JP2003074886A - Bathroom heater - Google Patents

Bathroom heater

Info

Publication number
JP2003074886A
JP2003074886A JP2001257293A JP2001257293A JP2003074886A JP 2003074886 A JP2003074886 A JP 2003074886A JP 2001257293 A JP2001257293 A JP 2001257293A JP 2001257293 A JP2001257293 A JP 2001257293A JP 2003074886 A JP2003074886 A JP 2003074886A
Authority
JP
Japan
Prior art keywords
bathroom
temperature
control valve
flow rate
heat exchanger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2001257293A
Other languages
Japanese (ja)
Other versions
JP3661619B2 (en
Inventor
Hironobu Fujita
博信 藤田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Noritz Corp
Original Assignee
Noritz Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Noritz Corp filed Critical Noritz Corp
Priority to JP2001257293A priority Critical patent/JP3661619B2/en
Publication of JP2003074886A publication Critical patent/JP2003074886A/en
Application granted granted Critical
Publication of JP3661619B2 publication Critical patent/JP3661619B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Steam Or Hot-Water Central Heating Systems (AREA)
  • Central Heating Systems (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a bathroom heater which can supply a heat exchanger with a specified quantity of hot water at start of operation without fail even if the flow characteristic of a flow control valve changes. SOLUTION: This bathroom heater is equipped with a heat exchanger 13 which is supplied with warm water circulated from a warm water heating heat source unit 20 via a warm water pipe HC, being installed in a circulation path for circulating the air within a bathroom by circulation fan 12, and the flow control valve 14 which controls the quantity of supplied warm water to the heat exchanger 13 so as to keep the temperature of the bathroom at a set bathroom temperature, being installed within the warm water pipe HC, and this is so arranged as to start operation in condition that the flow control valve 14 is opened to a preset initial opening. This bathroom heater is so arranged as to control the quantity of supplied warm water to the heat exchanger 13 by keeping the flow control valve 4 at its initial opening while a specified time passes after start of operation, and regulate the opening of the flow control valve 14 after passage of a specified time after start of operation so that the temperature of the heat exchanger 13 may come to the predetermined specified temperature separately for each quantity of circulating air.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】この発明は、温水暖房熱源機
から供給される温水の熱を利用して浴室内に温風を吹き
出すことによって浴室内の暖房を行う浴室暖房機に関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a bathroom heater that heats a bathroom by blowing hot air into the bathroom by using heat of hot water supplied from a hot water heating source.

【0002】[0002]

【従来の技術】温水暖房熱源機から供給される温水の熱
を利用して浴室内に温風を吹き出すことによって浴室内
の暖房を行う浴室暖房乾燥機には、本体ケース内に、浴
室内の空気を循環させる循環ファンと、この循環ファン
による空気の循環経路に、温水暖房熱源機から温水が循
環供給される熱交換器とが搭載されており、熱交換器に
温水を循環供給する温水配管に設置された熱動弁を、浴
室温度に応じてON、OFF動作させることによって、
浴室温度を浴室設定温度に保持するようにしたものがあ
る。
2. Description of the Related Art A bathroom heating / drying machine that heats a bathroom by blowing hot air into the bathroom by using the heat of hot water supplied from a hot water heating heat source machine has A circulation fan that circulates air and a heat exchanger to which hot water is circulated and supplied from a hot water heating heat source unit are installed in the air circulation path by the circulation fan, and hot water piping that circulates hot water to the heat exchanger. By turning on and off the thermal valve installed in the, depending on the bathroom temperature,
There is one that keeps the bathroom temperature at the bathroom set temperature.

【0003】しかしながら、上述したように、ON、O
FF動作する熱動弁によって熱交換器に断続的に一定流
量の温水を供給しても、浴室温度を精度よく浴室設定温
度に保持することができないので、こういったON、O
FF動作する熱動弁に代えて流量調節弁を設け、浴室温
度に応じて流量調節弁を比例制御することが望ましい。
However, as described above, ON, O
Even if a constant flow rate of hot water is intermittently supplied to the heat exchanger by the FF operated heat valve, the bathroom temperature cannot be accurately maintained at the bathroom set temperature.
It is desirable to provide a flow rate control valve instead of the FF-operated thermal valve, and to proportionally control the flow rate control valve according to the bathroom temperature.

【0004】また、こういった流量調節弁を浴室温度に
応じて比例制御させる場合は、浴室暖房乾燥機の運転を
開始した後、短時間で浴室温度を浴室設定温度近くにま
で昇温させることができるように、運転開始時には、例
えば、浴室暖房乾燥機が定格能力を発揮するような定格
の温水量を強制的に熱交換器に供給することが望まし
く、そのために予め定められた所定開度(初期開度)ま
で流量調節弁を強制的に開弁した状態で浴室暖房乾燥機
の運転を開始させることが考えられる。
When the flow rate control valve is proportionally controlled according to the bathroom temperature, the bathroom temperature should be raised to near the bathroom set temperature in a short time after the operation of the bathroom heating / drying machine is started. Therefore, at the start of operation, for example, it is desirable to forcibly supply the heat exchanger with a rated amount of hot water such that the bathroom heating / dryer exhibits its rated capacity. It is conceivable to start the operation of the bathroom heating dryer with the flow rate control valve forcedly opened up to (initial opening).

【0005】また、浴室暖房乾燥機の運転中に浴室温度
が暖房停止温度を上回ったために流量調節弁を強制的に
全閉にした場合は、例えば、次回開弁時における流量調
節弁の開度を、全閉直前における流量調節弁の開度まで
強制的に開弁するといった具合に、全閉直前における流
量調節弁の開度に基づいて次回開弁時における流量調節
弁の開度を設定することが考えられる。
When the bathroom temperature exceeds the heating stop temperature during the operation of the bathroom heating / drying machine and the flow rate control valve is forced to be fully closed, for example, the opening degree of the flow rate control valve at the time of the next valve opening. Is forcibly opened to the opening of the flow rate control valve immediately before fully closed, and the opening degree of the flow rate control valve at the time of next opening is set based on the opening degree of the flow rate control valve immediately before fully closed. It is possible.

【0006】[0006]

【発明が解決しようとする課題】しかしながら、流量調
節弁の流量特性は、温水暖房熱源機に搭載された循環ポ
ンプの能力や配管抵抗等によって変化するので、運転開
始時に流量調節弁を上述したような初期開度まで強制的
に開弁させたとしても、浴室暖房乾燥機が定格能力を発
揮するような温水量が熱交換器に確実に供給されるわけ
ではなく、運転開始後、必ずしも、短時間で浴室温度を
確実に浴室設定温度近くまで昇温させることができると
は限らないという問題がある。
However, since the flow rate characteristic of the flow rate control valve changes depending on the capacity of the circulation pump installed in the hot water heating heat source device, the pipe resistance, etc., the flow rate control valve is set as described above at the start of operation. Even if the valve is forcibly opened to such an initial opening, the amount of hot water that will cause the bathroom heater / dryer to reach its rated capacity is not reliably supplied to the heat exchanger. There is a problem that it is not always possible to reliably raise the bathroom temperature to near the bathroom set temperature in time.

【0007】一方、春先等、浴室温度がそれ程低くない
温度条件下で浴室暖房乾燥機を運転する場合、上述した
ように、運転開始時に流量調節弁を初期開度まで強制的
に開弁させることで、定格の温水量を熱交換器に強制的
に供給すると、通常の比例制御が働く前に浴室温度が暖
房停止温度を上回ってしまう場合があり、そのような場
合は、浴室温度が暖房停止温度を上回った時点で流量調
節弁を強制的に全閉にし、その後、浴室温度が浴室設定
温度以下にまで低下した時点で、流量調節弁を開弁させ
ることになるが、その際、上述したように、流量調節弁
を全閉にする直前の開度まで強制的に開弁させると、浴
室温度が即座に暖房停止温度を上回ってしまうので、再
び流量調節弁を強制的に全閉にしなければならない。従
って、こういった場合は、流量調節弁が同様のON、O
FF動作を繰り返すことになり、浴室温度を浴室設定温
度に収束させることができなくなるといった問題があ
る。
On the other hand, when the bathroom heating / drying machine is operated under temperature conditions where the bathroom temperature is not so low, such as in early spring, as described above, the flow control valve must be forcibly opened to the initial opening degree at the start of operation. Therefore, if the rated amount of hot water is forcibly supplied to the heat exchanger, the bathroom temperature may exceed the heating stop temperature before normal proportional control works.In such a case, the bathroom temperature stops heating. When the temperature exceeds the temperature, the flow rate control valve is forcibly closed completely, and then when the bathroom temperature drops below the bathroom set temperature, the flow rate control valve will be opened. As described above, if the flow control valve is forcibly opened to the opening just before it is fully closed, the bathroom temperature will immediately exceed the heating stop temperature, so the flow control valve must be fully closed again. I have to. Therefore, in such a case, the flow rate control valve has the same ON and O
Since the FF operation is repeated, there is a problem that the bathroom temperature cannot be converged to the bathroom set temperature.

【0008】また、冬場のように外気温度が低い場合で
あっても、浴室暖房乾燥機の運転を停止した後、短時間
の間に浴室暖房乾燥機の運転を再開するような場合は、
浴室温度がそれほど低下していないので、上述したよう
に、予め定められた初期開度まで流量調節弁を強制的に
開弁した状態で浴室暖房乾燥機の運転を開始すると、急
激に浴室温度が上昇して浴室設定温度を上回ってしま
い、外気温度が高い温度条件下で浴室暖房乾燥機の運転
を開始する場合と同様に、浴室温度を短時間で浴室設定
温度に収束させることができないという問題がある。
Further, even when the outside air temperature is low as in the winter, when the operation of the bathroom heating dryer is restarted within a short time after the operation of the bathroom heating dryer is stopped,
Since the bathroom temperature has not dropped so much, as described above, when the bathroom heater / dryer is started with the flow rate control valve forcibly opened to the predetermined initial opening, the bathroom temperature suddenly changes. The problem is that the bath temperature rises and exceeds the bathroom set temperature, and it is not possible to converge the bathroom temperature to the bathroom set temperature in a short time, as in the case of starting the operation of the bathroom heater / dryer under a high outside air temperature condition. There is.

【0009】そこで、この発明の第1の課題は、流量調
節弁の流量特性に拘わらず、運転開始時には所定の温水
量を確実に熱交換器に供給することができる浴室暖房機
を提供することにあり、また、この発明の第2の課題
は、運転開始後、浴室温度を短時間で確実に浴室設定温
度に収束させることのできる浴室暖房機を提供すること
にあり、さらに、この発明の第3の課題は、再運転時に
おいても、浴室温度を短時間で確実に浴室設定温度に収
束させることのできる浴室暖房機を提供することにあ
る。
Therefore, a first object of the present invention is to provide a bathroom heater capable of reliably supplying a predetermined amount of hot water to a heat exchanger at the start of operation regardless of the flow rate characteristics of the flow rate control valve. A second object of the present invention is to provide a bathroom heater capable of reliably converging the bathroom temperature to the bathroom set temperature in a short time after the start of operation. A third problem is to provide a bathroom heater capable of reliably converging the bathroom temperature to the bathroom set temperature in a short time even when restarting.

【0010】[0010]

【課題を解決するための手段及びその効果】上述した第
1の課題を解決するため、請求項1にかかる発明は、浴
室内の空気を循環させる循環経路中に設置された、温水
が循環供給される熱交換器と、温水の循環系路中に設置
された、浴室温度を浴室設定温度に保持するように前記
熱交換器への温水の供給量を制御する流量調節弁とを備
え、前記流量調節弁を予め定めた初期開度まで開弁した
状態で運転を開始するようにした浴室暖房機であって、
前記熱交換器の温度が予め定めた規定温度になるよう
に、前記流量調節弁を制御するようにしたことを特徴と
する浴室暖房機を提供するものである。
Means for Solving the Problems and Effects Thereof In order to solve the above-mentioned first problem, the invention according to claim 1 is to circulate and supply hot water installed in a circulation path for circulating air in a bathroom. A heat exchanger, and a flow rate control valve installed in the circulation path of the hot water for controlling the amount of hot water supplied to the heat exchanger so as to keep the bathroom temperature at the bathroom set temperature, A bathroom heater that starts operation with the flow rate control valve opened to a predetermined initial opening,
The bathroom heater is characterized in that the flow control valve is controlled so that the temperature of the heat exchanger reaches a predetermined temperature.

【0011】以上のように、この浴室暖房機は、熱交換
器の温度が予め定めた規定温度になるように、流量調節
弁を制御するようにしたので、流量調節弁の流量特性が
変化しても、所定の温水量を確実に熱交換器に供給する
ことが可能となる。従って、規定温度を所定の温水量が
供給されたときの熱交換器の温度に設定しておくこと
で、流量調節弁を予め定めた初期開度に開弁させた状態
で単に運転を開始する場合に比べて、浴室温度を短時間
で確実に浴室設定温度近くまで昇温させることができ
る。
As described above, in this bathroom heater, the flow rate control valve is controlled so that the temperature of the heat exchanger reaches the predetermined temperature, so that the flow rate characteristic of the flow rate control valve changes. However, it becomes possible to reliably supply a predetermined amount of hot water to the heat exchanger. Therefore, by setting the specified temperature to the temperature of the heat exchanger when a predetermined amount of hot water is supplied, the operation is simply started with the flow rate control valve opened to a predetermined initial opening. Compared with the case, the bathroom temperature can be reliably raised to near the bathroom set temperature in a short time.

【0012】また、運転開始直後は、必ずしも、定格温
度の温水が熱交換器に供給されるとは限らないので、請
求項2にかかる発明の浴室暖房機のように、運転開始か
ら所定時間が経過するまでの間は、前記流量調節弁を予
め定めた前記初期開度に保持し、運転開始から前記所定
時間が経過した後に、前記熱交換器の温度が予め定めた
規定温度になるように、前記流量調節弁を制御するよう
にしておくと、定格温度の温水が熱交換器に定常的に供
給されるようになった状態で、流量調節弁を制御するこ
とができるので、流量調節弁が必要以上に開弁すること
がなく、熱交換器温度のオーバーシュートを防止するこ
とができる。
Further, immediately after the start of operation, hot water of the rated temperature is not always supplied to the heat exchanger. Therefore, as in the bathroom heater according to the second aspect of the invention, the predetermined time has elapsed from the start of operation. Until the time elapses, the flow rate control valve is held at the predetermined initial opening degree, and after the predetermined time has elapsed from the start of operation, the temperature of the heat exchanger is set to a predetermined specified temperature. By controlling the flow rate control valve, the flow rate control valve can be controlled in the state where hot water of the rated temperature is constantly supplied to the heat exchanger. However, it is possible to prevent overshoot of the heat exchanger temperature without opening the valve more than necessary.

【0013】また、請求項3にかかる発明の浴室暖房機
のように、浴室内の空気の循環風量が少なくなるに従っ
て、前記規定温度を低く設定するようにしたものにあっ
ては、浴室暖房機から吹き出される温風の吹出風速が小
さくなるに従って、温風の吹出温度も低くなるので、浴
室暖房機から浴室に吹き出された温風が浴室上部に舞い
上がりにくくなり、浴室上部の温度が極端に高くなると
いった状態を防止することができる。
Further, in the bathroom heater according to the third aspect of the invention, the specified temperature is set lower as the circulating air volume of the air in the bathroom decreases. As the blowing speed of the warm air blown from the room decreases, the temperature of the hot air also drops, so the warm air blown from the bathroom heater to the bathroom is less likely to rise to the upper part of the bathroom, and the temperature of the upper part of the bathroom becomes extremely extreme. It is possible to prevent a situation in which the price rises.

【0014】また、上述した第2の課題を解決するた
め、請求項4にかかる発明は、浴室内の空気を循環させ
る循環経路中に設置された、温水が循環供給される熱交
換器と、温水の循環系路中に設置された、浴室温度を浴
室設定温度に保持するように前記熱交換器への温水の供
給量を制御する流量調節弁とを備え、前記流量調節弁を
予め定めた初期開度まで開弁した状態で運転を開始し、
運転開始後に前記流量調節弁を全閉にする際は、その全
閉直前における前記流量調節弁の開度に基づいて、次回
開弁時における前記流量調節弁の開度を設定するように
した浴室暖房機であって、運転開始から所定時間が経過
した時点で、浴室温度が浴室設定温度を上回っている場
合は、即座に前記流量調節弁を全閉にすると共に、次回
開弁時における前記流量調節弁の開度を、前記流量調節
弁の全閉直前における開度に対して予め定めた開度補正
量だけ閉方向に補正した開度に設定するようにしたこと
を特徴とする浴室暖房機を提供するものである。
In order to solve the above-mentioned second problem, the invention according to claim 4 is a heat exchanger installed in a circulation path for circulating the air in a bathroom, in which hot water is circulated and supplied, A flow rate control valve installed in the circulation path of the hot water for controlling the amount of hot water supplied to the heat exchanger so as to maintain the bathroom temperature at the bathroom set temperature, and the flow rate control valve is predetermined. Start operation with the valve opened to the initial opening,
When fully closing the flow rate control valve after the start of operation, based on the opening degree of the flow rate control valve immediately before the full closure, the bathroom which is configured to set the opening degree of the flow rate control valve at the next opening In the case of a heater, if the bathroom temperature exceeds the bathroom set temperature at the time when a predetermined time has passed from the start of operation, the flow rate control valve is immediately fully closed and the flow rate at the time of opening the next time. A bathroom heater characterized in that the opening of the control valve is set to an opening corrected in the closing direction by a predetermined opening correction amount with respect to the opening immediately before the flow control valve is fully closed. Is provided.

【0015】以上のように、この浴室暖房機は、運転開
始から所定時間が経過した時点で、浴室温度が浴室設定
温度を上回っている場合は、即座に前記流量調節弁を全
閉にすると共に、次回開弁時における前記流量調節弁の
開度を、前記流量調節弁の全閉直前における開度に対し
て予め定めた開度補正量だけ閉方向に補正した開度に設
定するようにしたので、運転開始時における浴室温度に
対して、予め設定されている流量調節弁の初期開度が開
きすぎであった場合でも、流量調節弁が全閉になった
後、再び開弁する際における流量調節弁の開度は、初期
開度に対して開度補正量だけ閉方向に修正されることに
なるので、流量調節弁がON、OFF動作を繰り返すこ
とがなく、浴室温度を短時間で浴室設定温度に収束させ
ることができる。
As described above, this bathroom heater immediately fully closes the flow rate control valve when the bathroom temperature exceeds the bathroom set temperature at the time when a predetermined time has passed from the start of operation. The opening degree of the flow rate control valve at the time of the next valve opening is set to an opening degree that is corrected in the closing direction by a predetermined opening degree correction amount with respect to the opening degree immediately before the flow rate control valve is fully closed. Therefore, even if the preset opening degree of the flow rate control valve is too open for the bathroom temperature at the start of operation, the flow rate control valve should be fully closed and then opened again. Since the opening of the flow rate control valve is corrected in the closing direction by the opening correction amount with respect to the initial degree of opening, the flow rate control valve does not repeat ON and OFF operations, and the bathroom temperature can be shortened in a short time. Can be set to the bathroom set temperature.

【0016】特に、請求項5にかかる発明の浴室暖房機
のように、運転開始から前記所定時間が経過した時点
で、浴室温度が浴室設定温度を上回っている場合は、運
転開始から前記所定時間が経過した時点における浴室温
度が高くなるに従って、前記開度補正量を大きくするよ
うにしておくと、運転開始から前記所定時間が経過した
時点における浴室温度が浴室設定温度に対して大きく上
回っている場合、即ち、運転開始時における浴室温度に
対して、予め定めた初期開度に開弁された流量調節弁が
大きく開きすぎている場合には、次回開弁時における流
量調節弁の開度が初期開度に対して大きく閉方向に修正
されるといった具合に、運転開始時における流量調節弁
の開きすぎの度合いに応じて、次回開弁時における流量
調節弁の開度が設定されるので、さらに、短時間で浴室
温度を浴室設定温度に収束させることができる。
Particularly, in the bathroom heater of the invention according to claim 5, when the bathroom temperature exceeds the bathroom set temperature at the time when the predetermined time has elapsed from the start of operation, the predetermined time from the start of operation If the opening correction amount is set to increase as the bathroom temperature at the time of elapses increases, the bathroom temperature at the time when the predetermined time elapses from the start of operation greatly exceeds the bathroom set temperature. In that case, that is, when the flow control valve opened to a predetermined initial opening is too wide open with respect to the bathroom temperature at the start of operation, the opening of the flow control valve at the next valve opening will be The opening of the flow control valve at the next valve opening is set according to the degree to which the flow control valve opens too much at the start of operation, such as by making a large correction to the initial opening. Since the further it is possible to converge the bath temperature bath set temperature in a short time.

【0017】また、上述した第3の課題を解決するた
め、請求項6にかかる発明は、浴室内の空気を循環させ
る循環経路中に設置された、温水が循環供給される熱交
換器と、温水の循環系路中に設置された、浴室温度を浴
室設定温度に保持するように前記熱交換器への温水の供
給量を制御する流量調節弁とを備え、前記流量調節弁を
予め定めた初期開度まで強制的に開弁した状態で運転を
開始するようにした浴室暖房機であって、直前の運転停
止時点から所定時間が経過する前に運転が再開された場
合は、直前の運転停止時点における前記流量調節弁の開
度を、初期開度に設定して運転を開始するようにしたこ
とを特徴とする浴室暖房機を提供するものである。
Further, in order to solve the above-mentioned third problem, the invention according to claim 6 is a heat exchanger installed in a circulation path for circulating air in a bathroom, in which hot water is circulated and supplied, A flow rate control valve installed in the circulation path of the hot water for controlling the amount of hot water supplied to the heat exchanger so as to maintain the bathroom temperature at the bathroom set temperature, and the flow rate control valve is predetermined. A bathroom heater designed to start operation with the valve opened compulsorily up to the initial opening, and if the operation is restarted before a predetermined time has elapsed since the last operation stop, the previous operation The bathroom heater is characterized in that the opening degree of the flow control valve at the time of stop is set to an initial opening degree to start the operation.

【0018】以上のように、この浴室暖房機は、直前の
運転停止時点から所定時間が経過する前に運転が再開さ
れた場合、即ち、浴室温度が浴室設定温度から大きく低
下していない状態で運転が再開された場合は、直前の運
転停止時点における前記流量調節弁の開度、即ち、浴室
温度が浴室設定温度に保持されている状態における流量
調節弁の開度を、初期開度に設定して運転を開始するよ
うにしたので、予め設定された初期開度まで流量調節弁
を開弁した状態から一律に運転を開始する場合に比べ
て、浴室設定温度に対する浴室温度のオーバーシュート
を防止でき、短時間で確実に浴室温度を浴室設定温度に
収束させることができる。
As described above, when the operation of the bathroom heater is restarted before a predetermined time has passed since the last stop of operation, that is, when the bathroom temperature has not dropped significantly from the set temperature of the bathroom. When the operation is restarted, the opening degree of the flow rate adjusting valve at the time of the last stop of operation, that is, the opening degree of the flow rate adjusting valve in the state where the bathroom temperature is maintained at the bathroom set temperature is set to the initial opening degree. Since the operation is started by doing so, overshooting of the bathroom temperature against the bathroom set temperature is prevented compared to when the operation is uniformly started from the state where the flow rate control valve is opened to the preset initial opening. Therefore, the bathroom temperature can be surely converged to the bathroom set temperature in a short time.

【0019】特に、請求項7にかかる発明の浴室暖房機
のように、直前の運転停止時点から所定時間が経過する
前に運転が再開された場合は、運転を停止した時点から
運転を再開するまでの経過時間が長くなるに従って、初
期開度を徐々に開方向に修正するようにしておくと、運
転停止後における浴室温度の低下を見込んで初期開度が
設定されることになるので、さらに、短時間で確実に浴
室温度を浴室設定温度に収束させることができる。
In particular, like the bathroom heater of the invention according to claim 7, when the operation is restarted before a predetermined time has elapsed since the last time the operation was stopped, the operation is restarted from the time when the operation was stopped. If the initial opening is gradually corrected in the opening direction as the elapsed time increases, the initial opening will be set in anticipation of a decrease in bathroom temperature after the operation is stopped. The bathroom temperature can be reliably converged to the bathroom set temperature in a short time.

【0020】また、上述した第3の課題を解決するた
め、請求項8にかかる発明は、浴室内の空気を循環させ
る循環経路中に設置された、温水が循環供給される熱交
換器と、温水の循環系路中に設置された、浴室温度を浴
室設定温度に保持するように前記熱交換器への温水の供
給量を制御する流量調節弁とを備え、前記流量調節弁を
予め定めた初期開度まで強制的に開弁した状態で運転を
開始するようにした浴室暖房機であって、運転開始時点
における前記熱交換器の温度が所定温度より高い場合
は、直前の運転停止時点における前記流量調節弁の開度
を、初期開度に設定して運転を開始するようにしたこと
を特徴とする浴室暖房機を提供するものである。
In order to solve the above-mentioned third problem, the invention according to claim 8 is a heat exchanger installed in a circulation path for circulating the air in a bathroom, in which hot water is circulated and supplied, A flow rate control valve installed in the circulation path of the hot water for controlling the amount of hot water supplied to the heat exchanger so as to maintain the bathroom temperature at the bathroom set temperature, and the flow rate control valve is predetermined. A bathroom heater that is configured to start operation in a state where the valve is forcibly opened up to the initial opening, and when the temperature of the heat exchanger at the time of starting operation is higher than a predetermined temperature, the temperature at the time of last operation stop The bathroom heater is characterized in that the opening of the flow rate control valve is set to an initial opening to start the operation.

【0021】以上のように、この浴室暖房機は、運転開
始時点における熱交換器の温度が所定温度より高い場
合、即ち、浴室温度が浴室設定温度から大きく低下して
いない状態で運転が再開された場合は、直前の運転停止
時点における前記流量調節弁の開度、即ち、浴室温度が
浴室設定温度に保持されている状態における流量調節弁
の開度を、初期開度に設定して運転を開始するようにし
たので、予め設定された初期開度まで流量調節弁を開弁
した状態から一律に運転を開始する場合に比べて、浴室
設定温度に対する浴室温度のオーバーシュートを防止で
き、短時間で確実に浴室温度を浴室設定温度に収束させ
ることができる。
As described above, the operation of this bathroom heater is restarted when the temperature of the heat exchanger at the start of operation is higher than the predetermined temperature, that is, in the state where the bathroom temperature has not dropped significantly from the bathroom set temperature. In the case of the above, the opening degree of the flow rate control valve at the time of the last stop of operation, that is, the opening degree of the flow rate control valve in the state where the bathroom temperature is maintained at the bathroom set temperature is set to the initial opening degree, and the operation is performed. Since it is started, it is possible to prevent the overshoot of the bathroom temperature against the bathroom set temperature and to shorten the time compared to when the operation is uniformly started from the state where the flow rate control valve is opened to the preset initial opening. With this, the bathroom temperature can be reliably converged to the bathroom set temperature.

【0022】特に、請求項9にかかる発明の浴室暖房機
のように、運転開始時における前記熱交換器の温度が所
定温度より高い場合は、運転開始時点における前記熱交
換器の温度が低くなるに従って、初期開度を徐々に開方
向に修正するようにしておくと、運転停止後における浴
室温度の低下を見込んで初期開度が設定されることにな
るので、さらに、短時間で確実に浴室温度を浴室設定温
度に収束させることができる。
Particularly, when the temperature of the heat exchanger at the start of operation is higher than a predetermined temperature, as in the bathroom heater of the invention according to claim 9, the temperature of the heat exchanger at the start of operation becomes low. If the initial opening is gradually corrected to the opening direction according to the above, the initial opening will be set in anticipation of a decrease in the bathroom temperature after the operation is stopped. The temperature can be converged to the bathroom set temperature.

【0023】また、上述した第3の課題を解決するた
め、請求項10にかかる発明は、浴室内の空気を循環さ
せる循環経路中に設置された、温水が循環供給される熱
交換器と、温水の循環系路中に設置された、浴室温度を
浴室設定温度に保持するように前記熱交換器への温水の
供給量を制御する流量調節弁とを備え、前記流量調節弁
を予め定めた初期開度まで強制的に開弁した状態で運転
を開始するようにした浴室暖房機であって、運転開始時
点における浴室温度が所定温度より高い場合は、直前の
運転停止時点における前記流量調節弁の開度を、初期開
度に設定して運転を開始するようにしたことを特徴とす
る浴室暖房機を提供するものである。
In order to solve the above-mentioned third problem, the invention according to claim 10 is a heat exchanger installed in a circulation path for circulating the air in a bathroom, in which hot water is circulated and supplied, A flow rate control valve installed in the circulation path of the hot water for controlling the amount of hot water supplied to the heat exchanger so as to maintain the bathroom temperature at the bathroom set temperature, and the flow rate control valve is predetermined. A bathroom heater configured to start operation in a state where the valve is forcibly opened to the initial opening, and when the bathroom temperature at the time of starting operation is higher than a predetermined temperature, the flow rate control valve at the time of immediately preceding stop of operation. The present invention provides a bathroom heater characterized in that the opening degree is set to an initial opening degree to start the operation.

【0024】以上のように、この浴室暖房機は、運転開
始時点における浴室温度が所定温度より高い場合、即
ち、浴室温度が浴室設定温度から大きく低下していない
状態で運転が再開された場合は、直前の運転停止時点に
おける前記流量調節弁の開度、即ち、浴室温度が浴室設
定温度に保持されている状態における流量調節弁の開度
を、初期開度に設定して運転を開始するようにしたの
で、予め設定された初期開度まで流量調節弁を開弁した
状態から一律に運転を開始する場合に比べて、浴室設定
温度に対する浴室温度のオーバーシュートを防止でき、
短時間で確実に浴室温度を浴室設定温度に収束させるこ
とができる。
As described above, this bathroom heater is operated when the bathroom temperature at the start of operation is higher than the predetermined temperature, that is, when the bathroom temperature is not significantly decreased from the bathroom set temperature. The opening degree of the flow rate control valve at the time of the last stop of operation, that is, the opening degree of the flow rate control valve in the state where the bathroom temperature is kept at the bathroom set temperature is set to the initial opening degree to start the operation. Therefore, compared to the case where the operation is uniformly started from the state where the flow rate control valve is opened to the preset initial opening, overshoot of the bathroom temperature with respect to the bathroom set temperature can be prevented,
The bathroom temperature can be reliably converged to the bathroom set temperature in a short time.

【0025】特に、請求項11にかかる発明の浴室暖房
機のように、運転開始時における浴室温度が所定温度よ
り高い場合は、運転開始時点における前記浴室温度が低
くなるに従って、初期開度を徐々に開方向に修正するよ
うにしておくと、運転停止後における浴室温度の低下を
見込んで初期開度が設定されることになるので、さら
に、短時間で確実に浴室温度を浴室設定温度に収束させ
ることができる。
Particularly, when the bathroom temperature at the start of operation is higher than a predetermined temperature, as in the bathroom heater of the invention according to claim 11, the initial opening is gradually increased as the bathroom temperature at the start of operation becomes lower. If the opening temperature is corrected to the open direction, the initial opening will be set in anticipation of a decrease in the bathroom temperature after the operation is stopped. Can be made.

【0026】[0026]

【発明の実施の形態】以下、実施の形態について図面を
参照して説明する。この浴室暖房乾燥機1は、図1に示
すように、本体ケース11内に、浴室内の空気を循環さ
せる循環ファン12や、循環ファン12による浴室内の
空気の循環経路中に配置された、温水配管HCを介して
温水暖房熱源機20から温水が循環供給される熱交換器
13が搭載されており、熱交換器13に温水を循環供給
する温水配管HCには、熱交換器13に供給する温水量
を調節する、ステッピングモータによって開閉駆動され
る流量調節弁14が設置されている。
BEST MODE FOR CARRYING OUT THE INVENTION Embodiments will be described below with reference to the drawings. As shown in FIG. 1, the bathroom heater / dryer 1 is arranged in a main body case 11 in a circulation fan 12 for circulating the air in the bathroom, and in a circulation path of the air in the bathroom by the circulation fan 12. A heat exchanger 13 to which hot water is circulated and supplied from a hot water heating heat source device 20 via a hot water pipe HC is mounted, and a hot water pipe HC for circulating hot water to the heat exchanger 13 is supplied to the heat exchanger 13. A flow rate control valve 14 that opens and closes by a stepping motor that adjusts the amount of hot water to be operated is installed.

【0027】また、本体ケース11内には、循環ファン
12、流量調節弁14等の暖房機構部を統括的に制御す
るコントローラ15が設置されていると共に、浴室内の
空気の吸込温度、即ち、浴室温度を検出する浴室温度セ
ンサ16や熱交換器13自体の温度を検出する熱交換器
温度センサ17が設置されており、運転スイッチ信号、
浴室設定温度信号、循環設定風量信号等がワイヤレスリ
モコン18からコントローラ15に送信されると共に、
浴室温度センサ16及び熱交換器温度センサ17からの
温度検出信号がコントローラ15に出力されるようにな
っている。
Further, in the main body case 11, a controller 15 for integrally controlling the heating mechanism such as the circulation fan 12 and the flow rate control valve 14 is installed, and the suction temperature of the air in the bathroom, that is, A bathroom temperature sensor 16 for detecting the bathroom temperature and a heat exchanger temperature sensor 17 for detecting the temperature of the heat exchanger 13 itself are installed, and an operation switch signal,
While the bathroom set temperature signal, the circulation set air volume signal, etc. are transmitted from the wireless remote controller 18 to the controller 15,
Temperature detection signals from the bathroom temperature sensor 16 and the heat exchanger temperature sensor 17 are output to the controller 15.

【0028】以上のように構成された浴室暖房乾燥機1
の運転動作について、図2〜図6に示すフローチャート
を参照しながら説明する。まず、図2に示すように、運
転スイッチがONされると(ステップS1)、流量調節
弁14の初期開度を決定するための前処理が実行され
(ステップS2)、この前処理によって決定された初期
開度まで流量調節弁14を強制的に開弁した状態で浴室
暖房乾燥機1の運転が開始される(ステップS3)。な
お、ここにいう「開度」は、流量調節弁14の開閉駆動
を行うステッピングモータに出力されるステップ数で示
されており、ステップ数が大きくなるに従って、流量調
節弁14の開度が大きくなるようになっている。
The bathroom heater / dryer 1 configured as described above
The driving operation will be described with reference to the flowcharts shown in FIGS. First, as shown in FIG. 2, when the operation switch is turned on (step S1), a preprocess for determining the initial opening of the flow rate control valve 14 is executed (step S2), and the preprocess is determined. The operation of the bathroom heater / dryer 1 is started with the flow rate control valve 14 forcedly opened to the initial opening (step S3). It should be noted that the “opening degree” here is indicated by the number of steps output to the stepping motor that drives the opening / closing of the flow rate adjusting valve 14, and the opening degree of the flow rate adjusting valve 14 increases as the number of steps increases. It is supposed to be.

【0029】まず、流量調節弁14の初期開度を決定す
るための前処理について、図3に示すフローチャートを
参照しながら説明する。まず、運転スイッチがONされ
ると、直前の運転停止時点から2時間以上経過している
か否か、即ち、運転開始時点における浴室温度が浴室設
定温度から大きく低下しているか否かを判断し(ステッ
プS11)、2時間以上経過している場合は、流量調節
弁14の初期開度を、予め定められた固定開度1(例え
ば、64ステップ)に設定する(ステップS12)。な
お、この「固定開度1」は、この浴室暖房乾燥機1が定
格能力を発揮するための定格温水量を熱交換器13に供
給することができると想定される開度に設定されてい
る。
First, the preprocessing for determining the initial opening of the flow rate control valve 14 will be described with reference to the flowchart shown in FIG. First, when the operation switch is turned on, it is determined whether or not two hours or more have passed since the last operation stop time, that is, whether or not the bathroom temperature at the start of operation is significantly lower than the bathroom set temperature ( (Step S11) If two hours or more have elapsed, the initial opening degree of the flow rate control valve 14 is set to a predetermined fixed opening degree 1 (for example, 64 steps) (Step S12). In addition, this "fixed opening 1" is set to an opening which is assumed to be capable of supplying the rated amount of hot water for the bathroom heating / drying machine 1 to exert its rated capacity to the heat exchanger 13. .

【0030】一方、ステップS11において、経過時間
が2時間未満である場合は、直前の運転停止時点におけ
る流量調節弁14の開度が記憶されているか否かを判断
し(ステップS13)、初回運転時のように流量調節弁
14の開度情報が記憶されていない場合や停電等によっ
て記憶していた流量調節弁14の開度情報が失われた場
合は、流量調節弁14の初期開度を、予め定められた固
定開度2(例えば、50ステップ)に設定する(ステッ
プS14)。なお、この「固定開度2」は、運転開始時
点における浴室温度が浴室設定温度から大きく低下して
いないことを考慮して、「固定開度1」よりも閉方向に
ある程度絞った開度に設定されている。
On the other hand, when the elapsed time is less than 2 hours in step S11, it is determined whether or not the opening degree of the flow rate control valve 14 at the time of the last operation stop is stored (step S13), and the first operation is performed. If the opening information of the flow rate control valve 14 is not stored as in the case of time, or if the stored opening degree information of the flow rate control valve 14 is lost due to a power outage or the like, the initial opening degree of the flow rate control valve 14 is changed. , And a predetermined fixed opening 2 (for example, 50 steps) is set (step S14). Note that this "fixed opening 2" is a smaller opening than the "fixed opening 1" in the closing direction, considering that the bathroom temperature at the start of operation has not dropped significantly from the bathroom set temperature. It is set.

【0031】ステップS13において、直前の運転停止
時点における流量調節弁14の開度が記憶されている場
合は、経過時間が30分未満であるか否かを判断し(ス
テップS15)、経過時間が30分未満である場合は、
初期開度を、記憶されている直前の運転停止時点におけ
る流量調節弁14の開度に設定する(ステップS1
6)。
In step S13, when the opening degree of the flow rate control valve 14 at the time of the last operation stop is stored, it is judged whether the elapsed time is less than 30 minutes (step S15), and the elapsed time is determined. If less than 30 minutes,
The initial opening is set to the stored opening of the flow rate control valve 14 at the time immediately before the stop of operation (step S1).
6).

【0032】ステップS15において、経過時間が30
分以上である場合は、経過時間が45分未満であるか否
かを判断し(ステップS17)、経過時間が30分以上
45分未満である場合は、初期開度を、記憶されている
直前の運転停止時点における流量調節弁14の開度に1
0ステップを加算した開度に設定する(ステップS1
8)。
In step S15, the elapsed time is 30
If the elapsed time is less than 45 minutes, it is determined whether the elapsed time is less than 45 minutes (step S17). If the elapsed time is 30 minutes or more and less than 45 minutes, the initial opening degree is stored immediately before being stored. 1 for the opening degree of the flow rate control valve 14 when the operation of
The opening is set by adding 0 step (step S1
8).

【0033】ステップS17において、経過時間が45
分以上である場合は、経過時間が1時間未満であるか否
かを判断し(ステップS19)、経過時間が45分以上
1時間未満である場合は、初期開度を、記憶されている
直前の運転停止時点における流量調節弁14の開度に1
5ステップを加算した開度に設定し(ステップS2
0)、経過時間が1時間以上2時間未満である場合は、
記憶されている直前の運転停止時点における流量調節弁
14の開度に20ステップを加算した開度に設定する
(ステップS21)。
In step S17, the elapsed time is 45
If the elapsed time is less than 1 hour, it is determined whether or not the elapsed time is less than 1 hour (step S19). If the elapsed time is 45 minutes or more and less than 1 hour, the initial opening is set immediately before being stored. 1 for the opening degree of the flow rate control valve 14 when the operation of
The opening is set by adding 5 steps (step S2
0), if the elapsed time is 1 hour or more and less than 2 hours,
20 degrees is added to the stored opening degree of the flow rate control valve 14 at the time of the last stop of operation (step S21).

【0034】以上のように、この浴室暖房乾燥機1で
は、直前の運転停止時点から2時間が経過する前に運転
が再開された場合、即ち、浴室温度が浴室設定温度から
大きく低下していない状態で運転が再開された場合は、
直前の運転停止時点における流量調節弁14の開度、即
ち、浴室温度が浴室設定温度に保持されている状態にお
ける流量調節弁14の開度に基づいて、初期開度を設定
するようにしたので、予め設定された固定開度2まで流
量調節弁14を開弁した状態から一律に運転を開始する
場合に比べて、浴室設定温度に対する浴室温度のオーバ
ーシュートを防止でき、短時間で確実に浴室温度を浴室
設定温度に収束させることができる。
As described above, in the bathroom heater / dryer 1, when the operation is restarted before two hours have passed since the last operation stop time, that is, the bathroom temperature has not dropped significantly from the bathroom set temperature. When the operation is restarted in the state,
Since the opening degree is set based on the opening degree of the flow rate control valve 14 at the time of the immediately preceding stop of operation, that is, the opening degree of the flow rate control valve 14 in the state where the bathroom temperature is maintained at the bathroom set temperature. Compared to the case where the operation is uniformly started from the state in which the flow rate control valve 14 is opened to the preset fixed opening 2, the overshoot of the bathroom temperature with respect to the bathroom set temperature can be prevented, and the bathroom can be reliably operated in a short time. The temperature can be converged to the bathroom set temperature.

【0035】特に、この浴室暖房乾燥機1では、直前の
運転停止時点から2時間が経過する前に運転が再開され
た場合は、運転を停止した時点から運転を再開するまで
の経過時間が長くなるに従って、初期開度を段階的に開
方向に修正するようにしているので、運転停止後におけ
る浴室温度の低下を見込んで初期開度が設定されること
になり、さらに、短時間で確実に浴室温度を浴室設定温
度に収束させることができる。
In particular, in this bathroom heating / drying machine 1, when the operation is restarted 2 hours after the last operation stop, the elapsed time from the stop of the operation to the restart is long. As the initial opening is gradually changed to the opening direction, the initial opening is set in anticipation of a decrease in the bathroom temperature after the operation is stopped. The bathroom temperature can be converged to the bathroom set temperature.

【0036】なお、この実施形態では、直前の運転停止
時点から2時間が経過したか否かによって、運転再開時
における流量調節弁14の初期開度を、予め定めた固定
開度1に設定するのか、直前の運転停止時点における流
量調節弁14の開度に基づいて初期開度を設定するのか
の判断を行っているが、判断基準となる経過時間は2時
間に限定されるものではなく、運転開始後における浴室
の温度上昇等を考慮して適宜決定すればよい。
In this embodiment, the initial opening of the flow rate control valve 14 at the time of restarting the operation is set to a predetermined fixed opening 1 depending on whether or not two hours have passed since the last stop of the operation. Whether or not to set the initial opening based on the opening of the flow rate control valve 14 at the time of the immediately preceding stop of operation, the elapsed time serving as a judgment reference is not limited to 2 hours. It may be appropriately determined in consideration of the temperature rise of the bathroom after the start of operation.

【0037】また、この実施形態では、直前の運転停止
時点から2時間が経過する前に運転が再開された場合
は、経過時間が30分以上45分未満、45分以上1時
間未満、1時間以上2時間未満といった3段階で、それ
ぞれ初期開度を開方向に修正するようにしているが、初
期開度を修正するための時間間隔や各開度修正量は、運
転開始後における浴室の温度上昇等を考慮して適宜決定
すればよい。
Further, in this embodiment, when the operation is restarted before 2 hours have passed since the last operation stop time, the elapsed time is 30 minutes or more and less than 45 minutes, 45 minutes or more and less than 1 hour, and 1 hour. The initial opening is corrected in the opening direction in three steps, each of which is less than 2 hours. However, the time interval for correcting the initial opening and each opening correction amount are the temperature of the bathroom after the start of operation. It may be appropriately determined in consideration of the increase.

【0038】また、この実施形態では、直前の運転停止
時点から2時間が経過する前に運転が再開された場合
は、経過時間が長くなるに従って、直前の運転停止時点
における流量調節弁14の開度を開方向に修正し、その
修正後の開度を初期開度に設定するようにしているが、
これに限定されるものではなく、直前の運転停止時点か
ら2時間(所定時間)が経過する前に運転が再開された
場合は、経過時間に拘わらず、直前の運転停止時点にお
ける流量調節弁14の開度を初期開度に設定することも
可能である。
Further, in this embodiment, when the operation is restarted 2 hours after the last operation stop time, the flow control valve 14 is opened at the last operation stop time as the elapsed time becomes longer. The degree is corrected to the opening direction, and the corrected opening is set to the initial opening.
However, the present invention is not limited to this, and when the operation is restarted before 2 hours (predetermined time) have elapsed from the time when the operation was stopped immediately before, the flow control valve 14 at the time when the operation is stopped immediately before is stopped regardless of the elapsed time. It is also possible to set the opening degree of to the initial opening degree.

【0039】また、この実施形態では、直前の運転停止
時点からの経過時間によって、初期開度を、直前の運転
停止時点における流量調節弁14の開度に基づいて設定
するのか、予め定めた固定開度(固定開度1)に設定す
るのかを判断するようにしているが、これに限定される
ものではなく、運転開始時点における実際の浴室温度が
予め定めた所定温度を上回っているか否かによって判断
したり、運転開始時点における熱交換器13の温度が予
め定めた所定温度を上回っているか否かによって判断す
ることも可能であり、そのような判断手法を採用する場
合は、運転開始時点における浴室温度や熱交換器温度が
所定温度をどの程度上回っているかによって、直前の運
転停止時点における流量調節弁14の開度に修正を加
え、即ち、運転開始時点における浴室温度や熱交換器温
度が低くなるに従って、直前の運転停止時点における流
量調節弁14の開度を徐々に開方向に修正し、その修正
後の開度を初期開度に設定すればよい。
Further, in this embodiment, the initial opening is set based on the opening of the flow rate control valve 14 at the time of the immediately preceding stop of operation, or a predetermined fixed value depending on the elapsed time from the time of the last stop of operation. Although it is determined whether to set the opening (fixed opening 1), the present invention is not limited to this, and whether the actual bathroom temperature at the start of operation is higher than a predetermined temperature. It is also possible to make a determination based on whether or not the temperature of the heat exchanger 13 at the time of starting operation exceeds a predetermined temperature set in advance. The opening degree of the flow rate control valve 14 at the time of the last stop of operation is corrected, that is, the start of operation, depending on how much the bathroom temperature and the heat exchanger temperature in the above are higher than a predetermined temperature. As the bathroom temperature and the heat exchanger temperature at the point become lower, the opening degree of the flow control valve 14 at the time of the last stop of operation is gradually corrected to the opening direction, and the corrected opening degree is set to the initial opening degree. Good.

【0040】また、運転を停止しても、熱交換器13の
温度は急激に低下するわけではないので、この浴室暖房
乾燥機1のように、浴室温度センサ16が本体ケース1
1内に設置されている場合、循環ファン12が停止して
いる運転停止状態においては、本体ケース11内の温度
が浴室設定温度を上回ってしまい、正確な浴室温度を検
出することができず、運転停止後、ある程度の時間が経
過するまでは、浴室温度センサ16が検出している温度
が浴室設定温度を上回る場合が多いので、そういった浴
室暖房乾燥機では、運転開始時点における浴室温度(浴
室温度センサが検出している温度)が浴室設定温度を上
回っているか否かによって、初期開度を、直前の運転停
止時点における流量調節弁の開度に基づいて設定するの
か、予め定めた固定開度に設定するのかを判断すること
も可能である。
Further, even if the operation is stopped, the temperature of the heat exchanger 13 does not drop sharply. Therefore, as in the bathroom heating / drying machine 1, the bathroom temperature sensor 16 has the main body case 1.
In the case where the circulating fan 12 is stopped, the temperature inside the main body case 11 exceeds the bathroom set temperature, and the accurate bathroom temperature cannot be detected. Since the temperature detected by the bathroom temperature sensor 16 often exceeds the bathroom set temperature until a certain amount of time elapses after the operation is stopped, in such a bathroom heating / drying machine, the bathroom temperature (bathroom temperature at the start of operation) Whether the initial opening is set based on the opening of the flow control valve at the time of the last stop of operation, depending on whether the temperature detected by the sensor) is higher than the set temperature of the bathroom, or a predetermined fixed opening. It is also possible to determine whether to set to.

【0041】このようにして前処理によって決定された
初期開度まで流量調節弁14を強制的に開弁した状態で
運転が開始された浴室暖房乾燥機1は、図2に示すよう
に、熱交換器温度センサ17によって検出された熱交換
器温度と循環設定風量(強風、弱風、微風)毎に予め設
定されている熱交換器13の規定温度とに基づいて、熱
交換器温度が規定温度になるように流量調節弁14の開
度調整を行うことで熱交換器13に供給される温水量を
制御する熱交温度制御と、浴室温度センサ16によって
検出される浴室温度と浴室設定温度とに基づいて、浴室
温度が浴室設定温度になるように流量調節弁14の開度
調整を行うことで熱交換器13への温水量を制御する室
温制御とが並行して実行され(ステップS4、ステップ
S5)、これによって、浴室温度が短時間で浴室設定温
度に収束し、保持される。なお、循環風量が強風に設定
されている場合における「熱交換器13の規定温度」
は、定格の暖房能力を発揮する定格温水量が熱交換器1
3に供給されたときの熱交換器13の温度であり、具体
的には、強風、弱風、微風に対してそれぞれ62℃、5
8℃、55℃に設定されている。
In this way, the bathroom heating / drying machine 1 started to operate with the flow rate control valve 14 forcibly opened to the initial opening determined by the pretreatment, as shown in FIG. The heat exchanger temperature is regulated based on the heat exchanger temperature detected by the exchanger temperature sensor 17 and the regulated temperature of the heat exchanger 13 preset for each circulation set air volume (strong wind, weak wind, slight wind). The heat exchange temperature control for controlling the amount of hot water supplied to the heat exchanger 13 by adjusting the opening degree of the flow rate control valve 14 so that the temperature becomes the temperature, and the bathroom temperature and the bathroom set temperature detected by the bathroom temperature sensor 16. Based on the above, the room temperature control for controlling the amount of hot water to the heat exchanger 13 is executed in parallel by adjusting the opening degree of the flow rate control valve 14 so that the bathroom temperature becomes the bathroom set temperature (step S4). , Step S5), Te, bathroom temperature converges in the bathroom set temperature in a short time, is maintained. The "specified temperature of the heat exchanger 13" when the circulating air volume is set to a strong wind
Is a heat exchanger 1 with a rated hot water volume that exhibits the rated heating capacity.
3 is the temperature of the heat exchanger 13 when supplied to the No. 3, specifically, 62 ° C. for strong wind, weak wind, and slight wind, 5
It is set to 8 ° C and 55 ° C.

【0042】まず、上述した熱交温度制御について、図
4に示すフローチャートを参照しながら詳細に説明す
る。上述したように、流量調節弁14が初期開度まで強
制的に開弁された状態で運転が開始されると、1分30
秒が経過したか否かを判断し(ステップS31)、運転
開始後1分30秒が経過するまでは、流量調節弁14の
開度が初期開度に保持される。このように、運転開始後
1分30秒の間、流量調節弁14の開度が初期開度に保
持されることで、温水暖房熱源機20から定格温度の温
水が熱交換器13に定常的に供給されるようになり、そ
の後に、流量調節弁14の開度調整を開始することによ
って、流量調節弁14が必要以上に開弁することがな
く、熱交換器温度のオーバーシュートを防止することが
できる。なお、運転開始後、流量調節弁14を初期開度
に保持する時間は、1分30秒に限定されるものではな
く、使用する温水暖房熱源機20の性能等を考慮して適
宜設定すればよい。
First, the heat exchange temperature control described above will be described in detail with reference to the flowchart shown in FIG. As described above, when the operation is started in the state where the flow rate control valve 14 is forcibly opened to the initial opening degree, one minute 30
It is determined whether or not seconds have elapsed (step S31), and the opening degree of the flow rate control valve 14 is maintained at the initial opening degree until 1 minute and 30 seconds have elapsed after the start of operation. As described above, the opening degree of the flow rate control valve 14 is maintained at the initial opening degree for 1 minute and 30 seconds after the start of operation, so that the hot water of the rated temperature is constantly supplied to the heat exchanger 13 from the hot water heating heat source device 20. Then, by starting the adjustment of the opening degree of the flow rate control valve 14, the flow rate control valve 14 does not open more than necessary and the overshoot of the heat exchanger temperature is prevented. be able to. It should be noted that the time for which the flow rate control valve 14 is held at the initial opening after the start of operation is not limited to 1 minute and 30 seconds, and may be appropriately set in consideration of the performance of the hot water heating heat source device 20 to be used. Good.

【0043】運転開始後1分30秒が経過した時点で、
浴室温度が浴室設定温度−3℃まで昇温されているか否
かを判断し(ステップS32)、浴室温度が浴室設定温
度−3℃を下回っている場合は、続いて、熱交換器13
の温度が規定温度−3℃まで昇温されているか否かを判
断する(ステップS33)。ここで、熱交換器13の温
度が規定温度−3℃を下回っている場合は、現在開度
(初期開度)では十分な温水量(定格温水量)が熱交換
器13に供給されていないことになるので、浴室温度が
浴室設定温度−3℃以上になるまで30秒毎に1ステッ
プづつ流量調節弁14を開弁していく(ステップS3
4)。
When 1 minute and 30 seconds have passed after the start of operation,
It is determined whether or not the bathroom temperature has risen to the bathroom set temperature -3 ° C (step S32), and if the bathroom temperature is lower than the bathroom set temperature -3 ° C, then the heat exchanger 13
It is determined whether or not the temperature has been raised to the specified temperature of -3 ° C (step S33). Here, when the temperature of the heat exchanger 13 is lower than the specified temperature −3 ° C., a sufficient hot water amount (rated hot water amount) is not supplied to the heat exchanger 13 at the current opening (initial opening). Therefore, the flow rate control valve 14 is opened step by step every 30 seconds until the bathroom temperature becomes equal to or higher than the bathroom set temperature −3 ° C. (step S3).
4).

【0044】一方、ステップS32において、浴室温度
が浴室設定温度−3℃以上に昇温されている場合や、ス
テップS33において、熱交換器13の温度が規定温度
−3℃以上に昇温されている場合は、続いて、熱交換器
13の温度が規定温度+1℃を上回っているか否かを判
断し(ステップS35)、熱交換器13の温度が規定温
度+1℃を上回っている場合は、現在開度(初期開度)
では必要以上の温水量が熱交換器13に供給されてお
り、この状態を継続すると浴室温度が浴室設定温度を上
回ってしまう可能性が高いので、熱交換器13の温度が
規定温度+1℃以下になるまで30秒毎に2ステップづ
つ流量調節弁14を閉弁していく(ステップS36)。
On the other hand, in step S32, when the bathroom temperature is raised to the bathroom set temperature -3 ° C or higher, or in step S33, the temperature of the heat exchanger 13 is raised to the specified temperature -3 ° C or higher. If the temperature of the heat exchanger 13 is higher than the specified temperature + 1 ° C (step S35), it is determined whether or not the temperature of the heat exchanger 13 is higher than the specified temperature + 1 ° C. Current opening (initial opening)
In this case, an excessive amount of hot water is supplied to the heat exchanger 13, and there is a high possibility that the bathroom temperature will exceed the bathroom set temperature if this state is continued, so the temperature of the heat exchanger 13 is below the specified temperature + 1 ° C. The flow rate control valve 14 is closed every 30 seconds in two steps until it becomes (step S36).

【0045】ステップS35において、熱交換器13の
温度が規定温度+1℃以下の場合は、熱交換器13の温
度が規定温度を上回っているか否かを判断し(ステップ
S37)、熱交換器13の温度が規定温度を上回ってい
る場合は、30秒毎に1ステップづつ流量調節弁14を
閉弁していき(ステップS38)、ステップS37にお
いて、熱交換器13の温度が規定温度以下の場合は、ス
テップS32に戻って、同様の動作を繰り返すことにな
る。
In step S35, when the temperature of the heat exchanger 13 is equal to or lower than the specified temperature + 1 ° C., it is determined whether or not the temperature of the heat exchanger 13 exceeds the specified temperature (step S37), and the heat exchanger 13 is determined. When the temperature of the heat exchanger 13 is higher than the specified temperature, the flow rate control valve 14 is closed step by step every 30 seconds (step S38), and when the temperature of the heat exchanger 13 is equal to or lower than the specified temperature in step S37. Returns to step S32 and repeats the same operation.

【0046】以上のように、この浴室暖房乾燥機1で
は、熱交換器13の温度が予め定めた規定温度に概ね保
持されるように、流量調節弁14の開度調整を行うよう
にしたので、温水暖房熱源機20に搭載された循環ポン
プの能力や配管抵抗等によって流量調節弁14の流量特
性が変化した場合でも、運転開始時に、定格能力を発揮
することができる定格温水量を確実に熱交換器13に供
給することが可能となり、流量調節弁14を予め定めた
初期開度に開弁した状態で単に運転を開始する場合に比
べて、浴室温度を短時間で確実に浴室設定温度近くまで
昇温させることができる。
As described above, in the bathroom heater / dryer 1, the opening degree of the flow rate adjusting valve 14 is adjusted so that the temperature of the heat exchanger 13 is maintained at a predetermined temperature which is set in advance. Even when the flow rate characteristic of the flow rate control valve 14 changes due to the capacity of the circulation pump mounted in the hot water heating heat source device 20, the pipe resistance, etc., the rated hot water amount capable of exhibiting the rated capacity at the start of operation can be ensured. It becomes possible to supply the heat to the heat exchanger 13, and as compared with the case where the operation is simply started in a state where the flow rate control valve 14 is opened to a predetermined initial opening degree, the bathroom temperature can be surely set in a short time. The temperature can be raised to near.

【0047】また、この浴室暖房乾燥機1では、上述し
たように、循環風量が少なくなるに従って、熱交換器1
3の規定温度を低く設定するようにしてあるので、浴室
暖房乾燥機1から吹き出される温風の吹出風速が小さく
なるに従って、温風の吹出温度も低くなる。従って、浴
室暖房乾燥機1から浴室に吹き出された温風が浴室上部
に舞い上がりにくくなり、浴室上部の温度が浴室下部に
比べて極端に高くなることがなく、浴室内の温度ムラを
最小限に抑えることができる。
In addition, in the bathroom heating / drying machine 1, as described above, the heat exchanger 1 is operated as the circulating air volume decreases.
Since the specified temperature of No. 3 is set to be low, as the blowing speed of the warm air blown from the bathroom heating dryer 1 becomes smaller, the blowing temperature of the warm air also becomes lower. Therefore, the warm air blown from the bathroom heater / dryer 1 to the bathroom is less likely to rise to the upper part of the bathroom, the temperature of the upper part of the bathroom does not become extremely higher than that of the lower part of the bathroom, and the temperature unevenness in the bathroom is minimized. Can be suppressed.

【0048】続いて、上述した室温制御について、図5
及び図6に示すフローチャートを参照しながら詳細に説
明する。上述したように、流量調節弁14を初期開度ま
で強制的に開弁した状態で運転が開始されると、図5に
示すように、1分30秒が経過したか否かを判断し(ス
テップS41)、運転開始後1分30秒が経過するまで
は、流量調節弁14の開度が初期開度に保持される。
Next, regarding the above-mentioned room temperature control, FIG.
Also, a detailed description will be given with reference to the flowchart shown in FIG. As described above, when the operation is started in the state where the flow rate control valve 14 is forcibly opened to the initial opening degree, as shown in FIG. 5, it is determined whether 1 minute and 30 seconds have elapsed ( In step S41), the opening degree of the flow rate control valve 14 is maintained at the initial opening degree until 1 minute and 30 seconds have elapsed after the start of operation.

【0049】運転開始後1分30秒が経過した時点で、
浴室温度が暖房停止温度(浴室設定温度+2℃)を上回
ったか否かを判断し(ステップS42)、浴室温度が暖
房停止温度を上回っている場合は、現在開度(初期開
度)では必要以上の温水量が熱交換器13に供給されて
いるので、次回開弁時における流量調節弁14の開度
(以下、次回初期開度という。)を、現在開度−10ス
テップとして記憶し(ステップS43)、流量調節弁1
4を強制的に全閉にする(ステップS46)。
When 1 minute and 30 seconds have passed after the start of operation,
It is determined whether or not the bathroom temperature exceeds the heating stop temperature (bathroom set temperature + 2 ° C) (step S42). If the bathroom temperature exceeds the heating stop temperature, the current opening (initial opening) is more than necessary. Since the amount of warm water of 10 is supplied to the heat exchanger 13, the opening degree of the flow rate control valve 14 at the time of the next valve opening (hereinafter referred to as the next initial opening degree) is stored as the current opening degree-10 step (step). S43), flow control valve 1
4 is forcibly closed completely (step S46).

【0050】一方、ステップS42において、浴室温度
が暖房停止温度以下の場合は、続いて、浴室温度が浴室
設定温度を上回っているか否かを判断し(ステップS4
4)、浴室温度が浴室設定温度を上回っている場合も、
現在開度(初期開度)では必要以上の温水量が熱交換器
13に供給されているので、次回初期開度を、現在開度
−5ステップとして記憶し(ステップS45)、流量調
節弁14を強制的に全閉にする(ステップS46)。
On the other hand, if the bathroom temperature is equal to or lower than the heating stop temperature in step S42, then it is determined whether or not the bathroom temperature is higher than the bathroom set temperature (step S4).
4) If the bathroom temperature is higher than the bathroom set temperature,
Since an excessive amount of hot water is supplied to the heat exchanger 13 at the current opening degree (initial opening degree), the next initial opening degree is stored as the current opening degree-5 steps (step S45), and the flow rate control valve 14 Is forcibly fully closed (step S46).

【0051】このようにして、流量調節弁14を強制的
に全閉にした後は、浴室温度が浴室設定温度以下になる
まで、そのままの状態で待機し(ステップS47)、浴
室温度が浴室設定温度以下に低下すると、ステップS4
3、ステップS45において記憶した次回初期開度まで
流量調節弁14を強制的に開弁し(ステップS48)、
ステップS41に移行する。
In this way, after the flow rate control valve 14 is forcibly fully closed, the bathroom temperature is kept as it is until the bathroom temperature becomes equal to or lower than the bathroom set temperature (step S47). When the temperature drops below the temperature, step S4
3. Forcibly open the flow rate control valve 14 until the next initial opening stored in step S45 (step S48),
Control goes to step S41.

【0052】一方、ステップS44において、浴室温度
が浴室設定温度以下の場合は、図6に示すように、ファ
ジー制御に移行し、浴室温度が浴室設定温度になるよう
に、流量調節弁14の開度調整を行う(ステップS4
9)。なお、ファジー制御は、所定の演算タイム(例え
ば、90秒)毎にファジー推論演算を実行し、その演算
結果に基づいて流量調節弁14の開度調整を行うように
なっている。
On the other hand, in step S44, if the bathroom temperature is equal to or lower than the bathroom set temperature, as shown in FIG. 6, the fuzzy control is performed and the flow rate control valve 14 is opened so that the bathroom temperature becomes the bathroom set temperature. Degree adjustment (step S4
9). In the fuzzy control, a fuzzy inference calculation is executed every predetermined calculation time (for example, 90 seconds), and the opening degree of the flow control valve 14 is adjusted based on the calculation result.

【0053】続いて、浴室温度が強制暖房停止温度(浴
室設定温度+3℃)を上回ったか否かを判断し(ステッ
プS50)、浴室温度が強制暖房停止温度を上回ってい
る場合は、現在開度では必要以上の温水量が熱交換器1
3に供給されていることになるので、次回初期開度を、
現在開度−5ステップとして記憶し(ステップS5
1)、流量調節弁14を即座に全閉にする(ステップS
56)。
Subsequently, it is judged whether or not the bathroom temperature exceeds the forced heating stop temperature (bathroom set temperature + 3 ° C.) (step S50), and if the bathroom temperature is higher than the forced heating stop temperature, the present opening degree is set. Then, the amount of hot water more than necessary is the heat exchanger 1
Since it has been supplied to 3, the next initial opening,
The present opening degree is stored as -5 steps (step S5
1) Immediately fully close the flow rate control valve 14 (step S
56).

【0054】一方、ステップS50において、浴室温度
が強制暖房停止温度以下の場合は、続いて、浴室温度が
暖房停止温度を上回っているか否かを判断し(ステップ
S52)、浴室温度が暖房停止温度を上回っている場合
は、流量調節弁14を即座に全閉にすることなく、40
秒毎に1ステップづつ流量調節弁14を閉弁していく
(ステップS53)。
On the other hand, if the bathroom temperature is equal to or lower than the forced heating stop temperature in step S50, it is subsequently determined whether or not the bathroom temperature is higher than the heating stop temperature (step S52), and the bathroom temperature is the heating stop temperature. If it is above 40%, the flow rate control valve 14 is not closed immediately and
The flow rate control valve 14 is closed one step every second (step S53).

【0055】その後、浴室温度が暖房停止温度を上回っ
た時点から6分が経過したか否かを判断し(ステップS
54)、6分が経過するまでは、同様の閉弁動作を繰り
返し、6分が経過しても、浴室温度が暖房停止温度を上
回っている場合は、次回初期開度を現在開度として記憶
し(ステップS55)、流量調節弁14を強制的に全閉
にする(ステップS56)。
Thereafter, it is determined whether 6 minutes have passed since the bathroom temperature exceeded the heating stop temperature (step S
54), the same valve closing operation is repeated until 6 minutes have passed, and if the bathroom temperature is higher than the heating stop temperature even after 6 minutes, the next initial opening is stored as the current opening. (Step S55), the flow rate control valve 14 is forcibly fully closed (Step S56).

【0056】このようにして、流量調節弁14を強制的
に全閉にした後は、浴室温度が浴室設定温度以下になる
まで、そのままの状態で待機し(ステップS57)、浴
室温度が浴室設定温度以下に低下すると、ステップS5
1、ステップS55において記憶した次回初期開度まで
流量調節弁14を強制的に開弁し(ステップS58)、
ステップS41に移行する。
In this way, after the flow rate control valve 14 is forcibly fully closed, the bathroom temperature is kept as it is until the bathroom temperature becomes equal to or lower than the bathroom set temperature (step S57). If the temperature drops below the temperature, step S5
1. Forcibly open the flow rate control valve 14 to the next initial opening stored in step S55 (step S58),
Control goes to step S41.

【0057】一方、ステップS52において、浴室温度
が暖房停止温度以下の場合は、ステップS49に移行
し、同様の動作を繰返すことになる。
On the other hand, if the bathroom temperature is equal to or lower than the heating stop temperature in step S52, the process proceeds to step S49 and the same operation is repeated.

【0058】以上のように、この浴室暖房乾燥機1で
は、運転開始から1分30秒が経過した時点で、浴室温
度が浴室設定温度を上回っている場合は、流量調節弁1
4を即座に全閉にすると共に、次回初期開度を、流量調
節弁14の全閉直前における開度に対して予め定めた開
度補正量だけ閉方向に補正した開度に設定するようにし
たので、運転開始時における浴室温度に対して、予め設
定されている流量調節弁14の初期開度が開きすぎであ
った場合でも、流量調節弁14が全閉になった後、再び
開弁する際における流量調節弁14の開度は、初期開度
に対して開度補正量だけ閉方向に修正されているので、
流量調節弁がON、OFF動作を繰り返すことがなく、
浴室温度を浴室設定温度に確実に収束させることができ
る。
As described above, in the bathroom heater / dryer 1, when the bathroom temperature is higher than the bathroom set temperature at the time of 1 minute and 30 seconds from the start of operation, the flow rate control valve 1
4 is fully closed immediately, and the next initial opening is set to an opening corrected in the closing direction by a predetermined opening correction amount with respect to the opening immediately before the flow control valve 14 is fully closed. Therefore, even when the preset opening degree of the flow rate control valve 14 is too wide with respect to the bathroom temperature at the start of operation, the flow rate control valve 14 is fully closed and then opened again. Since the opening degree of the flow rate control valve 14 at the time of performing is corrected in the closing direction by the opening degree correction amount with respect to the initial opening degree,
The flow control valve does not repeat ON and OFF operations,
The bathroom temperature can be reliably converged to the bathroom set temperature.

【0059】また、運転開始から1分30秒が経過した
時点における浴室温度が、暖房停止温度を上回っている
場合は開度補正量を10ステップに、暖房停止温度以下
ではあるが浴室設定温度を上回っている場合は開度補正
量を5ステップに設定するといった具合に、運転開始か
ら所定時間(1分30秒)が経過した時点における浴室
温度が高くなるに従って、開度補正量を段階的に大きく
するようにしたので、運転開始時における流量調節弁1
4の開きすぎの度合いに応じて、次回初期開度が適切に
設定され、短時間で浴室温度を浴室設定温度に収束させ
ることができる。
When the bathroom temperature at the time of 1 minute and 30 seconds from the start of the operation is higher than the heating stop temperature, the opening correction amount is set to 10 steps, and the bathroom set temperature, which is lower than the heating stop temperature, is set. If it is higher, the opening correction amount is set to 5 steps, and the opening correction amount is gradually increased as the bathroom temperature rises at the time when a predetermined time (1 minute 30 seconds) has passed from the start of operation. Since it was made larger, the flow rate control valve 1 at the start of operation
According to the degree of excessive opening of No. 4, the next initial opening degree is appropriately set, and the bathroom temperature can be converged to the bathroom set temperature in a short time.

【0060】また、運転開始後、ファジー制御に移行し
た後も、浴室温度が強制暖房停止温度を上回るような場
合は、流量調節弁14を即座に全閉にすると共に次回初
期開度を、流量調節弁14の全閉直前における開度に対
して予め定めた開度補正量(5ステップ)だけ閉方向に
補正した開度に設定するようにしたので、次回開弁後も
速やかに浴室温度を浴室設定温度に収束させることがで
きる。
If the bathroom temperature exceeds the forced heating stop temperature even after the operation starts and the fuzzy control is started, the flow rate control valve 14 is immediately fully closed and the next initial opening is set to the flow rate. Since the opening of the control valve 14 is corrected in the closing direction by a predetermined opening correction amount (5 steps) with respect to the opening immediately before the valve is fully closed, the bathroom temperature can be promptly changed after the next opening. Can be set to the bathroom set temperature.

【0061】なお、この実施形態では、開度補正量を5
ステップ、10ステップに設定しているが、これに限定
されるものではなく、適正な値を適宜選択して使用すれ
ばよい。
In this embodiment, the opening correction amount is set to 5
Although the number of steps is set to 10 steps, the present invention is not limited to this, and an appropriate value may be appropriately selected and used.

【0062】このようにして、熱交温度制御と室温制御
とが並行して実行されている途中で運転スイッチがOF
Fされると、図2に示すように、運転スイッチがOFF
された時点における流量調節弁14の開度が記憶された
後(ステップS6)、浴室暖房乾燥機1の運転が停止さ
れ(ステップS7)、ステップS6において記憶された
開度が、運転再開時の初期開度を決定する際に使用され
る。
In this way, the operation switch is turned off while the heat exchange temperature control and the room temperature control are being executed in parallel.
When it is F, the operation switch is turned off as shown in FIG.
After the opening degree of the flow rate control valve 14 at the time of the operation is stored (step S6), the operation of the bathroom heating / drying machine 1 is stopped (step S7), and the opening degree stored in step S6 is the value when the operation is restarted. Used to determine the initial opening.

【図面の簡単な説明】[Brief description of drawings]

【図1】この発明にかかる浴室暖房乾燥機の一実施形態
を示す概略構成図である。
FIG. 1 is a schematic configuration diagram showing an embodiment of a bathroom heating dryer according to the present invention.

【図2】同上の浴室暖房乾燥機の運転動作を示すフロー
チャートである。
FIG. 2 is a flowchart showing a driving operation of the above bathroom heating / drying machine.

【図3】同上の浴室暖房乾燥機の運転動作(前処理)を
示すフローチャートである。
FIG. 3 is a flowchart showing a driving operation (preprocessing) of the bathroom heating dryer of the above.

【図4】同上の浴室暖房乾燥機の運転動作(熱交温度制
御)を示すフローチャートである。
FIG. 4 is a flowchart showing an operation operation (heat exchange temperature control) of the bathroom heating dryer of the above.

【図5】同上の浴室暖房乾燥機の運転動作(室温制御)
を示すフローチャートである。
[Fig. 5] Driving operation of the above bathroom heating dryer (room temperature control)
It is a flowchart showing.

【図6】同上の浴室暖房乾燥機の運転動作(室温制御)
を示すフローチャートである。
[Fig. 6] Driving operation of the above bathroom heating dryer (room temperature control)
It is a flowchart showing.

【符号の説明】[Explanation of symbols]

1 浴室暖房乾燥機 11 本体ケース 12 循環ファン 13 熱交換器 14 流量調節弁 15 コントローラ 16 浴室温度センサ 17 熱交換器温度センサ 18 ワイヤレスリモコン 1 bathroom heating dryer 11 body case 12 Circulation fan 13 heat exchanger 14 Flow control valve 15 Controller 16 Bathroom temperature sensor 17 Heat exchanger temperature sensor 18 wireless remote control

Claims (11)

【特許請求の範囲】[Claims] 【請求項1】 浴室内の空気を循環させる循環経路中に
設置された、温水が循環供給される熱交換器と、温水の
循環系路中に設置された、浴室温度を浴室設定温度に保
持するように前記熱交換器への温水の供給量を制御する
流量調節弁とを備え、 前記流量調節弁を予め定めた初期開度まで開弁した状態
で運転を開始するようにした浴室暖房機であって、 前記熱交換器の温度が予め定めた規定温度になるよう
に、前記流量調節弁を制御するようにしたことを特徴と
する浴室暖房機。
1. A heat exchanger, which is installed in a circulation path for circulating the air in the bathroom and which is circulated and supplied with hot water, and a bathroom temperature, which is installed in a circulation path of the hot water, maintains a bathroom set temperature. And a flow rate control valve for controlling the amount of hot water supplied to the heat exchanger so that the bathroom heater is started in a state where the flow rate control valve is opened to a predetermined initial opening degree. The bathroom heater, wherein the flow rate control valve is controlled so that the temperature of the heat exchanger reaches a predetermined temperature.
【請求項2】 運転開始から所定時間が経過するまでの
間は、前記流量調節弁を予め定めた前記初期開度に保持
し、 運転開始から前記所定時間が経過した後に、前記熱交換
器の温度が予め定めた規定温度になるように、前記流量
調節弁を制御するようにした請求項1に記載の浴室暖房
機。
2. The flow control valve is maintained at the predetermined initial opening until a predetermined time elapses from the start of operation, and after the predetermined time elapses from the start of operation, the heat exchanger The bathroom heater according to claim 1, wherein the flow rate control valve is controlled so that the temperature reaches a predetermined regulated temperature.
【請求項3】 浴室内の空気の循環風量が少なくなるに
従って、前記規定温度を低く設定するようにした請求項
1または2に記載の浴室暖房機。
3. The bathroom heater according to claim 1, wherein the specified temperature is set lower as the circulating air volume of the air in the bathroom decreases.
【請求項4】 浴室内の空気を循環させる循環経路中に
設置された、温水が循環供給される熱交換器と、温水の
循環系路中に設置された、浴室温度を浴室設定温度に保
持するように前記熱交換器への温水の供給量を制御する
流量調節弁とを備え、 前記流量調節弁を予め定めた初期開度まで開弁した状態
で運転を開始し、 運転開始後に前記流量調節弁を全閉にする際は、その全
閉直前における前記流量調節弁の開度に基づいて、次回
開弁時における前記流量調節弁の開度を設定するように
した浴室暖房機であって、 運転開始から所定時間が経過した時点で、浴室温度が浴
室設定温度を上回っている場合は、即座に前記流量調節
弁を全閉にすると共に、次回開弁時における前記流量調
節弁の開度を、前記流量調節弁の全閉直前における開度
に対して予め定めた開度補正量だけ閉方向に補正した開
度に設定するようにしたことを特徴とする浴室暖房機。
4. A heat exchanger for circulating hot water, which is installed in a circulation path for circulating air in the bathroom, and a bathroom temperature, which is installed in a circulation path of the hot water, kept at a bathroom preset temperature. And a flow rate control valve for controlling the supply amount of hot water to the heat exchanger so as to start the operation in a state where the flow rate control valve is opened to a predetermined initial opening degree, and the flow rate after the operation is started. When fully closing the control valve, the bathroom heater configured to set the opening degree of the flow rate control valve at the time of the next opening based on the opening degree of the flow rate control valve immediately before the full closing. When the bathroom temperature exceeds the bathroom set temperature at the time when a predetermined time has passed from the start of operation, immediately close the flow control valve fully, and open the flow control valve at the next opening. To the opening just before the flow control valve is fully closed. A bathroom heater characterized in that the opening is corrected in the closing direction by a predetermined opening correction amount.
【請求項5】 運転開始から前記所定時間が経過した時
点で、浴室温度が浴室設定温度を上回っている場合は、
運転開始から前記所定時間が経過した時点における浴室
温度が高くなるに従って、前記開度補正量を大きくする
ようにした請求項4に記載の浴室暖房機。
5. When the bathroom temperature is higher than the bathroom set temperature at the time when the predetermined time has elapsed from the start of operation,
The bathroom heater according to claim 4, wherein the opening degree correction amount is increased as the bathroom temperature increases when the predetermined time has elapsed from the start of operation.
【請求項6】 浴室内の空気を循環させる循環経路中に
設置された、温水が循環供給される熱交換器と、温水の
循環系路中に設置された、浴室温度を浴室設定温度に保
持するように前記熱交換器への温水の供給量を制御する
流量調節弁とを備え、 前記流量調節弁を予め定めた初期開度まで強制的に開弁
した状態で運転を開始するようにした浴室暖房機であっ
て、 直前の運転停止時点から所定時間が経過する前に運転が
再開された場合は、直前の運転停止時点における前記流
量調節弁の開度を、初期開度に設定して運転を開始する
ようにしたことを特徴とする浴室暖房機。
6. A heat exchanger for circulating and supplying hot water, which is installed in a circulation path for circulating air in the bathroom, and a bathroom temperature, which is installed in a circulation path of the hot water, maintains a bathroom set temperature. And a flow rate control valve for controlling the amount of hot water supplied to the heat exchanger so as to start the operation in a state where the flow rate control valve is forcibly opened to a predetermined initial opening degree. In the case of a bathroom heater, if the operation is restarted before the lapse of a predetermined time from the time when the operation was stopped immediately before, the opening of the flow control valve at the time when the operation was stopped immediately before is set to the initial opening. A bathroom heater characterized by starting operation.
【請求項7】 直前の運転停止時点から所定時間が経過
する前に運転が再開された場合は、運転を停止した時点
から運転を再開するまでの経過時間が長くなるに従っ
て、初期開度を徐々に開方向に修正するようにした請求
項6に記載の浴室暖房機。
7. When the operation is restarted before a predetermined time has passed from the time when the operation was stopped immediately before, the initial opening degree is gradually increased as the elapsed time from the time when the operation is stopped until the operation is restarted increases. The bathroom heater according to claim 6, wherein the bathroom heater is corrected in the opening direction.
【請求項8】 浴室内の空気を循環させる循環経路中に
設置された、温水が循環供給される熱交換器と、温水の
循環系路中に設置された、浴室温度を浴室設定温度に保
持するように前記熱交換器への温水の供給量を制御する
流量調節弁とを備え、 前記流量調節弁を予め定めた初期開度まで強制的に開弁
した状態で運転を開始するようにした浴室暖房機であっ
て、 運転開始時点における前記熱交換器の温度が所定温度よ
り高い場合は、直前の運転停止時点における前記流量調
節弁の開度を、初期開度に設定して運転を開始するよう
にしたことを特徴とする浴室暖房機。
8. A heat exchanger, which is installed in a circulation path for circulating air in the bathroom and which is circulated and supplied with hot water, and a bathroom temperature, which is installed in a circulation path of the hot water, keeps the bathroom temperature at a bathroom preset temperature. And a flow rate control valve for controlling the amount of hot water supplied to the heat exchanger so as to start the operation in a state where the flow rate control valve is forcibly opened to a predetermined initial opening degree. In a bathroom heater, when the temperature of the heat exchanger at the time of starting operation is higher than a predetermined temperature, the opening of the flow control valve at the time of the last stop of operation is set to the initial opening to start the operation. A bathroom heater characterized in that
【請求項9】 運転開始時における前記熱交換器の温度
が所定温度より高い場合は、運転開始時点における前記
熱交換器の温度が低くなるに従って、初期開度を徐々に
開方向に修正するようにした請求項8に記載の浴室暖房
機。
9. When the temperature of the heat exchanger at the start of operation is higher than a predetermined temperature, the initial opening is gradually corrected to the opening direction as the temperature of the heat exchanger at the start of operation becomes lower. The bathroom heater according to claim 8.
【請求項10】 浴室内の空気を循環させる循環経路中
に設置された、温水が循環供給される熱交換器と、温水
の循環系路中に設置された、浴室温度を浴室設定温度に
保持するように前記熱交換器への温水の供給量を制御す
る流量調節弁とを備え、 前記流量調節弁を予め定めた初期開度まで強制的に開弁
した状態で運転を開始するようにした浴室暖房機であっ
て、 運転開始時点における浴室温度が所定温度より高い場合
は、直前の運転停止時点における前記流量調節弁の開度
を、初期開度に設定して運転を開始するようにしたこと
を特徴とする浴室暖房機。
10. A heat exchanger, which is installed in a circulation path for circulating the air in the bathroom and is circulated and supplied with hot water, and a bathroom temperature, which is installed in a circulation path of the hot water, maintains the bathroom temperature at a bathroom set temperature. And a flow rate control valve for controlling the amount of hot water supplied to the heat exchanger so as to start the operation in a state where the flow rate control valve is forcibly opened to a predetermined initial opening degree. In the bathroom heater, if the bathroom temperature at the start of operation is higher than the predetermined temperature, the opening of the flow control valve at the time of the last stop of operation is set to the initial opening to start the operation. A bathroom heater characterized by this.
【請求項11】 運転開始時における浴室温度が所定温
度より高い場合は、運転開始時点における前記浴室温度
が低くなるに従って、初期開度を徐々に開方向に修正す
るようにした請求項10に記載の浴室暖房機。
11. The method according to claim 10, wherein when the bathroom temperature at the start of operation is higher than a predetermined temperature, the initial opening is gradually corrected toward the opening direction as the bathroom temperature at the start of operation becomes lower. Bathroom heater.
JP2001257293A 2001-08-28 2001-08-28 Bathroom heater Expired - Fee Related JP3661619B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001257293A JP3661619B2 (en) 2001-08-28 2001-08-28 Bathroom heater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001257293A JP3661619B2 (en) 2001-08-28 2001-08-28 Bathroom heater

Publications (2)

Publication Number Publication Date
JP2003074886A true JP2003074886A (en) 2003-03-12
JP3661619B2 JP3661619B2 (en) 2005-06-15

Family

ID=19084982

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001257293A Expired - Fee Related JP3661619B2 (en) 2001-08-28 2001-08-28 Bathroom heater

Country Status (1)

Country Link
JP (1) JP3661619B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008249221A (en) * 2007-03-29 2008-10-16 Chofu Seisakusho Co Ltd Mist type bathroom heating device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008249221A (en) * 2007-03-29 2008-10-16 Chofu Seisakusho Co Ltd Mist type bathroom heating device

Also Published As

Publication number Publication date
JP3661619B2 (en) 2005-06-15

Similar Documents

Publication Publication Date Title
JP2005090480A (en) Vehicle engine cooling system control device and its method
WO2021254165A1 (en) Warm-up method based on temperature control module, vehicle, and storage medium
CN111189156A (en) Cold air prevention control method and device and air conditioner
JP3661619B2 (en) Bathroom heater
US20080142094A1 (en) Hot Water Device for Bathtub
CN114893896B (en) Control method and device for air conditioner
JP2624171B2 (en) Air conditioner operation control method
JP3658529B2 (en) Temperature control device
CN114857755A (en) Control method of indoor unit, controller, indoor unit, air conditioner and storage medium
JP3933023B2 (en) Hot water heating heat source machine
JP3644276B2 (en) Heating control method
JP3667526B2 (en) Hot water floor heater
JP3132790B2 (en) Automatic bath pot and hot water filling method
JP3380047B2 (en) Water heater
JP2009092307A (en) Bathroom heating and drying apparatus
JP3640436B2 (en) Floor heating system
JP3908668B2 (en) Heat pump water heater
JP2003056853A (en) Hot water heating device and its control method
JP2000179880A (en) Hot-water and water mixing device
JPH10160175A (en) Controller for hot water floor heating system
JPH09210434A (en) Vav control system
JP2000074396A (en) Method for controlling heating terminal
JPH07103499A (en) Circulation type hot water supplying apparatus
CN115972851A (en) Heating control method and device of air conditioner, storage medium and air conditioner
CN112050390A (en) Control method of fresh air conditioner

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20041111

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20041207

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050127

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050301

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050314

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090401

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100401

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110401

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110401

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120401

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130401

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130401

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140401

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees