JP2002348871A - Pile drawing crowbar 2 - Google Patents
Pile drawing crowbar 2Info
- Publication number
- JP2002348871A JP2002348871A JP2001234227A JP2001234227A JP2002348871A JP 2002348871 A JP2002348871 A JP 2002348871A JP 2001234227 A JP2001234227 A JP 2001234227A JP 2001234227 A JP2001234227 A JP 2001234227A JP 2002348871 A JP2002348871 A JP 2002348871A
- Authority
- JP
- Japan
- Prior art keywords
- pile
- bar
- iron plate
- crowbar
- chain
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は、てこの原理による
土中に打ち込んだ木杭の引き抜き方法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for pulling out a wooden pile driven into the ground according to the principle of leverage.
【0002】[0002]
【従来の技術】従来は手で引き抜く事がほとんどで、地
上に出ている部分を横から叩いて、杭と周囲の地面との
間に隙間を作り、少しでも杭を抜きやすくして手で引き
抜いていた。手で抜けない時は、鉄線、ワイヤー、ロー
プ等を杭に巻き付けて、重機があればそれで引き上げた
り、長く太い棒に鉄線等を巻きつけて、てこの作用を利
用して引き上げていた。2. Description of the Related Art Conventionally, pulling out by hand is almost always performed by hitting a part that is on the ground from the side to make a gap between the pile and the surrounding ground, and it is easy to pull out the pile even if it is a little. I was pulling out. When it could not be pulled out by hand, a wire, wire, rope, etc., was wound around a pile, and if there was a heavy machine, it was pulled up, or a long, thick rod was wound around an iron wire, and the lever was used to pull it up.
【0003】[0003]
【発明が解決しようとする課題】従来の技術では、人間
がハンマーで打ち込んだ杭であっても手で抜く時に土中
の杭が動き出すまでに100kg以上の力をかけても動
かないものは動かないので、手で無理やり引き抜こうと
して腰を痛める事がある。又、横から杭を叩く時に杭が
折れる。鉄線等を巻きつけて、長く太い棒を使いてこの
作用を利用して引き上げようとしても、巻きつけた鉄線
等が抜けてしまう事がある。しかも1本の杭を抜くのに
5〜10分も時間がかかることがよくある。更に、どう
しても抜けない時は、地上に出た部分をのこぎりで切断
して残った部分を打ち込んでしまわないと危険である。
以上のようなことから、杭抜き作業は時間的ロス、金銭
的ロス、身体的ダメージが非常に大きい等の問題点があ
る。In the prior art, even a pile driven by a hammer with a hammer, which does not move even if a force of 100 kg or more is applied until the pile in the soil starts moving when the pile is pulled out by hand. Because there is no, you may hurt your back trying to pull it out by hand. Also, the pile breaks when hitting it from the side. Even if an iron wire or the like is wound and a long and thick rod is used to lift the wire using this action, the wound iron wire or the like may come off. Moreover, it often takes 5 to 10 minutes to remove one pile. Furthermore, when it cannot escape, it is dangerous to cut the part that has come out on the ground with a saw and drive in the remaining part.
From the above, the pile removal operation has problems such as time loss, financial loss, and extremely large physical damage.
【0004】[0004]
【課題を解決するための手段】上記の問題点を解決する
ために、土中に打ち込んだ杭の露出部分をはさみ込む杭
つかみ部と、杭つかみ部が杭をはさみ込んだ状態で、て
この作用により杭を引き抜く方向に外力を付加する外力
付加部とを備えた、杭抜きバールを考案した。杭つかみ
部は、所定角度をなして屈曲したテコ部材の一辺の先端
側に設けられた杭受けと、杭受けとの間に杭をはさみ込
む杭押えとを有し、杭押えは、テコ部材の他辺に着脱自
在に取り付けられている。杭を抜く為には、杭をしっか
り掴み、引っ張り上げるという、2つの作業を要する。
本発明は、杭をどのようにしてしっかり掴むかという事
と、重機に頼らざるを得ないような100kg以上の力
をいかにして作り出すか、という事の解決手段として考
案した。[MEANS FOR SOLVING THE PROBLEMS] In order to solve the above-mentioned problems, a pile grip portion for inserting an exposed portion of a pile driven into the soil, and a lever in a state where the pile grip portion sandwiches the pile. The present invention has devised a pile removal bar having an external force applying portion for applying an external force in a direction in which a pile is pulled out by an action. The pile gripping portion has a pile receiver provided on the tip end side of one side of the lever member bent at a predetermined angle, and a pile retainer for inserting the pile between the pile receiver and the pile retainer. Is detachably attached to the other side. To remove a stake, two tasks are required: firmly grasping the stake and pulling it up.
The present invention has been devised as a solution to the problem of how to firmly grip the pile and how to produce a force of 100 kg or more that must rely on heavy equipment.
【0005】[0005]
【発明の実施の形態】本発明は図において説明すると、
図1に示すように鉄板2の長手方向の一端に鉄板2から
突出する握り棒1を有し、鉄板2の他端の一部は、くの
字形に切り込み、この先端から垂直に突出する杭受部3
が固定されている。鉄板2の他端と向かい合う、鉄板4
の一端の一部は鉄板2と同じように、くの字形に切り込
み、先端から垂直に突出する杭押え部5が固定されてい
る。また、鉄板2の一端の縁には垂直に突出した鉄板7
が固定されている。鉄板4の両側面には連結棒6が備え
られ、鉄板7とネジで連結できるようにした。BRIEF DESCRIPTION OF THE DRAWINGS FIG.
As shown in FIG. 1, a grip bar 1 protruding from the iron plate 2 is provided at one end in the longitudinal direction of the iron plate 2. Receiving part 3
Has been fixed. Iron plate 4 facing the other end of iron plate 2
A part of one end is cut in a U-shape in the same manner as the iron plate 2, and a stake holder 5 vertically projecting from the tip is fixed. The edge of one end of the iron plate 2 has an iron plate 7 projecting vertically.
Has been fixed. Connecting rods 6 are provided on both sides of the iron plate 4 so that the iron plate 4 can be connected to the iron plate 7 by screws.
【0006】図2に示すように、鉄板12の一端の縁に
は垂直に突出した鉄板17が固定され、この鉄板17に
は鉄板14の両側面に備えられた連結棒16を杭径合せ
ネジ18で固定できるように穴を設けた。穴は杭の大き
さによって調節できるように、高さを変えて幾つか設け
るとよい。As shown in FIG. 2, a vertically protruding iron plate 17 is fixed to an edge of one end of the iron plate 12, and connecting rods 16 provided on both side surfaces of the iron plate 14 are fixed to the iron plate 17 by a screw for adjusting a pile diameter. A hole was provided so that it could be fixed at 18. Several holes may be provided at different heights so that they can be adjusted according to the size of the pile.
【0007】図4に示すように連結棒36が水平になっ
ている時は、杭押え部35と杭受部33との間隔が広い
ので、杭の上方からかぶせることができる。When the connecting rod 36 is horizontal as shown in FIG. 4, the distance between the pile holding part 35 and the pile receiving part 33 is wide, so that the pile can be covered from above.
【0008】図5に示すように杭押え部45が下がり、
地面に接すると、杭受部43との間隔が狭くなり間の杭
は、杭押え部45と杭受部43によって固定される。As shown in FIG. 5, the pile holding portion 45 is lowered,
When it comes into contact with the ground, the interval between the pile receiving portion 43 is reduced, and the pile between the pile receiving portions 43 is fixed by the pile holding portion 45 and the pile receiving portion 43.
【0009】上記のように杭抜きバールを設置した後、
握り棒に一定の方向へ外力を付加すると、鉄板に杭径合
せネジで連結された連結棒も、杭押え部も同方向に引っ
張られる。この時、杭は杭押え部が一定方向へ移動しよ
うとする力によって杭受部に更に密着し、杭をしっかり
と固定する。そしてテコの作用により、作用点となる杭
受部が地面から浮こうとする為、杭を密着させている杭
押え部も共に浮き、杭も地表に持ち上げられる。1回で
およそ10cmほど土中から抜ける。握り棒を元の角度
に戻した時、杭受部と杭押え部の間隔が広がるので杭押
え部が下がるが、杭は土中に戻らない。杭押え部が下が
った時に杭は再び杭押え部と杭受部によって固定され
る。2〜3回繰り返すと人間が杭に触れる事なく、杭は
完全に抜ける。After installing the pile pull bar as described above,
When an external force is applied to the gripping bar in a certain direction, the connecting bar connected to the iron plate by the pile diameter adjusting screw and the pile holding unit are pulled in the same direction. At this time, the pile further adheres to the pile receiving part by the force of the pile holding part moving in a certain direction, and firmly fixes the pile. And, by the action of the lever, the pile receiving portion, which is the point of action, tends to float off the ground, so that the pile holding portion that makes the pile close together also floats, and the pile is lifted to the ground surface. At a time, it comes out of the soil about 10 cm. When the gripping rod is returned to the original angle, the space between the pile receiving part and the pile holding part widens, so that the pile holding part goes down, but the pile does not return to the soil. When the pile holding part is lowered, the pile is again fixed by the pile holding part and the pile receiving part. After repeating two or three times, the stake comes out completely without human being touching it.
【0010】杭受部と杭押え部の鉄板から突出した部分
が全く無い場合でも、鉄板がくの字型の切り込みを有し
ていれば、杭を挟み込む事が可能であり、杭の引き抜き
作業が可能である。[0010] Even when there is no portion of the pile receiving portion and the pile holding portion protruding from the iron plate, if the iron plate has a U-shaped cut, the pile can be sandwiched, and the work of pulling out the pile can be performed. It is possible.
【0011】連結棒は図で示すようなネジ状の物でなく
ても、バールとの連結ができる物であれば良い。The connecting rod need not be a screw-shaped one as shown in the figure, but may be any one that can be connected to a bar.
【0012】上記の杭抜きバールは、連結棒と杭押え部
を使用した杭抜きバールである。上記の形態以外にも、
以下に示すような、チェーンやワイヤー、ロープ等を用
いた杭抜きバールで同じ効果が得られる。The above-mentioned pile pull-out bar is a pile pull-out bar using a connecting rod and a pile holding portion. In addition to the above,
The same effect can be obtained by a pile pull bar using a chain, a wire, a rope, or the like as described below.
【0013】図6に示すように、連結棒や杭押え部を持
たず、チェーンのみを有した杭抜きバールの場合、鉄板
52の杭受部53に杭を密着させ、チェーン56で杭を
1回転半巻きつけて引っかけ部分59bにチェーン56
を掛けて固定し、握り棒51を倒すと、チェーン56が
杭をしっかり掴み、杭が抜ける。As shown in FIG. 6, in the case of a pile pullout bar having only a chain without a connecting rod or a pile holding portion, a pile is brought into close contact with a pile receiving portion 53 of an iron plate 52, and The chain 56 is wound half a turn and hooked on the hook 59b.
When the handle 56 is fixed and the grip bar 51 is depressed, the chain 56 firmly grasps the pile and the pile comes off.
【0014】図7に示すように、チェーン66と杭押え
部65を有した杭抜きバールの場合、引っ張り度調整穴
67にチェーン66を通し、杭受部53と杭押え部65
の間に挟んだ杭を固定する。握り棒61を引くと、チェ
ーン66も引っ張られて杭押え部65が杭を更にしっか
りと固定し、杭を引き抜く事ができる。As shown in FIG. 7, in the case of a pile pull-out bar having a chain 66 and a pile holding portion 65, the chain 66 is passed through the tension adjusting hole 67, and the pile receiving portion 53 and the pile holding portion 65 are formed.
Fix the pile sandwiched between. When the grip bar 61 is pulled, the chain 66 is also pulled, and the pile holding portion 65 further firmly fixes the pile, so that the pile can be pulled out.
【0015】以上の全ての杭抜きバールにおいて、握り
棒を差込式にするとコンパクト且つ軽量化でき、持ち運
びが、より容易となる。又、杭抜きバールの材質は鉄板
以外にも、鋼質のもので杭抜き作業が問題なく行えるの
であればどのような物を使用しても良い。In all of the above-mentioned pile pull-out burs, if the gripping bar is of a plug-in type, it can be made compact and lightweight, and can be more easily carried. In addition, the pile removing bar may be made of any material other than the iron plate as long as the pile removing operation can be performed without any problem.
【発明の効果】杭抜き作業がワンタッチでできる事によ
り、人件費の削減や、作業時間の短縮、杭抜き作業によ
るギックリ腰等の労災の消滅、重機が不要になる、杭の
再利用率の向上、等の効果が得られる。[Effects of the Invention] The pile removal operation can be performed with one touch, thereby reducing labor costs, shortening the work time, eliminating work-related injuries such as stiffness due to the pile removal operation, eliminating the need for heavy equipment, and reducing the reuse rate of piles. Effects such as improvement can be obtained.
【図1】杭抜きバール全体図Fig. 1: Overall view of a pile without bar
【図2】杭抜きバール上面図[Fig. 2] Top view of bar without pile
【図3】杭抜きバール背面図FIG. 3 is a rear view of a bar without a pile.
【図4】杭抜きバール側面図1FIG. 4 is a side view of a bar without a pile 1
【図5】杭抜きバール側面図2FIG. 5 is a side view of a bar without a pile 2
【図6】チェーン式杭抜きバール全体図FIG. 6 is an overall view of a chain type piling bar.
【図7】チェーン式杭抜きバール2全体図FIG. 7 is an overall view of a chain type piling bar 2
1、21、31、41、51、61 握り棒 2、12、22、32、42、52、62 鉄板(バ
ール) 3、13、33、43、53、63 杭受部 4、14、64 鉄板(杭
押え) 5、15、35、45、65 杭押え部 6、16、36、46 連結棒 7、17、27、37、47 鉄板(杭
径穴) 8、18、38、48 杭径合せ
ネジ 19、39、49 ナット 56、66 チェーン 67 引っ張り
度調整穴 58a、68a フック 59b、69b 引っかけ
部分1, 21, 31, 41, 51, 61 Retaining rod 2, 12, 22, 32, 42, 52, 62 Iron plate (bar) 3, 13, 33, 43, 53, 63 Pile receiving part 4, 14, 64 Iron plate (Pile retainer) 5, 15, 35, 45, 65 Pile retainer 6, 16, 36, 46 Connecting rod 7, 17, 27, 37, 47 Iron plate (Pile diameter hole) 8, 18, 38, 48 Pile diameter adjustment Screw 19, 39, 49 Nut 56, 66 Chain 67 Tension degree adjustment hole 58a, 68a Hook 59b, 69b Hooked portion
Claims (3)
む杭つかみ部と、杭つかみ部が杭をはさみ込んだ状態
で、てこの作用により杭を引き抜く方向に外力を付加す
る外力付加部とを備えた、杭抜きバール。1. A pile grip portion for clamping an exposed portion of a pile driven into the ground, and an external force applying portion for applying an external force in a direction in which the pile is pulled out by leverage with the pile grip portion sandwiching the pile. A crowbar with a stake.
したテコ部材の一辺の先端側に設けられた杭受けと、杭
受けとの間に杭をはさみ込む杭押えとを有し、杭押え
は、テコ部材の他辺に着脱自在に取り付けられている、
請求項1に記載の杭抜きバール。2. The pile gripping portion has a pile receiver provided on a tip side of one side of a lever member bent at a predetermined angle, and a pile retainer for inserting a pile between the pile receiver and the pile holder. The pile retainer is detachably attached to the other side of the lever member,
The pile pull bar according to claim 1.
ン、ワイヤーで杭を巻きつけたり、掴んだりする装置を
つけた杭抜きバール。(3) A pile removing bar provided with a device for winding or gripping the pile with a rope, a chain, or a wire to firmly grip the pile.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2001234227A JP2002348871A (en) | 2001-03-23 | 2001-06-26 | Pile drawing crowbar 2 |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2001-130360 | 2001-03-23 | ||
JP2001130360 | 2001-03-23 | ||
JP2001234227A JP2002348871A (en) | 2001-03-23 | 2001-06-26 | Pile drawing crowbar 2 |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2002348871A true JP2002348871A (en) | 2002-12-04 |
Family
ID=26614331
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2001234227A Pending JP2002348871A (en) | 2001-03-23 | 2001-06-26 | Pile drawing crowbar 2 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2002348871A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20180130211A (en) * | 2017-05-29 | 2018-12-07 | 주식회사 나라환경 | Installation and removal equipment for agricultural holding |
-
2001
- 2001-06-26 JP JP2001234227A patent/JP2002348871A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20180130211A (en) * | 2017-05-29 | 2018-12-07 | 주식회사 나라환경 | Installation and removal equipment for agricultural holding |
KR101959769B1 (en) | 2017-05-29 | 2019-07-04 | 주식회사 나라환경 | Installation and removal equipment for agricultural holding |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5042591A (en) | "T" post puller-pounder | |
US5248002A (en) | Ground rod installation method | |
AU2010295254B2 (en) | Post driver extractor | |
US6899187B1 (en) | Hollow pole driver | |
CA2302072C (en) | Multipurpose tool | |
US4302869A (en) | Hand puller for ropes | |
JP2002348871A (en) | Pile drawing crowbar 2 | |
US4432382A (en) | Tent stake | |
US20100314892A1 (en) | Apparatus for lifting and handling articles | |
US20030070821A1 (en) | Slide hammer stake driver | |
US5622352A (en) | Connected arch nail puller for claw hammer | |
US6415468B1 (en) | Concrete form snap tie tool | |
US6385854B1 (en) | Fire fighting tool for making a hole in a ceiling | |
JP2001105350A (en) | Peg driver | |
JP3242415U (en) | Stake extractor | |
JP2010126976A (en) | Reinforcing bar binding device | |
US3273929A (en) | Garden tool for removing weeds | |
CN220863916U (en) | Auxiliary device for nailing safety template | |
WO2000021352A1 (en) | Elimination of unwanted plants, and apparatus therefor | |
CN210341575U (en) | Rebar pulling-out tool | |
JP3233094U (en) | Weeding equipment | |
KR20190001801U (en) | A tool to drive a nail | |
JP3014565U (en) | Weeding equipment | |
US2764386A (en) | Stitch puller | |
JP2005171577A (en) | Method and device for laying block mat |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20040427 |