JP2003238043A - Maintenance management device for elevator - Google Patents

Maintenance management device for elevator

Info

Publication number
JP2003238043A
JP2003238043A JP2002036986A JP2002036986A JP2003238043A JP 2003238043 A JP2003238043 A JP 2003238043A JP 2002036986 A JP2002036986 A JP 2002036986A JP 2002036986 A JP2002036986 A JP 2002036986A JP 2003238043 A JP2003238043 A JP 2003238043A
Authority
JP
Japan
Prior art keywords
maintenance
work
parts
elevator
importance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2002036986A
Other languages
Japanese (ja)
Inventor
Terunobu Ooishi
照展 大石
Masateru Nakano
政輝 中野
Mikio Nakai
幹夫 中井
Eiichiro Tsuzukibashi
英一郎 続橋
Shohei Sakai
昌平 酒井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Building Systems Co Ltd
Original Assignee
Hitachi Building Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Building Systems Co Ltd filed Critical Hitachi Building Systems Co Ltd
Priority to JP2002036986A priority Critical patent/JP2003238043A/en
Publication of JP2003238043A publication Critical patent/JP2003238043A/en
Pending legal-status Critical Current

Links

Landscapes

  • Indicating And Signalling Devices For Elevators (AREA)
  • Maintenance And Inspection Apparatuses For Elevators (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a maintenance management device for an elevator capable of improving efficiency of maintenance and replacement work. <P>SOLUTION: This device is provided with a limited service life part extracting means 2 storing life values of a plurality of maintenance parts and extracting the maintenance parts whose service periods reach the life values in order of importance, an elevator selecting means 3 selecting a plurality of the elevators based on a type of the maintenance part and the importance and dividing the elevators to be installed in a prescribed range out of the selected elevators into regional blocks, and a work schedule calculating means 4 calculating a work route in the regional block. Thus, a schedule can be set so that maintenance work can be implemented in accordance with the type of the maintenance part and the importance in the regional block. Accordingly a tool necessary for a particular day can be selected in advance to carry and the work can be carried out in order from the elevator whose objected maintenance part is of higher importance. <P>COPYRIGHT: (C)2003,JPO

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、昇降機の寿命に達
した保守部品を交換する保守作業のスケジュールを作成
する昇降機の保守管理装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an elevator maintenance management device for creating a schedule of maintenance work for replacing maintenance parts that have reached the end of their service life.

【0002】[0002]

【従来の技術】一般に、エレベータやエスカレータ等の
昇降機は、その故障を未然に防ぐために定期的に寿命に
達した保守部品を保守作業にて交換している。
2. Description of the Related Art Generally, in elevators such as elevators and escalators, maintenance parts which have reached the end of their life are periodically replaced in maintenance work in order to prevent their failure.

【0003】従来、特開平7−282141号公報に記
載されるように、保守対象となる顧客を地域的にグルー
プ分けし、同一地域内にある複数の顧客に対する保守作
業を実施するための作業スケジュールを作成するものが
提案されている。
Conventionally, as described in Japanese Patent Application Laid-Open No. 7-281241, a work schedule for performing maintenance work on a plurality of customers in the same area by grouping the customers to be maintained into regions. Those that create are proposed.

【0004】[0004]

【発明が解決しようとする課題】ところで、前述した従
来のものは、複数の顧客間の移動効率を念頭においた作
業スケジュールを作成するものであり、必ずしも保守交
換作業の効率向上に寄与するものではなかった。すなわ
ち、交換を要する保守部品の種類によっては、その交換
に要する治工具の種類、あるいは保守部品の重要度が異
なるため、単に隣接する未保守顧客を選択しても、治工
具を持参してないことから保守拠点に戻ったり、予定に
無かった重要度の高い現場に急行することを要し、作業
スケジュールの見直しを行わなければならなくなるとい
う問題があった。
By the way, the above-mentioned prior art is to create a work schedule in consideration of the movement efficiency among a plurality of customers, and does not always contribute to the improvement of the efficiency of maintenance and replacement work. There wasn't. In other words, depending on the type of maintenance parts that need to be replaced, the types of jigs and tools required for replacement or the importance of maintenance parts differ, so even if you select an adjacent unmaintained customer, you do not bring the tools. Therefore, there was a problem that it was necessary to return to the maintenance base and to rush to a highly important site that was not scheduled, and the work schedule had to be reviewed.

【0005】本発明はこのような従来技術における実情
に鑑みてなされたもので、その目的は、保守交換作業の
効率向上を図ることのできる昇降機の保守管理装置を提
供することにある。
The present invention has been made in view of the actual situation in the prior art as described above, and an object thereof is to provide a maintenance management device for an elevator which can improve the efficiency of maintenance replacement work.

【0006】[0006]

【課題を解決するための手段】この目的を達成するため
に本発明の請求項1に係る発明は、昇降機の寿命に達し
た保守部品を交換する保守作業のスケジュールを作成す
る昇降機の保守管理装置において、複数の前記保守部品
のそれぞれの寿命値を記憶し、この寿命値に達した前記
保守部品を重要度順に抽出する寿命部品抽出手段と、前
記保守部品の種別および重要度に基づき複数の昇降機を
選別し、選別された昇降機のうち所定範囲内に設置され
るものを地域ブロック化する昇降機選別手段と、前記地
域ブロック内での作業順路を演算する作業スケジュール
演算手段とを備えた構成にしてある。
In order to achieve this object, the invention according to claim 1 of the present invention is an elevator maintenance management device for creating a schedule of maintenance work for replacing maintenance parts that have reached the life of the elevator. In the above, the life value of each of the plurality of maintenance parts is stored, and the life parts extraction means for extracting the maintenance parts having reached the life value in order of importance, and a plurality of elevators based on the type and importance of the maintenance parts. Of the selected elevators, the elevator selecting means for dividing the installed elevators within a predetermined range into regional blocks, and the work schedule computing means for computing the work route in the regional blocks. is there.

【0007】前記のように構成した本発明の請求項1に
係る発明によれば、寿命部品抽出手段により寿命値に達
した保守部品を重要度順に抽出するとともに、昇降機選
別手段により保守部品の種別および重要度に基づき複数
の昇降機を選別し、選別された昇降機のうち所定範囲内
に設置されるものを地域ブロック化する。次いで、作業
スケジュール演算手段により地域ブロック内での作業順
路を演算する。このように、保守部品の種別および重要
度に沿った保守作業を地域ブロック内で実施可能にスケ
ジュールが立てられることから、あらかじめその日に必
要な治工具を選択して携帯することができるとともに、
重要度の高い保守部品が対象となる昇降機から順次作業
することができる。したがって、保守交換作業の効率向
上を図ることができる。
According to the invention according to claim 1 of the present invention configured as described above, the life parts extracting means extracts the life parts which have reached the life value in the order of importance, and the elevator selecting means sorts the life parts by type. And a plurality of elevators are selected based on the importance, and the elevators installed within a predetermined range among the selected elevators are divided into regional blocks. Next, the work schedule calculating means calculates the work route in the regional block. In this way, the maintenance work according to the type and importance of the maintenance parts is scheduled so that it can be carried out in the regional block, so it is possible to select and carry the jigs and tools necessary for the day in advance.
It is possible to work sequentially from the elevators for which maintenance parts of high importance are targeted. Therefore, the efficiency of maintenance and replacement work can be improved.

【0008】また、本発明の請求項2に係る発明にある
ように、前記寿命部品抽出手段は、抽出された前記保守
部品のうち所定期間内に入手可能な前記保守部品を抽出
する構成にすることもできる。前記のように構成した本
発明の請求項2に係る発明によれば、寿命部品抽出手段
は、寿命値に達した保守部品を重要度順に抽出するとと
もに、抽出された保守部品のうち所定期間内に入手可能
な保守部品をさらに抽出する。これによって、交換作業
日に保守部品が無くて作業ができないという事態を確実
に回避し、円滑な保守交換作業を実現することができ
る。
According to a second aspect of the present invention, the life parts extracting means extracts the maintenance parts that can be obtained within a predetermined period from the extracted maintenance parts. You can also According to the invention according to claim 2 of the present invention configured as described above, the life parts extraction unit extracts the maintenance parts that have reached the life value in the order of importance, and selects the maintenance parts within a predetermined period of time. Further extract maintenance parts available to. As a result, it is possible to surely avoid a situation where the maintenance work cannot be performed due to the lack of maintenance parts on the day of the replacement work, and a smooth maintenance replacement work can be realized.

【0009】[0009]

【発明の実施の形態】以下、本発明の昇降機の保守管理
装置の実施の形態を図に基づいて説明する。
BEST MODE FOR CARRYING OUT THE INVENTION An embodiment of a maintenance management device for an elevator according to the present invention will be described below with reference to the drawings.

【0010】図1は本発明の昇降機の保守管理装置の一
実施形態を示すブロック図、図2は図1の保守管理装置
の処理手順を示すフローチャートである。
FIG. 1 is a block diagram showing an embodiment of a maintenance management device for an elevator according to the present invention, and FIG. 2 is a flowchart showing a processing procedure of the maintenance management device of FIG.

【0011】本実施形態の保守管理装置1は図1に示す
ように、複数の保守部品のそれぞれの寿命値を記憶し、
この寿命値に達した保守部品を重要度順に抽出するとと
もに、抽出された保守部品のうち所定期間内に入手可能
な保守部品を抽出する寿命部品抽出手段2と、前記保守
部品の種別および重要度に基づき複数の昇降機を選別
し、選別された昇降機のうち所定範囲内に設置されるも
のを地域ブロック化する昇降機選別手段3と、地域ブロ
ック内での作業順路を演算する作業スケジュール演算手
段4とを備えている。
As shown in FIG. 1, the maintenance management device 1 of the present embodiment stores the life values of a plurality of maintenance parts,
Maintenance parts that have reached this life value are extracted in order of importance, and life parts extraction means 2 that extracts maintenance parts that can be obtained within a predetermined period from the extracted maintenance parts, and the type and importance of the maintenance parts. Elevator selection means 3 for selecting a plurality of elevators based on the above, and for dividing the selected elevators that are installed within a predetermined range into regional blocks, and work schedule calculation means 4 for calculating a work route in the regional blocks. Is equipped with.

【0012】この実施形態にあっては図2に示すよう
に、寿命部品抽出手段2は手順S1として複数台の昇降
機に設置された保守部品のうち寿命値に達した保守部品
を抽出するとともに、手順S2として、手順S1で抽出
された保守部品のうち所定期間内に入手可能な保守部品
を抽出し、かつ、手順S3として、手順S2で抽出され
た保守部品をあらかじめ定められる重要度順に沿って選
別する。次いで、昇降機選別手段3は手順S4として保
守部品の種別および重要度に基づき複数の昇降機を選別
する。例えば重要度の最も高い同一種の保守部品が作業
対象となる複数の昇降機を選別し、手順S5としてこれ
らの選別された昇降機のうち所定範囲内、例えば保守員
の在中する保守拠点が管轄するエリア内に設置されるも
のを地域ブロック化する。なお、ここで地域ブロック化
する昇降機の数は、1日に保守員が保守交換作業を実施
できる数を目安とする。次に、作業スケジュール演算手
段4により手順S6として地域ブロック内で最も効率良
く巡回できる作業順路を演算し、手順S7として各地域
ブロック毎に保守員を割付ける。
In this embodiment, as shown in FIG. 2, the service life parts extraction means 2 extracts the service life parts that have reached the service life value out of the service life parts installed in a plurality of elevators in step S1. As a step S2, the maintenance parts that are available within a predetermined period are extracted from the maintenance parts extracted in the step S1, and as a step S3, the maintenance parts extracted in the step S2 are sorted in order of importance. Select. Next, the elevator selecting means 3 selects a plurality of elevators based on the type and importance of the maintenance parts in step S4. For example, a plurality of elevators for which the same type of maintenance parts with the highest importance are targeted for work are selected, and as a step S5, within a predetermined range of these selected elevators, for example, the maintenance base where the maintenance staff is present is under the jurisdiction. The thing installed in the area is made into a regional block. The number of elevators to be divided into regional blocks is based on the number that maintenance personnel can perform maintenance replacement work per day. Next, the work schedule calculating means 4 calculates a work route that can be most efficiently circulated in the regional block in step S6, and assigns a maintenance worker to each regional block in step S7.

【0013】このように構成した実施形態では、保守部
品の種別および重要度に沿った保守作業を地域ブロック
内で実施可能にスケジュールが立てられることから、あ
らかじめその日に必要な治工具を選択して携帯すること
ができるとともに、重要度の高い保守部品が対象となる
昇降機から順次作業することができ、したがって、保守
交換作業の効率向上を図り、労力、経費および人員の低
減を実現することができる。また、抽出された保守部品
のうち所定期間内に入手可能な保守部品をさらに抽出す
ることにより、交換作業日に保守部品が無くて作業がで
きないという事態を確実に回避し、円滑な保守交換作業
を実現することができる。
In the embodiment configured as described above, since the maintenance work can be carried out in the regional block in accordance with the type and importance of the maintenance parts, the jigs and tools necessary for the day can be selected in advance. It can be carried and work can be performed sequentially from the elevator for which maintenance parts of high importance are targeted. Therefore, the efficiency of maintenance replacement work can be improved, and labor, cost and personnel can be reduced. . In addition, by further extracting the maintenance parts that can be obtained within the specified period from the extracted maintenance parts, it is possible to reliably avoid the situation that the maintenance parts cannot be used due to lack of maintenance parts on the replacement work day, and to perform smooth maintenance replacement work. Can be realized.

【0014】[0014]

【発明の効果】本発明の請求項1に係る発明によれば、
保守部品の種別および重要度に沿った保守作業を地域ブ
ロック内で実施可能にスケジュールが立てられることか
ら、あらかじめその日に必要な治工具を選択して携帯す
ることができるとともに、重要度の高い保守部品が対象
となる昇降機から順次作業することができ、したがっ
て、保守交換作業の効率向上を図り、労力、経費および
人員の低減を実現することができる。
According to the invention of claim 1 of the present invention,
Since maintenance work can be carried out within the regional block according to the type and importance of maintenance parts, it is possible to select and carry the necessary jigs and tools for the day in advance, and to carry out highly important maintenance work. The parts can be sequentially worked from the target elevator, so that the efficiency of the maintenance and replacement work can be improved, and the labor, cost and personnel can be reduced.

【0015】また、本発明の請求項2に係る発明によれ
ば、抽出された保守部品のうち所定期間内に入手可能な
保守部品をさらに抽出することにより、交換作業日に保
守部品が無くて作業ができないという事態を確実に回避
し、円滑な保守交換作業を実現することができる。
According to the second aspect of the present invention, the maintenance parts that are available within the predetermined period are further extracted from the extracted maintenance parts, so that there is no maintenance part on the replacement work day. It is possible to surely avoid the situation where the work cannot be performed, and realize smooth maintenance and replacement work.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の昇降機の保守管理装置の一実施形態を
示すブロック図である。
FIG. 1 is a block diagram showing an embodiment of an elevator maintenance management device of the present invention.

【図2】図1の保守管理装置の処理手順を示すフローチ
ャートである。
FIG. 2 is a flowchart showing a processing procedure of the maintenance management device of FIG.

【符号の説明】[Explanation of symbols]

1 保守管理装置 2 寿命部品摘出手段 3 昇降機選別手段 4 作業スケジュール演算手段 1 Maintenance management device 2 Life time parts extraction means 3 Elevator selection means 4 Work schedule calculation means

───────────────────────────────────────────────────── フロントページの続き (72)発明者 中井 幹夫 東京都千代田区神田錦町1丁目6番地 株 式会社日立ビルシステム内 (72)発明者 続橋 英一郎 東京都千代田区神田錦町1丁目6番地 株 式会社日立ビルシステム内 (72)発明者 酒井 昌平 東京都千代田区神田錦町1丁目6番地 株 式会社日立ビルシステム内 Fターム(参考) 3F303 BA01 CB42 DC35 3F304 BA26 ED01    ─────────────────────────────────────────────────── ─── Continued front page    (72) Inventor Mikio Nakai             6-6 Kandanishikicho, Chiyoda-ku, Tokyo             Inside the Hitachi Building System (72) Inventor Eiichiro Zuhashi             6-6 Kandanishikicho, Chiyoda-ku, Tokyo             Inside the Hitachi Building System (72) Inventor Shohei Sakai             6-6 Kandanishikicho, Chiyoda-ku, Tokyo             Inside the Hitachi Building System F term (reference) 3F303 BA01 CB42 DC35                 3F304 BA26 ED01

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 昇降機の寿命に達した保守部品を交換す
る保守作業のスケジュールを作成する昇降機の保守管理
装置において、 複数の前記保守部品のそれぞれの寿命値を記憶し、この
寿命値に達した前記保守部品を重要度順に抽出する寿命
部品抽出手段と、前記保守部品の種別および重要度に基
づき複数の昇降機を選別し、選別された昇降機のうち所
定範囲内に設置されるものを地域ブロック化する昇降機
選別手段と、前記地域ブロック内での作業順路を演算す
る作業スケジュール演算手段とを備えたことを特徴とす
る昇降機の保守管理装置。
1. A maintenance management device for an elevator, which creates a schedule of maintenance work for replacing a maintenance part that has reached the end of its life, stores the life value of each of said plurality of maintenance parts, and reaches this life value. Life-time parts extraction means for extracting the maintenance parts in order of importance, and a plurality of elevators are selected based on the type and importance of the maintenance parts, and among the selected elevators, those installed within a predetermined range are made into regional blocks. An elevator maintenance management device, comprising: elevator selecting means for performing the operation; and work schedule calculating means for calculating a work route in the regional block.
【請求項2】 前記寿命部品抽出手段は、抽出された前
記保守部品のうち所定期間内に入手可能な前記保守部品
を抽出することを特徴とする請求項1記載の昇降機の保
守管理装置。
2. The maintenance management device for an elevator according to claim 1, wherein the life parts extracting means extracts the maintenance parts that can be obtained within a predetermined period from the extracted maintenance parts.
JP2002036986A 2002-02-14 2002-02-14 Maintenance management device for elevator Pending JP2003238043A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002036986A JP2003238043A (en) 2002-02-14 2002-02-14 Maintenance management device for elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002036986A JP2003238043A (en) 2002-02-14 2002-02-14 Maintenance management device for elevator

Publications (1)

Publication Number Publication Date
JP2003238043A true JP2003238043A (en) 2003-08-27

Family

ID=27778716

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002036986A Pending JP2003238043A (en) 2002-02-14 2002-02-14 Maintenance management device for elevator

Country Status (1)

Country Link
JP (1) JP2003238043A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019167445A1 (en) * 2018-03-01 2019-09-06 三菱電機株式会社 Work instruction assistance device
US11242220B2 (en) 2017-09-20 2022-02-08 Otis Elevator Company Safety braking systems for elevators

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11242220B2 (en) 2017-09-20 2022-02-08 Otis Elevator Company Safety braking systems for elevators
WO2019167445A1 (en) * 2018-03-01 2019-09-06 三菱電機株式会社 Work instruction assistance device
JPWO2019167445A1 (en) * 2018-03-01 2020-09-24 三菱電機株式会社 Work instruction support device

Similar Documents

Publication Publication Date Title
WO2006014811A3 (en) System and method for evaluating and managing the productivity of employees
KR101333925B1 (en) Elevator renewal method
EP1209604A3 (en) Automated service scheduling system based on customer value
EP1362663A3 (en) Parts supplying system of assembling production line and supplying method of the same
EP1204059A3 (en) Automated service scheduling system
WO2002082710A3 (en) Performing predictive maintenance on equipment
MXPA03003044A (en) Plant maintenanace method and apparatus.
EP1416394A3 (en) Method for selecting a font
DE602005010412D1 (en) Apparatus and method for sharing resources between multiple communication networks
WO2003094082A3 (en) Architecture for real-time maintenance of distributed mission plans
RU2738773C2 (en) Predicative control over multimodal ground transportation
CN110597210A (en) Flexible job shop scheduling energy-saving optimization method considering equipment pre-maintenance
Choudhury et al. A two-phase service system with Bernoulli vacation schedule, setup time and N-policy for an unreliable server with delaying repair
DE60307139D1 (en) METHOD AND SYSTEM FOR PARKING A PLANE AT AN AIRPORT
JP2013242774A (en) Maintenance work schedule preparation device and program
JP2003238043A (en) Maintenance management device for elevator
KR20160148666A (en) Crew member path task creating system and crew member path task creating method
Chen et al. NSGA-II applied to dynamic flexible job shop scheduling problems with machine breakdown
EP1422888A3 (en) Constraint based routing with irregular metrics
Najat et al. Minimizing the number of tardy jobs on identical parallel machines subject to periodic maintenance
JP2003296900A (en) Flight path adjusting device
EP1241605A3 (en) Automatic workflow monitoring/control method and apparatus
Adzakpa et al. On-line maintenance job scheduling and assignment to resources in distributed systems by heuristic-based optimization
JPWO2013125008A1 (en) Elevator group management device
US20070140468A1 (en) Method and system for scheduling resources in customer contact centers

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040901

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20061031

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20061219

A02 Decision of refusal

Effective date: 20070703

Free format text: JAPANESE INTERMEDIATE CODE: A02