JP2004018251A - Intermediate boom for crane - Google Patents

Intermediate boom for crane Download PDF

Info

Publication number
JP2004018251A
JP2004018251A JP2002179679A JP2002179679A JP2004018251A JP 2004018251 A JP2004018251 A JP 2004018251A JP 2002179679 A JP2002179679 A JP 2002179679A JP 2002179679 A JP2002179679 A JP 2002179679A JP 2004018251 A JP2004018251 A JP 2004018251A
Authority
JP
Japan
Prior art keywords
lug
boom
intermediate boom
crane
booms
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2002179679A
Other languages
Japanese (ja)
Inventor
Naoteru Fujita
藤田 直輝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Heavy Industries Construction Crane Co Ltd
Original Assignee
Sumitomo Heavy Industries Construction Crane Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Heavy Industries Construction Crane Co Ltd filed Critical Sumitomo Heavy Industries Construction Crane Co Ltd
Priority to JP2002179679A priority Critical patent/JP2004018251A/en
Publication of JP2004018251A publication Critical patent/JP2004018251A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide an intermediate boom for a crane capable of piling up a plurality of intermediate booms in order and in a stable condition, preventing collapse of cargoes when transporting them, and reducing the number of slinging works when moving. <P>SOLUTION: Connection pins 6 are inserted into each insertion hole of upper lugs 5D of the lower intermediate booms 5 piled up vertically and lower lugs 5E of the upper intermediate booms 5 to connect the upper lugs 5D with the lower lugs 5E. The upper and lower intermediate booms 5, 5 are mutually connected by facing sideway while the crane is put down on its side and are piled up. <P>COPYRIGHT: (C)2004,JPO

Description

【0001】
【発明の属する技術分野】
本発明は、クレーン用中間ブームに関し、詳しくは、保管や輸送に適するように構成されたクレーン用中間ブームに関するものである。
【0002】
【従来の技術】
ボトムブームとトップブームとの間に複数の中間ブームが接続されるクレーンでは、分解して保管する際、複数の中間ブームを上下に積み重ねることが多い。また、サイズの小さな中間ブームは、トラック等で輸送する際にも上下に積み重ねられる。
【0003】
このように複数の中間ブームを上下に積み重ねる場合、従来一般には、角材を敷いて複数の中間ブームを上下に積み重ねている。例えば、図20および図21に示すように、2本の角材Aを敷いてその上に下側の中間ブームBの両端部付近を載せ、この中間ブームBの上面の両端部付近に同様の2本の角材Aを敷いてその上に上側の中間ブームBの両端部付近を載せている。
【0004】
しかしながら、図20および図21に示したように、単に角材Aを敷いて中間ブームBを上下に積み重ねる従来例においては、上下の中間ブームB,Bを整然と積み重ねることが難しく、積み重ね状態が不安定となり易い。また、トラック等での輸送の際には、上下の中間ブームB,Bが横ずれして荷崩れを起す虞がある。
【0005】
そこで、角材などを使用することなく安定した状態で整然と上下に積み重ねることができるクレーンの中間ブームが特開平11−165986号公報において提案されている。この中間ブームは、その上面に少なくとも2本の緩衝材を幅方向に設け、各緩衝材の上面に、別の中間ブームを載置する凹部を形成したものである。
【0006】
【発明が解決しようとする課題】
ところで、前述の公報に記載されたクレーンの中間ブームでは、保管の際に複数の中間ブームを整然と安定した状態で上下に積み重ねることができるものの、上下の中間ブームが連結されていないため、以下のような問題がある。
【0007】
すなわち、トラック等での輸送の際には、振動により上下の中間ブームが横ずれして荷崩れを起す虞があるため、上下の中間ブームをロープで確実に固縛する必要がある。また、クレーンの分解作業や組立作業に際して中間ブームを移動する場合には、各中間ブーム毎に玉掛する必要があり、その作業に手間が掛る。
【0008】
そこで、本発明は、複数の中間ブームを整然と安定した状態で積み重ねることができ、輸送の際の荷崩れを防止でき、移動の際の玉掛回数を減少することができるクレーン用中間ブームを提供することを課題とする。
【0009】
【課題を解決するための手段】
このような課題を解決するための手段として、本発明に係るクレーン用中間ブームは、クレーンを構成する中間ブームであって、クレーンブームの倒伏状態における横向で上下に積み重ねて連結するための連結具の挿入孔を有するラグを備えていることを特徴とする。ここで、前記連結具は、例えば松葉ピンや割ピンの装着により抜け止めされる連結ピンや、ナットの螺合により抜け止めされるボルトなどで構成される。
【0010】
本発明に係るクレーン用中間ブームでは、上下に積み重ねられる下方の中間ブームのラグおよび上方の中間ブームのラグの各挿入孔に連結具を挿入してラグ同士を連結することにより、上下の中間ブームが相互に連結されて積み重ねられる。
【0011】
本発明のクレーン用中間ブームにおいて、前記ラグは上下に積み重ねられる前記中間ブームの上面側に突設された上部ラグと下面側に突設された下部ラグとで構成することができる。この場合、上下に積み重ねられる下方の中間ブームの上部ラグおよび上方の中間ブームの下部ラグの各挿入孔に連結具を挿入して上部ラグと下部ラグとを連結することにより、上下の中間ブームがクレーンの倒伏状態における横向で相互に連結されて積み重ねられる。
【0012】
また、本発明のクレーン用中間ブームにおいて、前記上部ラグおよび下部ラグの少なくとも一方は、他方を挟み込む凹状に構成するのが好ましい。この場合、上下に積み重ねられる下方の中間ブームの上部ラグに上方の中間ブームの下部ラグを支持させることができるため、上部ラグおよび下部ラグの各挿入孔に連結具を挿入して上部ラグと下部ラグとを連結する作業が容易となる。
【0013】
また、本発明のクレーン用中間ブームにおいて、他方を挟み込む凹状に構成された前記上部ラグまたは下部ラグは、他方を挟み込む凹状端部が開いて形成されていることが好ましい。この場合、一方のラグを他方のラグに挟み込むのに際して、一方のラグの開いた凹状端部が他方のラグの挿入の案内になる。
【0014】
また、本発明のクレーン用中間ブームにおいて、前記上部ラグおよび下部ラグの各挿入孔の位置を合わせる孔位置合わせ手段を備えることが好ましい。この場合、一方のラグを他方のラグに挟み込んで連結具を挿入するのに際して、前記上部ラグおよび下部ラグの各挿入孔の位置が容易に一致する。
【0015】
また、本発明のクレーン用中間ブームにおいて、前記ラグは中間ブームに溶接して一体に設けられていてもよいし、中間ブームに着脱自在に固定される別体として構成されていてもよい。ラグが中間ブームと別体に構成されている場合、既存の中間ブームにラグを装着することで本発明のクレーン用中間ブームが容易に構成される。
【0016】
また、本発明のクレーン用中間ブームにおいて、上下に積み重ねて連結するための前記連結具は中間ブームどうしを連結するブーム連結ピンであることが好ましい。この場合、連結具は中間ブームどうしを連結するブーム連結ピンを流用することが出来る。
【0017】
【発明の実施の形態】
次に、図面を参照して本発明に係るクレーンの中間ブームの実施の形態を説明する。参照する図面において、図1は一実施形態に係るクレーン用中間ブームを有するラチスブームクローラクレーンの側面図、図2は一実施形態に係るクレーン用中間ブームの構造を示す側面図、図3は図2に示したクレーン用中間ブームの構造を示す端面図である。
【0018】
一実施形態に係るクレーン用中間ブームは、図1に示すようなクローラクレーン1に装備されるラチスブーム2のボトムブーム3とトップブーム4との間に接続される例えば4本の中間ブーム5に適用される。この中間ブーム5は、図2および図3に示すように、直方体の格子状に溶接されたフレームパイプ(以下、主材と称する)5Aに複数の斜材5Bをジグザグ状に掛け渡して溶接したラチス構造物である。この中間ブーム5の長手方向の両端部には、図示しないブーム連結ピンと抜け止めの松葉ピンにより他の中間ブーム5と相互に連結される連結片5Cがそれぞれ4個ずつ突設されている。
【0019】
ここで、図2に示す中間ブーム5は、図1に示したラチスブームクレーン2の倒伏状態における横向で上下に積み重ねられるものであり、その長手方向の両端部付近の上面側には、前記連結片5Cの近傍に配置して主材5Aに溶接された合計4個の上部ラグ5Dが上方に突設されている。また、下面側には、各上部ラグ5Dの直下に配置して主材5Aに溶接された合計4個の下部ラグ5Eが下方に突設されている。
【0020】
前記上部ラグ5Dおよび下部ラグ5Eは、複数の中間ブーム5を図2に示す横向で上下に積み重ねて連結するためのものであり、図4および図5に拡大して示すように、連結具としての連結ピン6(図5参照)が挿入されるピン挿入孔5Fが中間ブーム5の幅方向に貫通して形成されている。図示の例では、上部ラグ5Dが山形状の輪郭に形成され、下部ラグ5Eが逆台形状の輪郭に形成されているが、これらの輪郭は適宜変更することができる。
【0021】
図5に拡大して示すように、前記上部ラグ5Dが単一片により構成されているのに対し、下部ラグ5Eは上部ラグ5Dを挟み込む二片により下向きの凹状に形成されている。そして、上部ラグ5Dおよび下部ラグ5Eの各ピン挿入孔5Fに挿入される連結ピン6は、その先端部を貫通して装着される松葉ピン7あるいは割ピン等によって抜け止めされるように構成されている。
【0022】
以上のように構成された一実施形態に係るクレーン用中間ブームとしての中間ブーム5を上下に積み重ねて連結する場合、例えば図6に示すような補助クレーン8により、まず、一方の中間ブーム5の上面側に突設された上部ラグ5Dに玉掛してこの中間ブーム5を横向に置き、その後、同様の手順により他方の中間ブーム5を一方の中間ブーム5の上方に吊り下げる。つぎに、図4および図5に示したように、上方の中間ブーム5の下面側に突設された各下部ラグ5Eを下方の中間ブーム5の上面側に突設された各上部ラグ5Dに位置合せする。そして、下部ラグ5Eおよび上部ラグ5Dの各ピン挿入孔5Fに連結ピン6を挿入し、その先端部を貫通して松葉ピン7を装着する。
【0023】
このような簡単な作業により、上下の中間ブーム5,5は、図7に示すように、上下に連結されることで整然と安定した状態で上下に積み重ねられる。このように上下に連結されて積み重ねられた中間ブーム5,5は、例えば図1に示したクローラクレーン1の作業現場でのラチスブームクレーン2の組立に当り、前記補助クレーン8により玉掛して、図8に示すように上下2本ずつ左右に並べてトラック9に積載され、作業現場へと輸送される。この輸送に際して、上下に積み重ねられた2本の中間ブーム5,5は、相互に連結されているため荷崩れすることがなく、ロープにより固縛する必要がなくなる。
【0024】
トラック9により作業現場に輸送された4本の中間ブーム5は、図9に示すように、まず、片側の上下2本が補助クレーン8により上方の中間ブーム5の上部ラグ5Dに玉掛して一緒に吊り上げられ、図10に示すようにクローラクレーン1のボトムブーム3付近に吊り降ろされる。そして、吊り降ろされた下方の中間ブーム5の基端部側に配設された4個の連結片5C(図2参照)のうち上方の一対の連結片5Cが前記ボトムブーム3の先端部側に配設された上方の一対の連結片に接続される。
【0025】
続いて、上部ラグ5Dと下部ラグ5Eとを連結している連結ピン6(図5参照)を抜き取ることにより、上下の中間ブーム5,5が分離され、図11に示すように、補助クレーン8に吊り下げられた上方の中間ブーム5が先にボトムブーム3に接続された1段目の中間ブーム5の先端部側に吊り降ろされる。そして、この上方の中間ブーム5の基端部側に配設された4個の連結片5Cが1段目の中間ブーム5の先端部側に配設された4個の連結片5Cにそれぞれ接続され、こうして1段目の中間ブーム5に2段目の中間ブーム5が接続される。
【0026】
その後、2段目の中間ブーム5から補助クレーン8の玉掛が外され、前記トラック9に残された3段目および4段目の上下2本の中間ブーム5,5が前述と同様に補助クレーン8により玉掛して一緒に吊り上げられる(図12参照)。以後、図13および図14に示すように、前述した作業手順と同様の作業手順により、先に接続された2段目の中間ブーム5の先端部に下方の3段目の中間ブーム5の基端部が接続され、この3段目の中間ブーム5の先端部に上方の4段目の中間ブーム5の基端部が接続される。
【0027】
その後、図1に示したトップブーム4が前記補助クレーン8により玉掛して吊り下げられ、この状態で前記4段目の中間ブーム5の先端部にトップブーム4の基端部が接続される。そして最後に、ボトムブーム3の先端を補助クレーン8で吊り上げることにより、ボトムブーム3の先端部側に配設された下方の一対の連結片に1段目の中間ブーム5の下方の一対の連結片5Cの位置が合い、この状態で各連結片が接続されてボトムブーム3と1段目の中間ブーム5とが連結される。こうしてクローラクレーン1のラチスブーム2の組立作業が完了する。
【0028】
このように、クローラクレーン1のラチスブーム2の組立作業に当り、4本の中間ブーム5は、それぞれ上下に連結して積み重ねられた2本を1組として補助クレーン8により玉掛することができ、従来のように1本づつ玉掛する場合に較べてその玉掛作業の工数が半減する。
【0029】
特に、上下2本の中間ブーム5,5が前記ラチスブーム2の倒伏状態における横向で相互に連結されて積み重ねられるため、ラチスブーム2の組立作業および分解作業に当り、補助クレーン8により中間ブーム5に玉掛して移動する際に、従来のように中間ブーム5を1個移動させる毎にその向きを変える必要がなく、補助クレーン8による玉掛回数を最小限にすることができる。
【0030】
本発明のクレーン用中間ブームにおいて、一実施形態の中間ブーム5では、図5に示すように、上部ラグ5Dが単一片により構成され、下部ラグ5Eが上部ラグ5Dを挟み込む二片により下向きの凹状に形成されているが、反対に下部ラグ5Eが単一片により構成され、上部ラグ5Dが下部ラグ5Eを挟み込む二片により上向きの凹状に形成されていてもよい。このように、上部ラグ5Dまたは下部ラグ5Eの何れか一方が他方を挟み込む凹状に形成されている場合、上下に積み重ねられる下方の中間ブーム5の上部ラグ5Dに上方の中間ブーム5の下部ラグ5Eを支持させることができるため、上下の積み重ねが滑ることなく安全に載置される上に、上部ラグ5Dおよび下部ラグ5Eの各ピン挿入孔5Fに連結ピン6を挿入して上部ラグ5Dと下部ラグ5Eとを連結する作業を容易に行うことができる。
【0031】
また、本発明のクレーン用中間ブームにおいて、一実施形態の中間ブーム5では、図5に示すように、一方の下部ラグ5Eの二片の凹状端部が直線状に形成されているが、図15に示すように、上部ラグ5Dが単一片の下部ラグ5Eを挟み込む二片の凹状に構成され、さらに、この凹状端部がハの字状に開いて形成されているように構成してもよい。この場合、下部ラグ5Eを上部ラグ5Dに挟み込むのに際して、上部ラグ5Dの開いた凹状端部が下部ラグ5Eの挿入の案内になるため、下部ラグ5Eを上部ラグ5Dに挿入して挟み込む作業を容易に行うことができる。なお、下部ラグ5Eが単一片の上部ラグ5Dを挟み込む二片の凹状に構成され、さらに、この凹状端部がハの字状に開いて形成されているように構成しても、同様な作用効果が奏される。
【0032】
また、本発明のクレーン用中間ブームにおいて、図16(a),(b),(c)に示すように、上部ラグ5Dおよび下部ラグ5Eの各挿入孔5Fの位置を合わせる孔位置合わせ手段を備えることが好ましい。
【0033】
同図(a)は、この孔位置合わせ手段が、凹状に構成された一方の上部ラグ5Dの先端部が、他方の下部ラグ5Eを支持する主材5Aに当接する位置で、各挿入孔5Fの位置が合うラグ高さ寸法に設定されて構成されている例を示している。同図(b)は、孔位置合わせ手段が、凹状に構成された一方の上部ラグ5Dに挟み込まれる他方の下部ラグ5Eの先端部が、上部ラグ5Dを支持する主材5Aに当接する位置で、各挿入孔5Fの位置が合うラグ高さ寸法に設定されて構成されている例を示している。同図(c)は、孔位置合わせ手段が、凹状に構成された一方の上部ラグ5Dに挟み込まれる他方の下部ラグ5Eの先端部が、上部ラグ5Dの凹状部間に亘って設けられたストッパ13に当接する位置で、各挿入孔5Fの位置が合うラグ高さ寸法に設定されて構成されている例を示している。
【0034】
このような各場合においては、下部ラグ5Eを上部ラグ5Dに挟み込んで連結ピン6を挿入するのに際して、上部ラグ5Dおよび下部ラグ5Eの各挿入孔5Fの位置が容易に一致するので、各ラグ5D,5Eの挿入孔5Fに連結ピン6を挿入する作業を容易に行うことができる。なお、上部ラグ5Dが単一片により構成され、下部ラグ5Eが上部ラグ5Dを挟み込む二片の凹状に形成されている場合にも、同様な作用効果が奏される。
【0035】
また、一実施形態の中間ブーム5では、上部ラグ5Dおよび下部ラグ5Eが主材5Aに溶接して一体に設けられているが、本発明のクレーン用中間ブームに付設される上部ラグおよび下部ラグは、図17および図18に示すように、中間ブーム5の主材5Aに着脱自在な別体の上部ラグ10および下部ラグ11として構成されていてもよい。
【0036】
前記上部ラグ10は、主材5Aを包持する半円状の湾曲部を有する対称形状のラグ片10A,10Bがボルト・ナット12の締結により主材5Aに着脱自在に装着されるものであり、ラグ片10A,10Bの主材5Aから上方に突出する部分は相互に接合されて単一片状に構成されており、この部分に前記ピン挿入孔5Fと同様のピン挿入孔10Cが形成されている。
【0037】
一方、前記下部ラグ11は、主材5Aを包持する半円状の湾曲部を有する対称形状のラグ片11A,11Bがボルト・ナット12の締結により主材5Aに着脱自在に装着されるものであり、ラグ片11A,11Bの主材5Aから下方に突出する部分は、前記ボルト・ナット12のボルトに装着されたスペーサリング11Cにより所定間隔を開けて対向しており、前記上部ラグ10を挟み込む下向きの凹状に形成されている。そして、この下向きの凹状部分に前記ピン挿入孔5Fと同様のピン挿入孔11Dが形成されている。
【0038】
このような上部ラグ10および下部ラグ11が主材5Aに着脱自在に固定される中間ブーム5においては、前述した一実施形態の中間ブーム5と同様の作用効果を奏する他、既存の中間ブームも上部ラグ10および下部ラグ11の固定によって容易に本発明のクレーン用中間ブームとして構成することができる。なお、上部ラグ10および下部ラグ11はその形状および構造を入れ代えて構成してもよい。
【0039】
また、以上の説明においては、中間ブーム5を上下に積み重ねて連結するための連結具として、特別な連結ピン6を用意した場合について説明したが、この連結具として、中間ブーム5どうしを連結片5Cで連結するためのブーム連結ピンを用いることも出来る。この場合、連結具として中間ブーム5どうしを連結するブーム連結ピンを流用することが出来るため、中間ブーム5を上下に積み重ねて連結するために特別な連結ピン6を用意する必要はない。また、中間ブーム5を分解して保管する際に、中間ブーム5どうしを連結していたブーム連結ピンを特別な場所に格納しておく必要もなく、また、中間ブーム5を上下に積み重ねて連結するのに使用することでブーム連結ピンが紛失してしまうこともなくなる。
【0040】
また、以上の説明においては、上部ラグ5Dまたは下部ラグ5Eの何れか一方が他方を挟み込む凹状に形成されている場合について説明したが、図19に示すように、上部ラグ5Dおよび下部ラグ5Eの双方を単一片に構成し、連結ピン6を挿入孔5Fに挿入して中間ブーム5を上下に積み重ねて連結することも可能である。
【0041】
【発明の効果】
以上説明したように、本発明に係るクレーン用中間ブームでは、クレーンブームの倒伏状態における横向で上下に積み重ねられる下方の中間ブームのラグおよび上方の中間ブームのラグの各挿入孔に連結具を挿入してラグ同士を連結することにより、上下の中間ブームが相互に連結されて積み重ねられる。従って、本発明のクレーン用中間ブームによれば、複数の中間ブームを整然と安定した状態で積み重ねることができ、輸送の際の荷崩れを防止でき、移動の際の玉掛回数を減少することができる。
【0042】
本発明のクレーン用中間ブームにおいて、前記ラグが上下に積み重ねられる前記中間ブームの上面側に突設された上部ラグと下面側に突設された下部ラグとで構成されている場合、上下に積み重ねられる下方の中間ブームの上部ラグおよび上方の中間ブームの下部ラグの各挿入孔に連結具を挿入して上部ラグと下部ラグとを締結することにより、上下の中間ブームがクレーンの倒伏状態における横向で相互に連結されて積み重ねられる。従って、この場合には、クレーンの組立作業および分解作業に当り、中間ブームに玉掛して移動する際に、従来のように中間ブームを1個移動させる毎にその向きを変える必要がなく、玉掛回数を最小限にすることができる。
【0043】
また、本発明のクレーン用中間ブームにおいて、前記上部ラグおよび下部ラグの少なくとも一方が他方を挟み込む凹状に構成されている場合、上下に積み重ねられる下方の中間ブームの上部ラグに上方の中間ブームの下部ラグを支持させることができるため、上下の積み重ねが滑ることなく安全に載置される上に、上部ラグおよび下部ラグの各挿入孔に連結具を挿入して上部ラグと下部ラグとを連結する作業を容易に行うことができる。
【0044】
また、本発明のクレーン用中間ブームにおいて、他方を挟み込む凹状に構成された前記上部ラグまたは下部ラグが、他方を挟み込む凹状端部が開いて形成されている場合、一方のラグを他方のラグに挟み込むのに際して、一方のラグの開いた凹状端部が他方のラグの挿入の案内になるため、一方のラグを他方のラグに挿入して挟み込む作業が容易となる。
【0045】
また、本発明のクレーン用中間ブームにおいて、前記上部ラグおよび下部ラグの各挿入孔の位置を合わせる孔位置合わせ手段を備えている場合、一方のラグを他方のラグに挟み込んで連結具を挿入するのに際して、前記上部ラグおよび下部ラグの各挿入孔の位置が容易に一致するので、各ラグの挿入孔に連結具を挿入する作業が容易となる。
【0046】
また、本発明のクレーン用中間ブームにおいて、前記ラグが中間ブームに着脱自在な別体として構成されている場合、既存の中間ブームもラグの装着によって容易に本発明の中間ブームとして構成することができる。
【0047】
また、本発明のクレーン用中間ブームにおいて、上下に積み重ねて連結するための連結具が中間ブームどうしを連結するブーム連結ピンである場合、連結具は中間ブームどうしを連結するブーム連結ピンを流用することが出来る。このため、中間ブームを上下に積み重ねて連結するために特別な連結具を用意する必要はない。また、中間ブームを分解して保管する際に、中間ブームどうしを連結していたブーム連結ピンを特別な場所に格納しておく必要もなく、また、中間ブームを上下に積み重ねて連結するのに使用することでブーム連結ピンが紛失してしまうこともなくなる。
【図面の簡単な説明】
【図1】本発明の一実施形態に係るクレーン用中間ブームを有するラチスブームクローラクレーンの側面図である。
【図2】一実施形態に係るクレーン用中間ブームとしての中間ブームの構造を示す側面図である。
【図3】図2に示した中間ブームの構造を示す端面図である。
【図4】図2に示した上部ラグおよび下部ラグの拡大図である。
【図5】図3に示した上部ラグおよび下部ラグの拡大図である。
【図6】図2に示した中間ブーム5を上下に積み重ねる作業の説明図である。
【図7】図2に示した中間ブームが上下に連結された状態を示す側面図である。
【図8】図7に示した上下2本の中間ブームのトラックへの積載状況を示す説明図である。
【図9】図8に示した上下2本の中間ブームのトラックからの吊り降ろし作業を示す説明図である。
【図10】図9に示した下方の1段目の中間ブームをラチスブームクレーンのボトムブームに接続する作業の説明図である。
【図11】図10に示した上方の2段目の中間ブームを1段目の中間ブームに接続する作業の説明図である。
【図12】図8に示した他の上下2本の中間ブームの吊り降ろし作業の説明図である。
【図13】図12に示した下方の3段目の中間ブームを2段目の中間ブームに接続する作業の説明図である。
【図14】図13に示した上方の4段目の中間ブームを3段目の中間ブームに接続する作業の説明図である。
【図15】一実施形態に係る中間ブームにおける上部ラグの凹状端部が開いて形成された変形例を示す拡大図である。
【図16】一実施形態に係る中間ブームにおける上部ラグおよび下部ラグの各挿入孔の位置を合わせる孔位置合わせ手段を示す拡大図である。
【図17】一実施形態に係る中間ブームにおける上部ラグおよび下部ラグを別体に構成した変形例を図4に対応して示す拡大図である。
【図18】一実施形態に係る中間ブームにおける上部ラグおよび下部ラグを別体に構成した変形例を図5に対応して示す拡大図である。
【図19】一実施形態に係る中間ブームにおける上部ラグおよび下部ラグを単一片で構成した変形例を示す拡大図である。
【図20】従来例の中間ブームが上下に積み重ねられた状態を示す側面図である。
【図21】従来例の中間ブームが上下に積み重ねられた状態を示す端面図である。
【符号の説明】
1 :クローラクレーン
2 :ラチスブーム
3 :ボトムブーム
4 :トップブーム
5 :中間ブーム
5A:フレームパイプ(主材)
5B:斜材
5C:連結片
5D:上部ラグ
5E:下部ラグ
5F:ピン挿入孔
6 :連結ピン
7 :松葉ピン
8 :補助クレーン
9 :トラック
10 :上部ラグ
10A:ラグ片
10B:ラグ片
10C:ピン挿入孔
11 :下部ラグ
11A:ラグ片
11B:ラグ片
11C:スペーサリング
11D:ピン挿入孔
12 :ボルト・ナット
13 :ストッパ
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to an intermediate boom for a crane, and more particularly, to an intermediate boom for a crane configured to be suitable for storage and transportation.
[0002]
[Prior art]
In a crane in which a plurality of intermediate booms are connected between the bottom boom and the top boom, the plurality of intermediate booms are often stacked up and down when disassembled and stored. Also, the small-sized intermediate booms are stacked up and down when transported by truck or the like.
[0003]
In the case where a plurality of intermediate booms are vertically stacked as described above, conventionally, generally, a plurality of intermediate booms are vertically stacked by laying square bars. For example, as shown in FIGS. 20 and 21, two square bars A are laid and the vicinity of both ends of the lower intermediate boom B is placed thereon. A book square A is laid, and the vicinity of both ends of the upper intermediate boom B is placed thereon.
[0004]
However, as shown in FIG. 20 and FIG. 21, in the conventional example in which the intermediate booms B are vertically stacked simply by laying the timber A, it is difficult to orderly stack the upper and lower intermediate booms B, B, and the stacking state is unstable. Easily. In addition, during transportation by truck or the like, the upper and lower intermediate booms B, B may be laterally shifted to cause collapse of the load.
[0005]
Japanese Patent Application Laid-Open No. H11-165986 proposes an intermediate boom of a crane which can be stacked up and down in a stable state without using a timber or the like. This intermediate boom has at least two cushioning members provided on the upper surface thereof in the width direction, and a concave portion for placing another intermediate boom is formed on the upper surface of each cushioning member.
[0006]
[Problems to be solved by the invention]
By the way, in the intermediate boom of the crane described in the above-mentioned publication, a plurality of intermediate booms can be stacked up and down in an orderly and stable state during storage, but since the upper and lower intermediate booms are not connected, the following There is such a problem.
[0007]
That is, when transporting by truck or the like, the upper and lower intermediate booms need to be securely fastened with a rope because the upper and lower intermediate booms may be laterally shifted due to vibration and collapse in load. Further, when the intermediate boom is moved during the disassembling operation and the assembling operation of the crane, it is necessary to sling each intermediate boom, which is troublesome.
[0008]
Therefore, the present invention provides an intermediate boom for a crane that can stack a plurality of intermediate booms in an orderly and stable state, can prevent collapse of a load during transportation, and can reduce the number of slugs during movement. That is the task.
[0009]
[Means for Solving the Problems]
As a means for solving such a problem, an intermediate boom for a crane according to the present invention is an intermediate boom that constitutes a crane, and is a connecting tool for stacking and connecting the crane boom vertically in a horizontal state in a falling state. A lug having an insertion hole. Here, the connection tool is composed of, for example, a connection pin that is prevented from falling off by mounting a pine needle pin or a split pin, a bolt that is prevented from being removed by screwing a nut, or the like.
[0010]
In the intermediate boom for a crane according to the present invention, the lugs of the lower intermediate boom and the lugs of the upper intermediate boom, which are stacked vertically, are inserted into the respective insertion holes to connect the lugs to each other, whereby the upper and lower intermediate booms are connected. Are interconnected and stacked.
[0011]
In the intermediate boom for a crane according to the present invention, the lugs may be composed of an upper lug protruding from an upper surface of the intermediate boom and a lower lug protruding from a lower surface of the intermediate boom. In this case, the upper and lower intermediate booms are connected by inserting the coupling tool into each of the insertion holes of the upper lug of the lower intermediate boom and the lower lug of the upper intermediate boom stacked vertically to connect the upper lug and the lower lug. The cranes are stacked and connected to each other in the horizontal position in the down state.
[0012]
Further, in the intermediate boom for a crane of the present invention, it is preferable that at least one of the upper lug and the lower lug is formed in a concave shape that sandwiches the other. In this case, since the lower lug of the upper intermediate boom can be supported by the upper lug of the lower intermediate boom stacked vertically, the coupling tool is inserted into each insertion hole of the upper lug and the lower lug, and the upper lug and the lower lug are inserted. The work of connecting the lug is facilitated.
[0013]
In the intermediate boom for a crane of the present invention, it is preferable that the upper lug or the lower lug configured to sandwich the other is formed with an open concave end that sandwiches the other. In this case, when one lug is sandwiched between the other lugs, the open concave end of one lug guides the insertion of the other lug.
[0014]
In the crane intermediate boom of the present invention, it is preferable that the intermediate boom for a crane is provided with hole positioning means for positioning the insertion holes of the upper lug and the lower lug. In this case, the positions of the insertion holes of the upper lug and the lower lug easily coincide with each other when the connector is inserted by inserting one lug into the other lug.
[0015]
In the intermediate boom for a crane of the present invention, the lug may be integrally provided by welding to the intermediate boom, or may be configured as a separate body detachably fixed to the intermediate boom. When the lug is configured separately from the intermediate boom, the intermediate boom for the crane of the present invention can be easily configured by attaching the lug to the existing intermediate boom.
[0016]
Further, in the intermediate boom for a crane of the present invention, it is preferable that the connecting tool for vertically stacking and connecting is a boom connecting pin for connecting the intermediate booms. In this case, the connecting tool can use a boom connecting pin for connecting the intermediate booms.
[0017]
BEST MODE FOR CARRYING OUT THE INVENTION
Next, an embodiment of an intermediate boom of a crane according to the present invention will be described with reference to the drawings. In the drawings to be referred to, FIG. 1 is a side view of a lattice boom crawler crane having an intermediate boom for a crane according to one embodiment, FIG. 2 is a side view showing a structure of an intermediate boom for a crane according to one embodiment, and FIG. It is an end elevation which shows the structure of the intermediate | middle boom for cranes shown in FIG.
[0018]
The intermediate boom for a crane according to one embodiment is applied to, for example, four intermediate booms 5 connected between a bottom boom 3 and a top boom 4 of a lattice boom 2 provided in a crawler crane 1 as shown in FIG. Is done. As shown in FIGS. 2 and 3, the intermediate boom 5 was welded by bridging a plurality of diagonal members 5B in a zigzag manner on a frame pipe (hereinafter, referred to as a main material) 5A welded in a rectangular parallelepiped lattice shape. It is a lattice structure. At both ends in the longitudinal direction of the intermediate boom 5, four connecting pieces 5 </ b> C which are mutually connected to the other intermediate booms 5 by a boom connecting pin (not shown) and a pine needle pin for retaining, respectively, are protruded.
[0019]
Here, the intermediate boom 5 shown in FIG. 2 is stacked vertically in the horizontal state when the lattice boom crane 2 shown in FIG. 1 is in the downright position. A total of four upper lugs 5D arranged near the piece 5C and welded to the main material 5A protrude upward. On the lower surface side, a total of four lower lugs 5E arranged immediately below each upper lug 5D and welded to the main material 5A are protruded downward.
[0020]
The upper lug 5D and the lower lug 5E are for stacking and connecting the plurality of intermediate booms 5 in the horizontal direction shown in FIG. 2 and as a connecting tool as shown in an enlarged manner in FIGS. A pin insertion hole 5F into which the connecting pin 6 (see FIG. 5) is inserted is formed to penetrate the intermediate boom 5 in the width direction. In the illustrated example, the upper lug 5D is formed in a mountain-shaped outline, and the lower lug 5E is formed in an inverted trapezoidal outline, but these outlines can be appropriately changed.
[0021]
As shown in an enlarged view in FIG. 5, the upper lug 5D is formed of a single piece, whereas the lower lug 5E is formed in a downward concave shape by two pieces sandwiching the upper lug 5D. The connecting pin 6 inserted into each of the pin insertion holes 5F of the upper lug 5D and the lower lug 5E is configured to be prevented from falling off by a crutch pin 7 or a split pin that is mounted through its tip. ing.
[0022]
When the intermediate booms 5 as the intermediate booms for a crane according to the embodiment configured as described above are stacked one above the other and connected together, for example, the auxiliary crane 8 as shown in FIG. The intermediate boom 5 is placed sideways on the upper lug 5D protruding from the upper surface side, and then the other intermediate boom 5 is suspended above the one intermediate boom 5 by the same procedure. Next, as shown in FIGS. 4 and 5, each lower lug 5E protruding from the lower surface of the upper intermediate boom 5 is connected to each upper lug 5D protruding from the upper surface of the lower intermediate boom 5. Align. Then, the connecting pin 6 is inserted into each of the pin insertion holes 5F of the lower lug 5E and the upper lug 5D, and the pine needles 7 are mounted through the distal ends thereof.
[0023]
By such a simple operation, the upper and lower intermediate booms 5, 5 are vertically stacked as shown in FIG. 7, and are stacked in an orderly and stable manner. The intermediate booms 5, 5, which are vertically connected and stacked in this manner, are assembled by the auxiliary crane 8 at the time of assembling the lattice boom crane 2 at the work site of the crawler crane 1 shown in FIG. As shown in FIG. 8, two trucks are arranged side by side on the left and right, loaded on the truck 9, and transported to the work site. In this transportation, the two intermediate booms 5 and 5 stacked one above the other are connected to each other, so that they do not collapse and do not need to be secured with a rope.
[0024]
As shown in FIG. 9, the four intermediate booms 5 transported to the work site by the trucks 9 first have the upper and lower two on one side slinged on the upper lug 5D of the upper intermediate boom 5 by the auxiliary crane 8 and joined together. And crawled near the bottom boom 3 of the crawler crane 1 as shown in FIG. Then, of the four connecting pieces 5C (see FIG. 2) arranged on the base end side of the suspended lower intermediate boom 5, the upper pair of connecting pieces 5C is connected to the distal end side of the bottom boom 3. Is connected to a pair of upper connecting pieces disposed in the upper part.
[0025]
Subsequently, by pulling out the connecting pin 6 (see FIG. 5) connecting the upper lug 5D and the lower lug 5E, the upper and lower intermediate booms 5 and 5 are separated, and as shown in FIG. The upper intermediate boom 5 suspended from the bottom boom 3 is first suspended from the tip of the first intermediate boom 5 connected to the bottom boom 3. The four connecting pieces 5C disposed on the base end side of the upper intermediate boom 5 are connected to the four connecting pieces 5C disposed on the distal end side of the first stage intermediate boom 5 respectively. Thus, the second-stage intermediate boom 5 is connected to the first-stage intermediate boom 5.
[0026]
Thereafter, the sling of the auxiliary crane 8 is removed from the intermediate boom 5 of the second stage, and the upper and lower two intermediate booms 5 and 5 of the third and fourth stages remaining on the truck 9 are moved to the auxiliary crane 8 in the same manner as described above. 8 and slung together (see FIG. 12). Thereafter, as shown in FIGS. 13 and 14, the lower end of the third intermediate boom 5 is attached to the distal end of the second intermediate boom 5 connected earlier by the same operation procedure as described above. The ends are connected, and the base end of the upper middle boom 5 of the fourth stage is connected to the distal end of the middle boom 5 of the third stage.
[0027]
Thereafter, the top boom 4 shown in FIG. 1 is slung and suspended by the auxiliary crane 8, and in this state, the base end of the top boom 4 is connected to the distal end of the fourth stage intermediate boom 5. Finally, by lifting the tip of the bottom boom 3 with the auxiliary crane 8, a pair of lower connection pieces disposed on the tip side of the bottom boom 3 are connected to a pair of lower pieces of the intermediate boom 5 of the first stage. The pieces 5C are aligned, and in this state, the connecting pieces are connected, and the bottom boom 3 and the first-stage intermediate boom 5 are connected. Thus, the assembly operation of the lattice boom 2 of the crawler crane 1 is completed.
[0028]
Thus, in assembling the lattice boom 2 of the crawler crane 1, the four intermediate booms 5 can be slung by the auxiliary crane 8 as a set of two stacked vertically connected one above the other. The man-hour for the slinging operation is reduced by half as compared with the case of slinging one by one as shown in FIG.
[0029]
In particular, since the upper and lower two intermediate booms 5 and 5 are connected to each other and stacked in a horizontal direction in a state in which the lattice boom 2 is in the down state, the auxiliary crane 8 hangs the intermediate boom 5 during the assembly operation and the disassembly operation of the lattice boom 2. When moving, the intermediate boom 5 does not need to change its direction each time it is moved, unlike the related art, and the number of slings by the auxiliary crane 8 can be minimized.
[0030]
In the intermediate boom 5 for a crane of the present invention, in the intermediate boom 5 of one embodiment, as shown in FIG. 5, the upper lug 5D is constituted by a single piece, and the lower lug 5E is formed by two pieces sandwiching the upper lug 5D. On the contrary, the lower lug 5E may be formed of a single piece, and the upper lug 5D may be formed in an upward concave shape by two pieces sandwiching the lower lug 5E. As described above, when either the upper lug 5D or the lower lug 5E is formed in a concave shape sandwiching the other, the upper lug 5D of the lower intermediate boom 5 stacked vertically and the lower lug 5E of the upper intermediate boom 5 are stacked. The upper and lower stacks can be safely mounted without slipping, and the upper lugs 5D and the lower lugs 5D can be inserted by inserting the connecting pins 6 into the pin insertion holes 5F of the upper lugs 5D and the lower lugs 5E. The work of connecting the lug 5E can be easily performed.
[0031]
Further, in the intermediate boom 5 for a crane of the present invention, in the intermediate boom 5 of one embodiment, as shown in FIG. 5, two concave ends of one lower lug 5E are formed linearly. As shown in FIG. 15, the upper lug 5D may be formed in a two-piece concave shape sandwiching the single-piece lower lug 5E, and the concave end may be formed to open in a C-shape. Good. In this case, when inserting the lower lug 5E into the upper lug 5D, the open concave end of the upper lug 5D serves as a guide for inserting the lower lug 5E. It can be done easily. In addition, even when the lower lug 5E is formed in a two-piece concave shape sandwiching the single-piece upper lug 5D, and the concave end portion is formed so as to open in a C-shape, the same effect is obtained. The effect is achieved.
[0032]
In the intermediate boom for a crane of the present invention, as shown in FIGS. 16 (a), (b) and (c), a hole alignment means for aligning the positions of the insertion holes 5F of the upper lug 5D and the lower lug 5E is provided. Preferably, it is provided.
[0033]
FIG. 5A shows that each of the insertion holes 5F is located at a position where the tip of one upper lug 5D formed in a concave shape comes into contact with the main material 5A supporting the other lower lug 5E. 2 shows an example in which the lug height dimension is set to match. FIG. 4B shows a position where the hole alignment means is in a position where the tip of the other lower lug 5E sandwiched by the one upper lug 5D formed in a concave shape contacts the main material 5A supporting the upper lug 5D. An example is shown in which the lug height is set to match the position of each insertion hole 5F. FIG. 4C shows a stopper in which the hole positioning means is provided between the concave portion of the upper lug 5D and the tip of the other lower lug 5E sandwiched by the one upper lug 5D formed in a concave shape. 13 shows an example in which the lug height dimension is set to match the position of each insertion hole 5F at the position where it comes into contact with the insertion hole 5F.
[0034]
In each of these cases, when inserting the connecting pin 6 while sandwiching the lower lug 5E between the upper lugs 5D, the positions of the respective insertion holes 5F of the upper lugs 5D and the lower lugs 5E easily match. The work of inserting the connecting pin 6 into the insertion hole 5F of 5D, 5E can be easily performed. The same operation and effect can be obtained when the upper lug 5D is formed of a single piece and the lower lug 5E is formed in a two-piece concave shape sandwiching the upper lug 5D.
[0035]
Further, in the intermediate boom 5 of one embodiment, the upper lug 5D and the lower lug 5E are integrally provided by welding to the main member 5A. However, the upper lug and the lower lug attached to the intermediate boom for a crane of the present invention. As shown in FIGS. 17 and 18, the upper lug 10 and the lower lug 11 which are detachable from the main member 5A of the intermediate boom 5 may be configured.
[0036]
The upper lug 10 is configured such that symmetric lug pieces 10A and 10B having a semicircular curved portion enclosing the main material 5A are detachably attached to the main material 5A by fastening bolts and nuts 12. The portions of the lug pieces 10A and 10B projecting upward from the main material 5A are joined to each other to form a single piece, and a pin insertion hole 10C similar to the pin insertion hole 5F is formed in this portion. ing.
[0037]
On the other hand, the lower lug 11 is configured such that symmetric lug pieces 11A and 11B having a semicircular curved portion enclosing the main material 5A are detachably attached to the main material 5A by fastening bolts and nuts 12. The portions of the lug pieces 11A and 11B protruding downward from the main material 5A are opposed to each other at a predetermined interval by a spacer ring 11C mounted on the bolt of the bolt / nut 12, and the upper lug 10 is It is formed in a downward concave shape to sandwich it. A pin insertion hole 11D similar to the pin insertion hole 5F is formed in the downward concave portion.
[0038]
The intermediate boom 5 in which the upper lug 10 and the lower lug 11 are detachably fixed to the main member 5A has the same operation and effect as the intermediate boom 5 of the above-described embodiment. By fixing the upper lug 10 and the lower lug 11, it is possible to easily configure the intermediate boom for a crane of the present invention. In addition, the upper lug 10 and the lower lug 11 may be configured by replacing their shapes and structures.
[0039]
Also, in the above description, a case has been described where a special connecting pin 6 is prepared as a connecting tool for stacking and connecting the intermediate booms 5 vertically, but as this connecting tool, the intermediate booms 5 are connected to each other by connecting pieces. A boom connecting pin for connecting at 5C can also be used. In this case, since a boom connecting pin for connecting the intermediate booms 5 can be used as a connecting tool, it is not necessary to prepare a special connecting pin 6 for stacking and connecting the intermediate booms 5 vertically. Further, when disassembling and storing the intermediate booms 5, there is no need to store the boom connecting pins connecting the intermediate booms 5 in a special place, and the intermediate booms 5 are vertically stacked and connected. The boom connecting pin will not be lost by using it.
[0040]
Further, in the above description, the case where either the upper lug 5D or the lower lug 5E is formed in a concave shape sandwiching the other has been described. However, as shown in FIG. Both may be configured as a single piece, and the connecting pins 6 may be inserted into the insertion holes 5F so that the intermediate booms 5 are vertically stacked and connected.
[0041]
【The invention's effect】
As described above, in the intermediate boom for a crane according to the present invention, the connecting tools are inserted into the insertion holes of the lugs of the lower intermediate boom and the lugs of the upper intermediate boom, which are stacked vertically in a horizontal state when the crane boom is lying down. By connecting the lugs together, the upper and lower intermediate booms are interconnected and stacked. Therefore, according to the intermediate boom for a crane of the present invention, a plurality of intermediate booms can be stacked in an orderly and stable state, load collapse during transportation can be prevented, and the number of slugs during movement can be reduced. .
[0042]
In the intermediate boom for a crane of the present invention, when the lugs are constituted by an upper lug protruding on the upper surface side and a lower lug protruding on the lower surface side of the intermediate boom, which is vertically stacked, the lugs are vertically stacked. The upper and lower intermediate booms are turned sideways when the crane is in a downright position by inserting a connector into each insertion hole of the upper lug of the lower intermediate boom and the lower lug of the upper intermediate boom to fasten the upper lug and the lower lug. Are interconnected and stacked. Therefore, in this case, when assembling and disassembling the crane and moving the intermediate boom while slinging, it is not necessary to change the direction each time the intermediate boom is moved as in the prior art. The number of times can be minimized.
[0043]
Further, in the intermediate boom for a crane of the present invention, when at least one of the upper lug and the lower lug is formed in a concave shape sandwiching the other, the lower lug of the upper intermediate boom is attached to the upper lug of the lower intermediate boom stacked vertically. Since the lugs can be supported, the upper and lower stacks can be placed safely without slipping, and the upper lug and the lower lug are connected by inserting a connecting tool into each of the insertion holes of the upper lug and the lower lug. Work can be performed easily.
[0044]
Further, in the intermediate boom for a crane of the present invention, when the upper lug or the lower lug formed in a concave shape for sandwiching the other is formed by opening a concave end portion for sandwiching the other, one lug is connected to the other lug. At the time of pinching, the open concave end of one lug guides the insertion of the other lug, so that the operation of inserting one lug into the other lug and pinching it becomes easy.
[0045]
Further, when the intermediate boom for a crane of the present invention is provided with hole alignment means for aligning the positions of the respective insertion holes of the upper lug and the lower lug, one of the lugs is inserted into the other lug to insert the coupling tool. In this case, since the positions of the respective insertion holes of the upper lug and the lower lug easily coincide with each other, the work of inserting the coupling tool into the insertion hole of each lug becomes easy.
[0046]
Further, in the intermediate boom for a crane of the present invention, when the lug is configured as a separate body detachable from the intermediate boom, the existing intermediate boom can be easily configured as the intermediate boom of the present invention by mounting the lug. it can.
[0047]
Further, in the intermediate boom for a crane of the present invention, when the connecting tool for vertically stacking and connecting is a boom connecting pin for connecting the intermediate booms, the connecting tool uses a boom connecting pin for connecting the intermediate booms. I can do it. For this reason, it is not necessary to prepare a special connecting tool for stacking and connecting the intermediate booms vertically. Also, when disassembling and storing the intermediate boom, there is no need to store the boom connecting pins that connected the intermediate booms in a special place. By using it, the boom connecting pin is not lost.
[Brief description of the drawings]
FIG. 1 is a side view of a lattice boom crawler crane having an intermediate crane for a crane according to an embodiment of the present invention.
FIG. 2 is a side view showing a structure of an intermediate boom as an intermediate boom for a crane according to one embodiment.
FIG. 3 is an end view showing the structure of the intermediate boom shown in FIG. 2;
FIG. 4 is an enlarged view of an upper lug and a lower lug shown in FIG.
FIG. 5 is an enlarged view of an upper lug and a lower lug shown in FIG. 3;
FIG. 6 is an explanatory diagram of an operation of vertically stacking the intermediate booms 5 shown in FIG.
FIG. 7 is a side view showing a state in which the intermediate boom shown in FIG. 2 is vertically connected.
FIG. 8 is an explanatory diagram showing a state of loading two upper and lower intermediate booms shown in FIG. 7 on a truck.
FIG. 9 is an explanatory view showing a work of hanging the two upper and lower intermediate booms shown in FIG. 8 from a truck.
FIG. 10 is an explanatory view of an operation of connecting the lower first intermediate boom shown in FIG. 9 to a bottom boom of a lattice boom crane.
FIG. 11 is an explanatory diagram of an operation of connecting the upper middle boom shown in FIG. 10 to the first middle boom.
FIG. 12 is an explanatory view of the work of hanging down the other two upper and lower intermediate booms shown in FIG. 8;
FIG. 13 is an explanatory diagram of an operation of connecting the lower third intermediate boom shown in FIG. 12 to the second intermediate boom.
14 is an explanatory diagram of an operation of connecting the upper middle boom of the fourth stage shown in FIG. 13 to the middle boom of the third stage.
FIG. 15 is an enlarged view showing a modified example in which the concave end portion of the upper lug of the intermediate boom according to the embodiment is opened.
FIG. 16 is an enlarged view showing hole alignment means for aligning the positions of the insertion holes of the upper lug and the lower lug in the intermediate boom according to one embodiment.
FIG. 17 is an enlarged view corresponding to FIG. 4, showing a modification in which an upper lug and a lower lug of the intermediate boom according to one embodiment are configured separately.
FIG. 18 is an enlarged view corresponding to FIG. 5, showing a modification in which an upper lug and a lower lug of the intermediate boom according to one embodiment are configured separately.
FIG. 19 is an enlarged view showing a modified example in which the upper lug and the lower lug in the intermediate boom according to the embodiment are configured as a single piece.
FIG. 20 is a side view showing a state where intermediate booms of a conventional example are vertically stacked.
FIG. 21 is an end view showing a state in which intermediate booms of a conventional example are vertically stacked.
[Explanation of symbols]
1: Crawler crane 2: Lattice boom 3: Bottom boom 4: Top boom 5: Intermediate boom 5A: Frame pipe (main material)
5B: Diagonal material 5C: Connecting piece 5D: Upper lug 5E: Lower lug 5F: Pin insertion hole 6: Connecting pin 7: Matsuba pin 8: Auxiliary crane 9: Truck 10: Upper lug 10A: Lug piece 10B: Lug piece 10C: Pin insertion hole 11: Lower lug 11A: Lug piece 11B: Lug piece 11C: Spacer ring 11D: Pin insertion hole 12: Bolt / nut 13: Stopper

Claims (10)

クレーンを構成する中間ブームであって、クレーンブームの倒伏状態における横向で上下に積み重ねて連結するための連結具の挿入孔を有するラグを備えていることを特徴とするクレーン用中間ブーム。An intermediate boom for a crane, comprising a lug having an insertion hole for a connecting tool for stacking and connecting the crane boom in a downright state in a horizontal direction. 前記ラグは上下に積み重ねられる前記中間ブームの上面側に突設された上部ラグと下面側に突設された下部ラグとで構成されていることを特徴とする請求項1に記載のクレーン用中間ブーム。2. The crane intermediate according to claim 1, wherein the lugs comprise an upper lug protruding from an upper surface of the intermediate boom and a lower lug protruding from a lower surface of the intermediate boom. boom. 前記上部ラグおよび下部ラグの少なくとも一方は、他方を挟み込む凹状に構成されていることを特徴とする請求項2に記載のクレーン用中間ブーム。The intermediate boom for a crane according to claim 2, wherein at least one of the upper lug and the lower lug is configured to have a concave shape sandwiching the other. 他方を挟み込む凹状に構成された前記上部ラグまたは下部ラグは、他方を挟み込む凹状端部が開いて形成されていることを特徴とする請求項3に記載のクレーン用中間ブーム。The intermediate boom for a crane according to claim 3, wherein the upper lug or the lower lug configured to have a concave shape for sandwiching the other is formed by opening a concave end portion for sandwiching the other. 前記上部ラグおよび下部ラグの各挿入孔の位置を合わせる孔位置合わせ手段を備えたことを特徴とする請求項3または請求項4に記載のクレーン用中間ブーム。The intermediate boom for a crane according to claim 3 or 4, further comprising hole alignment means for aligning the positions of the insertion holes of the upper lug and the lower lug. 前記孔位置合わせ手段は、凹状に構成された一方のラグの先端部が他方のラグを支持する主材に当接する位置で各挿入孔の位置が合うラグ高さ寸法に設定されて構成されていることを特徴とする請求項5に記載のクレーン用中間ブーム。The hole positioning means is configured to be set to a lug height dimension at which the position of each insertion hole matches at a position where the tip of one lug formed in a concave shape contacts the main material supporting the other lug. The intermediate boom for a crane according to claim 5, wherein: 前記孔位置合わせ手段は、凹状に構成された一方のラグに挟み込まれる他方のラグの先端部が一方のラグを支持する主材に当接する位置で各挿入孔の位置が合うラグ高さ寸法に設定されて構成されていることを特徴とする請求項5に記載のクレーン用中間ブーム。The hole alignment means is provided with a lug height dimension at which the position of each insertion hole matches at a position where the tip of the other lug sandwiched by one of the concave lugs abuts the main material supporting the one lug. The intermediate boom for a crane according to claim 5, wherein the intermediate boom is set and configured. 前記孔位置合わせ手段は、凹状に構成された一方のラグに挟み込まれる他方のラグの先端部が一方のラグの凹状部間に亘って設けられたストッパに当接する位置で各挿入孔の位置が合うラグ高さ寸法に設定されて構成されていることを特徴とする請求項5に記載のクレーン用中間ブーム。The hole alignment means is configured such that the position of each insertion hole is at a position where the tip of the other lug sandwiched between the one lugs formed in the concave shape abuts the stopper provided between the concave portions of the one lug. The intermediate boom for a crane according to claim 5, wherein the lug height dimension is set to match. 前記ラグが中間ブームに着脱自在に固定される別体として構成されていることを特徴とする請求項1から請求項8の何れか1項に記載のクレーン用中間ブーム。The intermediate boom for a crane according to any one of claims 1 to 8, wherein the lug is configured as a separate body detachably fixed to the intermediate boom. 上下に積み重ねて連結するための前記連結具は中間ブームどうしを連結するブーム連結ピンであることを特徴とする請求項1から請求項9の何れか1項に記載のクレーン用中間ブーム。The intermediate boom for a crane according to any one of claims 1 to 9, wherein the connecting tool for vertically stacking and connecting is a boom connecting pin for connecting the intermediate booms.
JP2002179679A 2002-06-20 2002-06-20 Intermediate boom for crane Pending JP2004018251A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002179679A JP2004018251A (en) 2002-06-20 2002-06-20 Intermediate boom for crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002179679A JP2004018251A (en) 2002-06-20 2002-06-20 Intermediate boom for crane

Publications (1)

Publication Number Publication Date
JP2004018251A true JP2004018251A (en) 2004-01-22

Family

ID=31177025

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002179679A Pending JP2004018251A (en) 2002-06-20 2002-06-20 Intermediate boom for crane

Country Status (1)

Country Link
JP (1) JP2004018251A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013193852A (en) * 2012-03-21 2013-09-30 Hitachi Sumitomo Heavy Industries Construction Crane Co Ltd Boom connecting pin storage bracket and boom connecting pin storage device
CN104150378A (en) * 2014-06-27 2014-11-19 浙江三一装备有限公司 Truss arm structure and engineering machine
EP3323768A4 (en) * 2015-07-16 2018-10-03 Kobelco Construction Machinery Co., Ltd. Connecting device for attachments
JP7452523B2 (en) 2021-12-28 2024-03-19 コベルコ建機株式会社 Stacking stand for support unit

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5791781U (en) * 1980-11-27 1982-06-05
JPS5830682U (en) * 1981-08-21 1983-02-28 日立建機株式会社 mobile tower crane
JPS60252590A (en) * 1984-05-29 1985-12-13 日立建機株式会社 Connecting structure of crane proper and boom
JPH08133673A (en) * 1994-11-07 1996-05-28 Takeo Yano Boom storing jig
JP2001294391A (en) * 2000-04-07 2001-10-23 Kato Works Co Ltd Joint jib for crane

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5791781U (en) * 1980-11-27 1982-06-05
JPS5830682U (en) * 1981-08-21 1983-02-28 日立建機株式会社 mobile tower crane
JPS60252590A (en) * 1984-05-29 1985-12-13 日立建機株式会社 Connecting structure of crane proper and boom
JPH08133673A (en) * 1994-11-07 1996-05-28 Takeo Yano Boom storing jig
JP2001294391A (en) * 2000-04-07 2001-10-23 Kato Works Co Ltd Joint jib for crane

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013193852A (en) * 2012-03-21 2013-09-30 Hitachi Sumitomo Heavy Industries Construction Crane Co Ltd Boom connecting pin storage bracket and boom connecting pin storage device
CN104150378A (en) * 2014-06-27 2014-11-19 浙江三一装备有限公司 Truss arm structure and engineering machine
EP3323768A4 (en) * 2015-07-16 2018-10-03 Kobelco Construction Machinery Co., Ltd. Connecting device for attachments
US10704579B2 (en) 2015-07-16 2020-07-07 Kobelco Construction Machinery Co., Ltd. Connecting device for attachments
JP7452523B2 (en) 2021-12-28 2024-03-19 コベルコ建機株式会社 Stacking stand for support unit

Similar Documents

Publication Publication Date Title
JP6096752B2 (en) Counterweight block and assembly for crane
US8529175B2 (en) Method for transporting concentrated mass loads by container
WO2006032182A1 (en) Pallet container
KR102069785B1 (en) Feed frame for wind turbine blades
US20050019127A1 (en) Contrail shipping platform
JP2004018251A (en) Intermediate boom for crane
JP2004250188A (en) Hoisting fixture
JP6728361B2 (en) Transport frame for wind turbine blades
KR102074218B1 (en) Freight of glass plate Clamping lift for Crain
JP6160660B2 (en) Attachment coupling device
CN113811506B (en) Transport apparatus for assembling components and method of using transport apparatus
JP2001002072A (en) Coil transportation pallet
JPH1077192A (en) Flat sling joint structure
JPH07315785A (en) Fork extension sleeve and forklift
KR200190418Y1 (en) A carriage for transporting plate glass
JP2003020010A (en) Binding device for long article
JPH072377U (en) Building material receiving method and lifting jig
JPS628512Y2 (en)
JP3245359U (en) pallet hanging equipment
JP2833688B2 (en) Glass plate mounting table
JP3071685U (en) Scaffolding pipe storage and transfer frame
JP4286976B2 (en) Band pallet
JP2001294236A (en) Pallet lock metal fitting
JPH0535640U (en) Pallet with fence
CA2050399C (en) Device for the storage and transport of stacked articles

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060223

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060307

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20060912