in the region having the high existence probability from the position observation values, Gate processing means for outputting a residual vector and a residual covariance matrix;
A correlation hypothesis between the selected position observation value and the target position is generated, and a probability that each correlation hypothesis is established is calculated as a hypothesis reliability based on the residual covariance matrix. Correlation processing means for calculating the probability of correlation with the position of each target as detection data correlation reliability;
A smoothing vector that is an estimated value of the target position and velocity at the current observation time, and an evaluation amount of a smoothing error, using at least the detection data correlation reliability, the residual vector, and the residual covariance matrix A smoothing means for calculating a smoothing error covariance matrix and outputting the same to the outside;
First delay means for holding the output of the smoothing processing means until the next observation time and outputting the delayed output;
Prediction processing means for calculating a prediction vector at the current observation time and a prediction error covariance matrix based on the smooth vector of the position observation value output from the first delay means and the smooth error covariance;
First input means for separating and outputting the smoothing vector and the smoothing error covariance matrix output from the first delay means;
Error covariance extrapolation processing means for extrapolating the smoothing error covariance matrix up to an arbitrary time within the current sampling interval and calculating an extrapolated prediction error covariance matrix;
Second delay means for holding and outputting the smooth vector and the error covariance matrix with a delay;
Position extrapolation processing means for extrapolating the smoothed vector output from the second delay means to a current observation time and calculating an extrapolated prediction vector;
The prediction vector from the prediction processing means and the extrapolation prediction error covariance matrix from the error covariance extrapolation processing means, or the extrapolation prediction vector from the position extrapolation processing means and the second delay means A second input means for inputting any one of the extrapolation prediction error covariance matrix to the gate processing means and the smoothing processing means is provided.
[0057]
Further, target observation means for observing the positions of a plurality of targets in a space at arbitrary time intervals and outputting the target position observation value for each observation,
Calculating the existence probability distribution of the target position in the space using the input data, selecting the position observation value in the region having the high existence probability from the position observation values, Gate processing means for outputting a residual vector and a residual covariance matrix;
A correlation hypothesis between the selected position observation value and the target position is generated, and a probability that each correlation hypothesis is established is calculated as a hypothesis reliability based on the residual covariance matrix. Correlation processing means for calculating the probability of correlation with the position of each target as detection data correlation reliability;
A smoothing vector that is an estimated value of the target position and velocity at the current observation time, and an evaluation amount of a smoothing error, using at least the detection data correlation reliability, the residual vector, and the residual covariance matrix A smoothing means for calculating a smoothing error covariance matrix and outputting the same to the outside;
First delay means for holding the output of the smoothing processing means until the next observation time and outputting the delayed output;
Prediction processing means for calculating a prediction vector at the current observation time and a prediction error covariance matrix based on the smooth vector of the position observation value output from the first delay means and the smooth error covariance;
Extrapolation processing means for extrapolating the smoothing vector and the smoothing error covariance matrix to an arbitrary time within the current sampling interval, and calculating an extrapolation prediction vector and an extrapolation prediction error covariance matrix;
Second delay means for holding the extrapolation prediction vector and the extrapolation prediction error covariance matrix;
A second input for inputting the extrapolation prediction vector and the extrapolation prediction error covariance matrix output from either the extrapolation processing means or the second delay means to the gate processing means and the smoothing processing means. Means are provided.
[0058]
In addition, an observation value accumulating means for accumulating a plurality of observation values observed at different times by the target observation means,
An observation time determining means is provided for determining one observation time for regarding the plurality of observation values as being obtained at the same time.
[0059]
DETAILED DESCRIPTION OF THE INVENTION
In the conventional target tracking device, it was assumed that at the sampling time tk, observation vectors obtained by observing all tracking targets at the same time can be obtained simultaneously. In order to cope with this situation in a more realistic case, the target tracking device of the present invention is configured such that all tracking targets are observed in a time-sharing manner and the target tracking device operates each time an observation value is input. For this purpose, the following description of time is introduced.
The target observation apparatus observes all targets in one sampling section from time tk to time tk + 1. One sampling interval may not be a fixed interval. It may be changed according to the number of tracking targets and the required tracking accuracy. In order to observe all tracking targets during one sampling period, the target observation apparatus divides an area where the target is supposed to exist (around the tracking target) into Uk areas and observes them in order. At this time, the observation time for each region between time tk and time tk + 1 is written as tk, u, (u = 1, 2,..., Uk). For example, if the target observation device is a radar, it is considered that all tracking targets are observed by sequentially irradiating Uk radar beams around the tracking target. At this time, it is assumed that the following equation is established with respect to time.
For convenience of description, it is assumed that tk, 0 = tk-1, Uk-1.
[0060]
[Expression 22]
Figure 2004037262
[0061]
Embodiment 1 FIG.
1 is a block diagram showing a configuration of a target tracking apparatus according to Embodiment 1 of the present invention.
In FIG. 1, reference numeral 1 denotes a target observation device (target observation means) that is a sensor for observing the position of a moving body, and 17 denotes a target tracking device.
In the target tracking device 17, 8 is an estimate of the target position and velocity at the current observation time based on the smooth vector and smooth error covariance from the first delay circuit calculated one observation time before the current observation time. A prediction processing unit (prediction processing unit) that calculates a prediction vector that is a value and a prediction error covariance that is an evaluation amount of a prediction error, and 9 is a smoothing vector and a smoothing error covariance matrix that are input from the first delay circuit 16. A first input unit 10 that inputs to the second delay circuit 10 is a second delay circuit (second delay means) that holds a smoothing vector and a smoothing error covariance matrix sent from the first input unit 9. ).
11 is an extrapolation processing unit (extrapolation processing unit) that extrapolates and predicts the smoothed vector and smoothing error covariance matrix from the second delay circuit 10 until the current observation time, and 12 is the prediction processing unit 8 or the extrapolation processing unit. 11 is a second input unit (second input means) that inputs the extrapolated prediction vector and the extrapolated prediction error covariance matrix from any one of 11 to the gate processing unit 13 and the smoothing processing unit 15, and 13 is an extrapolated prediction vector. And the extrapolated prediction error covariance to calculate the residual covariance matrix that represents the probability distribution of the tracking target and track the observations in the area where the target may exist (target existence area) It is a gate processing unit (gate processing means) that selects the possibility of correlation with the target.
14 generates a correlation hypothesis for associating the observed value with the tracking target, calculates the probability that each correlation hypothesis is established based on the existence probability distribution of the tracking target as a hypothesis reliability, A correlation processing unit (correlation processing means) that calculates the probability of correlation with the target as detection data correlation reliability, 15 is the detection data correlation reliability, and a residual vector (target observation position vector and prediction) from the gate processing unit 13 Current observation time based on the position vector difference vector) and the residual covariance matrix, the prediction error covariance matrix from the prediction processing unit 8, and the extrapolated prediction error covariance matrix from the second input unit 12. A smoothing processing unit (smoothing processing means) for calculating a smoothing vector that is an estimated value of the target position, velocity, etc. and a smoothing error covariance matrix that is an evaluation amount of the smoothing error, and 16 is a smoothing vector and smoothing error covariance. A first delay circuit for holding up the observation time (first delay means).
[0062]
Next, the operation will be described.
The motion model and observation model use the same settings as described in the prior art. However, since the observation times tk and u are used instead of the sampling times tk, the subscripts k and k-1 in the motion model and the observation model of the prior art are replaced with k, u and k, u-1, respectively.
When the observation vector zk, u, j (j = 1, 2,...) Is input from the target observation device 1 at the observation time tk, u, The smoothing vector and smoothing error covariance matrix of the previous observation time tk, u-1 for the target are input, and the prediction vector and the prediction error covariance matrix for the current observation time tk, u of each target c are calculated according to the following equation.
[0063]
[Expression 23]
Figure 2004037262
[0064]
Next, the first input unit 9 determines that the current observation time is the current sampling period tk to tk + 1.
When the input time of the first observation vector is (when u = 1), the smooth vector and the smooth error covariance matrix from the first delay circuit 16 are input to the second delay circuit 10. In the second and subsequent times (u = 2, 3,..., Uk), nothing is output. That is, the content of the second delay circuit 10 does not change. Note that the second delay circuit 10 stores a smooth vector and a smooth error covariance matrix at the last observation times tk−1 and uk−1 of the previous sampling interval.
[0065]
Next, all target smoothing vectors and smoothing error covariance matrices are input to the extrapolation processing unit 11 from the second delay circuit 10, and extrapolation prediction for the current observation times tk, u of each target c is performed according to the following equation. Calculate the vector and extrapolation prediction error covariance matrix.
[0066]
[Expression 24]
Figure 2004037262
[0067]
Next, the second input unit 12 predicts the prediction vector from the prediction processing unit 8 when the current observation time is the input time of the first observation vector in the current sampling period tk to tk + 1 (when u = 1). And the prediction error covariance matrix. From the second time onward (when u = 2, 3,..., Uk, the extrapolated prediction vector and the extrapolated prediction error covariance matrix from the extrapolation processing unit 11 are output. Since the equations for the extrapolated prediction vector and the extrapolated prediction error covariance matrix are the same as the equations for the prediction vector and the prediction error covariance matrix that are output when u = 1, the prediction vector and the prediction error that are output here are the same. All variance matrices are referred to as extrapolated prediction vectors and extrapolated prediction error covariance matrices.
[0068]
Next, the gate processing unit 13 receives the extrapolation prediction vector and the extrapolation prediction error covariance matrix of each target, and calculates a residual covariance matrix that is an existence probability distribution of the observation vector corresponding to each target.
[0069]
[Expression 25]
Figure 2004037262
[0070]
Next, by selecting all the observation vectors existing in the target gate for each target, an observation vector that can be correlated with each target is determined. That is, an observation vector that satisfies the following expression is selected for each target c.
[0071]
[Equation 26]
Figure 2004037262
[0072]
At the current observation time tk, u, j, a set of observation vectors selected by the gate processing unit 13 for all targets (L) is expressed as follows.
[0073]
[Expression 27]
Figure 2004037262
[0074]
Next, a hypothesis regarding the correlation between each target and the observed vector is identified by the correlation processing unit. The total number of hypotheses is Ik, u, and the whole hypothesis is expressed as follows.
[0075]
[Expression 28]
Figure 2004037262
[0076]
Each hypothesis is displayed in a matrix as follows. Each element of the matrix is 1 or 0. However, the first column (l = 0) of the following matrix is a column for indicating that the observation vector is an unnecessary signal.
[0077]
[Expression 29]
Figure 2004037262
[0078]
Each hypothesis matrix is derived to satisfy all of the following three criteria simultaneously.
1 The two can be associated only when the observation vector exists in the target software gate.
2 At most one observation vector correlates with each tracking target.
3 One tracking target or unnecessary signal corresponds to each observation vector.
[0079]
For example, let us consider a case where two targets are tracked, observation vectors z1 and z2 are obtained in the gate of the target 1 and z2 is obtained in the gate of the target 2 at the observation times tk and u. (In other words, z2 is in both the target 1 gate and the target 2 gate.) In this situation, the following four hypotheses are obtained when the correlation hypothesis is identified.
[0080]
[30]
Figure 2004037262
[0081]
Hypothesis 1 represents the hypothesis that target 1 correlates with observation vector z1 and target 2 correlates with observation vector z2.
Hypothesis 2 represents the hypothesis that target 1 is correlated with observation vector z2, target 2 has no correlated observation vector, and observation vector z1 is an unnecessary signal. Hypothesis 3 represents the hypothesis that target 1 has no correlated observation vector, target 2 correlates with observation vector z2, and observation vector z1 is an unnecessary signal. Hypothesis 4 represents the hypothesis that there is no observation vector that correlates with the two targets, and that both the observation vectors z1 and z2 are unnecessary signals.
For each hypothesis thus obtained, identification of the tracking target is defined by the following equation.
[0082]
[31]
Figure 2004037262
[0083]
This indicates an identification result of whether or not the tracking target has been detected, and is a value of the following expression according to the association of the observation vector to the target in the hypothesis.
[0084]
[Expression 32]
Figure 2004037262
[0085]
Also, the observation vector identification in the hypothesis is defined by the following equation.
[0086]
[Expression 33]
Figure 2004037262
[0087]
This indicates the identification result of whether the observation vector is a signal from the tracking target or an unnecessary signal, and is a value of the following equation according to the association of the observation vector in the hypothesis.
[0088]
[Expression 34]
Figure 2004037262
[0089]
In each hypothesis, the total number of observation vectors from unnecessary signals is expressed by the following equation.
[0090]
[Expression 35]
Figure 2004037262
[0091]
The probability (hypothesis reliability) that each hypothesis is established is calculated based on the following equation.
[0092]
[Expression 36]
Figure 2004037262
[0093]
Subsequently, using the hypothesis reliability, the probability that each observation vector correlates with the tracking target is calculated as detection data correlation reliability as follows.
[0094]
[Expression 37]
Figure 2004037262
[0095]
Next, in the smoothing processing unit 8, the prediction error covariance matrix is input from the prediction processing unit 8, the residual vector and the residual covariance matrix are input from the gate processing unit 13, and the detection data correlation reliability is input from the correlation processing unit 14. Then, an extrapolated prediction covariance matrix is input from the second input unit 12, and a smooth vector and a smooth error covariance matrix of each target at the current observation time are calculated according to the following equations.
[0096]
[Formula 38]
Figure 2004037262
[0097]
For the target for which detection data is not captured in the gate, the smoothing processing unit 15 executes the following expression, and uses the prediction processing result as it is as the smoothing result.
This process is called a memory track.
[0098]
[39]
Figure 2004037262
[0099]
The smoothing vector and smoothing error covariance matrix calculated as described above are held in the first delay circuit 16.
Each time an observation vector is input from the target observation device 1, the above series of operations is repeated until the end of tracking.
[0100]
According to the target tracking device of the first embodiment of the present invention described above, since the tracking process is executed for each observation time, that is, for each observation region, the observation vectors for all targets cannot be obtained at the same time. However, it is possible to execute the tracking process with high accuracy. Even in the same sampling period, since the tracking process is performed at each observation time, there is no need to wait for the arrival of all target observation vectors.
In addition, since the gate is calculated by extrapolation processing in the same sampling period, it is possible to suppress a rapid fluctuation of the gate and to prevent tracking maintenance failure.
[0101]
In the first embodiment, the tracking process for all tracking targets is performed at each observation time. However, it is also easy to configure the tracking process by selecting only targets that exist in the vicinity of the observed region. Is possible.
[0102]
Embodiment 2. FIG.
Hereinafter, the target tracking device of the second embodiment will be described with reference to FIG.
Components similar to those in FIG. 1 of the first embodiment are denoted by the same reference numerals, and description thereof is omitted.
[0103]
18 separates and outputs the smooth vector and the smooth error covariance matrix input from the first delay circuit 16, inputs the smooth vector to the second delay circuit 20, and converts the smooth error covariance matrix into the error A first input unit (first input means) that inputs to the variance extrapolation processing unit 19, 19 is an error covariance extraneous unit that performs extrapolation processing of the smooth error covariance matrix sent from the first input unit 18. An interpolation processing unit (error covariance extrapolation processing means) 20 holds a smooth vector and an extrapolated prediction error covariance matrix respectively sent from the first input unit 18 and the error covariance extrapolation processing unit 19. 2 is a position extrapolation processing unit (position extrapolation processing means) that extrapolates and predicts the smooth vector from the second delay circuit 20 until the current observation time, and 22 is an extrapolation prediction from the prediction processing unit 8. Extrapolation from vector and error covariance extrapolation processor 19 Either the error covariance matrix or the extrapolated prediction vector from the position extrapolation processing unit 21 or the extrapolation prediction error covariance matrix from the second delay circuit 20 is input to the gate processing unit 13 and the smoothing processing unit 15. This is the second input unit.
[0104]
Next, the operation will be described.
The components other than the first input unit 18, the error covariance extrapolation processing unit 19, the second delay circuit 20, the position extrapolation processing unit 21, and the second input unit 22 are the same as those in FIG. 1 of the first embodiment. Since the operation is the same, the description thereof is omitted.
[0105]
When the current observation time is the input time of the first observation vector in the current sampling period tk to tk + 1 (when u = 1), the first input unit 18 receives the smoothed vector from the first delay circuit 16 in the first 2 and the smoothed error covariance matrix are input to the error covariance extrapolation processing section 19. After the second time (when u = 2, 3,..., Uk), nothing is output. That is, the content of the second delay circuit 20 does not change.
[0106]
The error covariance extrapolation processing unit 19 extrapolates the smooth error covariance matrix from the first input unit 18 until a certain time (for example, set as follows) in the current sampling period tk to tk + 1, and performs the second input. To the unit 22 and the second delay circuit 20.
The error covariance extrapolation processing unit 19 operates only when a smooth error covariance matrix is input from the first input unit 18.
[0107]
[Formula 40]
Figure 2004037262
[0108]
The second delay circuit 20 holds the smoothing vector sent from the first input unit 18 and the extrapolated prediction error covariance matrix sent from the error covariance extrapolation processing unit 19 for one sampling period.
[0109]
The position extrapolation processing unit 21 extrapolates the smooth vector sent from the second delay circuit to the current observation time according to the motion model, and calculates an extrapolated prediction vector. The calculation formula is the same as the formula (38) in the first embodiment.
[0110]
When the current observation time is the input time of the first observation vector in the current sampling period tk to tk + 1 (when u = 1), the second input unit 22 predicts the prediction vector and the error covariance from the prediction processing unit 8. The extrapolation prediction error covariance matrix from the extrapolation processing unit 19 is output. From the second time onward (when u = 2, 3,..., Uk), the extrapolation prediction vector from the position extrapolation processing unit 21 and the extrapolation prediction error covariance matrix from the second delay circuit 20 are output. To do.
[0111]
In the subsequent processing, the extrapolation prediction error covariance matrix and the residual covariance matrix in the current sampling interval (tk to tk + 1) have a constant value regardless of the observation time. Therefore, the expressions in the first embodiment are read as follows.
[0112]
[Expression 41]
Figure 2004037262
[0113]
According to the target tracking device of the second embodiment of the present invention described above, since the tracking process is performed for each observation time, that is, for each observation region, the observation vectors for all targets cannot be obtained at the same time. However, it is possible to execute the tracking process with high accuracy. Even in the same sampling period, since the tracking process is performed at each observation time, there is no need to wait for the arrival of all target observation vectors.
[0114]
Since the gate size is fixed in the same sampling period, it is possible to prevent the tracking maintenance failure from occurring due to a rapid change in the gate or the gain.
[0115]
Since the extrapolation process executed at each observation time is only the extrapolation of the state vector, the amount of calculation can be reduced.
[0116]
In the second embodiment, the tracking process for all tracking targets is performed at each observation time, but it is also easy to configure the tracking process by selecting only targets that exist in the vicinity of the observed region. Is possible.
[0117]
Embodiment 3 FIG.
Hereinafter, the target tracking device according to the third embodiment will be described with reference to FIG.
The same components as those in FIG. 1 of the first embodiment are denoted by the same reference numerals, and the description thereof is omitted.
[0118]
Reference numeral 24 denotes a first input unit that inputs the smoothing vector and the smoothing error covariance matrix input from the first delay circuit 16 to the extrapolation processing unit 25. Reference numeral 25 denotes a smoothing vector and a smoothing from the first input unit 24. An extrapolation processing unit 26 that extrapolates the error covariance matrix to a certain time in the current sampling interval and calculates an extrapolation prediction vector and an extrapolation prediction error covariance matrix, and 26 is an extrapolation sent from the extrapolation processing unit 25 A second delay circuit that holds the interpolation prediction vector and the extrapolation prediction error covariance matrix, 27 is an extrapolation prediction vector and extrapolation prediction error covariance matrix from the extrapolation processing unit 25, or from the second delay circuit 26. This is a second input unit that inputs either the extrapolated prediction vector or the extrapolated prediction error covariance matrix to the gate processing unit 13 and the smoothing processing unit 15.
[0119]
Next, the operation will be described. Since the operation is the same as in the first embodiment except for the first input unit 24, the extrapolation processing unit 25, the second delay circuit 26, and the second input unit 27, the first input unit 24, the extrapolation process Only the unit 25, the second delay circuit 26, and the second input unit 27 will be described.
[0120]
When the current observation time is the input time of the first observation vector in the current sampling period tk to tk + 1 (u = 1), the first input unit 24 performs smoothing and smoothing from the first delay circuit 16. The error covariance matrix is input to the extrapolation processing unit 25. After the second time (when u = 2, 3,..., Uk), nothing is output.
[0121]
The extrapolation processing unit 25 extrapolates all target smoothing vectors and smoothing error covariance matrices from the first input unit 24 until a certain time (for example, set as follows) in the current sampling period tk to tk + 1. An interpolation prediction vector and an extrapolation prediction error covariance matrix are calculated and output to the second input unit 27 and the second delay circuit 26. The extrapolation processing unit 25 operates only when there is an input from the first input unit 24.
[0122]
[Expression 42]
Figure 2004037262
[0123]
The second delay circuit 26 stores an extrapolation prediction vector and an extrapolation prediction error covariance matrix.
[0124]
Next, the second input unit 27 performs extrapolation from the extrapolation processing unit 25 when the current observation time is the input time of the first observation vector in the current sampling period tk to tk + 1 (u = 1). Output prediction vector and extrapolation prediction error covariance matrix. In the second and subsequent times (u = 2, 3,..., Uk), the extrapolated prediction vector and extrapolated prediction error covariance matrix from the second delay circuit 26 are output.
[0125]
According to the target tracking device of the third embodiment, since the tracking process is executed for each observation time, that is, for each observation region, the tracking process can be accurately performed even when the observation vectors for all targets cannot be obtained at the same time. It is possible to execute. Even in the same sampling period, since the tracking process is performed at each observation time, there is no need to wait for the arrival of all target observation vectors.
Further, since the position and size of the gate are fixed in the same sampling period, it is possible to prevent a failure in tracking maintenance due to fluctuations in the gate or gain.
[0126]
Since the extrapolation process is executed once in one sampling section, the amount of calculation can be reduced.
[0127]
In the third embodiment, the tracking process for all tracking targets is performed at each observation time, but it is also easy to configure the tracking process by selecting only targets that exist in the vicinity of the observed region. Is possible.
[0128]
Embodiment 4 FIG.
The target tracking device according to the fourth embodiment of the present invention will be described below.
FIG. 4 is a block diagram showing Embodiment 4 of the present invention. Here, as an example, a case will be described in which the present embodiment is applied to the configuration of FIG. 1 of the first embodiment. However, the present embodiment can be similarly applied to the configuration of FIGS. In FIG. 4, the same components as those in FIG. 1 of the first embodiment are denoted by the same reference numerals, and the description thereof is omitted.
[0129]
Reference numeral 29 denotes an observation value accumulating unit (observation value accumulating means) that accumulates observation values sent from the target observation apparatus 1 to some extent and then inputs them to the target tracking apparatus.
Reference numeral 30 denotes an observation time determination unit (observation time determination means) that determines that one observation time is determined for the observation values sent from the observation value storage unit 29, at the same time.
[0130]
Next, the operation will be described. Since the parts other than the observation value accumulation unit 29 and the observation time determination unit 30 have the same configuration / operation as that of FIG. 1 of the first embodiment, only the observation value accumulation unit 29 and the observation time determination unit 30 will be described. .
[0131]
The observation value accumulation unit 29 accumulates observation values sent from the target observation device 1 for a plurality of observation times and inputs them to the target tracking device. The observation time of when it was observed is also stored with the observed value. It shall not be accumulated across sampling intervals. The number of observation values to be accumulated may be determined by the number of observation times or by the number of observation values themselves.
[0132]
The observation time determination unit 30 receives the observation value sent from the observation value storage unit 29, considers that an observation value extending over a plurality of observation times has been obtained at a certain time, and determines the deemed observation time. Thereafter, the target tracking device 31 operates according to this observation time. The deemed observation time is, for example, an average value or an intermediate value of a plurality of observation times.
[0133]
According to the target tracking device 31 of the fourth embodiment, since the tracking process is executed for each observation time, that is, for each observation region, the tracking process is accurately performed even when the observation vectors for all targets cannot be obtained at the same time. Can be performed.
[0134]
Since the observation values over a plurality of observation times are processed together, it is possible to adjust the calculation amount by determining the number of observation values to be accumulated.
[0135]
In the fourth embodiment, the tracking process for all tracking targets is performed at each observation time, but it is also easy to configure the tracking process to be performed by selecting only targets that exist in the vicinity of the observed region. Is possible.
[0136]
【The invention's effect】
According to the target tracking device of the first embodiment, since the tracking process is executed for each observation time, that is, for each observation region, the tracking process can be performed accurately even when the observation vectors for all targets cannot be obtained at the same time. It is possible to execute. Even in the same sampling period, since the tracking process is performed at each observation time, there is no need to wait for the arrival of all target observation vectors.
In addition, since the gate is calculated by extrapolation processing in the same sampling period, it is possible to suppress a rapid fluctuation of the gate and to prevent tracking maintenance failure.
[0137]
According to the target tracking device of the second embodiment, since the tracking process is executed for each observation time, that is, for each observation region, the tracking process can be accurately performed even when the observation vectors for all targets cannot be obtained at the same time. It is possible to execute. Even in the same sampling period, since the tracking process is performed at each observation time, there is no need to wait for the arrival of all target observation vectors. In addition, since the gate size is fixed in the same sampling period, it is possible to prevent the tracking maintenance failure from occurring due to a rapid change in the gate or the gain. Furthermore, since the extrapolation process executed at each observation time is only the extrapolation of the state vector, the amount of calculation can be reduced.
[0138]
According to the target tracking device of the third embodiment, since the tracking process is executed for each observation time, that is, for each observation region, the tracking process can be accurately performed even when the observation vectors for all targets cannot be obtained at the same time. It is possible to execute. Even in the same sampling period, since the tracking process is performed at each observation time, there is no need to wait for the arrival of all target observation vectors.
Further, since the position and size of the gate are fixed in the same sampling period, it is possible to prevent a failure in tracking maintenance due to fluctuations in the gate or gain. Furthermore, since the extrapolation process is executed once per sampling interval, the amount of calculation can be reduced.
[0139]
According to the target tracking device of the fourth embodiment, since the tracking process is executed for each observation time, that is, for each observation region, the tracking process can be accurately performed even when the observation vectors for all targets cannot be obtained at the same time. It is possible to execute. In addition, since the observation values over a plurality of observation times are processed together, it is possible to adjust the calculation amount by determining the number of observation values to be accumulated.
[Brief description of the drawings]
FIG. 1 is a configuration diagram of a target tracking device according to a first embodiment of the present invention.
FIG. 2 is a configuration diagram of a target tracking device according to a second embodiment of the present invention.
FIG. 3 is a configuration diagram of a target tracking device according to a third embodiment of the present invention.
FIG. 4 is a configuration diagram of a target tracking device according to a fourth embodiment of the present invention.
FIG. 5 is a configuration diagram of a conventional target tracking device.
[Explanation of symbols]
1 target observation device, 8 prediction processing unit,
9, 18, 24 First input section,
10, 20, 26 second delay circuit,
11, 25 extrapolation processing unit, 12, 22 second input unit,
13 gate processing unit, 14 correlation processing unit,
15 smoothing processing unit, 16 first delay circuit,
29 observation value storage unit, 30 observation time determination unit.

Claims (4)

任意の時間間隔で複数の目標の位置を空間内で観測し、前記各観測ごとに前記目標の位置観測値を出力する目標観測手段、
入力されたデータを用いて前記空間内における前記目標の位置の存在確率分布を算出し、前記位置観測値の内から前記存在確率の高い領域の中にある前記位置観測値を選択して、その残差ベクトルと残差共分散行列とを出力するゲート処理手段、
前記選択した位置観測値と前記目標の位置との相関仮説を生成するとともに、前記残差共分散行列に基づいて各相関仮説の成立する確率を仮説信頼度として算出し、さらに、各観測値が各目標の位置と相関する確率を探知データ相関信頼度として算出する相関処理手段、
少なくとも前記探知データ相関信頼度と、前記残差ベクトルおよび残差共分散行列とを用いて、現観測時刻の前記目標の位置と速度の推定値である平滑ベクトルと、平滑誤差の評価量である平滑誤差共分散行列とを算出し、外部に出力する平滑処理手段、
前記平滑処理手段の出力を次の観測時刻まで保持し、遅延して出力する第1の遅延手段、
前記第1の遅延手段から出力される前記位置観測値の平滑ベクトルと前記平滑誤差共分散を基に、現観測時刻の予測ベクトル、および予測誤差共分散行列を算出する予測処理手段、
前記第1の遅延手段の出力した前記平滑ベクトルと前記平滑誤差共分散行列とを保持し遅延して出力する第2の遅延手段、
前記第2の遅延手段の出力した前記平滑ベクトルと前記平滑誤差共分散行列を現観測時刻まで外挿予測し、外挿予測ベクトルおよび外挿予測誤差共分散行列を算出する外挿処理手段、
前記予測処理手段の算出した前記予測ベクトルと予測誤差共分散行列、または前記外挿処理手段の算出した前記外挿予測ベクトルと外挿予測誤差共分散行列とのいずれか一方を前記ゲート処理手段と前記平滑処理手段とに入力する第2の入力手段とを備え、各観測時刻ごとに追尾処理を実行するようにしたことを特徴とする目標追尾装置。
A target observing means for observing positions of a plurality of targets in a space at arbitrary time intervals, and outputting a position observation value of the target for each observation;
Calculating the existence probability distribution of the target position in the space using the input data, selecting the position observation value in the region having the high existence probability from the position observation values, Gate processing means for outputting a residual vector and a residual covariance matrix;
A correlation hypothesis between the selected position observation value and the target position is generated, and a probability that each correlation hypothesis is established is calculated as a hypothesis reliability based on the residual covariance matrix. Correlation processing means for calculating the probability of correlation with the position of each target as detection data correlation reliability;
A smoothing vector that is an estimated value of the target position and velocity at the current observation time, and an evaluation amount of a smoothing error, using at least the detection data correlation reliability, the residual vector, and the residual covariance matrix A smoothing means for calculating a smoothing error covariance matrix and outputting the same to the outside;
First delay means for holding the output of the smoothing processing means until the next observation time and outputting the delayed output;
Prediction processing means for calculating a prediction vector at the current observation time and a prediction error covariance matrix based on the smooth vector of the position observation value output from the first delay means and the smooth error covariance;
Second delay means for holding and outputting the smoothed vector and the smoothing error covariance matrix output from the first delay means with a delay;
Extrapolation processing means for extrapolating the smoothing vector and the smoothing error covariance matrix output from the second delay means to the current observation time, and calculating an extrapolation prediction vector and an extrapolation prediction error covariance matrix;
One of the prediction vector and prediction error covariance matrix calculated by the prediction processing means, or the extrapolation prediction vector and extrapolation prediction error covariance matrix calculated by the extrapolation processing means, and the gate processing means And a second input means for inputting to the smoothing means, and a tracking process is executed at each observation time.
任意の時間間隔で複数の目標の位置を空間内で観測し、前記各観測ごとに前記目標の位置観測値を出力する目標観測手段、
入力されたデータを用いて前記空間内における前記目標の位置の存在確率分布を算出し、前記位置観測値の内から前記存在確率の高い領域の中にある前記位置観測値を選択して、その残差ベクトルと残差共分散行列とを出力するゲート処理手段、
前記選択した位置観測値と前記目標の位置との相関仮説を生成するとともに、前記残差共分散行列に基づいて各相関仮説の成立する確率を仮説信頼度として算出し、さらに、各観測値が各目標の位置と相関する確率を探知データ相関信頼度として算出する相関処理手段、
少なくとも前記探知データ相関信頼度と、前記残差ベクトルおよび残差共分散行列とを用いて、現観測時刻の前記目標の位置と速度の推定値である平滑ベクトルと、平滑誤差の評価量である平滑誤差共分散行列とを算出し、外部に出力する平滑処理手段、
前記平滑処理手段の出力を次の観測時刻まで保持し、遅延して出力する第1の遅延手段、
前記第1の遅延手段から出力される前記位置観測値の平滑ベクトルと前記平滑誤差共分散を基に、現観測時刻の予測ベクトル、および予測誤差共分散行列を算出する予測処理手段、
前記第1の遅延手段から出力された前記平滑ベクトルと前記平滑誤差共分散行列とを分離して出力する第1の入力手段、
前記平滑誤差共分散行列を現サンプリング区間内の任意の時刻まで外挿処理を行い外挿予測誤差共分散行列を算出する誤差共分散外挿処理手段、
前記平滑ベクトルと前記誤差共分散行列とを保持し遅延して出力する第2の遅延手段、
前記第2の遅延手段の出力した前記平滑ベクトルを現観測時刻まで外挿予測し、外挿予測ベクトルを算出する位置外挿処理手段、
前記予測処理手段からの予測ベクトルと上記誤差共分散外挿処理手段からの外挿予測誤差共分散行列、または、上記位置外挿処理手段からの外挿予測ベクトルと上記第2の遅延手段からの外挿予測誤差共分散行列のいずれか一方を前記ゲート処理手段と前記平滑処理手段とに入力する第2の入力手段を備え、各観測時刻ごとに追尾処理を実行するようにしたことを特徴とする目標追尾装置。
A target observing means for observing positions of a plurality of targets in a space at arbitrary time intervals, and outputting a position observation value of the target for each observation;
Calculating the existence probability distribution of the target position in the space using the input data, selecting the position observation value in the region having the high existence probability from the position observation values, Gate processing means for outputting a residual vector and a residual covariance matrix;
A correlation hypothesis between the selected position observation value and the target position is generated, and a probability that each correlation hypothesis is established is calculated as a hypothesis reliability based on the residual covariance matrix. Correlation processing means for calculating the probability of correlation with the position of each target as detection data correlation reliability;
A smoothing vector that is an estimated value of the target position and velocity at the current observation time, and an evaluation amount of a smoothing error, using at least the detection data correlation reliability, the residual vector, and the residual covariance matrix A smoothing means for calculating a smoothing error covariance matrix and outputting the same to the outside;
First delay means for holding the output of the smoothing processing means until the next observation time and outputting the delayed output;
Prediction processing means for calculating a prediction vector at the current observation time and a prediction error covariance matrix based on the smooth vector of the position observation value output from the first delay means and the smooth error covariance;
First input means for separating and outputting the smoothing vector and the smoothing error covariance matrix output from the first delay means;
Error covariance extrapolation processing means for extrapolating the smoothing error covariance matrix up to an arbitrary time within the current sampling interval and calculating an extrapolated prediction error covariance matrix;
Second delay means for holding and outputting the smooth vector and the error covariance matrix with a delay;
Position extrapolation processing means for extrapolating the smoothed vector output from the second delay means to a current observation time and calculating an extrapolated prediction vector;
The prediction vector from the prediction processing means and the extrapolation prediction error covariance matrix from the error covariance extrapolation processing means, or the extrapolation prediction vector from the position extrapolation processing means and the second delay means A second input means for inputting any one of the extrapolated prediction error covariance matrix to the gate processing means and the smoothing means, and the tracking process is executed at each observation time; Target tracking device.
任意の時間間隔で複数の目標の位置を空間内で観測し、前記各観測ごとに前記目標の位置観測値を出力する目標観測手段、
入力されたデータを用いて前記空間内における前記目標の位置の存在確率分布を算出し、前記位置観測値の内から前記存在確率の高い領域の中にある前記位置観測値を選択して、その残差ベクトルと残差共分散行列とを出力するゲート処理手段、
前記選択した位置観測値と前記目標の位置との相関仮説を生成するとともに、前記残差共分散行列に基づいて各相関仮説の成立する確率を仮説信頼度として算出し、さらに、各観測値が各目標の位置と相関する確率を探知データ相関信頼度として算出する相関処理手段、
少なくとも前記探知データ相関信頼度と、前記残差ベクトルおよび残差共分散行列とを用いて、現観測時刻の前記目標の位置と速度の推定値である平滑ベクトルと、平滑誤差の評価量である平滑誤差共分散行列とを算出し、外部に出力する平滑処理手段、
前記平滑処理手段の出力を次の観測時刻まで保持し、遅延して出力する第1の遅延手段、
前記第1の遅延手段から出力される前記位置観測値の平滑ベクトルと前記平滑誤差共分散を基に、現観測時刻の予測ベクトル、および予測誤差共分散行列を算出する予測処理手段、
前記平滑ベクトルと平滑誤差共分散行列とを現サンプリング区間内の任意の時刻まで外挿予測し、外挿予測ベクトルおよび外挿予測誤差共分散行列を算出する外挿処理手段、
前記外挿予測ベクトルおよび外挿予測誤差共分散行列を保持する第2の遅延手段、
前記外挿処理手段または前記第2の遅延手段のいずれか一方から出力した前記外挿予測ベクトルと前記外挿予測誤差共分散行列を前記ゲート処理手段および前記平滑処理手段に入力する第2の入力手段を備え、各観測時刻ごとに追尾処理を実行するようにしたことを特徴とする目標追尾装置。
A target observing means for observing positions of a plurality of targets in a space at arbitrary time intervals, and outputting a position observation value of the target for each observation;
Calculating the existence probability distribution of the target position in the space using the input data, selecting the position observation value in the region having the high existence probability from the position observation values, Gate processing means for outputting a residual vector and a residual covariance matrix;
A correlation hypothesis between the selected position observation value and the target position is generated, and a probability that each correlation hypothesis is established is calculated as a hypothesis reliability based on the residual covariance matrix. Correlation processing means for calculating the probability of correlation with the position of each target as detection data correlation reliability;
A smoothing vector that is an estimated value of the target position and velocity at the current observation time, and an evaluation amount of a smoothing error, using at least the detection data correlation reliability, the residual vector, and the residual covariance matrix A smoothing means for calculating a smoothing error covariance matrix and outputting the same to the outside;
First delay means for holding the output of the smoothing processing means until the next observation time and outputting the delayed output;
Prediction processing means for calculating a prediction vector at the current observation time and a prediction error covariance matrix based on the smooth vector of the position observation value output from the first delay means and the smooth error covariance;
Extrapolation processing means for extrapolating the smoothing vector and the smoothing error covariance matrix to an arbitrary time within the current sampling interval, and calculating an extrapolation prediction vector and an extrapolation prediction error covariance matrix;
Second delay means for holding the extrapolation prediction vector and the extrapolation prediction error covariance matrix;
A second input for inputting the extrapolation prediction vector and the extrapolation prediction error covariance matrix output from either the extrapolation processing means or the second delay means to the gate processing means and the smoothing processing means. A target tracking device comprising means for executing tracking processing at each observation time.
前記目標観測手段が異なる時刻に観測した複数の観測値を蓄積してから出力する観測値蓄積手段、
前記複数の観測値に対して、これらが同一時刻に得られたとみなすための1つの観測時刻を決定する観測時刻決定手段を備えたことを特徴とする請求項1〜3のいずれか一項に記載の目標追尾装置。
Observation value accumulating means for accumulating a plurality of observation values observed at different times by the target observation means,
The observation time determination means which determines one observation time for considering that these were obtained at the same time with respect to the plurality of observation values is provided. The target tracking device described.
JP2002194963A 2002-07-03 2002-07-03 Target tracking device Expired - Lifetime JP3750855B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002194963A JP3750855B2 (en) 2002-07-03 2002-07-03 Target tracking device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002194963A JP3750855B2 (en) 2002-07-03 2002-07-03 Target tracking device

Publications (2)

Publication Number Publication Date
JP2004037262A true JP2004037262A (en) 2004-02-05
JP3750855B2 JP3750855B2 (en) 2006-03-01

Family

ID=31703522

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002194963A Expired - Lifetime JP3750855B2 (en) 2002-07-03 2002-07-03 Target tracking device

Country Status (1)

Country Link
JP (1) JP3750855B2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007292553A (en) * 2006-04-24 2007-11-08 Mitsubishi Electric Corp Multiple target tracking system
JP2008128777A (en) * 2006-11-20 2008-06-05 Mitsubishi Electric Corp Air traffic control system
JP2011002266A (en) * 2009-06-17 2011-01-06 Nec Corp Target tracking processor and method for correcting error covariance matrix used therefor
WO2019012575A1 (en) * 2017-07-10 2019-01-17 三菱電機株式会社 Target tracking device
WO2019138443A1 (en) * 2018-01-09 2019-07-18 三菱電機株式会社 Movement path estimation device, movement path estimation system, and movement path estimation method
JP2019133332A (en) * 2018-01-30 2019-08-08 株式会社豊田中央研究所 Association device, object tracking device, and program

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007292553A (en) * 2006-04-24 2007-11-08 Mitsubishi Electric Corp Multiple target tracking system
JP2008128777A (en) * 2006-11-20 2008-06-05 Mitsubishi Electric Corp Air traffic control system
JP2011002266A (en) * 2009-06-17 2011-01-06 Nec Corp Target tracking processor and method for correcting error covariance matrix used therefor
WO2019012575A1 (en) * 2017-07-10 2019-01-17 三菱電機株式会社 Target tracking device
WO2019138443A1 (en) * 2018-01-09 2019-07-18 三菱電機株式会社 Movement path estimation device, movement path estimation system, and movement path estimation method
WO2019138638A1 (en) * 2018-01-09 2019-07-18 三菱電機株式会社 Movement path estimation device, movement path estimation system, and movement path estimation method
JPWO2019138638A1 (en) * 2018-01-09 2020-01-16 三菱電機株式会社 Travel route estimation device, travel route estimation system, and travel route estimation method
JP2019133332A (en) * 2018-01-30 2019-08-08 株式会社豊田中央研究所 Association device, object tracking device, and program

Also Published As

Publication number Publication date
JP3750855B2 (en) 2006-03-01

Similar Documents

Publication Publication Date Title
EP2495583B1 (en) Target tracking system and target tracking method
JP6186834B2 (en) Target tracking device and target tracking program
CN110286357B (en) Target motion positioning method based on underwater sound detection
KR101885839B1 (en) System and Method for Key point Selecting for Object Tracking
CN106291498B (en) A kind of detecting and tracking combined optimization method based on particle filter
JP3750855B2 (en) Target tracking device
KR101833238B1 (en) System and method for tracking target using asynchronous sensors
JP2018205229A (en) Signal tracking device and signal tracking method
JP2004219300A (en) Target-tracking system
JP5701152B2 (en) TRACKING DEVICE, COMPUTER PROGRAM, AND TRACKING METHOD
JP3616029B2 (en) Tracking device
KR101280348B1 (en) Multiple target tracking method
CN115220002A (en) Multi-target data association tracking method and related device for fixed single station
JP5675273B2 (en) Target detection apparatus and target detection method
JP3650320B2 (en) Target tracking device
JP2004233136A (en) Target tracking device
JPH05297947A (en) Multi-target tracking device
JP3411485B2 (en) Target tracking device
JP3440010B2 (en) Target tracking device
JP7207050B2 (en) Moving object state quantity estimation device and program
JPH05288840A (en) Multitarget tracking apparatus
CN113589252B (en) Multi-radar sensor multi-target tracking method based on MHT algorithm
JP3859908B2 (en) Target tracking device
JP2018146352A (en) Sensor network system, data fusion system, sensor bias estimation device, sensor bias estimation method and sensor bias estimation program
WO2024004113A1 (en) Target tracking device, target tracking method, and target tracking program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040108

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050802

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20051122

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20051201

R151 Written notification of patent or utility model registration

Ref document number: 3750855

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091216

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091216

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101216

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111216

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111216

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121216

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121216

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131216

Year of fee payment: 8

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term