JP2003296411A - Support system for planning and sales of wind energy generation business - Google Patents

Support system for planning and sales of wind energy generation business

Info

Publication number
JP2003296411A
JP2003296411A JP2002103489A JP2002103489A JP2003296411A JP 2003296411 A JP2003296411 A JP 2003296411A JP 2002103489 A JP2002103489 A JP 2002103489A JP 2002103489 A JP2002103489 A JP 2002103489A JP 2003296411 A JP2003296411 A JP 2003296411A
Authority
JP
Japan
Prior art keywords
information
power generation
business
wind power
wind
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2002103489A
Other languages
Japanese (ja)
Inventor
Yoshitaka Takayanagi
柳 義 隆 高
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kyowa Engineering Consultants Co Ltd
Original Assignee
Kyowa Engineering Consultants Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kyowa Engineering Consultants Co Ltd filed Critical Kyowa Engineering Consultants Co Ltd
Priority to JP2002103489A priority Critical patent/JP2003296411A/en
Publication of JP2003296411A publication Critical patent/JP2003296411A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a support system for preparing a business plan, including selection of a candidate site, acquisition of land, survey, planning and designing for constructing a plant, procurement of a construction fund, and arrangement with related organizations, for a consulting company contracting for the wind energy generation business plan. <P>SOLUTION: The support system for planning and sales of wind energy generation business 100 comprises a computer 10 for supporting planning and sales of wind energy generation business, a Web server 11 to be connected to terminals 1-4, an application server 20 with a business transaction means necessary for planning the wind energy generation business, a wind energy generation business planning database 31 for extracting a candidate site for the wind energy generation and recording information on planning/arrangement items necessary for promoting the business, a candidate site survey information database 32 for recording information on the survey and analysis of the candidate site, and a design information database 33 for recording information on the power plant, equipment and construction plan. <P>COPYRIGHT: (C)2004,JPO

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、風力発電の候補地
選定から、調査、事業計画、建設計画、施工、運営まで
の事業企画の立案支援及び事業企画販売を支援するため
のシステムに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a system for supporting planning and sales of business plans from selection of candidate sites for wind power generation to research, business plans, construction plans, construction and operation.

【0002】[0002]

【従来の技術】従来、地球環境保全のためCO排出の
抑制がグローバルな課題とされ、従来の大規模火力発
電、原子力発電に代わるエコエネルギー利用として、風
力発電が見直されてきた。エコエネルギー利用としては
水力発電が従来から利用されてきたが、大規模なダムの
建設などによる上下流域の環境破壊が問題とされてき
た。風力発電は、地域毎の小規模な施設で電気エネルギ
ーを得ることができるため、大規模水力発電のような巨
大投資と、環境破壊をすることがないことからその建設
が望まれていた。
2. Description of the Related Art Conventionally, it has been a global issue to suppress CO 2 emission in order to protect the global environment, and wind power generation has been reconsidered as an alternative to conventional large-scale thermal power generation and nuclear power generation to use eco-energy. Hydroelectric power generation has been used for the use of eco-energy, but environmental destruction in the upstream and downstream areas due to the construction of large-scale dams has been a problem. Since wind power generation can obtain electric energy from a small-scale facility in each region, it has been desired to construct it because it does not cause huge investment and environmental damage like large-scale hydropower generation.

【0003】また、規制緩和により、民間企業での発電
と発電電力の余剰を売買することを可能とする電力自由
化がなされ、地域での小規模発電、エネルギーの利用が
採算面でも成り立つ状況となった。
In addition, deregulation has enabled the liberalization of electric power that enables private companies to buy and sell power generation and surplus generated power, and small-scale power generation and energy use in the region are also profitable. became.

【0004】しかし、最も環境保全効果の高い風力発電
については、実用上少なからずの規模の投資(1基数億
円)と、立地場所を必要とし、風況などの自然条件に関
する調査、建設資材・器材の搬入から建設条件の調査、
発電電力の搬送条件などの検討を必要とするため、専門
的な調査を必要とした。このため、風力発電プロジェク
トの推進を行なう公共団体・企業においては、候補地の
地権者説明・契約から、それぞれの専門コンサルタント
への委託など、事業企画が多岐にわたるため、組織毎に
行なうことは非常に難しかった。
[0004] However, for wind power generation, which has the highest environmental protection effect, it requires a considerable amount of investment for practical use (100 million yen per unit), a location is required, investigations on natural conditions such as wind conditions, construction materials, etc.・ Inspection of construction conditions from the delivery of equipment,
Since it was necessary to examine the conditions for transporting the generated power, a specialized survey was required. For this reason, public organizations and companies that promote wind power generation projects have a wide variety of business plans, from explanations and contracts of landowners at the candidate site to contracting to specialized consultants. It was difficult for me.

【0005】[0005]

【発明が解決しようとする課題】本発明は、従来風力発
電事業の候補者がそれぞれ行なっていた風力発電事業の
企画を請け負うコンサルティング企業に対し、候補地の
選定、土地の確保から建設のための調査・計画・設計及
び建設資金調達・関係機関との調整までを実施した事業
企画の作成を支援する風力発電事業企画・販売支援シス
テムの提供を目的とする。
DISCLOSURE OF THE INVENTION The present invention provides a consulting company that undertakes the planning of a wind power generation business, which was conventionally carried out by each candidate of the wind power generation business, for selecting a candidate site, securing a land, and then constructing it. The purpose of the project is to provide a wind power generation business planning and sales support system that supports the creation of business plans that carry out surveys, plans, designs, construction financing, and coordination with related organizations.

【0006】また、本支援システムにより、風力発電事
業の適地抽出、事業推進の促進を図り、エコエネルギー
利用に資することを目的とする。
[0006] Further, it is another object of the present support system to identify suitable sites for wind power generation business, promote business promotion, and contribute to utilization of eco energy.

【0007】[0007]

【課題を解決するための手段】前記課題を解決するた
め、本発明の風力発電事業企画・販売支援システムは、
風力発電事業の企画を行なうコンサルティング企業に設
ける風力発電事業企画・販売支援システムであって、イ
ンターネットを介して地球環境保全のための施策推進を
課題とする公共団体・電力事業者・一般企業からなる風
力発電事業候補の端末機と、電力購入候補である電力会
社・企業の端末機と、気象庁または民間気象観測機関の
気象観測ネットワークと、風力発電施設の建設候補地の
住民または関係者の端末機とに接続可能な風力発電の事
業企画企業の企画・販売支援コンピュータとから構成
し、前記企画・販売支援コンピュータは、前記端末機と
接続するためのファイアーウオールを含むWebサーバ
と、風力発電事業企画に必要な業務処理手段を備えるア
プリケーションサーバと、風力発電候補地を抽出すると
共に事業推進に必要な計画・調整項目情報を記録した風
力発電事業企画データベースと、候補地の調査解析情報
を記録する候補地精査情報データベースと、発電施設・
設備・施工計画に関する情報を記録した設計情報データ
ベースとを管理するデータベースサーバとからなり、前
記アプリケーションサーバは、気象観測ネットワークか
ら収集する気象観測情報および候補地に関する立地条件
・規制情報を前記風力発電事業企画データベースに登録
する調査情報管理手段と、風力発電施設・設備の設計情
報を管理する設計情報管理手段と、収集された情報から
候補地を抽出すると共に候補地現地調査情報を分析して
候補地を選定する候補地選定手段と、選定された候補地
の風況精査に関わる地権者説明・契約管理と風況観測設
備施工管理、観測管理を行なう候補地風況精査管理手段
と、風況精査情報の解析・エネルギー取得見込み分析を
行なう風況情報解析手段と、立地関係機関・新エネルギ
ー・産業技術総合開発機構・電力事業者・資金調達先金
融機関等の関係機関に対する調整・申請業務を管理する
関係機関調整・申請手段と、施工直前までの調査・企画
・設計・調整・申請を完了した事業計画をインターネッ
トを介して風力発電事業候補者に公開し、入札を受付け
る事業企画公開・入札手段とを備え、エコエネルギーで
ある風力の利用促進を図ることを特徴とする。
In order to solve the above-mentioned problems, the wind power generation business planning / sales support system of the present invention is
It is a wind power generation business planning and sales support system that is set up in a consulting company that plans wind power generation business, and consists of public organizations, electric power companies, and general enterprises whose task is to promote measures for global environment conservation via the Internet. Terminals for wind power generation business candidates, terminals for electric power companies / companies that are candidates for power purchase, weather observation networks of the Japan Meteorological Agency or private meteorological observation institutions, and terminals for residents or related parties at the candidate sites for construction of wind power generation facilities. And a computer for supporting the sales and planning of a wind power generation business that can be connected to a computer, the planning and sales support computer, the planning and sales support computer includes a Web server including a firewall for connecting to the terminal, and the wind power generation business planning. Application server equipped with necessary business processing means and wind power generation candidate site are extracted and necessary for business promotion And wind power generation business planning database that records the planning and adjustment item information, and the candidate site examination information database to record the survey analysis information of the candidate sites, power generation facilities and
The application server comprises a database server that manages a design information database that records information about facilities and construction plans, and the application server collects weather observation information collected from a meteorological observation network and location condition / regulatory information about a candidate site in the wind power generation business. Survey information management means to be registered in the planning database, design information management means to manage the design information of wind power generation facilities / equipment, and candidate sites are extracted from the collected information and the candidate site field survey information is analyzed to analyze the candidate sites. A candidate site selection method for selecting a candidate site, explanation of landowners involved in wind condition inspection of the selected candidate site, contract management, wind condition observation facility construction management, candidate site wind condition inspection management means for performing observation management, and wind condition inspection Wind condition information analysis means for analyzing information and energy acquisition prospects, and location-related institutions, new energy, and industrial technology synthesis Coordination and application means for related organizations that manage coordination and application operations for related organizations such as the generating organization, electric power companies, financial institutions to which funds are procured, and business plans for which investigation, planning, design, adjustment, and application have been completed up to just before construction. Is open to the wind power generation business candidate via the Internet, and the business plan disclosure / bidding means for accepting bids is provided, and the use of wind power, which is eco-energy, is promoted.

【0008】また、前記風力発電事業企画データベース
は、風力発電事業計画に関する標準工程テーブルと、新
エネルギー・産業技術総合開発機構(NEDO)が全国
予測した風況気象情報データテーブルと、気象庁のアメ
ダス観測網の風況データを含む気象情報テーブルと、既
設風力発電施設の風況データを記録した稼働情報データ
テーブルと、候補地地権者に対する説明・契約情報を記
録した候補地確保業務情報テーブルと、風況精査マニュ
アルと観測機器・資材に関する情報を記録した風況精査
情報テーブルと、風力発電設備及びその価格情報を記録
した設備情報テーブルと、関係機関への届出・申請書式
を記録した関係機関調整データテーブルとを備え、前記
候補地精査情報データベースは、適地として選定された
候補地の現地踏査を含む調査結果を記録した地形情報テ
ーブルと、自然公園、保安林その他規制条件を記録した
利用規制情報テーブルと、電波障害その他の障害施設情
報テーブルと、動植物などの生息分布情報を記録した生
態情報テーブルと、施設建設に関わる道路事情を記録し
た道路情報テーブルと、近隣の送電線、受電施設の配置
を記録した配電情報テーブルと、観測した風況データを
記録する風況データテーブルと、観測データの解析結果
を記録した風況データ解析テーブルとを備え、前記設計
情報データベースは、候補地の風況データ解析結果から
設計した風力発電事業計画を記録し、風力発電機器の設
備設計テーブルと、取付道路から基礎建築を含む施設設
計テーブルと、器材輸送から建設・運用までの施工計画
テーブルとを備えることを特徴とする。
The wind power generation business planning database includes a standard process table relating to a wind power generation business plan, a wind condition weather information data table predicted by the New Energy and Industrial Technology Development Organization (NEDO) nationwide, and an AMeDAS observation by the Japan Meteorological Agency. A weather information table containing wind condition data of the network, an operation information data table recording wind condition data of existing wind power generation facilities, a candidate site securing operation information table recording explanation / contract information for candidate landowners, and wind Wind condition inspection information table that records information on condition inspection manual and observation equipment / materials, facility information table that records wind power generation equipment and its price information, and related organization adjustment data that records notification / application form to related organizations The candidate site detailed inspection information database is provided with a table, and the site reconnaissance of the candidate sites selected as suitable sites is carried out. Topographic information table recording the survey results including, usage regulation information table recording natural parks, protected forests and other regulatory conditions, information table of radio interference and other obstacle facilities, ecological information table recording habitat distribution information of animals and plants , A road information table that records road conditions related to facility construction, a distribution information table that records the locations of nearby power transmission lines and power receiving facilities, a wind condition data table that records observed wind condition data, and an observation data A wind condition data analysis table recording the analysis result, and the design information database records the wind power generation business plan designed from the wind condition data analysis result of the candidate site, the facility design table of the wind power generation equipment, and the installation road. To a facility design table including basic construction, and a construction plan table from equipment transportation to construction / operation. .

【0009】また、前記関係機関調整・申請手段は、国
家事業との共同フィールドテスト契約及び炭酸ガス排出
抑制証明(排出権)の取得業務を含み、事業許認可見込
み及び補助金を含む資金調達見込みと採算見込みを明確
にして事業企画を販売することを特徴とする。
[0009] Further, the means for coordinating / applying the related organizations includes a joint field test contract with a national business and a business of obtaining a carbon dioxide emission control certificate (emissions right), and a prospective financing including a business license approval and a subsidy. The feature is that the profitability is clarified and business plans are sold.

【0010】[0010]

【発明の実施の形態】以下、本発明の実施の形態を、図
面を参照して詳細に説明する。図1は、風力発電事業企
画・販売支援システム100の構成を示す模式図であ
る。
BEST MODE FOR CARRYING OUT THE INVENTION Embodiments of the present invention will be described in detail below with reference to the drawings. FIG. 1 is a schematic diagram showing the configuration of a wind power generation business planning / sales support system 100.

【0011】風力発電事業企画・販売支援システム10
0は、インターネット7を介して地球環境保全のための
施策推進を課題とする公共団体・電力事業者・一般企業
からなる風力発電事業候補の端末機1と、電力購入候補
である電力会社・企業の端末機2と、気象庁または民間
気象観測機関の気象観測ネットワーク3と、風力発電施
設の建設候補地の住民または関係者の端末機4とに接続
可能な風力発電の事業企画企業の企画・販売支援コンピ
ュータ10とから構成されている。
Wind power generation business planning / sales support system 10
0 is a terminal 1 which is a candidate for a wind power generation business consisting of public organizations, electric power companies, and general enterprises whose objective is to promote measures for global environment conservation through the Internet 7, and electric power companies and companies who are candidates for electric power purchase. Planning and sales of wind power generation business planning companies that can connect to the terminal 2 of the above, the meteorological observation network 3 of the Meteorological Agency or a private meteorological observation organization, and the terminal 4 of the inhabitants of the construction site of the wind power generation facility or related persons. It is composed of the support computer 10.

【0012】前記地方公共団体・電力事業者や一般企業
は、炭酸ガス排出規制などの地球環境保全目標に沿って
社会的貢献希望から風力発電事業者となることを希望し
ていた。これらの風力発電事業候補者は、実施可能な風
力発電事業企画を提供し、事業参加を促す先である。
The above-mentioned local public bodies, electric power companies, and general enterprises have desired to become wind power generators in the hope of contributing to society in line with global environmental conservation goals such as carbon dioxide emission regulations. These wind power generation business candidates are the destinations that provide feasible wind power generation business plans and encourage business participation.

【0013】前記企画・販売支援コンピュータ10は、
前記端末機1〜4と接続するためのファイアーウオール
を含むWebサーバ11と、風力発電事業企画に必要な
業務処理手段を備えるアプリケーションサーバ20と、
風力発電候補地を抽出すると共に事業推進に必要な計画
・調整項目情報を記録した風力発電事業企画データベー
ス31と、候補地の調査解析情報を記録する候補地精査
情報データベース32と、発電施設・設備・施工計画に
関する情報を記録した設計情報データベース33とを管
理するデータベースサーバ30とを少なくとも備える。
The planning / sales support computer 10 is
A Web server 11 including a firewall for connecting to the terminals 1 to 4, an application server 20 including a business processing unit necessary for planning a wind power generation business,
A wind power generation business planning database 31 that records information on planning / adjustment items necessary for business promotion while extracting candidate sites for wind power generation, a candidate site inspection information database 32 that records survey analysis information of the candidate sites, and power generation facilities / equipment At least a database server 30 that manages a design information database 33 that records information about a construction plan.

【0014】図2は、本発明のデータベースの構成を示
す模式図である。前記風力発電事業企画データベース3
1は、風力発電事業計画に関する標準工程テーブル31
aと、新エネルギー・産業技術総合開発機構(NED
O)が全国予測した風況気象情報データテーブル31b
と、気象庁のアメダス観測網の風況データを含む気象情
報テーブル31cと、既設風力発電施設の風況データを
記録した稼働情報データテーブル31dと、候補地地権
者に対する説明・契約情報を記録した候補地確保業務情
報テーブル31eと、風況精査マニュアルと観測機器・
資材に関する情報を記録した風況精査情報テーブル31
fと、風力発電設備及びその価格情報を記録した設備情
報テーブル31gと、関係機関への届出・申請書式を記
録した関係機関調整データテーブル31hとを備える。
FIG. 2 is a schematic diagram showing the structure of the database of the present invention. The wind power generation business planning database 3
1 is the standard process table 31 for the wind power generation business plan
a and New Energy and Industrial Technology Development Organization (NED
O) nationwide forecasted wind and weather information data table 31b
And a weather information table 31c including wind condition data of the Amedas observation network of the Japan Meteorological Agency, an operation information data table 31d that records wind condition data of an existing wind power generation facility, and a candidate that records explanation / contract information for a candidate landowner. Land securing business information table 31e, wind condition inspection manual and observation equipment
Wind condition inspection information table 31 that records information about materials
f, a facility information table 31g in which wind power generation equipment and price information thereof are recorded, and a related organization adjustment data table 31h in which notification / application forms to related organizations are recorded.

【0015】前記候補地精査情報データベース32は、
適地として選定された候補地の現地踏査を含む調査結果
を記録した地形情報テーブル32aと、自然公園、保安
林その他規制条件を記録した利用規制情報テーブル32
bと、電波障害その他の障害施設情報テーブル32c
と、動植物などの生息分布情報を記録した生態情報テー
ブル32dと、施設建設に関わる道路事情を記録した道
路情報テーブル32eと、近隣の送電線、受電施設の配
置を記録した配電情報テーブル32fと、観測した風況
データを記録する風況データテーブル32gと、観測デ
ータの解析結果を記録した風況データ解析テーブル32
hとを備える。
The candidate site inspection information database 32 is
Topographical information table 32a that records the survey results including on-site reconnaissance of the candidate sites selected as suitable sites, and usage regulation information table 32 that records natural parks, protected forests and other regulatory conditions
b, radio wave interference and other obstacle facility information table 32c
An ecological information table 32d that records habitat distribution information of plants and animals, a road information table 32e that records road conditions related to facility construction, a power distribution information table 32f that records the locations of nearby power transmission lines and power receiving facilities, A wind condition data table 32g for recording the observed wind condition data and a wind condition data analysis table 32 for recording the analysis result of the observation data.
and h.

【0016】前記設計情報データベース33は、候補地
の風況データ解析結果から設計した風力発電事業計画を
記録し、風力発電機器の設備設計テーブル33aと、取
付道路から基礎建築を含む施設設計テーブル33bと、
器材輸送から建設・運用までの施工計画テーブル33c
とを備える。
The design information database 33 records the wind power generation business plan designed from the result of wind condition data analysis of the candidate site, and the equipment design table 33a of the wind power generation equipment and the facility design table 33b including the foundation road to the installation road. When,
Construction plan table 33c from equipment transportation to construction / operation
With.

【0017】前記アプリケーションサーバ20は、気象
観測ネットワークから収集する気象観測情報および候補
地に関する立地条件・規制情報を前記風力発電事業企画
データベースに登録する調査情報管理手段21と、風力
発電施設・設備の設計情報を管理する設計情報管理手段
22と、収集された情報から候補地を抽出すると共に候
補地現地調査情報を分析して候補地を選定する候補地選
定手段23と、選定された候補地の風況精査に関わる地
権者説明・契約管理と風況観測設備施工管理、観測管理
を行なう候補地風況精査管理手段24と、風況精査情報
の解析・エネルギー取得見込み分析を行なう風況情報解
析手段25と、立地関係機関・新エネルギー・産業技術
総合開発機構・電力事業者・資金調達先金融機関等の関
係機関に対する調整・申請業務を管理する関係機関調整
・申請手段26と、施工直前までの調査・企画・設計・
調整・申請を完了した事業計画をインターネットを介し
て風力発電事業候補者に公開し、入札を受付ける事業企
画公開・入札手段27とを備える。
The application server 20 stores the weather observation information collected from the weather observation network and the site condition / regulation information about the candidate site in the wind power generation business planning database 21 and the wind power generation facility / equipment. The design information management means 22 for managing the design information, the candidate site selecting means 23 for extracting the candidate sites from the collected information and analyzing the candidate site field survey information, and selecting the candidate sites, and the selected candidate sites Candidate site wind condition inspection management means 24 for explaining / contract management, wind condition observation equipment construction management, and observation management related to wind condition inspection, and wind condition information analysis for analyzing wind condition inspection information / energy acquisition prospect analysis Measures 25 and related organizations such as location related organizations, new energy, Industrial Technology Development Organization, electric power companies, financial institutions to which funds are procured, etc. - with related organizations adjustment and application means 26 to manage the application business, and research, planning and design to construction just before
The business plan disclosure / bidding means 27 for publishing the business plan for which adjustment / application has been completed to the wind power generation business candidate via the Internet and accepting a bid is provided.

【0018】次に本発明の風力発電事業企画・販売支援
システムによる業務の手順を図3を参照して説明する。
Next, the procedure of work by the wind power generation business planning / sales support system of the present invention will be described with reference to FIG.

【0019】先ずS31は、調査情報管理手段21によ
り、予め標準工程テーブル31a、候補地確保業務情報
テーブル31e、関係機関調整データテーブル31hに
それぞれの情報を登録すると共に、風況気象情報データ
テーブル31b、気象情報テーブル31c、稼働情報テ
ーブル31d、風況精査情報テーブル31fに公表され
る最新情報を登録する。
First, in S31, the survey information managing means 21 registers the respective information in advance in the standard process table 31a, the candidate site securing operation information table 31e, and the related organization adjustment data table 31h, and the wind condition and weather information data table 31b. The latest information published in the weather information table 31c, the operation information table 31d, and the wind condition inspection information table 31f is registered.

【0020】次にS32で、設計情報管理手段22によ
り、風力発電設備、器材、建設地造成、基礎、電気設備
の最新の設計情報を設備情報テーブルに登録する。
Next, in S32, the design information management means 22 registers the latest design information of the wind power generation equipment, equipment, construction site construction, foundation, and electric equipment in the equipment information table.

【0021】S33で、風力発電事業企画情報データベ
ース31に蓄積した風況データにより候補地点を評価
し、有望な地点を順位付けて候補地として選定する。
(候補地選定手段によるプレ選定)
In S33, the candidate points are evaluated based on the wind condition data accumulated in the wind power generation project planning information database 31, and the promising points are ranked and selected as the candidate points.
(Pre-selection by means of candidate site selection)

【0022】S34で、抽出された候補地の実地調査に
より、地形情報テーブル32a、利用規制情報テーブル
32b、障害施設情報テーブル32c、生態情報テーブ
ル32d、道路情報テーブル32e、配電情報テーブル
32fにプレ調査結果を登録する。
In step S34, the topographical information table 32a, the usage regulation information table 32b, the obstacle facility information table 32c, the ecological information table 32d, the road information table 32e, and the power distribution information table 32f are preliminarily surveyed by the field survey of the extracted candidate sites. Register the result.

【0023】S35で、プレ調査結果が記録された候補
地精査情報データベース32により、候補地点の評価を
行ない、風況精査候補地を選定し、調査地点の地権者に
観測施設建設のための契約を行なうと共に、調査補助金
の申請を関係機関調整・申請手段26により行なう。
In step S35, the candidate site detailed inspection information database 32 in which the pre-investigation results are recorded is used to evaluate the candidate sites, the wind condition detailed site is selected, and the landowner at the survey site is contracted to construct the observation facility. At the same time, the application for the research subsidy is made by the related organization coordination / application means 26.

【0024】S36で、風況精査の観測設備を建設し、
観測を開始し、候補地風況精査管理手段24により、定
期点検、データ回収、風況データテーブル32gへの登
録を行なう。
In S36, the observation equipment for wind condition inspection is constructed,
Observation is started, and the candidate site wind condition detailed examination management means 24 performs periodic inspection, data collection, and registration in the wind condition data table 32g.

【0025】S37で、一定期間の風況精査を行なった
風況データテーブル32gを読込み、風況特性(平均風
速、風速の時間変動、風向別平均風速、年間風向出現
率、風向別風速出現率、ワイブルパラメータ、鉛直分
布、乱れ強度、最大風速・最大瞬間風速)を解析し風況
データ解析テーブル32hに記録する。
In S37, the wind condition data table 32g which has been subjected to the wind condition inspection for a certain period is read, and the wind condition characteristics (average wind speed, time variation of wind speed, average wind speed by wind direction, annual wind direction appearance rate, wind speed appearance rate by wind direction) are read. , Weibull parameters, vertical distribution, turbulence intensity, maximum wind speed / maximum instantaneous wind speed) are analyzed and recorded in the wind condition data analysis table 32h.

【0026】S38で、風況データ解析テーブル32h
を読み出し、風力エネルギーの潜在量の評価(風力エネ
ルギー密度)、取得できる風力エネルギー量の評価(風
力エネルギー取得率)を計算し、候補となる風力発電設
備毎の風車の設備利用率、稼働率を算定し風力発電事業
の可否を評価する。
In S38, the wind condition data analysis table 32h
To calculate the evaluation of the potential amount of wind energy (wind energy density) and the evaluation of the amount of wind energy that can be acquired (wind energy acquisition rate), and calculate the facility utilization rate and operating rate of the wind turbine for each candidate wind power generation facility. Calculate and evaluate the feasibility of the wind power generation business.

【0027】S39で、最適な風力発電設備の選定、建
設地造成計画、基礎計画、設備搬入計画、配電計画の設
計を行ない設計情報データベース33の設備設計テーブ
ル33a、施設設計テーブル33b、施工計画テーブル
33cに登録する。
In S39, the optimum wind power generation facility is selected, the construction site construction plan, the basic plan, the facility delivery plan, and the power distribution plan are designed, and the facility design table 33a, facility design table 33b, and construction plan table of the design information database 33 are selected. Register with 33c.

【0028】最後にS40で、設計情報データベース3
3から所要投資金額の見積、事業許認可届出排出権証明
取得、資金調達先候補選定を含む事業企画を作成してW
ebサーバに記録し風力発電事業主体の候補、電力購入
候補の団体・企業に公開し、事業企画の入札を受付け
る。
Finally, in S40, the design information database 3
Create a business plan including estimation of required investment amount, acquisition of business license approval emission credit certificate, and selection of funding source from 3
It will be recorded in the eb server and will be disclosed to the wind power generation business candidate and the power purchase candidate group / company, and the bid for the business plan will be accepted.

【0029】S40では、入札により事業企画を販売す
ることとしたが、入札に限ることなく、事業許認可見込
み及び補助金を含む資金調達見込みと採算見込みを明確
にして事業企画を販売することができる。
In S40, the business plan is sold by bidding. However, the business plan can be sold without being limited to the bidding by clarifying the prospect of business license approval and the prospect of financing and profitability including subsidies. .

【0030】また、前記資金調達については、金融機
関、企業・団体からの大口の貸出し・出資に限らず、環
境問題解決・新エネルギー普及促進に賛同する市民から
の小口出資を受付ける事業計画とすることもできる。小
口出資に対しては、風力発電電力及び炭酸ガス排出権販
売利益を還元することができる。
Regarding the financing, the business plan is not limited to large-scale lending and investment from financial institutions and companies / organizations, but small-scale investment from citizens who support environmental problem solving and promotion of the spread of new energy. You can also For small-lot investment, profits from wind power generation and carbon dioxide emission credit sales can be returned.

【0031】風力発電事業については、国の機関により
8年間にわたる風況観測の結果年間平均風速が毎秒6m
以上の地域が日本全土の1/7に相当し、風車の建設を
阻害する諸要因を考慮した見積によれば2500万KW
(全国の現在発電量の20%相当)の風力利用発電が可
能とみられている。しかし、一般的な構築物ではないた
め、事業主体となる発注者が企画・計画を推進すること
が困難であった。本システムを用いて、コンサルタント
事業者が実施直前の事業企画として提案し、広く事業者
を募集し事業企画を販売することによりエコエネルギー
利用の促進をはかることができる。
As for the wind power generation business, as a result of wind condition observation for eight years by the national organization, the annual average wind speed is 6 m / s.
The above area is equivalent to 1/7 of the whole of Japan and is estimated to be 25 million KW considering various factors that hinder the construction of wind turbines.
Wind power generation is expected to be possible (equivalent to 20% of the current power generation in Japan). However, since it is not a general structure, it was difficult for the contractor who is the main body of the business to promote the planning and planning. By using this system, a consultant company can propose eco-energy as a project plan just before implementation, and widely seek business operators and sell the project plan to promote the use of eco-energy.

【0032】[0032]

【発明の効果】本発明の風力発電事業企画・販売支援シ
ステムによれば、従来風力発電事業の候補者がそれぞれ
行なっていた風力発電事業の企画を請け負うコンサルテ
ィング企業に対し、候補地の選定、土地の確保から建設
のための調査・計画・設計及び建設資金調達・関係機関
との調整までを実施した事業企画の作成を支援すること
ができる。
[Effects of the Invention] According to the wind power generation business planning / sales support system of the present invention, a candidate site is selected and land is provided to a consulting company that undertakes the planning of the wind power generation business, which was conventionally performed by each candidate of the wind power generation business. It is possible to support the creation of a business plan that has carried out everything from securing the property to research / planning / design for construction, financing for construction, and coordination with related organizations.

【0033】また、本支援システムにより、風力発電事
業の適地抽出、事業推進の促進を図り、エコエネルギー
利用に資することができる。
Further, the present support system can contribute to the utilization of eco-energy by extracting suitable sites for wind power generation business and promoting business promotion.

【0034】また、風力発電事業企画情報データベース
を備えることにより、事業企画の計画・管理業務を効率
よくすすめ、企画経費を削減することができる。
Further, by providing the wind power generation business planning information database, it is possible to efficiently carry out the business planning and management work and reduce the planning cost.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の風力発電事業企画・販売支援システム
の構成を示す模式図である。
FIG. 1 is a schematic diagram showing the configuration of a wind power generation business planning / sales support system of the present invention.

【図2】本発明のデータベースの構成を示す模式図であ
る。
FIG. 2 is a schematic diagram showing the structure of a database of the present invention.

【図3】本発明の業務の流れの説明図である。FIG. 3 is an explanatory diagram of a work flow of the present invention.

【符号の説明】[Explanation of symbols]

1 風力発電事業候補者の端末機 2 電力購入候補者の端末機 3 気象観測ネットワーク 4 風力発電施設候補地住民及び関係者の端末機 7 インターネット 10 事業機各企業の企画・販売支援コンピュータ 11 Webサーバ 20 アプリケーションサーバ 21 調査情報管理手段 22 設計情報管理手段 23 候補地選定手段 24 候補地風況精査管理手段 25 風況情報解析手段 26 関係機関調整・申請手段 27 事業企画公開・入札手段 30 データベースサーバ 31 風力発電事業企画情報データベース 32 候補地精査情報データベース 33 設計情報データベース 100 風力発電事業企画・販売支援システム 1 Terminal of wind power generation business candidate 2 Terminals for power purchase candidates 3 Meteorological observation network 4 Terminals for residents of the candidate site for wind power generation facilities and related parties 7 Internet 10 Business machines Planning and sales support computers for each company 11 Web server 20 Application server 21 Survey information management means 22 Design information management means 23 Candidate site selection means 24 Candidate site wind condition inspection management means 25 Wind condition information analysis means 26 Related Organization Adjustment / Application Method 27 Business plan disclosure / bidding means 30 database server 31 Wind power generation business planning information database 32 Candidate Site Inspection Information Database 33 Design information database 100 Wind power generation business planning and sales support system

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 風力発電事業の企画を行なうコンサルテ
ィング企業に設ける風力発電事業企画・販売支援システ
ムであって、 インターネットを介して地球環境保全のための施策推進
を課題とする公共団体・電力事業者・一般企業からなる
風力発電事業候補の端末機と、電力購入候補である電力
会社・企業の端末機と、気象庁または民間気象観測機関
の気象観測ネットワークと、風力発電施設の建設候補地
の住民または関係者の端末機とに接続可能な風力発電の
事業企画企業の企画・販売支援コンピュータとから構成
し、 前記企画・販売支援コンピュータは、前記端末機と接続
するためのファイアーウオールを含むWebサーバと、
風力発電事業企画に必要な業務処理手段を備えるアプリ
ケーションサーバと、風力発電候補地を抽出すると共に
事業推進に必要な計画・調整項目情報を記録した風力発
電事業企画データベースと、候補地の調査解析情報を記
録する候補地精査情報データベースと、発電施設・設備
・施工計画に関する情報を記録した設計情報データベー
スとを管理するデータベースサーバとからなり、 前記アプリケーションサーバは、気象観測ネットワーク
から収集する気象観測情報および候補地に関する立地条
件・規制情報を前記風力発電事業企画データベースに登
録する調査情報管理手段と、風力発電施設・設備の設計
情報を管理する設計情報管理手段と、収集された情報か
ら候補地を抽出すると共に候補地現地調査情報を分析し
て候補地を選定する候補地選定手段と、選定された候補
地の風況精査に関わる地権者説明・契約管理と風況観測
設備施工管理、観測管理を行なう候補地風況精査管理手
段と、風況精査情報の解析・エネルギー取得見込み分析
を行なう風況情報解析手段と、立地関係機関・新エネル
ギー・産業技術総合開発機構・電力事業者・資金調達先
金融機関等の関係機関に対する調整・申請業務を管理す
る関係機関調整・申請手段と、施工直前までの調査・企
画・設計・調整・申請を完了した事業計画をインターネ
ットを介して風力発電事業候補者に公開し、入札を受付
ける事業企画公開・入札手段とを備え、エコエネルギー
である風力の利用促進を図ることを特徴とする風力発電
事業企画・販売支援システム。
[Claim 1] A wind power generation business planning / sales support system provided in a consulting company that plans a wind power generation business, which is a public organization / electric power company whose task is to promote measures for global environment conservation via the Internet.・ Terminals of wind power generation business candidates consisting of general enterprises, terminals of electric power companies / companies that are candidates for power purchase, meteorological observation networks of the Meteorological Agency or private meteorological observation institutions, residents of candidate sites for construction of wind power generation facilities, or A planning / sales support computer of a business planning company for wind power generation that can be connected to a terminal of a person concerned, and the planning / sales support computer is a Web server including a firewall for connecting to the terminal. ,
An application server equipped with business processing means necessary for wind power generation business planning, a wind power generation business planning database that records information on planning / adjustment items necessary for business promotion while extracting wind power generation candidate sites, and candidate site survey analysis information Consisting of a database server that manages a candidate site inspection information database that records, and a design information database that records information about power generation facilities / equipment / construction plans, wherein the application server is meteorological observation information collected from a meteorological observation network and Survey information management means for registering location condition / regulation information on the candidate site in the wind power generation business planning database, design information management means for managing design information of wind power generation facility / equipment, and extracting candidate sites from the collected information A candidate for selecting a candidate site by analyzing field survey information Site selection means, explanation of landowners involved in wind condition inspection of selected candidate sites, contract management, wind condition observation facility construction management, candidate site wind condition inspection management means for observation management, analysis of wind condition inspection information Wind condition information analysis means for conducting energy acquisition prospect analysis, coordination with related organizations such as location related organizations, new energy, Japan Industrial Technology Development Organization, electric power companies, financial institutions to which funds are procured, etc.・ Providing application means and business plan disclosure / bid means to open the business plan for which investigation, planning, design, adjustment and application have been completed up to just before construction to the wind power generation business candidate via the Internet, and to accept bids. A wind power generation business planning and sales support system characterized by promoting the use of wind power, which is eco-energy.
【請求項2】 前記風力発電事業企画データベースは、
風力発電事業計画に関する標準工程テーブルと、新エネ
ルギー・産業技術総合開発機構(NEDO)が全国予測
した風況気象情報データテーブルと、気象庁のアメダス
観測網の風況データを含む気象情報テーブルと、既設風
力発電施設の風況データを記録した稼働情報データテー
ブルと、候補地地権者に対する説明・契約情報を記録し
た候補地確保業務情報テーブルと、風況精査マニュアル
と観測機器・資材に関する情報を記録した風況精査情報
テーブルと、風力発電設備及びその価格情報を記録した
設備情報テーブルと、関係機関への届出・申請書式を記
録した関係機関調整データテーブルとを備え、 前記候補地精査情報データベースは、適地として選定さ
れた候補地の現地踏査を含む調査結果を記録した地形情
報テーブルと、自然公園、保安林その他規制条件を記録
した利用規制情報テーブルと、電波障害その他の障害施
設情報テーブルと、動植物などの生息分布情報を記録し
た生態情報テーブルと、施設建設に関わる道路事情を記
録した道路情報テーブルと、近隣の送電線、受電施設の
配置を記録した配電情報テーブルと、観測した風況デー
タを記録する風況データテーブルと、観測データの解析
結果を記録した風況データ解析テーブルとを備え、 前記設計情報データベースは、候補地の風況データ解析
結果から設計した風力発電事業計画を記録し、風力発電
機器の設備設計テーブルと、取付道路から基礎建築を含
む施設設計テーブルと、器材輸送から建設・運用までの
施工計画テーブルとを備えることを特徴とする請求項1
記載の風力発電事業企画・販売支援システム。
2. The wind power generation business planning database comprises:
Standard process table for wind power generation business plan, wind condition meteorological information data table predicted by New Energy and Industrial Technology Development Organization (NEDO), meteorological information table including wind condition data of Amedas observation network of Meteorological Agency, existing Operation information data table recording wind condition data of wind power generation facility, candidate site securing operation information table recording explanation / contract information for candidate landowners, wind condition inspection manual and information on observation equipment / materials A wind condition inspection information table, an equipment information table recording wind power generation equipment and its price information, and a related organization adjustment data table recording a notification / application form to related organizations, the candidate site inspection information database, Topographic information table recording the survey results including on-site reconnaissance of candidate sites selected as suitable sites, natural parks, Usage regulation information table that records protected forests and other regulatory conditions, radio interference and other obstacle facility information tables, ecological information table that records habitat distribution information of plants and animals, and road information table that records road conditions related to facility construction And a distribution information table that records the locations of nearby power transmission lines and power receiving facilities, a wind condition data table that records the observed wind condition data, and a wind condition data analysis table that records the analysis results of the observed data, The design information database records a wind power generation business plan designed from the wind condition data analysis result of the candidate site, a facility design table of wind power generation equipment, a facility design table including basic construction from the installation road, and construction from equipment transportation. A construction plan table up to operation is provided.
Wind power generation business planning and sales support system described.
【請求項3】 前記関係機関調整・申請手段は、国家事
業との共同フィールドテスト契約及び炭酸ガス排出抑制
証明(排出権)の取得業務を含み、事業許認可見込み及
び補助金を含む資金調達見込みと採算見込みを明確にし
て事業企画を販売することを特徴とする請求項1記載の
風力発電事業企画・販売支援システム。
3. The means for coordinating / applying for related organizations includes a joint field test contract with a national project and a business to obtain a carbon dioxide emission control certificate (emissions right), and a prospect of financing including a business license approval and a subsidy. The wind power generation business planning / sales support system according to claim 1, wherein the business plan is sold with a clear profitability.
JP2002103489A 2002-04-05 2002-04-05 Support system for planning and sales of wind energy generation business Pending JP2003296411A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002103489A JP2003296411A (en) 2002-04-05 2002-04-05 Support system for planning and sales of wind energy generation business

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002103489A JP2003296411A (en) 2002-04-05 2002-04-05 Support system for planning and sales of wind energy generation business

Publications (1)

Publication Number Publication Date
JP2003296411A true JP2003296411A (en) 2003-10-17

Family

ID=29389286

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002103489A Pending JP2003296411A (en) 2002-04-05 2002-04-05 Support system for planning and sales of wind energy generation business

Country Status (1)

Country Link
JP (1) JP2003296411A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010140400A (en) * 2008-12-15 2010-06-24 Toshihisa Shirakawa Solar power generation system and bidding system of subsidy
KR101316576B1 (en) * 2011-05-26 2013-10-15 대한민국 Site Analysis System and Method for Wind Power
KR20190125233A (en) * 2017-08-25 2019-11-06 김경수 Method of selecting optimized wind farm model by using artificial neural network
JP7112782B1 (en) 2021-07-27 2022-08-04 Scalar株式会社 Information processing method, information processing device, information processing program, and recording medium

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010140400A (en) * 2008-12-15 2010-06-24 Toshihisa Shirakawa Solar power generation system and bidding system of subsidy
KR101316576B1 (en) * 2011-05-26 2013-10-15 대한민국 Site Analysis System and Method for Wind Power
KR20190125233A (en) * 2017-08-25 2019-11-06 김경수 Method of selecting optimized wind farm model by using artificial neural network
KR102264786B1 (en) * 2017-08-25 2021-06-16 김경수 Method of selecting optimized wind farm model by using artificial neural network
JP7112782B1 (en) 2021-07-27 2022-08-04 Scalar株式会社 Information processing method, information processing device, information processing program, and recording medium
JP2023018579A (en) * 2021-07-27 2023-02-08 Scalar株式会社 Information processing method, information processing apparatus, information processing program, and storage medium

Similar Documents

Publication Publication Date Title
Torkayesh et al. A state-of-the-art survey of evaluation based on distance from average solution (EDAS): Developments and applications
Xia et al. Evaluating the economic impact of wind power development on local economies in China
Alhamwi et al. FlexiGIS: an open source GIS-based platform for the optimisation of flexibility options in urban energy systems
Chen et al. A new model for wind farm layout optimization with landowner decisions
Park et al. Optimal location of biogas plants in supply chains under carbon effects: insight from a case study on animal manure in North Dakota
Soulouknga et al. Evaluation of the cost of producing wind-generated electricity in Chad
JP2003296411A (en) Support system for planning and sales of wind energy generation business
Brown et al. Carbon drawdown potential of utility-scale solar in the United States: Evidence from the state of Georgia
Berezin Digital transformation of city’s engineering and energy infrastructure systems
Karnawijaya et al. Eco-Design of A Digital-Based Waste Bank in Sukoharjo: Pentahelix Synergy Approach
Gonçalves Júnior et al. Multi-criteria assessment of potential regions for wind power generation in the State of Rio de Janeiro
KR20210074664A (en) Review method and server of system linkage for renewable energy
KR102347469B1 (en) System for managing smart energy village construction
Alonso et al. GIS based land use planning and watershed monitoring as tools for sustainable development
Mirabella et al. City environmental footprint: Insights and application of an innovative LCA-based method to evaluate urban environmental impacts
Júnior et al. Multi-criteria assessment of potential regions for wind power generation in the State of
Akash et al. A Multicriteria Approach to Identifying and Developing Renewable Energy Zones in Tajikistan
Chauhan et al. Feasibility Study for Setting Up of a Solar PV Power Plant in Dehradun, India
Halvatzis et al. Estimated Economic Impacts of Utility Scale Wind Power in Iowa
Bing et al. Construction of power data products based on STP theory
Mitsumori The Community-Level Socio-Economic Impact of a PFI-Based Small Hydropower Plant Construction Project
Storey Placer County Biomass Utilization Pilot Project (Final Technical Report)
Coover et al. An analysis of state-level economic impacts from the development of wind power plants in cache county, Utah
Reuter Sustainable mobility in Germany: a spatial approach to integrating photovoltaic installations and parking areas for electric vehicle charging
Bugg et al. Applying GIS for developing regional forest agreements in Australia

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050330

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070918

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20080129