JP2003050708A - Method for determining order of job execution - Google Patents

Method for determining order of job execution

Info

Publication number
JP2003050708A
JP2003050708A JP2002168125A JP2002168125A JP2003050708A JP 2003050708 A JP2003050708 A JP 2003050708A JP 2002168125 A JP2002168125 A JP 2002168125A JP 2002168125 A JP2002168125 A JP 2002168125A JP 2003050708 A JP2003050708 A JP 2003050708A
Authority
JP
Japan
Prior art keywords
job
execution
jobs
file
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2002168125A
Other languages
Japanese (ja)
Other versions
JP4219119B2 (en
Inventor
Yuri Hondo
友理 本堂
Hirofumi Nagasuga
弘文 長須賀
Tadashi Yamagishi
正 山岸
Toshiharu Tanaka
俊治 田中
Toshiyuki Kinoshita
俊之 木下
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP2002168125A priority Critical patent/JP4219119B2/en
Publication of JP2003050708A publication Critical patent/JP2003050708A/en
Application granted granted Critical
Publication of JP4219119B2 publication Critical patent/JP4219119B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To efficiently shorten time required for execution of the overall target job in a computer system, by which a plurality of jobs are executed in parallel. SOLUTION: A computer 101 accepts history information of files accessed, during execution of the jobs by every job from the outside and determines the order of execution of the jobs so that a second job is executed before a first job, when the second job inputs data to the file referred to during the execution of the first job, based on the history information to determine the execution order between mutual jobs to require reference of a prescribed file during the execution of the jobs in a certain system.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、複数のジョブが並
行して動作することが可能な計算機システムにおけるジ
ョブ実行順序決定方法に関し、特に、構成の異なる計算
機システムに移行する際に有効なジョブ実行順序決定方
法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of determining a job execution order in a computer system in which a plurality of jobs can operate in parallel, and in particular, effective job execution when moving to a computer system having a different configuration. Regarding the order determination method.

【0002】[0002]

【従来の技術】従来、大規模なバンキングシステムにお
けるオンライン処理や流通業における商品管理をするた
めのオンライン処理では、顧客サービスの向上を図るた
めに、数多くの業務が実施されている。オンライン処理
には、その業務で取り扱ったデータを集計するための一
括データ処理(バッチ処理)が付随している。オンライ
ン処理量の増加やオンラインサービスの種類の多様化に
伴い、バッチ処理量は増大し、その処理内容も複雑化し
つつある。一般に、オンライン処理を行うジョブをオン
ラインジョブ、バッチ処理を行うジョブをバッチジョブ
と呼ぶ。これらの増大化しつつある業務に対処するため
に、複数のCPUを用意した計算機システムの構築を行
い、そのシステムでバッチ業務を実施する傾向にある。
この複数CPUを有するシステム構築手法として、複数
台のCPUを一つの主記憶装置を共有して一つのオペレ
ーティングシステム(OS)で動作するシステム(密結
合マルチプロセサシステム)がある。もう一つのシステ
ム構築手法として、独立したCPUおよび主記憶装置を
持つ複数個の計算機を、チャネル間結合装置などで結合
させたシステム(疎結合マルチプロセサシステム)があ
る。
2. Description of the Related Art Conventionally, in online processing for large-scale banking systems and online processing for managing merchandise in the distribution industry, many operations are carried out in order to improve customer service. The online processing is accompanied by batch data processing (batch processing) for totaling the data handled in the business. As the amount of online processing increases and the types of online services diversify, the amount of batch processing is increasing and the processing content is becoming more complicated. Generally, a job that performs online processing is called an online job, and a job that performs batch processing is called a batch job. In order to cope with these increasing jobs, there is a tendency to construct a computer system having a plurality of CPUs and execute batch jobs in the system.
As a system construction method having a plurality of CPUs, there is a system (tightly coupled multiprocessor system) in which a plurality of CPUs share one main storage device and operate with one operating system (OS). As another system construction method, there is a system (loosely coupled multiprocessor system) in which a plurality of computers having independent CPUs and main storage devices are coupled by an inter-channel coupling device or the like.

【0003】上述した両方の構築手法によるシステムに
おいては、短時間でバッチ処理が完了するように効率の
よいジョブスケジュールを編成する必要がある。特に、
疎結合マルチプロセサシステムでは、複数の独立したO
Sが動作するため、OS間で相互に連携をとりながら業
務を遂行する必要がある。そこで、バッチ処理を効率よ
く実施させる従来の手法として、特開平5−17380
7号公報や特開平6−68052号公報に開示されたも
のがある。この2件は、疎結合マルチプロセサシステム
上で、負荷が均等化されるように動的に資源の利用率を
測定し、スケジューリングを行うジョブ分散方式に関す
るものである。すなわち、上記特開平5−173807
号公報に記載されたものは、一定時間毎にシステムの資
源負荷量を測定する資源負荷測定手段を設け、そこでの
測定結果に応じてジョブ実行多重度を動的に変更させる
ものである。また、上記特開平6−68052号公報に
記載されたものは、一定時間間隔でプロセッサの使用率
を測定するプロセッサ使用率監視部を設け、最も負荷の
低いプロセッサにジョブを自動的に割り当てる機能に関
するものである。
In the system using both of the above construction methods, it is necessary to organize an efficient job schedule so that batch processing can be completed in a short time. In particular,
In a loosely coupled multiprocessor system, multiple independent O
Since S operates, it is necessary to perform business while the OSs cooperate with each other. Therefore, as a conventional method for efficiently performing batch processing, Japanese Patent Laid-Open No. 17380/1993
There is one disclosed in Japanese Patent Laid-Open No. 7 and Japanese Patent Laid-Open No. 6-68052. These two cases relate to a job distribution method in which resource utilization is dynamically measured and scheduling is performed so as to equalize loads on a loosely coupled multiprocessor system. That is, the above-mentioned JP-A-5-173807.
The technique disclosed in Japanese Patent Laid-Open Publication No. 2003-242242 is provided with a resource load measuring means for measuring the resource load amount of the system at regular time intervals and dynamically changing the job execution multiplicity according to the measurement result. Further, the one disclosed in Japanese Patent Laid-Open No. 6-68052 is related to a function of automatically allocating a job to the processor with the least load by providing a processor usage rate monitoring unit for measuring the usage rate of the processor at a constant time interval. It is a thing.

【0004】[0004]

【発明が解決しようとする課題】近年、業務の多様化や
データ量の増加に伴い、バッチ処理が複雑化しているこ
とは前述の通りである。ジョブの処理時間を短縮するた
めの方法として、計算機のCPU性能を上げるかまたは
ジョブ全体を高多重化する手段が考えられる。しかしな
がら、前者の単一CPU性能を上げるには現在の技術で
ほぼ限界が現れており、今後、後者のジョブの高多重化
が必須になるのは確実と考えられる。しかし、これらの
複雑なバッチジョブの相関関係を崩さずに、バッチジョ
ブの高多重化を実現するには、ジョブのスケジューリン
グの効率化を行わなければ、マルチプロセサシステムの
計算機資源を有効に活用することにはならない。上記2
つの公開公報に記載された従来技術は、既に構築された
システム上でのジョブ実行中に動的にジョブスケジュー
リングを決定するものである。これは、ジョブが実行さ
れる際に、そのジョブ単体に対してスケジューリングの
効率化を図るもので、ジョブ全体に対しての測定を行っ
てスケジューリングの効率化を行うものではなかった。
また、これらの従来技術は、既に構築されたシステムで
ジョブを実行する場合に適用されるものであり、システ
ム構成の変更を行う場合の前もったジョブスケジューリ
ング評価に利用することができなかった。
As described above, in recent years, batch processing has become complicated due to diversification of business and increase in data amount. As a method for shortening the job processing time, a means of increasing the CPU performance of the computer or highly multiplexing the entire job can be considered. However, the current technology has almost reached its limit in improving the former single CPU performance, and it is considered certain that the latter will require high multiplexing in the future. However, in order to achieve high multiplexing of batch jobs without breaking the correlation of these complicated batch jobs, efficient use of the computer resources of the multi-processor system is required unless the efficiency of job scheduling is increased. It doesn't. 2 above
The prior art described in one of the publications determines job scheduling dynamically during job execution on an already constructed system. This is to improve the efficiency of scheduling for a single job when the job is executed, and not to measure the entire job and improve the efficiency of scheduling.
Further, these conventional techniques are applied when a job is executed in an already constructed system, and cannot be used for the job scheduling evaluation in advance when the system configuration is changed.

【0005】オンラインジョブが時間に依存したジョブ
であるのに対し、一括データ処理であるバッチジョブは
決まった入力ファイルに対し一定の処理を行う開始時刻
に依存しないという性質を持つ。このような複数のジョ
ブが定期的に繰り返されるような形態であるジョブに関
しては、過去のジョブ実行履歴をもとに、その後のジョ
ブ実行の予測が可能である。このような性質のジョブに
ついて、実行される前にジョブスケジューリング計画を
行うことによって、全体の処理時間の短縮を見込むこと
ができる。また、システム設計時に前記のようなジョブ
スケジューリング計画を行うことで、ディスク装置など
へのファイルの配置計画などを立てることができ、シス
テム構成の変更を行う場合の前もったジョブスケジュー
リング評価を行うことができる。
While an online job is a time-dependent job, a batch job, which is a batch data process, has the property that it does not depend on the start time at which certain processing is performed on a fixed input file. For such a job in which a plurality of jobs are periodically repeated, it is possible to predict the subsequent job execution based on the past job execution history. By performing a job scheduling plan before executing a job of this nature, it is possible to expect a reduction in the overall processing time. In addition, by performing the above-mentioned job scheduling plan when designing the system, it is possible to make a file allocation plan for the disk device, etc., and perform job scheduling evaluation in advance when changing the system configuration. You can

【0006】本発明はバッチジョブのスケジューリング
効率化を対象とし、以下の三つの目的を持つ。本発明の
第一の目的は、バッチ処理を実施する前に、過去の実行
履歴をもとに、効率勢なジョブスケジュールの立案を支
援することが可能なジョブ実行順序決定方法を提供する
ことにある。本発明の第二の目的は、ジョブ多重度など
のシステム運用上の変更があった場合に、過去の実行履
歴をもとに、その効果を変更前に見積もることが可能な
ジョブ実行順序決定方法を提供することにある。本発明
の第三の目的は、疎結合マルチプロセサシステム上にジ
ョブを分配させる場合に、上記システム内の他の計算機
に接続されているディスクへのアクセス頻度を少なく
し、データ転送に関するオーバーヘッドを低くおさえる
ため、分配されるジョブがアクセスするファイルが上記
システム内の一つの計算機に接続されているディスクに
配置することが可能となるように、各ジョブを実行させ
る計算機を、過去の履歴情報をもとに決定することが可
能なジョブ実行順序決定方法を提供することにある。
The present invention is directed to improving the efficiency of batch job scheduling and has the following three objects. A first object of the present invention is to provide a job execution order determination method capable of supporting efficient job schedule planning based on past execution history before executing batch processing. is there. A second object of the present invention is to provide a job execution order determination method capable of estimating the effect before the change based on the past execution history when the system operation such as the job multiplicity is changed. To provide. A third object of the present invention is to reduce the frequency of access to a disk connected to another computer in the above system when distributing jobs on a loosely coupled multiprocessor system, and to keep overhead related to data transfer low. Therefore, the computer that executes each job is based on past history information so that the files accessed by the distributed jobs can be placed on the disk connected to one computer in the above system. It is to provide a job execution order determination method capable of determining the job execution order.

【0007】[0007]

【課題を解決するための手段】本発明は、上記目的を達
成するために、計算機において、あるシステムでジョブ
実行中に所定のファイル参照することを要するジョブ相
互間の実行順序を決定する方法であって、前記計算機
は、前記計算機の外部から、前記ジョブごとに、ジョブ
実行中にアクセスしたファイルの履歴情報を受付け、前
記履歴情報に基づいて、第1のジョブを実行中に参照し
たファイルに対して、第2のジョブがデータを入力する
場合にあっては、該第2のジョブが該第1のジョブより
も先になるように前記ジョブの実行順序を決定すること
を特徴としている。また、前記計算機は、前記計算機の
外部から前記システムの資源に関するパラメタを受付
け、前記計算機の外部から、前記ジョブごとに、ジョブ
実行中にアクセスしたファイルの履歴情報を受付け、前
記パラメタと前記履歴情報とに基づいて、前記ジョブの
実行順序を決定することも特徴としている。
In order to achieve the above-mentioned object, the present invention is a method for determining the execution order between jobs which requires reference to a predetermined file during job execution in a system in a computer. Therefore, the computer receives, from the outside of the computer, history information of a file accessed during job execution for each job, and based on the history information, a file referred to during execution of the first job is received. On the other hand, when the second job inputs data, the execution order of the jobs is determined so that the second job precedes the first job. Further, the computer receives parameters relating to the resources of the system from outside the computer, receives from the outside of the computer, for each job, history information of a file accessed during job execution, the parameters and the history information. It is also characterized in that the execution order of the jobs is determined based on

【0008】[0008]

【作用】本発明によると、収集したアクセス履歴情報か
ら各ジョブの実行開始条件を決定し、実行履歴情報から
各ジョブの実行時間を求めることにより現状のジョブ実
行に基づいたジョブ実行開始時間を求めることができ
る。そして、シミュレーションの対象である計算機シス
テムにおけるジョブ多重度を、並行して動作可能な最大
ジョブ数とする第一条件と、上記実行開始条件に従うと
いう第二条件をもとにしてシミュレーションを行うステ
ップにより、ジョブスケジューラによらない仮想的なジ
ョブ実行を再現できる。このシミュレーション結果か
ら、処理時間短縮がはかれるジョブスケジュール案を提
示することができる。
According to the present invention, the execution start condition of each job is determined from the collected access history information, and the execution time of each job is obtained from the execution history information to obtain the job execution start time based on the current job execution. be able to. Then, the job multiplicity in the computer system to be simulated is the maximum number of jobs that can be operated in parallel, and the second condition that the execution start condition is followed by the simulation. , Virtual job execution that does not depend on the job scheduler can be reproduced. From this simulation result, it is possible to present a job schedule plan that can reduce the processing time.

【0009】ジョブ多重度増減などのシステム運用上の
変更をパラメタとして与えられた場合に、そのパラメタ
を上記実行開始条件などに付加することにより、運用上
の変更を行った場合のジョブスケジュール結果を提供で
きる。その結果、現状システムでの問題点を解決する見
積りを得た上でのシステム再構築が可能となる。また、
シミュレーションを行う前に、あらかじめアクセスする
ファイルに基づいてジョブのグルーピングを行うことに
より、パラメタとして与えられた新しいシステム条件で
のジョブスケジュール結果を提供できる。その結果、疎
結合マルチプロセサシステムなどの現行のシステムと違
った構成のシステム上でのジョブスケジュール案を提供
することができる。以上のように、実行履歴を用いる静
的な評価により、本発明は実機を用いることなく、すな
わち対象となるシステムに負担をかけることなくジョブ
スケジュールに関する定量的評価を得ることが可能にな
る。
When a system operation change such as an increase / decrease in job multiplicity is given as a parameter, the parameter is added to the above-mentioned execution start condition to obtain a job schedule result when the operation change is made. Can be provided. As a result, the system can be reconstructed after obtaining an estimate to solve the problems in the current system. Also,
By grouping jobs based on the files to be accessed before the simulation, the job schedule result under the new system condition given as a parameter can be provided. As a result, it is possible to provide a job schedule proposal on a system having a configuration different from the current system such as the loosely coupled multiprocessor system. As described above, the static evaluation using the execution history makes it possible for the present invention to obtain a quantitative evaluation regarding the job schedule without using an actual machine, that is, without burdening the target system.

【0010】[0010]

【実施例】本実施例では、一つ以上のCPU、および、
そのCPUからアクセスされるディスクを有する一つ以
上の計算機により構成される計算機システムを対象とし
ている。計算機システムが複数の計算機から構成される
場合には、それら各計算機は相互に通信を行う手段を有
するものとする。上記の計算機システムにおいて、複数
のジョブは並行実行される。ここで、並行実行されるジ
ョブの数には上限があり、その上限をジョブ多重度と呼
ぶ。ジョブは、一つ以上のジョブステップにより構成さ
れる。ここでジョブステップは、そのジョブの中で実行
されるプログラムの一つに対応している。read、w
rite、参照などの動作が行われたファイルを、本件
ではアクセスファイルと呼ぶ。バッチジョブは、参照す
るファイルが生成されていれば論理的に実行可能であ
る。従って、あるジョブがアクセスするファイルが他の
ジョブによってアクセスされている場合には、その他の
ジョブが終了した後に実行開始する必要がある。ジョブ
が、どのジョブの実行終了後に開始すべきであるかをス
ケジューリング条件と呼ぶ。
Embodiment In this embodiment, one or more CPUs, and
The target is a computer system composed of one or more computers having disks accessed from the CPU. When the computer system is composed of a plurality of computers, each computer shall have means for communicating with each other. In the above computer system, a plurality of jobs are executed in parallel. Here, there is an upper limit to the number of jobs that are executed in parallel, and the upper limit is called the job multiplicity. A job is composed of one or more job steps. Here, the job step corresponds to one of the programs executed in the job. read, w
A file that has been subjected to operations such as write and reference is called an access file in this case. The batch job can be logically executed as long as the referenced file is generated. Therefore, when a file accessed by a job is accessed by another job, it is necessary to start execution after the other job is completed. A job that a job should start after completion of execution is called a scheduling condition.

【0011】以下、本発明の実施例を図面を用いて詳細
に説明する。図1は、本発明の一実施例の基本的なシス
テム構成を示している。本実施例において、計算機10
1は、CPU102、メモリ103により構成されてい
る。メモリ103上には、後述するパラメタ情報114
およびジョブ実行履歴115を入力してジョブスケジュ
ーリング解析を行なうジョブスケジューリング解析部1
04、システムの稼働履歴を収集するシステム稼働履歴
収集部110、およびジョブスケジュールプログラム1
11が設けられ、さらに、ジョブスケジュールプログラ
ム111はジョブ起動部112および登録作成部113
から構成されている。これらの各部における処理はCP
U102によって実行されるものとする。
Embodiments of the present invention will be described below in detail with reference to the drawings. FIG. 1 shows the basic system configuration of an embodiment of the present invention. In this embodiment, the computer 10
Reference numeral 1 is composed of a CPU 102 and a memory 103. Parameter information 114, which will be described later, is stored in the memory 103.
A job scheduling analysis unit 1 that inputs a job execution history 115 and a job scheduling analysis
04, system operation history collection unit 110 for collecting system operation history, and job schedule program 1
11, and the job schedule program 111 includes a job activation unit 112 and a registration creation unit 113.
It consists of The processing in each of these parts is CP
It shall be executed by U102.

【0012】計算機101に登録されたジョブは、ジョ
ブスケジュールプログラム111内の登録簿作成部11
3により、ジョブ登録簿117に登録される。ジョブ起
動部112は、上記の手順により作成されたジョブ登録
簿117をもとに、ジョブを起動し実行状態にする。起
動するには、起動しようとするジョブが、どのプログラ
ムを実行するもので、どのファイルにアクセスするかを
記述したジョブ制御文118が各ジョブ毎に用意されて
いる必要がある。ジョブ起動部112は、このジョブ制
御文118をもとに、ジョブを実行するのに必要なファ
イルなどの資源が確保されているかを確認した上でジョ
ブを起動する。
A job registered in the computer 101 is registered in the registration list creating unit 11 in the job schedule program 111.
3 is registered in the job register 117. The job activation unit 112 activates the job based on the job registration list 117 created by the above procedure and puts it in the execution state. To activate the job, a job control statement 118 that describes which program is executed by the job to be activated and which file to access must be prepared for each job. Based on this job control statement 118, the job activation unit 112 confirms whether resources such as files necessary for executing the job are secured, and then activates the job.

【0013】ジョブは上記手順により実行状態になる。
その実行状況をシステム稼働履歴収集部110が収集し
てジョブ実行履歴115を作成する。このジョブ実行履
歴115の構成例を図2に示す。採取する実行履歴デー
タとしては、同図に示すように、ジョブ開始レコード1
15−1、ジョブステップ開始レコード115−2、ア
クセスファイルに関するファイルクローズレコード11
5−3、ジョブステップ終了レコード115−4、ジョ
ブ終了レコード115−5などが挙げられる。これらの
各レコードは、ジョブの実行開始、ファイルのクローズ
などの事象によって発生するものであり、それらのレコ
ードの先頭または内部にそのレコードが何の事象によっ
て発生したかを表すレコードタイプが含まれている。本
実施例では、ジョブ開始レコードを01、ジョブステッ
プ開始レコードを02、ファイルクローズレコードを0
3、ジョブステップ終了レコードを04、ジョブ終了レ
コードを05とするレコードタイプに関する記述が、各
レコードの先頭にあるものとする。
The job is put into the execution state by the above procedure.
The system operation history collection unit 110 collects the execution status and creates a job execution history 115. A configuration example of the job execution history 115 is shown in FIG. As the execution history data to be collected, as shown in FIG.
15-1, job step start record 115-2, file close record 11 for access file
5-3, job step end record 115-4, job end record 115-5 and the like. Each of these records is generated by an event such as the start of job execution, file closing, etc., and the record type that indicates what event caused the record is included at the beginning or inside of these records. There is. In this embodiment, the job start record is 01, the job step start record is 02, and the file close record is 0.
It is assumed that the description about the record type in which the job step end record is 04 and the job end record is 05 is at the beginning of each record.

【0014】図2に示されたジョブ実行履歴データであ
る各レコードについてさらに詳細に説明する。ジョブ開
始レコード115−1は、レコードタイプ01の他に、
ジョブ名、ジョブ開始日付、ジョブ開始時刻を有し、ジ
ョブステップ開始レコード115−2は、レコードタイ
プ12の他に、ジョブステップ名、ジョブステップ開始
日付、ジョブステップ開始時刻、このレコードを出した
ジョブ名を有し、アクセスファイルに関するファイルク
ローズレコード115−3は、レコードタイプ03の他
に、ファイル名、ファイルクローズ日付、ファイルクロ
ーズ時刻、このレコードを出したジョブステップ名、こ
のレコードを出したジョブ名を有し、ジョブステップ終
了レコード115−4は、レコードタイプ04の他に、
ジョブステップ名、ジョブステップ終了日付、ジョブス
テップ終了時刻、このレコードを出したジョブ名を有
し、ジョブ終了レコード115−5は、レコードタイプ
05の他に、ジョブ名、ジョブ終了日付、ジョブ終了時
刻、CPU使用時間を有している。
Each record, which is the job execution history data shown in FIG. 2, will be described in more detail. The job start record 115-1 includes the record type 01,
The job step start record 115-2 has a job name, a job start date, and a job start time. In addition to the record type 12, the job step name, the job step start date, the job step start time, and the job that issued this record. The file close record 115-3 that has a name and has an access file includes a file name, a file close date, a file close time, a job step name that issued this record, and a job name that issued this record, in addition to the record type 03. The job step end record 115-4 has a record type 04,
It has a job step name, a job step end date, a job step end time, and a job name that issued this record. The job end record 115-5 has a job name, a job end date, and a job end time in addition to the record type 05. , CPU usage time.

【0015】ジョブ実行履歴115とともにジョブスケ
ジューリング解析部104へ入力されるパラメタ情報1
14の構造を図3に示す。パラメタ情報114は、ジョ
ブに関するデータである図2に詳細に示したジョブ実行
履歴115以外の、シミュレーションに必要な、空間数
(最大ジョブ実行多重度)や、CPU性能比率(新たな
システムにおけるCPUの性能の改善比率)や、出力結
果の指定などの全ての情報を含む。図3は空間数30、
CPU性能比率1(同一性能のCPUの場合)、グルー
ピングON(グルーピング機能を有効にした場合)、・
・・の場合を示している。
Parameter information 1 input to the job scheduling analysis unit 104 together with the job execution history 115
The structure of 14 is shown in FIG. The parameter information 114 is data related to jobs, other than the job execution history 115 shown in detail in FIG. 2, the number of spaces (maximum job execution multiplicity) required for simulation, the CPU performance ratio (CPU of a new system). Performance improvement ratio) and all information such as output result specification. Figure 3 shows 30 spaces
CPU performance ratio 1 (for CPUs with the same performance), grouping ON (when grouping function is enabled),
.. indicates the case.

【0016】次に、本発明が特徴としているジョブスケ
ジューリング解析部104の詳細を説明する。ジョブス
ケジューリング解析部104は、図1に示したように、
上述した実行履歴データ115(図2参照)を解析する
ジョブデータ解析部600、上述したパラメタ情報11
4(図3参照)からシミュレーションに必要な情報であ
るシミュレーション条件定義情報(図5の114−1)
を作成するパラメタ解析部700、ジョブデータ解析部
600により作成されたデータについてジョブのグルー
ピングを行うジョブグルーピング部800、これらの入
力データによりジョブの実行状況をシミュレートするシ
ミュレーション部900により構成される。ジョブスケ
ジューリング解析部104と、システム稼働履歴収集部
110は、本実施例では、同一システム内に設けている
が、別システムに設けてもよい。
Next, details of the job scheduling analysis unit 104, which is a feature of the present invention, will be described. The job scheduling analysis unit 104, as shown in FIG.
The job data analysis unit 600 that analyzes the execution history data 115 (see FIG. 2) described above, the parameter information 11 described above.
4 (see FIG. 3) to simulation condition definition information (114-1 in FIG. 5) that is information necessary for simulation.
A parameter analysis unit 700 for creating a job, a job grouping unit 800 for performing a job grouping on the data created by the job data analysis unit 600, and a simulation unit 900 for simulating the execution status of the job by these input data. The job scheduling analysis unit 104 and the system operation history collection unit 110 are provided in the same system in this embodiment, but may be provided in different systems.

【0017】また、シミュレーション部900で解析さ
れた結果が、シミュレーション結果116として、シミ
ュレーション部900より出力される。このシミュレー
ション結果116の例を図4に示す。出力情報として
は、同図に示すように、シミュレーション後のジョブ実
行多重度の時間的遷移116−1や、実行ジョブのリス
ト116−2などが挙げられる。図4の実行ジョブのリ
スト116−2は、空間1の実行ジョブはJOB1、J
OB5およびJOB3で、空間2の実行ジョブはJOB
2およびJOB8であり、例えば、JOB1は7:00
乃至7:45に実行され、実行時間は45分間であるこ
とを示している。なお、実行ジョブのリスト中にジョブ
毎に使用される資源などを含めることも可能である。
The result analyzed by the simulation unit 900 is output from the simulation unit 900 as a simulation result 116. An example of this simulation result 116 is shown in FIG. As the output information, as shown in the figure, temporal transition 116-1 of job execution multiplicity after simulation, list 116-2 of executed jobs, and the like are listed. In the execution job list 116-2 of FIG. 4, the execution jobs of the space 1 are JOB1 and J.
In OB5 and JOB3, the job executed in space 2 is JOB
2 and JOB8, for example, JOB1 is 7:00.
Through 7:45, the execution time is 45 minutes. It is also possible to include resources used for each job in the list of executed jobs.

【0018】次に、ジョブスケジューリング解析部10
4の詳細な説明図を図5に示す。ジョブデータ解析部6
00は、ジョブ実行履歴115から本発明でシミュレー
ションに用いる情報単位である情報セル200を作成す
る。情報セル200は、ジョブ実行履歴115の中に含
まれる履歴の種類によって、図6の情報セル構成例に示
したように、ジョブ情報セル201、ジョブステップ情
報セル202、ファイル情報セル203に大別される。
情報セル200はテーブル構造になっており、その中の
要素(ポインタ)が関連のある情報セルをポイントする
ことで、情報セル全体がリスト構造になるように構成さ
れている。ジョブ情報セル201は、そのジョブを構成
するジョブステップ情報セル202のリストを指す。ま
た、そのジョブステップ情報セル202は、そのジョブ
ステップでアクセスするファイルのファイル情報セル2
03を指す。これらが1組となって、ジョブの全体の情
報を表す。ジョブ実行履歴115には解析の対象となる
ジョブが複数含まれているため、ジョブ情報セル201
自身も、リスト構造となっており、ポインタによって順
次次のジョブ情報セル201を指すように構成されてい
る。
Next, the job scheduling analysis unit 10
A detailed explanatory view of No. 4 is shown in FIG. Job data analysis unit 6
00 creates an information cell 200, which is an information unit used for simulation in the present invention, from the job execution history 115. The information cell 200 is roughly classified into a job information cell 201, a job step information cell 202, and a file information cell 203 according to the type of history included in the job execution history 115 as shown in the information cell configuration example of FIG. To be done.
The information cell 200 has a table structure, and an element (pointer) therein points to a related information cell so that the entire information cell has a list structure. The job information cell 201 indicates a list of job step information cells 202 that make up the job. Further, the job step information cell 202 is the file information cell 2 of the file accessed in the job step.
Refers to 03. These form one set and represent the entire information of the job. Since the job execution history 115 includes a plurality of jobs to be analyzed, the job information cell 201
The self itself also has a list structure, and is constructed so that pointers sequentially point to the next job information cell 201.

【0019】次に、上記の各情報セルのさらに詳細なテ
ーブル構造を図7〜図9を用いて説明する。各情報セル
には、情報セルのリスト構造を形成するための情報とと
もに、実行履歴の中に含まれる情報が必要に応じて格納
される。図7はジョブ情報セル201のテーブル構造を
示すものである。同図中、ポインタ301はジョブ情報
セルのリストにおいて次の要素をポイントするもので、
ポインタ302は、そのジョブを構成するジョブステッ
プの情報セルのリストの先頭をポイントするものであ
る。また、303はジョブを識別するためのジョブ名
を、304はジョブ開始時刻を、305はジョブ終了時
刻を格納する領域であり、これらはシミュレーション部
900で実行条件を求める際に使用される。また、30
6はそのジョブが使用したトータルのCPU使用時間を
格納する領域である。
Next, a more detailed table structure of each of the above information cells will be described with reference to FIGS. The information contained in the execution history is stored in each information cell as necessary, together with the information for forming the list structure of the information cell. FIG. 7 shows the table structure of the job information cell 201. In the figure, a pointer 301 points to the next element in the list of job information cells.
The pointer 302 points to the beginning of the list of information cells of the job steps that make up the job. Further, 303 is a job name for identifying a job, 304 is a job start time, and 305 is an area for storing a job end time. These areas are used when the simulation unit 900 obtains execution conditions. Also, 30
An area 6 stores the total CPU usage time used by the job.

【0020】図8は、ジョブステップ情報セル202の
テーブル構造を示すものである。同図中、ポインタ40
1はジョブステップ情報セルのリストにおいて次の要素
(ジョブステップ情報セル)をポイントするもので、ポ
インタ402は、そのジョブステップでアクセスするフ
ァイルの情報セルのリストの先頭をポイントするもので
ある。403はジョブステップを識別するためのジョブ
ステップ名を、404はそのジョブステップで実行され
るプログラム名を格納するための領域である。図9はフ
ァイル情報セル203のテーブル構造を示すものであ
る。同図中、ポインタ501はファイル情報セルのリス
トにおいて次の要素(ファイル情報セル)をポイントす
るためのものである。502はファイルを識別するとと
もに、シミュレーション部900で実行条件を求める際
に使用されるファイル名を格納するための領域である。
FIG. 8 shows the table structure of the job step information cell 202. In the figure, a pointer 40
Reference numeral 1 indicates a next element (job step information cell) in the job step information cell list, and the pointer 402 points at the head of the information cell list of the file accessed in the job step. Reference numeral 403 is an area for storing a job step name for identifying a job step, and 404 is an area for storing a program name executed by the job step. FIG. 9 shows the table structure of the file information cell 203. In the figure, a pointer 501 is for pointing to the next element (file information cell) in the list of file information cells. Reference numeral 502 is an area for identifying a file and storing a file name used when the simulation unit 900 obtains an execution condition.

【0021】次に、ジョブデータ解析部600の処理の
流れを図10のフローチャートを用いて詳細に説明す
る。まず、ジョブ実行履歴115から、先頭のデータを
読み込み、ステップ602乃至ステップ606の処理を
ジョブ実行履歴115のデータが空になるまで継続する
(ステップ601)。そのレコードが読み込まれるまで
の情報セルリストの中に、そのレコードの内容を格納す
べき情報セルが存在しないレコード、例えば、ジョブ開
始レコードなどを読み込んだ場合、新たに内容を格納す
る情報セルを作成する必要がある。読み込んだジョブ実
行履歴115のデータが、これらの新たに情報セルを作
成するべきレコードタイプであるか否かを判定する(ス
テップ602)。
Next, the processing flow of the job data analysis unit 600 will be described in detail with reference to the flowchart of FIG. First, the top data is read from the job execution history 115, and the processes of steps 602 to 606 are continued until the data of the job execution history 115 becomes empty (step 601). When a record that does not contain the information cell for storing the contents of the record in the information cell list until the record is read, such as a job start record, is read, an information cell that newly stores the contents is created. There is a need to. It is determined whether or not the read data of the job execution history 115 is the record type for which these new information cells should be created (step 602).

【0022】上記ステップ602における判定が真であ
った場合、該レコードがジョブか、ジョブステップか、
またはファイルに関するものであるかをそのレコードの
内容から判定し、それに該当する形式の情報セルの領域
を確保し(ステップ603)、その領域にデータを格納
するとともに、その新しい情報セルに対するリストから
のポインタ設定など、リスト構造を形成するための情報
を設定する(ステップ604)。上記ステップ602に
おける判定が偽であった場合、それ以前に作成された情
報セルの中の対応する情報セルにデータを格納する(ス
テップ605)。その後、ジョブ実行履歴115の次の
データの処理を対象として判定ステップ601に戻る
(ステップ606)。
If the determination in step 602 above is true, whether the record is a job or a job step,
Alternatively, it is determined from the contents of the record whether or not it is related to a file, an area of the information cell of the corresponding format is secured (step 603), the data is stored in the area, and at the same time, from the list for the new information cell. Information for forming the list structure such as pointer setting is set (step 604). If the determination in step 602 above is false, the data is stored in the corresponding information cell among the information cells created before that (step 605). After that, the process returns to the determination step 601 for the processing of the next data of the job execution history 115 (step 606).

【0023】パラメタ解析部700は、図3に示した如
きパラメタ情報114を解析して、シミュレーションの
条件となるシミュレーション条件定義情報114−1を
作成するものである。次に、パラメタ解析部700の処
理を図11のフローチャートを用いて詳細に説明する。
まず、パラメタ情報114からパラメタの読み込みを行
い、ステップ702乃至ステップ703に示した処理を
パラメタが空になるまで継続する(ステップ701)。
読み込んだパラメタ情報がどのパラメタであるかを判別
し、パラメタのタイプに合わせてシミュレーション条件
定義情報114−1に反映させる(ステップ702)。
例を挙げると、パラメタ情報114から、ジョブが実行
される多重度を空間数として読み込み、シミュレーショ
ン条件定義情報114−1の中の対応する項目に設定す
る。処理を継続するために次のパラメタ情報114を対
象として判定ステップ701に戻る(ステップ70
3)。
The parameter analysis unit 700 analyzes the parameter information 114 as shown in FIG. 3 to create simulation condition definition information 114-1 which is a condition for simulation. Next, the processing of the parameter analysis unit 700 will be described in detail with reference to the flowchart of FIG.
First, a parameter is read from the parameter information 114, and the processing shown in steps 702 to 703 is continued until the parameter becomes empty (step 701).
Which parameter the read parameter information is is determined and reflected in the simulation condition definition information 114-1 according to the type of the parameter (step 702).
For example, from the parameter information 114, the multiplicity with which the job is executed is read as the number of spaces and set in the corresponding item in the simulation condition definition information 114-1. In order to continue the process, the process returns to the judgment step 701 for the next parameter information 114 (step 70).
3).

【0024】ジョブグループング部800は、現行のシ
ステムと異なる疎結合マルチプロセサシステムを意識し
た、ファイルアクセスの局所性に着目したジョブグルー
ピングを行った結果を得る場合に用いられるものであ
る。ジョブグルーピング部800の処理により、ジョブ
情報セル201のリストを、アクセスするファイルが重
複するジョブの情報セルのリストに分割しグルーピング
する。該ジョブグルーピング部800で作成されたジョ
ブグループ単位でシミュレーション部900によりシミ
ュレーションを行うことで、アクセスするファイルの重
複をなくした、あるいは少なくしたジョブグループでの
スケジューリング解析結果を出すことが可能になる。
The job grouping unit 800 is used to obtain the result of job grouping focusing on the locality of file access in consideration of a loosely coupled multiprocessor system different from the current system. By the processing of the job grouping unit 800, the list of job information cells 201 is divided into groups of information cells of jobs whose files to be accessed are duplicated and grouped. By performing simulation by the simulation unit 900 in units of job groups created by the job grouping unit 800, it becomes possible to obtain scheduling analysis results for a job group in which duplication of accessed files is eliminated or reduced.

【0025】次に、ジョブグルーピング部800の処理
を、図12のフローチャートを用いて詳細に説明する。
まず、最初に、シミュレーション条件定義情報114−
1の中のジョブのグルーピングを行うか否かを指定して
いるテーブルデータを参照し、グルーピングを行うと指
定してある場合に以下のステップ802乃至ステップ8
04の処理を行い、それ以外は処理を行わないで処理を
終了する(ステップ801)。
Next, the processing of the job grouping unit 800 will be described in detail with reference to the flowchart of FIG.
First, the simulation condition definition information 114-
The table data that specifies whether to group the jobs in 1 is referred to, and when it is specified that the grouping is performed, the following steps 802 to 8 are performed.
The process of 04 is performed, and the process is terminated without performing other processes (step 801).

【0026】ステップ801において、グルーピングを
行なうと指定してある場合には、まず、ジョブ情報セル
201の読み込み動作を行い、以下のステップ802乃
至ステップ804の処理をジョブ情報セル201のリス
トが空になるまで継続する(ステップ802)。ステッ
プ802で読み込んだジョブ情報セルで表されるジョブ
と同一ファイルにアクセスするジョブを、ジョブ情報セ
ルのリストの中から順次検索し、これらのジョブを同一
グループとみなしてグルーピングする。また、ここで同
一グループとされたジョブと同一ファイルにアクセスす
るジョブも同様に同一グループとする(ステップ80
3)。次のジョブ情報セルを対象として(ステップ80
4)、ステップ802に戻って再び同様の処理を行な
う。
If it is specified in step 801 that grouping is to be performed, first, the read operation of the job information cell 201 is performed, and the processing of the following steps 802 to 804 is performed to empty the list of the job information cell 201. It continues until it becomes (step 802). Jobs that access the same file as the job represented by the job information cell read in step 802 are sequentially searched from the list of job information cells, and these jobs are regarded as the same group and grouped. Further, the jobs that access the same file as the jobs in the same group here are also in the same group (step 80).
3). Target the next job information cell (step 80
4) Then, returning to step 802, the same processing is performed again.

【0027】次に、シミュレーション部900における
ジョブ実行のシミュレーションの手順を図13および図
14のフローチャートを用いて詳細に説明する。図14
は、図13で行われるジョブ情報セル201のリストつ
なぎ換えを模式的に表したものである。図14におい
て、201−j(j=1〜j)は内容の異なるジョブ情
報セルを表す。図14中の空間1001のテーブル構造
例を図15に示す。図15に示した空間1001のテー
ブル構造において、ポインタ1101は次の空間100
1をポイントするためのものである。また、ポインタ1
102はその空間1001に接続されるジョブ情報セル
のリストの先頭をポイントするためのものである。
Next, the procedure of the job execution simulation in the simulation section 900 will be described in detail with reference to the flowcharts of FIGS. 13 and 14. 14
13 schematically illustrates the reconnection of the list of the job information cells 201 performed in FIG. In FIG. 14, 201-j (j = 1 to j) represent job information cells having different contents. FIG. 15 shows an example of the table structure of the space 1001 in FIG. In the table structure of the space 1001 shown in FIG. 15, the pointer 1101 indicates the next space 1001.
It is for pointing at 1. Also, pointer 1
Reference numeral 102 is for pointing to the beginning of the list of job information cells connected to the space 1001.

【0028】次に、図13のフローチャートに沿ってシ
ミュレーション部900の動作を詳細に説明する。まず
最初に、シミュレーション条件定義情報114−1から
情報を読み込む。シミュレーション条件定義情報114
−1が空になるまで以下のステップ902乃至ステップ
903の処理を行う(ステップ901)。シミュレーシ
ョン条件定義情報114−1が空になったら、ステップ
904に進む。
Next, the operation of the simulation section 900 will be described in detail with reference to the flowchart of FIG. First, information is read from the simulation condition definition information 114-1. Simulation condition definition information 114
The following steps 902 to 903 are performed until -1 becomes empty (step 901). When the simulation condition definition information 114-1 is empty, the process proceeds to step 904.

【0029】ステップ902では、読み込んだシミュレ
ーション条件に対応した処理を行う。例えば、ジョブ実
行多重度の最大数を表す空間数のパラメタであった場合
は、その数の空間1001をメモリ領域に確保する。ま
たCPU性能比率であった場合は、ジョブ情報セル20
1内のCPU使用時間306を該比率に合わせて換算
し、同時にジョブ終了時刻305の書き換え(図7参
照)も行う。
In step 902, processing corresponding to the read simulation conditions is performed. For example, when the parameter is the number of spaces representing the maximum number of job execution multiplicity, the space 1001 of that number is secured in the memory area. If it is the CPU performance ratio, the job information cell 20
The CPU usage time 306 in 1 is converted according to the ratio, and at the same time, the job end time 305 is rewritten (see FIG. 7).

【0030】接続するジョブ情報セルのリスト1の先頭
から、ジョブ情報セル201を順々に取り出すために、
ジョブ情報セル201があるかどうかの判定を行い(ス
テップ904)、ジョブ情報セル201があった場合、
先頭からそれを順に取り出し空になるまで以下のステッ
プ905乃至ステップ911の処理を行う。まず、上記
のジョブの、他のジョブとのファイル受渡しなどのスケ
ジューリング条件を求める(ステップ905)。次に、
ステップ905で求めたスケジューリング条件により実
行開始可能な時刻を算出する(ステップ906)。ステ
ップ906で求めた時刻に空間1001に接続されたジ
ョブ情報セルリストの内容を検索し、上記実行開始可能
な時刻に空きがあり、実行可能であるか否かを判定する
(ステップ907)。
In order to sequentially extract the job information cells 201 from the beginning of the list 1 of the job information cells to be connected,
It is determined whether or not the job information cell 201 exists (step 904). If the job information cell 201 exists,
It is sequentially taken out from the beginning and the processes of the following steps 905 to 911 are performed until it is empty. First, the scheduling conditions of the above jobs such as file transfer with other jobs are obtained (step 905). next,
The time when execution can be started is calculated based on the scheduling conditions obtained in step 905 (step 906). At the time obtained in step 906, the contents of the job information cell list connected to the space 1001 are searched, and it is determined whether or not there is a vacant time at which the execution can be started and the execution is possible (step 907).

【0031】上記ステップ907における判定が真(実
行可能)であった場合、その空いている空間1001に
ジョブ情報セルを接続する。また、ジョブ情報セルを接
続した際、そのジョブ情報セルが指し示すジョブステッ
プ情報セルなども一緒に空間1001に接続する(ステ
ップ908)。上記ステップ907における判定が偽
(実行不可)であった場合、上記ステップ906で求め
た実行開始可能時刻以降で、最も早く実行が可能となる
空間1001に、ジョブ情報セルを接続する(ステップ
909)。その後、上述したジョブ情報セルの接続が終
了した後、ジョブ実行時間などのジョブ情報セル内のデ
ータの書換えを行い(ステップ910)、次のジョブ情
報セルを対象として判定ステップ904に戻る。なお、
シミュレーション部900での処理中に、ジョブが実行
されない時間が生じることがある。これらの時間を空き
であることを表すジョブ情報セルで表すことで、空間1
001のジョブ情報セルリスト内でのアイドル時間を表
現することができる。
If the determination in step 907 is true (executable), the job information cell is connected to the empty space 1001. When the job information cell is connected, the job step information cell pointed to by the job information cell and the like are also connected to the space 1001 (step 908). If the determination in step 907 is false (executable), the job information cell is connected to the space 1001 in which execution can be performed earliest after the execution startable time obtained in step 906 (step 909). . Then, after the connection of the job information cell described above is completed, the data in the job information cell such as the job execution time is rewritten (step 910), and the process returns to the determination step 904 for the next job information cell. In addition,
During the processing in the simulation unit 900, there are times when a job is not executed. By expressing these times with a job information cell indicating that the space is empty, the space 1
Idle time in the job information cell list of 001 can be expressed.

【0032】次に、シミュレーション部900における
ステップ904乃至ステップ911によって具体的にど
のようにジョブ情報セルが変更されるかを図14を参照
しながら説明する。まず、判定ステップ904におい
て、接続すべき未処理のジョブ情報セルのリストを参照
する。図14に示した例の場合、未処理のジョブ情報セ
ルとして201−1、201−2、・・・・、201−
iがあるから判定ステップ904はYESであるため、
リストの先頭から201−1、201−2、・・・、2
01−iを順に取り出してそれぞれに対してステップ9
05乃至ステップ911の処理を行う。
Next, how the job information cell is specifically changed in steps 904 to 911 in the simulation section 900 will be described with reference to FIG. First, in decision step 904, a list of unprocessed job information cells to be connected is referred to. In the case of the example shown in FIG. 14, the unprocessed job information cells are 201-1, 201-2, ..., 201-.
Since i is present, the determination step 904 is YES,
From the top of the list, 201-1, 201-2, ..., 2
01-i are taken out in order, and step 9 is carried out for each.
The processing from 05 to step 911 is performed.

【0033】最初に、リストの先頭のジョブ情報セル2
01−1を処理するにあたり、ステップ905乃至ステ
ップ908またはステップ909において、シミュレー
ションの結果をメモリ上で表したジョブ情報セルのリス
トの中でジョブ情報セル201−1がどのジョブの後で
実行されるべきかを割出す。図14における例の場合、
ジョブ情報セル201−4の後に実行されるものとす
る。その場合、ステップ908またはステップ909に
おいて、ジョブ情報セル201−1は201−4の後に
つがぎ換えられる。同時にジョブ情報セル201−1は
未処理のジョブ情報セルリスト200からは削除され
る。以上説明したように、本実施例では、ジョブの実行
状況をメモリ上で情報セルのリストとして表し、パラメ
タ情報とジョブ実行履歴を用いてシミュレーションを行
う。
First, the job information cell 2 at the head of the list
In processing 01-1, in step 905 to step 908 or step 909, after which job the job information cell 201-1 is executed in the list of job information cells representing the simulation result on the memory. Figure out what should be done. In the case of the example in FIG.
It shall be executed after the job information cell 201-4. In that case, in step 908 or step 909, the job information cell 201-1 is reshuffled after 201-4. At the same time, the job information cell 201-1 is deleted from the unprocessed job information cell list 200. As described above, in the present embodiment, the execution status of the job is represented as a list of information cells on the memory, and the simulation is performed using the parameter information and the job execution history.

【0034】[0034]

【発明の効果】本発明によれば、現行のシステムでのジ
ョブ処理時間短縮が図れるジョブスケジューリング案を
得られる。さらに、システム構成変更によるジョブ実行
状況が、システム構成変更前に、現行システムのジョブ
稼働状況をもとにして把握することが可能になる。さら
に、ジョブ実行履歴に基づいてシミュレーションを行う
ため、対象となるシステムに動的なジョブモニタリング
程の負担をかけずに静的に評価を行うことが可能とな
る。
According to the present invention, it is possible to obtain a job scheduling plan that can shorten the job processing time in the existing system. Further, the job execution status due to the system configuration change can be grasped before the system configuration change based on the job operating status of the current system. Furthermore, since the simulation is performed based on the job execution history, it is possible to perform the static evaluation without imposing a load on the target system as much as dynamic job monitoring.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明のジョブスケジューリング解析方法を実
現するためのジョブスケジューリング解析部104を具
備した計算機システムの一実施例である。
FIG. 1 is an embodiment of a computer system including a job scheduling analysis unit 104 for realizing a job scheduling analysis method of the present invention.

【図2】本発明の入力情報となるジョブ実行履歴115
の説明図である。
FIG. 2 is a job execution history 115 that is input information of the present invention.
FIG.

【図3】本発明の入力情報となるパラメタ情報114の
説明図である。
FIG. 3 is an explanatory diagram of parameter information 114 that is input information of the present invention.

【図4】本発明の出力情報となるシミュレーション結果
116の説明図である。
FIG. 4 is an explanatory diagram of a simulation result 116 which is output information of the present invention.

【図5】本発明のジョブスケジューリング解析部104
の具体的な構成例である。
FIG. 5 is a job scheduling analysis unit 104 of the present invention.
3 is a specific configuration example of

【図6】本発明のジョブスケジューリング解析方法で用
いられるジョブおよびジョブに関するデータである情報
セルの構成を示した説明図である。
FIG. 6 is an explanatory diagram showing the configuration of a job and an information cell, which is data related to the job, used in the job scheduling analysis method of the present invention.

【図7】ジョブのデータを格納するジョブ情報セルのテ
ーブル構造を示した説明図である。
FIG. 7 is an explanatory diagram showing a table structure of a job information cell that stores job data.

【図8】ジョブステップのデータを格納するジョブステ
ップ情報セルのテーブル構造を示した説明図である。
FIG. 8 is an explanatory diagram showing a table structure of a job step information cell that stores job step data.

【図9】アクセスファイルのデータを格納するファイル
情報セルのテーブル構造を示した説明図である。
FIG. 9 is an explanatory diagram showing a table structure of a file information cell that stores data of an access file.

【図10】ジョブデータ解析部600の処理を説明した
フローチャートである。
FIG. 10 is a flowchart illustrating a process of job data analysis unit 600.

【図11】パラメタ解析部700の処理を説明したフロ
ーチャートである。
11 is a flowchart illustrating a process of a parameter analysis unit 700. FIG.

【図12】ジョブグルーピング部800の処理を説明し
たフローチャートである。
FIG. 12 is a flowchart illustrating a process of a job grouping unit 800.

【図13】スケジューリングのシミュレーション部90
0の処理を説明したフローチャートである。
FIG. 13 is a scheduling simulation unit 90.
It is a flow chart explaining processing of 0.

【図14】シミュレーションでのジョブ実行を表すため
のデータ構造を示した説明図である。
FIG. 14 is an explanatory diagram showing a data structure for representing job execution in a simulation.

【図15】シミュレーションで用いられる空間1001
のテーブル構造を示した説明図である。
FIG. 15: Space 1001 used in simulation
It is an explanatory view showing the table structure of.

【符号の説明】[Explanation of symbols]

101…計算機、102…CPU、103…メモリ、1
04…ジョブスケジューリング解析部、600…ジョブ
データ解析部、700…パラメタ解析部、800…ジョ
ブグルーピング部、900…シミュレーション部、11
0…システム稼働履歴収集部、111…ジョブスケジュ
ールプログラム、112…ジョブ起動部、113…登録
簿作成部、114…パラメタ情報、115…ジョブ実行
履歴、116…シミュレーション結果、117…ジョブ
登録簿、118…ジョブ制御文。
101 ... Calculator, 102 ... CPU, 103 ... Memory, 1
04 ... Job scheduling analysis unit, 600 ... Job data analysis unit, 700 ... Parameter analysis unit, 800 ... Job grouping unit, 900 ... Simulation unit, 11
0 ... System operation history collection unit, 111 ... Job schedule program, 112 ... Job activation unit, 113 ... Registration list creation unit, 114 ... Parameter information, 115 ... Job execution history, 116 ... Simulation result 117 ... Job registration list, 118 … Job control statements.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 山岸 正 神奈川県横浜市戸塚区戸塚町5030番地 株 式会社日立製作所ソフトウェア開発本部内 (72)発明者 田中 俊治 神奈川県川崎市麻生区王禅寺1099番地 株 式会社日立製作所システム開発研究所内 (72)発明者 木下 俊之 神奈川県川崎市麻生区王禅寺1099番地 株 式会社日立製作所システム開発研究所内 Fターム(参考) 5B045 BB28 BB42 EE16 GG01 KK05 5B085 AC14 BA01 BC03 BG02 5B098 GA03 GA10 GC01 GC02 GC09 GD14    ─────────────────────────────────────────────────── ─── Continued front page    (72) Inventor Tadashi Yamagishi             5030 Totsuka Town, Totsuka Ward, Yokohama City, Kanagawa Prefecture             Ceremony Company Hitachi Software Development Division (72) Inventor Shunji Tanaka             1099 Ozenji, Aso-ku, Kawasaki City, Kanagawa Prefecture             Ceremony company Hitachi Systems Development Laboratory (72) Inventor Toshiyuki Kinoshita             1099 Ozenji, Aso-ku, Kawasaki City, Kanagawa Prefecture             Ceremony company Hitachi Systems Development Laboratory F term (reference) 5B045 BB28 BB42 EE16 GG01 KK05                 5B085 AC14 BA01 BC03 BG02                 5B098 GA03 GA10 GC01 GC02 GC09                       GD14

Claims (8)

【特許請求の範囲】[Claims] 【請求項1】 計算機において、あるシステムでジョブ
実行中に所定のファイル参照することを要するジョブ相
互間の実行順序を決定する方法であって、 前記計算機は、 前記計算機の外部から、前記ジョブごとに、ジョブ実行
中にアクセスしたファイルの履歴情報を受付け、 前記履歴情報に基づいて、第1のジョブを実行中に参照
したファイルに対して、第2のジョブがデータを入力す
る場合にあっては、該第2のジョブが該第1のジョブよ
りも先になるように前記ジョブの実行順序を決定するこ
とを特徴とするジョブ実行順序決定方法。
1. A method for determining an execution order between jobs that requires reference to a predetermined file during execution of a job in a computer, the computer comprising: In the case where the history information of the file accessed during the job execution is received, and the second job inputs data to the file referred to during the execution of the first job based on the history information, Is a job execution order determining method, wherein the execution order of the jobs is determined so that the second job comes before the first job.
【請求項2】 前記計算機は、ファイルの履歴情報の他
に、前記システムのCPUの性能比率に関する情報を取
得することを特徴とする請求項1記載のジョブ実行順序
決定方法。
2. The job execution order determining method according to claim 1, wherein the computer acquires, in addition to file history information, information regarding a CPU performance ratio of the system.
【請求項3】 前記計算機は、ファイルの履歴情報の他
に、前記システムの多重度に関する情報が含まれる情報
を取得することを特徴とする請求項1記載のジョブ実行
順序決定方法。
3. The job execution order determining method according to claim 1, wherein the computer acquires, in addition to file history information, information including information regarding the multiplicity of the system.
【請求項4】 前記ジョブの実行履歴には、各ジョブ間
のファイル受け渡し関係を示す情報が含まれており、 ジョブの実行順序を決定するステップにおいては、前記
ジョブ間のファイル受け渡し関係を示す情報に従って、
前記ジョブの実行のシミュレーションを行うことを特徴
とする請求項1、請求項2または請求項3のいずれかに
記載のジョブ実行順序決定方法。
4. The job execution history includes information indicating a file transfer relationship between the jobs, and in the step of determining the execution order of the jobs, information indicating a file transfer relationship between the jobs. According to
4. The job execution order determining method according to claim 1, wherein the execution of the jobs is simulated.
【請求項5】 前記ジョブの実行のシミュレーションに
は、前記シミュレーション結果を出力するステップを有
することを特徴とする請求項4記載のジョブ実行順序決
定方法。
5. The job execution order determination method according to claim 4, wherein the simulation of the execution of the jobs includes a step of outputting the simulation result.
【請求項6】 前記ジョブの実行履歴に基づいて、同一
のファイルを使用するジョブを一つのグループにまと
め、 前記まとめられたグループに含まれるジョブについて、
シミュレーションを行うことを特徴とする請求項4また
は5記載のジョブ実行順序決定方法。
6. The jobs that use the same file are grouped into one group based on the execution history of the jobs, and the jobs included in the group are summarized.
The job execution order determination method according to claim 4, wherein a simulation is performed.
【請求項7】 前記システムは、前記ジョブが実行され
たシステムとは異なるシステムであることを特徴とする
請求項1から請求項6までのうちのいずれかに記載のジ
ョブ実行順序決定方法。
7. The job execution order determination method according to claim 1, wherein the system is a system different from the system in which the job is executed.
【請求項8】 計算機において、あるシステムでジョブ
実行中に所定のファイル参照することを要するジョブ相
互間の実行順序を決定する方法であって、 前記計算機は、 前記計算機の外部から前記システムの資源に関するパラ
メタを受付け、 前記計算機の外部から、前記ジョブごとに、ジョブ実行
中にアクセスしたファイルの履歴情報を受付け、 前記パラメタと前記履歴情報とに基づいて、前記ジョブ
の実行順序を決定することを特徴とするジョブ実行順序
決定方法。
8. A method for determining the order of execution of jobs in a computer, which requires reference to a predetermined file during job execution in a certain system, wherein the computer is a resource of the system from outside the computer. Accepting a parameter relating to, for each job, accepting history information of a file accessed during job execution from outside the computer, and determining an execution order of the jobs based on the parameter and the history information. A method for determining the job execution sequence.
JP2002168125A 2002-06-10 2002-06-10 How to determine job execution order Expired - Fee Related JP4219119B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002168125A JP4219119B2 (en) 2002-06-10 2002-06-10 How to determine job execution order

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002168125A JP4219119B2 (en) 2002-06-10 2002-06-10 How to determine job execution order

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP08796695A Division JP3501385B2 (en) 1995-04-13 1995-04-13 Job execution order determination method

Publications (2)

Publication Number Publication Date
JP2003050708A true JP2003050708A (en) 2003-02-21
JP4219119B2 JP4219119B2 (en) 2009-02-04

Family

ID=19195083

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002168125A Expired - Fee Related JP4219119B2 (en) 2002-06-10 2002-06-10 How to determine job execution order

Country Status (1)

Country Link
JP (1) JP4219119B2 (en)

Also Published As

Publication number Publication date
JP4219119B2 (en) 2009-02-04

Similar Documents

Publication Publication Date Title
JP3501385B2 (en) Job execution order determination method
Ganapathi et al. Statistics-driven workload modeling for the cloud
Joseph et al. IntMA: Dynamic interaction-aware resource allocation for containerized microservices in cloud environments
CN100533387C (en) System and method for executing job step
CN104298550B (en) A kind of dynamic dispatching method towards Hadoop
US9760294B2 (en) Computer system, storage management computer, and storage management method
US7979864B2 (en) Apparatus for setting used license of executing job into unused license state and allocating the set unused license to a to be executed job based on priority
US20160328266A1 (en) Process grouping for improved cache and memory affinity
US6889243B1 (en) Job scheduling analysis method and system using historical job execution data
CN102999132B (en) Administering thermal distribution among memory modules of a computing system
US9715409B2 (en) Job delay detection method and information processing apparatus
US8612805B2 (en) Processor system optimization supporting apparatus and supporting method
JP5385912B2 (en) Calculation device, system management device, calculation method, and program
US9442817B2 (en) Diagnosis of application server performance problems via thread level pattern analysis
WO2013140529A1 (en) Information processing method, program, and information processing device
da Silva et al. Characterizing, modeling, and accurately simulating power and energy consumption of i/o-intensive scientific workflows
Wildstrom et al. Towards self-configuring hardware for distributed computer systems
Kumar et al. A comprehensive review of straggler handling algorithms for mapreduce framework
Shi et al. A case study of tuning MapReduce for efficient Bioinformatics in the cloud
CN105630575A (en) Performance evaluation method aiming at KVM virtualization server
Liu et al. High-responsive scheduling with MapReduce performance prediction on hadoop YARN
Zhang et al. Performance modeling and optimization of deadline-driven Pig programs
US20160110117A1 (en) Computer system and method for controlling hierarchical storage therefor
US7039707B2 (en) Disk subsystem, computer system, storage managing method and program
JP4219119B2 (en) How to determine job execution order

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050419

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050902

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20051028

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20051125

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20051226

RD12 Notification of acceptance of power of sub attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7432

Effective date: 20051226

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20051226

A911 Transfer of reconsideration by examiner before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20060201

A912 Removal of reconsideration by examiner before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A912

Effective date: 20060303

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20081016

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20081111

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111121

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees