JP2003129571A - Unit room - Google Patents

Unit room

Info

Publication number
JP2003129571A
JP2003129571A JP2001361758A JP2001361758A JP2003129571A JP 2003129571 A JP2003129571 A JP 2003129571A JP 2001361758 A JP2001361758 A JP 2001361758A JP 2001361758 A JP2001361758 A JP 2001361758A JP 2003129571 A JP2003129571 A JP 2003129571A
Authority
JP
Japan
Prior art keywords
unit
unit room
bolts
unit rooms
rooms
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2001361758A
Other languages
Japanese (ja)
Inventor
Shuichi Oku
修一 奥
Masaaki Mukai
正明 向井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2001361758A priority Critical patent/JP2003129571A/en
Publication of JP2003129571A publication Critical patent/JP2003129571A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To solve the problem that three is the problem that a large number of days on a construction and a construction cost are required for installing unit rooms in a conventional construction method, and there is a prefabricated type that unit rooms to some extent unit-built in a factory are carried at a site and built but there is a clearance for a truck (the clearance in a height of approximately 2,650 mm on the truck because of an overall height of 3,800 mm from a ground surface in the case of a four ton truck) and the unit rooms in a height exceeding the clearance is impossible. SOLUTION: In the unit rooms, the frames of the unit rooms are manufactured previously by a dividing into upper and lower sections by a steel frame material, patch plates or through-bolts are installed to the connecting sections of the upper and lower frames by a welding or the like, the frames of the unit rooms divided into the upper and lower sections are carried into the place of installation and the patch plates or the through-bolts for the connecting sections of the upper and lower frames are clamped mutually by bolts. In the unit rooms, when the unit rooms having wide floor areas are manufactured, the unit rooms are arranged in a horizontal one row and a plurality of the unit rooms are mounted and crossing steel plates connecting the patch plates or the through-bolts are clamped together mutually in the horizontal direction of the unit rooms.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、業務用の衣類洗濯
機を部屋内に並べて装備し、顧客に賃貸使用させる、い
わゆるコインランドリーや、スーパーの店舗などのユニ
ット部屋に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a so-called coin-operated laundry or a unit room such as a supermarket store, in which commercial clothes washing machines are arranged side by side in a room and used by a customer for rental.

【0002】[0002]

【従来の技術】従来、この種のユニット部屋は、設置場
所に礎石を打ち込んだ上に建材を持ち込み、設置場所の
現地で、いわゆる従来工法で建築するのが通常であっ
た。
2. Description of the Related Art Heretofore, in this type of unit room, it has been customary to drive a cornerstone into the installation site, bring in building materials, and construct it at the site of the installation site by the so-called conventional method.

【0003】[0003]

【発明が解決しようとする課題】この従来の工法では、
ユニット部屋の設置に多くの建設日数と建設コストがか
かる課題があった。また、ある程度、工場でユニット建
築したものを現地に持ち込んで建築するプレハブ方式の
ものもあるが、運送トラックの高さ制限があり(4トン
車の場合、地面よりの総高は3800mm、従って、ト
ラック上高さ約2650mmの制限)、その制限をこえ
る高さのユニット部屋は不可能であった。更に、この従
来の建築方法の場合、一度、建築が完了すると、移築す
ることは事実上不可能であった。
SUMMARY OF THE INVENTION In this conventional construction method,
There was a problem that it took many construction days and construction cost to install the unit room. Also, to some extent, there is a prefabricated type that is constructed by bringing a unit construction in the factory to the site, but there is a limit to the height of the transportation truck (in the case of a 4-ton car, the total height from the ground is 3800 mm, therefore, The height above the track was about 2650 mm), and a unit room with a height above that limit was impossible. Furthermore, in the case of this conventional construction method, once construction is completed, it is virtually impossible to relocate.

【0004】[0004]

【課題を解決するための手段】この課題を解決するため
の本発明の技術的手段は次の通りである。即ち、鉄骨材
でユニット部屋の枠組を、あらかじめ工場にて、上下に
分けて製作し、上下の枠組の接続部に溶接などによりパ
ッチ板、または、通しボルトを取りつけ、この上下に分
けたユニット部屋の枠組を設置場所に搬入し、上下の枠
組の接続部の前記のパッチ板、または、通しボルトを相
互に締結したことを特徴とするユニット部屋である。ま
た、床面積の広いユニット部屋を製作する場合には、横
一列にユニット部屋を並べて複数設置し、ユニット部屋
の横方向には上記のパッチ板、または、通しボルト間を
連結する渡り鋼板を相互に共締めしてなるユニット部屋
である。更に、ユニット部屋の上下の枠組に、あらかじ
め工場にて、外壁側には上下に繋ぎ目をS字または凹凸
嵌合する外壁材を取りつけ、内壁側には断熱ボードやク
ロスを張りつけて製作し、上下の枠組の接続部のパッチ
板または渡り鋼板をボルト接続した後に、この接続部を
プラスチックカバーなどで覆い隠した構成のユニット部
屋である。
The technical means of the present invention for solving this problem are as follows. That is, the frame of the unit room made of steel aggregate is divided into upper and lower parts in advance at the factory, and patch plates or through bolts are attached to the connection parts of the upper and lower frames by welding, etc. The unit room is characterized in that the framework of (1) is carried into the installation place, and the patch plates or through bolts at the connecting portions of the upper and lower frameworks are mutually fastened. Also, when manufacturing a unit room with a large floor area, multiple unit rooms are installed side by side in a row, and the patch plate described above or the crossover steel plate connecting the through bolts is installed in the horizontal direction of the unit room. It is a unit room that is tightened together. Furthermore, in the upper and lower frameworks of the unit room, in the factory, the outer wall side is fitted with an outer wall material with S-shaped joints or concave and convex fittings on the outer wall side, and a heat insulating board or cloth is attached to the inner wall side. It is a unit room that is constructed by bolting the patch plates or transition steel plates of the connection parts of the upper and lower frames and then covering the connection parts with a plastic cover or the like.

【0005】[0005]

【発明の実施の形態】以下、本発明の実施例を図面1〜
5に基ずいて説明する。図1は本発明のユニット部屋の
鉄骨材の枠組の斜視図である。図2は上下鉄骨材枠組の
接続部の詳細斜視図である。図3は単一のユニット部屋
を横一列に並べて設置した斜視図である。図4は内装、
外装を施した接続部の詳細断面図とその正面図である。
図5は上下鉄骨材枠組の接続部の他の実施例の詳細斜視
図である。以下、本発明の実施例の形態について説明す
る。図1〜5において、あらかじめ工場にて製作した鉄
骨材の上の枠組1と下の枠組2をあらかじめ工場にて製
作し、この上下の枠組1、2をユニット部屋Aの設置場
所に搬入し、設置場所のコンクリート基礎石3の上に下
の枠組2をボルト締結して取り付け、この下の枠組2の
上に上の枠組1を乗せ、接続部に水平に溶接したパッチ
板4、または、通しボルト6’を相互に合わせ、押さえ
板5などを挟んでボルト6とナット7で締結してユニッ
ト部屋Aを組み上げる。次に、床面積の広いユニット部
屋を製作する場合は、図2、図3、図5に示すように、
横一列にユニット部屋AとA’、A’’と複数並べ、パ
ッチ板4、または、通しボルト6’を横方向に連結する
渡り鋼板8を相互に共締めして製作するようになってい
る。更に、図4に詳細図示のように、ユニット部屋の上
下の枠組1、2にあらかじめ工場にて、外壁側には上下
に繋ぎ目9をS字または凹凸嵌合する外壁材10を取り
つけ、内壁側には断熱ボード11やクロス12を張りつ
けて製作し、上下の枠組1、2の接続部のパッチ板4を
渡り鋼板8とボルト6、ナット7で図4のように連結、
接続する。その接続後にプラスチックカバー13を被せ
てユニット部屋は完成される。尚、鉄骨材の上下の枠組
1、2の寸法は4トントラックに積載できるように、例
えば、図2、図3のL1寸法は約2650mm以下に
し、L2寸法を850mmにすれば、総高L=3500
mmのゆとりのあるユニット部屋が提供できる。また、
渡り鋼板8は本実施例では厚み15mm、横幅u=20
0mm、縦幅v=100mmである。図5は上下鉄骨材
枠組の接続部の他の実施例の詳細斜視図で、下枠組2に
図5のように、通しボルト6’をナット7止めし、これ
に、上枠組1を通して締結する実施例を示している。
BEST MODE FOR CARRYING OUT THE INVENTION Embodiments of the present invention will now be described with reference to the accompanying drawings.
A description will be given based on item 5. FIG. 1 is a perspective view of the framework of the steel frame material of the unit room of the present invention. FIG. 2 is a detailed perspective view of the connecting portion of the upper and lower steel frame members. FIG. 3 is a perspective view showing a single unit room arranged side by side in a row. Figure 4 shows the interior,
FIG. 3 is a detailed cross-sectional view of a connection part provided with an exterior and a front view thereof.
FIG. 5 is a detailed perspective view of another embodiment of the connecting portion of the upper and lower steel frame members. Embodiments of the present invention will be described below. 1 to 5, the upper frame 1 and the lower frame 2 of the steel frame material manufactured in advance in the factory are manufactured in the factory in advance, and the upper and lower frames 1 and 2 are carried into the installation place of the unit room A, The lower frame 2 is attached by bolting onto the concrete foundation stone 3 at the installation site, the upper frame 1 is placed on the lower frame 2, and the patch plate 4 horizontally welded to the connection part or through The unit room A is assembled by aligning the bolts 6 ′ with each other, and sandwiching the pressing plate 5 and the like and fastening them with the bolts 6 and the nuts 7. Next, when manufacturing a unit room with a large floor area, as shown in FIGS. 2, 3, and 5,
A plurality of unit rooms A, A ′, and A ″ are arranged in a horizontal row, and the patch plates 4 or the transition steel plates 8 that connect the through bolts 6 ′ in the horizontal direction are fastened together. . Further, as shown in detail in FIG. 4, the upper and lower frameworks 1 and 2 of the unit room are preliminarily factory-fitted with an outer wall member 10 having an S-shaped or concave-convex fitting joint 9 on the outer wall side. A heat insulation board 11 and a cloth 12 are attached to the side to manufacture the patch board 4 at the connecting portions of the upper and lower frames 1 and 2 and are connected with a steel plate 8 and bolts 6 and nuts 7 as shown in FIG.
Connecting. After the connection, the unit room is completed by covering the plastic cover 13. Note that the upper and lower frameworks 1 and 2 of the steel aggregate can be loaded on a 4-ton truck, for example, if the L1 dimension in FIGS. 2 and 3 is about 2650 mm or less and the L2 dimension is 850 mm, the total height L = 3500
A unit room with room of mm can be provided. Also,
In this embodiment, the transition steel plate 8 has a thickness of 15 mm and a width u = 20.
The length is 0 mm and the vertical width v is 100 mm. FIG. 5 is a detailed perspective view of another embodiment of the connecting portion of the upper and lower steel frame members. As shown in FIG. 5, the through bolt 6 ′ is fixed to the nut 7 by the lower frame member 2 and the upper frame member 1 is fastened thereto. An example is shown.

【0006】[0006]

【発明の効果】以上説明したように、本発明のユニット
部屋は、あらかじめ工場にて、上下に分けた枠組を製作
し、下の枠組の高さを例えば約2650mm以下にする
ことにより、4トントラック車で運搬可能になる。ま
た、ほとんどの部材を工場にて製作可能で、あらかじめ
工場にて製作された上下枠組の部材などを設置場所に搬
入し、現場では組み立て作業のみにて作業が完了する。
従って、建設日数の大幅な短縮とコストの削減が実現で
きる。更に、上下の枠組の組み立ては、接続部のパッチ
板、または、通しボルトをボルト止めするだけで堅固に
組み立てできると共に、横一列にユニット部屋を並べて
複数設置することも容易にできる。また、移築する場合
には、それぞれの取りつけボルトを外すだけで分解でき
て、極めて簡単に移築できるメリットがある。尚、枠組
の外壁、内壁をあらかじめ取りつけておけば、更に一層
の日数短縮とコスト低減の効果を発揮する。外壁にはそ
の接続突き合わせ部に、S字または凹凸嵌合溝を設けて
雨水の侵入を防止している。また、接続部のパッチ板は
プラスチックカバーで覆い隠すなどのデザイン上の配慮
もしているなど、数々の効果を発揮したユニット部屋が
提供できる。
As described above, in the unit room of the present invention, the upper and lower frames are manufactured in advance in the factory, and the height of the lower frame is set to, for example, about 2650 mm or less. It can be transported by car. In addition, most of the members can be manufactured in the factory, and the members of the upper and lower frameworks manufactured in the factory in advance are brought into the installation site, and the work is completed only by the assembly work on site.
Therefore, it is possible to significantly reduce the number of construction days and cost. Further, the upper and lower frames can be assembled firmly by simply fastening the patch plate of the connecting portion or the through bolts, and it is also possible to easily install a plurality of unit rooms in a horizontal row. Also, when relocating, it can be disassembled simply by removing the respective mounting bolts, which has the advantage of being extremely easy to relocate. If the outer wall and the inner wall of the frame are attached in advance, the effect of further shortening the number of days and the cost can be achieved. The outer wall is provided with an S-shaped or concave-convex fitting groove at its connection butting portion to prevent rainwater from entering. In addition, the patch board of the connection part is covered with a plastic cover to make it possible to provide a unit room with many effects.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明実施例ユニット部屋の鉄骨材枠組の斜視
図である。
FIG. 1 is a perspective view of a steel frame in a unit room according to an embodiment of the present invention.

【図2】本発明実施例ユニット部屋の上下鉄骨材枠組の
接続部の詳細斜視図である。
FIG. 2 is a detailed perspective view of a connecting portion of the upper and lower steel aggregate frames in the unit room of the embodiment of the present invention.

【図3】本発明実施例の単一のユニット部屋を横一列に
並べて設置した斜視図である。
FIG. 3 is a perspective view of a single unit room according to the embodiment of the present invention, which is installed side by side in a row.

【図4】本発明実施例ユニット部屋の内装、外装を施し
た接続部の詳細断面図とその正面図である。
FIG. 4 is a detailed cross-sectional view and a front view of a connecting portion provided with interior and exterior of a unit room of an embodiment of the present invention.

【図5】本発明の上下鉄骨材枠組の接続部の他の実施例
の詳細斜視図である。
FIG. 5 is a detailed perspective view of another embodiment of the connecting portion of the upper and lower steel frame members of the present invention.

【符号の説明】[Explanation of symbols]

1 上の枠組 2 下の枠組 3 コンクリート基礎石 4 パッチ板 5 押さえ板 6 ボルト 6’通しボルト 7 ナット 8 渡り鋼板 9 外壁の繋ぎ目 10 外壁材 11 断熱ボード 12 クロス 13 プラスチックカバー 1 upper framework 2 Lower framework 3 concrete foundation stone 4 patch boards 5 holding plate 6 bolts 6'through bolt 7 nuts 8 Transition steel plate 9 Joints of outer walls 10 Outer wall material 11 Insulation board 12 cross 13 plastic cover

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】業務用の衣類洗濯機を部屋内に並べて装備
し、顧客に賃貸使用させる、いわゆるコインランドリー
や小さな店舗などのユニット部屋において、鉄骨材でユ
ニット部屋の枠組を、あらかじめ工場にて、上下に分け
て製作し、上下の枠組の接続部に溶接などによりパッチ
板、または、通しボルトを取りつけ、この上下に分けた
ユニット部屋の枠組を設置場所に搬入し、上下の枠組の
接続部の前記のパッチ板、または、通しボルトを相互に
締結したことを特徴とするユニット部屋。
1. In a unit room such as a so-called coin laundry or a small store, in which commercial clothes washing machines are arranged side by side in a room and used by a customer for rent, a frame of the unit room is made of steel frame in advance at a factory. It is manufactured separately in the upper and lower parts, patch plates or through bolts are attached to the connection parts of the upper and lower frameworks by welding, etc., and the frame parts of the upper and lower unit rooms are carried into the installation place, and the connection parts of the upper and lower frame parts are connected. A unit room characterized in that the patch plate or the through bolt is fastened to each other.
【請求項2】ユニット部屋を横一列に並べて複数設置
し、ユニット部屋の横方向には上記のパッチ板または、
通しボルト間を連結する渡り鋼板を相互に共締めしてな
る請求項1に記載のユニット部屋。
2. A plurality of unit rooms are arranged side by side in a row, and the patch plate or the above is arranged in the lateral direction of the unit room.
The unit room according to claim 1, wherein the transition steel plates that connect the through bolts are fastened together.
【請求項3】ユニット部屋の上下の枠組に、あらかじめ
工場にて、外壁側には上下に繋ぎ目をS字または凹凸嵌
合する外壁材を取りつけ、内壁側には断熱ボードやクロ
スを張りつけて製作し、上下の枠組の接続部のパッチ板
または渡り鋼板をボルト接続した後に、この接続部をプ
ラスチックカバーなどで覆い隠した請求項1、または請
求項2に記載のユニット部屋。
3. The upper and lower frameworks of the unit room are preliminarily factory fitted with outer wall materials having S-shaped joints or concave and convex fittings on the outer wall side and a heat insulating board or cloth attached to the inner wall side in advance. The unit room according to claim 1 or 2, wherein the unit room is manufactured, and after connecting the patch plate or the transition steel plate of the connecting portion of the upper and lower frames by bolts, the connecting portion is covered with a plastic cover or the like.
JP2001361758A 2001-10-22 2001-10-22 Unit room Pending JP2003129571A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001361758A JP2003129571A (en) 2001-10-22 2001-10-22 Unit room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001361758A JP2003129571A (en) 2001-10-22 2001-10-22 Unit room

Publications (1)

Publication Number Publication Date
JP2003129571A true JP2003129571A (en) 2003-05-08

Family

ID=19172362

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001361758A Pending JP2003129571A (en) 2001-10-22 2001-10-22 Unit room

Country Status (1)

Country Link
JP (1) JP2003129571A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016069849A (en) * 2014-09-29 2016-05-09 日本トレクス株式会社 Fabricated house
JP2016069876A (en) * 2014-09-29 2016-05-09 日本トレクス株式会社 Fabricated house
CN109235904A (en) * 2018-10-19 2019-01-18 科能源科技(天津)有限公司 A kind of building block unit assembly mold

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2016069849A (en) * 2014-09-29 2016-05-09 日本トレクス株式会社 Fabricated house
JP2016069876A (en) * 2014-09-29 2016-05-09 日本トレクス株式会社 Fabricated house
CN109235904A (en) * 2018-10-19 2019-01-18 科能源科技(天津)有限公司 A kind of building block unit assembly mold
CN109235904B (en) * 2018-10-19 2019-12-03 一科能源科技(天津)有限公司 A kind of building block unit assembly mold

Similar Documents

Publication Publication Date Title
US8359797B2 (en) Structure constructed using precast members and method of constructing the same
JP2003129571A (en) Unit room
CA2452963A1 (en) Apparatus and method for assembling a press box through the use of modular componentry
KR100786711B1 (en) Non-support concrete slab form system combined with ceiling finish
JPH0971946A (en) Foundation
JP3887217B2 (en) Unit building
WO2006001222A1 (en) Three-dimensional structure
KR101437083B1 (en) Method for constructing steel structure building with easy assembly
JP2003074122A (en) Unit building and expansion unit
KR102090676B1 (en) Industrialization house and construction method thereof
JP2012202051A (en) Mixed structure building and method for constructing the same
KR200234163Y1 (en) Construction structure of pillar for building structure
JP5467935B2 (en) Mixed structure unit type building and construction method of mixed structure unit type building
JP4044676B2 (en) Unit building
JP3451274B2 (en) Soil unit and integrated prefabricated house unit
KR20220111082A (en) Composite frame with end-buried girder joint
JPH0790929A (en) Construction method of src beam
JP2001020386A (en) Beam connection structure
JPH084233A (en) Fabricated stairs
JP3830627B2 (en) Joint structure of reinforced concrete columns and beams
JP2552781B2 (en) Roof unit manufacturing method
JP2558889Y2 (en) garage
JPH10317388A (en) Partition foundation for concrete building
JP3096213U (en) Reusable prefabricated unit house and foundation
KR200200412Y1 (en) A truss assembly structure of steel material hous