JP2002339325A - Concrete stand - Google Patents

Concrete stand

Info

Publication number
JP2002339325A
JP2002339325A JP2001146445A JP2001146445A JP2002339325A JP 2002339325 A JP2002339325 A JP 2002339325A JP 2001146445 A JP2001146445 A JP 2001146445A JP 2001146445 A JP2001146445 A JP 2001146445A JP 2002339325 A JP2002339325 A JP 2002339325A
Authority
JP
Japan
Prior art keywords
concrete
bolt
electric cable
hole
gantry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2001146445A
Other languages
Japanese (ja)
Other versions
JP3637379B2 (en
Inventor
Tamotsu Toyoda
有 豊田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyoda Co Ltd
Original Assignee
Toyoda Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyoda Co Ltd filed Critical Toyoda Co Ltd
Priority to JP2001146445A priority Critical patent/JP3637379B2/en
Publication of JP2002339325A publication Critical patent/JP2002339325A/en
Application granted granted Critical
Publication of JP3637379B2 publication Critical patent/JP3637379B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Road Signs Or Road Markings (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a lightweight concrete stand which can be produced at a factory and can be easily assembled by manpower on the job site. SOLUTION: Vertical coupling bolts 5 for supporting equipment, insert 8 to 10 for tightening bolts 7, and an insertion hole 11 for an electric cable continuing from the top surface of the highest stage to the inside at each stage are provided, the main body 1 of the stand is formed by laying blocks 2 to 4 stages, and a band-shaped coupling plate 6 to be crossed on the side surface of each stage and a tightening bolt to be pushed in an fixed to the side surface of each stage are provided.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、踏切りの障害物セ
ンサー等を据付け機器として立付け装備するコンクリー
ト架台の改良に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an improvement of a concrete gantry in which a crossing obstacle sensor or the like is installed as an installation device.

【0002】[0002]

【従来の技術】一般に、鉄道の踏切りにおいては、遮断
機が降りる前に、列車往来の邪魔となる障害物が踏切り
内にあるのを予め検知するため、図9並びに図10で示
すような障害物センサーSが設置されている。
2. Description of the Related Art In general, at a railroad crossing, before an obstacle gets off, it is necessary to detect in advance that an obstacle obstructing the traffic of the train is present in the railroad crossing. An object sensor S is provided.

【0003】その障害物センサーSは、下部側を地面下
に埋設するコンクリート架台Cの天面に数本の立付けボ
ルトBで支持することによりコンクリート架台Cに立付
け装備されている。また、障害物センサーの電気ケーブ
ルHはコンクリート架台Cの天面から内部に引き込んで
側方に引き出し、外線部分をコンクリート蓋Rで覆うこ
とにより敷設されている。
[0003] The obstacle sensor S is mounted on the concrete gantry C by being supported on the top surface of a concrete gantry C buried below the ground with several erection bolts B. Further, the electric cable H of the obstacle sensor is laid by being drawn into the inside from the top surface of the concrete gantry C and drawn out to the side, and covering the outside line portion with the concrete lid R.

【0004】従来、そのコンクリート架台は、コンクリ
ート型枠を現場で組み立て、生コンクリートを型枠内に
流し込んで養生することによる現場打ちで設けられてい
る。このコンクリート架台の現場打ちでは、安全性から
列車が往来する毎に作業を中断しなければならず、ま
た、生コンクリートの養生に時間を要するため、完成ま
でには多くの時間が掛る。
[0004] Conventionally, the concrete gantry is provided by cast-in-place by assembling a concrete formwork on site and pouring fresh concrete into the formwork and curing it. In the case of cast-in-place of a concrete gantry, the work must be interrupted every time a train comes and goes due to safety, and it takes a long time to cure the ready-mixed concrete.

【0005】そのコンクリート架台は、現場打ちに代え
て、工場内で予め作製したものを現場に持ち込んで施工
すればよい。然し、このコンクリート架台は全体を一体
に形成すると、大型のものでは高さ900mm,重量3
20Kg、小型なものでも高さ600mm,重量210
Kg程度と重量のあるものとなるため、運搬には重機が
必要となるが、立地条件から重機が現場に立ち入れない
ところもあり、作業には極めて手間が掛る。
[0005] Instead of cast-in-place, the concrete gantry may be prepared by bringing it in the factory in advance to the site. However, when this concrete base is integrally formed as a whole, a large one has a height of 900 mm and a weight of three.
20kg, height 600mm, weight 210 even small size
Heavy equipment is required for transportation because it is as heavy as about Kg, but heavy equipment is extremely inconvenient in some places due to locational conditions.

【0006】[0006]

【発明が解決しようとする課題】本発明は、工場内で作
製でき、現場まで容易に搬送可能な軽量なものに形成す
ると共に、現場で重機等を必要とせずに人力で容易に組
立設置でき、また、電気ケーブルも現場の施工条件に合
わせて引込み配線可能なコンクリート架台を提供するこ
とを目的とする。
DISCLOSURE OF THE INVENTION The present invention can be manufactured in a factory, formed into a light-weight product that can be easily transported to the site, and can be easily assembled and installed manually without the need for heavy equipment at the site. It is another object of the present invention to provide a concrete gantry in which electric cables can be drawn in and wired according to the construction conditions at the site.

【0007】[0007]

【課題を解決するための手段】本発明の請求項1に係る
コンクリート架台においては、機器支持用の立付けボル
トを最上段の天面に植立固定し、締付けボルトのインサ
ートを各段の側面から内部に埋込み固定し、各段の内部
に連続する電気ケーブルの挿通穴を最上段の天面に開口
させて設け、その構成から縦長な梯形を呈する架台本体
を数段の積上げブロックに分けて形成すると共に、各段
のインサートと相応するボルト軸の通し穴を板面に設け
た帯状の連結プレートと、連結プレートを各段の側面に
掛渡し固定する締付けボルトとを備えることにより構成
されている。
In the concrete gantry according to the first aspect of the present invention, an upright bolt for supporting the equipment is planted and fixed on a top surface of the uppermost step, and an insert of the tightening bolt is attached to a side surface of each step. From the top, the insertion hole for the continuous electric cable is opened at the top of the top, and the gantry body, which has a vertically long trapezoidal shape, is divided into several stacked blocks. It is formed by including a band-shaped connecting plate provided with a through hole of a bolt shaft corresponding to an insert of each step on a plate surface, and a tightening bolt for fixing the connecting plate to a side surface of each step. I have.

【0008】本発明の請求項2に係るコンクリート架台
においては、電気ケーブルの挿通穴を凹溝として形成す
る厚み分を保って各段を中抜き構造に形成することによ
り構成されている。
In the concrete gantry according to the second aspect of the present invention, each step is formed in a hollow structure while maintaining the thickness of the electric cable insertion hole as a concave groove.

【0009】本発明の請求項3に係るコンクリート架台
においては、各段の側面近く内部で連続し、最上段の中
腹辺から中央方向に湾曲し、最上段の中腹から縦穴部で
連続させて最上段の天面中央に開孔する電気ケーブルの
挿通穴を設けることにより構成されている。
In the concrete gantry according to the third aspect of the present invention, the concrete pedestal is continuous near the inside of the side of each step, is curved toward the center from the middle side of the uppermost step, and is continuously connected to the vertical hole from the middle side of the uppermost step. It is configured by providing an insertion hole for an electric cable which is opened in the center of the upper surface of the upper stage.

【0010】本発明の請求項4に係るコンクリート架台
においては、各段の側面近く内部で縦方向に連続する電
気ケーブルの挿通穴を設けると共に、電気ケーブルの引
込み孔を穿設可能な薄肉壁を各段に形成し、更に、その
連続する薄肉壁の目印ラインを各段の側面に付形するこ
とにより構成されている。
[0010] In the concrete gantry according to the fourth aspect of the present invention, a thin wall capable of forming an electric cable insertion hole which is continuous in the vertical direction in the vicinity of the side surface of each step and a hole for drawing the electric cable is provided. It is formed in each step, and furthermore, the mark line of the continuous thin wall is formed on the side surface of each step.

【0011】本発明の請求項5に係るコンクリート架台
においては、平面略四辺形の突起を上段側の底面に設け
ると共に、その突起が嵌り合う切欠溝を下段側の天面に
設けることにより構成されている。
According to a fifth aspect of the present invention, there is provided a concrete gantry, wherein a substantially quadrangular projection is provided on the upper bottom surface and a notch groove for fitting the projection is provided on the lower top surface. ing.

【0012】本発明の請求項6に係るコンクリート架台
においては、連結プレートを嵌め込む窪み部を各段の側
面に連続させて設けることにより構成されている。
In the concrete gantry according to the sixth aspect of the present invention, the concave portion for fitting the connecting plate is provided continuously on the side surface of each step.

【0013】本発明の請求項7に係るコンクリート架台
においては、六角ボルトを締付けボルトとして備えると
共に、ボルト軸の通し穴を板面に設けた基板部と、その
基板部の片側端から折れ曲がって連結プレートの側辺に
係合する掛止め片と、基板部の他側端から折れ曲がって
ボルト頭の側面に当接するストッパ爪とからなる弛み防
止用の押え金具を備えることにより構成されている。
According to a seventh aspect of the present invention, in the concrete frame, a hexagonal bolt is provided as a fastening bolt, and a through hole of a bolt shaft is provided on a plate surface, and the substrate portion is bent from one end of the substrate portion and connected. It is provided with a holding metal fitting for preventing loosening, which comprises a locking piece that engages with the side of the plate and a stopper claw that bends from the other end of the substrate portion and abuts against the side surface of the bolt head.

【0014】[0014]

【発明の実施の形態】以下、図1〜図8を参照して説明
すると、図示実施の形態は、図9,図10で示すものと
同様に、図1で示すように架台本体1が平面四角形で縦
長な梯形を呈し、踏切りの障害物センサーを立付け装備
するコンクリート架台として構成されている。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Referring to FIGS. 1 to 8, the embodiment shown in FIG. 1 is similar to that shown in FIGS. It has a rectangular and vertically long trapezoidal shape, and is configured as a concrete gantry equipped with an obstacle sensor for railroad crossings.

【0015】このコンクリート架台は、図2で示すよう
に架台本体1を三段の積上げブロック2,3,4に分
け、各段2,3,4を生コンクリートから工場内で予め
型枠成形したものにより組み立てられている。その最上
段2には、図3で示すように障害物センサーを固定支持
する四本の立付けボルト5が天面より上方に植立固定さ
れている。
In this concrete gantry, as shown in FIG. 2, the gantry main body 1 is divided into three stacked blocks 2, 3, and 4, and each of the tiers 2, 3, and 4 is preliminarily molded from a ready-mixed concrete in a factory. Assembled by things. As shown in FIG. 3, four standing bolts 5 for fixing and supporting the obstacle sensor are planted and fixed on the uppermost stage 2 above the top surface.

【0016】その積上げブロック2,3,4は、連結プ
レート6を各段2,3,4の側面に掛け渡すと共に、締
付けボルト7を連結プレート6の板面より各段2,3,
4の内部にねじ込むことにより架台本体1として組み立
てられている(図1参照)。この締付けボルト7のねじ
受けには、図4で示すようにインサート(螺合ナット)
8,9,10が各段2,3,4の側面から内部に埋込み
固定されている。
The stacking blocks 2, 3, 4 hang the connecting plate 6 on the side surfaces of the respective steps 2, 3, 4 and tighten the tightening bolts 7 from the plate surface of the connecting plate 6, respectively.
4 is assembled as a gantry body 1 by screwing into the inside of the gantry 4 (see FIG. 1). An insert (screw nut) as shown in FIG.
8, 9, and 10 are embedded and fixed from the side surfaces of the steps 2, 3, and 4, respectively.

【0017】連結プレート6としては、図5で示すよう
に各段のインサートと相応位置するボルト軸の通し穴6
a,6b,6cを板面に設けた帯状の金属プレートが備
えられている。この連結プレート6は、各段2,3,4
を三側面から固定支持する必要から三本備えられてい
る。また、インサート8,9,10は各段2,3,4の
三側面で内部に埋込み固定されている(図3参照)。
As shown in FIG. 5, the connecting plate 6 has through holes 6 of bolt shafts corresponding to the inserts of each stage.
A strip-shaped metal plate provided with a, 6b, and 6c on a plate surface is provided. This connecting plate 6 is provided in each of the stages 2, 3, 4
Are provided from the need to fixedly support from three sides. The inserts 8, 9, and 10 are embedded and fixed inside on three sides of each step 2, 3, and 4 (see FIG. 3).

【0018】各積上げブロック2,3,4は、電気ケー
ブルの挿通穴11を凹溝として形成する厚み分を保つ空
洞部12a,12b,12cを設けることにより中抜き
構造に形成されている(図4参照)。最上段2の空洞部
12aは、電気ケーブルの引込み孔11aから内部に向
かう縦穴部11bの下方からハの字状に広がるよう設け
られている。中段3,最下段4の空洞部12b,12c
は、外形形状と略相似形を呈するよう設けられている。
Each of the stacking blocks 2, 3, and 4 is formed in a hollow structure by providing hollow portions 12a, 12b, and 12c each having a thickness for forming the insertion hole 11 of the electric cable as a groove. 4). The hollow portion 12a of the uppermost stage 2 is provided so as to spread in a C-shape from below the vertical hole portion 11b extending from the drawing hole 11a of the electric cable toward the inside. Cavities 12b and 12c of middle stage 3 and bottom stage 4
Is provided so as to have a substantially similar shape to the outer shape.

【0019】電気ケーブルの挿通穴11は、図6で示す
ように電気ケーブルの引出し孔11aを最上段2の天面
中央に開孔(図3参照)するもので、各段2,3,4の
側面近く内部で凹溝11b,11c,11dとして縦方
向に連続し、最上段の中腹辺から曲面溝11eで中央方
向に湾曲し、最上段の中腹から縦穴部11fで連続させ
て天面中央の引出し孔11aに至るようインサート8,
9,10の装備されていない部位に設けられている。
As shown in FIG. 6, the insertion hole 11 of the electric cable is formed by opening a drawing hole 11a of the electric cable at the center of the top surface of the uppermost step 2 (see FIG. 3). Inside the vicinity of the side surface of the upper surface, the grooves are vertically continuous as concave grooves 11b, 11c, and 11d. Insert 8 so as to reach the extraction hole 11a of
It is provided at a part where no equipment is provided.

【0020】その挿通穴11の構成中、曲面溝11eは
170mm程度のアール形状に形成するとよい。この挿
通穴11により、最上段の引出し孔11aから導出する
電気ケーブルを障害物センサーの直下で内部に配線でき
るばかりでなく、最上段2の側面近くから縦穴部11f
に配線しても、電気ケーブルの被膜剥離等が生ずるのを
曲面溝11eで防げる。
In the configuration of the insertion hole 11, the curved groove 11e is preferably formed in a round shape of about 170 mm. With this insertion hole 11, not only the electric cable led out from the uppermost extraction hole 11a can be routed inside immediately below the obstacle sensor, but also the vertical hole portion 11f from near the side surface of the uppermost stage 2.
Even if the wiring is carried out, it is possible to prevent the peeling of the coating of the electric cable or the like by the curved groove 11e.

【0021】各段2,3,4には、上述した電気ケーブ
ルの挿通穴11を各段2,3,4の側面近くで縦方向に
連続させて設けることにより、電気ケーブルの引込み孔
(図示せず)を穿設可能な薄肉壁13a,13b,13
cが形成されている。また、この薄肉壁13a,13
b,13cを外部から特定できるよう薄肉壁の目印ライ
ン14a,14bが各段2,3,4の側面に連続させて
付形されている(図1参照)。
Each of the stages 2, 3, and 4 is provided with the above-described electric cable insertion hole 11 continuously in the vertical direction near the side surface of each of the stages 2, 3, and 4. (Not shown) can be formed in the thin walls 13a, 13b, 13
c is formed. In addition, the thin walls 13a, 13
Mark lines 14a and 14b of the thin wall are formed continuously on the side surfaces of each of the steps 2, 3 and 4 so that b and 13c can be specified from the outside (see FIG. 1).

【0022】それに加えて、上段側のブロック2,3に
は平面略四辺形の突起15a,15bが空洞部13a,
13bの下辺縁を囲うよう底面に設けられている。これ
に対し、下段側のブロック3,4には突起15a,15
bが嵌り合う切欠溝16a,16bが空洞部13b,1
3cの上辺縁を切り欠くことにより天面に設けられてい
る。その他に、インサート8,9,10が埋込み固定さ
れている三側面には連結プレート6を嵌め込む窪み部1
7a,17b,17cが各段に連続するよう設けられて
いる。
In addition, the upper blocks 2 and 3 are provided with projections 15a and 15b each having a substantially quadrangular planar shape.
13b is provided on the bottom surface so as to surround the lower edge. On the other hand, the lower blocks 3 and 4 have projections 15a and 15
The notched grooves 16a and 16b into which the “b” fits are hollow portions 13b and 1
3c is provided on the top surface by notching the upper edge. In addition, the recesses 1 into which the connection plates 6 are fitted are provided on three sides on which the inserts 8, 9, and 10 are embedded and fixed.
7a, 17b and 17c are provided so as to be continuous with each stage.

【0023】上述した締付けボルト7としては、図7で
示すように六角ボルトが備え付けられている。その締付
けボルト7には、ボルト軸7aの通し穴18aを板面に
設けた基板部18bと、基板部18bの片側端から折れ
曲がって連結プレート6の側辺に係合する掛止め片18
cと、基板部18bの他側端から折れ曲がってボルト頭
7bの側面に係合する二つのストッパ爪18d(18
e)とからなる弛み防止用の押え金具18が備えられて
いる。
As the tightening bolt 7 described above, a hexagonal bolt is provided as shown in FIG. The fastening bolt 7 has a board portion 18b provided with a through hole 18a of the bolt shaft 7a in the plate surface, and a hook piece 18 which is bent from one end of the board portion 18b and engages with the side of the connection plate 6.
c and two stopper claws 18d (18) that bend from the other end of the board portion 18b and engage with the side surface of the bolt head 7b.
e) is provided.

【0024】その締付けボルト7のインサート8として
は、内端側よりスリット8aを設けて径を拡開形成し、
複数本の刻み凹溝8bを外周面に設けたものを各積上げ
ブロック2,3,4の内部に埋め込み装着するとよい。
このインサート8では、内端側の拡開と刻み凹溝8bと
により回り止め並びに抜け外れの立付け機能を発揮でき
る。
As the insert 8 of the tightening bolt 7, a slit 8a is provided from the inner end side to expand the diameter, and
A plurality of notched grooves 8b provided on the outer peripheral surface may be embedded and mounted in the stacking blocks 2, 3, and 4, respectively.
In the insert 8, the function of preventing rotation and detachment can be exhibited by the expansion at the inner end side and the cut groove 8b.

【0025】このように構成するコンクリート架台は、
上述した各構成部から、大型のものとして高さ900m
m,天面幅300mmの正方形,下面幅450mmの正
方形で重量220Kg程度、また、小型のものとして高
さ600mm,天面幅300mmの正方形,下面幅40
0mmの正方形で重量140Kg程度の相対的に軽量な
ものに構成できる。
The concrete gantry thus constructed is
900m high from the above components
m, a square having a top surface width of 300 mm, a square having a bottom surface width of 450 mm, weighing about 220 kg, and a small device having a height of 600 mm, a square having a top surface width of 300 mm, and a bottom surface width of 40 mm.
It can be made to be a relatively lightweight one with a square of 0 mm and a weight of about 140 kg.

【0026】そのコンクリート架台は、積上げブロック
2,3,4をバラの状態で各組立部品と共に現場に搬送
できる。この際、積上げブロック2,3,4が軽量なも
のであるから少ない作業員で簡単な作業により搬送車に
昇降できる。その積上げブロック2,3,4を昇降移動
する便宜から、締付けボルト7としては吊り環を備える
アイボルトを用いるとよい。
In the concrete gantry, the stacking blocks 2, 3, and 4 can be transported in a loose state together with the respective assembly parts to the site. At this time, since the stacking blocks 2, 3, and 4 are lightweight, the stacking blocks 2, 3, and 4 can be moved up and down by a simple operation with a small number of workers. For convenience of moving the stacking blocks 2, 3, and 4 up and down, an eyebolt having a suspension ring may be used as the tightening bolt 7.

【0027】そのコンクリート架台を設置するには、ま
ず、架台本体1を所定高さまで埋め込む穴作り並びに基
礎固めを行った後、下段から上段の順に積み上げる。こ
の各段2,3の積上げは、上段2,3の突起15a,1
5bを下段3,4の切欠溝16a,16bに嵌め込むこ
とにより各段2,3,4を正確に位置合わせさせて容易
に行える。
In order to install the concrete gantry, first, a hole for embedding the gantry body 1 to a predetermined height and the foundation are hardened, and then the gantry body 1 is piled up from the bottom to the top. The stacking of the steps 2 and 3 is performed by the protrusions 15a and 1 of the upper steps 2 and 3.
By fitting 5b into the cutout grooves 16a, 16b of the lower stages 3, 4, the respective stages 2, 3, 4 can be accurately positioned and easily performed.

【0028】次に、連結プレート6を各側面の窪み17
a,17b,17cにあてがって締付けボルト7で押込
み固定する。その締付けボルト7は、押え金具18をワ
ッシャー19と共に予め軸線上に備えてインサート8,
9,10にねじ込む。また、連結プレート7は三方から
あてがい固定することにより積み上げられた各段2,
3,4を架台本体1として組立固定できる。
Next, the connecting plate 6 is inserted into the recesses 17 on each side.
a, 17b, and 17c, and push in and fix them with the tightening bolts 7. The fastening bolt 7 is provided with a presser fitting 18 and a washer 19 on the axis in advance, and the insert 8,
Screw in 9 and 10. In addition, the connecting plate 7 is applied to each step from three sides, and each step 2
3, 4 can be assembled and fixed as the gantry body 1.

【0029】その締付けボルト7のねじ込み後、図8で
示すように押え金具18の各ストッパ爪18d,18e
を基板部18bから折れ曲げて角部をボルト頭7bの側
面に係合させてストッパ爪18d,18eで挟込み支持
することにより、締付けボルト7が列車の走行に伴う振
動で弛み出すのを防げるよう取り付けられる。
After the tightening bolt 7 is screwed in, each stopper claw 18d, 18e of the holding member 18 is turned on as shown in FIG.
Is bent from the substrate portion 18b, and the corners are engaged with the side surfaces of the bolt head 7b to be sandwiched and supported by the stopper claws 18d and 18e, thereby preventing the tightening bolt 7 from being loosened by the vibration accompanying the running of the train. Attached.

【0030】その架台本体1の組立後、架台本体1を設
置する所定の高さに応じて薄肉壁13a,13b,13
cのいずれかをポンチ等で穿孔することにより電気ケー
ブルを導出する引込み孔を架台本体1の側面に設ける。
その引込み孔は、薄肉壁13a,13b,13cを目印
ライン14a,14bで特定できるから電気ケーブルの
挿通穴11と連通させて容易に開孔形成できる。
After assembling the gantry body 1, the thin walls 13a, 13b, 13
A lead-in hole for leading out an electric cable by piercing any one of c with a punch or the like is provided on a side surface of the gantry body 1.
Since the thin holes 13a, 13b, and 13c can be specified by the mark lines 14a and 14b, the drawing holes can be easily formed by communicating with the insertion holes 11 of the electric cable.

【0031】その引込み孔の穿孔まで必要な作業を行っ
た後、電気ケーブルを引込み孔から引出し孔11aまで
通すことにより挿通穴11の内部に配線し、電気ケーブ
ルを障害物センサーと接続すると共に、障害物センサー
を立付けボルト5で立付け固定し、架台本体1を所定高
さまで埋め込む等の作業を行えばよい。
After performing necessary operations up to the drilling of the drop-in hole, an electric cable is routed from the drop-in hole to the pull-out hole 11a to be routed inside the insertion hole 11, and the electric cable is connected to the obstacle sensor. Work such as mounting the obstacle sensor with the mounting bolts 5 and embedding the gantry body 1 to a predetermined height may be performed.

【0032】なお、上述した実施の形態ではコンクリー
ト架台として設置機器を踏切りの障害物センサーで説明
したが、例えば一般道における危険なカーブを知らせる
黄色の点滅信号のような埋込み設置型のコンクリートブ
ロックを架台とする各種の機器を立付け設置するものと
しても適用できる。
In the above-described embodiment, the installation equipment has been described as an obstacle sensor of a railroad crossing as a concrete mount. However, for example, an embedded installation type concrete block such as a yellow blinking signal indicating a dangerous curve on a general road is used. The present invention can also be applied to a case where various devices to be used as a stand are installed upright.

【0033】[0033]

【発明の効果】以上の如く、本発明の請求項1に係るコ
ンクリート架台に依れば、機器立付け支持用の立付けボ
ルトと、締付けボルトのインサートと、最上段の天面か
ら各段の内部に連続する電気ケーブルの挿通穴を設けて
架台本体を数段の積上げブロックに分けて形成すると共
に、各段のインサートと相応するボルト軸の通し穴を板
面に設けた帯状の連結プレートと、連結プレートを各段
の側面に掛渡し固定する締付けボルトとを備えることに
より、軽量な積上げブロックをバラの状態で各組立部品
と共に容易に現場まで搬送でき、重機を必要とせずに少
ない作業員で簡単な作業により短時間で現場に設置する
ことができる。
As described above, according to the concrete gantry according to the first aspect of the present invention, the erection bolts for supporting the erection of the equipment, the inserts of the bolster bolts, and the top of the uppermost tier are provided. With a through hole for continuous electric cable provided inside, the gantry body is divided into several stacked blocks and formed, and a strip-shaped connecting plate with through holes for bolt shafts corresponding to the inserts of each stage provided on the plate surface. And fastening bolts that bridge the connecting plate to the side surface of each stage, so that lightweight stacking blocks can be easily transported together with each assembly part in a loose state to the site, and fewer workers are needed without the need for heavy machinery It can be installed on site in a short time by simple work.

【0034】本発明の請求項2に係るコンクリート架台
に依れば、電気ケーブルの挿通穴を凹溝として形成する
厚み分を保って各段を中抜き構造に形成することによ
り、各積立ブロックをより一層軽量なものに構成するこ
とができる。
According to the concrete gantry according to the second aspect of the present invention, each of the stacked blocks is formed by forming each step into a hollow structure while maintaining the thickness for forming the insertion hole of the electric cable as a concave groove. It can be configured to be even lighter.

【0035】本発明の請求項3に係るコンクリート架台
に依れば、各段の側面近く内部で連続し、最上段の中腹
辺から中央方向に湾曲し、最上段の中腹から縦穴部で連
続させて最上段の天面中央に開孔する電気ケーブルの挿
通穴を設けることにより、電気ケーブルを機器本体の直
下で最上段の引出し孔から導出させて機器本体と確実に
接続できると共に、最上段の側面近くから中央の縦穴部
に配線しても、電気ケーブルの被膜剥離等が生ずるのを
湾曲部で防ぐことができる。
According to the concrete frame according to the third aspect of the present invention, the concrete frame is continuous near the inside of the side of each step, curved toward the center from the middle side of the uppermost step, and connected to the vertical hole from the middle side of the uppermost step. By providing an insertion hole for an electric cable that opens in the center of the top of the top, the electric cable can be led out of the top drawer directly under the main body of the equipment, and can be securely connected to the main body of the equipment. Even if wiring is carried out from the vicinity of the side surface to the central vertical hole portion, it is possible to prevent the peeling of the coating of the electric cable from occurring at the curved portion.

【0036】本発明の請求項4に係るコンクリート架台
に依れば、各段の側面近く内部で縦方向に連続する電気
ケーブルの挿通穴を設けると共に、電気ケーブルの引込
み孔を穿設可能な薄肉壁を各段に形成し、更に、その連
続する薄肉壁の目印ラインを各段の側面に付形すること
により、電気ケーブルを現場の施工条件に合わせて容易
に配線することができる。
According to the concrete gantry according to the fourth aspect of the present invention, an insertion hole for an electric cable which is continuous vertically in the vicinity of the side surface of each step and a drawing hole for the electric cable can be formed. By forming the wall in each step and forming the mark line of the continuous thin wall on the side surface of each step, the electric cable can be easily routed according to the construction conditions at the site.

【0037】本発明の請求項5に係るコンクリート架台
に依れば、平面略四辺形の突起を上段側の底面に設ける
と共に、その突起が嵌り合う切欠溝を下段側の天面に設
けることにより、各段を正確に位置合わせさせて容易に
積上げ組み立てることができる。
According to the concrete gantry according to the fifth aspect of the present invention, the substantially quadrangular planar projection is provided on the bottom surface of the upper stage, and the notch groove for fitting the projection is provided on the top surface of the lower stage. It is easy to stack and assemble each stage accurately.

【0038】本発明の請求項6に係るコンクリート架台
に依れば、連結プレートを嵌め込む窪みを各段の側面に
連続させて設けることにより、連結プレートを積上げブ
ロックの側面にあてがって締付けボルトで容易に押え込
み固定することができる。
According to the concrete frame according to the sixth aspect of the present invention, the connecting plate is provided on the side surface of the stacking block by providing a continuous recess on the side surface of each step. It can be pressed down and fixed easily.

【0039】本発明の請求項7に係るコンクリート架台
に依れば、六角ボルトを締付けボルトとして備えると共
に、ボルト軸の通し穴を板面に設けた基板部と、その基
板部の片側端から折れ曲がって連結プレートの側辺に係
合する掛止め片と、基板部の他側端から折れ曲がってボ
ルト頭の側面に当接するストッパ爪とからなる弛み防止
用の押え金具を備えることにより、締付けボルトが列車
等の走行に伴う振動で弛み出すのを確実に防ぐことがで
きる。
According to the concrete frame according to the seventh aspect of the present invention, a hexagonal bolt is provided as a tightening bolt, a board portion provided with a through hole for a bolt shaft on a plate surface, and a bent portion is bent from one end of the board portion. By providing a retaining piece for preventing loosening consisting of a latching piece that engages with the side of the connecting plate and a stopper claw that bends from the other end of the board portion and abuts against the side surface of the bolt head, the tightening bolt is It is possible to reliably prevent loosening due to vibrations caused by running of a train or the like.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係るコンクリート架台を示す斜視図で
ある。
FIG. 1 is a perspective view showing a concrete gantry according to the present invention.

【図2】図1のコンクリート架台を各積上げブロック毎
に示す側面図である。
FIG. 2 is a side view showing the concrete gantry of FIG. 1 for each stacking block.

【図3】図1のコンクリート架台を最上段の平面で示す
説明図である。
FIG. 3 is an explanatory diagram showing the concrete gantry of FIG. 1 in a top plane.

【図4】図1のコンクリート架台をA―A線で示す断面
図である。
FIG. 4 is a cross-sectional view of the concrete gantry of FIG. 1 taken along line AA.

【図5】図1のコンクリート架台を組立固定する連結プ
レートを示す平面図である。
FIG. 5 is a plan view showing a connection plate for assembling and fixing the concrete gantry of FIG. 1;

【図6】図1のコンクリート架台をB―B線で示す断面
図である。
FIG. 6 is a sectional view of the concrete gantry of FIG. 1 taken along line BB.

【図7】図1のコンクリート架台を組立固定する締付け
ボルト並びに押え金具を示す説明図である。
FIG. 7 is an explanatory view showing a tightening bolt and a holding member for assembling and fixing the concrete gantry of FIG. 1;

【図8】図13の締付けボルト並びに押え金具を組付け
状態で示す説明図である。
FIG. 8 is an explanatory view showing the fastening bolt and the holding metal of FIG. 13 in an assembled state.

【図9】一般例に係るコンクリート架台による設置機器
の取付け状態を示す斜視図である。
FIG. 9 is a perspective view showing an attached state of an installation device using a concrete gantry according to a general example.

【図10】図9のコンクリート架台による設置機器の取
付け状態を示す側面図である。
FIG. 10 is a side view showing an installation state of installation equipment by the concrete gantry of FIG. 9;

【符号の説明】[Explanation of symbols]

1 架台本体 2〜4 積上げブロック 5 機器本体の立付けボルト 6 連結プレート 7 締付けボルト 8〜10 インサート 11 電気ケーブルの挿通穴 11a 電気ケーブルの引出し孔 11b〜11d 挿通穴の凹溝 11e 挿通穴の湾曲面 11f 挿通穴の縦穴部 12a〜12c 中抜き構造の空洞部 13a〜13c 薄肉壁 14a,14b 薄肉壁の目印ライン 15a,15b 上端側の突起 16a,16b 下段側の切欠溝 17a〜17c 連結プレートあてがい用の窪み部 18 締付けボルト弛み防止用の押え金具 18a ボルト軸の通し穴 18b 押え金具の基板部 18c 押え金具の掛止め片 18d,18e 締付けボルトのストッパ爪 DESCRIPTION OF SYMBOLS 1 Stand main body 2-4 Stacking block 5 Equipment main body upright bolt 6 Connecting plate 7 Tightening bolt 8-10 Insert 11 Electric cable insertion hole 11a Electric cable lead-out hole 11b-11d Concave groove of insertion hole 11e Curved insertion hole Surface 11f Vertical hole portion of insertion hole 12a to 12c Hollow portion of hollow structure 13a to 13c Thin wall 14a, 14b Marking line 15a, 15b Upper projection 16a, 16b Lower cutout groove 17a to 17c Connecting plate Depressed part 18 Clamping bolt for preventing loosening of tightening bolt 18a Through hole of bolt shaft 18b Board part of clamp metal 18c Locking piece of clamp metal 18d, 18e Stopper nail of clamping bolt

Claims (7)

【特許請求の範囲】[Claims] 【請求項1】 踏切りの障害物センサー等を機器本体と
して立付け装備するコンクリート架台であって、機器支
持用の立付けボルトを最上段の天面に植立固定し、締付
けボルトのインサートを各段の側面から内部に埋込み固
定し、各段の内部に連続する電気ケーブルの挿通穴を最
上段の天面に開口させて設け、その構成から縦長な梯形
を呈する架台本体を数段の積上げブロックに分けて形成
すると共に、各段のインサートと相応するボルト軸の通
し穴を板面に設けた帯状の連結プレートと、連結プレー
トを各段の側面に掛渡し固定する締付けボルトとを備え
てなることを特徴とするコンクリート架台。
1. A concrete gantry in which an obstacle sensor or the like of a railroad crossing is installed upright as an equipment body, and an upright bolt for supporting equipment is planted and fixed on a top surface of an uppermost step, and an insert of a tightening bolt is attached to each of the mounts. It is embedded and fixed from the side of the step inside, and the insertion hole for the electric cable that is continuous inside each step is opened at the top of the top step, and the base body that presents a vertically long trapezoidal shape from its configuration is a stacking block of several steps And a strip-shaped connecting plate provided with through holes of bolt shafts corresponding to the inserts of the respective stages on the plate surface, and tightening bolts for fixing the connecting plates to the side surfaces of the respective stages. A concrete mount characterized by the above.
【請求項2】 電気ケーブルの挿通穴を凹溝として形成
する厚み分を保って各段を中抜き構造に形成したことを
特徴とする請求項1に記載のコンクリート架台。
2. The concrete gantry according to claim 1, wherein each step is formed in a hollow structure while maintaining a thickness for forming an insertion hole of the electric cable as a concave groove.
【請求項3】 各段の側面近く内部で連続し、最上段の
中腹辺から中央方向に湾曲し、最上段の中腹から縦穴部
で連続させて最上段の天面中央に開孔する電気ケーブル
の挿通穴を設けたことを特徴とする請求項1または2に
記載のコンクリート架台。
3. An electric cable which is continuous near the inside of the side surface of each step, curved toward the center from the middle abdominal side of the uppermost step, and continuous at the vertical hole from the middle side of the uppermost step, and is opened at the center of the top surface of the uppermost step. The concrete mount according to claim 1, wherein a through hole is provided.
【請求項4】 各段の側面近く内部で縦方向に連続する
電気ケーブルの挿通穴を設けると共に、電気ケーブルの
引込み孔を穿設可能な薄肉壁を各段に形成し、更に、そ
の連続する薄肉壁の目印ラインを各段の側面に付形した
ことを特徴とする請求項1〜3のいずれかに記載のコン
クリート架台。
4. An electric cable insertion hole which is continuous in the longitudinal direction inside the vicinity of the side surface of each step, and a thin wall through which a lead-in hole of the electric cable can be formed is formed in each step. The concrete gantry according to any one of claims 1 to 3, wherein a mark line of the thin wall is formed on a side surface of each step.
【請求項5】 平面略四辺形の突起を上段側の底面に設
けると共に、その突起が嵌り合う切欠溝を下段側の天面
に設けたことを特徴とする請求項1または2に記載のコ
ンクリート架台。
5. The concrete according to claim 1, wherein a projection having a substantially quadrangular shape in a plane is provided on a bottom surface on an upper side, and a notch groove for fitting the projection is provided on a top surface on a lower side. Mount.
【請求項6】 連結プレートを嵌め込む窪み部を各段の
側面に連続させて設けたことを特徴とする請求項1また
は2に記載のコンクリート架台。
6. The concrete gantry according to claim 1, wherein a concave portion into which the connecting plate is fitted is provided continuously on a side surface of each step.
【請求項7】 六角ボルトを締付けボルトとして備える
と共に、ボルト軸の通し穴を板面に設けた基板部と、そ
の基板部の片側端から折れ曲がって連結プレートの側辺
に係合する掛止め片と、基板部の他側端から折れ曲がっ
てボルト頭の側面に当接するストッパ爪とからなる弛み
防止用の押え金具を備えたことを特徴とする請求項1〜
6のいずれかに記載のコンクリート架台。
7. A base plate having a hexagonal bolt as a tightening bolt, a through hole for a bolt shaft provided on a plate surface, and a latching piece bent from one end of the base plate and engaged with a side of the connecting plate. And a stopper metal fitting for preventing loosening, comprising: a stopper claw which is bent from the other end of the substrate portion and abuts on a side surface of the bolt head.
7. The concrete gantry according to any one of 6.
JP2001146445A 2001-05-16 2001-05-16 Concrete mount Expired - Fee Related JP3637379B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001146445A JP3637379B2 (en) 2001-05-16 2001-05-16 Concrete mount

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001146445A JP3637379B2 (en) 2001-05-16 2001-05-16 Concrete mount

Publications (2)

Publication Number Publication Date
JP2002339325A true JP2002339325A (en) 2002-11-27
JP3637379B2 JP3637379B2 (en) 2005-04-13

Family

ID=18992101

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001146445A Expired - Fee Related JP3637379B2 (en) 2001-05-16 2001-05-16 Concrete mount

Country Status (1)

Country Link
JP (1) JP3637379B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008031647A (en) * 2006-07-26 2008-02-14 Daiichi Kosan:Kk Stand for barricade
JP2011074711A (en) * 2009-10-01 2011-04-14 Sanrekku:Kk Basic stage

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008031647A (en) * 2006-07-26 2008-02-14 Daiichi Kosan:Kk Stand for barricade
JP2011074711A (en) * 2009-10-01 2011-04-14 Sanrekku:Kk Basic stage

Also Published As

Publication number Publication date
JP3637379B2 (en) 2005-04-13

Similar Documents

Publication Publication Date Title
US20110078975A1 (en) Construction Bracket and Method of Use
US11926983B2 (en) Enclosure cover assemblies
US20130219824A1 (en) Bracket for Use With Boardwalk System
US8915038B1 (en) Dynamic concrete form
US20040040224A1 (en) Mounting of tubular steel columns on concrete base
JP6764667B2 (en) Safety fence base
JP2002339325A (en) Concrete stand
US7021022B2 (en) Attachment system and method for attaching wall or floor systems to respective floors or walls
AU2019203118A1 (en) Coupling an upper end of a hollow section column to a building unit support
US20080047213A1 (en) Suspended ceiling clip and method of use
JP6228955B2 (en) Exterior material connector and building exterior forming method
JPH0743282Y2 (en) Floor assembly structure in the corridor
JPH10331179A (en) Concrete block coupling method and metal piece for coupling
JP3024564U (en) Barricade with built-in connecting parts
KR200320198Y1 (en) Concrete form fixing tool for underground breast wall
KR200241832Y1 (en) Separation device of a mold for a structure construction
JPH019225Y2 (en)
JPS5836909Y2 (en) Elevator hoisting machine support
JP3845264B2 (en) Sleeve fixture and member fixture
JP2000120936A (en) Fixing auxiliary tool for frame
JPH11256877A (en) Attaching construction for temporary long-sized pole member
JPH0648015Y2 (en) Ceiling hanging bracket device
JP2004003168A (en) Fixing metal fitting of concrete form
JPH10121724A (en) Molding tool for slab throgh hole for piping
JPH071373Y2 (en) Partition locking metal fittings for double floors

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040706

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040906

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20041124

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20041215

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090121

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100121

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110121

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120121

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130121

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140121

Year of fee payment: 9

LAPS Cancellation because of no payment of annual fees