JP2002342567A - Support system for verifying adequacy of fund reference price - Google Patents

Support system for verifying adequacy of fund reference price

Info

Publication number
JP2002342567A
JP2002342567A JP2001147557A JP2001147557A JP2002342567A JP 2002342567 A JP2002342567 A JP 2002342567A JP 2001147557 A JP2001147557 A JP 2001147557A JP 2001147557 A JP2001147557 A JP 2001147557A JP 2002342567 A JP2002342567 A JP 2002342567A
Authority
JP
Japan
Prior art keywords
fund
combination
investment trust
value
price
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2001147557A
Other languages
Japanese (ja)
Inventor
Keiichi Miyazaki
啓一 宮崎
Mitsuko Kubohara
充子 久保原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mizuho Trust and Banking Co Ltd
Original Assignee
Mizuho Trust and Banking Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mizuho Trust and Banking Co Ltd filed Critical Mizuho Trust and Banking Co Ltd
Priority to JP2001147557A priority Critical patent/JP2002342567A/en
Publication of JP2002342567A publication Critical patent/JP2002342567A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To assist a check on whether a computer reference price and its parameter are adequate. SOLUTION: According to bill dealing data of the day from a stock current price DB200, a bond current price DB300, and a daily balance DB400 and data from a trusting-side data storage device 40, an arithmetic part 11 computes reference prices of the day by funds, evaluated current prices by fund/stock, and evaluated current prices by fund/bond and then computes their variation rates from data of the previous day stored in an arithmetic management storage device 20. A variation rate evaluation part 13 decides whether the variation rates are within permissible variation rate ranges stored in a permissible variation rate storage device 30. A check list generation part 14 generates a list of variation rates equal to or exceeding the permissible variation rates. A data comparison part 15 compares data regarding the reference price from a trusting company stored in the trust-side data storage device 40 with data regarding a reference price that a trusted company itself generates and computes the difference and the check list generation part 14 generates a list of comparison results.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の技術分野】本発明は、証券取引における投信基
準価額等の妥当性検証の支援システムに関し、より詳細
には、投信委託会社及び投信受託会社それぞれにおいて
演算される証券取引における投信基準価額の妥当性の検
証を支援するための、投信委託会社及び投信受託会社の
少なくとも一方が保有する支援システムに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a support system for verifying the validity of an investment trust base price or the like in a securities transaction, and more particularly, to a system for calculating the investment trust base price in a securities transaction calculated by each of an investment trust management company and an investment trust management company. The present invention relates to a support system held by at least one of an investment trust management company and an investment trust management company to support validation.

【0002】[0002]

【従来の技術】投信基準価額(以下、「基準価額」)
は、投資家がその価額を参考にして翌日受益証券を売買
することから、その算出は、極めて慎重に行われてい
る。そのため、基準価額は、投信委託会社(以下、「委
託会社」)と投信受託会社(以下、「受託会社」)の双
方でそれぞれ計算し、相互に照合して一致を確認した上
で、店頭、新聞及びTV等のマスコミを介して一般に公
表している。基準価額は、以下の式に基づいて演算さ
れ、公表される。 基準価額=(資産(A)−負債(B)+評価損益
(C))/口数(N)x計算単位 だたし、計算単位は通常、10,000口である。
2. Description of the Related Art Investment trust base price (hereinafter "base price")
Is calculated with extreme caution because investors buy and sell units the next day based on their prices. Therefore, the NAV is calculated by both the investment trust management company (hereinafter referred to as “trusted company”) and the investment trust management company (hereinafter referred to as “trusted company”). It is publicized through the media such as newspapers and TV. The base price is calculated based on the following formula and published. Base value = (Asset (A)-Liability (B) + Valuation loss (C)) / Number of units (N) x Calculation unit However, the calculation unit is usually 10,000 units.

【0003】基準価額は、約定自体が委託会社からの指
示に基づくものである等の、処理の基礎データが委託会
社と受託会社とで同根である部分も多いため、委託会社
及び受託会社が上記式に基づいてそれぞれ算出する基準
価額、並びに該基準価額を演算するための上記式中のパ
ラメータ(すなわち、資産、負債、評価損益、口数)
は、通常、一致するものである。しかしながら、オペレ
ータが入力するデータも種々あり、一致しないこともあ
り得る。また、委託会社から受託会社に通信された基礎
データそのものに間違いが含まれている場合には、基準
価額が委託会社及び受託会社の間で一致したとしても、
実際の価額を反映していないことになる。
[0003] The base price is often based on instructions from the consignor, and the basic data for processing is often the same between the consignor and the trustee. A base value calculated based on the formula, and parameters in the above formula for calculating the base price (ie, assets, liabilities, valuation gains and losses, units)
Is usually a match. However, there are various types of data input by the operator, and they may not match. Also, if the basic data transmitted from the trustee company to the trustee company contains an error, even if the base value matches between the trustee company and the trustee company,
It does not reflect the actual price.

【0004】委託会社と受託会社とでそれぞれ計算した
基準価額、純資産総額(=資産−負債+評価損益)のい
ずれかが不一致の場合、委託会社と受託会社との間で、
資産、負債、損益、及び利益についても日計表を科目毎
に照合し、かつ、株式、債券、外国投資勘定等の時価の
照合を行う。このような照合は、委託会社及び受託会社
の担当者が、電話回線を利用して口頭で行い、上記式中
の右辺のパラメータがすべて一致し、これにより基準価
額が一致するまで、継続される。
[0004] When either the base value or the total net asset (= asset−liability + valuation gain / loss) calculated by the trustee and the trustee does not match, the trustee and the trustee have:
The daily schedule is checked for assets, liabilities, profits and losses, and profits by subject, and the fair values of stocks, bonds, foreign investment accounts, etc. are checked. Such matching is performed verbally by a person in charge of the trust company and the trustee company using a telephone line, and is continued until all the parameters on the right side in the above equation match, thereby matching the base prices. .

【0005】[0005]

【発明が解決しようとする課題】ところで、基準価額の
計算に必要な株式及び債券等の時価データを入手可能な
時間帯が16時頃であり、基準価額等を新聞等において
公表するためには、18時頃までに委託会社と受託会社
との間で基準価額及びその演算パラメータを一致させる
必要がある。したがって、膨大な量の証券取引データに
基づいて基準価額等を短時間で計算ししかも一致させる
必要があり、委託会社及び受託会社のいずれか一方又は
双方で事務的なミス等が生じてしまうと、基準価額等に
不一致が生じてしまう。そして、不一致が生じると、証
券取引データが膨大であるため、どこでミスが生じたの
かを突き止めることに多大な労力を必要とし、場合によ
っては、マスコミ等を介しての公表が遅れてしまう可能
性がある。
By the way, the time zone in which market price data such as stocks and bonds necessary for calculating the base price can be obtained is around 16:00. It is necessary to match the reference value and its calculation parameter between the trust company and the trust company by about 18:00. Therefore, it is necessary to calculate and match the base price etc. in a short time based on a huge amount of securities transaction data, and if one or both of the consignment company and the consignment company causes clerical errors, etc. Inconsistency occurs in the base price and the like. If there is a discrepancy, the volume of securities transaction data is enormous, requiring a great deal of effort to find out where the mistake has occurred, and in some cases, delays in publication via the media etc. There is.

【0006】本発明は、このような従来の問題点に鑑み
てなされたものであり、その目的は、計算された基準価
額、及び該基準価額を演算するためのパラメータ値が妥
当であるか否かを、容易にチェックできるようにするこ
とである。
The present invention has been made in view of such conventional problems, and has as its object to determine whether a calculated reference value and a parameter value for calculating the reference value are appropriate. Is to be easily checked.

【0007】[0007]

【課題を解決するための手段】上記した目的を達成する
ために、本発明に係る、投信委託会社及び投信受託会社
それぞれにおいて演算される証券取引における投信基準
価額の妥当性の検証を支援するための、投信委託会社及
び投信受託会社の少なくとも一方が保有する支援システ
ムにおいては、当日のファンド毎の投信基準価額、ファ
ンドと株式の組合せ毎の評価時価、及びファンドと債券
の組合せ毎の評価時価を演算する第1の演算手段と、第
1の演算手段によって演算された前日のファンド毎の投
信基準価額、ファンドと株式の組合せ毎の評価時価、及
びファンドと債券の組合せ毎の評価時価を少なくとも記
憶する第1の記憶手段と、当日及び前日のファンド毎の
投信基準価額、ファンドと株式の組合せ毎の評価時価、
及びファンドと債券の組合せ毎の評価時価に基づいて、
これらそれぞれの変動率を演算する第2の演算手段と、
予め設定された、ファンド毎の投信基準価額、ファンド
と株式の組合せ毎の評価時価、及びファンドと債券の組
合せ毎の評価時価の許容変動率を記憶する第2の記憶手
段と、第2の演算手段によって演算されたファンド毎の
投信基準価額の変動率、ファンドと株式の組合せ毎の評
価時価の変動率、及びファンドと債券の組合せ毎の評価
時価の変動率が、第2の記憶手段に記憶された対応する
許容変動率の範囲内であるか否かを評価する変動率評価
手段と、変動率が許容変動率以上のファンド毎の投信基
準価額、ファンドと株式の組合せ毎の評価時価、及びフ
ァンドと債券の組合せ毎の評価時価のリストを作成する
第1のリスト作成手段とからなることを特徴としてい
る。
Means for Solving the Problems In order to achieve the above-mentioned object, the present invention provides a method for supporting verification of the validity of an investment trust base value in a securities transaction calculated by each of an investment trust trust company and an investment trust trust company. In the support system held by at least one of the investment trust management company and the investment trust management company, the investment trust base value of each fund, the valuation market value of each combination of fund and stock, and the valuation market value of each combination of fund and bond on the day First calculating means for calculating, and at least the investment trust base value for each fund, the valuation market value for each combination of fund and stock, and the valuation market value for each combination of fund and bond calculated on the previous day calculated by the first calculation means. A first storage means, a fund reference value for each fund on the day and the day before, a valuation market value for each combination of fund and stock,
And the valuation market value of each combination of fund and bond,
Second calculating means for calculating each of these fluctuation rates;
Second storage means for storing a preset investment trust base value for each fund, a valuation market value for each combination of fund and stock, and an allowable fluctuation rate of a valuation market value for each combination of fund and bond, and a second operation The rate of change of the investment trust base value of each fund, the rate of change of the valuation market value of each combination of fund and stock, and the rate of change of the valuation market value of each combination of fund and bond calculated by the means are stored in the second storage means. And a volatility evaluation means for evaluating whether the volatility is within the range of the corresponding permissible volatility, an investment trust base value for each fund whose volatility is equal to or higher than the permissible volatility, a valuation market value for each fund and stock combination, It is characterized by comprising a first list creating means for creating a list of evaluation market values for each combination of a fund and a bond.

【0008】上記した本発明に係る支援システムはさら
に、該支援システムが投信受託会社(又は投信委託会
社)に具備されている場合、投信委託会社(又は投信受
託会社)から通信されたファンド毎の投信基準価額に関
するデータと、支援システムにおいて演算されたファン
ド毎の投信基準価額とを対比し、一致しているか否かを
判定するデータ対比手段と、データ対比手段における対
比結果を表す基準価額対照リストを作成する第2のリス
ト作成手段とを備えていることが好ましい。これによ
り、データの対比を自動的に行うことができる。
[0008] The support system according to the present invention further includes, if the support system is provided in an investment trust trust company (or an investment trust trust company), for each fund communicated from the investment trust trust company (or the investment trust trust company). Data comparing means for comparing data on the investment trust base price with the investment trust base price calculated for each fund in the support system to determine whether or not they match each other, and a reference price control list showing the result of comparison by the data comparing means And a second list creating means for creating the list. Thereby, data comparison can be performed automatically.

【0009】[0009]

【発明の実施の形態】図1は、本発明に係る投信基準価
額の妥当性検証の支援システム(投信基準価額チェック
システム)100の構成を示している。図1において、
200、300、及び400は、外部データベース(D
B)であり、外部の業者が提供する、実際の証券取引に
おける株式時価データ及び債券時価データを蓄積してい
る株式時価DB(例えば、日経クイック、時事通信等の
DB)、債券時価DB(例えば、日本相互証券、ロイタ
ー等のDB)、及び日計DB400である。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS FIG. 1 shows the configuration of a support system (investment trust base value check system) 100 for verifying the validity of an investment trust base price according to the present invention. In FIG.
200, 300, and 400 are external databases (D
B), a stock market price DB (for example, a DB for Nikkei Quick, Newsletter etc.) storing stock market value data and bond market value data in actual securities transactions provided by an external trader, and a bond market price DB (for example, , Japan Mutual Securities, Reuters, etc.) and the daily total DB 400.

【0010】投信基準価額チェックシステム100は、
コンピュータ・プログラムによって動作する演算/管理
装置10を備えており、該装置10には、演算管理記憶
装置20、許容変動率記憶装置30、委託側基準価額デ
ータ記憶装置(委託側データ記憶装置)40、キーボー
ド及びマウス等の入力装置50、ディスプレイ60、及
びプリンタ70が接続されている。演算/管理装置10
は、機能ブロック図で表すと、外部の株式時価DB20
0、債券時価DB300、及び日計DB400から検索
して演算管理記憶装置20に記憶されている時価デー
タ、並びに、委託会社(本システムが受託会社に具備さ
れている場合)から通信されて委託側データ記憶装置4
0に記憶されたデータに基づいて演算を行う演算部1
1、許容変動率設定部12、変動率評価部13、チェッ
クリスト作成部14、及び委託/受託データ対比部(デ
ータ対比部)15を備えている。演算管理記憶装置20
には、上記したように、株式時価DB200、債券時価
DB300、及び日計DB400から転送されるデータ
が記憶されるとともに、演算部11において演算された
演算結果も記憶される。
[0010] The investment trust base value check system 100 includes:
An arithmetic / management device 10 operated by a computer program is provided. The device 10 includes an arithmetic management storage device 20, an allowable change rate storage device 30, a reference price data storage device (consignment data storage device) 40. , An input device 50 such as a keyboard and a mouse, a display 60, and a printer 70 are connected. Arithmetic / management device 10
Is a functional block diagram of an external stock market DB 20
0, the market value data retrieved from the bond market value DB 300 and the daily total DB 400 and stored in the operation management storage device 20, and the trust side transmitted from the trust company (when this system is provided in the trust company) Data storage device 4
Operation unit 1 that performs an operation based on the data stored in 0
1, an allowable change rate setting unit 12, a change rate evaluation unit 13, a check list creation unit 14, and a commissioned / contracted data comparison unit (data comparison unit) 15. Operation management storage device 20
As described above, the data transferred from the stock market price DB 200, the bond market price DB 300, and the daily total DB 400 are stored, and the calculation result calculated by the calculation unit 11 is also stored.

【0011】演算部11は、演算管理記憶装置20及び
委託側データ記憶装置40に記憶されたデータに基づい
て、ファンド毎の基準価額を演算しかつ該基準価額の変
動率を演算する機能と、ファンド−株式毎(ファンドと
株式の組合せ毎)の株式時価の変動率を演算する機能
と、ファンド−債券毎(ファンドと債券の組合せ毎)の
債券時価の変動率を演算する機能とを備えている。
The calculation unit 11 calculates a reference price for each fund based on the data stored in the calculation management storage device 20 and the entrusted data storage device 40, and calculates a rate of change of the reference price. It has a function of calculating the fluctuation rate of the stock market value for each fund-stock (each combination of fund and stock) and a function of calculating the fluctuation rate of the bond market value for each fund-bond (each combination of fund and bond). I have.

【0012】演算部11によって演算されるファンド毎
の基準価額は、上記したように、 基準価額=(資産(A)−負債(B)+評価損益
(C))/口数(N)x計算単位 によって演算される。また、演算部11によって演算さ
れるファンド毎の基準価額の変動率は、以下のように演
算される。 変動率(%)=(作成基準日の基準価額−前回の基準価
額)/前回の基準価額x100 すなわち、変動率は、演算管理記憶装置20に記憶され
ている今回(作成基準日)と前回(作成基準日前の直近
日)の基準価額の差を前回の基準価額で割り算し、それ
を%で表したものである。ファンド−株式毎の株式時価
の変動率及びファンド−債券毎の債券時価の変動率も、
基準価額の変動率と同様にして演算される。
The base value of each fund calculated by the calculation unit 11 is, as described above, base value = (asset (A) −liability (B) + valuation loss (C)) / unit (N) × unit of calculation Is calculated by The rate of change of the reference price for each fund calculated by the calculation unit 11 is calculated as follows. Fluctuation rate (%) = (base price on creation base date−previous base price) / previous base price × 100 That is, the change rate is stored in the operation management storage device 20 between the present (creation base date) and the last ( The difference between the base prices on the last day before and the base date before creation is divided by the previous base price and expressed as a percentage. The volatility of the market value of each fund and stock and the volatility of the market value of each bond and fund
The calculation is performed in the same manner as the change rate of the reference price.

【0013】許容変動率設定部12は、基準価額、株式
時価、及び債券時価の演算単位毎の許容変動率を入力す
るための画面をディスプレイ60に表示し、オペレータ
が入力装置50から入力した該単位毎の許容変動率を、
許容変動率記憶装置30に記憶させる。許容変動率は、
相場変動等により適宜変更されるが、統計的データに基
づいて、例えば、以下に例示するように設定される。 基準価額の許容変動率 ・追加型株式ファンド :5% ・追加型公社債ファンド :1% ・単位型株式ファンド :5% ・単位型公社債ファンド :1% ・変動の大きい特定ファンド:9% 株式時価の許容変動率 ・銘柄によらず、一律に25% 債券時価の許容変動率 ・国債 :0.2% ・転換社債 :3.0% ・転換社債以外の一般社債 :1.0% ・ユーロ円債 :0.5%
The allowable change rate setting unit 12 displays on the display 60 a screen for inputting an allowable change rate for each calculation unit of the base price, the stock market value, and the bond market value. The permissible fluctuation rate for each unit is
It is stored in the allowable variation rate storage device 30. The permissible change rate is
Although it is appropriately changed due to market fluctuations or the like, it is set based on statistical data, for example, as exemplified below. Permissible volatility of the base price ・ Additional equity fund: 5% ・ Additional public and corporate bond fund: 1% ・ Unit type equity fund: 5% ・ Unit type public and corporate bond fund: 1% ・ Specific fund with large fluctuation: 9% Permissible volatility-25% regardless of brand Permissible volatility of market value of bonds-Government bonds: 0.2%-Convertible bonds: 3.0%-General bonds other than convertible bonds: 1.0%-Euro yen bonds : 0.5%

【0014】変動率評価部13は、演算部11によって
演算された演算単位毎(ファンド毎の基準価額、ファン
ド−株式毎の株式時価、及びファンド−債券毎の債券時
価)の変動率と、予め設定されて許容変動率記憶装置3
0に記憶されている対応する許容変動率とを対比する。
そして、演算結果の変動率が許容変動率を上回った場合
に、それを表すための超過マーク、例えば「*」を、演
算単位の変動率に対応づけて付加し、演算管理記憶装置
20に記憶する。チェックリスト作成部14は、演算管
理記憶装置20から、超過マーク「*」が付与されてい
る演算結果を読み出して、変動率チェックリストを作成
する。作成された変動率チェックリストは、演算管理記
憶装置20に記憶されるとともに、ディスプレイ60に
表示され、かつ、必要に応じて、プリンタ70からプリ
ントアウトされる。
The fluctuation rate evaluation unit 13 calculates a fluctuation rate for each operation unit (base value for each fund, stock market value for each fund and stock, and bond market value for each fund and bond) calculated by the operation unit 11, and Set and allowed fluctuation rate storage device 3
Compare with the corresponding permissible change rate stored in 0.
When the change rate of the calculation result exceeds the allowable change rate, an excess mark for indicating the change rate, for example, “*” is added in association with the change rate of the calculation unit and stored in the calculation management storage device 20. I do. The checklist creation unit 14 reads out the calculation result with the excess mark “*” from the calculation management storage device 20 and creates a change rate checklist. The created change rate check list is stored in the operation management storage device 20, is displayed on the display 60, and is printed out from the printer 70 as necessary.

【0015】変動率チェックリストには、「基準価額変
動率チェックリスト」、「株式時価変動率チェックリス
ト」、及び「債券時価変動率チェックリスト」が含まれ
ている。これら変動率チェックリストは、変動率が最も
大きい順に配列することが好ましい。また、必要に応じ
て、許容変動率を超過していないファンドもリストアッ
プしてもよく、この場合、許容変動率が超過しているフ
ァンドには、超過マーク「*」を付ければよい。
The volatility checklist includes a “base price volatility checklist”, a “stock market price volatility checklist”, and a “bond market price volatility checklist”. It is preferable that these change rate check lists are arranged in the order of the highest change rate. If necessary, funds that do not exceed the allowable volatility may be listed. In this case, the fund with the allowable volatility exceeding may be marked with an excess mark “*”.

【0016】「基準価額変動率チェックリスト」は、委
託会社毎に作成され、図2に示したように、「ファンド
コード及びファンド名」、「ファンドタイプ」、「(当
日)基準価額」、「前回基準価額」、「変動額」、「変
動率」、「許容変動率」、「前回算出日」を含んでい
る。「株式時価変動チェックリスト」は、委託会社毎に
作成され、図3に示したように、「ファンドコード及び
ファンド名」、「銘柄コード及び銘柄名」、「当日時価
/約定単価」、「前日時価/当日時価」、「変動率」、
「差額」、「計上日及び取引種別」を含んでいる。「債
券時価変動率チェックリスト」は、委託会社毎に作成さ
れ、図4に示したように、「ファンドコード及びファン
ド名」、「債券種類コード及び債券種類」、「銘柄コー
ド及び銘柄名」、「当日時価/約定単価」、「前日時価
/当日時価」、「変動率」、「差額」を含んでいる。図
2〜図4に例示したチェックリストには、変動率が許容
変動率以上のファンド及び銘柄のみがリストアップされ
ている。
The "standard price change rate check list" is created for each consignor, and as shown in FIG. 2, "fund code and fund name", "fund type", "(current day) standard price", " This includes the “previous base value”, “change amount”, “change rate”, “permissible change rate”, and “previous calculation date”. The “Market Price Fluctuation Checklist” is created for each consignment company and, as shown in FIG. 3, “Fund Code and Fund Name”, “Stock Code and Brand Name”, “Current Date / Contract Price”, “Previous Day” Market price / current price ”,“ rate of change ”,
Includes “Difference” and “Accounting date and transaction type”. The “bond market price volatility checklist” is created for each consignor, and as shown in FIG. 4, “fund code and fund name”, “bond type code and bond type”, “brand code and brand name”, It includes “current date / contract price”, “previous date / current date”, “rate of change”, and “difference”. In the checklists illustrated in FIGS. 2 to 4, only funds and issues whose volatility is equal to or higher than the permissible volatility are listed.

【0017】データ対比部15は、演算部11が演算し
たファンド毎の基準価額に関するデータと、委託会社か
ら送られてきて委託側データ記憶装置40に記憶された
ファンド毎の基準価額に関するデータとを対比し、デー
タが不一致であるファンドを抽出する。その結果に基づ
き、チェックリスト作成部14は、「基準価額照合リス
ト」を作成し、ディスプレイ60及び/又はプリンタ7
0から出力する。「基準価額照合リスト」には、例え
ば、図5〜図7に示すように、基準価額に関するデータ
として、「ファンドコード及びファンド名」、「純資産
総額」、「残口数」、「資産−負債(A−B)」、「基
準価額」、「解約価額」、「買取価額」、「基準/前日
比」、「オープン元本」、「買取/前日比」、「株式+
ワラント」、「先物・オプション」、「予約為替」、
「外国投資勘定」、「公社債」、「マザー信託」が含ま
れている。「株式+ワラント」、「先物・オプショ
ン」、「予約為替」、「外国投資勘定」、「公社債」、
及び「マザー信託」は、評価損益に関するデータであ
る。
The data comparing section 15 compares the data relating to the reference price of each fund calculated by the computing section 11 and the data relating to the reference price of each fund sent from the consignment company and stored in the consignment side data storage device 40. In contrast, funds whose data do not match are extracted. Based on the result, the checklist creation unit 14 creates a “reference value collation list”, and displays the list 60 and / or the printer 7.
Output from 0. As shown in FIGS. 5 to 7, for example, as shown in FIGS. 5 to 7, “fund code and fund name”, “total net assets”, “remaining units”, “asset-liability ( AB), “base price”, “churn price”, “purchase price”, “base / day-over-day”, “open principal”, “purchase / day-over-day”, “stock +
Warrants, futures and options,
Includes "foreign investment accounts", "public bonds" and "mother trusts". "Equity + Warrants", "Futures / Options", "Foreign Exchange", "Foreign Investment Account", "Public and Corporate Bonds",
And “Mother Trust” are data on valuation gains and losses.

【0018】図5に示した「基準価額照合リスト」は、
委託会社及び受託会社での計算結果の基準価額が一致し
ているが、純資産が不一致であることを表している。そ
して、純資産が不一致であることは、公社債評価損益が
相違していることに起因していることを表している。図
6に示した「基準価額照合リスト」は、基準価額及び純
資産が一致しているが、資産−負債(A−B)が不一致
であることを表している。そして、その原因として、評
価損益(「株式+ワラント」、及び「公社債」の評価損
益)が不一致であることを表している。図7に示した
「基準価額照合リスト」は、基準価額が一致している
が、純資産が相違していることを表している。そして、
その原因として、資産−負債(A−B)が不一致である
ことを表している。
The “reference value collation list” shown in FIG.
The calculation results of the trustee company and the trustee company match, but the net assets do not match. The mismatch between the net assets indicates that the valuation gains and losses on the bonds are different. The “reference value collation list” illustrated in FIG. 6 indicates that the reference value and the net asset match, but the asset-liability (AB) does not match. The reason for this is that the valuation gain / loss (valuation gain / loss of “stock + warrant” and “public / corporate bond”) does not match. The “reference value collation list” shown in FIG. 7 indicates that the reference values match, but the net assets differ. And
This indicates that the asset-liability (AB) is mismatched.

【0019】データ対比部15は、図5〜図7の「基準
価額照合リスト」に示されるような、委託会社と受託会
社との間のデータに不一致があることを発見すると、チ
ェックリスト作成部14に対して、「変動率チェックリ
スト」(図2〜図4)を作成するよう指示し、これによ
り、該チェックリストが、ディスプレイ60及び/又は
プリンタ70から出力される。例えば、基準価額そのも
のが相違している場合には、図2に示したような「基準
価額変動率チェックリスト」を出力させる。図5に示し
たように公社債評価損益が相違している場合には、図4
に示したような「債券時価変動率チェックリスト」を出
力させる。図6及び図7に示したように資産−負債(A
−B)と評価損益が相違している場合には、図3及び図
4に示したような「株式時価変動率チェックリスト」及
び「債券時価変動率チェックリスト」を出力させる。
When the data comparing unit 15 finds that the data between the trust company and the trust company is inconsistent, as shown in the "reference value matching list" in FIGS. 14 is instructed to create a “variation rate checklist” (FIGS. 2 to 4), whereby the checklist is output from the display 60 and / or the printer 70. For example, when the reference prices themselves are different, a “reference price change rate check list” as shown in FIG. 2 is output. If the valuation gains and losses on the bonds are different as shown in FIG.
The bond price fluctuation rate checklist as shown in (1) is output. As shown in FIGS. 6 and 7, asset-liability (A
If the valuation gain / loss is different from that of -B), the “share market price volatility checklist” and the “bond market price volatility checklist” as shown in FIGS. 3 and 4 are output.

【0020】担当者は、出力された変動率チェックリス
トを見て、例えば、データに間違いがある可能性が高い
順、例えば変動率が大きい順に、データの見直しを行う
ことができる。これにより、データ入力ミス、委託会社
からのデータの非妥当性等を速やかに発見することがで
き、基準価額に関するデータを、委託会社及び受託会社
の間で速やかに一致させることができる。
The person in charge can review the output of the change rate check list, for example, in order of increasing the possibility that the data has an error, for example, in order of increasing the change rate, to review the data. As a result, a data entry error, invalidity of data from the consignment company, and the like can be quickly found, and data on the reference price can be quickly matched between the consignment company and the trustee company.

【0021】本発明に係る基準価額チェックシステム1
00において実行される処理の流れを、図8を参照して
説明する。まず、ステップS1において、担当者が入力
装置50を用いて、許容変動率設定部12の機能に基づ
き、予め設定され許容変動率記憶装置30に記憶されて
いる演算単位毎の許容変動率(ファンド毎の基準価額、
ファンド−株式毎の評価時価、及びファンド−債券毎の
評価時価の許容変動率)を読み出し、これら許容変動率
を必要に応じて変更する。そして、ステップS2におい
て、株式時価DB200、債券時価DB300、及び日
計DB400から当日の証券取引データ、並びに委託側
データ記憶装置40に記憶されているデータを読み出
し、これらデータに基づいて、演算部11は、当日のフ
ァンド毎の基準価額、ファンド−株式毎の評価時価、及
びファンド−債券毎の評価時価を演算し、その結果を演
算管理記憶装置20に記憶する。なお、演算管理記憶装
置20には、前日のファンド毎の基準価額、ファンド−
株式毎の評価時価、及びファンド−債券毎の評価時価も
格納されていることは、言うまでもない。
Reference value check system 1 according to the present invention
The flow of processing executed in 00 will be described with reference to FIG. First, in step S <b> 1, a person in charge uses the input device 50 based on the function of the allowable change rate setting unit 12 and sets the allowable change rate (fund) for each calculation unit that is set in advance and stored in the allowable change rate storage device 30. Base value for each,
(Evaluation market value of each fund-stock, and permissible fluctuation rate of evaluation value of each fund-bond)), and change these permissible fluctuation rates as necessary. Then, in step S2, the securities transaction data of the day and the data stored in the entrusted data storage device 40 are read from the stock market price DB 200, the bond market price DB 300, and the daily total DB 400, and the calculation unit 11 is executed based on these data. Calculates the base value of each fund, the valuation market value of each fund-stock, and the valuation market value of each fund-bond on the day, and stores the result in the calculation management storage device 20. Note that the arithmetic management storage device 20 stores the base value, fund-
It goes without saying that the valuation market value for each stock and the valuation market value for each fund-bond are also stored.

【0022】次いで、ステップS3において、演算部1
1は、演算管理記憶装置20に記憶されている、当日及
び前日のデータに基づいて、演算単位毎(ファンド毎の
基準価額、ファンド−株式毎の評価時価、及びファンド
−債券毎の評価時価)の変動率を演算し、その結果を演
算管理記憶装置20に記憶する。そして、ステップS4
において、変動率評価部13は、演算の結果得られた変
動率がそれぞれ、許容変動率記憶装置30に記憶されて
いる対応する許容変動率の範囲内であるか否かを判定
し、許容変動率の範囲外である変動率に超過マーク
「*」を付ける。次いで、ステップS5において、チェ
ックリスト作成部14は、図2〜図4に示すような「基
準価額変動率チェックリスト」、「株式時価変動率チェ
ックリスト」、及び「債券時価変動率チェックリスト」
を作成し、演算管理記憶装置20に記憶する。この時点
で、担当者は、これらの変動率チェックリストをディス
プレイ60に表示し、かつプリンタ70からプリントア
ウトすることが可能となる。これにより、委託会社から
の基準価額に関するデータとの照合の前に、受託会社側
で演算した結果が妥当であるか否かを、予め検討するこ
ともできる。
Next, in step S3, the operation unit 1
1 is based on the data of the current day and the previous day and stored in the operation management storage device 20 for each operation unit (a base value for each fund, a valuation market value for each fund-stock, and a valuation market value for each fund-bond). Is calculated, and the result is stored in the operation management storage device 20. Then, step S4
In, the fluctuation rate evaluation unit 13 determines whether each of the fluctuation rates obtained as a result of the calculation is within the range of the corresponding permissible fluctuation rate stored in the permissible fluctuation rate storage device 30, and An excess mark “*” is attached to a fluctuation rate that is out of the range of the rate. Next, in step S5, the checklist creation unit 14 performs the “standard price fluctuation rate checklist”, the “stock market price fluctuation rate checklist”, and the “bond market price fluctuation rate checklist” as shown in FIGS.
Is created and stored in the operation management storage device 20. At this point, the person in charge can display these change rate check lists on the display 60 and print out them from the printer 70. Thus, before collation with the data on the reference price from the trustee company, it is also possible to examine in advance whether the result calculated by the trustee company is appropriate.

【0023】その後、ステップS6において、データ対
比部15は、委託側データ記憶装置40に記憶されてい
る委託会社からの基準価額に関するデータを、受託会社
自身が作成した基準価額に関するデータと対比し、その
差を演算する。そして、ステップS7において、チェッ
クリスト作成部14は、対比した結果を、図5〜図7に
示すような基準価額対照リストとして作成し出力する。
次いで、出力された基準価額対照リスト中に基準価額に
関するデータの不一致が存在している場合に、ステップ
S8において、変動率チェックリストを読み出す。
Thereafter, in step S6, the data comparing section 15 compares the data relating to the reference price from the consignment company stored in the consignment-side data storage device 40 with the data relating to the reference price created by the consignment company itself. The difference is calculated. Then, in step S7, the check list creation unit 14 creates and outputs a comparison result as a reference price comparison list as shown in FIGS.
Next, when there is a data mismatch regarding the reference price in the output reference price control list, the change rate check list is read in step S8.

【0024】これにより、担当者は、基準価額対照リス
トと変動率チェックリストとを参照して、委託会社及び
受託会社で基準価額の演算に使用されたデータの妥当性
を検証することができ、もって、委託会社及び受託会社
においてそれぞれ演算された基準価額を妥当な価額に速
やかに一致させることができる。先述したが、ステップ
S6におけるデータ対比部15での対比の前に、図2〜
図4に示した変動率チェックリストを出力することによ
り、受託会社側の入力データ等が適切であったか否かを
チェックすることもできる。上記においては、本発明に
係る投信基準価額チェックシステム100が受託会社側
に具備されていることを前提として説明したが、委託会
社側に具備されても良いことは勿論である。委託会社及
び受託会社の双方に投信基準価額チェックシステム10
0を具備させることにより、より速やかに妥当な基準価
額の一致に到達することができる。
Thus, the person in charge can verify the validity of the data used in the calculation of the base price by the trustee company and the trustee company with reference to the base value control list and the change rate check list, As a result, the reference price calculated by each of the trustee company and the trustee company can be quickly matched with an appropriate price. As described above, before the comparison in the data comparing unit 15 in step S6, FIGS.
By outputting the change rate check list shown in FIG. 4, it is also possible to check whether the input data or the like on the trustee company side is appropriate. The above description has been made on the assumption that the investment trust reference value check system 100 according to the present invention is provided on the trustee company side. Investment trust base value check system 10 for both the trustee and trustee
By providing 0, it is possible to reach a reasonable match of the reference value more quickly.

【0025】本発明に係る投信基準価額の妥当性検証の
支援システムは、以上のように、変動率が許容値を超え
ているファンド、ファンド−株式、ファンド−債券をリ
ストにして表示及び/又はプリントアウトすることがで
きるので、基準価額の演算に必要なデータの入力ミス等
の間違いを、容易に発見することができる。したがっ
て、委託会社及び受託会社の間の基準価額に関するデー
タが相違した場合等において、その原因を速やかに突き
止めることができ、よってデータの不一致を速やかに解
消することができる。
As described above, the support system for verifying the validity of the investment trust base value according to the present invention provides a list of funds, fund-stocks, and fund-bonds whose volatility exceeds an allowable value, and / or displays the list. Since it can be printed out, it is possible to easily find an error such as an error in inputting data necessary for calculating the reference price. Therefore, in the case where the data relating to the reference price differs between the trustee company and the trustee company, the cause can be promptly determined, and the inconsistency of the data can be promptly resolved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る投信基準価額の妥当性検証の支援
システムの構成を示すためのブロック図である。
FIG. 1 is a block diagram showing a configuration of a support system for verifying the validity of an investment trust reference value according to the present invention.

【図2】本発明に係る支援システムによって計算され作
成された基準価額変動率チェック表の一例を示す図であ
る。
FIG. 2 is a diagram showing an example of a reference price fluctuation rate check table calculated and created by the support system according to the present invention.

【図3】本発明に係る支援システムによって計算され作
成された株式時価変動率チェックリストの一例を示す図
である。
FIG. 3 is a diagram showing an example of a stock market price change rate check list calculated and created by the support system according to the present invention.

【図4】本発明に係る支援システムによって計算され作
成された債券時価変動率チェックリストの一例を示す図
である。
FIG. 4 is a diagram showing an example of a bond market price fluctuation rate check list calculated and created by the support system according to the present invention.

【図5】本発明に係る支援システムによって作成され
た、委託会社側及び受託会社側のデータを対比した結果
を示した基準価額照合リストの一例を示す図である。
FIG. 5 is a diagram showing an example of a reference price collation list created by the support system according to the present invention and showing a result of comparing data on the trust company side and the trust company side.

【図6】本発明に係る支援システムによって作成され
た、委託会社側及び受託会社側のデータを対比した結果
を示した基準価額照合リストの一例を示す図である。
FIG. 6 is a diagram showing an example of a reference price collation list created by the support system according to the present invention and showing a result of comparing data on the trust company side and the trust company side.

【図7】本発明に係る支援システムによって作成され
た、委託会社側及び受託会社側のデータを対比した結果
を示した基準価額照合リストの一例を示す図である。
FIG. 7 is a diagram illustrating an example of a reference price collation list created by the support system according to the present invention and showing a result of comparing data on the trust company side and the trust company side.

【図8】本発明に係る支援システムによって実行される
処理の流れを示したフローチャートである。
FIG. 8 is a flowchart showing a flow of processing executed by the support system according to the present invention.

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 投信委託会社及び投信受託会社それぞれ
において演算される証券取引における投信基準価額の妥
当性の検証を支援するための、投信委託会社及び投信受
託会社の少なくとも一方が保有する支援システムにおい
て、 当日のファンド毎の投信基準価額、ファンドと株式の組
合せ毎の評価時価、及びファンドと債券の組合せ毎の評
価時価を演算する第1の演算手段と、 第1の演算手段によって演算された前日のファンド毎の
投信基準価額、ファンドと株式の組合せ毎の評価時価、
及びファンドと債券の組合せ毎の評価時価を少なくとも
記憶する第1の記憶手段と、 当日及び前日のファンド毎の投信基準価額、ファンドと
株式の組合せ毎の評価時価、及びファンドと債券の組合
せ毎の評価時価に基づいて、これらそれぞれの変動率を
演算する第2の演算手段と、 予め設定された、ファンド毎の投信基準価額、ファンド
と株式の組合せ毎の評価時価、及びファンドと債券の組
合せ毎の評価時価の許容変動率を記憶する第2の記憶手
段と、 第2の演算手段によって演算されたファンド毎の投信基
準価額の変動率、ファンドと株式の組合せ毎の評価時価
の変動率、及びファンドと債券の組合せ毎の評価時価の
変動率が、第2の記憶手段に記憶された対応する許容変
動率の範囲内であるか否かを評価する変動率評価手段
と、 変動率が許容変動率以上のファンド毎の投信基準価額、
ファンドと株式の組合せ毎の評価時価、及びファンドと
債券の組合せ毎の評価時価のリストを作成する第1のリ
スト作成手段とからなることを特徴とする支援システ
ム。
Claims: 1. A support system owned by at least one of an investment trust trust company and an investment trust trust company for supporting verification of the validity of an investment trust reference value in a securities transaction calculated by each of the investment trust trust company and the investment trust trust company. The first calculation means for calculating the investment trust base value of each fund, the valuation market value of each combination of fund and stock, and the valuation market value of each combination of fund and bond on the day; and the day before calculated by the first calculation means Investment fund base value for each fund, valuation market value for each combination of fund and stock,
A first storage means for storing at least a valuation market value of each fund and bond combination; an investment trust base value of each fund on the day and the day before; a valuation market value of each fund and stock combination; and a valuation market value of each fund and bond combination A second calculating means for calculating each of these fluctuation rates based on the valuation market value; and a preset investment trust base value for each fund, a valuation market value for each combination of fund and stock, and a combination for each combination of fund and bond. Second storage means for storing an allowable fluctuation rate of the valuation market price of the fund, a fluctuation rate of an investment trust base value for each fund calculated by the second calculating means, a fluctuation rate of a valuation market value of each combination of fund and stock, and A change rate evaluation means for evaluating whether or not a change rate of the evaluation market value for each combination of the fund and the bond is within a range of a corresponding allowable change rate stored in the second storage means; Investment fund base value for each fund whose rate is equal to or greater than the allowable volatility,
A support system comprising: first list creation means for creating a list of evaluation market prices for each combination of a fund and a stock and evaluation markets for each combination of a fund and a bond.
【請求項2】 請求項1記載の支援システムにおいて、
該支援システムが投信受託会社(又は投信委託会社)に
具備されている場合、該支援システムはさらに、 投信委託会社(又は投信受託会社)から通信されたファ
ンド毎の投信基準価額に関するデータと、支援システム
において演算されたファンド毎の投信基準価額とを対比
し、一致しているか否かを判定するデータ対比手段と、 データ対比手段における対比結果を表す基準価額対照リ
ストを作成する第2のリスト作成手段とを備えているこ
とを特徴とする支援システム。
2. The support system according to claim 1, wherein
If the support system is provided by an investment trust management company (or an investment trust management company), the support system further includes data on the investment trust base value for each fund transmitted from the investment trust management company (or the investment trust management company). Data comparison means for comparing the investment trust base value of each fund calculated in the system to determine whether or not they match each other, and creation of a second list for creating a reference price control list representing the comparison result in the data comparison means And a support system.
JP2001147557A 2001-05-17 2001-05-17 Support system for verifying adequacy of fund reference price Pending JP2002342567A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001147557A JP2002342567A (en) 2001-05-17 2001-05-17 Support system for verifying adequacy of fund reference price

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001147557A JP2002342567A (en) 2001-05-17 2001-05-17 Support system for verifying adequacy of fund reference price

Publications (1)

Publication Number Publication Date
JP2002342567A true JP2002342567A (en) 2002-11-29

Family

ID=18993025

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001147557A Pending JP2002342567A (en) 2001-05-17 2001-05-17 Support system for verifying adequacy of fund reference price

Country Status (1)

Country Link
JP (1) JP2002342567A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8326740B2 (en) 2005-04-06 2012-12-04 Profund Advisors Llc Method and system for calculating an intraday indicative value of leveraged bullish and bearish exchange traded funds

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8326740B2 (en) 2005-04-06 2012-12-04 Profund Advisors Llc Method and system for calculating an intraday indicative value of leveraged bullish and bearish exchange traded funds
US8452692B2 (en) 2005-04-06 2013-05-28 Profund Advisors Llc Method and system for managing exchange traded funds using an intraday indicative value
US8595129B2 (en) 2005-04-06 2013-11-26 Profund Advisors Llc Method and system for managing exchange traded funds using an intraday indicative value
US8788403B1 (en) 2005-04-06 2014-07-22 Profund Advisors Llc Method and system for managing exchange traded funds using an intraday indicative value

Similar Documents

Publication Publication Date Title
US7333950B2 (en) System for creating, pricing and managing and electronic trading and distribution of credit risk transfer products
US7711626B2 (en) Systems, methods, and computer program products for adjusting the assets of an investment account
US8103575B1 (en) System and method for use in auditing financial transactions
US7827084B2 (en) Method and system for pricing options
US20180144401A1 (en) Method of creating and trading derivative investment products based on an average price of an underlying asset during a calculation period
US8160950B2 (en) Method and apparatus for trading assets
US7353198B2 (en) Method and system for managing a mortgage-backed securities index
US8326715B2 (en) Method of creating and trading derivative investment products based on a statistical property reflecting the variance of an underlying asset
US11562432B1 (en) Systems, methods, and computer products for optimizing the selection of collateral
US20100241554A1 (en) Method and system for pricing financial derivatives
US20060253367A1 (en) Method of creating and trading derivative investment products based on a volume weighted average price of an underlying asset
JP2010541104A (en) Method and apparatus for improved electronic trading
US20090248564A1 (en) Settlement pricing for centrally cleared swaps
US20140229351A1 (en) Method and apparatus for listing and trading a futures contract with variable delivery and/or expiry dates
US8423448B2 (en) Method and system of trading a standardized contract
US20020138381A1 (en) Individually managed accounts with multiple style allocation options
US7925566B1 (en) System and method for trading fixed income financial instruments
US20140324668A1 (en) Trade Matching Platform with Variable Pricing Based on Clearing Relationships
JP5174334B2 (en) Order forwarding processing system between multiple electronic trading systems
US7702580B1 (en) System and method for mortgage loan pricing, sale and funding
JP2015518986A (en) Method and system for generating a government bond volatility index and trading derivative products based thereon
US20100223175A1 (en) Method and system for standardizing bilaterally-negotiated derivative positions
US20150149340A1 (en) Tandem Options Contracts Providing Fixed Binary Payout
JP2002342567A (en) Support system for verifying adequacy of fund reference price
US20100138356A1 (en) System and method for managing and valuating financial instruments using cumulative subpositions

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040903

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050311

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20050715