JP2003313692A - Apparatus for manufacturing electrolyzed water - Google Patents

Apparatus for manufacturing electrolyzed water

Info

Publication number
JP2003313692A
JP2003313692A JP2002138679A JP2002138679A JP2003313692A JP 2003313692 A JP2003313692 A JP 2003313692A JP 2002138679 A JP2002138679 A JP 2002138679A JP 2002138679 A JP2002138679 A JP 2002138679A JP 2003313692 A JP2003313692 A JP 2003313692A
Authority
JP
Japan
Prior art keywords
electrode
water
outer cylinder
supply
electric power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2002138679A
Other languages
Japanese (ja)
Inventor
Toshiaki Tanaka
敏明 田中
Kenichi Haruyama
賢一 春山
Hiromitsu Natsume
弘光 夏目
Yoshio Iwase
芳男 岩瀬
Hiromitsu Moriyama
廣満 森山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
L Tech KK
Original Assignee
L Tech KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by L Tech KK filed Critical L Tech KK
Priority to JP2002138679A priority Critical patent/JP2003313692A/en
Publication of JP2003313692A publication Critical patent/JP2003313692A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/30Hydrogen technology
    • Y02E60/36Hydrogen production from non-carbon containing sources, e.g. by water electrolysis

Abstract

<P>PROBLEM TO BE SOLVED: To provide an apparatus for manufacturing electrolyzed water, which can provide acidic water or alkaline water as soon as the operation switch is turned on. <P>SOLUTION: A timer 50 of a controller 46 starts counting at the instant when the operation switch 51 is turned off. When a preprogrammed time has passed, the timer 50 finishes counting, a CPU 49 triggers, the controller 46 applies such a low direct voltage and current as to make the electrolysis capability lower than that at the time of a normal electrolysis operation, to a first electrode 7 and a second electrode 20, and a preliminary electrolysis operation starts. Thereby, the apparatus maintains acidity of the acidic water in an electrolytic cell A, and avoids degradation of the acidic water. <P>COPYRIGHT: (C)2004,JPO

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、水道水や貯水タン
クから供給される水を通水しながら電気分解して酸性水
又はアルカリ水を生成する電解水製造装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an electrolyzed water production apparatus for electrolyzing while supplying tap water or water supplied from a water storage tank to produce acidic water or alkaline water.

【0002】[0002]

【従来の技術】この種の電解水製造装置は、滅菌や消毒
を行なうために酸性水を生成したり、健康向上のために
アルカリ水を生成する。そして、酸性水かアルカリ水か
のいずれかを供給し、運転スイッチをオフして前記生成
を停止した後には、時間経過と共に電解水製造装置に残
っていた酸性水の酸性濃度又はアルカリ水のアルカリ濃
度が低下する。
2. Description of the Related Art This type of electrolyzed water producing apparatus produces acidic water for sterilization and disinfection and alkaline water for improving health. Then, after supplying either acidic water or alkaline water and stopping the generation by turning off the operation switch, the acidic concentration of the acidic water remaining in the electrolyzed water production apparatus with time or the alkaline water alkaline The concentration decreases.

【0003】[0003]

【発明が解決しようとする課題】このため、次に酸性水
又はアルカリ水を供給するために、運転スイッチをオン
した直後は酸性濃度が低下した酸性水あるいはアルカリ
濃度が低下したアルカリ水が供給され、すぐには使用で
きなく、運転スイッチをオンしてしばらく時間が経過し
てから使用せざるを得ない。
Therefore, in order to supply the acidic water or the alkaline water next, immediately after the operation switch is turned on, the acidic water with the reduced acidic concentration or the alkaline water with the reduced alkaline concentration is supplied. , It cannot be used immediately, and it has to be used after a while after turning on the operation switch.

【0004】そこで本発明は、運転スイッチをオンして
からすぐに酸性水又はアルカリ水を使用できる電解水製
造装置を提供することを目的とする。
Therefore, an object of the present invention is to provide an electrolyzed water producing apparatus which can use acidic water or alkaline water immediately after the operation switch is turned on.

【0005】[0005]

【課題を解決するための手段】このため第1の発明は、
水道水や貯水タンクから供給される水を通水しながら電
気分解して酸性水又はアルカリ水を生成する電解水製造
装置において、内部に第1電極を設けた外筒と、該外筒
内に配設され該外筒との間に流路を形成すると共に内部
上方に第2電極を設け下方に電解質を配置すると共に上
部側壁に隔膜を設けた内筒と、前記第1電極及び第2電
極への電力の供給が停止してから所定時間経過した後に
は通常よりも低い電解能力となるように該第1電極及び
第2電極へ電力を供給する制御装置を備えたことを特徴
とする。
Therefore, the first invention is
In an electrolyzed water manufacturing apparatus that electrolyzes to generate acidic water or alkaline water while passing tap water or water supplied from a water storage tank, an outer cylinder having a first electrode inside, and an outer cylinder inside the outer cylinder. An inner cylinder having a flow path formed between the outer cylinder and the outer cylinder, a second electrode above the inside, and an electrolyte below, and a diaphragm on the upper side wall; and the first and second electrodes. It is characterized by comprising a control device for supplying electric power to the first electrode and the second electrode so that the electrolysis capacity becomes lower than usual after a lapse of a predetermined time after the supply of electric power to the electrode is stopped.

【0006】第2の発明は、前記制御装置は、前記第1
電極及び第2電極への電力の供給が停止してから所定時
間経過した後には電力の供給停止前よりも低い電圧にて
該第1電極及び第2電極へ電力を供給することを特徴と
する。
In a second invention, the control device is the first device.
After the supply of power to the electrodes and the second electrode is stopped, after a predetermined time has passed, the power is supplied to the first electrode and the second electrode at a voltage lower than that before the supply of power is stopped. .

【0007】第3の発明は、水道水や貯水タンクから供
給される水を通水しながら電気分解して酸性水又はアル
カリ水を生成する電解水製造装置において、内部に第1
電極を設けた外筒と、該外筒内に配設され該外筒との間
に流路を形成すると共に内部上方に第2電極を設け下方
に電解質を配置すると共に上部側壁に隔膜を設けた内筒
と、前記第1電極及び第2電極への電力の供給が停止し
てから所定時間経過した後には通常よりも低い電解能力
となるように該第1電極及び第2電極へ電力を間欠的に
供給する制御装置を備えたことを特徴とする。
A third aspect of the present invention is an electrolyzed water producing apparatus for electrolyzing electrolyzed water while supplying tap water or water supplied from a water storage tank to produce acidic water or alkaline water.
A flow path is formed between an outer cylinder provided with an electrode and the outer cylinder arranged in the outer cylinder, a second electrode is provided above the inside, an electrolyte is provided below, and a diaphragm is provided on an upper side wall. The inner cylinder and the first electrode and the second electrode are supplied with electric power so that the electrolysis capacity becomes lower than usual after a lapse of a predetermined time after the supply of electric power to the first electrode and the second electrode is stopped. It is characterized by comprising a control device for intermittently supplying.

【0008】第4の発明は、水道水や貯水タンクから供
給される水を通水しながら電気分解して酸性水又はアル
カリ水を生成する電解水製造装置において、内部に第1
電極を設けた外筒と、該外筒内に配設され該外筒との間
に流路を形成すると共に内部上方に第2電極を設け下方
に電解質を配置すると共に上部側壁に隔膜を設けた内筒
と、前記流路に流入する供給水の量を検出する流量計
と、前記第1電極及び第2電極への電力の供給が停止し
てから所定時間経過した後には通常よりも低い電解能力
となるように該第1電極及び第2電極へ電力を供給し、
かつ前記流量計により計測された供給水の量が多くなる
のに従い前記所定時間を次第に短く制御する制御装置を
備えたことを特徴とする。
A fourth invention is an electrolyzed water producing apparatus for electrolyzing while supplying tap water or water supplied from a water storage tank to generate acidic water or alkaline water.
A flow path is formed between an outer cylinder provided with an electrode and the outer cylinder arranged in the outer cylinder, a second electrode is provided above the inside, an electrolyte is provided below, and a diaphragm is provided on an upper side wall. The inner cylinder, the flow meter for detecting the amount of supply water flowing into the flow path, and the value lower than usual after a lapse of a predetermined time after the supply of electric power to the first electrode and the second electrode is stopped. Electric power is supplied to the first electrode and the second electrode so as to have an electrolytic capacity,
In addition, a control device for controlling the predetermined time to be gradually shortened as the amount of supplied water measured by the flow meter increases is provided.

【0009】第5の発明は、水道水や貯水タンクから供
給される水を通水しながら電気分解して酸性水又はアル
カリ水を生成する電解水製造装置において、内部に第1
電極を設けた外筒と、該外筒内に配設され該外筒との間
に流路を形成すると共に内部上方に第2電極を設け下方
に電解質を配置すると共に上部側壁に隔膜を設けた内筒
と、前記第1電極及び第2電極への電力の供給が停止し
てから所定時間経過した後は所定のサイクルで該第1電
極及び第2電極へ電力を供給する制御装置を備えたこと
を特徴とする。
A fifth aspect of the present invention is an electrolyzed water producing apparatus for electrolyzing electrolyzed water while passing tap water or water supplied from a water storage tank to produce acidic water or alkaline water.
A flow path is formed between an outer cylinder provided with an electrode and the outer cylinder arranged in the outer cylinder, a second electrode is provided above the inside, an electrolyte is provided below, and a diaphragm is provided on an upper side wall. And an inner cylinder, and a control device for supplying power to the first electrode and the second electrode in a predetermined cycle after a predetermined time has elapsed after stopping the supply of power to the first electrode and the second electrode. It is characterized by that.

【0010】[0010]

【発明の実施の形態】以下図面に基づき、本発明の第1
の実施の形態を説明する。図1は本発明の電解水製造装
置の断面図であり、1は外筒上部2と外筒下部3を嵌合
接続して構成した外筒で、合成樹脂材料にて形成してい
る。
BEST MODE FOR CARRYING OUT THE INVENTION A first embodiment of the present invention will now be described with reference to the drawings.
An embodiment will be described. FIG. 1 is a cross-sectional view of an electrolyzed water producing apparatus of the present invention. Reference numeral 1 denotes an outer cylinder formed by fitting and connecting an outer cylinder upper portion 2 and an outer cylinder lower portion 3, which are made of a synthetic resin material.

【0011】前記外筒上部2は中空の円筒状で、その上
部内側には後述する蓋体15に設けた嵌合筒部15aを
挿入嵌着する嵌合受部2aを設けると共に下端には前記
外筒下部3を接続するために小径とした段状の接続部2
bを設けている。また、この外筒上部2の側板部上方に
は内部で生成した電解水を外部に吐出するための吐出口
2cを設けた吐出筒部2dを形成し、この吐出口2cよ
りも上方には後述する第1電極7を固定するための固定
手段としての各ビス4を貫通させる各取付孔2eを設け
ている。2fは第1電極7より小径とした絞り部で、該
絞り部2f内側に該第1電極7の下端部を当接させるこ
とで、この電極7の揺動を防止するように構成してい
る。
The outer cylinder upper part 2 has a hollow cylindrical shape, and a fitting receiving part 2a for inserting and fitting a fitting cylindrical part 15a provided on a lid 15 described later is provided on the inner side of the upper part thereof, and the lower end thereof is provided with the aforementioned fitting part 2a. A stepped connecting portion 2 having a small diameter for connecting the lower portion 3 of the outer cylinder.
b is provided. Further, a discharge cylinder portion 2d provided with a discharge opening 2c for discharging the electrolyzed water generated inside is formed above the side plate portion of the outer cylinder upper portion 2 and will be described below above the discharge opening 2c. Each mounting hole 2e through which each screw 4 as a fixing means for fixing the first electrode 7 is provided. Reference numeral 2f is a narrowed portion having a diameter smaller than that of the first electrode 7, and the lower end portion of the first electrode 7 is brought into contact with the inner side of the narrowed portion 2f to prevent the electrode 7 from swinging. .

【0012】前記外筒下部3の上端接続部3aは内径を
広げて段状とし、前記外筒上部2の接続部2bと嵌合後
接着して一体化している。3bは外筒下部3の底板部3
c中央に後述する内筒14内の固定部28外周を、シー
ルパッキン5を介して着脱自在に嵌合するために設けた
円筒状をした第1の環状壁としての排水筒嵌合部であ
る。
The upper end connecting portion 3a of the outer cylinder lower portion 3 has a stepped shape with its inner diameter widened, and is integrated with the connecting portion 2b of the outer cylinder upper portion 2 by fitting and then bonding. 3b is a bottom plate portion 3 of the lower portion 3 of the outer cylinder.
It is a drainage tube fitting portion as a cylindrical first annular wall provided for removably fitting the outer periphery of the fixed portion 28 in the inner cylinder 14 described later at the center of the c via the seal packing 5. .

【0013】また、この排水筒嵌合部3b上端円周部は
後述する内筒14装着時にはその底面部17aに当接し
て、この底面部17aと外筒1の底板部3cとの間に空
間Bを形成している。この空間Bは、後述する電解用給
水部3gから供給される水を電解槽Aへ通水するための
電解水生成通路を形成している。
The upper end circumferential portion of the drainage pipe fitting portion 3b abuts on the bottom surface portion 17a of the inner cylinder 14 to be described later, and a space is provided between the bottom surface portion 17a and the bottom plate portion 3c of the outer cylinder 1. B is formed. The space B forms an electrolyzed water generation passage for passing water supplied from the electrolysis water supply unit 3g described later to the electrolysis tank A.

【0014】3dは後述する内筒14内の余分な水を外
部に排出するためにゴムホース等を接続するための排水
接続部である。3eは前記排水筒嵌合部3bと同心円外
周上に設けた円筒状の第2の環状壁としての給水筒嵌合
部で、該嵌合部3e内側には後述する内筒14の給水壁
17cの外周を、シールパッキン6を介して嵌合接続し
ている。3fは後述の内筒14内に給水するゴムホース
等を接続するための円筒状の給水接続部である。3gは
底板部3cに下方に向けて円筒状に一体形成している電
解用給水部で、外筒1と内筒14間に形成される電解槽
A内に電解水生成用の水道水や貯水タンクからの水を供
給するためのゴムホース等を接続するものである。
Reference numeral 3d is a drainage connecting portion for connecting a rubber hose or the like for discharging excess water in the inner cylinder 14 described later to the outside. Reference numeral 3e designates a water pipe fitting portion as a cylindrical second annular wall provided on the outer circumference of a concentric circle with the drain pipe fitting portion 3b. Inside the fitting portion 3e, a water supply wall 17c of an inner cylinder 14 described later is provided. The outer circumference of is fitted and connected via a seal packing 6. Reference numeral 3f is a cylindrical water supply connection portion for connecting a rubber hose or the like for supplying water into the inner cylinder 14 described later. 3 g is a water supply portion for electrolysis, which is integrally formed in a cylindrical shape downward in the bottom plate portion 3 c. The electrolysis tank A formed between the outer cylinder 1 and the inner cylinder 14 has tap water or stored water for generating electrolytic water. A rubber hose for supplying water from the tank is connected.

【0015】3hは外筒下部3の内周面下部に、例えば
上面視略90°毎に4箇所一体形成した縦長のリブで、
後述する内筒14の挿入時にはその外周面に当接するこ
とで円滑に所定位置に案内することと、外筒1と内筒1
4間の電解水生成通路を確保するために設けている。ま
た、該リブ3hによって、内筒14の外周面と外筒1の
内周面との間に電解水生成通路としての電解槽Aを形成
している。
Reference numeral 3h denotes a vertically long rib integrally formed on the lower portion of the inner peripheral surface of the outer cylinder lower portion 3 at, for example, approximately 90 ° in a top view.
When the inner cylinder 14 is inserted, which will be described later, the outer cylinder 1 and the inner cylinder 1 can be smoothly guided to a predetermined position by contacting the outer peripheral surface thereof.
It is provided to secure an electrolyzed water generation passage between the four. The rib 3h forms an electrolytic cell A as an electrolyzed water generation passage between the outer peripheral surface of the inner cylinder 14 and the inner peripheral surface of the outer cylinder 1.

【0016】図2において、7はチタン製又は白金製又
はチタンと白金の合金製材料等を使用して中空の円筒状
に形成した第1電極である。8は断面形状がクランク形
状を呈して導電材料で耐酸性又はアルカリ性があるチタ
ン等からなる第1電極7の支持手段としての支持アング
ルで、一端を第1電極7の上部に溶接して固定し、他端
は外筒1の側板部に外側からビス4を第1電極7に電源
を供給するためのリード線9の先端に設けた電源接続手
段としての端子10、ワッシャー11、ゴム等のシール
剤12を介在させた状態で取付孔2eを貫通させナット
13で固定している。上記支持アングル8は、第1電極
7に4箇所固定しているが、これに限らず適宜な数で良
い。
In FIG. 2, reference numeral 7 designates a hollow cylindrical first electrode made of titanium, platinum, or an alloy of titanium and platinum. Reference numeral 8 is a support angle as a support means of the first electrode 7 made of titanium or the like, which is a conductive material and has a crank shape in cross section and is acid-resistant or alkali-resistant, and one end of which is fixed to the upper portion of the first electrode 7 by welding. , The other end is a seal on the side plate portion of the outer cylinder 1, such as a terminal 10, a washer 11, rubber, etc. as a power source connecting means provided at the tip of a lead wire 9 for supplying power to the first electrode 7 with a screw 4 from the outside. With the agent 12 interposed, the mounting hole 2e is penetrated and fixed with a nut 13. Although the support angles 8 are fixed to the first electrode 7 at four positions, the number is not limited to this and may be an appropriate number.

【0017】次に図3に示すように、14は蓋体15と
隔膜装着部16と内部に電解質を収容する収容部17を
一体に連結構成している内筒であり、該内筒14は前記
外筒1内に上方から着脱自在に配設している。前記内筒
14の上部には前記外筒1の上面開口を閉塞する蓋体1
5が着脱可能に設けられ、更に蓋体15と隔膜装着部1
6とを、あるいは隔膜装着部16と収容部17とを分離
して外せる構成(例えば、互いにネジ山を形成して着脱
可能とする構造)とすることにより、蓋体15及び内筒
14を外筒1より外して取出した後、蓋体15から隔膜
装着部16を、あるいは隔膜装着部16から収容部17
を外した後、ナット26を外して内部の電解質Cの交換
や第2電極20の清掃・交換を簡単に行うことができる
ようにする。尚、前記内筒14と蓋体15とを着脱可能
とならない構造としたり、蓋体15と隔膜装着部16と
を着脱可能とならない構造、隔膜装着部16と収容部1
7とを着脱可能とならない構造としてもよい。また、該
内筒14は外筒1と2重構造を成し、その間は電解槽A
と水を通水するための電解水生成通路を構成する空間を
形成している。
Next, as shown in FIG. 3, reference numeral 14 is an inner cylinder which integrally connects a lid 15, a diaphragm mounting portion 16 and a housing portion 17 for housing an electrolyte therein. The outer cylinder 1 is detachably arranged from above. A lid 1 for closing an upper surface opening of the outer cylinder 1 is provided on an upper portion of the inner cylinder 14.
5 is detachably provided, and further, a lid 15 and a diaphragm mounting portion 1
6 or a structure in which the diaphragm mounting portion 16 and the accommodating portion 17 can be separated and removed (for example, a structure in which threads are mutually formed to be removable), so that the lid body 15 and the inner cylinder 14 can be removed. After detaching from the cylinder 1 and taking out, the septum mounting portion 16 from the lid 15 or the accommodating portion 17 from the septum mounting portion 16.
After removing, the nut 26 is removed so that the electrolyte C inside and the second electrode 20 can be easily cleaned and replaced. The inner cylinder 14 and the lid 15 are not detachable, or the lid 15 and the diaphragm mounting portion 16 are not detachable, the diaphragm mounting portion 16 and the housing portion 1.
It is also possible to adopt a structure in which 7 and 7 cannot be detached. The inner cylinder 14 has a double structure with the outer cylinder 1, and the space between them is the electrolytic cell A.
And a space forming an electrolyzed water generation passage for passing water.

【0018】15aは前記蓋体15の外側下方に一体に
垂下形成した円筒状の嵌合筒部で、外側を下方に垂下す
るほど小径とすることで外筒1の嵌合受部2aに挿入及
び嵌合を容易にして固定しており、前述の如く前記内筒
14は前記外筒1内に上方から着脱自在に装着されるこ
ととなる。尚、図示しないが、この嵌合筒部15aの外
周部と嵌合受部2aの内周部との嵌合部分はネジ山を形
成して着脱可能としたり、ビス(図示せず)を介して着
脱可能に固定してもよい。
Reference numeral 15a denotes a cylindrical fitting cylinder portion integrally formed below the outside of the lid body 15, and is inserted into the fitting receiving portion 2a of the outer cylinder 1 by making the outside diameter downward so as to have a smaller diameter. Also, the fitting is facilitated and fixed, and as described above, the inner cylinder 14 is detachably mounted in the outer cylinder 1 from above. Although not shown, a fitting portion between the outer peripheral portion of the fitting cylindrical portion 15a and the inner peripheral portion of the fitting receiving portion 2a is formed with a screw thread so as to be attachable and detachable, or through a screw (not shown). It may be detachably fixed.

【0019】さらに、前記蓋体15中央には断面視略凸
状をした円筒状の操作摘み15bを設け、この操作摘み
15bを持って内筒14を外筒1内に容易に着脱できる
ようにしている。
Further, a cylindrical operation knob 15b having a substantially convex cross section is provided in the center of the lid body 15 so that the inner cylinder 14 can be easily attached to and detached from the outer cylinder 1 by holding the operation knob 15b. ing.

【0020】18は前記嵌合受部2aと嵌合筒部15a
の嵌合時に内部の電解水等が外部に漏れないようシール
するためのシールパッキンである。
Reference numeral 18 denotes the fitting receiving portion 2a and the fitting tubular portion 15a.
This is a seal packing for sealing the inside of the electrolyzed water and the like so as not to leak outside during the fitting.

【0021】15cは前記操作摘み15b中央に断面視
略凹状に設けた支持溝で、支持溝15cの中央には後述
の第2電極20を吊下げ支持する電極支持部材としての
ボルト21を貫通させるための貫通孔15dを設けてい
る。該支持溝15cは、後述の第2電極20を蓋体15
に固定するナット26を蓋体15の操作摘み15bに埋
没するようにしていることで外観性の向上とボルト21
やナット26による怪我を防止している。
Reference numeral 15c is a support groove provided in the center of the operation knob 15b in a substantially concave shape in cross section, and a bolt 21 as an electrode support member for suspending and supporting a second electrode 20 described later is passed through the center of the support groove 15c. A through hole 15d for that is provided. The supporting groove 15c covers the second electrode 20 which will be described later.
The nut 26 fixed to the bottom is embedded in the operation knob 15b of the lid body 15 to improve the appearance and the bolt 21.
The nut 26 prevents injury.

【0022】15eは前記支持溝15cに後述の第2電
極20に電源を供給するためのリード線19を配設する
ための配線溝である。
Reference numeral 15e is a wiring groove for disposing a lead wire 19 for supplying power to a second electrode 20 described later in the support groove 15c.

【0023】15fは前記支持溝15cの下側に一体に
垂下形成した円筒状の電極支持部で、下端周縁は後述の
第2電極20の上面部20aに当接した状態で前記ボル
ト21に嵌合するナット26により固定している。
Reference numeral 15f denotes a cylindrical electrode supporting portion integrally formed below the supporting groove 15c, and the lower end peripheral edge thereof is fitted to the bolt 21 while being in contact with the upper surface portion 20a of the second electrode 20 described later. It is fixed by a mating nut 26.

【0024】20は黒鉛や活性炭等の材料を使用して円
筒状に形成した第2の電極で、上面部20a中央と底板
部20b中央には前記ボルト21が貫通する支持孔が開
設されている。前記ボルト21は耐食性(耐酸性かつ耐
アルカリ性)でかつ導電性材料であるステンレス等から
なり、該ボルト21の一端21bはナット部を形成し前
記第2電極20の底板部20bに当接固定すると共に他
端21aは蓋体15に固定している。
Reference numeral 20 is a second electrode formed in a cylindrical shape using a material such as graphite or activated carbon, and a support hole through which the bolt 21 penetrates is formed in the center of the upper surface portion 20a and the center of the bottom plate portion 20b. . The bolt 21 is made of stainless steel or the like that is corrosion resistant (acid resistant and alkali resistant) and is a conductive material, and one end 21b of the bolt 21 forms a nut portion and abuts and fixes it on the bottom plate portion 20b of the second electrode 20. At the same time, the other end 21a is fixed to the lid body 15.

【0025】該ボルト21は他端21aを第2電極20
の底板部20b側の支持孔から挿入し上面部20aの支
持孔から貫通突出させ、ボルト21の一端21bのナッ
ト部が第2電極20の底板部20bに当接するまで挿入
した状態で、第2電極20の上面部20a側からワッシ
ャー22を介してナット23で第2電極20を固定す
る。次に、ボルト21の他端21a側を電極支持部15
fの下側孔15g側から挿入し貫通孔15dから支持溝
15c内に突出させ、第2電極20の上面部20aと電
極支持部15fの下端周縁が当接する位置まで挿入した
状態でボルト21の他端21a先端にワッシャー24と
リード線19からの電源を接続する電源接続手段として
の端子25を介してナット26により第2電極20を蓋
体15に固定する。
The other end 21a of the bolt 21 has a second electrode 20a.
Of the second electrode 20 until the nut portion of the one end 21b of the bolt 21 abuts on the bottom plate portion 20b of the second electrode 20. The second electrode 20 is fixed by the nut 23 from the upper surface portion 20a side of the electrode 20 via the washer 22. Next, the other end 21a side of the bolt 21 is attached to the electrode supporting portion 15
f of the bolt 21 while being inserted from the lower hole 15g side, protruding from the through hole 15d into the support groove 15c, and inserted to a position where the upper surface portion 20a of the second electrode 20 and the lower end peripheral edge of the electrode supporting portion 15f abut. The second electrode 20 is fixed to the lid body 15 by a nut 26 via a washer 24 and a terminal 25 as a power source connecting means for connecting a power source from the lead wire 19 to the tip of the other end 21a.

【0026】よって、第2電極20を支持しているボル
ト21の他端を電極支持部15f内を貫通して蓋体15
に止着固定することにより、第2電極20を内筒14内
に吊下固定するものである。
Therefore, the other end of the bolt 21 supporting the second electrode 20 penetrates the inside of the electrode supporting portion 15f to cover the lid body 15.
The second electrode 20 is suspended and fixed in the inner cylinder 14 by being fixedly fixed to the inner cylinder 14.

【0027】前記隔膜装着部16は、電解能力に応じて
所定面積を有する四角や丸、楕円形等の色々な形状に開
設した開口部16aを設けており、該装着部16の外面
あるいは内面には電気分解時にイオンが通過し電解槽A
と内筒14の開口部を隔てておく隔膜27を接着剤によ
り装着あるいはインサート形成にて装着している。ま
た、隔膜27は2分割したものを装着することで、位置
合わせが容易でたるみのない装着が可能となり効率の良
い取付け作業が行える。
The diaphragm mounting portion 16 is provided with openings 16a opened in various shapes such as a square, a circle, and an ellipse having a predetermined area according to the electrolysis capacity, and the outer surface or the inner surface of the mounting portion 16 is provided. Ion passes through during electrolysis, and electrolytic cell A
A diaphragm 27 for separating the opening of the inner cylinder 14 is attached by an adhesive or by insert formation. In addition, by installing the septum 27 divided into two parts, it is possible to perform the positioning easily and to mount the diaphragm 27 without sagging, so that the mounting work can be performed efficiently.

【0028】前記収容部17は有底円筒状の容器で、第
2電極20の下方において内部に第1電極7と第2電極
20間で電気分解時にマイナスイオンとプラスイオンに
分解し酸性水又はアルカリ水を生成するための電解質C
を収容する。
The accommodating portion 17 is a cylindrical container having a bottom, and is disposed below the second electrode 20 inside the first electrode 7 and the second electrode 20 during electrolysis so as to be decomposed into negative ions and positive ions and acidic water or Electrolyte C for producing alkaline water
To house.

【0029】28は収容部17の底面部17a中央に開
設した取付孔17eに挿通した排水筒29を接着等によ
り固定する固定部で、排水筒29の下部はその外周を前
記排水筒嵌合部3bとパッキン5を介して着脱自在に嵌
合接続している。
Reference numeral 28 is a fixing portion for fixing a drain pipe 29 inserted in a mounting hole 17e opened at the center of the bottom portion 17a of the accommodating portion 17 by adhesion or the like, and the lower part of the drain pipe 29 has its outer periphery at the drain pipe fitting portion. 3b and the packing 5 are detachably fitted and connected.

【0030】また、前記排水筒29は合成樹脂材料を中
空の円筒状に形成したもので、その上端は内筒14の排
水口としての開口部29aを第2電極20と隔膜27間
に位置するよう屈曲させて配置している。
The drain tube 29 is made of a synthetic resin material in the shape of a hollow cylinder, and the upper end of the drain tube 29 has an opening 29a as a drain port of the inner tube 14 between the second electrode 20 and the diaphragm 27. It is bent so that it is arranged.

【0031】さらに、その上端の排水口29a位置は第
1電極7、第2電極20と隔膜27の上端と略同じ高さ
になるように設定しており、この位置は電気分解時のイ
オンの移動に必要な水量を確保しつつそれ以上の給水時
には不要な水等を装置外部に放出するものである。
Further, the position of the drain port 29a at the upper end is set to be substantially the same height as the upper ends of the first electrode 7, the second electrode 20 and the diaphragm 27, and this position is for the ions during electrolysis. While securing the amount of water required for movement, unnecessary water is discharged to the outside of the device when supplying more water.

【0032】尚、前記電解質Cとしては、塩化ナトリウ
ム、塩化カリウム、塩化カルシウム、塩化マグネシウム
等の塩化化合物や硫酸ナトリウムや硫酸カルシウム等の
硫化化合物等を使用できるが、本実施形態では塩化ナト
リウム(食塩)を使用している。
As the electrolyte C, a chloride compound such as sodium chloride, potassium chloride, calcium chloride or magnesium chloride or a sulfide compound such as sodium sulfate or calcium sulfate can be used. ) Is used.

【0033】17cは前記収容部17の底面部17a下
方に向けて円筒状に垂下形成した給水壁で、前記固定部
28の外側に同心円上に設けており、前記給水筒嵌合部
3eとシール用のパッキン6を介して挿抜自在に嵌合す
るよう構成している。また、給水壁17cは前記排水筒
嵌合部3bと給水室Eを形成し、この給水室Eから水の
流入部としての給水孔17dを介して内筒14内に給水
を行うものである。
Reference numeral 17c designates a water supply wall which is formed in a cylindrical shape so as to extend downward from the bottom surface 17a of the accommodating portion 17, and is provided concentrically outside the fixed portion 28 and seals with the water supply cylinder fitting portion 3e. It is configured so that it can be freely inserted and removed via a packing 6 for use. Further, the water supply wall 17c forms a water supply chamber E with the drain pipe fitting portion 3b, and supplies water from the water supply chamber E into the inner cylinder 14 through a water supply hole 17d serving as a water inflow portion.

【0034】よって、排水筒嵌合部3bと給水筒嵌合部
3eを同心円上に設けたことで、内筒14を外筒1へ装
着する時に内筒14と外筒1の角度や位置合わせが不要
となり、容易に内筒14を外筒1に装着できるように構
成しているものである。
Therefore, by providing the drainage pipe fitting portion 3b and the water supply pipe fitting portion 3e on the concentric circles, when the inner cylinder 14 is attached to the outer cylinder 1, the angle and position of the inner cylinder 14 and the outer cylinder 1 are aligned. Is unnecessary, and the inner cylinder 14 can be easily attached to the outer cylinder 1.

【0035】また、前記第1の電極7、第2の電極2
0、隔膜27の上端は全て同じ高さに配置することでイ
オン化した物質の移動が効率良く行えるようにしてい
る。
The first electrode 7 and the second electrode 2 are also provided.
0, the upper ends of the diaphragms 27 are all arranged at the same height so that the ionized substances can be efficiently transferred.

【0036】以下図4に基づいて、上記電解水製造装置
への給水回路及び制御回路について説明する。40は市
水である水道水や貯水タンクから供給される水を電解用
給水部3gへ供給する第1の給水回路であり、該第1の
給水回路40の途中には減圧弁41、第1電磁弁42及
び流量計である流量センサー43が設けられている。ま
た、44は第1の給水回路40の途中(第1電磁弁42
より上流側)から分岐し水道水や貯水タンクから供給さ
れる水を給水接続部3fへ供給する第2の給水回路であ
り、該第2の給水回路44の途中に第2電磁弁45が設
けられている。
The water supply circuit and control circuit for the electrolyzed water producing apparatus will be described below with reference to FIG. Reference numeral 40 denotes a first water supply circuit for supplying tap water, which is city water, or water supplied from a water storage tank, to the electrolysis water supply unit 3g. A pressure reducing valve 41, a first water supply circuit 40 is provided in the middle of the first water supply circuit 40. A solenoid valve 42 and a flow sensor 43, which is a flow meter, are provided. Further, 44 is in the middle of the first water supply circuit 40 (first solenoid valve 42
It is a second water supply circuit that branches from the upstream side) and supplies tap water or water supplied from a water storage tank to the water supply connection portion 3f, and a second solenoid valve 45 is provided in the middle of the second water supply circuit 44. Has been.

【0037】また、46は電解水製造装置のマイクロコ
ンピュータである制御装置であり、該制御装置46は記
憶素子であるROM47、データを随時記憶する記憶素
子であるRAM48、中央演算素子であるCPU49及
びタイマ50などから構成されている。
Further, 46 is a control device which is a microcomputer of the electrolyzed water producing device. The control device 46 is a ROM 47 which is a storage element, a RAM 48 which is a storage element which stores data as needed, a CPU 49 which is a central processing element, and It is composed of a timer 50 and the like.

【0038】そして、ROM47は電源が投入され、第
1、第2電磁弁42、45の開閉、第1電極7と第2電
極20とに印加する直流電圧の値(以下印加電圧とい
う)、図5に示したようにカートリッジとして交換可能
な内筒14を使用し始めてから流量センサー43により
検出された流量、すなわち電解水製造装置へ供給され電
解水製造装置により生成された酸性水あるいはアルカリ
水の量(以下生成水量という)に基づいて後述する運転
スイッチがオフしてから印加電圧を定常時より小さくし
て通常よりも電解能力を低くする運転(以下予備電解運
転という)を開始するまでの時間を制御するプログラム
などを記憶している。
Then, the ROM 47 is turned on, the first and second solenoid valves 42 and 45 are opened / closed, the value of the DC voltage applied to the first electrode 7 and the second electrode 20 (hereinafter referred to as applied voltage), 5, the flow rate detected by the flow rate sensor 43 since the use of the replaceable inner cylinder 14 as a cartridge, that is, the acidic water or alkaline water supplied to the electrolyzed water production apparatus and produced by the electrolyzed water production apparatus is started. The time from the turning off of the operation switch, which will be described later, based on the amount (hereinafter referred to as the amount of generated water) to the start of an operation (hereinafter referred to as preliminary electrolysis operation) in which the applied voltage is made smaller than in the steady state and the electrolysis capacity is lower than usual It stores a program for controlling the.

【0039】また、RAM48は流量センサー43によ
り検出された流量、すなわち電解水製造装置へ供給され
電解水製造装置により生成された酸性水あるいはアルカ
リ水の量(以下生成水量という)などのデータを随時記
憶する。また、CPU49は流量センサー43により検
出されRAM48に記憶された生成水量などのデータに
基づいてROM47に記憶されたプログラムにより第
1、第2電磁弁42、45の開閉、印加電圧などを制御
する。また、51は制御装置46に接続された電解水製
造装置の運転スイッチで、タイマ50はこの運転スイッ
チ51がオフしてからの時間などをカウントし、52は
同じく制御装置46に接続されたリセットスイッチで、
内筒14内の電解質Cとしての食塩を新たに交換した直
後に使用するときなどに操作するものであり、53は電
源スイッチである。
Further, the RAM 48 stores data such as the flow rate detected by the flow rate sensor 43, that is, the amount of acidic water or alkaline water (hereinafter referred to as produced water amount) supplied to the electrolyzed water producing apparatus and produced by the electrolyzed water producing apparatus. Remember. Further, the CPU 49 controls the opening / closing of the first and second solenoid valves 42, 45, the applied voltage, etc. by the program stored in the ROM 47 based on the data such as the amount of generated water detected by the flow rate sensor 43 and stored in the RAM 48. Further, 51 is an operation switch of the electrolyzed water manufacturing apparatus connected to the control device 46, a timer 50 counts the time after the operation switch 51 is turned off, and 52 is a reset switch also connected to the control device 46. With a switch
This is operated when the salt as the electrolyte C in the inner cylinder 14 is used immediately after being newly replaced, and 53 is a power switch.

【0040】そして、第1、第2電磁弁42、45及び
流量センサー43などは制御装置46に信号線を介して
接続されている。
The first and second electromagnetic valves 42 and 45, the flow rate sensor 43 and the like are connected to the control device 46 via signal lines.

【0041】以上の構成により、以下本実施形態の動作
について説明する。電解水製造装置の使用者が本製造装
置を初めて使用するに当り、電解水製造装置に電源を投
入した(コンセントにプラグを差し込み)後、電源スイ
ッチ53をオンすると、制御装置46が第1電磁弁42
に開信号を出力し、該第1電磁弁42が開く。このた
め、第1の給水回路40を介して電解用給水部3gから
水道水あるいは貯水タンク等からの水が供給され、電解
水生成通路から電解槽A内へと水位が上昇し、流量セン
サー43がその流量500ml(ミリリットル)を検出
すると、第1電磁弁42を閉じる。このとき、水位は吐
出口2cの上端まで上昇する。
With the above configuration, the operation of this embodiment will be described below. When the user of the electrolyzed water producing apparatus uses the electrolyzed water producing apparatus for the first time, after turning on the power to the electrolyzed water producing apparatus (inserting the plug into the outlet) and turning on the power switch 53, the control device 46 causes the first electromagnetic wave. Valve 42
An open signal is output to the first solenoid valve 42 and the first solenoid valve 42 is opened. Therefore, tap water or water from a water storage tank or the like is supplied from the electrolysis water supply unit 3g through the first water supply circuit 40, the water level rises from the electrolyzed water generation passage into the electrolysis tank A, and the flow rate sensor 43 Detects the flow rate of 500 ml (milliliter), the first solenoid valve 42 is closed. At this time, the water level rises to the upper end of the discharge port 2c.

【0042】次に、制御装置46は第2電磁弁45に開
信号を出力し、第2電磁弁45が開き、給水接続部3f
から水道水あるいは貯水タンク等に貯留された水が供給
され、内筒14内の電解質Cとしての食塩を配置してい
る収納部D内に給水動作が行われ、食塩を溶かす。
Next, the control device 46 outputs an open signal to the second solenoid valve 45, the second solenoid valve 45 is opened, and the water supply connecting portion 3f is opened.
From this, tap water or water stored in a water storage tank is supplied, and a water supply operation is performed in the storage portion D in which the salt as the electrolyte C in the inner cylinder 14 is arranged to dissolve the salt.

【0043】そして、食塩を浸漬しながら内筒14内の
水位は上昇するが、第2電極20が浸漬されはじめる
と、第2電磁弁45に開信号を出力すると同時に第1電
極7にプラス、第2電極20にマイナスの所定直流電圧
を印加しているので、水位の上昇により電流が流れはじ
め、これを電圧に変換して3.2V以上になると、それ
からタイマ50による25秒間経過後に第2電磁弁45
を閉じ自動的に給水を停止するように構成している。
The water level in the inner cylinder 14 rises while immersing the salt, but when the second electrode 20 begins to immerse, an open signal is output to the second solenoid valve 45 and at the same time the first electrode 7 is positively added. Since a predetermined negative DC voltage is applied to the second electrode 20, a current starts to flow due to the rise of the water level, and when this is converted to a voltage of 3.2 V or higher, the second time is passed after 25 seconds by the timer 50. Solenoid valve 45
It is configured to close and automatically stop water supply.

【0044】従って、内筒14内の水位が上昇して、オ
ーバーフローした余分な水はその開口部29aから排水
筒29、排水接続部3dを介して内筒14及び外筒1外
部に排出される。
Therefore, the water level in the inner cylinder 14 rises, and excess water overflowed is discharged from the opening 29a to the outside of the inner cylinder 14 and the outer cylinder 1 through the drain pipe 29 and the drain connection 3d. .

【0045】次に、この給水停止後、使用者が運転スイ
ッチ51をオンする毎に、制御装置46が動作して第1
電極7にプラス、第2電極20にマイナスの所定直流電
圧(例えば電圧は15V、電流は10A)が印加される
と共に、CPU49が動作し、制御装置46は開信号を
第1電磁弁42へ出力し、第1電磁弁42が開く。この
ため、第1の給水回路40を介して電解用給水部3gか
ら水道水あるいは貯水タンク等からの水が供給され、隔
膜27を介して第1電極7と第2電極20間でイオン化
した物質の移動が行われ酸性水が生成され、通常の電解
運転が開始され、酸性水が吐出口2cから吐出される。
詳述すると、電気分解時にマイナスイオン(Cl-)が
隔膜27を通過して第1電極(陽極)7に集まり、また
プラスイオン(Na+)が隔膜27を通過して第2電極
(陰極)20に集まり、塩素イオンは酸素と結合し水素
イオンと反応して塩素過酸化物を生成し、更に電気分解
によって次亜塩素酸が生成されることにより電解水の残
留塩素濃度が高くなって、供給された水の電気分解によ
り生じた水素イオン(H+)や生成された塩素過酸化物
から一部分離した水素イオン(H+)の濃度により酸性
水が生成され、吐出口2cから吐出される。
Next, after this water supply is stopped, every time the user turns on the operation switch 51, the control device 46 operates and the first
A predetermined DC voltage (for example, a voltage of 15 V and a current of 10 A) that is positive to the electrode 7 and negative to the second electrode 20 is applied, the CPU 49 operates, and the control device 46 outputs an open signal to the first solenoid valve 42. Then, the first solenoid valve 42 opens. For this reason, tap water or water from a water storage tank or the like is supplied from the electrolysis water supply unit 3g through the first water supply circuit 40, and the ionized substance between the first electrode 7 and the second electrode 20 through the diaphragm 27. Is carried out to generate acidic water, normal electrolysis operation is started, and acidic water is discharged from the discharge port 2c.
More specifically, during the electrolysis, negative ions (Cl ) pass through the diaphragm 27 and collect at the first electrode (anode) 7, and positive ions (Na + ) pass through the diaphragm 27 and the second electrode (cathode). Collected in 20, chlorine ions combine with oxygen and react with hydrogen ions to generate chlorine peroxide, and further, by generating hypochlorous acid by electrolysis, the residual chlorine concentration of electrolyzed water increases, acid water is generated by the concentration of the supplied generated by the electrolysis of water hydrogen ions (H +) and a portion from the generated chlorine peroxide separated hydrogen ion (H +), is discharged from the discharge port 2c .

【0046】また、運転スイッチ51のオンによりCP
U49が動作してタイマ50がカウントを開始すると共
に制御装置46が第2電磁弁45に開信号を出力し、第
2電磁弁45が開く。このため、給水接続部3fから水
が供給され、収納部D内に給水動作が行われる。このと
き、水は底面部17aの給水孔17dを通り、底部から
収納部D内へ行われ、流入した水により内筒14内の電
解質C及び電解質溶液が攪拌され食塩濃度が均一にな
る。このため、第2電極20及び隔膜27の周囲の電解
質溶液の濃度も均一になる。また、オーバーフローした
余分な水は開口部29aから排水筒29、排水接続部3
dを介して排出され、底面部17aの給水孔17dから
の給水と開口部29aから排水筒29を介する排水とに
より、内筒14内の撹拌が確実に行われる。そして、運
転スイッチ51のオンによる給水が開始されてから所定
時間(例えば1秒間)経過すると、タイマ50がカウン
トアップしてCPU49が動作し、制御装置46が第2
電磁弁45に閉信号を出力し、第2電磁弁45が閉じ
る。このため、内筒14内への給水が停止する。
When the operation switch 51 is turned on, CP
U49 operates, the timer 50 starts counting, the control device 46 outputs an open signal to the second solenoid valve 45, and the second solenoid valve 45 opens. Therefore, water is supplied from the water supply connection portion 3f, and the water supply operation is performed in the storage portion D. At this time, water passes through the water supply hole 17d of the bottom surface portion 17a and is carried into the storage portion D from the bottom portion, and the inflowing water agitates the electrolyte C and the electrolyte solution in the inner cylinder 14 to make the salt concentration uniform. Therefore, the concentration of the electrolyte solution around the second electrode 20 and the diaphragm 27 also becomes uniform. In addition, the excess water that overflows is drained from the opening 29a to the drain pipe 29 and the drain connection portion 3.
The water is discharged through d, and the inside of the inner cylinder 14 is surely stirred by the water supply from the water supply hole 17d of the bottom surface part 17a and the drainage from the opening 29a through the drain tube 29. Then, after a lapse of a predetermined time (for example, 1 second) from the start of water supply by turning on the operation switch 51, the timer 50 counts up, the CPU 49 operates, and the control device 46 causes the second control.
A close signal is output to the solenoid valve 45, and the second solenoid valve 45 is closed. Therefore, the water supply to the inner cylinder 14 is stopped.

【0047】このように電源投入した状態下での運転ス
イッチ51のオンに伴う内筒14内への給水は運転スイ
ッチ51のオン毎に行われ、運転スイッチ51のオン毎
に、内筒14内へ短時間(例えば1秒間)給水すること
により、内筒14内の電解質C及び電解質溶液が攪拌さ
れ、電解質溶液の濃度が均一になり安定し、酸性水の供
給毎の電解質溶液の濃度のばらつきが回避され、ほぼ均
一になる。この結果、酸性水を安定して供給することが
可能になる。
In this way, water is supplied to the inside of the inner cylinder 14 when the operation switch 51 is turned on when the power is turned on, every time the operation switch 51 is turned on. By supplying water for a short time (for example, 1 second), the electrolyte C and the electrolyte solution in the inner cylinder 14 are agitated, the concentration of the electrolyte solution becomes uniform and stable, and the concentration of the electrolyte solution varies every time the acidic water is supplied. Is avoided and becomes almost uniform. As a result, it becomes possible to stably supply the acidic water.

【0048】また、上記のような極性の場合、電解水で
ある生成水として酸性水を吐出口2cより吐出するが、
第1電極7にマイナス、第2電極20にプラスの所定直
流電圧を印加すればアルカリ水を吐出することができ
る。
In the case of the above polarity, acidic water is discharged from the discharge port 2c as the generated water which is electrolyzed water.
Alkaline water can be discharged by applying a predetermined DC voltage of minus to the first electrode 7 and plus to the second electrode 20.

【0049】もし、吐出する生成水濃度を制御したい場
合には、生成水濃度を測定表示するPHセンサー等を、
例えば吐出口2cの下流に設け、電解用給水部3gに供
給する水量を制御すれば電解槽A内を通過する通水時間
を可変調節することで電解水のPH(電解水濃度)を調
節できる。
If it is desired to control the concentration of produced water to be discharged, a PH sensor or the like for measuring and displaying the produced water concentration,
For example, the pH (electrolytic water concentration) of the electrolyzed water can be adjusted by variably adjusting the water passage time passing through the inside of the electrolytic cell A by providing the downstream of the discharge port 2c and controlling the amount of water supplied to the electrolysis water supply unit 3g. .

【0050】上記の如く、通常の電解運転が開始された
後、使用者が運転スイッチ51をオフすると、制御装置
46が動作し、第1電磁弁42へ閉信号を出力する。こ
のため、第1電磁弁42が閉じ、電解水製造装置への水
の供給が停止し、酸性水の供給が停止する。
As described above, when the user turns off the operation switch 51 after the normal electrolysis operation is started, the controller 46 operates and outputs a close signal to the first solenoid valve 42. Therefore, the first electromagnetic valve 42 is closed, the supply of water to the electrolyzed water producing apparatus is stopped, and the supply of acidic water is stopped.

【0051】また、運転スイッチ51のオフと同時にタ
イマ50がカウントを開始する。そして、予め設定され
た時間、例えば図5に示すように流量センサー43によ
り検出された生成水(酸性水)量の累計が50リットル
未満の場合には、1.5時間経過するとタイマ50がカ
ウントアップし、CPU49が動作して制御装置46が
上記通常の電解運転時より低い電圧、電流(例えば2.
5V、0.1A)を第1電極7及び第2電極20に印加
する予備電解運転が始まり、この予備電解運転は次の運
転スイッチ51がオンするまで継続する。これにより、
電解槽Aの酸性水の酸性度が維持され、酸性水の劣化は
回避される。
The timer 50 starts counting at the same time when the operation switch 51 is turned off. Then, when the accumulated amount of generated water (acidic water) detected by the flow rate sensor 43 is less than 50 liters for a preset time, for example, as shown in FIG. Up, the CPU 49 operates and the control device 46 causes the voltage and current (for example, 2.
5 V, 0.1 A) is applied to the first electrode 7 and the second electrode 20 to start the preliminary electrolysis operation, and this preliminary electrolysis operation continues until the next operation switch 51 is turned on. This allows
The acidity of the acidic water in the electrolytic cell A is maintained, and deterioration of the acidic water is avoided.

【0052】また、次に運転スイッチ51をオンする
と、上述したように第2電磁弁45が短時間開き、内筒
14内へ短時間給水され、電解質C及び電解質溶液が攪
拌されると共に、第1電極7及び第2電極20に直流電
圧(例えば電圧は15V、電流は10A)が印加される
と共に第1電磁弁42が開き、水が供給されると直ちに
酸性水が供給される。
When the operation switch 51 is turned on next, the second solenoid valve 45 is opened for a short time as described above, water is supplied into the inner cylinder 14 for a short time, the electrolyte C and the electrolyte solution are stirred, and A direct current voltage (for example, voltage is 15 V, current is 10 A) is applied to the first electrode 7 and the second electrode 20, the first solenoid valve 42 is opened, and when water is supplied, acidic water is supplied immediately.

【0053】また、酸性水の供給停止時に電解水製造装
置内の水を排水する必要がなくなり、電解水製造装置の
保守、管理の簡略化を図ることができる。
Further, it is not necessary to drain the water in the electrolyzed water producing apparatus when the supply of the acidic water is stopped, and the maintenance and management of the electrolyzed water producing apparatus can be simplified.

【0054】また、新しい内筒14の使用を開始してか
ら生成水量の累計、すなわち流量センサー43の検出流
量が増加するのに伴い、第1電極7や第2電極20やイ
オンを透過し分離する隔膜27が劣化し、電解水製造装
置の酸性水の生成能力が低下し、運転スイッチ51のオ
フ時の酸性水の酸性度が低下するが、図5の示したよう
に、予備運転を開始するまでの時間を短くする。このた
め、酸性水の供給停止後の酸性水の酸性度が維持され、
再び運転スイッチ51をオンし、酸性水の供給を開始す
る際には直ちに酸性水の供給を開始する。
Further, as the cumulative amount of water produced, that is, the flow rate detected by the flow rate sensor 43, increases after the use of the new inner cylinder 14, the first electrode 7, the second electrode 20 and ions are permeated and separated. The diaphragm 27 is deteriorated, the generation capacity of the acidic water of the electrolyzed water producing apparatus is decreased, and the acidity of the acidic water when the operation switch 51 is turned off is decreased. However, as shown in FIG. 5, the preliminary operation is started. Shorten the time to do. Therefore, the acidity of the acidic water is maintained after the supply of acidic water is stopped,
When the operation switch 51 is turned on again and the supply of acidic water is started, the supply of acidic water is immediately started.

【0055】上記のように、酸性水の供給が行われる
が、電解水製造装置に電源を投入し(コンセントにプラ
グを差し込んだ状態)電源スイッチ53をオンしたまま
の状態下で、内筒14(カートリッジ)を交換した際や
内筒14内の電解質溶液を排出して新たに食塩を投入し
た際には、リセットスイッチ52の操作により、制御装
置46が動作し、流量センサー43の検出流量はリセッ
トされ、また前述したように、制御装置46が第1電磁
弁42を開き、第1の給水回路40を介して水が供給さ
れ、電解水生成通路から電解槽A内へと水位が上昇し、
流量センサー43がその流量500ml(ミリリット
ル)を検出すると、第1電磁弁42を閉じる。次に、制
御装置46は第2電磁弁45を開き、内筒14内の電解
質Cとしての食塩を配置している収納部D内に給水動作
が行われ、食塩を溶かすが、内筒14内の水位は上昇し
て第2電極20が浸漬されはじめると、第2電磁弁45
に開信号を出力すると同時に第1電極7にプラス、第2
電極20にマイナスの所定直流電圧を印加しているの
で、水位の上昇により電流が流れはじめ、これを電圧に
変換して3.2V以上になると、それからタイマ50に
よる25秒間経過後に第2電磁弁45を閉じ自動的に給
水を停止する。
Although the acidic water is supplied as described above, the inner cylinder 14 is kept under the condition that the electrolyzed water producing apparatus is powered on (the plug is inserted in the outlet) and the power switch 53 is kept ON. When the (cartridge) is replaced or when the electrolyte solution in the inner cylinder 14 is discharged and new salt is added, the control device 46 is operated by operating the reset switch 52, and the flow rate detected by the flow rate sensor 43 is As described above, the control device 46 opens the first solenoid valve 42, water is supplied through the first water supply circuit 40, and the water level rises from the electrolytic water generation passage into the electrolytic cell A as described above. ,
When the flow rate sensor 43 detects the flow rate of 500 ml (milliliter), the first solenoid valve 42 is closed. Next, the control device 46 opens the second electromagnetic valve 45, and the water supply operation is performed in the storage portion D in which the salt as the electrolyte C in the inner cylinder 14 is arranged to dissolve the salt, but in the inner cylinder 14. When the water level rises and the second electrode 20 begins to be dipped, the second solenoid valve 45
At the same time that an open signal is output to the first electrode 7,
Since a predetermined negative DC voltage is applied to the electrode 20, a current starts to flow due to the rise of the water level, and when this is converted to a voltage of 3.2 V or higher, the second solenoid valve is operated 25 seconds after the timer 50 elapses. 45 is closed and water supply is automatically stopped.

【0056】次に、この給水停止後、使用者が運転スイ
ッチ51をオンする毎に、制御装置46が動作して第1
電極7にプラス、第2電極20にマイナスの所定直流電
圧(例えば電圧は15V、電流は10A)が印加される
と共に、制御装置46は開信号を第1電磁弁42へ出力
し、第1電磁弁42を開き、水が供給されて隔膜27を
介して第1電極7と第2電極20間でイオン化した物質
の移動が行なわれ酸性水が生成され、通常の電解運転が
開始され、酸性水が吐出口2cから吐出される。詳述す
ると、電気分解時にマイナスイオン(Cl-)が隔膜2
7を通過して第1電極(陽極)7に集まり、またプラス
イオン(Na+)が隔膜27を通過して第2電極(陰
極)20に集まり、塩素イオンは酸素と結合し水素イオ
ンと反応して塩素過酸化物を生成し、更に電気分解によ
って次亜塩素酸が生成されることにより電解水の残留塩
素濃度が高くなって、供給された水の電気分解により生
じた水素イオン(H+)や生成された塩素過酸化物から
一部分離した水素イオン(H+)の濃度により酸性水が
生成され、吐出口2cから吐出される。
Next, after this water supply is stopped, every time the user turns on the operation switch 51, the control device 46 operates and the first
A predetermined DC voltage (for example, a voltage of 15 V and a current of 10 A) that is positive to the electrode 7 and negative to the second electrode 20 is applied, and the control device 46 outputs an open signal to the first electromagnetic valve 42, and the first electromagnetic valve 42. The valve 42 is opened, water is supplied, the ionized substance is transferred between the first electrode 7 and the second electrode 20 through the diaphragm 27 to generate acidic water, and normal electrolysis operation is started. Is discharged from the discharge port 2c. More specifically, during the electrolysis, negative ions (Cl ) are generated by the diaphragm 2
7, the positive ions (Na + ) pass through the diaphragm 27 and collect at the first electrode (anode) 7 and the second electrode (cathode) 20. Chloride ions combine with oxygen and react with hydrogen ions. Then, chlorine peroxide is generated, and hypochlorous acid is further generated by electrolysis, so that the residual chlorine concentration of the electrolyzed water is increased, and hydrogen ions (H + ) Or the concentration of hydrogen ions (H + ) partially separated from the generated chlorine peroxide, acidic water is generated and discharged from the discharge port 2c.

【0057】なお、上記の実施形態においては、運転ス
イッチ51のオン毎に第2電磁弁45を短時間開き、内
筒14内へ給水し攪拌を行ったが、運転スイッチ51の
オン毎ではなく、運転スイッチ51を例えば1回又は複
数回オンする毎に、第2電磁弁45を短時間開き、内筒
14内へ給水し攪拌を行ってもよく、この場合には、内
筒14内の電解質溶液の濃度のばらつきを回避し、酸性
水を安定して供給できると共に、給水回数を減らし、使
用する水の量を極力少なくすることが可能になる。
In the above embodiment, each time the operation switch 51 is turned on, the second solenoid valve 45 is opened for a short time to supply water into the inner cylinder 14 to stir the water. Every time the operation switch 51 is turned on, for example, once or a plurality of times, the second electromagnetic valve 45 may be opened for a short time to supply water into the inner cylinder 14 to perform stirring. In this case, the inner cylinder 14 It is possible to avoid variations in the concentration of the electrolyte solution, stably supply acidic water, reduce the number of times of water supply, and minimize the amount of water used.

【0058】また、上記の実施形態においては、リセッ
トスイッチ52の操作後から運転スイッチ51のオンに
より、第2電磁弁45を短時間(1秒間)開き、内筒1
4内へ給水し攪拌を行ったが、例えば、タイマ50によ
りリセットスイッチ52操作後の運転時間の累計をカウ
ントし、運転時間の累計が予め設定されている所定時間
に達した以後は、上記の実施形態のように運転スイッチ
51のオンにより、第2電磁弁45を短時間開き、内筒
14内へ給水し攪拌を行うようにしてもよい。このよう
にすることにより、電解質溶液の濃度が安定していると
きの給水を極力回避しつつ、酸性水を安定して供給する
ことができる。
In the above embodiment, after the reset switch 52 is operated, the operation switch 51 is turned on to open the second solenoid valve 45 for a short time (1 second), and the inner cylinder 1
4 was supplied with water and agitated. For example, the timer 50 counts the cumulative total of operating times after the operation of the reset switch 52, and after the cumulative total of operating times reaches a preset predetermined time, As in the embodiment, by turning on the operation switch 51, the second electromagnetic valve 45 may be opened for a short time to supply water into the inner cylinder 14 to perform stirring. By doing so, acidic water can be stably supplied while avoiding water supply as much as possible when the concentration of the electrolyte solution is stable.

【0059】さらに、流量センサー43により検出され
た生成水(酸性水)量の累計が予め設定されている所定
の量に達した以後は、上記の実施形態のように運転スイ
ッチ51のオンにより、第2電磁弁45を短時間開き、
内筒14内へ給水し攪拌を行うようにしてもよい。この
ようにすることによっても、電解質溶液の濃度が安定し
ているときの給水を極力回避しつつ、酸性水を安定して
供給することができる。
Furthermore, after the cumulative total of the amount of produced water (acidic water) detected by the flow rate sensor 43 reaches a preset predetermined amount, the operation switch 51 is turned on as in the above embodiment, Open the second solenoid valve 45 for a short time,
Water may be supplied into the inner cylinder 14 to perform stirring. By doing so as well, it is possible to stably supply the acidic water while avoiding the water supply as much as possible when the concentration of the electrolyte solution is stable.

【0060】なお、上記の実施形態においては、予備電
解運転時に電極に印加する電圧、電流を変化させなかっ
たが、生成水量の累計の増加に伴い、すなわち電極の劣
化に伴って上記予備電解運転時に電極に印加される電
圧、電流を次第に高くすることによって酸性水の劣化を
一層確実に防止することができ、酸性水の供給開始時の
酸性水の酸性度を一層確実に維持することが可能にな
る。
In the above embodiment, the voltage and current applied to the electrodes during the pre-electrolysis operation were not changed, but the pre-electrolysis operation was performed with the increase in the cumulative amount of produced water, that is, with the deterioration of the electrodes. The deterioration of acidic water can be more reliably prevented by increasing the voltage and current applied to the electrodes at certain times, and the acidity of acidic water at the start of supplying acidic water can be more reliably maintained. become.

【0061】次に、第2の実施形態について説明する。
この実施形態においては、ROM48には予備電解運転
時に第1電極7と第2電極20に直流電圧の印加を所定
時間毎に繰り返すようなプログラミング、すなわち、オ
ンオフデューティのプログラミング(第1電極7及び第
2電極20へ電力を間欠的に供給するプログラミング)
が記憶されている。
Next, a second embodiment will be described.
In this embodiment, the ROM 48 is programmed so that the application of the DC voltage to the first electrode 7 and the second electrode 20 is repeated every predetermined time during the pre-electrolysis operation, that is, the programming of the on-off duty (the first electrode 7 and the second electrode 7). Programming for supplying electric power to the two electrodes 20 intermittently)
Is remembered.

【0062】このため、運転スイッチ51のオフ時、電
解水生成通路Aの酸性水の酸性度を維持することがで
き、運転スイッチ51のオン時に直ちに酸性水を供給す
ることができる。
Therefore, when the operation switch 51 is off, the acidity of the acidic water in the electrolytic water producing passage A can be maintained, and when the operation switch 51 is on, the acidic water can be supplied immediately.

【0063】次に、第3の実施形態について説明する。
この実施形態は、前記第1電極7及び第2電極10への
電力の供給が停止してから所定時間経過した後は所定の
サイクルで該第1電極7及び第2電極20へ電力を供給
するように制御するものである。
Next, a third embodiment will be described.
In this embodiment, power is supplied to the first electrode 7 and the second electrode 20 in a predetermined cycle after a lapse of a predetermined time after the supply of power to the first electrode 7 and the second electrode 10 is stopped. To control it.

【0064】即ち、運転スイッチ51のオフと同時にタ
イマ50がカウントを開始する。そして、予め設定され
た時間、例えば30分間経過した後は、制御装置46が
上記通常の電解運転時と同じ電圧、電流(例えば15
V、10A)を第1電極7及び第2電極20に所定サイ
クル(例えば、1分間オン、1分間オフ)で印加する予
備電解運転を開始し、この予備電解運転は次の運転スイ
ッチ51がオンするまで継続する。これにより、電解槽
Aの酸性水の酸性度が維持され、酸性水の劣化を回避す
ることができる。
That is, the timer 50 starts counting at the same time when the operation switch 51 is turned off. Then, after a preset time, for example, 30 minutes has elapsed, the control device 46 causes the same voltage and current (for example, 15
V, 10 A) is applied to the first electrode 7 and the second electrode 20 in a predetermined cycle (for example, on for 1 minute and off for 1 minute) to start a preliminary electrolysis operation. In this preliminary electrolysis operation, the next operation switch 51 is turned on. Continue until you do. As a result, the acidity of the acidic water in the electrolytic bath A is maintained, and deterioration of the acidic water can be avoided.

【0065】また、次に運転スイッチ51をオンする
と、第2電磁弁45を開いて給水接続部3fから水を供
給することなく、上述したように第1電極7及び第2電
極20に直流電圧(例えば電圧は15V、電流は10
A)が印加されると共に第1電磁弁42が開き、水が供
給されると直ちに酸性水を供給することが可能になる。
Next, when the operation switch 51 is turned on, the DC voltage is applied to the first electrode 7 and the second electrode 20 as described above without opening the second electromagnetic valve 45 and supplying water from the water supply connection portion 3f. (For example, voltage is 15V, current is 10
When (A) is applied and the first solenoid valve 42 is opened, the acidic water can be supplied as soon as the water is supplied.

【0066】以上本発明の実施態様について説明した
が、上述の説明に基づいて当業者にとって種々の代替
例、修正又は変形が可能であり、本発明はその趣旨を逸
脱しない範囲で前述の種々の代替例、修正又は変形を包
含するものである。
Although the embodiments of the present invention have been described above, various alternatives, modifications, and variations can be made by those skilled in the art based on the above description, and the present invention is not limited to the above-mentioned various modifications. It is intended to cover alternatives, modifications or variations.

【0067】[0067]

【発明の効果】以上のように本発明は、一旦生成水の供
給を停止した後に、生成水を供給する際に直ちに生成水
の供給を開始することができる。
As described above, according to the present invention, the supply of the generated water can be started immediately after the supply of the generated water is stopped once the supply of the generated water is stopped.

【図面の簡単な説明】[Brief description of drawings]

【図1】電解水製造装置の組立てた状態を説明する概略
縦断面図である。
FIG. 1 is a schematic vertical cross-sectional view illustrating an assembled state of an electrolyzed water producing apparatus.

【図2】電極板の取付け構造を説明する概略縦断面図で
ある。
FIG. 2 is a schematic vertical cross-sectional view illustrating a mounting structure of an electrode plate.

【図3】電解水製造装置の内筒を説明する要部縦断面図
である。
FIG. 3 is a longitudinal sectional view of an essential part for explaining an inner cylinder of the electrolyzed water producing apparatus.

【図4】電解水製造装置への給水回路及び制御回路を説
明するブロック図である。
FIG. 4 is a block diagram illustrating a water supply circuit and a control circuit for the electrolyzed water manufacturing apparatus.

【図5】生成水(酸性水)量の累計と生成水の供給停止
後、予備電解運転を開始するまでの時間との関係を示す
図である。
FIG. 5 is a diagram showing the relationship between the cumulative amount of generated water (acidic water) and the time after the supply of generated water is stopped until the preliminary electrolysis operation is started.

【符号の説明】[Explanation of symbols]

1 外筒 7 第1電極 14 内筒 20 第2電極 27 隔膜 46 制御装置 50 タイマ C 電解質 1 outer cylinder 7 First electrode 14 Inner cylinder 20 Second electrode 27 diaphragm 46 Control device 50 timer C electrolyte

───────────────────────────────────────────────────── フロントページの続き (72)発明者 春山 賢一 群馬県邑楽郡千代田町大字新福寺670番地 1 エルテック株式会社内 (72)発明者 夏目 弘光 群馬県邑楽郡千代田町大字新福寺670番地 1 エルテック株式会社内 (72)発明者 岩瀬 芳男 群馬県邑楽郡千代田町大字新福寺670番地 1 エルテック株式会社内 (72)発明者 森山 廣満 神奈川県川崎市多摩区菅馬場3−10−9 Fターム(参考) 4D061 DA03 DB07 DB08 EA02 EB04 EB12 EB29 EB30 EB34 EB37 EB39 ED12 ED13 GA02 GA15 GA19 GC12 4K021 AB07 AB25 BA02 BA03 BB02 BC06 BC07 CA01 CA02 CA04 CA05 CA06 CA08 CA09 DB01 DB14 DB18    ─────────────────────────────────────────────────── ─── Continued front page    (72) Inventor Kenichi Haruyama             670 Shinfukuji, Oyaku-gun, Gunma Prefecture             1 Within L-Tech Co., Ltd. (72) Inventor Hiromitsu Natsume             670 Shinfukuji, Oyaku-gun, Gunma Prefecture             1 Within L-Tech Co., Ltd. (72) Inventor Yoshio Iwase             670 Shinfukuji, Oyaku-gun, Gunma Prefecture             1 Within L-Tech Co., Ltd. (72) Inventor Hiromitsu Moriyama             3-10-9 Sugaba, Tama-ku, Kawasaki-shi, Kanagawa F-term (reference) 4D061 DA03 DB07 DB08 EA02 EB04                       EB12 EB29 EB30 EB34 EB37                       EB39 ED12 ED13 GA02 GA15                       GA19 GC12                 4K021 AB07 AB25 BA02 BA03 BB02                       BC06 BC07 CA01 CA02 CA04                       CA05 CA06 CA08 CA09 DB01                       DB14 DB18

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 水道水や貯水タンクから供給される水を
通水しながら電気分解して酸性水又はアルカリ水を生成
する電解水製造装置において、内部に第1電極を設けた
外筒と、該外筒内に配設され該外筒との間に流路を形成
すると共に内部上方に第2電極を設け下方に電解質を配
置すると共に上部側壁に隔膜を設けた内筒と、前記第1
電極及び第2電極への電力の供給が停止してから所定時
間経過した後には通常よりも低い電解能力となるように
該第1電極及び第2電極へ電力を供給する制御装置を備
えたことを特徴とする電解水製造装置。
1. An electrolyzed water production apparatus for electrolyzing to generate acidic water or alkaline water while passing tap water or water supplied from a water storage tank, and an outer cylinder provided with a first electrode therein. An inner cylinder which is disposed in the outer cylinder, forms a flow path between the outer cylinder and the inner electrode, has a second electrode provided at an upper portion inside, an electrolyte is provided at a lower portion, and a diaphragm is provided at an upper side wall;
A control device for supplying electric power to the first electrode and the second electrode so that the electrolysis capacity becomes lower than usual after a lapse of a predetermined time after the supply of electric power to the electrode and the second electrode is stopped. An electrolyzed water production apparatus characterized by:
【請求項2】 前記制御装置は、前記第1電極及び第2
電極への電力の供給が停止してから所定時間経過した後
には電力の供給停止前よりも低い電圧にて該第1電極及
び第2電極へ電力を供給することを特徴とする請求項1
に記載の電解水製造装置。
2. The control device includes the first electrode and the second electrode.
The electric power is supplied to the first electrode and the second electrode at a voltage lower than that before the supply of the electric power is stopped after a predetermined time has elapsed after the supply of the electric power to the electrode is stopped.
The electrolyzed water manufacturing apparatus according to 1.
【請求項3】 水道水や貯水タンクから供給される水を
通水しながら電気分解して酸性水又はアルカリ水を生成
する電解水製造装置において、内部に第1電極を設けた
外筒と、該外筒内に配設され該外筒との間に流路を形成
すると共に内部上方に第2電極を設け下方に電解質を配
置すると共に上部側壁に隔膜を設けた内筒と、前記第1
電極及び第2電極への電力の供給が停止してから所定時
間経過した後には通常よりも低い電解能力となるように
該第1電極及び第2電極へ電力を間欠的に供給する制御
装置を備えたことを特徴とする電解水製造装置。
3. An electrolyzed water production apparatus for electrolyzing acid water or alkaline water while passing tap water or water supplied from a water storage tank, and an outer cylinder provided with a first electrode therein, An inner cylinder which is disposed in the outer cylinder, forms a flow path between the outer cylinder and the inner electrode, has a second electrode provided at an upper portion inside, an electrolyte is provided at a lower portion, and a diaphragm is provided at an upper side wall;
A control device for intermittently supplying electric power to the first electrode and the second electrode so that the electrolysis capacity becomes lower than usual after a predetermined time has elapsed since the supply of electric power to the electrode and the second electrode stopped. An electrolyzed water production apparatus characterized by being provided.
【請求項4】 水道水や貯水タンクから供給される水を
通水しながら電気分解して酸性水又はアルカリ水を生成
する電解水製造装置において、内部に第1電極を設けた
外筒と、該外筒内に配設され該外筒との間に流路を形成
すると共に内部上方に第2電極を設け下方に電解質を配
置すると共に上部側壁に隔膜を設けた内筒と、前記流路
に流入する供給水の量を検出する流量計と、前記第1電
極及び第2電極への電力の供給が停止してから所定時間
経過した後には通常よりも低い電解能力となるように該
第1電極及び第2電極へ電力を供給し、かつ前記流量計
により計測された供給水の量が多くなるのに従い前記所
定時間を次第に短く制御する制御装置を備えたことを特
徴とする電解水製造装置。
4. An electrolyzed water production apparatus for electrolyzing water while supplying tap water or water supplied from a water storage tank to generate acidic water or alkaline water, and an outer cylinder provided with a first electrode therein, An inner cylinder having a flow path formed between the outer cylinder and the outer cylinder, a second electrode provided inside the upper cylinder, an electrolyte arranged below, and a diaphragm provided on an upper side wall; A flow meter for detecting the amount of feed water flowing into the first electrode and a second meter so that the electrolysis capacity becomes lower than usual after a lapse of a predetermined time after the supply of electric power to the first electrode and the second electrode is stopped. Electrolyzed water production characterized by comprising a control device for supplying electric power to the first electrode and the second electrode and for controlling the predetermined time gradually shorter as the amount of supply water measured by the flowmeter increases. apparatus.
【請求項5】 水道水や貯水タンクから供給される水を
通水しながら電気分解して酸性水又はアルカリ水を生成
する電解水製造装置において、内部に第1電極を設けた
外筒と、該外筒内に配設され該外筒との間に流路を形成
すると共に内部上方に第2電極を設け下方に電解質を配
置すると共に上部側壁に隔膜を設けた内筒と、前記第1
電極及び第2電極への電力の供給が停止してから所定時
間経過した後は所定のサイクルで該第1電極及び第2電
極へ電力を供給する制御装置を備えたことを特徴とする
電解水製造装置。
5. In an electrolyzed water producing apparatus for electrolyzing to generate acidic water or alkaline water while passing tap water or water supplied from a water storage tank, an outer cylinder provided with a first electrode therein, An inner cylinder which is disposed in the outer cylinder, forms a flow path between the outer cylinder and the inner electrode, has a second electrode provided at an upper portion inside, an electrolyte is provided at a lower portion, and a diaphragm is provided at an upper side wall;
Electrolyzed water comprising a controller for supplying power to the first electrode and the second electrode in a predetermined cycle after a predetermined time has elapsed after the supply of power to the electrode and the second electrode was stopped. Manufacturing equipment.
JP2002138679A 2002-02-21 2002-05-14 Apparatus for manufacturing electrolyzed water Pending JP2003313692A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002138679A JP2003313692A (en) 2002-02-21 2002-05-14 Apparatus for manufacturing electrolyzed water

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2002044099 2002-02-21
JP2002-44099 2002-02-21
JP2002138679A JP2003313692A (en) 2002-02-21 2002-05-14 Apparatus for manufacturing electrolyzed water

Publications (1)

Publication Number Publication Date
JP2003313692A true JP2003313692A (en) 2003-11-06

Family

ID=29551773

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002138679A Pending JP2003313692A (en) 2002-02-21 2002-05-14 Apparatus for manufacturing electrolyzed water

Country Status (1)

Country Link
JP (1) JP2003313692A (en)

Similar Documents

Publication Publication Date Title
JPWO2003095102A1 (en) Electrolyzed water spray device
CN208328132U (en) Novel hypochlorite generator with online accurate proportion function
EP1995220A1 (en) Water treatment device
CN208328133U (en) The novel hypochlorite generator of salt consumption can be reduced
CN208328131U (en) The novel hypochlorite generator of reaction rate can be improved
JPH1024294A (en) Production of weakly acidic chlorine based sterilizing water
US20130199928A1 (en) Device for producing an electrochemically activated solution by means of an electrolysis process
JP2003313692A (en) Apparatus for manufacturing electrolyzed water
JP4668884B2 (en) Slightly acidic water generator
JP2003311269A (en) Apparatus for producing electrolyzed water
JP4204955B2 (en) Electrolyzed water generation method and apparatus
JP2003285061A (en) Electrolytic water producing apparatus
JP2003245670A (en) Electrolytic water making device
JP2018158285A (en) Electrolytic water generation apparatus
JP2004223497A (en) Method for cleaning electrode of running water type apparatus for forming strongly acidic water
JP2004167339A (en) Electrolytic water making apparatus
JP3694107B2 (en) Electrolyzed water generator
JP2002273425A (en) Device for producing electrolytic water capable of being miniaturized
JP3364769B2 (en) Continuous electrolyzed water generator
JP3548638B2 (en) Electrolyzed water generator
JP2580213Y2 (en) Water conditioner that can add calcium ion
JPH09308885A (en) Electrolytic water making apparatus
JP3821359B2 (en) One type of electrolytic cell that does not discharge electrolyzed water
JPH1190457A (en) Water treatment apparatus
JPH0451916Y2 (en)

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040331

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050401

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060523

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20061017