JP2003119778A - Tip shoe for steel pipe pile - Google Patents

Tip shoe for steel pipe pile

Info

Publication number
JP2003119778A
JP2003119778A JP2001318561A JP2001318561A JP2003119778A JP 2003119778 A JP2003119778 A JP 2003119778A JP 2001318561 A JP2001318561 A JP 2001318561A JP 2001318561 A JP2001318561 A JP 2001318561A JP 2003119778 A JP2003119778 A JP 2003119778A
Authority
JP
Japan
Prior art keywords
tip
steel pipe
bottom plate
pipe pile
blade
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2001318561A
Other languages
Japanese (ja)
Other versions
JP3555886B2 (en
Inventor
Katsuhide Nitta
勝秀 新田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KOORIYAMA SAKUI KOGYO KK
Original Assignee
KOORIYAMA SAKUI KOGYO KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KOORIYAMA SAKUI KOGYO KK filed Critical KOORIYAMA SAKUI KOGYO KK
Priority to JP2001318561A priority Critical patent/JP3555886B2/en
Publication of JP2003119778A publication Critical patent/JP2003119778A/en
Application granted granted Critical
Publication of JP3555886B2 publication Critical patent/JP3555886B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a tip shoe for a steel pipe pile which can be used for quickly building a tip pile on the job site by assembling a tip pile by realizing an effective rotating excavating force by suppressing the resistance given to the tip edge surface even in a hard soil layer. SOLUTION: Straight two through slits 11 crossing at right angle at the center are provided; two excavating blades 2 as a pair are inserted to the through slits, coupled to the through slits, assembled to a cross-shaped shaft section, inserted to through slits and fixed on a bottom plate 1 by fitting the notched portion 10a provided at the outer peripheral edge 10 to the protruded edge portion 30a of the tip edge surface 30 of the steel pipe pile 3 and the blades are formed to converge at the tip intersecting portion 24. Also, at the time of conformity, the protruded edge portion of the steel pipe pile is extended from the bottom plate, and the outer peripheral portion of the blade body portion can be linked to the protruded edge portion if this is necessary. In addition, each of excavating blade can be inserted to each through slit from the opposite side of the bottom plate.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本願発明は、鋼管杭の先端に取り
付け固定する鋼管杭用の先端シューに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a tip shoe for a steel pipe pile mounted and fixed to the tip of the steel pipe pile.

【0002】[0002]

【従来の技術とその課題】従来から、鋼管杭を回転させ
て支持地盤に食い込ませる杭打ち工法に用いる鋼管杭用
の先端シューとしては、種々形状の羽根金具を鋼管杭の
先端に固着したものがある。しかしながら、従来の先端
シューは打設抵抗が大きく固い土質層に当たると鋼管杭
の先端に加わる抵抗が極度に増大して、打設不可能に陥
ったり鋼管杭の損傷を招いたりしていた。また、打設時
に杭周辺の地盤を乱すものが多く、打設後においては摩
擦抵抗による鋼管杭の地盤支持力が得られ難かった。特
に鋼管杭の先端シューの強度が低いと、先端シューの軸
線が鋼管杭の軸線に対して傾いてしまうことも原因の一
つとされていた。
2. Description of the Related Art Conventionally, a tip shoe for a steel pipe pile used in a pile driving method in which a steel pipe pile is rotated to bite into a supporting ground, a blade fitting of various shapes is fixed to the tip of the steel pipe pile. There is. However, when the conventional tip shoe hits a hard soil layer with a high driving resistance, the resistance applied to the tip of the steel pipe pile is extremely increased, which causes the impossibility of driving and damage to the steel pipe pile. In addition, there are many things that disturb the ground around the pile during driving, and it was difficult to obtain the ground bearing capacity of the steel pipe pile due to frictional resistance after driving. Particularly, if the strength of the tip shoe of the steel pipe pile is low, the axis of the tip shoe may be inclined with respect to the axis of the steel pipe pile.

【0003】また、これら先端シュー固定用の鋼管杭
は、延長用の中間用杭とは別仕様で、先端用杭として別
個に製造されるのが一般的であるため、工事現場の仕様
に合わせた本数の先端用杭と中間用杭とを予め用意して
おく必要があった。しかし、実際にはいずれか一方に過
不足が起きたり、破損したりして補充や返品などの煩雑
な面があった。
Further, the steel pipe piles for fixing the tip shoes have different specifications from the extension piles for intermediate use, and are generally manufactured separately as the piles for tip ends, so that they are matched to the specifications at the construction site. It was necessary to prepare in advance a number of piles for the tip and piles for the middle. However, in reality, one of them has an excess or deficiency or is damaged, and there is a complicated aspect such as replenishment or return.

【0004】[0004]

【目的】そこで、本願発明は上記課題に鑑みて為された
ものであっで、固い土質層においても先端縁面に受ける
抵抗を少なく抑えて有効な回転掘削力を発揮させると共
に、先端シューを組み付け構造とすることにより、現場
で迅速に先端用杭を構成することができる運搬性と取扱
性に優れた新規な鋼管杭用の先端シューを提供するもの
である。
[Purpose] Therefore, the present invention has been made in view of the above problems, and even in a hard soil layer, the resistance received on the tip edge surface can be suppressed to a small extent to exhibit an effective rotary excavating force, and the tip shoe can be assembled. By providing a structure, a novel tip shoe for a steel pipe pile is provided which is capable of quickly constructing a pile for a tip on site and is excellent in transportability and handleability.

【0005】[0005]

【課題を解決するための手段】上記問題を解決する本願
発明は以下のように構成される。すなわち、請求項1で
は、中央で直交した直線状の2本の貫通スリット(1
1)を有し、外周縁(10)が鋼管杭(3)の先端縁面
(30)に嵌合して固定する底板(1)と、該底板
(1)における上記2本の貫通スリット(11)に所定
長さまで挿入して軸断面十字状に組み合わせて固定する
と共に、先端交差部(24)で収束するように形成した
2枚一対からなる掘削刃(2)と、からなることを特徴
とする。
The present invention which solves the above problems is configured as follows. That is, in claim 1, two linear through slits (1
1), the outer peripheral edge (10) of which is fitted and fixed to the tip edge surface (30) of the steel pipe pile (3), and the two through slits (1) in the bottom plate (1). 11) Inserted to a predetermined length, combined and fixed in a cross shape in the axial cross section, and composed of a pair of two excavating blades (2) formed so as to converge at the tip intersection (24). And

【0006】請求項2では、請求項1記載の底板(1)
の外周縁(10)と鋼管杭(3)の先端縁面(30)と
の嵌合において、鋼管杭(3)の先端縁面(30)の突
出縁部(30a)を、底板(1)の外周縁(10)に設
けた切欠き部(10a)と適合するように形成したこと
を特徴とする。
In the second aspect, the bottom plate (1) according to the first aspect.
When fitting the outer peripheral edge (10) of the steel pipe pile (3) with the tip edge surface (30) of the steel pipe pile (3), the protruding edge portion (30a) of the tip edge surface (30) of the steel pipe pile (3) is replaced with the bottom plate (1). It is characterized in that it is formed so as to fit with the notch (10a) provided on the outer peripheral edge (10).

【0007】請求項3では、請求項2記載の底板(1)
の外周縁(10)の切欠き部(10a)と適合する突出
縁部(30a)を、適合時に底板(1)よりも延出する
ように形成して、底板(1)に挿入された掘削刃(2)
の刃体部(20a、22a)の外周部と突出縁部(30
a)を係合するように構成したことを特徴とする。
In the third aspect, the bottom plate (1) according to the second aspect.
The protruding edge portion (30a) that fits with the cutout portion (10a) of the outer peripheral edge (10) of the blade is formed so as to extend beyond the bottom plate (1) when fitted, and the drilling is inserted into the bottom plate (1). Blade (2)
Of the blade body (20a, 22a) and the projecting edge (30
It is characterized in that it is configured to engage a).

【0008】請求項4では、請求項1記載の該底板
(1)の直交した直線状の各貫通スリット(11)への
2枚一対からなる掘削刃(2)の挿入において、2枚一
対の掘削刃(2)で底板(1)を挟持するように、掘削
刃(2)のそれぞれを底板(1)の反対側から挿入して
組み合わせたことを特徴とする。
According to a fourth aspect of the present invention, when inserting the pair of two excavating blades (2) into the orthogonal linear through slits (11) of the bottom plate (1) of the first aspect, the pair of two blades is inserted. Each of the digging blades (2) is inserted from the opposite side of the bottom plate (1) so as to sandwich the bottom plate (1) between the digging blades (2), and is combined.

【0009】[0009]

【作用】上記構成により本願発明は以下の作用を奏す
る。すなわち、請求項1によれば先端交差部で収束する
掘削刃が、貫通スリットを介して底板に固定される。ま
た、請求項2によれば掘削刃が鋼管杭の外径まで延びる
ため鋼管杭の打設抵抗が少ない。さらに、請求項3によ
れば掘削刃が鋼管杭の先端縁面の突出縁部に係合するた
め、掘削刃の固定強度が向上して、鋼管杭が打設不可能
に陥ったり、損傷や横滑りの発生が抑制される。加え
て、請求項4によれば底板が2枚の掘削刃により挟持さ
れるため底板の強度が向上し、鋼管杭の打設後における
地盤支持力も長期間維持される。
With the above structure, the present invention has the following effects. That is, according to the first aspect, the excavating blade that converges at the tip crossing portion is fixed to the bottom plate through the through slit. Further, according to the second aspect, since the excavating blade extends to the outer diameter of the steel pipe pile, the driving resistance of the steel pipe pile is small. Further, according to claim 3, since the excavating blade engages with the protruding edge portion of the tip edge surface of the steel pipe pile, the fixing strength of the excavating blade is improved, and the steel pipe pile falls into the impossibility of mounting, damage or damage. The occurrence of skidding is suppressed. In addition, according to the fourth aspect, since the bottom plate is sandwiched by the two excavating blades, the strength of the bottom plate is improved, and the ground supporting force after the steel pipe pile is placed is maintained for a long period of time.

【0010】[0010]

【発明の実施の形態】次に、本願発明に係る鋼管杭用の
先端シューの具体的実施形態例について図面に基づき詳
細に説明する。図1は本実施形態例1の先端シューの外
観斜視図であり、図2は本実施形態例1の先端シューの
組み立て状態を示す分解斜視図であり、図3は本実施形
態例1の先端シューの鋼管杭への取り付け状態を示す斜
視図であり、図4は本実施形態例1の先端シューの鋼管
杭への取り付け状態を示す一部切り欠き斜視図である。
なお、図面は実際の使用形態を考慮して、先端シューを
下向きとして描いており、以下の記載で用いる方向性は
説明の便宜上図面を基準としているが、これにより本願
発明を限定するものではない。
BEST MODE FOR CARRYING OUT THE INVENTION Next, specific embodiments of a tip shoe for a steel pipe pile according to the present invention will be described in detail with reference to the drawings. 1 is an external perspective view of the tip shoe of the first embodiment example, FIG. 2 is an exploded perspective view showing an assembled state of the tip shoe of the first embodiment example, and FIG. 3 is a tip of the first embodiment example. It is a perspective view which shows the attachment state to the steel pipe pile of a shoe, and FIG. 4 is a partially cutaway perspective view which shows the attachment state to the steel pipe pile of the tip shoe of this Embodiment 1.
It should be noted that the drawings are drawn with the tip shoe facing downward in consideration of the actual usage form, and the directionality used in the following description is based on the drawings for convenience of explanation, but this does not limit the present invention. .

【0011】[0011]

【実施形態例1】本実施形態の鋼管杭用の先端シューS
(以下「先端シュー」と省略。)は、鋼管杭3の先端に
取り付け固定するものであり、略円盤状の底板1と、先
端交差部24において収束する形状を有する平板状の2
枚の掘削刃2(2A、2B)とから構成している。
[Embodiment 1] Tip shoe S for steel pipe pile of the present embodiment
(Hereinafter abbreviated as “tip shoe”) is attached and fixed to the tip of the steel pipe pile 3, and has a substantially disc-shaped bottom plate 1 and a flat plate-shaped 2 having a shape that converges at the tip intersection portion 24.
It is composed of one excavating blade 2 (2A, 2B).

【0012】鋼管杭3の基本的な材質および形状は従来
品と同様であるが、その先端縁面30(図面においては
下端面)には底板1の板厚分より若干大きく突出させた
突出縁部30aを形成している。この突出縁部30a
は、鋼管杭3の軸心から中心角略90度の範囲で対向す
る2カ所を連峰状に突出させて形成している。
The basic material and shape of the steel pipe pile 3 are the same as those of the conventional product, but the tip edge surface 30 (the lower end surface in the drawing) of the steel pipe pile 3 has a projecting edge slightly projected from the thickness of the bottom plate 1. The portion 30a is formed. This protruding edge portion 30a
Is formed by projecting two opposing portions in a range of a central angle of approximately 90 degrees from the axial center of the steel pipe pile 3 in a mountainous manner.

【0013】底板1は、鋼管杭3の外径と略同一径の鋼
製円盤であり、その外周縁10には上記突出縁部30a
と嵌合する切欠き部10aを形成している。また、底板
1には、上下に貫通した2本の直線状のスリットを中央
付近で直交させて平面視十字状とした貫通スリット11
を形成している。該貫通スリット11は、底板1の直径
の2/3〜3/4程度の長さを有すると共に、掘削刃2
A、2Bの板厚程度の溝幅を有し、上記切欠き部10a
の切欠き端面10bに沿う位置に形成している。
The bottom plate 1 is a steel disk having a diameter substantially the same as the outer diameter of the steel pipe pile 3, and the outer peripheral edge 10 thereof has the protruding edge portion 30a.
A notch portion 10a that fits with is formed. Further, the bottom plate 1 has a penetrating slit 11 which has two linear slits penetrating vertically and which are orthogonal to each other in the vicinity of the center so as to have a cross shape in a plan view.
Is formed. The through slit 11 has a length of about 2/3 to 3/4 of the diameter of the bottom plate 1, and the drilling blade 2
The notch portion 10a has a groove width of about A and 2B.
It is formed at a position along the notched end face 10b.

【0014】2枚の掘削刃2A、2Bは、鋼製で略三角
形板状に形成し、先端側を鋼管杭3の軸心線に一致させ
て軸断面十字状となるように組み合わせている。各掘削
刃2A、2Bは、それぞれ刃体部20a、21aと幹部
20b、21bとの構成部分から成る。
The two digging blades 2A and 2B are made of steel and formed into a substantially triangular plate shape, and are combined so that the tip end side thereof is aligned with the axial center line of the steel pipe pile 3 so that the axial cross section has a cross shape. Each of the excavating blades 2A and 2B is made up of constituent parts of blade bodies 20a and 21a and trunks 20b and 21b.

【0015】一方の掘削刃2Aの刃体部20aは、その
先端側を二等辺三角形の先端角(本実施例では90度)
に形成し、先端角の対辺(先端角を挟む二等辺の底辺部
を結ぶ線分)の長さ(掘削刃2Aの最大幅)は底板1の
直径に略一致させると共に、貫通スリット11の溝幅に
適合する厚さを有している。また、掘削刃2Aの幹部2
0bは、上記対辺から連続して形成しており、前記貫通
スリット11に適合して貫通し得る幅と高さをもった矩
形状としている。さらに、幹部20bの上端の幅中央部
から刃体部20aに向かって所定長さの直交用スリット
20cを形成して、掘削刃2Bと交差状態で組み合わせ
ができるようにしている。
The blade body 20a of one of the excavating blades 2A has an isosceles triangular tip angle (90 degrees in this embodiment) on the tip side.
The length (maximum width of the excavating blade 2A) of the opposite side of the tip angle (the line segment connecting the bases of the isosceles sandwiching the tip angle) is made substantially equal to the diameter of the bottom plate 1, and the groove of the through slit 11 is formed. It has a thickness that matches the width. In addition, the digging blade 2A executive 2
0b is formed continuously from the opposite side, and has a rectangular shape having a width and a height that can fit and penetrate the through slit 11. Further, an orthogonal slit 20c having a predetermined length is formed from the center of the width at the upper end of the trunk portion 20b toward the blade body portion 20a so that it can be combined with the excavating blade 2B in an intersecting state.

【0016】他方の掘削刃2Bの刃体部21aは、その
先端側を二等辺三角形の先端角(本実施例では90度)
に形成し、先端角の対辺(先端角を挟む二等辺の底辺部
を結ぶ線分)の長さ(掘削刃2Bの最大幅)は前記貫通
スリット11の長さに略一致させると共に、貫通スリッ
ト11の溝幅に適合する厚さを有している。また、刃体
部21aの先端から幹部21b側に向かって所定長さの
直交用スリット21cを形成して、掘削刃2Aと交差状
態で組み合わせができるようにしている。掘削刃2Bの
幹部21bは、刃体部21aに連続して形成し、鋼管杭
3の内径に略一致させた幅と所定の高さをもった矩形状
に形成している。
The blade body portion 21a of the other excavating blade 2B has an isosceles triangular tip angle (90 degrees in this embodiment) on the tip side.
The length (maximum width of the excavating blade 2B) of the opposite side of the tip angle (the line segment connecting the bases of the isosceles sandwiching the tip angle) is made substantially equal to the length of the through slit 11, and the through slit is formed. It has a thickness adapted to the groove width of 11. Further, the orthogonal slit 21c having a predetermined length is formed from the tip of the blade body portion 21a toward the trunk portion 21b side so that it can be combined with the excavating blade 2A in an intersecting state. The trunk portion 21b of the excavating blade 2B is formed continuously with the blade body portion 21a, and is formed in a rectangular shape having a width substantially matching the inner diameter of the steel pipe pile 3 and a predetermined height.

【0017】[0017]

【本実施形態例1の作用】上記構成により、底板1と2
枚の掘削刃2A、2Bとの組み合わせは、図2に示すよ
うに、先ず、掘削刃2Aの幹部20bを底板1の下面側
から貫通スリット11に差し込んで刃体部20aの底辺
側を底板1に当接させ、掘削刃2Aにより底板1の下面
12を保持する。次いで、掘削刃2Bの刃体部21bを
底板1の上面側から貫通スリット11に差し込んで幹部
21bを底板1に当接させると共に、刃体部21bの直
交用スリット21cと前記掘削刃2Aの刃体部20aの
直交用スリット20cとを対向交差するようにして当接
するまで挿入し、互いの当接部を溶接して保持する。な
お、底板1への2枚の掘削刃2A、2Bの取り付け順
は、いずれが先であってもよい。
[Operation of Embodiment 1] With the above-mentioned structure, the bottom plates 1 and 2 are
As shown in FIG. 2, the combination of the two drilling blades 2A and 2B is performed by first inserting the trunk portion 20b of the drilling blade 2A into the through slit 11 from the lower surface side of the bottom plate 1 and placing the bottom side of the blade body portion 20a at the bottom plate 1. And the lower surface 12 of the bottom plate 1 is held by the excavating blade 2A. Then, the blade body portion 21b of the excavating blade 2B is inserted into the through slit 11 from the upper surface side of the bottom plate 1 to bring the stem portion 21b into contact with the bottom plate 1, and the orthogonal slit 21c of the blade body portion 21b and the blade of the excavating blade 2A. The orthogonal slit 20c of the body portion 20a is inserted so as to be opposed to each other and abutted, and the abutting portions thereof are welded and held. It should be noted that the two excavating blades 2A, 2B may be attached to the bottom plate 1 in any order.

【0018】そしてこれらを、鋼管杭3の先端縁面30
に形成した突出縁部30aと底板1の切欠き部10aを
適合させて溶接することにより先端用の鋼管杭3を構成
する(図3、図4)。このようにして構成された先端シ
ューSは、2枚の掘削刃2A、2Bが、底板1の上下両
面から組み合わされるので、先端側が補強されて強度向
上が図られる。また、掘削刃2Aの刃体部20aの両端
部は、突出縁部30aに係合した状態で溶接されるので
掘削刃2Aの強度が増し、結果として先端シューSの強
度が高められることになる。
[0018] And these, the tip edge surface 30 of the steel pipe pile 3
The steel pipe pile 3 for the tip is configured by adapting and welding the projecting edge portion 30a formed on the above and the notch portion 10a of the bottom plate 1 (FIGS. 3 and 4). In the tip shoe S thus configured, the two excavating blades 2A and 2B are combined from the upper and lower surfaces of the bottom plate 1, so that the tip side is reinforced and the strength is improved. Further, since both ends of the blade body portion 20a of the excavating blade 2A are welded in a state of being engaged with the projecting edge portion 30a, the strength of the excavating blade 2A is increased, and as a result, the strength of the tip shoe S is increased. .

【0019】一方、掘削刃2Bの幹部21bの両端部
は、鋼管杭3に内接しているので鋼管杭3の強度が高め
られる。掘削刃2A、2Bと底板1の組み合わせ、およ
び先端シューSと鋼管杭3の先端縁面30との位置決め
の容易さにより製品精度を上げることができる。また、
鋼管杭3の施工機械Mによる鋼管杭3の軸回転を伴う打
設においては、固い土質層Gにおいても尖った掘削刃2
により先端縁面30に受ける抵抗を少なく抑えられ、先
端シューSが取り付けられた鋼管杭3が打設不可能に陥
ったり、損傷や横滑りを生じることがなく作業性に優
れ、鋼管杭3の打設後においては底板1が平坦であるた
め地盤支持力が長期間維持される(図5)。
On the other hand, since both ends of the trunk portion 21b of the excavating blade 2B are inscribed in the steel pipe pile 3, the strength of the steel pipe pile 3 is enhanced. Product accuracy can be improved by the combination of the digging blades 2A, 2B and the bottom plate 1 and the ease of positioning the tip shoe S and the tip edge surface 30 of the steel pipe pile 3. Also,
In the placement of the steel pipe pile 3 by the construction machine M with the axial rotation of the steel pipe pile 3, even the hard soil layer G has a sharp drilling blade 2
As a result, the resistance received on the tip edge surface 30 can be suppressed to a low level, the steel pipe pile 3 with the tip shoe S attached cannot fall into place, and there is no damage or skidding, which is excellent in workability, and the steel pipe pile 3 can be driven. Since the bottom plate 1 is flat after installation, the ground supporting force is maintained for a long time (FIG. 5).

【0020】[0020]

【実施形態例2】本実施形態例2では、組み合わせる掘
削刃の組み合わせ方の変形例を示すもので、前記実施形
態例1で用いた掘削刃2Bに代えて、掘削刃2Aにおけ
る直交用スリット22cを刃体部22a側に形成した掘
削刃2Cと、掘削刃2Aとを交差挿入して組み合わせた
ものである。その後に、各幹部20b、22bを直交さ
せた状態で底板1の貫通スリット11に下面側から挿入
してそれぞれを固着させる。かかる本実施形態例2の構
成では、掘削刃2Aと掘削刃2Cの双方の刃体部20
a、22aの両端部が、それぞれ回転時に突出縁部30
aと当接することになるため、4点支持となってより回
転時の補強が図られることになる(図6)。
[Embodiment 2] This Embodiment 2 shows a modified example of a combination of excavating blades to be combined. Instead of the excavating blade 2B used in Embodiment 1, the orthogonal slit 22c in the excavating blade 2A is used. The digging blade 2C formed on the side of the blade body 22a and the digging blade 2A are cross-inserted and combined. After that, the trunk portions 20b and 22b are inserted into the through slit 11 of the bottom plate 1 from the lower surface side in a state of being orthogonal to each other and fixed to each other. In the configuration of the present second embodiment example, the blade body portions 20 of both the drilling blade 2A and the drilling blade 2C are provided.
Both ends of a and 22a have protruding edges 30 when rotating.
Since it comes into contact with a, it serves as a four-point support and can be reinforced during rotation (FIG. 6).

【0021】[0021]

【実施形態例3】本実施形態例3では、組み合わせる掘
削刃の組み合わせ方の変形例を示すもので、前記実施形
態例1で用いた掘削刃2Aに代えて、掘削刃2Bにおけ
る直交用スリット23cを幹部23b側に形成した掘削
刃2Dと、掘削刃2Bとを交差挿入して組み合わせたも
のである。その後に、各幹部21b、23bを直交させ
た状態で底板1の貫通スリット11に上面側から挿入し
てそれぞれを固着させる。かかる本実施形態例3の構成
では、掘削刃2Bと掘削刃2Dの双方の幹部21b、2
3bの各両端部が、鋼管杭3に4箇所で内接することに
より、打設における回転時の補強が図られることになる
(図7)。
[Embodiment 3] This Embodiment 3 shows a modified example of how to combine the excavating blades to be combined. Instead of the excavating blade 2A used in Embodiment 1, the orthogonal slit 23c in the excavating blade 2B is used. The digging blade 2D formed on the side of the trunk portion 23b and the digging blade 2B are cross-inserted and combined. After that, the trunks 21b and 23b are inserted into the through slit 11 of the bottom plate 1 from the upper surface side in a state of being orthogonal to each other, and the trunks 21b and 23b are fixed to each other. In the configuration of the third embodiment, the trunks 21b, 2b of both the digging blade 2B and the digging blade 2D are provided.
Since both ends of 3b are inscribed in the steel pipe pile 3 at four locations, reinforcement during rotation during driving is achieved (Fig. 7).

【0022】[0022]

【効果】以上の構成を有する本願発明に係る鋼管杭用の
先端シューは、以下の効果を奏するものである。すなわ
ち、固い土質層においても先端縁面に受ける抵抗を少な
く抑えることができるため、鋼管杭が打設不可能に陥っ
たり、損傷や横滑りを生じ難くなるため作業性に優れ、
また、鋼管杭の打設後においては底板が平坦面であるた
め大きな地盤支持力を長期間維持することが可能とな
る。
[Effect] The tip shoe for a steel pipe pile according to the present invention having the above-described structure has the following effects. That is, even in a hard soil layer, it is possible to suppress the resistance received on the tip edge surface to a small amount, so that the steel pipe pile falls into a place where it cannot be placed, and it is less likely to cause damage or skid, which is excellent in workability,
Further, since the bottom plate is a flat surface after placing the steel pipe pile, it becomes possible to maintain a large ground supporting force for a long period of time.

【0023】さらに、先端シューは3枚の板材の組み合
わせによって構成しているため、その運搬性と取扱性に
優れると共に、準備しておいた中間接続用の鋼管杭に現
場で先端シューを取り付けることにより迅速に先端用杭
として対応させることができる顕著な効果を有するもの
でもある。
Furthermore, since the tip shoe is made up of a combination of three plate materials, it has excellent transportability and handleability, and the tip shoe can be attached to the prepared steel pipe pile for intermediate connection on site. It also has a remarkable effect that can be quickly dealt with as a tip pile.

【図面の簡単な説明】[Brief description of drawings]

【図1】実施形態例1の先端シューの外観斜視図であ
る。
FIG. 1 is an external perspective view of a tip shoe according to a first embodiment.

【図2】実施形態例1の先端シューの組み立て状態を示
す分解斜視図である。
FIG. 2 is an exploded perspective view showing an assembled state of the tip shoe of the first embodiment.

【図3】実施形態例1の先端シューの鋼管杭への取り付
け状態を示す斜視図である。
FIG. 3 is a perspective view showing how the tip shoe of the first embodiment is attached to a steel pipe pile.

【図4】実施形態例1の先端シューの鋼管杭への取り付
け状態を示す一部切り欠き斜視図である。
FIG. 4 is a partially cutaway perspective view showing a state where the tip shoe of the first embodiment is attached to a steel pipe pile.

【図5】実施形態例1の先端シューを用いた鋼管杭によ
る打設作業を示す斜視図である。
FIG. 5 is a perspective view showing a driving operation using a steel pipe pile using the tip shoe of the first embodiment.

【図6】実施形態例2の先端シューの組み立て状態を示
す分解斜視図である。
FIG. 6 is an exploded perspective view showing an assembled state of the tip shoe of the second embodiment.

【図7】実施形態例3の先端シューの組み立て状態を示
す分解斜視図である。
FIG. 7 is an exploded perspective view showing an assembled state of the tip shoe of the third embodiment.

【符号の説明】[Explanation of symbols]

S 先端シュー 1 底板 10 外周縁 10a 切欠き部 10b 切欠き端面 11 貫通スリット 12 下面 13 上面 2 掘削刃 2A 掘削刃 20a 刃体部 20b 幹部 20c 直交用スリツト 2B 掘削刃 21a 刃体部 21b 幹部 21c 直交用スリツト 2C 掘削刃(実施形態例2) 22a 刃体部 22b 幹部 22c 直交用スリツト 2D 掘削刃(実施形態例3) 23a 刃体部 23b 幹部 23c 直交用スリツト 24 先端交差部 3 鋼管杭 30 先端縁面 30a 突出縁部 G 土質層 M 施工機械 S tip shoe 1 bottom plate 10 outer periphery 10a Notch 10b Notched end face 11 through slit 12 Lower surface 13 Upper surface 2 drilling blade 2A drilling blade 20a blade body 20b executive 20c Orthogonal slit 2B drilling blade 21a Blade part 21b Executive 21c Orthogonal slit 2C drilling blade (embodiment example 2) 22a Blade part 22b Executive 22c Orthogonal slit 2D drilling blade (Embodiment 3) 23a Blade part 23b Executive 23c Orthogonal slit 24 Tip intersection 3 steel pipe pile 30 Tip edge surface 30a protruding edge G soil layer M construction machine

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】中央で直交した直線状の2本の貫通スリッ
ト(11)を有し、外周縁(10)が鋼管杭(3)の先
端縁面(30)に嵌合して固定する底板(1)と、 該底板(1)における上記2本の貫通スリット(11)
に所定長さまで挿入して軸断面十字状に組み合わせて固
定すると共に、先端交差部(24)で収束するように形
成した2枚一対からなる掘削刃(2)と、 からなることを特徴とする鋼管杭用の先端シュー。
1. A bottom plate having two linear through slits (11) orthogonal to each other in the center, and an outer peripheral edge (10) of which is fitted and fixed to a tip edge surface (30) of a steel pipe pile (3). (1) and the two through slits (11) in the bottom plate (1)
It is characterized in that it comprises a pair of two excavating blades (2) formed so as to be converged at the tip crossing portion (24) while being inserted into a predetermined length to be combined and fixed in a cross shape in axial cross section. Tip shoe for steel pipe piles.
【請求項2】底板(1)の外周縁(10)と鋼管杭
(3)の先端縁面(30)との嵌合において、 鋼管杭(3)の先端縁面(30)の突出縁部(30a)
を、底板(1)の外周縁(10)に設けた切欠き部(1
0a)と適合するように形成したことを特徴とする請求
項1記載の鋼管杭用の先端シュー。
2. When fitting the outer peripheral edge (10) of the bottom plate (1) and the tip edge surface (30) of the steel pipe pile (3), the protruding edge portion of the tip edge surface (30) of the steel pipe pile (3). (30a)
Is provided on the outer peripheral edge (10) of the bottom plate (1).
0a) is formed so as to be compatible with 0a), and the tip shoe for a steel pipe pile according to claim 1.
【請求項3】底板(1)の外周縁(10)の切欠き部
(10a)と適合する突出縁部(30a)を、適合時に
底板(1)よりも延出するように形成して、底板(1)
に挿入された掘削刃(2)の刃体部(20a、22a)
の外周部と突出縁部(30a)を係合するように構成し
たことを特徴とする請求項2記載の鋼管杭用の先端シュ
ー。
3. A projecting edge portion (30a) which fits with a cutout portion (10a) of an outer peripheral edge (10) of the bottom plate (1) is formed so as to extend beyond the bottom plate (1) when fitted. Bottom plate (1)
Body part (20a, 22a) of the drilling blade (2) inserted in the
The tip shoe for a steel pipe pile according to claim 2, characterized in that the outer peripheral portion and the protruding edge portion (30a) are configured to engage with each other.
【請求項4】該底板(1)の直交した直線状の各貫通ス
リット(11)への2枚一対からなる掘削刃(2)の挿
入において、 2枚一対の掘削刃(2)で底板(1)を挟持するよう
に、掘削刃(2)のそれぞれを底板(1)の反対側から
挿入して組み合わせたことを特徴とする請求項1記載の
鋼管杭用の先端シュー。
4. When inserting a pair of two digging blades (2) into each of the orthogonal linear through slits (11) of the bottom plate (1), a pair of digging blades (2) forms a bottom plate (2). The tip shoe for a steel pipe pile according to claim 1, wherein each of the excavating blades (2) is inserted from the opposite side of the bottom plate (1) so as to sandwich 1).
JP2001318561A 2001-10-16 2001-10-16 Tip shoe for steel pipe pile Expired - Fee Related JP3555886B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001318561A JP3555886B2 (en) 2001-10-16 2001-10-16 Tip shoe for steel pipe pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001318561A JP3555886B2 (en) 2001-10-16 2001-10-16 Tip shoe for steel pipe pile

Publications (2)

Publication Number Publication Date
JP2003119778A true JP2003119778A (en) 2003-04-23
JP3555886B2 JP3555886B2 (en) 2004-08-18

Family

ID=19136242

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001318561A Expired - Fee Related JP3555886B2 (en) 2001-10-16 2001-10-16 Tip shoe for steel pipe pile

Country Status (1)

Country Link
JP (1) JP3555886B2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102140795A (en) * 2010-02-01 2011-08-03 宿迁市固丰管桩有限公司 Steel pile tip of prestressed concrete pipe pile
KR101759879B1 (en) * 2017-01-19 2017-07-20 쏘일락이엔지(주) Rotational penetration pile unit, rotational penetration pile and construction method thereof
JP2018100487A (en) * 2016-12-19 2018-06-28 JSPiling株式会社 Steel pipe pile
JP2020002682A (en) * 2018-06-29 2020-01-09 株式会社シグマベース Pile-shaped ground reinforcement body for rotary press-in construction method, and intermediate reinforcement body used for the same
JP2020159120A (en) * 2019-03-27 2020-10-01 日鉄建材株式会社 Lid body for underground embedded steel pipe, underground embedded steel pipe, and joint member
KR20220140120A (en) * 2021-04-09 2022-10-18 민용 the composite pile stucture for a soft groud in facility installation

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104652429B (en) * 2014-12-30 2017-12-19 河南省建筑设计研究院有限公司 A kind of attachment means of concrete hollow pile and steel pile tip

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102140795A (en) * 2010-02-01 2011-08-03 宿迁市固丰管桩有限公司 Steel pile tip of prestressed concrete pipe pile
JP2018100487A (en) * 2016-12-19 2018-06-28 JSPiling株式会社 Steel pipe pile
KR101759879B1 (en) * 2017-01-19 2017-07-20 쏘일락이엔지(주) Rotational penetration pile unit, rotational penetration pile and construction method thereof
JP2020002682A (en) * 2018-06-29 2020-01-09 株式会社シグマベース Pile-shaped ground reinforcement body for rotary press-in construction method, and intermediate reinforcement body used for the same
JP2020159120A (en) * 2019-03-27 2020-10-01 日鉄建材株式会社 Lid body for underground embedded steel pipe, underground embedded steel pipe, and joint member
JP7189821B2 (en) 2019-03-27 2022-12-14 日鉄建材株式会社 Lid for underground steel pipe, underground steel pipe, and joint member
KR20220140120A (en) * 2021-04-09 2022-10-18 민용 the composite pile stucture for a soft groud in facility installation
KR102472204B1 (en) 2021-04-09 2022-11-29 민용 the composite pile stucture for a soft groud in facility installation

Also Published As

Publication number Publication date
JP3555886B2 (en) 2004-08-18

Similar Documents

Publication Publication Date Title
JP2003119778A (en) Tip shoe for steel pipe pile
US20180148901A1 (en) Supports for Helical Piles and Anchors
US2835017A (en) Nail stake
KR101700851B1 (en) Big helical pile
JP2009138487A (en) Steel pipe pile
JP2018100487A (en) Steel pipe pile
US20080134954A1 (en) Survey marker
CN112643288A (en) Manufacturing method of rotary penetration steel pipe pile with blades at front end
US6065243A (en) Tree and shrub stabilizing device
JP2006063625A (en) Steel pipe joint member
JP5666229B2 (en) Joint structure of steel column and steel beam
EP1070447B1 (en) Teeth arrangement for blade disks
JP2015148135A (en) Spiral pile base and construction method thereof
JP7285676B2 (en) Rotating pile and construction method of rotating pile
JP7133260B1 (en) FOUNDATION INTEGRATED SCREW PILE AND METHOD FOR MANUFACTURING THE SAME
JPH11140861A (en) Stirring head for improving ground
CN114929008A (en) Cutting element, use thereof and mobile cutting device with same
JP2022190513A (en) Rotary penetration steel pipe pile with tip blade
JP3175442U (en) Auxiliary blade for mower and rotary blade for mower
JPH0567631U (en) Yamadome material joints and Yamadome materials
JPS607439Y2 (en) drilling rig
JP2000170160A (en) Steel pipe pile
JP3224526U (en) Rotary penetration steel pipe pile with tip wing
JP2009127267A (en) Steel pipe pile with widened bottom
JPH0226988Y2 (en)

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040413

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20040419

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20040507

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees