JP2003036291A - Product cost estimation method and system - Google Patents

Product cost estimation method and system

Info

Publication number
JP2003036291A
JP2003036291A JP2001223057A JP2001223057A JP2003036291A JP 2003036291 A JP2003036291 A JP 2003036291A JP 2001223057 A JP2001223057 A JP 2001223057A JP 2001223057 A JP2001223057 A JP 2001223057A JP 2003036291 A JP2003036291 A JP 2003036291A
Authority
JP
Japan
Prior art keywords
man
product
cost
design
estimation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2001223057A
Other languages
Japanese (ja)
Inventor
Yuichi Ideushi
雄一 出牛
Takahisa Baba
隆久 馬場
Tsutomu Imoto
努 井本
Seiichi Sakurai
誠一 桜井
Osamu Okada
修 岡田
Shigeru Maenozono
繁 前之園
Masao Izumi
正夫 泉
Shuji Takahashi
修史 高橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Oki Electric Industry Co Ltd
Original Assignee
Oki Electric Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Oki Electric Industry Co Ltd filed Critical Oki Electric Industry Co Ltd
Priority to JP2001223057A priority Critical patent/JP2003036291A/en
Publication of JP2003036291A publication Critical patent/JP2003036291A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a cost estimation method and system that allows a designer to estimate the cost of a product, such as an electronic device, starting with the design stage. SOLUTION: This is a product cost estimation method and system which estimate the cost of the product in response to the input of design-drawing identification data on a product. Corresponding to design-drawing identification data on the product, the system holds design information data, including the part types of parts specified on the design drawing and the process types (machining, assembly, and test) of the parts. The system also holds estimation conditions including part unit prices of the part types as well as the standard man-hours and the man-hour unit prices of the process types. In response to the input of design-drawing identification data on the product, the system adds up the part unit prices corresponding to part types included in the corresponding design information data for the number of required parts to calculate the total member cost, and the system also adds up the standard man-hours corresponding to the process types included in the corresponding design information data to calculate the total man-hours. The system then multiplies the calculated total man-hours by the man-hour unit price for conversion to the process cost.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、電子機器等の製品
のコストを見積る製品コスト見積方法及びシステムに関
する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a product cost estimation method and system for estimating the cost of products such as electronic devices.

【0002】[0002]

【従来の技術】従来、電子機器製品の製造原価は、設計
開発終了後に設計部門より工場へ正式製品図面が発行さ
れ、工場で量産試作が行われる段階になって初めて見積
りがなされることが一般的であった。そのため、量産試
作時点で、製品原価が目標コストより高いことが分かっ
ても、設計変更が間に合わず、高い原価のまま量産しな
ければならなかった。このような時機に遅れたコスト見
積を回避するためには、設計開発段階での早期のコスト
見積を行うことが考えられる。しかし、かかる設計段階
において容易にコストを見積る手段がなく、目標コスト
を意識した十分なデザインレビューができないため、量
産開始後にコスト低減のための設計変更が多発し、それ
に伴う設備投資、例えば金型投資や製品評価などで無駄
な費用や時間を費やしていた。
2. Description of the Related Art Conventionally, the manufacturing cost of an electronic device product is generally estimated only after the design department issues a formal product drawing to the factory after design and development, and mass production trials are performed at the factory. It was target. Therefore, even if it was found that the product cost was higher than the target cost at the time of mass-production trial production, the design change could not be made in time and the high cost had to be mass-produced. In order to avoid such cost estimation that is delayed in time, it is conceivable to perform cost estimation early in the design and development stage. However, because there is no means to easily estimate the cost in such a design stage, and sufficient design reviews that consider the target cost cannot be performed, there are frequent design changes for cost reduction after the start of mass production, which leads to capital investment, such as molds. It wasted money and time on investment and product evaluation.

【0003】かかる問題を解決する方法として、特開平
8−50610は情報処理装置等の装置の組立工程及び
検査工程における工程毎の標準時間を見積る方式を開示
している。しかし、かかる方法においては、見積り実施
のために製品図面が必要であり設計開発段階での見積り
は困難であった。又、特開平11−120249は、プ
ラント製品のための見積設計支援装置を開示している。
しかし、かかる装置は、見積り対象となる製品の顧客の
要求仕様の確定に応じて、速やかに見積りを該顧客に提
示することを目的として材料費或いは部品費を見積るこ
とが可能であるが、製造段階における加工工数や、電子
機器特有の機能検査等の工数見積りを加えたコスト計算
は困難であった。
As a method for solving such a problem, Japanese Patent Laid-Open No. 8-50610 discloses a method of estimating a standard time for each step in the assembly process and inspection process of a device such as an information processing device. However, in such a method, it is difficult to estimate at the design and development stage because a product drawing is required for performing the estimation. Further, Japanese Patent Laid-Open No. 11-120249 discloses an estimate design support device for plant products.
However, such an apparatus can estimate the material cost or the component cost for the purpose of promptly presenting the estimate to the customer in accordance with the confirmation of the customer's required specifications of the product to be estimated. It was difficult to calculate the cost by adding the processing man-hours at the stage and the man-hour estimation such as the function inspection peculiar to electronic equipment.

【0004】[0004]

【発明が解決しようとする課題】そこで,本発明の目的
は、電子機器等の製品のコスト見積りを設計段階から可
能とする製品コスト見積方法及びシステムを提供するこ
とである。
SUMMARY OF THE INVENTION Therefore, an object of the present invention is to provide a product cost estimation method and system which enables cost estimation of products such as electronic devices from the design stage.

【0005】[0005]

【課題を解決するための手段】本発明による製品コスト
見積方法は、製品の設計図面の識別データの入力に応じ
て該製品のコストを見積る製品コスト見積方法であり、
該製品の設計図面の識別データに対応して、該設計図面
に規定される部品の部品種別と、該部品の加工、組立及
び試験工程の工程種別とを含む設計情報データを保持す
る設計情報データ保持ステップと、該部品種別に対応す
る部品単価と、該工程種別に対応する標準工数及び工数
単価とを含む見積条件を保持する見積条件保持ステップ
と、該製品の設計図面の識別データの入力に応じて、対
応する設計情報データの部品種別に対応する該部品単価
を部品数に応じて合算して部材費を集計する部材費集計
ステップと、該製品の設計図面の識別データの入力に応
じて、対応する設計情報データの工程種別に対応する該
標準工数を工程数に応じて合算して総工数を集計する総
工数集計ステップと、該集計された総工数を該工数単価
を乗ずることにより加工費に換算する加工費換算ステッ
プとを含むことを特徴とする。
A product cost estimation method according to the present invention is a product cost estimation method for estimating the cost of a product according to input of identification data of a design drawing of the product,
Design information data holding design information data including the component type of the component defined in the design drawing and the process type of the machining, assembly, and test process of the component corresponding to the identification data of the design drawing of the product A holding step, a quotation condition holding step of holding a quotation condition including a component unit price corresponding to the component type, and a standard man-hour and a unit price of the process corresponding to the process type, and inputting identification data of design drawings of the product. According to the input of the component cost totaling step of totaling the component cost by adding up the component unit prices corresponding to the component types of the corresponding design information data according to the number of components, and the identification data of the design drawing of the product. , A total man-hour totaling step of totaling the total man-hours by adding up the standard man-hours corresponding to the process type of the corresponding design information data, and multiplying the total man-hours by the total man-hour unit price. Characterized in that it comprises a processing cost conversion step of converting the processing costs.

【0006】本発明による製品コスト見積システムは、
製品の設計図面の識別データの入力に応じて該製品のコ
ストを見積る製品コスト見積システムであり、該製品の
設計図面の識別データに対応して、該設計図面に規定さ
れる部品の部品種別と、該部品の加工、組立及び試験工
程の工程種別とを含む設計情報データを保持する設計情
報データ保持手段と、該部品種別に対応する部品単価
と、該工程種別に対応する標準工数及び工数単価とを含
む見積条件を保持する見積条件保持手段と、該製品の設
計図面の識別データの入力に応じて、対応する設計情報
データの部品種別に対応する該部品単価を部品数に応じ
て合算して部材費を集計する部材費集計手段と、該製品
の設計図面の識別データの入力に応じて、対応する設計
情報データの工程種別に対応する該標準工数を工程数に
応じて合算して総工数を集計する総工数集計手段と、該
集計された総工数を該工数単価を乗ずることにより加工
費に換算する加工費換算手段とを含むことを特徴とす
る。
The product cost estimation system according to the present invention is
A product cost estimation system that estimates the cost of the product in response to the input of identification data of the design drawing of the product, and corresponds to the identification data of the design drawing of the product, and the part type of the part specified in the design drawing. , Design information data holding means for holding design information data including process types of the parts processing, assembling and testing processes, a unit price of the parts corresponding to the type of parts, and a standard man-hour and a unit price of man-hours corresponding to the process types. According to the input of the identification condition data of the design drawing of the product and the estimation condition holding means for holding the estimation conditions including the above, the component unit price corresponding to the component type of the corresponding design information data is added according to the number of components. According to the input of identification data of the design drawing of the product, the standard man-hour corresponding to the process type of the corresponding design information data is added up according to the number of processes, and the total is calculated. Work The total man-hours collecting unit to aggregate, characterized in that it comprises a processing cost converting means for converting the processing costs by multiplying the 該工 number bid total man-hours that is the aggregate.

【0007】[0007]

【発明の実施の形態】図1は、本発明の実施例であり、
製品コスト見積システムの構成を示している。ここで、
製品コスト見積システム1は、板金部品コスト見積プロ
グラム2と、プリント配線板組立工数見積プログラム3
と、BWB(Back Wiring Board)組立工数見積プログ
ラム4と、ケーブル組立工数見積プログラム5と、装置
組立工数見積プログラム6と、電子部品実装済プリント
配線板及び装置の検査工数を見積る基板及び装置検査工
数見積プログラム7と、以上の各プログラムの見積り結
果を基にして工数の集計及び加工費換算と使用部品の部
材費積上げとを行う総合コスト見積プログラム8とから
構成される。
FIG. 1 shows an embodiment of the present invention.
The structure of the product cost estimation system is shown. here,
The product cost estimation system 1 includes a sheet metal part cost estimation program 2 and a printed wiring board assembly man-hour estimation program 3.
, BWB (Back Wiring Board) assembly man-hour estimation program 4, cable assembly man-hour estimation program 5, device assembly man-hour estimation program 6, and board and device inspection man-hours for estimating the inspection man-hours of the printed wiring board and the device on which electronic parts are mounted. It comprises an estimation program 7 and a total cost estimation program 8 for totaling the man-hours, converting the processing cost, and accumulating the component cost of the used parts based on the estimation results of the above programs.

【0008】製品コスト見積システム1は、更に、見積
結果を保存する見積結果データベース9と、製品仕様、
設計図面、部品構成品表及び検査項目データを格納する
設計情報データベース10と、電気部品の仕様、性能、
形状及びサイズデータを格納する部品情報データベース
11と、購入実績のある部品単価データを格納する部品
単価データベース12と、製品又は部品毎の組立及び検
査工数の実績データを格納する工数実績データベース1
3と、工数当たりの作業単価データを格納する工数単価
データベース14とを含む。設計情報データベース10
は、例えば設計用CAD端末21にて電子機器の製品設
計、即ち装置設計、実装設計、基板設計、試験設計等の
設計作業を行い、その製品の設計図面、電気部品及び機
構部品の構成品表、機構部品種別検査項目等の設計情報
を設計図面番号に関連づけて登録して置く。この時、設
計開発途中のものでも登録可能である。部品単価データ
ベース12、工数実績データベース13及び工数単価デ
ータベース14は、管理端末22により登録又は修正の
管理操作を可能である。
The product cost estimation system 1 further includes an estimation result database 9 for storing estimation results, product specifications,
A design information database 10 that stores design drawings, a parts composition table, and inspection item data, and specifications and performance of electrical parts.
A parts information database 11 that stores shape and size data, a parts unit price database 12 that stores parts unit price data that has been purchased, and a man-hour results database 1 that stores actual data of assembly and inspection man-hours for each product or part.
3 and a man-hour unit price database 14 that stores work unit price data per man-hour. Design information database 10
Performs, for example, product design of electronic devices, that is, device design, mounting design, board design, test design, etc., using the designing CAD terminal 21, and design drawings of the product, component parts list of electrical parts and mechanical parts Design information such as mechanical part type inspection items is registered and stored in association with the design drawing number. At this time, it is possible to register even those that are in the process of design and development. The component unit price database 12, the man-hour performance database 13, and the man-hour unit price database 14 can be registered or modified by the management terminal 22.

【0009】製品コスト見積システム1は、設計者が電
子機器製品の設計作業を行うCAD端末に実装されて設
計作業と並行して又は設計作業に継続してコスト見積作
業を可能とするのが好ましく、或いは別個のコンピュー
タに実装されても良い。図2は、設計情報データベース
10の構成例を示している。ここで、設計情報データ
は、設計図面の識別データ、例えば、図面番号をキーと
して管理される。かかる識別データは、製品又は部品モ
ジュールの物品番号をキーとして管理されても良い。図
2に示されるように、板金部品の設計情報としては、寸
法、材質、加工方法、表面処理方法等の設計情報からな
る。プリント配線組立工程の設計情報としては、部品の
実装工程の情報からなる。BWB組立工数の設計情報と
しては、コネクタ及びコンタクト実装や補強金具取付け
工程の情報からなる。ケーブル組立工程の設計情報とし
ては、線材形状やコネクタコンタクト、付帯作業、例え
ばタイラップ固定、捺印、収縮チューブ取付け等の情報
からなる。装置組立工程の設計情報としては、ネジ、ラ
ベル、ケーブル、特殊部品等の部品種別や部品締結方
法、例えば、ネジ締め、リベット、接着他の情報からな
る。基板試験工程の設計情報としては、電子部品が実装
されたプリント配線板単体での検査項目、例えば、初期
動作確認、主信号導通試験、警報動作試験、電源試験等
の情報からなる。製品試験工程の設計情報としては、最
終製品状態での装置の検査項目、例えば、警報試験、主
信号導通試験、共通部切替試験、LOOP試験、及びラ
インテスト等の試験工程等の情報からなる。
It is preferable that the product cost estimation system 1 is mounted on a CAD terminal for a designer to design an electronic device product to enable the cost estimation work in parallel with the design work or continuously. Alternatively, it may be implemented in a separate computer. FIG. 2 shows a configuration example of the design information database 10. Here, the design information data is managed using the identification data of the design drawing, for example, the drawing number as a key. Such identification data may be managed using the article number of the product or the part module as a key. As shown in FIG. 2, the design information of the sheet metal part includes design information such as dimensions, materials, processing methods, and surface treatment methods. The design information of the printed wiring assembly process includes information of the component mounting process. The design information of the BWB assembly man-hour includes information on the connector and contact mounting and the reinforcing metal fitting process. The design information of the cable assembling process includes information such as wire shape, connector contact, incidental work such as tie wrap fixing, marking, shrink tube attachment and the like. The design information of the device assembling process includes information such as screw type, label type, cable type, and special type component type and component fastening method, for example, screw tightening, rivet, bonding and other information. The design information of the board test process includes inspection items for a single printed wiring board on which electronic components are mounted, such as information on initial operation confirmation, main signal continuity test, alarm operation test, and power supply test. The design information of the product test process includes information on the inspection items of the device in the final product state, for example, an alarm test, a main signal continuity test, a common part switching test, a LOOP test, and a line test.

【0010】図3は、見積条件データベース15の構成
例を示している。ここで、板金部品の工程毎の標準工
数、即ち、加工標準時間Hs(Hours of Standard)と
組立標準時間Hsが単位mH(mHours)で定められる。
かかる標準時間は、WF(WorkFactor)法に基づき、加
工、組立又は検査の個々の工程において標準的な作業者
が通常の作業において要する時間であり、各工程を構成
する動作の分析及び実測に基づいて定めるものである。
尚、かかる標準時間の全工程に亘る集計は、単純な合算
計算式だけでなく、例えば、各工程毎に重み付けをなし
た計算式が本見積条件データベース15に規定されて用
いられても良い。
FIG. 3 shows an example of the structure of the estimation condition database 15. Here, the standard man-hour for each process of the sheet metal part, that is, the processing standard time Hs (Hours of Standard) and the assembly standard time Hs are defined in the unit mH (mHours).
The standard time is a time required for a standard worker to perform a normal work in each process of processing, assembling or inspection based on the WF (WorkFactor) method, and is based on the analysis and actual measurement of the motions constituting each process. It is determined by.
In addition, not only a simple total calculation formula but also a calculation formula weighted for each process may be defined and used in the present estimation condition database 15 for the totalization of the standard time over all processes.

【0011】図4は、製品コスト見積システム1におけ
る基本的な処理手順を示している。製品コスト見積りシ
ステム1が起動されると、初期画面として各見積プログ
ラムを選択する選択画面(メニュー)が端末、例えば、
設計用CAD端末21に送出される(ステップS1)。
これに対して設計用CAD端末21の操作者が任意のプ
ログラムを選択することにより、板金部品コスト見積プ
ログラム2と、プリント配線板組立工数見積プログラム
3と、BWB(Back Wiring Board)組立工数見積プロ
グラム4と、ケーブル組立工数見積プログラム5と、装
置組立工数見積プログラム6と、基板及び装置検査工数
見積プログラム7と、総合コスト見積プログラム8との
各々を別個に起動することができる(ステップS2乃至
S8)。通常、最後に総合コスト見積プログラム8を起
動して実行してその見積り結果を得て、終了指示するこ
とにより終了することができる(ステップS9)。或い
は、再度を各プログラムを実行することも可能である。
FIG. 4 shows a basic processing procedure in the product cost estimation system 1. When the product cost estimation system 1 is started, a selection screen (menu) for selecting each estimation program as an initial screen is displayed on the terminal, for example,
It is sent to the design CAD terminal 21 (step S1).
On the other hand, the operator of the design CAD terminal 21 selects an arbitrary program, so that the sheet metal part cost estimation program 2, the printed wiring board assembly man-hour estimation program 3, and the BWB (Back Wiring Board) assembly man-hour estimation program 4, the cable assembly man-hour estimation program 5, the device assembly man-hour estimation program 6, the board / device inspection man-hour estimation program 7, and the total cost estimation program 8 can be separately activated (steps S2 to S8). ). Normally, the total cost estimation program 8 is finally activated and executed to obtain the estimation result, and the termination can be instructed (step S9). Alternatively, each program can be executed again.

【0012】図5は、各見積プログラムの共通的な処理
手順を示している。これらの処理は、板金部品コスト見
積プログラム2と、プリント配線板組立工数見積プログ
ラム3と、BWB組立工数見積プログラム4と、ケーブ
ル組立工数見積プログラム5と、装置組立工数見積プロ
グラム6と、基板及び装置検査工数見積プログラム7と
において同様である。
FIG. 5 shows a common processing procedure of each estimation program. These processes include a sheet metal part cost estimation program 2, a printed wiring board assembly man-hour estimation program 3, a BWB assembly man-hour estimation program 4, a cable assembly man-hour estimation program 5, a device assembly man-hour estimation program 6, a board and a device. The same applies to the inspection man-hour estimation program 7.

【0013】ここで、先ず、操作者からの図面番号入力
を受け付ける(ステップS11)。次に、この図面番号
に応じて、コスト見積システム1の各見積プログラム
は、設計情報データベース10から当該図面番号に対応
する設計情報データを取り込む(ステップS12)。次
に、操作者の見積り指示操作に応じて、該設計情報デー
タの部品種別に対応する部品単価を部品数に応じて合算
して部材費を集計する(ステップS13)。部品単価の
取り込みは、部品単価データベース12を参照して行
う。次いで、該設計情報データの工程種別に対応する標
準工数を工程数に応じて合算して総工数を集計する(ス
テップS14)。該標準工数の取り込みは、見積条件デ
ータベース15を参照して行う。又は、工数実績データ
ベース13の実績工数を参照して行っても良い。
First, the drawing number input from the operator is accepted (step S11). Next, according to the drawing number, each estimation program of the cost estimation system 1 fetches the design information data corresponding to the drawing number from the design information database 10 (step S12). Next, according to the estimation instruction operation by the operator, the component unit prices corresponding to the component types of the design information data are added up according to the number of components to total the component cost (step S13). The component unit price is fetched by referring to the component unit price database 12. Then, the standard man-hours corresponding to the process type of the design information data are added up according to the number of processes to total the total man-hours (step S14). The standard man-hours are fetched by referring to the estimation condition database 15. Alternatively, the actual man-hours in the man-hour performance database 13 may be referred to.

【0014】次に、その見積結果を操作者の端末に表示
する(ステップS15)。操作者からの見直し指示を待
ち(ステップS16)、もし見直しがある場合には操作
者からの設計情報データの変更を受け付け(ステップS
17)、ステップS13に戻る。もし見直しがない場合
には、見積結果を見積結果データベース9に保存記憶す
る(ステップS18)。
Next, the estimation result is displayed on the operator's terminal (step S15). Wait for a review instruction from the operator (step S16), and if there is a review, accept the change of the design information data from the operator (step S16).
17) and returns to step S13. If there is no review, the estimation result is saved and stored in the estimation result database 9 (step S18).

【0015】図6は、本実施例の図面番号入力画面の画
面例として、板金部品コスト見積プログラム2の図面番
号入力画面を示している。該入力画面は、図面番号入力
欄61と、見積実行釦62と、設計情報データベースか
ら当該図面番号に対応する見積に必要な設計情報の取り
込みを指示する読込釦63と、該設計情報の表示欄64
とを含む。
FIG. 6 shows a drawing number input screen of the sheet metal part cost estimate program 2 as an example of the drawing number input screen of this embodiment. The input screen includes a drawing number input field 61, an estimate execution button 62, a read button 63 for instructing to import design information necessary for an estimate corresponding to the drawing number from the design information database, and a design information display field. 64
Including and

【0016】操作者は、図面番号を図面番号入力欄61
に入力して、読込釦63を指示する。これに応じて、設
計情報が設計情報の表示欄64に表示されるので、操作
者はこれらの情報を目視確認の上、見積実行釦62を指
示することにより見積が実行される。設計情報表示欄6
4には、情報表示のみならず、設計情報の内容変更の操
作を可能としても良い。これにより、操作者が見積結果
からの設計見直しの結果を一時的に変更して見積を再計
算することができる。例えば、材質をステンレスから鉄
系部材に変更する等して見積を再計算することができ
る。
The operator inputs the drawing number into the drawing number input field 61.
To input the read button 63. In response to this, the design information is displayed in the design information display field 64, and the operator visually confirms the information and then issues the estimate by executing the estimate execution button 62. Design information display column 6
In addition to the information display, the operation of changing the contents of the design information may be possible. This allows the operator to temporarily change the result of design review from the estimation result and recalculate the estimation. For example, the estimate can be recalculated by changing the material from stainless steel to an iron-based member.

【0017】図7は、図6の入力画面の見積指示の結果
得られる見積結果画面例を示している。該見積結果画面
は、当該図面番号を表示する図面番号表示欄71と、集
計の結果得られる見積単価を表示する単価表示欄72
と、工数見積内訳表示欄73とを含む。工数見積内訳表
示欄73は、当該図面に規定された製造部品の製造工数
の詳細を示し、対応する工数をmH単位で示している。
表示された見積結果は、DB登録釦74を指示操作する
ことにより見積結果データベース9に保存記憶される。
FIG. 7 shows an example of an estimation result screen obtained as a result of the estimation instruction on the input screen shown in FIG. The estimate result screen includes a drawing number display field 71 for displaying the drawing number and a unit price display field 72 for displaying an estimated unit price obtained as a result of the aggregation.
And a man-hour estimate breakdown display field 73. The man-hour estimate breakdown display column 73 shows the details of the manufacturing man-hours of the manufactured parts specified in the drawing, and shows the corresponding man-hours in mH.
The displayed estimation result is saved and stored in the estimation result database 9 by operating the DB registration button 74.

【0018】図8は、図面番号入力画面の画面例を示し
ている。かかる画面は、プリント配線板組立工数見積プ
ログラム3と、BWB(Back Wiring Board)組立工数
見積プログラム4と、ケーブル組立工数見積プログラム
5と、装置組立工数見積プログラム6と、基板及び装置
検査工数見積プログラム7とにおいて共通的に用いられ
る。
FIG. 8 shows an example of the drawing number input screen. This screen displays a printed wiring board assembly man-hour estimation program 3, a BWB (Back Wiring Board) assembly man-hour estimation program 4, a cable assembly man-hour estimation program 5, a device assembly man-hour estimation program 6, a board / device inspection man-hour estimation program. 7 and 7 are commonly used.

【0019】ここで、図面番号入力欄81に図面番号が
入力される。好ましくは、構成部品表示欄82に当該図
面に対応する製品又は部品モジュールを構成する部品の
詳細内訳を表示しても良い。集計釦83を操作者が指示
することにより見積が実行される。図9は、工数見積結
果画面の画面例を示している。
Here, the drawing number is entered in the drawing number input field 81. Preferably, a detailed breakdown of the parts constituting the product or part module corresponding to the drawing may be displayed in the component display field 82. The estimation is executed when the operator designates the total button 83. FIG. 9 shows a screen example of the man-hour estimation result screen.

【0020】ここで、図面番号表示欄91に表示される
図面に対応する製品又は部品モジュールの加工工数の詳
細が表示され、符号92の部分に全体の工数Hn(Hour
s ofNet)及びHs(Hours of Standard)が表示され
る。登録釦93を操作者が指示操作することにより、当
該見積結果が見積結果データベース9に保存記録され
る。
Here, details of the processing man-hours of the product or component module corresponding to the drawing displayed in the drawing number display field 91 are displayed, and the total man-hour Hn (Hour (Hour
s of Net) and Hs (Hours of Standard) are displayed. When the operator operates the registration button 93, the estimation result is stored and recorded in the estimation result database 9.

【0021】図10は、総合コスト見積プログラムの見
積結果画面の画面例を示している。ここで、該結果画面
は、図面番号表示欄101を含み、以下に当該図面に対
応する物品の部材構成品及び加工工程の詳細内訳102
が表示される。詳細内訳102の見積Hsの部分に基板
及び装置検査工数見積プログラム7と、プリント配線板
組立工数見積プログラム3と、BWB組立工数見積プロ
グラム4と、ケーブル組立工数見積プログラム5からの
見積結果の工数が、200、100、100及び100
のように見積結果データベース9から各々読み出されて
表示される(符号104部分)。板金部品見積プログラ
ム2からの部材費は見積単価欄に1000円と表示され
る(符号105部分)。
FIG. 10 shows an example of the estimation result screen of the total cost estimation program. Here, the result screen includes a drawing number display field 101, and below, a detailed breakdown 102 of the member components of the article corresponding to the drawing and the processing step.
Is displayed. In the portion of the estimated Hs of the detailed breakdown 102, the man-hours of the estimation result from the board / device inspection man-hour estimation program 7, the printed wiring board assembly man-hour estimation program 3, the BWB assembly man-hour estimation program 4, and the cable assembly man-hour estimation program 5 are displayed. , 200, 100, 100 and 100
As described above, each is read out from the estimation result database 9 and displayed (reference numeral 104 portion). The member cost from the sheet metal part quotation program 2 is displayed in the quotation unit price column as 1000 yen (reference numeral 105).

【0022】計算釦106を操作者が指示操作すること
により、工数見積結果が500mHと集計され、工数単
価データベース14を参照することにより加工費換算結
果が1500円と表示され、更に、部材費見積結果が1
000円と表示される(符号107部分)。又、工数実
績データベース13を参照して、当該工程の実績工数、
現行工数を表示して操作者への参考情報に供することも
できる(符号103部分)。
By manipulating the calculation button 106 by the operator, the man-hour estimation result is aggregated to 500 mH, and by referring to the man-hour unit price database 14, the processing cost conversion result is displayed as 1500 yen. Result is 1
It is displayed as 000 yen (reference numeral 107 portion). In addition, referring to the man-hour performance database 13, the actual man-hours of the process,
It is also possible to display the current man-hours and use it as reference information for the operator (reference numeral 103).

【0023】以上のように、本実施例におけるコスト見
積システムによれば、各種見積プログラムと設計情報、
部品情報、部品単価、実績工数、工数単価データベース
をリンクさせたシステムを構築したことにより、設計者
が設計開発段階に、一部設計途中の製品でも、図面番号
を採番して必要な情報を設計情報データベースヘ登録し
ておけば、本システムを使って、自分の設計した製品原
価(部材費+加工費)を、即座に把捉することができ
る。
As described above, according to the cost estimation system in this embodiment, various estimation programs and design information,
By constructing a system that links part information, part unit price, actual man-hours, and man-hour unit price database, designers can assign necessary information by numbering drawing numbers even for products that are in the process of designing at the design development stage. If you register it in the design information database, you can use this system to immediately grasp the product cost (material cost + processing cost) that you designed.

【0024】[0024]

【発明の効果】以上のように、本発明による製品コスト
見積方法及びシステムにより、設計段階において得られ
る設計図面番号を指定することにより製造から試験工程
に亘って発生する部材費及び加工費が算定され、製品設
計段階において製品のコストを見積ることが可能とな
る。
As described above, by the product cost estimation method and system according to the present invention, by designating the design drawing number obtained at the design stage, the component cost and the processing cost incurred from the manufacturing to the test process are calculated. The cost of the product can be estimated at the product design stage.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明の実施例であり、製品コスト見積システ
ムの構成を示しているブロック図である。
FIG. 1 is a block diagram showing a configuration of a product cost estimation system according to an embodiment of the present invention.

【図2】本実施例における設計情報データベースの構成
例を示している図である。
FIG. 2 is a diagram showing a configuration example of a design information database according to the present embodiment.

【図3】本実施例における見積条件データベースの構成
例を示している図である。
FIG. 3 is a diagram showing a configuration example of an estimation condition database in the present embodiment.

【図4】製品コスト見積システムの処理手順を示してい
るフローチャートである。
FIG. 4 is a flowchart showing a processing procedure of a product cost estimation system.

【図5】製品コスト見積システムを構成する各プログラ
ムに共通する基本的な処理手順を示しているフローチャ
ートである。
FIG. 5 is a flowchart showing a basic processing procedure common to each program constituting the product cost estimation system.

【図6】板金部品コスト見積プログラムにおける図面番
号入力画面を示している図である。
FIG. 6 is a diagram showing a drawing number input screen in the sheet metal part cost estimation program.

【図7】板金部品コスト見積プログラムにおける見積結
果画面を示している図である。
FIG. 7 is a diagram showing an estimation result screen in a sheet metal part cost estimation program.

【図8】各見積プログラムにおける図面番号入力画面を
示している図である。
FIG. 8 is a diagram showing a drawing number input screen in each estimation program.

【図9】各見積プログラムにおける見積結果画面を示し
ている図である。
FIG. 9 is a diagram showing an estimation result screen in each estimation program.

【図10】総合コスト見積プログラムにおける見積結果
画面を示している図である。
FIG. 10 is a diagram showing an estimation result screen in the total cost estimation program.

【符号の説明】[Explanation of symbols]

1 コスト見積システム 2 板金部品コスト見積プログラム 3 プリント配線板組立工数見積プログラム 4 BWB組立工数見積プログラム 5 ケーブル組立工数見積プログラム 6 装置組立工数見積プログラム 7 基板及び装置検査工数見積プログラム 8 総合コスト見積プログラム 9 見積結果データベース(DB) 10 設計情報データベース(DB) 11 部品情報データベース(DB) 12 部品単価データベース(DB) 13 工数実績データベース(DB) 14 工数単価データベース(DB) 21 設計用CAD端末 22 管理端末 1 Cost estimation system 2 Sheet metal parts cost estimation program 3 Printed wiring board assembly man-hour estimation program 4 BWB assembly man-hour estimation program 5 Cable assembly man-hour estimation program 6 Equipment assembly man-hour estimation program 7 Board and equipment inspection man-hour estimation program 8 Total cost estimation program 9 Estimate result database (DB) 10 Design information database (DB) 11 Parts information database (DB) 12 Parts unit price database (DB) 13 Effort result database (DB) 14 Man-hour unit price database (DB) 21 CAD terminal for design 22 Management terminal

───────────────────────────────────────────────────── フロントページの続き (72)発明者 井本 努 東京都港区虎ノ門1丁目7番12号 沖電気 工業株式会社内 (72)発明者 桜井 誠一 東京都港区虎ノ門1丁目7番12号 沖電気 工業株式会社内 (72)発明者 岡田 修 東京都港区虎ノ門1丁目7番12号 沖電気 工業株式会社内 (72)発明者 前之園 繁 東京都港区虎ノ門1丁目7番12号 沖電気 工業株式会社内 (72)発明者 泉 正夫 東京都港区虎ノ門1丁目7番12号 沖電気 工業株式会社内 (72)発明者 高橋 修史 東京都港区虎ノ門1丁目7番12号 沖電気 工業株式会社内 Fターム(参考) 5B046 DA01 HA05 KA05    ─────────────────────────────────────────────────── ─── Continued front page    (72) Inventor Tsutomu Imoto             1-7-12 Toranomon, Minato-ku, Tokyo Oki Electric             Industry Co., Ltd. (72) Inventor Seiichi Sakurai             1-7-12 Toranomon, Minato-ku, Tokyo Oki Electric             Industry Co., Ltd. (72) Inventor Osamu Okada             1-7-12 Toranomon, Minato-ku, Tokyo Oki Electric             Industry Co., Ltd. (72) Inventor Shigeru Maenozono             1-7-12 Toranomon, Minato-ku, Tokyo Oki Electric             Industry Co., Ltd. (72) Inventor Masao Izumi             1-7-12 Toranomon, Minato-ku, Tokyo Oki Electric             Industry Co., Ltd. (72) Inventor Osamu Takahashi             1-7-12 Toranomon, Minato-ku, Tokyo Oki Electric             Industry Co., Ltd. F-term (reference) 5B046 DA01 HA05 KA05

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 製品の設計図面の識別データの入力に応
じて前記製品のコストを見積る製品コスト見積方法であ
って、 前記製品の設計図面の識別データに対応して、前記設計
図面に規定される部品の部品種別と、前記部品の加工、
組立及び試験工程の工程種別とを含む設計情報データを
保持する設計情報データ保持ステップと、 前記部品種別に対応する部品単価と、前記工程種別に対
応する標準工数及び工数単価とを含む見積条件を保持す
る見積条件保持ステップと、 前記製品の設計図面の識別データの入力に応じて、対応
する設計情報データの部品種別に対応する前記部品単価
を部品数に応じて合算して部材費を集計する部材費集計
ステップと、 前記製品の設計図面の識別データの入力に応じて、対応
する設計情報データの工程種別に対応する前記標準工数
を工程数に応じて合算して総工数を集計する総工数集計
ステップと、 前記集計された総工数を前記工数単価を乗ずることによ
り加工費に換算する加工費換算ステップと、 を含むことを特徴とする製品コスト見積方法。
1. A product cost estimation method for estimating the cost of the product in response to input of identification data of the design drawing of the product, which is defined in the design drawing in correspondence with the identification data of the design drawing of the product. Parts type and processing of the parts,
A design information data holding step of holding design information data including process types of assembly and test processes, a part unit price corresponding to the part type, a standard man-hour corresponding to the process type, and an estimation condition including a man-hour unit price. According to the estimation condition holding step to hold and the input of the identification data of the design drawing of the product, the component unit price corresponding to the component type of the corresponding design information data is added up according to the number of components to total the component cost. Total man-hours for totaling the total man-hours by adding up the standard man-hours corresponding to the process type of the corresponding design information data in accordance with the input of the component cost totaling step and the identification data of the design drawing of the product. A product cost estimation step comprising: a totaling step; and a processing cost conversion step of converting the totalized total man-hours into a processing cost by multiplying the man-hour unit price. Method.
【請求項2】 製品の設計図面の識別データの入力に応
じて前記製品のコストを見積る製品コスト見積システム
であって、 前記製品の設計図面の識別データに対応して、前記設計
図面に規定される部品の部品種別と、前記部品の加工、
組立及び試験工程の工程種別とを含む設計情報データを
保持する設計情報データ保持手段と、 前記部品種別に対応する部品単価と、前記工程種別に対
応する標準工数及び工数単価とを含む見積条件を保持す
る見積条件保持手段と、 前記製品の設計図面の識別データの入力に応じて、対応
する設計情報データの部品種別に対応する前記部品単価
を部品数に応じて合算して部材費を集計する部材費集計
手段と、 前記製品の設計図面の識別データの入力に応じて、対応
する設計情報データの工程種別に対応する前記標準工数
を工程数に応じて合算して総工数を集計する総工数集計
手段と、 前記集計された総工数を前記工数単価を乗ずることによ
り加工費に換算する加工費換算手段と、 を含むことを特徴とする製品コスト見積システム。
2. A product cost estimation system for estimating the cost of the product according to the input of identification data of the design drawing of the product, which is defined in the design drawing corresponding to the identification data of the design drawing of the product. Parts type and processing of the parts,
Design information data holding means for holding design information data including the process type of the assembly and test process, a part unit price corresponding to the part type, and an estimation condition including a standard man-hour and a man-hour unit price corresponding to the process type. According to the estimation condition holding means for holding and the input of the identification data of the design drawing of the product, the component unit prices corresponding to the component types of the corresponding design information data are added up according to the number of components to total the component cost. According to the input of the component cost totaling means and the identification data of the design drawing of the product, the standard man-hours corresponding to the process type of the corresponding design information data are added up in accordance with the number of processes to total the total man-hours. A product cost estimation system comprising: an aggregating means; and a processing cost converting means for converting the totalized man-hours into a processing cost by multiplying the man-hour unit price.
JP2001223057A 2001-07-24 2001-07-24 Product cost estimation method and system Pending JP2003036291A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001223057A JP2003036291A (en) 2001-07-24 2001-07-24 Product cost estimation method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001223057A JP2003036291A (en) 2001-07-24 2001-07-24 Product cost estimation method and system

Publications (1)

Publication Number Publication Date
JP2003036291A true JP2003036291A (en) 2003-02-07

Family

ID=19056450

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001223057A Pending JP2003036291A (en) 2001-07-24 2001-07-24 Product cost estimation method and system

Country Status (1)

Country Link
JP (1) JP2003036291A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018156130A (en) * 2017-03-15 2018-10-04 株式会社リコー Information processing system, information processing method and program

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018156130A (en) * 2017-03-15 2018-10-04 株式会社リコー Information processing system, information processing method and program

Similar Documents

Publication Publication Date Title
US8442874B2 (en) Flight selection method
US20140350708A1 (en) Work process management system, work process management terminal device, computer program, and work process management method
US7698010B2 (en) Methods, systems and computer program products for altering video images to aid an operator of a fastener insertion machine
US20210357545A1 (en) Work instruction system and method
JP2002312017A (en) Work evaluation device, work evaluation method and program to realize work evaluation method in computer
JPWO2002059813A1 (en) Environmental load calculation system, environmental load calculation method, environmental load display object, environmental load display method, program, and medium
JP2003036291A (en) Product cost estimation method and system
JPH07164267A (en) Assembling time estimating device
JP2743225B2 (en) Production management device
US20050033469A1 (en) Working time period grasping system and work instruction preparing system
CN112148544B (en) Terminal device testing method, smart watch and system
CN110222391A (en) Electrical equipment drawing practice, system and terminal device
JPH09101947A (en) Time series forcasting method
JP2009245247A (en) Work management system and work management method
JP2004199340A (en) Plant automatic design system
CN113762547A (en) Data processing method, device, equipment and computer readable storage medium
JP2002059147A (en) Regeneration work support system and method of supporting regeneration work
JPH09160947A (en) Device for displaying selection condition of electronic component to be loaded on printed wiring board
JPH11306226A (en) Circuit design support method
TH49322A (en) Methods and equipment for estimating product costs
JP2003114910A (en) Design assisting device on sales floor
JPH1063748A (en) Use article arranging device
JP2002228666A (en) Reagent installation method and reagent installation processor
JP2002351945A (en) Product cost computing device, product cost computing method, and program
JP2000076345A (en) Device and method for supporting production capacity and cost examination