JP2003114712A - Centralized storage method for half-finished repair sheet metal parts - Google Patents

Centralized storage method for half-finished repair sheet metal parts

Info

Publication number
JP2003114712A
JP2003114712A JP2002033941A JP2002033941A JP2003114712A JP 2003114712 A JP2003114712 A JP 2003114712A JP 2002033941 A JP2002033941 A JP 2002033941A JP 2002033941 A JP2002033941 A JP 2002033941A JP 2003114712 A JP2003114712 A JP 2003114712A
Authority
JP
Japan
Prior art keywords
semi
sheet metal
finished
finished product
storage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2002033941A
Other languages
Japanese (ja)
Inventor
Akiriyo Handa
阿喜良 半田
Kenji Yoshikawa
賢司 吉川
Masatatsu Noshiro
真達 能代
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Honda Motor Co Ltd
Original Assignee
Honda Motor Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Honda Motor Co Ltd filed Critical Honda Motor Co Ltd
Priority to JP2002033941A priority Critical patent/JP2003114712A/en
Publication of JP2003114712A publication Critical patent/JP2003114712A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Abstract

PROBLEM TO BE SOLVED: To store repair sheet metal parts with reduced cost. SOLUTION: Sheet metal parts half-pressed at the pre-coating stage, pressed parts 6, subcomponents 7, or the like, are placed one upon another as half- finished parts, wrapped in a rust preventing sheet 12 into a storage-oriented package 10 which is stored as a unit package. Such centralized storage is implemented when a prescribed number is reached out of the number expected to be demanded, for instance, when the total volume of metal molds coincides with the total volume of half-finished parts in storage. At this time point, the total amount of the half-finished parts expected to be demanded are packaged en-bloc for storage, and the metal molds are discarded. The half-finished parts in storage will undergo additional treatment as demanded and will be issued as finished parts when required.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】この発明は、自動車の補修用
板金部品など、長期間において保管を義務づけられてい
る板金部品に対する有利な在庫一括集中保管方法に関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an advantageous collective centralized storage method for stock sheet metal parts, such as repair sheet metal parts for automobiles, which are obliged to be stored for a long period of time.

【0002】[0002]

【従来の技術】日々の生産に供する半完成品等を在庫す
る場合は、保管日数がせいぜい数日と短いため保管及び
在庫管理に対してあまり苦労しない(このような短期の
半完成品在庫管理に関する一例として実開平6−437
50号参照)。しかし、所定の保管期限がある補修用部
品であって、しかもこれが比較的大型の板金部品である
場合には事情が異なる。
2. Description of the Related Art When stocking semi-finished products for daily production, the number of storage days is at most a few days, so there is no difficulty in storage and inventory management (such short-term semi-finished product inventory management As an example of
No. 50). However, the situation is different when the repair part has a predetermined storage period and is a relatively large sheet metal part.

【0003】図1の上段Aに示すものは、この種の補修
用板金部品の一例として自動車の後部外板に相当するリ
ヤパネルに対する従来の保管方法であり、プレス等所定
の加工及び塗装が終わった完成品のリヤフロアパネル一
つ毎に梱包した販売用荷姿1にてこれを一つづつラック
2に収納して倉庫へ保管している。この販売用の完成品
荷姿1における縦(Y)・横(X)・高さ(H)の各寸
法は比較的大きなものである。この補修用板金部品は、
所定の需要予測により在庫調整されつつ、本体の自動車
が製造終了してもその後所定期間は保管し供給すること
を義務づけられている。
The upper part A of FIG. 1 shows a conventional storage method for a rear panel corresponding to a rear outer plate of an automobile as an example of this kind of repair sheet metal part, and predetermined processing such as pressing and coating are completed. Each of the finished rear floor panels of the finished product is packed in a package 1 for sale and stored in a rack 2 one by one. The vertical (Y), horizontal (X), and height (H) dimensions of the finished package 1 for sale are relatively large. This repair sheet metal part is
The inventory is adjusted according to a predetermined demand forecast, and it is obliged to store and supply the automobile for a predetermined period after the manufacture of the main body of the vehicle is finished.

【0004】図2の上段は、この従来例における板金部
品部品の製造〜保管の各工程を示し、まず原板シート3
を用意し(工程(1))、これを所定形状にドローしてド
ロー成形品4を形成し(工程(2))、さらに不要部をカ
ットする等のトリムを施したトリム済み品5とし(工程
(3))、続いてこれを折り曲げや所定箇所に穴を開ける
ベンドやピアスを行ってプレス完成品6を得る(工程
(4))。これらの工程(1)〜(4)を経てプレス工程が完了
する。なおプレス前段工程(2)(3)及びプレス後段工程
(4)におけるプレス未完了のものがプレス途中品であ
り、これらの工程(1)〜(4)を経てプレス工程が完了する
とプレス完成品になる。さらにプレス完成品に対してナ
ットなどの小部品等からなる構成子部品を溶接等して組
立一体化するサブコンプを行ってサブコンプ品7を形成
し(工程(5))、続いて塗装して完成品8を得(工程
(6))、これを一つづつ梱包して完成品荷姿1とする
(工程(7))ことにより終了する。この板金部品は在庫
の状況に応じて小ロットづつ生産され、在庫を調整する
ようになっている。
The upper part of FIG. 2 shows the steps from the manufacture to the storage of sheet metal parts in this conventional example. First, the original sheet 3
Is prepared (step (1)), and this is drawn into a predetermined shape to form a draw-molded product 4 (step (2)). Further, trimmed product 5 is formed by trimming unnecessary parts ( Process
(3)), and then bend it or bend or pierce it to make a hole at a predetermined place to obtain a press finished product 6 (step
(Four)). The pressing step is completed through these steps (1) to (4). The pre-press process (2) (3) and post-press process
The unpressed product in (4) is an in-press product, and when the pressing process is completed through these processes (1) to (4), it becomes a pressed product. Further, sub-comp 7 is formed by assembling and integrating component parts consisting of small parts such as nuts with the press-finished product to form sub-comp product 7 (process (5)), and then painting is completed. Product 8 (Process
(6)), and packing them one by one to form the finished product packing form 1 (process (7)), and the process ends. The sheet metal parts are produced in small lots according to the stock situation, and the stock is adjusted.

【0005】[0005]

【発明が解決しようとする課題】ところで、上記従来例
では、完成品荷姿1で保管するため、保管用スペースを
多く必要とし保管コストが増大する。特に車体外板のよ
うな自動車用板金部品は大型化する傾向があるから、な
おさら保管コストがかさむことになる。また、在庫状況
に応じて何回も小ロット生産して保管を続けるので、製
造コストも増大する。
By the way, in the above-described conventional example, since the finished product 1 is stored, a large storage space is required, and the storage cost increases. In particular, sheet metal parts for automobiles such as a vehicle body outer panel tend to be large in size, which further increases the storage cost. In addition, since small lots are produced and stored many times according to the stock situation, the manufacturing cost increases.

【0006】さらに、このような断続的生産により長期
間供給をするには、金型を全期間保有し続ける必要があ
り、このための金型保管費、錆止め費用、メンテナンス
費用等が発生し、これも在庫保管のコストアップ要因と
なる。そのうえ、板金部品が大型であればこれを製造す
る大きな金型を所有できる大規模な工場が限定されるか
ら、製造場所も限定されることになり、小ロットを比較
的小規模の工場で製造するような機動的な対応がとりに
くい。そのうえ塗装後の完成品を保管すると、保管中の
塗装傷による不良品化が生じたり、色別による需要数の
相違に対して柔軟に対応できにくい場合がある。また子
部品を加えたり穴を追加するなどの微細部の相違した派
生タイプに対しても色同様に柔軟な対応ができにくい。
そこで本願発明は、このような補修用板金部品の効率的
な在庫保管方法の提供を目的とする。
Furthermore, in order to supply for a long period of time by such intermittent production, it is necessary to keep the mold for the entire period, which causes mold storage costs, rust prevention costs, maintenance costs, etc. This also increases the cost of inventory storage. In addition, if the sheet metal parts are large, the large-scale factory that can own the large molds for manufacturing the sheet-metal parts will be limited, so the manufacturing location will be limited, and small lots will be manufactured in relatively small factories. It is difficult to take such agile response. In addition, storing the finished product after painting may result in defective products due to paint scratches during storage, or it may be difficult to flexibly respond to differences in the number of demands for each color. Also, it is difficult to flexibly deal with derivative types with different fine parts such as adding child parts and holes.
Therefore, an object of the present invention is to provide an efficient inventory storage method for such repair sheet metal parts.

【0007】[0007]

【課題を解決するための手段】上記課題を解決するため
本願における補修用板金部品の在庫一括集中保管方法に
係る発明は、板状部材から、ドロー,トリム、ベンド及
びピアス等のプレス工程並びに溶接、組立及び塗装の各
工程を経て製造される半完成品の板金部品を補修用在庫
として一括集中保管方法において、予想需要数が所定の
設定値を下回ったとき、前記板金部品を少なくとも塗装
前の半完成品状態で複数を一括して防錆シートで覆うこ
とにより一梱包として保管するとともに、金型を廃却す
ることを特徴とする。
SUMMARY OF THE INVENTION In order to solve the above problems, the invention relating to a method for centralized batch storage of repair sheet metal parts according to the present invention includes a pressing step such as drawing, trimming, bending and piercing and welding from a plate member. In the collective centralized storage method, where the semi-finished sheet metal parts manufactured through each process of assembly and painting are collectively stored as a repair inventory, when the expected demand number falls below a predetermined set value, at least the sheet metal parts before painting are It is characterized in that a plurality of semi-finished products are collectively covered with a rust preventive sheet to be stored as one package and the mold is discarded.

【0008】このとき、前記予想需要数における所定の
設定値は、前記半完成品の一括保管されるべき梱包体積
と金型の体積及び梱包部品保管金額と金型保管金額とが
一致するときの値とすることができる。また、前記保管
された半完成品は、需要に応じて追加加工を施すことに
より完成品として出荷する。
At this time, the predetermined set value in the expected demand number is set when the package volume of the semi-finished products to be stored together and the volume of the mold and the storage amount of the package parts and the storage amount of the mold match. It can be a value. Further, the stored semi-finished product is subjected to additional processing according to demand and shipped as a finished product.

【0009】さらに、前記在庫される半完成品は、プレ
ス工程の途中であるプレス工程の途中であるトリム、ド
ロー、ベンド又はピアスを施されたプレス途中品、プレ
ス完成品又はこのプレス完成品に対して他部品を一体化
したサブコンプ品のいずれでもよい。なお、サブコンプ
品の構成は、プレス完成品と他部品を溶接等で組立一体
化したもの、若しくはプレス完成品又は半完成品と他部
品を一まとめにして保管できるように組み合わせ一体化
(以下、これを抱き合わせという)したもののいずれで
もよい。また、前記完成品補修部品の受注により、一括
集中保管している半完成品を組み立てて完成品として供
給することができる。
Further, the stocked semi-finished product is a half-pressed product that is trimmed, drawn, bent, or pierced during the press process, which is in the middle of the press process, a press-finished product, or this press-finished product. On the other hand, any of the sub-comp products in which other components are integrated may be used. In addition, the composition of the sub-comp product is such that the press finished product and other parts are assembled and integrated by welding etc., or the press completed product or semi-finished product and other parts are combined and integrated so that they can be stored together (hereinafter, This can be either a tie. Further, by receiving an order for the repair parts of the finished product, it is possible to assemble and supply the semi-finished products collectively centrally stored.

【0010】[0010]

【発明の効果】本願発明によれば、予想需要数が所定の
設定値になったとき、補修用板金部品を半完成品として
一括製造し、これを複数個一単位として、梱包保管す
る。このため、保管用スペースを著しく削減できる。ま
た、金型を同時に廃棄するため、金型の長期保管から解
放され、これによるコストアップを回避できる。
According to the present invention, when the expected demand number reaches a predetermined set value, the repair sheet metal parts are collectively manufactured as semi-finished products, and a plurality of these are packaged and stored as one unit. Therefore, the storage space can be significantly reduced. Further, since the molds are discarded at the same time, the molds are released from long-term storage, and the cost increase due to this is avoided.

【0011】なお、一括保管された半完成品は、需要に
応じてその後、追加加工を施して完成品とし、必要数量
づつ供給する。このとき半完成品は少なくとも塗装前の
ものであるから、需要に応じて必着な色に塗装でき、色
別による需要数の相違に対して柔軟に対応できる。また
保管中の塗装をキづつけないで済む。しかも、保管期限
切れとなった在庫は、半完成品状態で廃棄でき、完成品
にするまでの工程が省略されているから、廃棄に伴うコ
ストを節約できる。
The semi-finished products stored in a batch are then subjected to additional processing according to demand to be finished products and supplied in required quantities. At this time, since the semi-finished product is at least unpainted, it can be painted in an indispensable color according to demand, and it is possible to flexibly cope with the difference in the number of demands depending on the color. In addition, the paint during storage does not get scratched. Moreover, the stock whose storage period has expired can be discarded in the state of semi-finished products, and the process up to the completion of the finished products is omitted, so the costs associated with disposal can be saved.

【0012】さらに、予想需要数における所定の設定値
を、半完成品の一括保管されるべき梱包体積と金型の体
積とが一致するときの値とすれば、半完成品をその後所
定の長期間保管したとしても、金型を廃棄することによ
りその保管スペースで間に合うことになるので、保管ス
ペースが最も少なくなり、長期に及ぶ補修用板金部品の
在庫保管を有利にできる。
Further, if the predetermined set value in the expected demand number is set to a value when the package volume of the semi-finished products to be stored in batch and the volume of the mold coincide with each other, the semi-finished products are thereafter set to a predetermined length. Even if it is stored for a certain period of time, by discarding the mold, the storage space can be used in time, so that the storage space is minimized, and it is possible to advantageously store the inventory of repair sheet metal parts for a long period of time.

【0013】また、在庫される半完成品は、プレス工程
の途中であるドロー、トリム、ベンド若しくはピアス等
を施されたプレス途中品、プレス完成品並びにプレス完
成品に対して他部品を溶接等で組立一体化したサブコン
プ品のいずれでもよい。トリム済み品等のプレス途中品
は1個当たりの体積が最小になるから保管スペースを最
も小さくできる。プレス完成品の場合はプレス工程途中
のものよりも体積が大きくなるが、大型のプレス機械を
必要とする工程が終了するので、その後は加工場所を限
定されず機動的な加工が可能になる。さらに、サブコン
プ品の場合は最も体積が大きくなる反面、他の溶接又は
抱き合わせ保管で一体化するので、これら組付部品(場
合によってはその金型を含む)を別に在庫する必要がな
くなり、部品管理や在庫保管の上で有利になる。
In addition, the semi-finished products to be stocked include intermediate products in the press process such as draw, trim, bend or pierce, which are in the middle of the pressing process, press-finished products and other parts to the press-finished products. It may be any of the sub-comp products assembled and integrated in. The storage space can be minimized because the volume of each intermediate product such as trimmed products is the smallest. In the case of a press-finished product, the volume is larger than that in the middle of the pressing process, but since the process that requires a large-sized press machine is completed, the processing place is not limited thereafter, and flexible processing is possible. Furthermore, in the case of a sub comp product, the volume is the largest, but since it is integrated by other welding or tie storage, it is not necessary to stock these assembled parts (including the mold in some cases) separately, and parts management It is advantageous in terms of inventory storage.

【0014】そのうえ、一括保管された半完成品は、需
要に応じてその後、追加加工を施して完成品とし、必要
数量づつ供給することができる。このとき半完成品は少
なくとも塗装前のものであるから、需要に応じて必着な
色に塗装でき、色別による需要数の相違に対して柔軟に
対応できる。また子部品を加えたり穴を追加するなどの
微細部の相違した派生タイプに対しても色同様に柔軟な
対応ができる。しかも、半完成品を追加加工するだけで
完成品を得ることができるので、受注から供給までのリ
ードタイムを短縮することができる。また半完成品対す
る追加加工は比較的簡単なもので済むため、追加加工を
外注する場合における外注相手先の保有設備による制約
が少なくなり、外注先選定の自由度が大きくなる。
In addition, the semi-finished products stored in a batch can be subjected to additional processing according to demand to obtain finished products, which can be supplied in required quantities. At this time, since the semi-finished product is at least unpainted, it can be painted in an indispensable color according to demand, and it is possible to flexibly cope with the difference in the number of demands depending on the color. In addition, it is possible to flexibly deal with derivative types with different minute parts such as adding child parts and adding holes, as well as colors. Moreover, the finished product can be obtained only by additionally processing the semi-finished product, so that the lead time from order receipt to supply can be shortened. In addition, since additional processing for semi-finished products is relatively simple, restrictions on the equipment owned by the subcontractor when subcontracting the additional processing are lessened, and the degree of freedom in selecting subcontractors is increased.

【0015】[0015]

【発明の実施の形態】以下、図面に基づいて自動車用リ
ヤパネルを補修用板金部品とする保管方法を説明する。
図2の下段に示すように、本願発明はプレス前段(工程
(3))の段階における加工パネルであるトリム済み品5
を複数枚重ねて一梱包とする(工程(8))か、プレス完
成品6若しくはサブコンプ品7を同様に一梱包とする
(工程(9))。この場合におけるトリム済み品5はプレ
ス後段のベンド及びピアス前のため、プレス完成品6よ
りも高さ方向の寸法が小さく、例えば1/20等の高さ
になる。このため同じ梱包高さにすれば、最も多くの枚
数を一梱包にできる。但し、各種段階のプレス途中品及
びプレス完成品は、サブコンプ品と比べて程度の相違は
あるがいずれも上記保管上の利点を有する。
BEST MODE FOR CARRYING OUT THE INVENTION A storage method using a vehicle rear panel as a repair sheet metal part will be described below with reference to the drawings.
As shown in the lower part of FIG.
Trimmed product 5 which is a processed panel at the stage (3))
Are stacked to form one package (step (8)), or the press-finished product 6 or the sub-compressed product 7 is similarly packaged (step (9)). In this case, the trimmed product 5 has a smaller dimension in the height direction than the press completed product 6 since it is before the bending and piercing in the latter stage of the pressing, and has a height of, for example, 1/20. Therefore, if the packing height is the same, the largest number of sheets can be packed into one packing. However, in-press products at various stages and press-finished products have the above-mentioned storage advantages, although they differ to some extent from the sub-comp products.

【0016】また、工程(9)のように、サブコンプ品7
を梱包すれば、子部品等の構成他部品を溶接又は抱き合
わせ保管で一体化して保管できるから、これら他部品を
別個に保管する必要がなくなり、構成部品点数の多い場
合の保管に有利となる。このとき、縦(y)と横(x)
の各寸法は完成品荷姿1におけるXYと近いものにな
る。これら工程(8)又は(9)によって重ねられた半完成品
は、工程(10)により一梱包とされた一括保管用集合荷姿
10とされる。その寸法を完成品荷姿1におけるXYH
とほぼ同程度にしてもよい。なお、プレス完成品の状態
で一括集中保管することもできる。
Further, as in the step (9), the subcomp product 7
By packaging, the other components such as child parts can be integrally stored by welding or tie storage, so that it is not necessary to separately store these other components, which is advantageous for storage when the number of component parts is large. At this time, vertical (y) and horizontal (x)
The respective dimensions are similar to XY in the finished product packing 1. The semi-finished products stacked by these steps (8) or (9) are made into a collective storage package 10 for one-time storage which is packed in one step (10). The dimensions are XYH in the finished product packaging 1.
May be almost the same as. It is also possible to collectively store the pressed products in a batch.

【0017】図1に下段に示すように、この一括保管用
集合荷姿10はラック2に対して一梱包づつ保管され、
ラック2全体としては同程度の大きさであっても、上段
の従来例が完成品一つづつ一梱包の場合と比べて著しく
保管量が増大し、例えば、3〜5倍程度が可能になる。
すなわち、一括保管用集合荷姿10を完成品荷姿1の寸
法XYHとほぼ同程度にしても内容量が明らかなに増大
している。
As shown in the lower part of FIG. 1, the collective package 10 for collective storage is stored in the rack 2 one package at a time.
Even if the rack 2 as a whole has the same size, the storage amount of the conventional example in the upper stage is remarkably increased as compared with the case where the finished products are packed one by one. .
That is, even if the collective package 10 for collective storage is substantially the same as the dimension XYH of the finished product package 1, the internal capacity is significantly increased.

【0018】図3は、プレス完成品6を一括保管する際
の梱包例を示し、プレス完成品6を5〜50枚単位で重
ねてコーナー部に発泡材などの公知の適宜緩衝材からな
る破れ防止当て具11を当てて、全体をビニール等の防
錆性にすぐれた適宜材料からなる防錆シート12で密閉
し、周囲を線材の枠13で囲んで一梱包の一括保管用集
合荷姿10とする。この一括保管用集合荷姿10はフォ
ークリフト等による積み下ろしが可能な搬送形態単位に
なっており、枠13はこのような搬送に耐える強度を与
えられている。
FIG. 3 shows an example of packing when the pressed finished products 6 are stored in a lump, and the pressed finished products 6 are piled up in units of 5 to 50 and the corners are made of a known appropriate cushioning material such as foam material. Apply the anti-corrosion tool 11 and seal the whole with a rust preventive sheet 12 made of an appropriate material such as vinyl having excellent rust preventive property, and surround the circumference with a frame 13 of wire rods to collect a package in a package for collective storage 10 And This collective storage package 10 for batch storage is a unit of a transport mode that can be loaded and unloaded by a forklift or the like, and the frame 13 is provided with a strength to withstand such transport.

【0019】この防錆シート12による梱包は、長期に
わたり内容物である半完成品が錆びないように所定の防
錆性を発揮する必要がある。図4は、この防錆性テスト
方法を例示するものであり、予め定められた夏冬一日サ
イクルによる恒温恒湿槽テストで判定する。このテスト
において夏冬一日サイクルを所定回数、例えば、10サ
イクル/年として、これを保管目標年数の5〜10年分
反復して錆を発生しなければ合格とする。
The packaging with the rust preventive sheet 12 is required to exhibit a predetermined rust preventive property so that the semi-finished product which is the content does not rust over a long period of time. FIG. 4 exemplifies this rust preventive test method, which is determined by a constant temperature and humidity tank test according to a predetermined summer / winter one day cycle. In this test, the summer-winter day cycle is set to a predetermined number of times, for example, 10 cycles / year, and if this is repeated for 5 to 10 years of the storage target number of years and no rust is generated, it is judged as passing.

【0020】夏冬一日サイクルを構成する夏日一日のサ
イクルは、温度65℃、湿度85%を3時間、その後温
度25℃、湿度40%を3時間とし、その後温度0℃ま
で下げる。冬1日サイクルは、温度0℃で3時間維持し
た後、温度25℃、湿度40%を3時間維持し、さらに
温度65℃、湿度85%まで上昇させる。なお、最初の
夏日一日サイクルが開始されるまでの時間が全体の立ち
上げ時間(例えば1時間)として設定される。
In the day of summer and day constituting the summer-winter day cycle, the temperature is 65 ° C., the humidity is 85% for 3 hours, the temperature is 25 ° C. and the humidity is 40% for 3 hours, and then the temperature is lowered to 0 ° C. In the winter 1-day cycle, the temperature is kept at 0 ° C. for 3 hours, then the temperature is kept at 25 ° C. and the humidity is 40% for 3 hours, and the temperature is further raised to 65 ° C. and the humidity is 85%. The time until the first day of the summer day is started is set as the overall start-up time (for example, 1 hour).

【0021】図5は、本一括保管のタイミング設定を示
すための図であり、曲線はある期間(年、月等)に要求
されると予想され補修用板金部品の需要数を示すデマン
ドカーブである。また横軸は期間、縦軸は補修用板金部
品の予測需要数量及びその体積である。デマンドカーブ
は自動車の発売後上昇して所定期間でピークCに達し、
その後なだらかな下降に転じる。このデマンドカーブは
経験則に基づいて決定される。デマンドカーブのうち実
線は中程度以上の需要があるもの、破線は小さいもので
ある。
FIG. 5 is a diagram for showing the timing setting of this batch storage, and the curve is a demand curve showing the demanded number of repair sheet metal parts expected to be required in a certain period (year, month, etc.). is there. The horizontal axis is the period and the vertical axis is the forecast demand quantity and volume of the repair sheet metal parts. The demand curve rises after the car is released and reaches peak C in a predetermined period,
After that, it begins to decline gently. This demand curve is determined based on empirical rules. Of the demand curves, the solid line shows medium demand and the broken line shows small demand.

【0022】デマンドカーブはピークCを通過してある
期間が経過すると、目安保管量ラインDと点Eにて交わ
る。この点Eまでの期間のうち実線のように中程度以上
の需要があるものの場合は、金型を保有してロット生産
で供給する。破線のように目安保管量ラインDよりも全
体が下側にあるものは後述する一括保管になる。
The demand curve intersects with the reference storage amount line D at a point E after a certain period of time passing through the peak C. In the period up to this point E, if there is a medium or higher demand as indicated by the solid line, the mold is held and the product is supplied by lot production. Items that are entirely below the standard storage amount line D as indicated by the broken line are collectively stored as described later.

【0023】目安保管量ラインDは、点E時点における
一括在庫保管量の体積が金型の体積と一致するラインと
して設定され、本願発明における所定の設定値に相当し
ている。なお、一括在庫保管量はデマンドカーブを点E
以降在庫期限まで積分した量である。
The standard storage amount line D is set as a line in which the volume of the collective inventory storage amount at the point E coincides with the volume of the mold, and corresponds to a predetermined set value in the present invention. In addition, the bulk inventory storage amount is on the demand curve at point E.
After that, it is the amount integrated until the inventory deadline.

【0024】実線のデマンドカーブが目安保管量ライン
DとEで交わると、それ以降の保管すべき予想全量を前
記半完成品の状態で製造してから金型を廃棄し、半完成
品による一括保管に移行し、その後所定年限まで保管す
る。点Gは部品の供給年限であり、本実施例における金
型保管においてはこの時点に特別の意味はないが、従来
ではこの時点よりさらに所定の供給年限までずっと金型
を保有し続ける必要があった。
When the solid demand curve intersects with the standard storage amount lines D and E, the expected total amount to be stored thereafter is manufactured in the state of the semi-finished product, and then the mold is discarded. Move to storage and then store for a specified period. Point G is the supply period of parts, and there is no special meaning at this point in the die storage in this embodiment, but conventionally it is necessary to continue to hold the die until the predetermined supply period from this point. It was

【0025】なお、破線で示すように、需要の小さなデ
マンドカーブを有する製品の場合は、かなり早い時期、
例えばピークFの時点で目安保管量ラインDと一致する
場合には、この時点Fにて前記一括保管へ移行し、その
後半完成品を所定年限保管することになった。
Incidentally, as shown by the broken line, in the case of a product having a demand curve with a small demand, a considerably early period,
For example, when it coincides with the reference storage amount line D at the time of peak F, the batch storage is started at this time F, and the latter half finished product is stored for a predetermined period.

【0026】次に、本実施例の作用を説明する。上記の
ように予想需要数が所定の設定値Dになったとき、補修
用板金部品を半完成品(5,6又は7)として一括製造
し、これを複数個一単位とし、一括保管用集合荷姿10
にて梱包保管する。このため、保管用スペースを著しく
削減できる。また、金型を同時に廃棄するため、金型の
長期保管から解放され、これによるコストアップを回避
できる。
Next, the operation of this embodiment will be described. When the expected demand quantity reaches the predetermined set value D as described above, repair sheet metal parts are manufactured as a semi-finished product (5, 6 or 7) in a batch, and a plurality of these are made into one unit to be a collective storage assembly. Package 10
Pack and store in. Therefore, the storage space can be significantly reduced. Further, since the molds are discarded at the same time, the molds are released from long-term storage, and the cost increase due to this is avoided.

【0027】なお、一括保管された半完成品(5,6又
は7)は、需要に応じてその後、追加加工を施して完成
品とし、必要数量づつ供給する。このとき半完成品
(5,6又は7)は塗装前のものであるから、需要に応
じて必着な色に塗装でき、色別による需要数の相違に対
して柔軟に対応できる。また保管中の塗装をキづつけな
いで済む。
The semi-finished products (5, 6 or 7) stored in a batch are then subjected to additional processing according to demand to obtain finished products, which are supplied in required quantities. At this time, since the semi-finished product (5, 6 or 7) is not yet painted, it can be painted in an indispensable color according to demand, and it is possible to flexibly deal with the difference in the number of demands depending on the color. In addition, the paint during storage does not get scratched.

【0028】しかも、保管期限切れとなった在庫は、半
完成品状態で廃棄でき、完成品にするまでの工程が省略
されているから、廃棄に伴うコストを節約できる。
Furthermore, the stock whose storage period has expired can be discarded in the state of semi-finished products, and the process of making it into a finished product is omitted, so that the costs associated with the disposal can be saved.

【0029】さらに、予想需要数における所定の設定値
Dが、半完成品(5,6又は7)の一括保管されるべき
梱包体積と金型の体積とが一致するときの値になってい
るので、半完成品(5,6又は7)をその後所定の長期
間保管したとしても、金型を廃棄することによりその保
管スペースで間に合うことになるので、保管スペースが
最も少なくなり、長期に及ぶ補修用板金部品の在庫保管
を有利にできる。
Further, the predetermined set value D in the expected number of demands is a value when the packing volume of the semi-finished products (5, 6 or 7) to be collectively stored and the volume of the mold match. Therefore, even if the semi-finished product (5, 6 or 7) is stored for a predetermined long period of time thereafter, the storage space will be the shortest because the mold is discarded and the storage space will be sufficient for a long period of time. Inventory storage of repair sheet metal parts can be made advantageous.

【0030】また、在庫される半完成品は、プレス工程
の途中であるプレス途中品、プレス完成品6又はプレス
完成品に対して他部品を溶接等で組立一体化したサブコ
ンプ品7のいずれでもよい。プレス途中品は、プレス未
完了状態におけるものであれば、トリム済み品5、ドロ
ー、ベンド若しくはピアス等の各種段階のもののいずれ
でもよいが、例えば、トリム済み品5の場合は1個当た
りの体積が最小になるから保管スペースを最も小さくで
きる。
In addition, the semi-finished product to be stocked may be any of the in-press product in the middle of the pressing process, the pressed product 6 or the sub-comp product 7 in which other parts are assembled and integrated with the pressed product by welding or the like. Good. The in-press product may be any of the trimmed product 5, various stages such as draw, bend, and piercing as long as it is in the incomplete press state. For example, in the case of the trimmed product 5, the volume per piece The storage space can be minimized because the size is minimized.

【0031】プレス完成品6の場合はトリム済み品5よ
りも体積が大きくなるが、大型のプレス機械を必要とす
る工程が終了するので、その後は加工場所を限定されず
機動的な加工が可能になる。なお、プレス途中品でもト
リムの前後でプレス機械の大きさが変化し、トリム後の
ベンドやピアスではより小型の汎用機を使用できる。サ
ブコンプ品7の場合は最も体積が大きくなる反面、他の
組付部品まで一体化するので、これら組付部品(場合に
よってはその金型を含む)を別に在庫する必要がなくな
り、部品管理や在庫保管の上で有利になる。
The finished press product 6 has a larger volume than the trimmed product 5, but since the process that requires a large press machine is completed, the working place is not limited thereafter, and flexible working is possible. become. In addition, the size of the press machine changes before and after trimming even in the middle of pressing, so a smaller general-purpose machine can be used for the bend and piercing after trimming. In the case of the sub-comp product 7, the volume is the largest, but since other assembly parts are also integrated, it is not necessary to stock these assembly parts (including their molds in some cases) separately, and parts management and inventory It has an advantage in storage.

【0032】図6は工程(8)と(9)の保管方法によるコス
ト比較である。まずトリム済み品5を保管する場合、5
0枚を一梱包とすることにより、総コストa、1個当た
りのコストbとしたとき、サブコンプ品7を10枚づつ
一梱包とする場合の総コストcよりも若干dだけ高くな
る。しかし、1個当たりのコストeは同bよりも遙かに
大きくなる。したがって、コスト的にはサブコンプ品7
よりもトリム済み品5の状態で保管する方が有利とな
る。なお、サブコンプ品7に代えてプレス完成品6とし
た場合でも同様である。
FIG. 6 is a cost comparison between the storage methods of steps (8) and (9). First of all, when storing the trimmed product 5,
By packing 0 sheets into one package, when the total cost a and the cost per piece b are set, the total cost c is slightly higher than the total cost c when packing 10 sub-complement products 7 each. However, the cost e per piece is much larger than the cost b. Therefore, in terms of cost, the subcomp product 7
It is more advantageous to store the trimmed product 5 than the trimmed product 5. The same applies to the case where the press completed product 6 is used instead of the subcomp product 7.

【図面の簡単な説明】[Brief description of drawings]

【図1】補修用板金部品の保管時における荷姿を従来例
と併せて示す図
FIG. 1 is a diagram showing a package shape of a repair sheet metal part during storage together with a conventional example.

【図2】製造〜梱包工程を従来例とともに示す図FIG. 2 is a view showing a manufacturing process and a packaging process together with a conventional example.

【図3】梱包方法を示す図[Figure 3] Diagram showing the packing method

【図4】防錆テスト方法を示す図FIG. 4 is a diagram showing a rust prevention test method.

【図5】設定需要数の決定タイミングを示す図FIG. 5 is a diagram showing the timing of determining the set demand quantity.

【図6】荷姿によるコスト比較図[Figure 6] Cost comparison chart based on packaging

【符号の説明】[Explanation of symbols]

1:販売用の完成品荷姿、2:ラック、3:原板シー
ト、4:ドロー成形品、5:トリム済み品、6:プレス
完成品、7:サブコンプ品、8:完成品、10:一括保
管用集合荷姿、11:破れ防止当て具、12:防錆シー
ト、13:枠
1: Packaging of finished products for sale 2: Rack, 3: Original sheet, 4: Draw molded product, 5: Trimmed product, 6: Pressed product, 7: Subcomp product, 8: Completed product, 10: Batch Collective package for storage, 11: Tear-prevention tool, 12: Anticorrosion sheet, 13: Frame

───────────────────────────────────────────────────── フロントページの続き (72)発明者 能代 真達 東京都港区南青山2丁目1番1号 本田技 研工業株式会社内 Fターム(参考) 3C100 AA45 BB05 EE01    ─────────────────────────────────────────────────── ─── Continued front page    (72) Inventor Masahiro Noshiro             2-1-1 Minamiaoyama, Minato-ku, Tokyo Honda Gi             Ken Kogyo Co., Ltd. F term (reference) 3C100 AA45 BB05 EE01

Claims (7)

【特許請求の範囲】[Claims] 【請求項1】 板状部材から、ドロー,トリム、ベンド
及びピアス等のプレス工程並びに溶接、組立及び塗装の
各工程を経て製造される板金部品を補修用在庫として保
管する方法において、予想需要数が所定の設定値を下回
ったとき、前記板金部品を少なくとも塗装前の半完成品
状態で複数を一括して防錆シートで覆うことにより一梱
包として保管するとともに、金型を廃却することを特徴
とする補修用板金部品の半完成品一括集中保管方法。
1. A method of storing sheet metal parts manufactured from a plate-shaped member through press steps such as draw, trim, bend and piercing, and welding, assembling and painting steps as a stock for repair, and an expected number of demands. When the value falls below a predetermined set value, at least the sheet metal parts in a semi-finished product state before painting are collectively covered with a rust preventive sheet and stored as one package, and the mold is discarded. A method for centralized storage of semi-finished sheet metal parts for repair.
【請求項2】 前記予想需要数における所定の設定値
は、前記半完成品の一括保管されるべき梱包体積と金型
の体積及び梱包部品保管金額と金型保管金額とが一致す
るときの値であることを特徴とする請求項1に記載した
補修用板金部品の半完成品一括集中保管方法。
2. The predetermined set value for the expected number of demands is a value when the packaging volume of the semi-finished products to be collectively stored, the volume of the mold, and the packaging component storage amount and the die storage amount match. The method for collectively storing semi-finished products of repair sheet metal parts according to claim 1, wherein
【請求項3】 前記保管された半完成品は、需要に応じ
て追加加工を施すことにより完成品として必要数量づつ
出荷されることを特徴とする請求項1に記載した補修用
板金部品の半完成品一括集中保管方法。
3. The half of the repaired sheet metal part according to claim 1, wherein the stored semi-finished products are shipped in a required quantity as finished products by performing additional processing according to demand. Centralized storage method for finished products.
【請求項4】 前記半完成品は、プレス工程の途中であ
る、ドロー、トリム、ベンド又はピアス等を施されたプ
レス途中品であることを特徴とする請求項1〜3のいず
れかに記載した補修用板金部品の半完成品一括集中保管
方法。
4. The semi-finished product is a press-finished product that has been subjected to a draw, trim, bend, piercing, or the like, which is in the middle of a pressing process, and is in the middle of a press process. Centralized storage method for semi-finished products of repaired sheet metal parts.
【請求項5】 前記半完成品は、プレス完成品であるこ
とを特徴とする請求項1〜3のいずれかに記載した補修
用板金部品の半完成品一括集中保管方法。
5. The method for collectively storing semifinished products of repair sheet metal parts according to claim 1, wherein the semifinished product is a press finished product.
【請求項6】 前記半完成品は、プレス完成品に対して
他部品を溶接したサブコンプ品であることを特徴とする
請求項1〜3のいずれかに記載した補修用板金部品の半
完成品一括集中保管方法。
6. The semi-finished product of a repair sheet metal part according to claim 1, wherein the semi-finished product is a sub-comp product obtained by welding other parts to a press-finished product. Collective centralized storage method.
【請求項7】 前記完成品補修部品の受注により、一括
集中保管している半完成品を組み立てて完成品として供
給することを特徴とする請求項1に記載した補修用板金
部品の半完成品一括集中保管方法。
7. The semi-finished product of the repair sheet metal part according to claim 1, wherein upon receipt of an order for the finished product repair part, the semi-finished product collectively stored in a batch is assembled and supplied as a finished product. Collective centralized storage method.
JP2002033941A 2001-08-01 2002-02-12 Centralized storage method for half-finished repair sheet metal parts Pending JP2003114712A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002033941A JP2003114712A (en) 2001-08-01 2002-02-12 Centralized storage method for half-finished repair sheet metal parts

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2001233771 2001-08-01
JP2001-233771 2001-08-01
JP2002033941A JP2003114712A (en) 2001-08-01 2002-02-12 Centralized storage method for half-finished repair sheet metal parts

Publications (1)

Publication Number Publication Date
JP2003114712A true JP2003114712A (en) 2003-04-18

Family

ID=26619769

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002033941A Pending JP2003114712A (en) 2001-08-01 2002-02-12 Centralized storage method for half-finished repair sheet metal parts

Country Status (1)

Country Link
JP (1) JP2003114712A (en)

Similar Documents

Publication Publication Date Title
US20080072644A1 (en) Integrated, automated, variable sheet metal forming and assembly system
JP2003114712A (en) Centralized storage method for half-finished repair sheet metal parts
Garg et al. Execution of single minute exchange of die on corrugation machine in cardboard box manufacturing company: a case study
WO2003012563A1 (en) Concentrated collective storage method for stock of sheet metal parts for repair
CN104668320A (en) Production process used for gluing and edge covering of automobile door cover
DE102017000480B4 (en) Method for reusing a nest pack insert made from a shape memory material
CA2619938A1 (en) An assembly and a method for cooling and/or forming an item
WO2003040841A1 (en) Compound processing system for sheet metal processing
JP2003233406A (en) Collectively centralized storage method for semi-finished product of spare sheet-metal part
JP2006062702A (en) Packaging tray container for motor
CN2861085Y (en) Material shelf
WO1990010512A1 (en) Process for producing mold
JP2003316414A (en) Semi-finished parts collective storing method and semi- finished parts collective production method
JP4525908B2 (en) Method for manufacturing container cap, and container cap
CN213377527U (en) Glue dispensing and transporting integrated machine for assembling inductors
CN110482026A (en) A kind of EPS packing case method for customizing for automobile component
JPH054551U (en) Sheet metal cover for electronic devices
JP4517471B2 (en) Equipment replacement instruction output device and equipment replacement instruction output method
Giardini et al. Innovative sheet forming processes: evaluation of the economic convenience of an actual case
US20200320475A1 (en) Regional manufacture and assembly of vehicle and vehicle structure
CN220837438U (en) Stamping device is used in spring production
CN112692177B (en) Heat-insulating aluminum profile packaging combination production line and working method thereof
KR100412648B1 (en) Automatic carrying system of panel for press factory
Sirikasemsuk et al. Setup Time Reduction in a Reciprocating Compressor Manufacturing Company: Lean Culture for Sustainable Development and Competitiveness
JPH0643750U (en) Production planning device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20041202

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070725

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070731

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20071204