JP2003196368A - Management job evaluation system regarding maintenance of facility, its method, and management job evaluation program regarding maintenance of facility to be executed on a computer - Google Patents

Management job evaluation system regarding maintenance of facility, its method, and management job evaluation program regarding maintenance of facility to be executed on a computer

Info

Publication number
JP2003196368A
JP2003196368A JP2001392163A JP2001392163A JP2003196368A JP 2003196368 A JP2003196368 A JP 2003196368A JP 2001392163 A JP2001392163 A JP 2001392163A JP 2001392163 A JP2001392163 A JP 2001392163A JP 2003196368 A JP2003196368 A JP 2003196368A
Authority
JP
Japan
Prior art keywords
management
cost
work
quality
evaluation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2001392163A
Other languages
Japanese (ja)
Inventor
Koichiro Imagawa
浩一郎 今川
Shinya Terasaka
信也 寺坂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BRIDGEPOINT JAPAN KK
Original Assignee
BRIDGEPOINT JAPAN KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BRIDGEPOINT JAPAN KK filed Critical BRIDGEPOINT JAPAN KK
Priority to JP2001392163A priority Critical patent/JP2003196368A/en
Publication of JP2003196368A publication Critical patent/JP2003196368A/en
Pending legal-status Critical Current

Links

Abstract

<P>PROBLEM TO BE SOLVED: To provide new technology by which management jobs such as building maintenance can automatically be evaluated. <P>SOLUTION: This management job evaluation system is provided with: a storage means for storing reference management specifications of the management jobs; a means for accepting the current management specifications, the current costs and job performance states about a prescribed management job; a quality evaluation means for evaluating quality regarding the prescribed management job according at least to the current management specifications, the reference management specifications and the job performance states and for calculating quality scores; a cost evaluation means for evaluating costs regarding the prescribed management job according at least to the current management specifications, the reference management specifications and the current costs and for calculating cost scores; and a total evaluation means for mapping the calculated quality scores and cost scores on a parameter space consisting of two axes of the quality and the costs and for deriving the total evaluation based on mapping positions. <P>COPYRIGHT: (C)2003,JPO

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、清掃、設備管理、
警備といった、いわゆる施設維持に関する管理業務を評
価するための情報処理技術に関わり、特に、管理品質と
管理コストという2つの観点から管理業務を評価するた
めの情報処理技術に関する。
TECHNICAL FIELD The present invention relates to cleaning, facility management,
The present invention relates to an information processing technology for evaluating a management operation related to facility maintenance such as security, and particularly to an information processing technology for evaluating a management operation from two viewpoints of management quality and management cost.

【0002】[0002]

【従来の技術】ビル等の建物を管理・維持していくため
には、ビルメンテナンス業務、例えば清掃、設備管理、
警備といった複数の施設維持に関する管理業務を、継続
的に行う必要がある。
2. Description of the Related Art In order to manage and maintain buildings such as buildings, building maintenance work such as cleaning, equipment management,
It is necessary to continuously perform management work related to maintenance of multiple facilities such as security.

【0003】従来、ビルメンテナンス業務は、各管理業
務を専門とする業者がビルのオーナ等からの依頼を受け
て実施している場合が多い。業者が管理業務を実施する
場合、管理業務の内容に応じて所定の管理仕様を定め、
これに基づき業務を実施するサービス形態が一般的とな
る。
Conventionally, building maintenance work is often carried out by a company specializing in each management work upon request from the building owner or the like. When a contractor carries out management work, it defines predetermined management specifications according to the content of the management work,
A service form for performing work based on this is general.

【0004】ここで、管理仕様とは管理業務の実施内容
を規定する情報であり、例えば清掃業務であれば、清掃
を行うエリアごとに作業回数や人員、清掃範囲、頻度等
を定めたものが管理仕様となる。
Here, the management specification is information that defines the contents of implementation of management work. For example, in the case of cleaning work, the number of work, personnel, cleaning range, frequency, etc. are defined for each cleaning area. It is a management specification.

【0005】[0005]

【発明が解決しようとする課題】従来、管理仕様は、各
管理業者が経験に基づいて独自に決定している場合が多
く、同様にコスト(管理費用)についても独自の基準を
用いて算出している場合が多い。
Conventionally, management specifications are often determined independently by each management company based on their experience. Similarly, costs (management costs) are calculated using unique criteria. There are many cases.

【0006】しかし、このように、各管理業者がそれぞ
れの経験や独自基準に基づいて管理仕様やコストを定め
るという枠組みのもとでは、決定過程が極めて不透明・
不明瞭であることに加え、管理仕様やコストについて客
観性が担保されないため、管理業務を依頼する側(例え
ば、ビルオーナー)にとって、管理仕様が妥当かどう
か、コストが高いか安いかを判断することが非常に難し
くなる。
However, the decision process is extremely unclear under the framework in which each management company determines management specifications and costs based on their own experience and unique standards.
In addition to being unclear, because the objectivity of the management specifications and costs is not ensured, it is judged whether the management specifications are appropriate and whether the costs are high or low for the side requesting the management work (for example, the building owner). Becomes very difficult.

【0007】例えば、複数の管理業者の見積もりを比較
した上で管理業者を選択しようとした場合、コスト算出
のベースとなる単価や管理仕様が管理業者ごとに異なる
ため、トータルコストの高低のみで管理業者を選択する
ことは必ずしも妥当ではない。
[0007] For example, when trying to select a management company after comparing the estimates of a plurality of management companies, the unit price and the management specifications that are the basis for cost calculation differ from one management company to another, so management is performed only by the total cost. Choosing a vendor is not always appropriate.

【0008】本願の発明者は、上記のような問題が生じ
るのは、管理業務を評価する枠組み、具体的には、管理
業務を評価する具体的な基準が存在しないからであると
考え、かかる評価基準について検討を重ねた結果、基準
管理仕様を設定し、これに基づき品質とコストという2
軸で管理業務を評価するという新しい枠組みを発想する
に至った。
The inventor of the present application considers that the above problems occur because there is no framework for evaluating management work, specifically, there is no specific standard for evaluating management work. As a result of repeated examinations of evaluation criteria, standard management specifications were set, and based on this, quality and cost were 2
I came up with the idea of a new framework for evaluating management work on the axis.

【0009】本発明は、かかる発想に基づき、ビルメン
テナンス等の管理業務を自動的に評価することができる
新しい技術を提供することを目的とする。
It is an object of the present invention to provide a new technique capable of automatically evaluating management work such as building maintenance based on such an idea.

【0010】[0010]

【課題を解決するための手段】本発明の施設維持に関す
る管理業務評価システムは、管理業務の基準管理仕様を
記憶する記憶手段と、所定の管理業務について、現行管
理仕様、現行コスト、業務実施状況を受け付ける手段
と、現行管理仕様、基準管理仕様、業務実施状況とに少
なくとも基づき、前記所定の管理業務に関して品質を評
価して、品質スコアを算出する品質評価手段と、現行管
理仕様、基準管理仕様、現行コストとに少なくとも基づ
き、前記所定の管理業務に関してコストを評価し、コス
トスコアを算出するコスト評価手段と、前記算出した品
質スコア及びコストスコアに基づいて、前記所定の管理
業務について総合評価を求める総合評価手段と、を備え
ることを特徴とする。
A management work evaluation system for facility maintenance according to the present invention is a storage means for storing standard management specifications of management work and a current management specification, current cost, and work implementation status for a predetermined management work. Based on at least the current management specification, the standard management specification, and the work implementation status, the quality evaluation means for evaluating the quality of the predetermined management operation and calculating the quality score, and the current management specification, the standard management specification. Based on at least the current cost, a cost evaluation unit that evaluates a cost for the predetermined management operation and calculates a cost score, and a comprehensive evaluation of the predetermined management operation based on the calculated quality score and cost score. And a comprehensive evaluation means to be obtained.

【0011】好適には、前記品質評価手段は、現行管理
仕様と基準管理仕様との比較に基づき、現行管理仕様が
基準管理仕様をどの程度充足しているかを評価対象とし
て品質スコアを算出する第1手段、現行管理仕様と業務
実施状況との比較に基づき、実際に行われている作業が
現行管理仕様をどの程度充足しているかを評価対象とし
て品質スコアを算出する第2手段、業務実施状況に基づ
き、作業体制を評価対象として品質スコアを算出する第
3手段、のうち少なくともいずれかを備える。
Preferably, the quality evaluation means calculates a quality score based on a comparison between the current management specification and the standard management specification by evaluating how much the current management specification satisfies the standard management specification. 1 means, the second means for calculating the quality score by evaluating how much the actual work is fulfilling the current management specifications based on the comparison between the current management specifications and the business execution status Based on the above, at least one of the third means for calculating the quality score with the work system as an evaluation target is provided.

【0012】この場合、前記第1手段は、現行管理仕様
及び基準管理仕様に含まれる作業回数の比較に基づいて
品質スコアを算出することが望ましい。また、前記第2
手段は、現行管理仕様に基づき定まる作業者数と業務実
施状況に含まれる実際の作業者数との比較に基づいて品
質スコアを算出することが望ましい。また、前記第3手
段は、関連情報の記録状況、標準作業の設定状況、作業
レベル向上のための施策設定状況、作業評価基準の設定
状況、作業結果の分析状況、作業品質の確認状況、作業
計画の設定状況、のうちいずれかに基づいて、品質スコ
アを算出することが望ましい。
In this case, it is preferable that the first means calculates the quality score based on the comparison of the number of operations included in the current management specification and the standard management specification. Also, the second
The means preferably calculates the quality score based on a comparison between the number of workers determined based on the current management specifications and the actual number of workers included in the work implementation status. Further, the third means is the recording status of related information, standard work setting status, measure setting status for work level improvement, work evaluation standard setting status, work result analysis status, work quality confirmation status, work status. It is desirable to calculate the quality score based on one of the setting conditions of the plan.

【0013】好適には、前記コスト評価手段は、現行管
理仕様と現行コストとに少なくとも基づき、現行コスト
の妥当性を評価対象としてコストスコアを算出する手
段、基準管理仕様と現行コストとに少なくとも基づき、
現行コストの必要十分性を評価対象としてコストスコア
を算出する手段、のうち少なくともいずれかを備える。
[0013] Preferably, the cost evaluation means is based on at least the current management specification and the current cost, and means for calculating a cost score with the validity of the current cost as an evaluation target, and based on at least the standard management specification and the current cost. ,
At least any one of means for calculating a cost score with the necessity and sufficiency of the current cost as an evaluation target is provided.

【0014】好適には、前記総合評価手段は、品質とコ
ストの2軸から成るパラメータ空間に前記算出した品質
スコア及びコストスコアをマッピングし、そのマッピン
グ位置に基づき総合評価を求める。
Preferably, the comprehensive evaluation means maps the calculated quality score and cost score in a parameter space having two axes of quality and cost, and obtains a comprehensive evaluation based on the mapping position.

【0015】この場合、前記総合評価手段は、以下のル
ールに基づいて総合評価を求めることが望ましい。 [ルール] 前記パラメータ空間上のマッピング位置 総合評価 (any 、過剰コストスコア ) コストに問題あり (not(過少品質) 、過少コストスコア ) コストに問題あり (過少品質スコア 、any ) 品質に問題あり (過剰品質スコア 、not(過剰コスト) ) 品質に問題あり また好適には、前記総合評価手段は、各スコアに基づき
評価対象の改善優先度を評価して、総合評価を求める。
In this case, it is desirable that the comprehensive evaluation means obtain the comprehensive evaluation based on the following rules. [Rule] Mapping position on the parameter space Overall evaluation (any, excess cost score) Cost problem (not (under quality), under cost score) Cost problem (under quality score, any) Quality problem ( Excessive quality score, not (excessive cost)) There is a problem in quality, and preferably, the comprehensive evaluation unit evaluates the improvement priority of the evaluation target based on each score to obtain a comprehensive evaluation.

【0016】本発明の施設維持に関する管理業務評価方
法は、所定の管理業務について、現行管理仕様、基準管
理仕様、現行コスト、業務実施状況を受け付ける工程
と、現行管理仕様、基準管理仕様、業務実施状況とに少
なくとも基づき、前記所定の管理業務に関して品質を評
価して、品質スコアを算出する品質評価工程と、現行管
理仕様、前記基準管理仕様、現行コストとに少なくとも
基づき、前記所定の管理業務に関してコストを評価し、
コストスコアを算出するコスト評価工程と、前記算出し
た品質スコア及びコストスコアに基づいて、前記所定の
管理業務について総合評価を求める総合評価工程と、を
備えることを特徴とする。
The management work evaluation method for facility maintenance according to the present invention includes a step of receiving a current management specification, a standard management specification, a current cost, and a work execution status for a predetermined management work, a current management specification, a standard management specification, and a work execution. Based on at least the situation, a quality evaluation step of evaluating quality with respect to the predetermined management work and calculating a quality score, and based on at least the current management specification, the standard management specification, and the current cost, regarding the predetermined management work. Evaluate the cost,
It is characterized by comprising a cost evaluation step of calculating a cost score, and a comprehensive evaluation step of obtaining a comprehensive evaluation of the predetermined management work based on the calculated quality score and cost score.

【0017】好適には、前記品質評価工程は、現行管理
仕様と基準管理仕様との比較に基づき、現行管理仕様が
基準管理仕様をどの程度充足しているかを評価対象とし
て品質スコアを算出する工程、現行管理仕様と業務実施
状況との比較に基づき、実際に行われている作業が現行
管理仕様をどの程度充足しているかを評価対象として品
質スコアを算出する工程、業務実施状況に基づき、作業
体制を評価対象として品質スコアを算出する工程、のう
ち少なくともいずれかを備える。
Preferably, the quality evaluation step is a step of calculating a quality score based on a comparison between the current management specification and the standard management specification by evaluating to what extent the current management specification satisfies the standard management specification. Based on the comparison between the current management specification and the work implementation status, the process of calculating the quality score by evaluating the extent to which the work actually performed satisfies the current management specification, and the work implementation based on the work implementation status At least one of the steps of calculating a quality score with the system as an evaluation target is provided.

【0018】好適には、前記コスト評価工程は、現行管
理仕様と現行コストとに少なくとも基づき、現行コスト
の妥当性を評価対象としてコストスコアを算出する工
程、基準管理仕様と現行コストとに少なくとも基づき、
現行コストの必要十分性を評価対象としてコストスコア
を算出する工程、のうち少なくともいずれかを備える。
Preferably, the cost evaluation step is based on at least a current management specification and a current cost, and a step of calculating a cost score with the validity of the current cost as an evaluation target, and based on at least the standard management specification and the current cost. ,
At least one of the steps of calculating a cost score with the necessity of the current cost as an evaluation target is provided.

【0019】好適には、前記総合評価工程は、品質とコ
ストの2軸から成るパラメータ空間に前記算出した品質
スコア及びコストスコアをマッピングし、そのマッピン
グ位置に基づき総合評価を求める。
Preferably, the comprehensive evaluation step maps the calculated quality score and cost score in a parameter space consisting of two axes of quality and cost, and obtains a comprehensive evaluation based on the mapping position.

【0020】本発明のプログラムは、本発明の評価方法
の各工程をコンピュータ上で実行させることを特徴とす
る。本発明のプログラムは、CD−ROM、磁気ディス
ク、半導体メモリなどの各種の記録媒体を通じてコンピ
ュータにインストールまたはロードすることができる。
The program of the present invention is characterized in that each step of the evaluation method of the present invention is executed on a computer. The program of the present invention can be installed or loaded into a computer through various recording media such as a CD-ROM, a magnetic disk and a semiconductor memory.

【0021】[0021]

【発明の実施の形態】(第1実施形態)以下に本発明の
実施の形態について図面を用いて説明する。図1は、本
発明の第1の実施形態である管理業務の評価システムの
構成をあらわすブロック図である。図1に示すように、
管理業務の評価システム1は、標準仕様記憶手段10、
個別基準仕様記憶手段11、標準作業時間記憶手段1
2、標準作業体制記憶手段13、標準単価記憶手段1
4、評価ルール記憶手段15、入出力手段16、制御手
段17を含んで構成される。
BEST MODE FOR CARRYING OUT THE INVENTION (First Embodiment) An embodiment of the present invention will be described below with reference to the drawings. FIG. 1 is a block diagram showing the configuration of a management work evaluation system according to the first embodiment of the present invention. As shown in Figure 1,
The management system evaluation system 1 includes a standard specification storage unit 10,
Individual standard specification storage means 11 and standard working time storage means 1
2, standard work system storage means 13, standard unit price storage means 1
4, an evaluation rule storage unit 15, an input / output unit 16, and a control unit 17.

【0022】ここで、本発明による評価システムは、物
理的には専用化したシステム、あるいは汎用の情報処理
装置のいずれであってもよい。例えば、一般的な構成の
情報処理装置において、本発明の管理業務の評価方法に
おける各工程を規定したソフトウェアを起動することに
より、本発明の評価システムを実現することができる。
なお、前記専用化したシステム又は情報処理装置は、単
一のコンピュータにより構成されるものであっても、ネ
ットワーク上に分散した複数のコンピュータにより構成
されるものであっても良い。
The evaluation system according to the present invention may be either a physically dedicated system or a general-purpose information processing device. For example, in an information processing device having a general configuration, the evaluation system of the present invention can be realized by activating software that defines each step in the management work evaluation method of the present invention.
The dedicated system or information processing apparatus may be composed of a single computer or a plurality of computers distributed on a network.

【0023】本発明において、何を管理対象とするか、
どのような施設維持に関する管理業務を評価するかは設
計に応じて定めることができるが、以下、本実施形態で
は、ビルを管理対象とし、清掃業務を評価する場合を例
として説明を行う。
In the present invention, what is to be managed is
What kind of facility maintenance management work to evaluate can be determined according to the design, but in the following description of the present embodiment, a case where a building is a management target and a cleaning work is evaluated will be described as an example.

【0024】標準仕様記憶手段10は、標準的なエリア
(清掃業務を実施する部屋、空間等の区分単位)に関
し、エリア情報、作業内容、標準仕様を対応づけて記憶
している。図2に、標準仕様記憶手段10のデータ構造
の概念図を示す。
The standard specification storage means 10 stores area information, work contents, and standard specifications in association with each other with respect to a standard area (a division unit such as a room in which cleaning work is performed or a space). FIG. 2 shows a conceptual diagram of the data structure of the standard specification storage means 10.

【0025】エリア情報は、少なくともエリア識別情
報、エリアタイプを含んで構成される。
The area information includes at least area identification information and area type.

【0026】エリア識別情報は、エリアを識別するため
の情報であり、例えば図2に示すように、エレベータホ
ール、給湯室、便所、廊下、階段といった、一般的なビ
ルが備える各エリアの名称をエリア識別情報として用い
ることができる。
The area identification information is information for identifying an area. For example, as shown in FIG. 2, the name of each area provided in a general building such as an elevator hall, a hot water supply room, a toilet, a corridor, and stairs is shown. It can be used as area identification information.

【0027】エリアタイプは、各エリアにおいて仕様に
影響を与えるファクターがある場合に、かかるファクタ
ーを特定する情報である。このようなファクターとして
は例えば床の材質が考えられ、この場合、エリアタイプ
としては、例えばハードフロア、カーペット、高級カー
ペットといったものが考えられる。
The area type is information that specifies a factor that affects the specifications in each area. As such a factor, for example, the floor material may be considered, and in this case, the area type may be, for example, a hard floor, a carpet, or a high-grade carpet.

【0028】作業内容は、具体的な個々の清掃業務を特
定する情報であり、例えばハウスキーピング、しみ抜
き、バキューム、サニタイジング、シャワーシャンプ
ー、シャワースクラブ、ワックスがけ、ポリッシャー洗
浄といったものが考えられる。
The work content is information for identifying a specific individual cleaning work, and may be, for example, housekeeping, stain removal, vacuum, sanitizing, shower shampoo, shower scrub, waxing, and polisher cleaning.

【0029】標準仕様は、標準的なエリアについて清掃
業務を行う場合における、基準となる管理仕様である。
ここで、清掃業務のように、作業した回数に依存して品
質、コストが変動するような管理業務の場合、管理仕様
は少なくとも作業回数を含むように規定される。作業回
数としては、例えば1年あたり作業回数、1週あたり作
業回数、1日あたり作業回数等を用いることができる。
図2に示す例では、1週あたりの作業回数((作業日数
/週)×(作業回数/日))や、1年あたりの作業回数
((作業日数/年)×(作業回数/日))により仕様を
規定している。
The standard specification is a standard management specification when performing cleaning work on a standard area.
Here, in the case of a management task such as a cleaning task whose quality and cost vary depending on the number of times the task has been performed, the management specification is defined to include at least the number of tasks. As the number of operations, for example, the number of operations per year, the number of operations per week, the number of operations per day, or the like can be used.
In the example shown in FIG. 2, the number of works per week ((work days / week) × (work count / day)) or the number of works per year ((work days / year) × (work count / day)) ) Specifies the specifications.

【0030】個別基準仕様記憶手段11は、評価対象と
なる個々のビルに関し、該ビルが有する各エリアについ
て、エリア情報、作業内容、個別基準仕様を対応づけて
記憶している。個別基準仕様記憶手段11のデータ構造
は、標準仕様記憶手段10と同様とすることができる
(図3参照)。
The individual standard specification storage means 11 stores area information, work content, and individual standard specifications in association with each area of the building to be evaluated, in association with each building. The data structure of the individual standard specification storage means 11 can be the same as that of the standard specification storage means 10 (see FIG. 3).

【0031】評価対象のビルが有する各エリアのエリア
情報や作業内容は、例えば評価対象のビルの設計情報や
現行の管理仕様等に基づいて定めることができる。
Area information and work contents of each area of the building to be evaluated can be determined based on, for example, design information of the building to be evaluated and current management specifications.

【0032】個別基準仕様は、評価対象のビルが有する
各エリアについて清掃業務を行う場合における、基準と
なる管理仕様である。個別基準仕様は、後述するよう
に、評価対象のビルが有する各エリアに標準仕様を当て
はめることにより、求めることができる。
The individual standard specification is a standard management specification when performing cleaning work for each area of the building to be evaluated. The individual standard specifications can be obtained by applying the standard specifications to each area of the building to be evaluated, as described later.

【0033】標準作業時間記憶手段12は、作業内容、
エリアタイプ、標準作業時間を対応づけて記憶してい
る。図4に、標準作業時間記憶手段12のデータ構造の
概念図を示す。
The standard work time storage means 12 stores the work contents,
Area type and standard work time are stored in association with each other. FIG. 4 shows a conceptual diagram of the data structure of the standard work time storage means 12.

【0034】標準作業時間とは、標準的な技能の持ち主
が、各作業内容、エリアタイプを条件として清掃業務を
行った場合の、単位面積あたりの作業時間を表わす。標
準作業時間は、例えば実際に清掃業務を実施して作業時
間を計測し、それら計測した作業時間に基づいて決定す
ることが考えられる(タイム・アンド・モーションスタ
ディ)。
The standard work time means the work time per unit area when the owner of the standard skill performs the cleaning work on the condition of each work content and area type. It is considered that the standard work time is determined by, for example, actually performing a cleaning work, measuring the work time, and based on the measured work time (time and motion study).

【0035】標準作業体制記憶手段13は、作業体制
(関連情報の記録状況、標準作業の設定状況、作業レベ
ル向上のための施策設定状況、作業評価基準の設定状
況、作業結果の分析状況、作業品質の確認状況、作業計
画の設定状況など)について、それぞれ標準値を記憶し
ている。
The standard work system storage means 13 stores work systems (related information recording status, standard work setting status, policy setting status for work level improvement, work evaluation standard setting status, work result analysis status, work status). Standard values are stored for quality confirmation status, work plan setting status, etc.).

【0036】関連情報の記録状況は、清掃業務に関連す
る所定の情報(関連情報)について記録・管理がなされ
ているかどうかを表わす。このような関連情報として
は、例えば組織図、雇用記録、現行仕様書、各種契約
書、作業計画書、作業手順書、業務日報などが考えられ
る。本実施形態では、関連情報について記録・管理され
ているかどうかを、例えば関連情報に対応する業務書類
が存在するかどうかにより判断するように構成する。こ
の場合、関連情報の記録状況についての標準値として、
標準的に備えておくべき関連情報に対応する業務書類の
数を記憶する。
The recording status of the related information indicates whether or not predetermined information (related information) related to the cleaning work is recorded and managed. As such related information, for example, an organization chart, an employment record, current specifications, various contracts, work plans, work procedures, work daily reports, etc. can be considered. In this embodiment, it is configured to judge whether or not the related information is recorded and managed, for example, based on whether or not there is a business document corresponding to the related information. In this case, as a standard value for the recording status of related information,
The number of business documents corresponding to the related information that should be prepared as standard is stored.

【0037】標準作業の設定状況は、清掃業務の各作業
内容について標準作業を設定しているかどうかを表わ
す。例えばハウスキーピング(ハードフロア)の場合、
全面剥離、シャワースクラブ、スプレーバフ、自動洗浄
機、しみ抜きといったものが標準作業として考えられ
る。本実施形態では、標準作業の設定状況の標準値とし
て、例えば標準作業を設定しておくべき作業数を記憶す
る。
The standard work setting status indicates whether or not the standard work is set for each work content of the cleaning work. For example, in the case of housekeeping (hard floor),
Full-scale stripping, shower scrubbing, spray buffing, automatic washing machine, and stain removal are considered as standard work. In the present embodiment, as the standard value of the setting status of the standard work, for example, the number of works for which the standard work should be set is stored.

【0038】作業レベル向上のための施策設定状況は、
清掃業務の各作業内容についてトレーニングや資格取得
に対するインセンティブ等を設定しているかどうかを表
わす。本実施形態では、作業レベル向上のための施策設
定状況の標準値として、例えばトレーニングを設定して
おくべき作業数を記憶する。
The status of policy setting for improving the work level is
Indicates whether or not training and incentives for qualification are set for each work content of cleaning work. In the present embodiment, for example, the number of work for which training is set is stored as the standard value of the policy setting status for improving the work level.

【0039】作業評価基準の設定状況は、清掃業務の各
作業内容について、作業品質を判断するための評価基準
を設定しているかどうかを表わす。本実施形態では、作
業評価基準の設定状況の標準値として、例えば作業品質
の評価基準を設定しておくべき作業数を記憶する。
The setting condition of the work evaluation standard indicates whether or not the evaluation standard for judging the work quality is set for each work content of the cleaning work. In the present embodiment, as the standard value of the setting status of the work evaluation standard, for example, the number of works for which the work quality evaluation standard should be set is stored.

【0040】作業結果の分析状況は、清掃業務の各作業
内容について、作業結果の分析を行っているかどうか表
わす。本実施形態では、作業結果の分析状況の標準値と
して、例えば作業結果の分析を行うべき作業数を記憶す
る。
The work result analysis status indicates whether or not the work result is analyzed for each work content of the cleaning work. In the present embodiment, as the standard value of the analysis status of the work result, for example, the number of works for which the work result is to be analyzed is stored.

【0041】作業品質の確認状況は、清掃業務の各作業
内容について、作業品質の確認を定期的に行っているか
どうかを表わす。本実施形態では、作業品質の確認状況
の標準値として、例えば作業品質の確認を行うべき作業
数を記憶する。
The work quality confirmation status indicates whether or not the work quality is regularly confirmed for each work content of the cleaning work. In the present embodiment, as the standard value of the confirmation status of the work quality, for example, the number of works for which the work quality should be confirmed is stored.

【0042】作業計画の設定状況は、清掃業務の各作業
内容について、所定期間(日、週、月、年)単位で作業
計画を設定・見直ししているかどうかを表わす。本実施
形態では、作業計画の設定状況の標準値として、例えば
作業計画を設定・見直ししている作業数を記憶する。
The setting status of the work plan indicates whether or not the work plan is set / reviewed in units of a predetermined period (day, week, month, year) for each work content of the cleaning work. In the present embodiment, as the standard value of the setting status of the work plan, for example, the number of works for which the work plan is set / reviewed is stored.

【0043】標準単価記憶手段14は、標準的な技能の
持ち主を前提とした場合の、作業者1人あたりの単位時
間コスト(標準単価)を記憶する。本実施形態では、作
業者1人あたり1日あたりのコストを標準単価として記
憶するものとする。
The standard unit price storage means 14 stores the unit time cost (standard unit price) per worker on the assumption that the owner has a standard skill. In this embodiment, the cost per day per worker is stored as the standard unit price.

【0044】なお、地域や技能レベルに応じて複数種類
の標準単価を記憶するように構成してもよい。例えば、
地域による標準単価の相違は、日本ビル新聞社発行の
「ビルメンテナンスの積算見積」を参照して定めること
ができる。
A plurality of types of standard unit prices may be stored according to the region and skill level. For example,
The difference in standard unit price depending on the region can be determined by referring to "Estimated Estimate of Building Maintenance" issued by Nihon Building Shimbun.

【0045】評価ルール記憶手段15は、品質スコアと
コストスコアの2軸から成るパラメータ空間の領域に対
応づけて、総合評価情報を記憶している。本実施形態で
は、総合評価情報として、管理業務に対する格付け、各
軸(品質軸、スコア軸)における問題の所在(有無)を
含むように構成する。
The evaluation rule storage means 15 stores the comprehensive evaluation information in association with the area of the parameter space consisting of the two axes of the quality score and the cost score. In this embodiment, the comprehensive evaluation information is configured to include the rating for the management work and the location (presence / absence) of the problem in each axis (quality axis, score axis).

【0046】格付けは、例えばA(最高)〜E(最低)
で表わすことができる。格付けの付与方針としては、例
えばパラメータ空間を図5(a)に示すように領域分割
した場合、中央に位置する領域は品質、コストともに適
正であるため格付けAとし、他の領域については、コス
トパフォーマンス(品質スコア/コストスコア)が大き
いほど格付けが高くなるように設定することが考えられ
る。
Ratings are, for example, A (highest) to E (lowest)
Can be expressed as As a rating assigning policy, for example, when the parameter space is divided into regions as shown in FIG. 5A, since the central region is appropriate in terms of quality and cost, the rating is set to A, and other regions are set to cost. It can be considered that the higher the performance (quality score / cost score), the higher the rating.

【0047】問題の所在は、改善するとしたら何を直せ
ばよいのかという観点から分析してルールを設定する。
例えば本実施形態では以下のようなルールを採用してい
る。 [ルール] 前記パラメータ空間上のマッピング位置(領域) 総合評価(問題の所在) (any 、過剰コストスコア ) コストに問題あり (not(過少品質) 、過少コストスコア ) コストに問題あり (過少品質スコア 、any ) 品質に問題あり (過剰品質スコア 、not(過剰コスト) ) 品質に問題あり 図5(b)に、本実施形態における評価ルール記憶手段
15のデータ構造を示す。なお、図6に示すように、格
付けに準じて問題の深刻度合いを定めたり、総合評価情
報に評価コメントを含めるように構成してもよい。
The location of the problem is analyzed and set a rule from the viewpoint of what should be fixed if it is improved.
For example, in this embodiment, the following rules are adopted. [Rule] Mapping position (area) on the parameter space Overall evaluation (location of problem) (any, excess cost score) Cost problem (not (under quality), under cost score) Cost problem (under quality score) , Any) There is a problem in quality (excessive quality score, not (excess cost)) There is a problem in quality FIG. 5B shows the data structure of the evaluation rule storage means 15 in this embodiment. As shown in FIG. 6, the severity of the problem may be determined according to the rating, or the comprehensive evaluation information may include the evaluation comment.

【0048】各記憶手段におけるデータの管理や検索に
は、リレーショナルデータベース等の従来のデータベー
ス技術を用いることができる。
Conventional data base technology such as a relational data base can be used for data management and retrieval in each storage means.

【0049】入出力手段16は、本評価システム1の利
用者からの入力を受け付けるとともに、かかる利用者に
対し情報を出力することができる構成となっていればよ
く、例えばキーボードやマウス等の入力手段や、ディス
プレイやプリンタ等の出力手段により構成することがで
きる。
The input / output unit 16 may be configured to accept input from the user of the evaluation system 1 and output information to the user. For example, input from a keyboard or mouse. It can be configured by means and output means such as a display and a printer.

【0050】制御手段17は、本評価システム1全体の
動作を制御するとともに、個別基準仕様設定処理、品質
評価処理、コスト評価処理、総合評価処理などを実行す
る。図1では、制御手段17において実行される上記の
各処理をそれぞれ機能手段としてとらえて図示してい
る。
The control means 17 controls the operation of the entire evaluation system 1 and executes individual standard specification setting processing, quality evaluation processing, cost evaluation processing, comprehensive evaluation processing and the like. In FIG. 1, the above-described respective processes executed by the control unit 17 are shown as functional units.

【0051】以下、図7、9、10、11に示すフロー
チャートを参照しながら、個別基準仕様設定処理(個別
基準仕様設定手段)、品質評価処理(品質評価手段)、
コスト評価処理(コスト評価手段)、総合評価処理(総
合評価手段)について説明する。なお、各ステップは処
理内容に矛盾を生じない範囲で任意に順番を変更して実
行することができる。
Hereinafter, with reference to the flow charts shown in FIGS. 7, 9, 10 and 11, individual standard specification setting processing (individual standard specification setting means), quality evaluation processing (quality evaluation means),
The cost evaluation processing (cost evaluation means) and the comprehensive evaluation processing (total evaluation means) will be described. It should be noted that each step can be executed by arbitrarily changing the order as long as the processing content does not conflict.

【0052】(個別基準仕様設定処理:図7)個別基準
仕様設定処理とは、評価対象のビルに関し、現行仕様、
現行コスト、業務実施状況を受け付けるとともに、該ビ
ルについて個別基準仕様を設定する処理である。
(Individual standard specification setting process: FIG. 7) The individual standard specification setting process is the current specification of the building to be evaluated.
This is a process of accepting the current cost and the business implementation status and setting individual standard specifications for the building.

【0053】制御手段17は、ユーザから、入出力手段
16を介して、現行仕様、現行コスト、業務実施状況を
受け付ける(S100)。
The control means 17 receives the current specifications, the current cost, and the work implementation status from the user via the input / output means 16 (S100).

【0054】現行仕様とは、評価対象のビルについて現
に採用している管理仕様を指す。S100では、評価対
象のビルが有する各エリアについて、該エリアのエリア
情報、該エリアのエリア規模、作業内容に対応づけて、
現行仕様を受け付けるように構成する(図8参照)。な
お、エリア規模は、各エリアの広さ、大きさ等を特定す
る情報であり、例えば各エリアの床面積をエリア規模と
して用いることができる。更に、給湯室の流し台や便所
の便器のように、そのエリアに必須に設置する設備があ
る場合は、その設備数もエリア規模に含めるように構成
してもよい。
The current specifications refer to the management specifications currently adopted for the building to be evaluated. In S100, for each area of the building to be evaluated, in association with the area information of the area, the area scale of the area, and the work content,
It is configured to accept the current specifications (see FIG. 8). The area scale is information that specifies the size, size, etc. of each area, and for example, the floor area of each area can be used as the area scale. Furthermore, if there are facilities that are indispensable to be installed in the area, such as a sink in the hot water supply room or a toilet bowl in a toilet, the number of such facilities may be included in the area scale.

【0055】現行コストとは、評価対象ビルについて清
掃業務を実施するために現に発生しているコストを指
す。具体的には、清掃業者に対して実際に支払っている
費用等が現行コストに該当することになる。
The current cost refers to the cost actually incurred to carry out the cleaning work on the building to be evaluated. Specifically, the actual cost paid to the cleaning company corresponds to the current cost.

【0056】業務実施状況とは、評価対象ビルに関し、
実際に実施している清掃業務の状況を指す。具体的に
は、実際に作業をしている作業者数(又は、契約人
数)、実際の作業体制などが業務実施状況に該当するこ
とになる。S100では、評価対象のビルが有する各エ
リアごとに、業務実施状況を受け付けるように構成す
る。
The work implementation status refers to the building to be evaluated,
This refers to the status of cleaning work that is actually being carried out. Specifically, the number of workers actually working (or the number of contractors), the actual work system, and the like correspond to the work implementation status. In S100, the work implementation status is received for each area of the building to be evaluated.

【0057】次に、制御手段17は、評価対象のビルが
有する各エリアについて、標準仕様記憶手段10が記憶
する標準仕様の中から、エリア情報、作業内容に関して
最も近似する標準仕様を選択する(S101)。
Next, the control means 17 selects, for each area of the building to be evaluated, the standard specifications that are the closest to the area information and work contents from the standard specifications stored in the standard specification storage means 10 ( S101).

【0058】そして、制御手段17は、評価対象のビル
が有する各エリアについて、(個別基準仕様の作業回
数)=(選択した標準仕様における作業回数)に基づ
き、該エリアの個別基準仕様を決定し、個別基準仕様記
憶手段11に記憶する(S102)(図3参照)。
Then, the control means 17 determines the individual standard specification of each area of the building to be evaluated based on (the number of operations of the individual standard specifications) = (the number of operations of the selected standard specifications). , Is stored in the individual standard specification storage means 11 (S102) (see FIG. 3).

【0059】ここで、例えば、ユーザから個別基準仕様
の品質レベルを定めるパラメータを受け付け、これに基
づき個別基準仕様を調整するように構成してもよい。例
えば、ユーザからパラメータα(α=1〜3;αが大き
いほど過剰品質)を受け付け、(個別基準仕様の作業回
数)=(1+β×(α−2))×(選択した標準仕様に
おける作業回数)に基づき個別基準仕様を決定するよう
に構成する。βは作業回数が規定されている期間や作業
内容等に応じて定めればよく、例えば、作業回数が1週
あたりで規定されている場合は、β=0.2とすること
が考えられる。
Here, for example, a parameter that determines the quality level of the individual standard specification may be received from the user, and the individual standard specification may be adjusted based on the parameter. For example, the parameter α (α = 1 to 3; the larger the α, the more excessive quality) is accepted, and (the number of work of the individual standard specifications) = (1 + β × (α−2)) × (the number of work of the selected standard specifications) ) To determine the individual standard specifications. β may be determined in accordance with the period for which the number of operations is defined, the content of work, etc. For example, when the number of operations is defined per week, β may be set to 0.2.

【0060】なお、設計に応じて、ユーザが個別基準仕
様を直接入力して決定するように構成してもよい。
The user may directly input and decide the individual standard specifications according to the design.

【0061】(品質評価処理:図9)品質評価処理と
は、現行仕様、個別基準仕様、業務実施状況とに少なく
とも基づき、清掃業務に関して品質を評価して、品質ス
コアを算出する処理である。本実施形態では、以下に説
明するように、品質スコアを、第1品質スコア、第2品
質スコア、第3品質スコアの線形和として算出する。
(Quality evaluation process: FIG. 9) The quality evaluation process is a process of evaluating the quality of the cleaning work based on at least the current specifications, the individual standard specifications, and the work implementation status, and calculating the quality score. In the present embodiment, as described below, the quality score is calculated as a linear sum of the first quality score, the second quality score, and the third quality score.

【0062】制御手段17は、個別基準仕様記憶手段1
1を参照し、現行仕様、個別基準仕様それぞれに含まれ
る作業回数に基づいて、第1品質スコアを算出する(S
200)。具体的には、第1品質スコア=E{現行仕様
の作業回数/個別基準仕様の作業回数}×100に基づ
き、第1品質スコアを求める。ここで、E{}は、個別
基準仕様を決定した全エリアについての平均値を求める
ことを意味する。
The control means 17 is the individual standard specification storage means 1
1, the first quality score is calculated based on the number of operations included in each of the current specifications and the individual standard specifications (S
200). Specifically, the first quality score is calculated based on the first quality score = E {number of work of current specification / number of work of individual standard specification} × 100. Here, E {} means obtaining an average value for all areas for which individual standard specifications are determined.

【0063】なお、(現行仕様の作業回数/個別基準仕
様の作業回数)が1となるエリア、1を超えるエリア、
1より小さいエリアの3通りに場合分けを行い、各場合
ごとに重みを変えて、重み付き平均値により第1品質ス
コアを求めるように構成してもよい。重みとしては、例
えば、1となるエリアについて他のエリアよりも大きい
重み(例えば2倍の重み)を設定することが考えられ
る。
Areas in which (the number of work of the current specification / the number of work of the individual standard specification) is 1, an area exceeding 1,
The first quality score may be obtained from the weighted average value by dividing the case into three cases of areas smaller than 1, changing the weight in each case. As the weight, for example, it is conceivable to set a larger weight (for example, twice as much weight) for one area as for other areas.

【0064】第1品質スコアは、現行仕様の作業回数と
個別基準仕様の作業回数との比によって、現行仕様が個
別基準仕様をどの程度充足しているかを表わしたもので
ある。第1品質スコアは、個別基準仕様を決定した全エ
リアにおいて現行仕様と個別基準仕様が一致する場合に
100を取る一方、現行仕様に過不足がある場合は、1
00以下、又は100以上の値を取ることになる。
The first quality score represents how much the current specification satisfies the individual standard specifications by the ratio of the number of operations of the current specifications and the number of operations of the individual standard specifications. The first quality score is 100 when the current specifications and the individual standard specifications match in all areas where the individual standard specifications are determined, while it is 1 when the current specifications have an excess or deficiency.
The value will be 00 or less, or 100 or more.

【0065】制御手段17は、標準作業時間記憶手段1
2を参照し、現行仕様に基づき定まる作業者数と業務実
施状況に含まれる実際の作業者数との比較に基づいて、
第2品質スコアを算出する(S201)。具体的には、
第2品質スコア=E{1日あたり実際の作業者数/現行
仕様どおりに実施した場合に必要な作業者数}×100
=E{1日あたり実際の作業者数/(エリア床面積[m
]×標準作業時間[時間/m]×現行仕様の1日あ
たり作業回数/1人あたり1日あたり平均作業時間[時
間/日・人])}×100に基づき、第2品質スコアを
求める。なお、1人あたり1日あたり平均作業時間は設
計に応じて設定すればよく、例えば8時間(又は4時
間)とすることが考えられる。また、日によって作業者
数が変化する場合は、式中の各値について1日あたりで
はなく、週あたり、月あたり、又は年あたりとして計算
してもよい。
The control means 17 is the standard working time storage means 1
Referring to 2, based on the comparison between the number of workers determined based on the current specifications and the actual number of workers included in the work implementation status,
A second quality score is calculated (S201). In particular,
Second quality score = E {actual number of workers per day / number of workers required when performing according to current specifications} × 100
= E {actual number of workers per day / (area floor area [m
2 ] × standard working time [hour / m 2 ] × current number of working days per day / average working time per person per day [hour / day / person])} × 100 Ask. The average working time per person per day may be set according to the design, and may be set to, for example, 8 hours (or 4 hours). When the number of workers changes depending on the day, each value in the formula may be calculated not as per day but as per week, per month, or per year.

【0066】第2品質スコアは、実際の作業者数と現行
仕様上の作業者数との比によって、実際に行われている
作業が現行仕様をどの程度充足しているかを表わしたも
のである。第2品質スコアは、個別基準仕様を決定した
全エリアにおいて現行仕様に促した作業者数となってい
る場合に100を取る一方、実際の作業者数に過不足が
ある場合は、100以下、又は100以上の値を取るこ
とになる。
The second quality score expresses how much the work actually performed satisfies the current specification by the ratio of the actual number of workers and the number of workers according to the current specifications. . The second quality score is 100 when the number of workers urged by the current specifications in all areas where the individual standard specifications are determined is 100, while 100 or less when the actual number of workers is insufficient, Or, it will take a value of 100 or more.

【0067】更に、設計に応じて、実際に行われている
作業が現行仕様をどの程度充足しているかについて、評
価担当者及び/又はビルオーナ等の主観評価に基づくス
コアを求め、第2品質スコアの算出において考慮するよ
うに構成してもよい。
Further, according to the design, a score based on the subjective evaluation of the person in charge of evaluation and / or the building owner or the like is obtained as to how much the work actually being performed satisfies the current specifications, and the second quality score is obtained. May be configured to be considered in the calculation of

【0068】制御手段17は、標準作業体制記憶手段1
3を参照し、実際の作業体制と標準作業体制に基づい
て、第3品質スコアを算出する(S202)。具体的に
は、第3品質スコアA={a1×(実際の業務書類数/
関連情報の記録状況の標準値)+a2×(実際に標準作
業を設定している作業数/標準作業の設定状況の標準
値)+a3×(実際にトレーニングを設定している作業
数/作業レベル向上のための施策設定状況の標準値)+
a4×(実際に作業評価基準を設定している作業数/作
業評価基準の設定状況の標準値)+a5×(実際に作業
結果を分析している作業数/作業結果の分析状況の標準
値)}×100、第3品質スコアB={a6×(実際に
作業品質の確認をしている作業数/作業品質の確認状況
の標準値)+a7×(実際に作業計画の設定・見直しし
ている作業数/作業計画の設定状況の標準値)}×10
0に基づき、2種類の第3品質スコアA、Bを求める。
前記式において、a1〜a5、a6〜a7はそれぞれa
1+a2+a3+a4+a5=1、a6+a7=1を満
たすように設定された重みパラメータである。
The control means 17 is the standard work system storage means 1
3, the third quality score is calculated based on the actual work system and the standard work system (S202). Specifically, the third quality score A = {a1 × (actual number of business documents /
Standard value of the recording status of related information) + a2 x (the number of work actually setting standard work / standard value of the setting status of standard work) + a3 x (number of work actually setting training / work level improvement Standard value of policy setting status for
a4 x (number of work actually setting work evaluation standard / standard value of setting condition of work evaluation standard) + a5 x (number of work actually analyzing work result / standard value of analysis result of work result) } × 100, third quality score B = {a6 × (number of works actually confirming work quality / standard value of work quality confirmation status) + a7 × (actual work plan is set / reviewed) Number of works / standard value of work plan settings)} × 10
Based on 0, two types of third quality scores A and B are obtained.
In the above formula, a1 to a5 and a6 to a7 are each a
It is a weighting parameter set so as to satisfy 1 + a2 + a3 + a4 + a5 = 1 and a6 + a7 = 1.

【0069】第3品質スコアAは、作業体制に関して適
正なマネジメントがなされているかどうかを表わしたも
のであり、第3品質スコアBは、作業体制における計画
性を評価したものである。各第3品質スコアは実際の作
業体制が標準作業体制と一致する場合に100を取る一
方、実際の作業体制に過不足がある場合は、100以
下、又は100以上の値を取ることになる。
The third quality score A represents whether or not the work system is properly managed, and the third quality score B is an evaluation of the planning property in the work system. Each third quality score takes 100 when the actual work system matches the standard work system, and takes 100 or less or 100 or more when the actual work system has an excess or deficiency.

【0070】制御手段17は、最後に、第1品質スコ
ア、第2品質スコア、第3品質スコアA、第3品質スコ
アBの線形和として、すなわち、品質スコア=p品質×
第1品質スコア+q品質×第2品質スコア+r品質×第
3品質スコアA+s品質×第3品質スコアBに基づき、
品質スコアXを算出する(S203)。前記式におい
て、p品質、q品質、r品質、s品質は、p品質+q
品質+r品質+s品質=1となるように設定された重み
パラメータである。重みパラメータの各値は設計に応じ
て設定することができるが、例えば、p品質=0.3
5、q品質=0.35、r品質=0.20、s品質
0.10のように定めることが考えられる。
Finally, the control means 17 makes a linear sum of the first quality score, the second quality score, the third quality score A and the third quality score B, that is, quality score = p quality ×
Based on the first quality score + q quality × second quality score + r quality × third quality score A + s quality × third quality score B,
The quality score X is calculated (S203). In the above equation, p quality , q quality , r quality , and s quality are p quality + q
It is a weighting parameter set so that quality + r quality + s quality = 1. Although each value of the weight parameter can be set according to the design, for example, p quality = 0.3
5, q quality = 0.35, r quality = 0.20, s quality =
It is possible to set it as 0.10.

【0071】なお、第3品質スコアについてA、Bに分
けずに算出し、品質スコア=p品質×第1品質スコア+
品質×第2品質スコア+r品質×第3品質スコアに基
づき、品質スコアXを算出するように構成してもよい。
The third quality score is calculated without being divided into A and B, and the quality score = p quality × first quality score +
The quality score X may be calculated based on q quality × second quality score + r quality × third quality score.

【0072】(コスト評価処理:図10)コスト評価処
理とは、現行仕様、現行コスト、個別基準仕様、標準単
価に基づき、清掃業務に関してコストを評価して、コス
トスコアを算出する処理である。本実施形態では、以下
に説明するように、コストスコアを、第1コストスコ
ア、第2コストスコアの線形和として算出する。
(Cost Evaluation Process: FIG. 10) The cost evaluation process is a process of evaluating the cost for the cleaning work based on the current specification, the current cost, the individual standard specification, and the standard unit price, and calculating the cost score. In the present embodiment, as described below, the cost score is calculated as a linear sum of the first cost score and the second cost score.

【0073】制御手段17は、標準単価記憶手段14を
参照し、現行仕様、現行コスト、標準単価に基づいて、
第1コストスコアを算出する(S300)。具体的に
は、第1コストスコア=(現行コスト/(SUM{(エ
リア床面積[m]×標準作業時間[時間/m]×現
行仕様の1日あたり作業回数/1日あたり1人平均作業
時間[時間/日・人])×1人あたり1日あたり標準単
価[円/日・人]}×年間作業日数))×100に基づ
き、第1コストスコアを求める。ここで、SUM{}
は、個別基準仕様を決定した全エリアについての合計値
を求めることを意味する。
The control means 17 refers to the standard unit price storage means 14, and based on the current specification, the current cost and the standard unit price,
A first cost score is calculated (S300). Specifically, the first cost score = (current cost / (SUM {(area floor area [m 2 ] × standard working time [hour / m 2 ] × current number of work per day / one person per day) The first cost score is obtained based on the average work time [hours / day / person]) × standard unit price per person per day [yen / day / person]} × annual work days)) × 100. Where SUM {}
Means obtaining the total value for all areas for which the individual standard specifications are determined.

【0074】次に、制御手段17は、個別基準仕様記憶
手段11、標準単価記憶手段14を参照し、個別基準仕
様、現行コスト、標準単価に基づいて、第2コストスコ
アを算出する(S301)。具体的には、第2コストス
コア=(現行コスト/(SUM{(エリア床面積
[m]×標準作業時間[時間/m]×個別基準仕様
の1日あたり作業回数/1人あたり1日あたり平均作業
時間[時間/日・人])×1人あたり1日あたり標準単
価[円/日・人]}×年間作業日数))×100に基づ
き、第2コストスコアを求める。
Next, the control means 17 refers to the individual standard specification storage means 11 and the standard unit price storage means 14, and calculates the second cost score based on the individual standard specifications, the current cost, and the standard unit price (S301). . Specifically, the second cost score = (current cost / (SUM {(area floor area [m 2 ] × standard work time [hour / m 2 ] × number of work per day of individual standard specifications / 1 per person The second cost score is calculated based on the average work time per day [hour / day / person]) × standard unit price per day per person [yen / day / person]} × annual work days)) × 100.

【0075】第1コストスコアは、現行コストと、現行
仕様に基づいて標準単価により見積もったコストとの比
によって、現行コストの妥当性を表わしたものである。
一方、第2コストスコアは、現行コストと、個別基準仕
様に基づいて標準単価により見積もったコストとの比に
よって、現行コストの必要十分性を表わしたものであ
る。
The first cost score represents the validity of the current cost by the ratio of the current cost and the cost estimated by the standard unit price based on the current specifications.
On the other hand, the second cost score represents the necessity / sufficiency of the current cost by the ratio of the current cost and the cost estimated by the standard unit price based on the individual standard specifications.

【0076】制御手段17は、最後に、第1コストスコ
ア、第2コストスコアの線形和として、すなわち、コス
トスコア=pコスト×第1コストスコア+qコスト×第
2コストスコアに基づき、コストスコアYを算出する
(S302)。前記式において、pコスト、q
コストは、pコスト+qコスト=1となるように設定さ
れた重みパラメータである。重みパラメータの各値は設
計に応じて設定することができるが、例えば、pコスト
=0.50、qコスト=0.50のように定めることが
考えられる。
Finally, the control means 17 calculates the cost score Y as a linear sum of the first cost score and the second cost score, that is, based on the cost score = p cost × first cost score + q cost × second cost score. Is calculated (S302). In the above equation, p cost , q
The cost is a weighting parameter set so that p cost + q cost = 1. Although each value of the weight parameter can be set according to the design, for example, p cost
= 0.50, q cost = 0.50.

【0077】(総合評価処理:図11)総合評価処理と
は、品質スコア及びコストスコアに基づいて、清掃業務
について総合評価を求める処理である。本実施形態で
は、総合評価として、品質とコストの2軸から成るパラ
メータ空間に品質スコア及びコストスコアをマッピング
し、そのマッピング位置に基づき管理業務に対する格付
け、各軸(品質軸、スコア軸)における問題の所在(有
無)を求める。
(Comprehensive Evaluation Process: FIG. 11) The comprehensive evaluation process is a process for obtaining a comprehensive evaluation of the cleaning work based on the quality score and the cost score. In this embodiment, as a comprehensive evaluation, a quality score and a cost score are mapped in a parameter space composed of two axes of quality and cost, a rating is given to a management task based on the mapping position, and problems in each axis (quality axis, score axis) Seek the whereabouts (presence or absence) of.

【0078】制御手段17は、まず品質スコア軸とコス
トスコア軸から成るパラメータ空間に算出した品質スコ
アXとコストスコアYの組(X、Y)をマッピングし、
パラメータ空間上のどの分割領域に位置するかを判断す
る(S400)。
The control means 17 first maps the set (X, Y) of the calculated quality score X and cost score Y in the parameter space consisting of the quality score axis and the cost score axis,
It is determined which divided area on the parameter space is located (S400).

【0079】本実施形態では、以下のルールに基づい
て、パラメータ空間を9つの領域、すなわち、(過少品
質、過少コスト)、(過少品質、適正コスト)、(過少
品質、過剰コスト)、(適正品質、過少コスト)、(適
正品質、適正コスト)、(適正品質、過剰コスト)、
(過剰品質、過少コスト)、(過剰品質、適正コス
ト)、(過剰品質、過剰コスト)に分割している(図5
(b)参照)。 [ルール] 0≦X or Y<90・・・・・・過少 90≦X or Y≦110・・・・・適正 110<X or Y・・・・・・・・・過剰 次に、制御手段17は、評価ルール記憶手段15を参照
し、(X、Y)が位置する領域に対応する総合評価情報
を抽出する(S401)。
In the present embodiment, based on the following rules, the parameter space is divided into nine areas, namely (under-quality, under-cost), (under-quality, appropriate cost), (under-quality, excessive cost), (appropriate quality). Quality, under-cost), (appropriate quality, fair cost), (proper quality, excess cost),
It is divided into (excess quality, under-cost), (excess quality, appropriate cost), and (excess quality, excess cost) (FIG. 5).
(See (b)). [Rule] 0 ≦ X or Y <90: Insufficient 90 ≦ X or Y ≦ 110: Appropriate 110 <X or Y: Excess Next, control means The reference numeral 17 refers to the evaluation rule storage means 15 and extracts the comprehensive evaluation information corresponding to the area where (X, Y) is located (S401).

【0080】例えば、(X、Y)=(70、130)で
あった場合、上記ルールに基づいて判断すると(過少品
質、過少コスト)領域となる。これに図5(b)に示す
ような評価ルールを適用すると、「格付けE」及び「品
質、コストに問題あり」という総合評価情報が得られる
ことになる。
For example, in the case of (X, Y) = (70, 130), the area becomes (insufficient quality, insufficient cost) when judged based on the above rule. When the evaluation rule as shown in FIG. 5 (b) is applied to this, comprehensive evaluation information of "rating E" and "there is a problem in quality and cost" is obtained.

【0081】このようにして得られた、各品質スコア、
各コストスコア、総合評価情報等は、入出力手段16を
介して、テキストやグラフ、音声などにより出力するこ
とができる。図12に出力例を示す。
Each quality score obtained in this way,
Each cost score, comprehensive evaluation information, and the like can be output as text, a graph, voice, or the like via the input / output unit 16. FIG. 12 shows an output example.

【0082】本実施形態では、管理業務(清掃業務)に
ついて基準となる管理仕様を定め、これに基づき品質と
スコアという2つの側面から評価を行い、両者に基づい
て格付け及び問題の所在を総合評価情報として求めるよ
うに構成しているため、管理業者が独自に決定した管理
仕様、コストに対しても客観性を担保して評価を行うこ
とができ、管理仕様が妥当かどうか、コストが高いか安
いかを、両者のバランスを考慮して適切に判断すること
が可能となる。
In the present embodiment, a management specification which is a standard for management work (cleaning work) is defined, and based on this, evaluation is performed from two aspects of quality and score, and based on both, the rating and the location of the problem are comprehensively evaluated. Since it is configured to obtain it as information, it is possible to evaluate the management specifications and costs independently determined by the management company while ensuring the objectivity, and whether the management specifications are appropriate and the cost is high. It is possible to properly judge whether it is cheap or not, considering the balance between the two.

【0083】特に、品質に関する具体的な評価基準とし
て、現行仕様が個別基準仕様をどの程度充足している
か、実際に行われている作業が現行仕様をどの程度充足
しているか、作業体制に関して適正なマネジメントがな
されているかどうか、計画性を持って作業体制を構築し
ているかどうかを用い、コストに関する具体的な評価基
準として、現行コストの妥当性、現行コストの必要十分
性を用いることで、より的確に品質及びコストを評価す
ること可能としている。
In particular, as a concrete quality evaluation standard, it is appropriate with respect to how much the current specification satisfies the individual standard specification, how much work actually being performed satisfies the current specification, and the work system. By using the validity of the current cost and the necessity and sufficientness of the current cost as a concrete evaluation standard for the cost, it is possible to use This makes it possible to evaluate quality and cost more accurately.

【0084】また、本実施形態の評価システムを利用す
ることにより、ビルオーナー等は総合評価情報として格
付け及び問題の所在を得ることができ、自己のビル等の
管理業務がどのようなレベルにあり、どこを改善すべき
かについて容易に把握することが可能となる。
Further, by using the evaluation system of the present embodiment, the building owner or the like can obtain the rating and the location of the problem as the comprehensive evaluation information, and at what level the management work of the own building or the like is. Therefore, it becomes possible to easily understand where to improve.

【0085】(変形例)次に、第1実施形態の変形例を
説明する。本変形例は、原則として第1実施形態と同じ
構成であるが、品質評価処理、コスト評価処理、総合評
価処理において、それぞれ影響度に関する工程が追加さ
れている点で異なる。以下、第1実施形態と異なる部分
について説明する。
(Modification) Next, a modification of the first embodiment will be described. This modified example has the same configuration as that of the first embodiment in principle, but is different in that a step related to the degree of influence is added in each of the quality evaluation processing, the cost evaluation processing, and the comprehensive evaluation processing. Hereinafter, parts different from the first embodiment will be described.

【0086】(品質評価処理)制御手段17は、以下の
式に基づき、第1品質スコアの影響度を求める。また同
様にして、第2、第3A、第3Bの各品質スコアについ
ても影響度を求める(S204)。なお、以下の式にお
いて、ABS{}は絶対値を与える関数を意味する。
(Quality evaluation processing) The control means 17 calculates the degree of influence of the first quality score based on the following equation. Similarly, the degree of influence is also obtained for each of the second, third A, and third B quality scores (S204). In the following equation, ABS {} means a function that gives an absolute value.

【0087】第1品質スコアの影響度=p品質×ABS
{第1品質スコア−100}/(p 品質×ABS{第1
品質スコア−100}+q品質×ABS{第2品質スコ
ア−100}+r品質×ABS{第3品質スコアA−1
00}+s品質×ABS{第3品質スコアB−10
0)) (コスト評価処理)制御手段17は、以下の式に基づ
き、第1コストスコアの影響度を求める。また同様にし
て、第2コストスコアについても影響度を求める(S3
03)。
Impact of first quality score = pquality× ABS
{1st quality score-100} / (p quality× ABS {first
Quality score −100} + qquality× ABS {second quality score
A-100} + rquality× ABS {third quality score A-1
00} + squalityX ABS {3rd quality score B-10
0)) (Cost evaluation process) The control means 17 is based on the following formula.
Then, the degree of influence of the first cost score is calculated. Also in the same way
Then, the degree of influence is also calculated for the second cost score (S3
03).

【0088】第1コストスコアの影響度=pコスト×A
BS{第1コストスコア−100}/(pコスト×AB
S{第1コストスコア−100}+qコスト×ABS
{第2コストスコア−100}) (総合評価処理)制御手段17は、S401において求
めた総合評価情報が、「品質に問題があり」となってい
る場合、第1、第2、第3A、第3Bの各品質スコアに
ついて、影響度が大きい順にソーティングし、上位所定
数を改善優先度が高いものと評価して、総合評価情報に
含める(S402)。
Impact degree of first cost score = p cost × A
BS {first cost score-100} / (p cost x AB
S {first cost score −100} + q cost × ABS
{2nd cost score-100}) (Comprehensive evaluation process) When the comprehensive evaluation information obtained in S401 is "there is a problem in quality", the first, second, third A, For each of the 3B quality scores, sorting is performed in descending order of the degree of influence, and a predetermined number of higher ranks are evaluated as having higher improvement priority and included in the comprehensive evaluation information (S402).

【0089】また、S401において求めた総合評価情
報が、「コストに問題があり」となっている場合、第
1、第2の各コストスコアについて、影響度が大きい順
にソーティングし、上位所定数を改善優先度が高いもの
と評価して、総合評価情報に含める(S403)。
Further, when the comprehensive evaluation information obtained in S401 is "There is a problem with the cost", the first and second cost scores are sorted in descending order of the degree of influence, and the upper predetermined number is set. It is evaluated that the improvement priority is high and included in the comprehensive evaluation information (S403).

【0090】本変形例では、更に各スコアについて影響
度を算出し、これに基づいて改善優先度を評価するよう
に構成しているため、本評価システム1の利用者は、総
合評価情報に基づいて、管理業務のどこに問題があり、
そして何から改善すべきかについて容易に判断すること
が可能となる。
In this modified example, the degree of influence is further calculated for each score, and the improvement priority is evaluated based on the calculated degree of influence. Therefore, the user of the present evaluation system 1 is based on the comprehensive evaluation information. Where is the problem in management,
Then, it becomes possible to easily judge what to improve.

【0091】(第2実施形態)次に、本発明の第2の実
施の形態について説明する。第2の実施の形態は、評価
プログラムを記録した記録媒体を備える。この記録媒体
としてはCD−ROM、磁気ディスク、半導体メモリそ
の他の記録媒体を用いることができる。
(Second Embodiment) Next, a second embodiment of the present invention will be described. The second embodiment includes a recording medium recording an evaluation program. As this recording medium, a CD-ROM, a magnetic disk, a semiconductor memory or other recording medium can be used.

【0092】評価プログラムは記録媒体からデータ処理
装置に読み込まれ、データ処理装置の動作を制御する。
データ処理装置は評価プログラムの制御により、第1実
施形態における評価システム1の、標準仕様記憶手段1
0、個別基準仕様記憶手段11、標準作業時間記憶手段
12、標準作業体制記憶手段13、標準単価記憶手段1
4、評価ルール記憶手段15、IF手段16、制御手段
17による処理と同一の処理を実行する。
The evaluation program is read from the recording medium to the data processing device and controls the operation of the data processing device.
The data processing device is controlled by the evaluation program, and the standard specification storage means 1 of the evaluation system 1 in the first embodiment is used.
0, individual standard specification storage means 11, standard work time storage means 12, standard work system storage means 13, standard unit price storage means 1
4. The same processing as the processing by the evaluation rule storage unit 15, the IF unit 16, and the control unit 17 is executed.

【0093】(その他)なお、本発明は、上記各実施の
形態に限定されることなく種々に変形して適用すること
が可能である。
(Others) The present invention is not limited to the above-described embodiments, but can be modified in various ways and applied.

【0094】例えば、上記実施形態ではビルについての
清掃業務を例として説明したが、本発明は他の評価対象
(例えば、学校、病院など)や他の管理業務(例えば設
備管理、警備など)に対しても適用することができる。
例えば設備管理の場合、各仕様はエリア情報に代えて機
器情報に対応づけられ、機器情報は、機器識別情報(例
えば、空冷ヒートポンプ、室外機、変電設備といった機
器名称)、作業内容(例えば、外観点検、機能点検、巡
回点検、メーター検針など)等を含んで構成されること
になる。
For example, in the above-mentioned embodiment, the cleaning work for the building has been described as an example, but the present invention can be applied to other evaluation objects (eg school, hospital, etc.) and other management works (eg equipment management, security, etc.). It can also be applied to.
For example, in the case of equipment management, each specification is associated with equipment information instead of area information, and equipment information includes equipment identification information (for example, equipment names such as air-cooled heat pump, outdoor unit, and substation equipment), work content (for example, appearance). Inspection, functional inspection, patrol inspection, meter reading, etc.) etc.

【0095】また、評価対象によって異なる評価基準を
用いるように構成してもよい。例えば、標準仕様記憶手
段において、施設の種類(例えば、商業施設、医療施
設、教育施設など)や施設規模に応じて複数の標準仕様
を記憶しておき、個別基準設定処理において、評価対象
の施設の種類に対応する標準仕様に基づいて個別基準仕
様を設定するように構成することが考えられる。
Also, different evaluation criteria may be used depending on the evaluation target. For example, in the standard specification storage means, a plurality of standard specifications are stored according to the type of facility (for example, commercial facility, medical facility, educational facility, etc.) or facility scale, and the facility to be evaluated in the individual standard setting process. It is conceivable that the individual standard specifications are set based on the standard specifications corresponding to the types.

【0096】また、上記実施形態では各仕様が作業回数
を含むものとして説明したが、各仕様が他の情報、例え
ば作業時間等を含むものとして、各手段、各処理を構成
してもよい。
Further, in the above embodiment, each specification is described as including the number of times of work, but each means and each process may be configured such that each specification includes other information, for example, work time.

【0097】また、上記実施形態では実際の作業者数と
現行仕様上の作業者数との比に基づいて第2品質スコア
を算出する構成について説明したが、作業人数に代え
て、実際に実施されている作業回数と現行仕様上の作業
回数との比に基づいて第2品質スコアを求めるように構
成してもよい。
Further, in the above-described embodiment, the configuration for calculating the second quality score based on the ratio of the actual number of workers to the number of workers according to the current specification has been described. The second quality score may be obtained based on the ratio of the number of operations performed and the number of operations according to the current specifications.

【0098】また、上記実施形態ではパラメータ空間を
9分割して各領域に総合評価情報を対応づける構成につ
いて説明したが、パラメータ空間の領域分割の仕方はこ
れに限られず、例えば図13(a)に示すような分割方
法も考えられる。この場合、評価ルール記憶手段のデー
タ構造としては、図13(b)のようにすることが考え
られる。
In the above embodiment, the parameter space is divided into nine areas, and the comprehensive evaluation information is associated with each area. However, the method of dividing the parameter space into areas is not limited to this, and for example, FIG. A division method as shown in FIG. In this case, the data structure of the evaluation rule storage means may be as shown in FIG.

【0099】[0099]

【発明の効果】本発明によれば、基準管理仕様を設定
し、これに基づき品質とコストという2軸で管理業務を
評価するように構成しているため、ビルメンテナンス等
の管理業務について客観性を担保して自動的に評価する
ことが可能となる。
According to the present invention, the standard management specification is set and the management operation is evaluated on the basis of the two axes of quality and cost based on the standard management specification. It is possible to secure and automatically evaluate.

【図面の簡単な説明】[Brief description of drawings]

【図1】 本発明の第1の実施形態である評価システム
の構成を示すブロック図である。
FIG. 1 is a block diagram showing a configuration of an evaluation system that is a first embodiment of the present invention.

【図2】 標準仕様記憶手段10におけるデータ構造を
説明するための図である。
FIG. 2 is a diagram for explaining a data structure in a standard specification storage unit 10.

【図3】 個別基準仕様記憶手段11におけるデータ構
造を説明するための図である。
FIG. 3 is a diagram for explaining a data structure in an individual standard specification storage unit 11.

【図4】 標準作業時間記憶手段12におけるデータ構
造を説明するための図である。
FIG. 4 is a diagram for explaining a data structure in a standard work time storage unit 12.

【図5】 評価ルール記憶手段15におけるデータ構造
を説明するための図である。
5 is a diagram for explaining a data structure in the evaluation rule storage means 15. FIG.

【図6】 評価ルール記憶手段15におけるデータ構造
について、他の例を説明するための図である。
FIG. 6 is a diagram for explaining another example of the data structure in the evaluation rule storage means 15.

【図7】 個別基準設定処理の流れを説明するためのフ
ローチャートである。
FIG. 7 is a flowchart for explaining the flow of individual reference setting processing.

【図8】 ユーザから受け付ける現行仕様のデータ構造
を説明するための図である。
FIG. 8 is a diagram for explaining a data structure of a current specification received from a user.

【図9】 品質評価処理の流れを説明するためのフロー
チャートである。
FIG. 9 is a flowchart for explaining the flow of quality evaluation processing.

【図10】 コスト評価処理の流れを説明するためのフ
ローチャートである。
FIG. 10 is a flowchart for explaining the flow of cost evaluation processing.

【図11】 総合評価処理の流れを説明するためのフロ
ーチャートである。
FIG. 11 is a flowchart for explaining the flow of comprehensive evaluation processing.

【図12】 評価結果の出力例を説明するための図であ
る。
FIG. 12 is a diagram for explaining an output example of evaluation results.

【図13】 評価ルール記憶手段15におけるデータ構
造について、他の例を説明するための図である。
FIG. 13 is a diagram for explaining another example of the data structure in the evaluation rule storage unit 15.

【符号の説明】[Explanation of symbols]

1 評価システム 10 標準仕様記憶手段 11 個別基準仕様記憶手段 12 標準作業時間記憶手段 13 標準作業体制記憶手段 14 標準単価記憶手段 15 評価ルール記憶手段 16 入出力手段 17 制御手段 1 Evaluation system 10 Standard specification storage means 11 Individual standard specification storage means 12 Standard working time storage means 13 Standard work system storage means 14 Standard unit price storage means 15 Evaluation Rule Storage Means 16 Input / output means 17 Control means

Claims (14)

【特許請求の範囲】[Claims] 【請求項1】 管理業務の基準管理仕様を記憶する記憶
手段と、 所定の管理業務について、現行管理仕様、現行コスト、
業務実施状況を受け付ける手段と、 現行管理仕様、基準管理仕様、業務実施状況とに少なく
とも基づき、前記所定の管理業務に関して品質を評価し
て、品質スコアを算出する品質評価手段と、 現行管理仕様、基準管理仕様、現行コストとに少なくと
も基づき、前記所定の管理業務に関してコストを評価
し、コストスコアを算出するコスト評価手段と、 前記算出した品質スコア及びコストスコアに基づいて、
前記所定の管理業務について総合評価を求める総合評価
手段と、を備えることを特徴とする施設維持に関する管
理業務の評価システム。
1. Storage means for storing standard management specifications of management operations; current management specifications, current costs, for predetermined management operations;
A means for receiving the work implementation status, a quality evaluation means for evaluating the quality of the predetermined management work based on at least the current management specifications, the standard management specifications, and the work implementation status, and a quality evaluation means for calculating the quality score, and the current management specifications, Based on at least the standard management specification and the current cost, the cost is evaluated with respect to the predetermined management work, and a cost evaluation unit that calculates a cost score, and based on the calculated quality score and cost score,
An evaluation system for facility management related to facility maintenance, comprising: a comprehensive evaluation means for requesting a comprehensive evaluation of the predetermined management operation.
【請求項2】 前記品質評価手段は、 現行管理仕様と基準管理仕様との比較に基づき、現行管
理仕様が基準管理仕様をどの程度充足しているかを評価
対象として品質スコアを算出する第1手段、 現行管理仕様と業務実施状況との比較に基づき、実際に
行われている作業が現行管理仕様をどの程度充足してい
るかを評価対象として品質スコアを算出する第2手段、 業務実施状況に基づき、作業体制を評価対象として品質
スコアを算出する第3手段、 のうち少なくともいずれかを備えることを特徴とする請
求項1記載の管理業務の評価システム。
2. The first means for calculating the quality score, wherein the quality evaluation means evaluates how much the current management specification satisfies the standard management specification based on a comparison between the current management specification and the standard management specification. Based on the comparison between the current management specifications and the work implementation status, the second means for calculating the quality score by evaluating the extent to which the actual work performed satisfies the current management specifications, based on the business implementation status The management operation evaluation system according to claim 1, further comprising at least one of a third means for calculating a quality score with a work system as an evaluation target.
【請求項3】 前記第1手段は、現行管理仕様及び基準
管理仕様に含まれる作業回数の比較に基づいて品質スコ
アを算出することを特徴とする請求項2記載の管理業務
の評価システム。
3. The evaluation system for management work according to claim 2, wherein the first means calculates the quality score based on a comparison of the number of works included in the current management specification and the standard management specification.
【請求項4】 前記第2手段は、現行管理仕様に基づき
定まる作業者数と業務実施状況に含まれる実際の作業者
数との比較に基づいて品質スコアを算出することを特徴
とする請求項2又は3記載の管理業務の評価システム。
4. The quality score is calculated based on a comparison between the number of workers determined based on the current management specifications and the actual number of workers included in the work implementation status. Evaluation system for management work described in 2 or 3.
【請求項5】 前記第3手段は、関連情報の記録状況、
標準作業の設定状況、作業レベル向上のための施策設定
状況、作業評価基準の設定状況、作業結果の分析状況、
作業品質の確認状況、作業計画の設定状況、のうちいず
れかに基づいて、品質スコアを算出することを特徴とす
る請求項2乃至4のいずれか1項記載の管理業務の評価
システム。
5. The third means is a recording status of related information,
Standard work setting status, work level improvement measure setting status, work evaluation standard setting status, work result analysis status,
5. The management work evaluation system according to claim 2, wherein the quality score is calculated based on one of a work quality confirmation status and a work plan setting status.
【請求項6】 前記コスト評価手段は、 現行管理仕様と現行コストとに少なくとも基づき、現行
コストの妥当性を評価対象としてコストスコアを算出す
る手段、 基準管理仕様と現行コストとに少なくとも基づき、現行
コストの必要十分性を評価対象としてコストスコアを算
出する手段、 のうち少なくともいずれかを備えることを特徴とする請
求項1乃至5のいずれか1項に記載の管理業務の評価シ
ステム。
6. The cost evaluation means is a means for calculating a cost score based on at least the current management specification and the current cost with the adequacy of the current cost as an evaluation target, and a current management method based on at least the standard management specification and the current cost. The management operation evaluation system according to any one of claims 1 to 5, further comprising: at least one of a unit that calculates a cost score with the necessity of cost as an evaluation target.
【請求項7】 前記総合評価手段は、品質とコストの2
軸から成るパラメータ空間に前記算出した品質スコア及
びコストスコアをマッピングし、そのマッピング位置に
基づき総合評価を求めることを特徴とする請求項1乃至
6のいずれか1項に記載の管理業務の評価システム。
7. The comprehensive evaluation means is a combination of quality and cost.
7. The management work evaluation system according to claim 1, wherein the calculated quality score and cost score are mapped in a parameter space made up of axes, and a comprehensive evaluation is obtained based on the mapping position. .
【請求項8】 前記総合評価手段は、以下のルールに基
づいて総合評価を求めることを特徴とする請求項7記載
の管理業務の評価システム。 [ルール] 前記パラメータ空間上のマッピング位置 総合評価 (any 、過剰コストスコア ) コストに問題あり (not(過少品質) 、過少コストスコア ) コストに問題あり (過少品質スコア 、any ) 品質に問題あり (過剰品質スコア 、not(過剰コスト) ) 品質に問題あり
8. The management operation evaluation system according to claim 7, wherein the comprehensive evaluation means obtains a comprehensive evaluation based on the following rules. [Rule] Mapping position on the parameter space Overall evaluation (any, excess cost score) Cost problem (not (under quality), under cost score) Cost problem (under quality score, any) Quality problem ( Excess quality score, not (excess cost)) There is a problem with quality
【請求項9】 前記総合評価手段は、各スコアに基づき
評価対象の改善優先度を評価して、総合評価を求めるこ
とを特徴とする請求項1乃至8のいずれか1項に記載の
管理業務の評価システム。
9. The management operation according to claim 1, wherein the comprehensive evaluation unit evaluates the improvement priority of the evaluation target based on each score to obtain a comprehensive evaluation. Rating system.
【請求項10】 所定の管理業務について、現行管理仕
様、基準管理仕様、現行コスト、業務実施状況を受け付
ける工程と、 現行管理仕様、基準管理仕様、業務実施状況とに少なく
とも基づき、前記所定の管理業務に関して品質を評価し
て、品質スコアを算出する品質評価工程と、 現行管理仕様、前記基準管理仕様、現行コストとに少な
くとも基づき、前記所定の管理業務に関してコストを評
価し、コストスコアを算出するコスト評価工程と、 前記算出した品質スコア及びコストスコアに基づいて、
前記所定の管理業務について総合評価を求める総合評価
工程と、を備えることを特徴とする施設維持に関する管
理業務の評価方法。
10. The predetermined management based on at least the process of receiving the current management specification, the standard management specification, the current cost, and the business execution status, and the current management specification, the standard management specification, and the business execution status for the predetermined management business. Based on at least the quality evaluation step of evaluating the quality of the work and calculating the quality score and the current management specification, the standard management specification, and the current cost, the cost is evaluated and the cost score is calculated for the predetermined management work. Based on the cost evaluation step and the calculated quality score and cost score,
A comprehensive evaluation step of requesting a comprehensive evaluation for the predetermined management operation, the method for evaluating the management operation relating to facility maintenance.
【請求項11】 前記品質評価工程は、 現行管理仕様と基準管理仕様との比較に基づき、現行管
理仕様が基準管理仕様をどの程度充足しているかを評価
対象として品質スコアを算出する工程、 現行管理仕様と業務実施状況との比較に基づき、実際に
行われている作業が現行管理仕様をどの程度充足してい
るかを評価対象として品質スコアを算出する工程、 業務実施状況に基づき、作業体制を評価対象として品質
スコアを算出する工程、 のうち少なくともいずれかを備えることを特徴とする請
求項10記載の管理業務の評価方法。
11. The quality evaluation step is a step of calculating a quality score by evaluating how much the current management specification satisfies the standard management specification based on a comparison between the current management specification and the standard management specification. Based on the comparison between the management specifications and the work implementation status, the process of calculating the quality score for the extent to which the actual work being performed satisfies the current management specifications, and the work structure based on the work implementation status The method according to claim 10, further comprising at least one of a step of calculating a quality score as an evaluation target.
【請求項12】 前記コスト評価工程は、 現行管理仕様と現行コストとに少なくとも基づき、現行
コストの妥当性を評価対象としてコストスコアを算出す
る工程、 基準管理仕様と現行コストとに少なくとも基づき、現行
コストの必要十分性を評価対象としてコストスコアを算
出する工程、 のうち少なくともいずれかを備えることを特徴とする請
求項10又は11記載の管理業務の評価方法。
12. The cost evaluation step is a step of calculating a cost score based on at least the current management specification and the current cost, with the adequacy of the current cost as an evaluation target, and based on at least the standard management specification and the current cost. 12. The method for evaluating management work according to claim 10, further comprising at least one of a step of calculating a cost score with the necessity of costs as an evaluation target.
【請求項13】 前記総合評価工程は、品質とコストの
2軸から成るパラメータ空間に前記算出した品質スコア
及びコストスコアをマッピングし、そのマッピング位置
に基づき総合評価を求めることを特徴とする請求項10
乃至12のいずれか1項に記載の管理業務の評価方法。
13. The comprehensive evaluation step is characterized in that the calculated quality score and cost score are mapped to a parameter space having two axes of quality and cost, and a comprehensive evaluation is obtained based on the mapping position. 10
13. The management operation evaluation method according to any one of 1 to 12.
【請求項14】 請求項10乃至13のいずれか一項に
記載の評価方法をコンピュータで実行させるためのプロ
グラム。
14. A program for causing a computer to execute the evaluation method according to any one of claims 10 to 13.
JP2001392163A 2001-12-25 2001-12-25 Management job evaluation system regarding maintenance of facility, its method, and management job evaluation program regarding maintenance of facility to be executed on a computer Pending JP2003196368A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001392163A JP2003196368A (en) 2001-12-25 2001-12-25 Management job evaluation system regarding maintenance of facility, its method, and management job evaluation program regarding maintenance of facility to be executed on a computer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001392163A JP2003196368A (en) 2001-12-25 2001-12-25 Management job evaluation system regarding maintenance of facility, its method, and management job evaluation program regarding maintenance of facility to be executed on a computer

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2007210855A Division JP2007293926A (en) 2007-08-13 2007-08-13 Method and system for evaluating management process regarding maintaining facility, and program executed on computer for evaluating management process regarding maintaining facility

Publications (1)

Publication Number Publication Date
JP2003196368A true JP2003196368A (en) 2003-07-11

Family

ID=27599562

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001392163A Pending JP2003196368A (en) 2001-12-25 2001-12-25 Management job evaluation system regarding maintenance of facility, its method, and management job evaluation program regarding maintenance of facility to be executed on a computer

Country Status (1)

Country Link
JP (1) JP2003196368A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006046415A1 (en) * 2004-10-27 2006-05-04 Re-Products Co., Ltd. Cleaning work estimating system, cleaning work estimating method, and cleaning work estimating program
KR101419708B1 (en) 2012-05-22 2014-07-15 김종수 Method and System For The Business Standardization Work
WO2022179446A1 (en) * 2021-02-26 2022-09-01 一智科技有限公司 Method and system for providing profile label for contractor

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006046415A1 (en) * 2004-10-27 2006-05-04 Re-Products Co., Ltd. Cleaning work estimating system, cleaning work estimating method, and cleaning work estimating program
JPWO2006046415A1 (en) * 2004-10-27 2008-05-22 リ・プロダクツ株式会社 Cleaning work estimation system, cleaning work estimation method, and cleaning work estimation program
KR101419708B1 (en) 2012-05-22 2014-07-15 김종수 Method and System For The Business Standardization Work
WO2022179446A1 (en) * 2021-02-26 2022-09-01 一智科技有限公司 Method and system for providing profile label for contractor

Similar Documents

Publication Publication Date Title
US9423989B2 (en) System and method for dynamically reconfiguring one or more autonomous cells in a print shop environment
Paleologo Price-at-risk: A methodology for pricing utility computing services
Faniran et al. Interactions between construction planning and influence factors
Ji et al. Data preprocessing–based parametric cost model for building projects: Case studies of Korean construction projects
US8285579B2 (en) Automatic determination and location of product support infrastructure resources
US20060277086A1 (en) System and method for optimization-based production capability planning
US20070136104A1 (en) Method for valuation of real and personal property
US20120109700A1 (en) Payroll System Optimization
Ustaoglu et al. Examining lag effects between industrial land development and regional economic changes: The Netherlands experience
JP6852015B2 (en) Vacancy rate estimation device and method and computer program
Tas et al. A building cost estimation model based on cost significant work packages
US20090276290A1 (en) System and method of optimizing commercial real estate transactions
Lawrence Negotiating due-dates between customers and producers
KR101134441B1 (en) Method and server system for economic evaluation of a shop in proposed site
Moyo et al. Work measurement techniques utilized by the building industry in the Midlands province of Zimbabwe
JP2003196368A (en) Management job evaluation system regarding maintenance of facility, its method, and management job evaluation program regarding maintenance of facility to be executed on a computer
JP2003242228A (en) Facility operation management system
Novak Comparison of managerial implications for utilization of variable costing and throughput accounting methods
JP2007293926A (en) Method and system for evaluating management process regarding maintaining facility, and program executed on computer for evaluating management process regarding maintaining facility
Herding et al. A rolling horizon planning approach for short-term demand supply matching
O’Kelly Applied retail location models using spatial interaction tools
Herding A short-term demand supply matching approach for semiconductor supply chains
JP2007079999A (en) Management system for apartment house
Chin et al. A project progress measurement and management system
CN116993116B (en) Distribution method and equipment for outsourcing human resources

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20041220

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070614

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20071011