JP2002279191A - Predated completing process system and its method - Google Patents

Predated completing process system and its method

Info

Publication number
JP2002279191A
JP2002279191A JP2001078306A JP2001078306A JP2002279191A JP 2002279191 A JP2002279191 A JP 2002279191A JP 2001078306 A JP2001078306 A JP 2001078306A JP 2001078306 A JP2001078306 A JP 2001078306A JP 2002279191 A JP2002279191 A JP 2002279191A
Authority
JP
Japan
Prior art keywords
account
date
processing
cancellation
priority
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2001078306A
Other languages
Japanese (ja)
Other versions
JP3611110B2 (en
Inventor
Tadashi Komatsu
正 小松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HACHIJUNI BANK Ltd
Original Assignee
HACHIJUNI BANK Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HACHIJUNI BANK Ltd filed Critical HACHIJUNI BANK Ltd
Priority to JP2001078306A priority Critical patent/JP3611110B2/en
Publication of JP2002279191A publication Critical patent/JP2002279191A/en
Application granted granted Critical
Publication of JP3611110B2 publication Critical patent/JP3611110B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide settlements conforming to a predetermined priority order if funds are insufficient, while concurrently processing settlements using account during day hours. SOLUTION: The system includes a computing means 4 for computing account processing requests received by a receiving means 4 on each account day, and a file 6 for recording the results computed by the computing means 4 in the form of account information related to the sum of money that can be withdrawn on every account day. The computing means 4 includes an account processing part 8 which processes account processing requests on the account day which is the same as or prior to a computation date, based on account information on the account day, and a canceling process part 10 which, if account processing requests on a forward account date cannot be settled by the account processing, cancels the account processing requests which are lower in priority order among a plurality of account processing requests counted as settled on the account date on which settlements cannot be made.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、先日付完結処理シ
ステム及び方法に係り、特に、金融機関での預金口座等
を用いて振替等の決済を行うシステム及び方法に関し、
さらに、預金口座の残高等の共通資源に対して複数の処
理が競合する場合の最適化処理に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a future completion system and method, and more particularly, to a system and method for performing settlement such as transfer using a deposit account at a financial institution.
Further, the present invention relates to an optimization process when a plurality of processes compete for a common resource such as a balance of a deposit account.

【0002】[0002]

【従来の技術】従来より、公共料金の口座振替処理は、
自動現金預入支払機(ATM)や自動支払機(CD)及
びオンラインシステムが停止し、口座残高が確定した後
に、バッチ処理で実行されていた。すなわち、電気、ガ
ス、水道等の公共料金を指定振替日(勘定日)の前夜か
ら翌朝までの時間を利用して、口座からの出金処理(引
落処理)を行っていた。そして、残高が不足する場合
に、口座処理の種類に応じた優先順位の高い口座処理を
他の口座処理よりも優先して決済するには、例えば、税
金の支払を公共料金の支払に優先させるには、税金の支
払に関するバッチ処理を先に処理し、その後に公共料金
の支払を処理するようにしていた。
2. Description of the Related Art Conventionally, utility bill transfer processing has been
After the automatic teller machine (ATM), the automatic teller machine (CD), and the online system were shut down and the account balance was confirmed, it was executed in batch processing. That is, withdrawal processing (withdrawal processing) from the account is performed using the time from the eve of the designated transfer date (accounting date) to the next morning for utilities such as electricity, gas, and water. Then, in the case where the balance is insufficient, in order to settle the account processing with a higher priority according to the type of account processing in preference to other account processing, for example, prioritize the payment of tax over the payment of utility charges. , The batch processing related to the payment of tax is processed first, and then the payment of utility charges is processed.

【0003】夜間バッチ処理による従来例では、決済を
行う勘定日の前日夜間に処理を完了するため、勘定日の
前夜に残高が不足して決済不能となった場合には、勘定
日当日に残高が充足し決済可能となっても振替等の口座
処理を行うことができなかった。これを改善するため、
勘定日の前日に残不足で決済不能であった場合に、勘定
日当日の夜間に再度口座処理をバッチ処理にて実行して
いた。これにより、当日の入金に応じた決済を可能とし
ていた。
In the conventional example using the night batch processing, the processing is completed on the night before the day of the account to be settled. Could not be processed, such as transfer, even if the payment was satisfied. To improve this,
If settlement was not possible due to a shortage on the day before the account date, the account process was executed again in the batch process on the night of the account date. As a result, the settlement according to the deposit on the day was enabled.

【0004】特開昭59−77573号公報には、残高
が不足していた口座に対して、勘定日当日に入金があっ
た場合には、決済不能であった口座処理を即時に処理す
る手法が開示されている。すなわち、この公報には、シ
ステム運用効率を向上させることを目的として、バッチ
処理を用いずに、入金があり且つ残不足であった口座に
対してのみ再振替を試みる手法が開示されている。ま
た、特開平7−93439号公報にもほぼ同様の手法が
開示されている。
Japanese Unexamined Patent Application Publication No. 59-77573 discloses a method for immediately processing an unsettled account when an account with insufficient balance is paid on the day of the account. Is disclosed. That is, this gazette discloses a method in which, for the purpose of improving system operation efficiency, re-transfer is performed only to an account that has received money and has insufficient funds without using batch processing. Japanese Patent Application Laid-Open No. Hei 7-93439 discloses a substantially similar method.

【0005】また、近年の金融機関では、ATM等を用
いた口座からの出金(支払)や入金等を24時間稼働さ
せることが課題となっている。上記バッチ処理による口
座振替等の決済は、ATM等による入出金を停止し、残
高を静止状態とさせてからバッチ処理を行うため、入出
金を24時間稼働とすると、振替を日付変更と同時に行
わなければならなくなる。
[0005] In recent years, it has been a problem for financial institutions to operate withdrawal (payment) and deposit from an account using an ATM or the like for 24 hours. In the settlement of the account transfer etc. by the above batch processing, since the deposit and withdrawal by ATM etc. is stopped and the batch processing is performed after the balance is stopped, if the deposit and withdrawal is operated for 24 hours, the transfer is performed at the same time as the date change I have to.

【0006】この24時間稼働時の振替等の取り扱いに
ついて、例えば、特開2000-194783号公報に
は、振替等の口座処理を事前に処理しておき、勘定日当
日の午前0時に補正する手法が開示されている。すなわ
ち、この公報には、勘定日前日の残高に基づいて口座振
替後の残高を算出しておき、勘定日当日の午前0時(実
施例としては、日付変更処理後にその口座に最初にアク
セスされたとき)に補正(確定処理)をする旨開示され
ている。
[0006] Regarding the handling of transfers and the like during 24-hour operation, for example, Japanese Patent Application Laid-Open No. 2000-194784 discloses a method in which account processing such as transfers is processed in advance, and correction is made at midnight on the day of the account. Is disclosed. That is, in this publication, the balance after account transfer is calculated based on the balance on the day before the account, and at 0:00 am on the day of the account (in the embodiment, the account is first accessed after the date change process. ) Is corrected (determination process).

【0007】また、特開2000−293605号公報
には、勘定日の前日等の口座残高に不足があり、事前処
理での決済が不能であった場合には、再度口座振替を実
施する自動回収データを作成しておき、この自動回収デ
ータに基づいて再振替処理を勘定日以後に実行する手法
が開示されている。
[0007] Japanese Patent Application Laid-Open No. 2000-293605 discloses an automatic collection method in which, if there is a shortage in the account balance on the day before the account date or the like and the settlement in the pre-processing is impossible, the account transfer is performed again. A method is disclosed in which data is created in advance, and a re-transfer process is executed after the account date based on the automatic collection data.

【0008】このように、上記従来例では、振替等の口
座処理を事前に準備しておくことで、24時間連続稼働
を図る手法が開示されている。
[0008] As described above, the above-mentioned conventional example discloses a method of preparing for account processing such as transfer in advance so as to operate continuously for 24 hours.

【0009】[0009]

【発明が解決しようとする課題】しかしながら、上記従
来例では、振替等の口座処理を優先順位に基づいて実行
することができない、という不都合があった。また、残
高に不足がない場合には、優先順位の高い口座処理から
先に事前処理又はバッチ処理を実行すると、優先順位に
従った口座処理となるが、振替依頼の持ち込み等の口座
処理の準備が優先順位の順序でなされるとは限らないた
め、一貫した処理を行うことができない。さらに、残高
が不足した場合に優先順位を反映すべきであるところ、
上記従来例では、事前処理で決済した口座処理と、その
後の入出金額に応じて決済すべき口座処理とを優先順位
に従って調整することが難しい。
However, in the above conventional example, there is a disadvantage that account processing such as transfer cannot be executed based on the priority. Also, if there is no shortage of balance, if pre-processing or batch processing is executed first for account processing with higher priority, account processing according to priority will be performed, but preparation for account processing such as bringing in transfer requests will be performed. Are not always performed in the order of priority, so that consistent processing cannot be performed. In addition, where priority should be reflected in case of insufficient funds,
In the above conventional example, it is difficult to adjust the account processing settled in the pre-processing and the account processing to be settled according to the deposit and withdrawal amount according to the priority order.

【0010】特開平11−134417号公報には、我
が国での銀行勘定系の非稼働時に当該口座残高に基づい
て海外にて出金する場合に、当該口座での振替よりも海
外での出金を優先する旨が開示されている。この従来例
では、国内での口座を静止状態としつつ、海外での出金
を優先するものであり、24時間稼働に対応しつつ口座
処理の種類に応じて優先順位を反映させるものではな
い。
Japanese Unexamined Patent Publication No. Hei 11-134417 discloses that, when a bank account system is not operating in Japan, when withdrawing abroad based on the account balance, withdrawal abroad rather than transfer with the account. Is disclosed. In this conventional example, the withdrawal overseas is prioritized while keeping the domestic account stationary, and the priority order is not reflected according to the type of account processing while operating 24 hours a day.

【0011】そして、バッチ処理による従来例では、口
座残高が確定した前夜から勘定日当日のオンライン稼働
時間前までの限られた時間内に、口座振替等の全ての口
座処理を行わなければならず、口座処理のデータ量の増
加やオンライン稼働時間の延長に対応するためにはコン
ピュータ(CPU)などの機器を増強しなければならな
い、という不都合があった。
[0011] In the conventional example of batch processing, all account processing such as account transfer must be performed within a limited time from the night before the account balance is determined to the time before the online operation on the day of the account. In addition, in order to cope with an increase in the amount of data for account processing and an extension of online operation time, there has been a disadvantage that devices such as a computer (CPU) must be increased.

【0012】さらに、事前処理をしておき、日付変更と
同時に振替後の残高へと確定処理を行う例では、日付変
更時の負荷が巨大となるか、又は各口座への最初のアク
セス時に確定処理分応答が遅れてしまうため、やはり、
応答時間を確保し負荷を軽減するためにコンピュータ
(CPU)などの機器を増強しなければならない、とい
う不都合があった。
Further, in an example in which pre-processing is performed and the settlement processing is performed on the balance after the transfer at the same time as the date change, the load at the time of the date change becomes huge, or the settlement is performed at the first access to each account. Since the processing response is delayed,
There is an inconvenience that devices such as a computer (CPU) must be increased in order to secure a response time and reduce a load.

【0013】[0013]

【発明の目的】本発明は、係る従来例の有する不都合を
改善し、特に、24時間稼働を行うために、ATM等の
端末を用いた入出金等のオンライン処理と並列して口座
振替や融資返済等の種々の取引を処理しつつ、口座残高
に不足があった場合には口座振替等の種別に応じた優先
順位に基づいて優先順位の高い口座処理の決済を優先す
ることのできる先日付完結処理システム及び方法を提供
することを、その目的とする。
The object of the present invention is to improve the disadvantages of the conventional example, and in particular, in order to operate 24 hours a day, in parallel with online processing such as depositing and withdrawing using a terminal such as an ATM, account transfer and financing. While processing various transactions such as repayment, if there is a shortage in the account balance, a future date that can prioritize the settlement of account processing with high priority based on the priority according to the type of account transfer etc. It is an object to provide a complete processing system and method.

【0014】[0014]

【課題を解決するための手段】本発明では、その前提と
して、先日付完結処理を用いる。すなわち、本発明で
は、先日付の口座処理をその勘定日を迎える前に実行
し、勘定日別の口座情報(例えば、残高)を保有する。
そして、先日付が当日となった瞬間に参照すべき口座情
報を変化させる。例えば、2日の時点で3日を勘定日と
する口座処理を2日の最終残高に基づいて計算してお
き、2日の残高と3日の残高とを2日の時点で個別に保
有する(勘定日別の口座情報)。2日当日では、口座名
義人が先日付である3日の残高を直接利用することはで
きない。そして、2日から3日になった瞬間に、すなわ
ち、日付変更処理が完了した時点で、予め計算しておい
た3日の残高を用いる。このように、2日の時点で3日
の口座処理を計算し、3日の残高を算出しておくこと
で、2日の時点で3日の口座処理は完結している。日付
変更後の確定処理等は不要である。
According to the present invention, a pre-date completion process is used as a premise. That is, in the present invention, the account processing of the future date is executed before the account date, and account information (for example, balance) for each account date is retained.
Then, the account information to be referred to at the moment when the future date becomes the current day is changed. For example, the account processing with 3 days as the account date at 2 days is calculated based on the final balance of 2 days, and the balance of 2 days and the balance of 3 days are individually held at 2 days. (Account information by account date). On the second day, the account holder cannot directly use the balance of the third day, which is the future date. At the moment from the second day to the third day, that is, at the time when the date change process is completed, the balance calculated on the third day is used. As described above, the account processing for three days is calculated at the time of two days, and the balance of three days is calculated, whereby the account processing for three days is completed at the time of two days. No confirmation processing after the date change is required.

【0015】本発明では、先日付での口座情報を先日付
の勘定日毎に生成しておくことで、事前処理によって先
日付の口座処理を完結させる。そして、先日付の日時に
至るまでに口座残高の異動や利率や契約内容の変更があ
った場合には、その変更を先日付での残高に反映させ
る。すなわち、本発明では、現在の口座情報に基づい
て、その後に口座処理が無い場合の先日付での残高を生
成しておき、その先日付の残高に基づいて先日付の口座
処理を実行しておくことで、従来バッチ処理で行ってい
た口座処理をオンライン処理中に並行して処理する。こ
れは、現在処理する口座処理を、先日付の日時が到来す
るまでの最終の口座処理と仮定し、当該先日付の残高等
を予め計算する処理である。その後、先日付の勘定日が
至る前に別の口座処理があった場合には、再度その口座
処理が最終の口座処理であると仮定し、先日付の残高等
を算出する。
In the present invention, the future date account processing is completed by pre-processing by generating the future date account information for each future date account date. Then, if there is a change in the account balance, a change in the interest rate, or a change in the contract content before the date and time of the future date, the change is reflected on the balance in the future date. That is, according to the present invention, based on the current account information, a future-dated balance in the case where there is no subsequent account processing is generated, and the future-dated account processing is executed based on the future-dated balance. By doing so, account processing conventionally performed in batch processing is processed in parallel during online processing. This is a process in which the current account processing is assumed to be the last account processing until the date and time of the future date arrives, and the balance and the like of the future date are calculated in advance. Thereafter, if another account process is performed before the future date account date, it is assumed that the account process is the final account process again, and the future date balance or the like is calculated.

【0016】先日付完結処理の原理は、現時点での情報
に基づいて、その後の変化が無いとした場合の、将来の
口座情報を生成しておく点にある。その後に口座処理が
無い場合や、自動定期化サービスにて普通預金口座から
定期預金へ入金する契約に変更が無い場合や、小切手の
資金化について不渡の連絡が無い場合を想定して、その
前提での先日付の口座情報を予め算出しておく。先日付
の処理であるため、口座名義人がその先日付の残高を直
接に用いて取引をすることができず、従って、先日付処
理については取消を行うことができる。
The principle of the pre-date completion processing is to generate future account information based on information at the present time, assuming that there is no subsequent change. Assuming that there is no account processing afterwards, that there is no change in the contract for depositing from the savings account to the time deposit with the automatic periodic service, or that there is no notification of non-delivery about the check funding, Is calculated in advance. Because of the future date processing, the account holder cannot directly make a transaction using the future date balance, and therefore the future date processing can be canceled.

【0017】決済は、取消ができない資金移動等が行わ
れたときに完了する。この決済の完了性(ファイナリテ
ィ)は、取消不能な状態の確定に依存する。先日付完結
処理では、先日付にて一旦成立した口座処理は、未だ決
済完了性を有さない。その後に他の口座処理がなけれ
ば、勘定日当日へと日付変更した時に決済は完了する。
このように、先日付完結処理は、先日付の口座処理を実
行し、先日付の勘定日での残高を算出したことで、その
後に当該勘定日での口座処理がないとした前提で、完結
している。そして、当該勘定日にて再度口座処理が生じ
たのであれば、先日付での口座処理(取引)はファイナ
リティを有しないため、取消や再実行(再カット)を行
うことができる。必要な取消や再カットが完了した時点
で、その口座に対する口座処理は完結する。
The settlement is completed when an irrevocable money transfer or the like is performed. The finality of the settlement depends on the determination of the irrevocable state. In the future date completion process, the account process once established on the future date does not yet have settlement completeness. If there is no other account processing thereafter, the settlement is completed when the date is changed to the account day.
As described above, the future completion processing is performed on the assumption that there is no account processing on the account date after executing the account processing on the future date and calculating the balance on the account date on the future date. are doing. Then, if the account processing occurs again on the account date, the account processing (transaction) on the future date has no finality, and therefore can be canceled or re-executed (re-cut). When the necessary cancellation or recut is completed, account processing for the account is completed.

【0018】このように、先日付完結処理では、特に先
日付の処理について、口座処理の再構築や入れ替え等の
最適化が可能である。別の表現をすると、ある順序に従
ってデータを並べ替えるように、口座処理(トランザク
ション)を並べ替えることができる。これを決済の分野
で説明すると、すべての決済を行うには残高が不足して
しまう場合に、予め定められた優先すべき決済を優先し
て処理することができることとなる。
As described above, in the future date completion processing, especially for the future date processing, it is possible to optimize the restructuring and replacement of the account processing. Stated another way, account transactions (transactions) can be reordered to reorder data according to an order. To explain this in the field of settlement, when the balance becomes insufficient to perform all settlements, it is possible to preferentially process predetermined settlements to be prioritized.

【0019】そして、先日付完結処理では、口座に異動
がある毎に口座処理を行い、その口座処理は完結するた
め、先日付の日時を迎える前後、すなわち、日付変更時
にはなんら処理を行う必要がない。このため、オンライ
ン処理の終了後にバッチ処理にて口座処理を行う必要が
なくなり、また、バッチ処理を所定の時間内に完了させ
るためにCPUを増強する必要がない。
In the future date completion processing, the account processing is performed every time there is a change in the account. Since the account processing is completed, no processing needs to be performed before and after the future date and time, that is, when the date is changed. Absent. Therefore, there is no need to perform account processing in batch processing after the online processing is completed, and it is not necessary to increase the number of CPUs to complete the batch processing within a predetermined time.

【0020】現在の状態からの変化には、続く口座処理
が無いという前提のみならず、先日付で契約する定期預
金や口座に元加する利息の利率が現在に判明していて、
その後に変更がないという前提(変更が有った場合に
は、再度口座処理を実行する)などが含まれる。このた
め、先日付完結処理を行うことのできる対象は数多い。
通常の普通預金口座や当座預金口座に対する種々の口座
処理や、ある条件に応じたオプションの行使や、先物取
引を口座で決済する場合に、期日での額が定まっている
場合の差額の算出及び決済や、住宅ローンの特別な増額
返済のための普通預金口座からの出金の予約などについ
ても、先日付完結処理としてオンライン処理中に実行す
ることができる。
The change from the current state is based not only on the assumption that there is no subsequent account processing, but also on the interest rate of the term deposit and the interest added to the account which are contracted at a future date.
It is assumed that there is no change after that (if there is a change, account processing is executed again). For this reason, there are many targets for which the future date completion processing can be performed.
Various account processing for ordinary savings account and checking account, exercise of options according to certain conditions, calculation of the difference when the amount at the due date is fixed when settlement of futures transactions with the account and Payments and reservations for withdrawals from a savings account for a special repayment of a mortgage can also be performed during online processing as a post-finish process.

【0021】さて、先日付完結処理では、先日付での口
座残高を算出した後に、現在の口座残高からATM等で
出金された場合には、先日付の口座残高を当該出金額分
減額する。この減額により、先日付で成立していた口座
処理が決済不能となる場合がある。本発明の第1群(第
1実施形態)では、先日付の口座処理が決済不能となっ
た場合の取消に関して、優先順位を反映させる。
In the future date completion processing, after the account balance at the future date is calculated, if the current account balance is paid out by an ATM or the like, the future day's account balance is reduced by the withdrawal amount. . Due to this reduction, the account processing established on the previous date may not be able to be settled. In the first group (first embodiment) of the present invention, the priority is reflected in the cancellation when the account processing of the future date becomes unsettled.

【0022】一方、先日付の口座残高が不足で先日付で
の口座処理が決済不能であった場合に、現在の口座残高
にATM等で入金された場合には、当該未成立の口座処
理の再カットを試みる。本発明の第2群(第2実施形
態)では、この再カットに関して、優先順位を反映させ
る。この再カットでの優先順位の反映は、当日について
も適用できる。
On the other hand, if the account balance at the future date is insufficient and the account processing at the future date cannot be settled, and if the current account balance is paid by an ATM or the like, the unaccounted account processing is not performed. Try re-cutting. In the second group (second embodiment) of the present invention, the priority is reflected on the recut. The reflection of the priority in the recut can be applied to the same day.

【0023】本発明の第4群(第4実施形態)では、先
日付にて取消と再カットとを組み合わせることで、口座
処理の入れ替えを行う。第3実施形態では、口座処理に
限定せず、口座の残高のような共通資源に対して競合す
るトランザクション並べ替え(入れ替え)による最適化
について開示する。第3実施形態と第4実施形態では動
作原理は共通している。
In the fourth group (fourth embodiment) of the present invention, account processing is switched by combining cancellation and re-cutting at a future date. In the third embodiment, optimization by transaction rearrangement (replacement) competing for common resources such as account balances is disclosed, without being limited to account processing. The operating principle is common between the third embodiment and the fourth embodiment.

【0024】第1群の発明では、主に、勘定日の取引等
の口座処理要求を受信する受信手段と、この受信手段に
て受信した口座処理要求を勘定日毎に演算する演算手段
と、この演算手段によって演算される結果を前記勘定日
毎の出金可能額等と関連した口座情報として記録するフ
ァイルとを備えている。そして、演算手段が、当該演算
を行う演算日に対して同日又は先日付となる勘定日の口
座処理要求を当該勘定日の口座情報に基づいて処理する
口座処理部と、この口座処理部による口座処理によって
先日付の勘定日での口座処理要求が決済不能となる場合
には当該決済不能となる勘定日での複数の決済済みの口
座処理要求のうち優先順位の低い口座処理要求を当該優
先順位の低い順序にて取り消す取消処理部とを備えた、
という構成を採っている。これにより上記課題を解決し
ようとするものである。
In the first group of inventions, mainly, a receiving means for receiving an account processing request such as a transaction on an account date, an arithmetic means for calculating the account processing request received by the receiving means for each account date, A file for recording the result calculated by the calculation means as account information related to the possible withdrawal amount and the like for each account date. An arithmetic processing unit configured to process an account processing request for an account date on the same day or a future date as to the arithmetic day on which the arithmetic is performed based on the account information on the account date; If the processing makes it impossible to settle the account processing request on the future account date, the lower priority account processing request among the multiple settled account processing requests on the account date that cannot be settled is set as the priority. With a cancellation processing unit that cancels in the order of
The configuration is adopted. This aims to solve the above problem.

【0025】第1群の発明では、先日付の口座処理でフ
ァイナリティを有さない口座処理について、取消が必要
な場合に、口座処理による取引金額に関わらず、優先順
位の低い順に取り消す。これにより、優先順位の高い取
引を実行することができる。
According to the first group of inventions, when an account process that does not have finality in the account process of the future date needs to be canceled, it is canceled in ascending order of priority regardless of the transaction amount due to the account process. Thereby, high-priority transactions can be executed.

【0026】第2群の発明では、勘定日の取引等の口座
処理要求を受信する受信手段と、この受信手段にて受信
した口座処理要求を勘定日毎に演算する演算手段と、こ
の演算手段によって演算される結果を前記勘定日毎の出
金可能額等と関連した口座情報として記録するファイル
とを備えている。そして、前記演算手段が、当該演算を
行う演算日に対して同日又は先日付となる勘定日の口座
処理要求を当該勘定日の口座情報に基づいて処理する口
座処理部と、この口座処理部による口座処理によって当
該口座処理の勘定日と同日又は先日付の勘定日で未成立
であった口座処理要求が決済可能となる場合には当該決
済可能となる勘定日での複数の未決済の口座処理要求の
うち優先順位の高い口座処理要求を当該優先順位の高い
順序にて処理する再カット処理部とを備えた、という構
成を採っている。これにより前述した課題を解決しよう
とするものである。
In the second group of inventions, receiving means for receiving an account processing request such as a transaction on an account date, calculating means for calculating the account processing request received by the receiving means for each accounting day, and this calculating means And a file for recording the calculated result as account information related to the possible withdrawal amount and the like for each account date. And an account processing unit for processing the account processing request on the account date that is the same day or a future date with respect to the calculation date on which the calculation is performed based on the account information on the account date. If account processing requests that cannot be completed on the same day as the account processing account date or on the future date can be settled, a plurality of unsettled account processes on the account date that can be settled And a recut processing unit for processing an account processing request having a higher priority among the requests in the order of the higher priority. This aims to solve the above-mentioned problem.

【0027】第2群の発明では、口座に異動があったと
きに、優先順位の高い順に決済可能性を判定し、決済可
能である場合には、優先順位の低い口座処理の組み合わ
せに関わらず、優先順位の高い口座処理を再カットす
る。これにより、すべての決済を行うには残高が不足す
る場合に、優先順位の高い決済を優先して処理する。
In the second group of inventions, when an account is transferred, the possibility of settlement is determined in descending order of priority, and if settlement is possible, regardless of the combination of account processing of lower priority. Re-cut, high priority account processing. Thereby, when the balance is insufficient for performing all the settlements, the settlement with the higher priority is preferentially processed.

【0028】「口座処理」は、例えば、金融機関の個人
向けの普通口座を例とすると、給与振込等の口座への振
込(入金)や、公共料金の自動引落のような口座からの
振替(出金)や、融資の返済や家賃の引落などの自動引
落(出金)などである。また、法人等を例とすると、
「口座処理」は、各種支払の振込予約や、給与支払のた
めの引落や、口座引落で集金した家賃の入金などであ
る。これら種々の内容の口座処理を扱うようにしても良
いし、例えば振込などは別の演算手段にて扱い、公共料
金の振替のみを本発明による先日付完結処理システムで
扱うようにしても良い。また、証券取引用の口座を例と
すると、「口座処理」は、株取引に要した資金の決済
や、金融商品の自動的な購入などが該当する。このよう
に、「口座処理」には、まず、商取引の決済手法の種々
の態様が含まれる。この決済の対象は単一の通貨のみな
らず、例えば先日付での為替レートを予め取引者間で定
めておくことができれば、外為取引に応用することもで
きる。さらに、決済の対象は、通貨を扱う口座のみなら
ず、例えば商品やサービスの販売時に付加するポイント
値(マイレージポイント)でも良い。さらに「口座処
理」には、その口座の属性を設定又は変更する処理を含
めるようにしても良い。例えば、定期の自動更新に応じ
た自動融資極度額の変更や、長期ローンでの変動金利と
固定金利とのスワップの予約等を含めるようにしても良
い。また、ATMやCDや金融機関の店舗の窓口端末に
よる現金の入金や出金は即時の口座処理であり、演算日
と勘定日が一致する。
In the "account processing", for example, assuming an ordinary account for an individual of a financial institution as an example, a transfer (payment) to an account such as a salary transfer, or a transfer from an account such as an automatic withdrawal of a utility bill ( Withdrawal) and automatic withdrawal (withdrawal) such as loan repayment and rent withdrawal. In the case of a corporation, for example,
The “account processing” includes reservations for various kinds of payments, deductions for salary payments, and payment of rent collected by an account withdrawal. The account processing of these various contents may be handled, for example, the transfer may be handled by another arithmetic means, and only the transfer of the utility bill may be handled by the future completion processing system according to the present invention. Further, assuming an account for securities trading as an example, the “account processing” corresponds to settlement of funds required for stock trading, automatic purchase of financial products, and the like. As described above, the “account processing” first includes various aspects of the settlement method of the commercial transaction. The settlement target is not limited to a single currency. For example, if the exchange rate at the future date can be determined in advance between traders, it can be applied to forex trading. Further, the settlement target may be not only an account dealing with currency, but also, for example, a point value (mileage point) added at the time of selling a product or service. Further, the “account process” may include a process of setting or changing the attribute of the account. For example, a change in the maximum amount of automatic financing according to a periodic automatic update, a swap reservation between a floating interest rate and a fixed interest rate in a long-term loan, and the like may be included. Payment and withdrawal of cash by an ATM, a CD, or a counter terminal of a store of a financial institution are immediate account processes, and the calculation date and the account date coincide.

【0029】上記ファイルには、預金・融資等の取引履
歴や、現在の残高や、口座に定義された自動融資可能額
(貸越極度)などの口座に関する情報が格納されてい
る。「口座情報」というときには、主に残高情報を意味
する。残高情報は、口座処理要求が決済可能であるか又
は決済不能であるかを判定するための数値であり、例え
ば、定期預金等を担保とする自動融資が無い場合には実
際の残高で、定期預金等を担保とする自動融資が付随す
る場合には、自動融資可能額(貸越極度)と実際の残高
とを加算した額を出金可能額としても良い。定期預金等
を担保とする自動融資を行う場合には、口座情報として
担保明細等の属性情報を持つようにすると良い。
The above-mentioned file stores information on accounts such as transaction history of deposits and loans, the current balance, and the amount of automatic financing defined in the account (extreme overdraft). The term "account information" mainly means balance information. The balance information is a numerical value for determining whether the account processing request can be settled or cannot be settled. When an automatic loan with a deposit or the like as a collateral is attached, an amount obtained by adding the automatic loan possible amount (extreme overdraft) and the actual balance may be used as the payable amount. When performing automatic financing with time deposits and the like as collateral, it is preferable to have attribute information such as collateral details as account information.

【0030】演算手段は、例えば、口座処理要求として
入金があった場合には、現在の残高を読み出して、入金
額を加算し、ファイルを更新する。
For example, when there is a deposit as an account processing request, the calculating means reads the current balance, adds the deposit amount, and updates the file.

【0031】本発明では、口座処理部が、演算を行う演
算日に対して同日又は先日付となる勘定日の口座処理要
求を当該勘定日の口座情報に基づいて処理する。そし
て、ファイルには、口座処理部の処理結果が当該口座処
理の勘定日での口座情報として格納される。
According to the present invention, the account processing unit processes an account processing request for an account date on the same day or a future date with respect to the calculation day on which the calculation is performed, based on the account information of the account day. Then, the processing result of the account processing unit is stored in the file as account information on the account date of the account processing.

【0032】「勘定日」は、取引を行う日である。現状
の金融機関で取り扱う取引の実行時期の指定は「日」で
あるため、日を単位としている。「勘定日」は、複数の
口座処理が競合する単位である。第1の口座処理の勘定
日が1日のみで、第2の口座処理の勘定日が2日のみの
場合、この2つの口座処理は競合しない。1日の残高に
基づいて第1の口座処理要求が処理され、2日の残高に
基づいて第2の口座処理要求が処理される。特定日の残
高から引落を行うという契約によると、この2つの口座
処理要求間には優先順位は適用されない。2日に第3の
口座処理要求も存在する場合、第2の口座処理要求と第
3の口座処理要求とが競合する。第2の口座処理要求の
優先順位が第3の口座処理要求の優先順位よりも高けれ
ば、第2の口座処理要求を優先して処理する。また、例
えば、第2の口座処理要求の出金額が20,000で、
第3の口座処理要求の出金額が10,000で、2日の
口座残高が15,000である場合、優先順位の高い第
2の口座処理要求は決済できない。従って、決済できる
第3の口座処理要求を決済する。その後、先日付での2
日の残高が6,000増加した場合、第3の口座処理要
求を取り消せば、第2の口座処理要求の決済が可能とな
る。この例では、第2の口座処理要求を再カット(修正
再カット)して、第3の口座処理要求を取り消す。この
ような再カットと取消との関係は、第3実施形態及び第
4実施形態にて開示される。
The “account date” is a date on which a transaction is performed. Since the execution time of transactions currently handled by financial institutions is specified as "days", the unit is days. The “account date” is a unit in which a plurality of account processes compete. If the account date for the first account transaction is only one day and the account date for the second account transaction is only two days, the two account transactions do not conflict. A first account processing request is processed based on the daily balance and a second account processing request is processed based on the two day balance. According to the contract to debit from the balance on a particular day, no priority is applied between the two account processing requests. If there is also a third account processing request on the second day, the second account processing request conflicts with the third account processing request. If the priority of the second account processing request is higher than the priority of the third account processing request, the second account processing request is processed with priority. Also, for example, if the withdrawal amount of the second account processing request is 20,000,
If the withdrawal amount of the third account processing request is 10,000 and the account balance of the second day is 15,000, the second account processing request having a higher priority cannot be settled. Therefore, the third account processing request that can be settled is settled. Then 2
If the balance of the day increases by 6,000, the third account processing request can be canceled and the second account processing request can be settled. In this example, the second account processing request is recut (corrected recut), and the third account processing request is canceled. Such a relationship between the recut and the cancellation is disclosed in the third embodiment and the fourth embodiment.

【0033】このように、口座処理要求が競合する期間
の単位が「勘定日」である。そして、より具体的には、
「勘定日」は、例えば、口座処理が振替であれば振替日
である。融資の返済であれば「約定返済日」が勘定日で
あると考える。給与振込であれば振込日が勘定日に相当
する。本明細書では、これら種々の口座処理要求に指定
される取引実行日を「勘定日」と呼ぶ。「演算日」は演
算を行う「当日」であり、「現在」ともいう。
As described above, the unit of the period in which the account processing requests compete is the “account date”. And more specifically,
The “account date” is, for example, a transfer date if the account processing is a transfer. If the loan is repaid, the "settlement repayment date" is considered to be the account date. In the case of payroll transfer, the transfer date corresponds to the account date. In this specification, the transaction execution dates specified in these various account processing requests are referred to as “account dates”. The “calculation date” is the “current day” on which the calculation is performed, and is also referred to as “present”.

【0034】本発明では、演算日時に対して先日付とな
る勘定日での口座処理要求を、演算日時の段階で処理す
る。その処理結果を、演算日時に対して先日時となる勘
定日での口座情報として格納する。したがって、口座情
報は、口座処理要求がなされた勘定日別に生成され、管
理される。例えば、演算日時の残高と、先日付での処理
を行った将来の残高との情報がファイルに格納される。
この将来の残高は、今までに行った口座処理の後、口座
処理がないままその勘定日が到来しときの、その勘定日
の残高である。このため、日付が変更したときに、その
日付変更の前後でなんら処理を行うことなく、当該勘定
日に行うべき口座処理を完了した状態で、新たに迎えた
日付での残高が確定する。
In the present invention, an account processing request on an account date that is a future date with respect to the calculation date and time is processed at the calculation date and time stage. The result of the processing is stored as account information on the account date that is earlier than the calculation date and time. Accordingly, account information is generated and managed for each account date on which an account processing request was made. For example, information on the balance at the calculation date and time and the future balance after the processing on the future date is stored in the file.
This future balance is the balance of the account day when the account date arrives without account processing after the account processing performed so far. Therefore, when the date is changed, the balance on the newly arrived date is determined without any processing before and after the date change, and with the account processing to be performed on the account date completed.

【0035】例えば、先日付である勘定日が、演算日時
の翌営業日であったとする。そして、翌営業日を勘定日
とする振替等の口座処理要求をその翌営業日(振替日,
勘定日)の前日に演算する。演算した結果、現在の残高
と、翌営業日の残高とが個別にファイルに格納される。
その後、当該口座に対して残高の変動をもたらす処理が
行われなかったとすると、本日から明日へ日付変更した
段階で、引落(出金)が確定し、新たな残高に基づいた
処理が可能となる。従って、午前0:00を過ぎた瞬間
に、口座振替後の新たな残高に基づいた処理を行うこと
ができる。出金の確定は、その出金が決済完了性を有す
るということである。
For example, it is assumed that the account date which is the future date is the business day following the calculation date and time. Then, an account processing request such as transfer with the next business day as the account date is sent to the next business day (transfer date,
Calculate the day before (account date). As a result of the calculation, the current balance and the balance on the next business day are individually stored in a file.
Thereafter, assuming that a process that causes a change in the balance is not performed on the account, at the stage where the date is changed from today to tomorrow, the withdrawal (withdrawal) is determined, and a process based on the new balance becomes possible. . Therefore, at the moment after 0:00 am, processing based on the new balance after the account transfer can be performed. Confirmation of withdrawal means that the withdrawal has settlement completeness.

【0036】第3群の発明では、業務処理要求(また
は、口座処理要求)の実行可否を定める資源の状態を一
定期間別に先日付で記録した資源状態ファイルと、この
資源状態ファイルに記録された情報に基づいて各業務処
理要求を処理する演算手段とを備えている。そして、資
源状態ファイルは、資源の状態を過去から現在並びに将
来となる先日付まで日単位等の一定期間毎(例えば、勘
定日毎)に格納する資源明細セグメント(例えば、残高
明細セグメント)と、過去又は先日付で成立した業務処
理要求を当該業務処理の優先順位付きで成立順に格納す
る取引明細セグメントと、先日付にて資源不足で未成立
の業務処理要求を当該優先順位付きで格納する未成立明
細セグメント(例えば、残不足明細セグメント)とを備
えている。そして、前記演算手段は、前記業務処理要求
を実行すると共に当該業務処理要求が成立した場合には
前記取引明細セグメントに記録する一方、前記資源の不
足で未成立の場合には前記未成立明細セグメントに記録
する業務処理部(または、口座処理部)と、この業務処
理部による処理の結果先日付にて前記資源に不足が生じ
た場合には当該不足が生じた期間内で前記取引明細セグ
メントに記録された業務処理要求群から優先順位の低い
順に前記資源不足が解消するまで順次業務処理要求を取
り消す取消処理部と、前記業務処理部による処理の結
果、当日又は先日付にて資源が増加した場合には当該増
加した期間以後で前記未成立明細セグメントに記録され
た業務処理群から前記資源不足とならない利用可能資源
の範囲内で前記未成立の業務処理要求を優先順位の高い
順に実行する再実行処理部とを備えた、という構成を採
っている。これにより前述した課題を解決しようとする
ものである。
In the third group of inventions, a resource status file in which the status of a resource that determines whether a business process request (or an account process request) can be executed or not is recorded for a certain period of time at a future date, and the resource status file is recorded in the resource status file. Computing means for processing each business processing request based on the information. The resource status file includes a resource detail segment (for example, a balance detail segment) that stores the resource status from the past to the present and future future dates for each fixed period (for example, for each accounting day) such as a daily unit. Alternatively, a transaction detail segment that stores business processing requests that were completed on a prior date with the priority of the business processing in the order of completion, and a business processing request that stores unsatisfied business processing requests with a shortage of resources on a future date with the priority And a detailed segment (for example, a remaining shortage detailed segment). The computing means executes the business processing request and records the business processing request in the transaction detail segment when the business processing request is satisfied. The business processing unit (or account processing unit) to be recorded in the transaction processing unit (or the account processing unit). A cancellation processing unit for sequentially canceling the business processing request from the recorded business processing request group in the order of lower priority until the resource shortage is resolved, and as a result of the processing by the business processing unit, the resource has increased on the current day or the future date In this case, after the increased period, the uncompleted business process within a range of available resources that does not cause the resource shortage from the business process group recorded in the uncompleted detailed segment. Request and a re-execution processing unit for executing the order of priority, and employs a configuration that. This aims to solve the above-mentioned problem.

【0037】この発明では、業務処理部は、先日付にて
成立した業務処理を取引明細セグメントに記録し、未成
立の場合には、未成立明細セグメントに記録する。そし
て、取消処理部は、業務処理の結果、資源に不足が生じ
た勘定日がある場合にはその勘定日に成立している業務
処理のうち、優先順位の最も低い業務処理を取引明細セ
グメントから抽出し、その優先順位の低い業務処理を取
り消す。この取消は、資源不足が解消するまで繰り返し
実行する。また、再実行処理部は、当日又は先日付での
業務処理の結果、資源が増加した場合には、未成立明細
セグメントに記録された業務処理要求のうち、優先順位
の高い順に再実行が可能であるか否かを判定し、再実行
が可能であれば未成立であった業務処理を再実行する。
さらに、再実行後の資源に基づいて次に優先順位の高い
業務処理の再実行を行う。これを資源不足とならない範
囲内で繰り返す。これらにより、資源の増減に応じて、
優先順位の高い業務処理を優先順位の低い業務処理に優
先して実行する。
According to the present invention, the business processing unit records the business process completed on the previous date in the transaction detail segment, and if not completed, records the business process in the uncompleted detail segment. Then, as a result of the business process, if there is an account date on which the resource is insufficient, the business process with the lowest priority among the business processes established on the account date is selected from the transaction statement segment. Extract and cancel business processes with lower priorities. This cancellation is repeatedly performed until the resource shortage is resolved. In addition, the re-execution processing unit can re-execute in the order of the highest priority among the business processing requests recorded in the unsuccessful detailed segment, when the resource increases as a result of the business processing on the current day or the future date. Is determined, and if re-execution is possible, the unexecuted business process is re-executed.
Further, based on the re-executed resources, the next highest priority business process is re-executed. This is repeated within a range that does not cause resource shortage. With these, according to the increase and decrease of resources,
A higher priority business process is executed prior to a lower priority business process.

【0038】また、第3及び第4実施形態では、優先順
位の高い未成立の業務処理よりも優先順位の低い成立済
みの業務処理がある場合、優先順位の低い成立済みの業
務処理を取り消して、優先順位の高い業務処理を再実行
することで、成立させる業務処理(トランザクション)
を入れ替える修正再実行(修正再カット)処理を開示す
る。
Further, in the third and fourth embodiments, when there is an established business process having a lower priority than an unestablished business process having a higher priority, the established business process having a lower priority is canceled. Business processes (transactions) that are established by re-executing business processes with higher priorities
And a correction re-execution (correction re-cut) process for replacing.

【0039】第4群の発明では、勘定日の取引等の口座
処理要求を受信する受信手段と、この受信手段にて受信
した口座処理要求を勘定日毎に演算する演算手段と、こ
の演算手段によって演算される結果を前記勘定日毎の出
金可能額等と関連した口座情報として記録するファイル
とを備えている。そして、前記ファイルが前記口座情報
として、前記勘定日毎の残高を格納する残高明細セグメ
ントと、前記口座処理部による処理順序で処理した前記
口座処理要求を取引明細として勘定日及び優先順位を含
めて格納する取引明細セグメントと、決済不能で未成立
の口座処理要求を残不足明細として勘定日及び優先順位
を含めて格納する残不足明細セグメントとを備えてい
る。さらに、前記演算手段は、前記勘定日毎の残高を使
用した出金又は入金の決済を要求する口座処理要求を起
動業務として実行すると共に当該実行中の起動業務プロ
グラム群と単一のトランザクションとしての連動を所定
の受動業務処理部に依頼する起動業務処理部と、この起
動業務処理部によって連動依頼される前記勘定日毎の口
座残高の出金又は入金等の受動業務を前記各セグメント
を用いて実行すると共に当該受動業務の実行によって前
記勘定日毎の残高明細が変化した場合には所定の取消再
カットメインプログラムを当該起動業務及び受動業務が
連動した単一のトランザクションとは異なる他の派生ト
ランザクションとして起動する受動業務処理部と、取消
再カットメインプログラムが派生トランザクションとし
て起動されたときに当該起動された際の前記各セグメン
トの状態に基づいて前記起動業務の取消又は再カットの
要否を判定すると共に当該判定結果と各起動業務となる
口座処理要求の優先順位とに基づいて前記起動業務の取
消又は再カットを当該取消再カットメインプログラムと
は異なる他の派生トランザクションとして前記起動業務
処理部に実行させる取消再カットメイン処理部とを備え
ている。
In the fourth group of inventions, receiving means for receiving an account processing request such as a transaction on an account date, calculating means for calculating the account processing request received by the receiving means for each accounting day, and this calculating means And a file for recording the calculated result as account information related to the possible withdrawal amount and the like for each account date. Then, the file stores the account information as the account information, a balance statement segment storing the balance for each account date, and the account processing request processed in the processing order by the account processing unit, including the account date and priority as a transaction statement. And a remaining shortage detail segment that stores account processing requests that cannot be settled and that have not been completed, including remaining dates and priorities, as remaining shortage details. Further, the calculating means executes an account processing request for requesting settlement of withdrawal or payment using the balance for each account date as a start-up business, and interlocks with the running start-up business program group as a single transaction. And a passive business processing unit that requests a predetermined passive business processing unit to perform passive business using the respective segments, such as withdrawal or deposit of the account balance for each of the account dates requested by the startup business processing unit in conjunction with each other. In addition, when the balance statement for each of the account dates changes due to the execution of the passive business, the predetermined cancellation / recut main program is started as another derived transaction different from the single transaction in which the starting business and the passive business are linked. When the passive business processing unit and the cancel / recut main program are started as a derived transaction, The necessity of canceling or re-cutting the start operation is determined based on the state of each segment at the time of activation, and the start operation is performed based on the determination result and the priority of the account processing request to be each start operation. And a cancellation / recut main processing unit for causing the start-up business processing unit to execute the cancellation or re-cut as another derived transaction different from the cancellation / recut main program.

【0040】受動業務処理部は、共通資源である口座残
高を管理する。起動業務処理部は、この受動業務処理部
によって管理される口座残高を使用した決済を要求す
る。起動業務は、例えば、公共料金の引落や、融資の返
済等を要求する。公共料金の引落の成立と、普通預金口
座からの出金とは、トランザクションとして原子性を有
さなければならない。すなわち、引落が成立したとする
一方、普通預金口座からの出金がなされない状態は処理
として不完全である。このため、起動業務と受動業務と
は連動し、1つのトランザクションとして実行される。
また、口座に異動が生じると、残不足明細セグメント等
を参照して口座処理の取消又は再カットの要否を判定し
なければならない。取消再カットメイン処理部は、この
判定及び取消又は再カットの起動を制御する。起動業務
と受動業務とは連動するが、取消再カットメインは派生
トランザクションとして起動される。これにより、CP
Uの増強をせずにオンラインの応答性を確保することが
できる。例えば、未成立の口座処理要求が200件ある
とする。この200件の残不足を解消できる金額がAT
Mを用いて入金されたとする。取消再カットメインは、
この200件の再カットの実行を順次制御する。このと
き、ATMによる入金の完了を200件の再カット完了
後とすると、ATMの入金での応答性が極度に悪化し、
並行して実行される他のジョブへの悪影響も懸念され
る。このため、第4群(第3群)による本発明では、A
TMの入金は1つのトランザクション(起動と受動の連
動)として完了させておき、このトランザクションとは
異なる別の派生トランザクションとして受動業務のプロ
グラム中から取消再カットメインを起動している。
The passive business processing unit manages an account balance, which is a common resource. The start-up business processing unit requests a settlement using the account balance managed by the passive business processing unit. The start-up operation requires, for example, the deduction of a utility bill, the repayment of a loan, and the like. The establishment of a utility bill withdrawal and the withdrawal from a savings account must have atomicity as a transaction. That is, the state where the withdrawal is established but the withdrawal from the savings account is not made is incomplete as a process. For this reason, the starting task and the passive task are linked and executed as one transaction.
Further, when the account is changed, it is necessary to determine whether or not it is necessary to cancel or re-cut the account processing by referring to the remaining shortage detail segment or the like. The cancellation / recut main processing unit controls this determination and activation of cancellation or recut. The start operation and the passive operation are linked, but the cancellation recut main is started as a derived transaction. Thereby, the CP
Online responsiveness can be ensured without increasing U. For example, assume that there are 200 unsatisfied account processing requests. AT is the amount that can solve the remaining shortage of 200
Suppose that money was received using M. Cancel re-cut main
The execution of the 200 recuts is sequentially controlled. At this time, assuming that the completion of the deposit by the ATM is after the completion of the re-cut of 200 cases, the response in the deposit of the ATM is extremely deteriorated,
It is feared that other jobs executed in parallel may be adversely affected. Therefore, in the present invention by the fourth group (third group),
The payment of the TM is completed as one transaction (coupling of activation and passive), and the cancellation recut main is activated from within the passive business program as another derived transaction different from this transaction.

【0041】第4群の発明では、前記取消再カットメイ
ン処理部が、前記残高明細に基づいて勘定日毎の出金可
能額を算出すると共に、先日付の勘定日での当該出金可
能額がマイナスとなり決済不能となる場合には、当該決
済不能となる勘定日での複数の決済済みの口座処理要求
のうち優先順位の低い口座処理要求の取消を前記起動業
務処理部に派生トランザクションとして実行させる取消
起動制御機能と、前記残高明細に基づいて勘定日毎の出
金可能額を算出すると共に、演算日時当日又は先日付の
勘定日での出金可能額に基づいて前記残不足明細に格納
された当日又は先日付の勘定日で未成立の口座処理要求
のうち優先順位の高い順に各口座処理要求が決済可能と
なるか否かを判定する再カット可否判定機能と、この再
カット可否判定機能によって決済可能と判定された未成
立の口座処理要求がある場合には当該口座処理要求の再
カットを前記起動業務処理部に派生トランザクションと
して実行させる再カット起動制御機能とを備えた、とい
う構成を採っている。これにより、上記課題を解決しよ
うとするものである。
In the fourth group of inventions, the cancellation / recut main processing unit calculates a possible withdrawal amount for each account date based on the balance statement, and calculates the possible withdrawal amount on a future date account date. In the case where the settlement becomes negative and the settlement becomes impossible, the activation business processing unit executes the cancellation of the low priority account processing request among the plurality of settled account processing requests on the account date on which the settlement is impossible as the derivative transaction. The cancellation activation control function calculates the possible withdrawal amount for each account date based on the balance statement, and is stored in the remaining shortage statement based on the possible withdrawal amount on the calculation date / time or the future date. A recut availability determination function for determining whether or not each account processing request can be settled in the order of higher priority among account processing requests that have not been completed on the current day or an earlier accounting date, and a recut availability determination device. And a recut activation control function for causing the activation business processing unit to execute the recut of the account processing request as a derived transaction when there is an unsatisfied account processing request determined to be settleable by I am taking it. This aims to solve the above problem.

【0042】この例では、取消再カットメインは、1つ
の口座処理要求の取消又は再カットを派生トランザクシ
ョンとして起動し、一旦終了する(同期点に達する、ま
たはコミットする)。派生トランザクションとして起動
された起動業務は、受動業務に連動する。受動業務は、
口座残高を更新すると、再度取消再カットメインを派生
トランザクションとして起動する。取消再カットメイン
は、この起動された状態で取消又は再カットの要否を判
定し、判定結果に従って起動業務の取消又は再カットを
派生トランザクションとして起動する。このような取消
再カットメインの間欠的な処理により優先順位の最適化
を行う処理を、本明細書ではスパイラル処理と呼ぶ。実
行の概念としては、「派生をくるくると回す」ことで最
適化するものである。
In this example, the cancel recut main invokes the cancel or recut of one account processing request as a derived transaction and ends once (reaches or commits to a synchronization point). The startup business started as a derived transaction is linked to the passive business. Passive business is
When the account balance is updated, the cancellation re-cut main is started again as a derived transaction. The cancellation / recut main determines whether or not cancellation or recut is necessary in the activated state, and starts the cancellation or recut of the startup business as a derived transaction according to the determination result. The process of optimizing the priority by such an intermittent process of the cancellation / recut main is called a spiral process in this specification. The concept of execution is to optimize by "turning the derivation around."

【0043】派生トランザクションを用いたスパイラル
処理により、オンラインの応答性を確保しつつ、先日付
の口座処理(決済)の最適化を行うことができる。この
ような用途に用いられる派生トランザクションのシステ
ム技術的な詳細については、同一出願人によってなされ
る別の出願を参照されたい。派生トランザクションを用
いたスパイラル処理の実現には、派生トランザクション
の起動時にフラグやビットを渡し、取消再カットメイン
での判定にてこのフラグ等を参照することが好ましい。
この点を、第3,4実施形態や、第1実施例等で詳述す
る。
By the spiral processing using the derived transaction, the account processing (settlement) of the future date can be optimized while securing the online response. Please refer to another application filed by the same applicant for the system technical details of the derived transaction used in such an application. In order to realize the spiral processing using the derived transaction, it is preferable to pass a flag or a bit when the derived transaction is activated, and to refer to the flag or the like in the determination in the cancellation / recut main.
This point will be described in detail in the third and fourth embodiments and the first example.

【0044】各実施形態にて扱う優先順位は、種々の定
め方があり得る。決済を例とすると、勘定日での決済が
不能の場合に直ちに不渡管理等を行わなければならない
ような口座処理要求の優先順位を高く設定するようにし
てもよいし、処理数が大量であるものは優先順位を低く
設定しておくようにしてもよいし、再カット期限が一定
期間の口座処理要求の優先順位を高く設定するようにし
ても良い。また、一律な優先順位ではなく、個別に設定
するようにしても良いし、さらに、口座振替による決済
では、顧客名義人の指定に基づいて優先順位を定めるよ
うにしても良い。
The priorities handled in each embodiment can be determined in various ways. In the case of settlement, for example, if settlement on the account date is not possible, the priority of an account processing request that must immediately perform non-delivery management or the like may be set high, or the number of processes is large. The priority order may be set lower, or the priority order of an account processing request with a fixed re-cut time limit may be set higher. In addition, the priority may be set individually instead of a uniform priority. Further, in the settlement by account transfer, the priority may be determined based on the designation of the customer holder.

【0045】なお、口座処理の種類別の優先順位が機能
するのは、振替等の決済に関して口座残高に不足が生じ
る場合である。振替等による決済機能の提供という事務
処理については、口座の状況に応じた最適な決済を提供
すべきであり、これにより、出願人は、顧客の信頼と期
待に応えることを図っている。
The order of priority for each type of account processing functions when there is a shortage in the account balance for settlement such as transfer. Regarding the paperwork of providing a settlement function by transfer or the like, an optimal settlement should be provided according to the status of the account, whereby the applicant strives to meet the trust and expectations of customers.

【0046】[0046]

【発明の実施の形態】以下、本発明の実施の形態を図面
を参照して説明する。
Embodiments of the present invention will be described below with reference to the drawings.

【第1実施形態】第1実施形態では、先日付完結処理シ
ステムにおいて、現在又は現在に近い将来の勘定日での
口座異動によってその勘定日またはより遠い将来の勘定
日にて決済不能となる場合に、決済不能となる先日付の
勘定日での取引を取り消す。この際、各取引に定義され
た優先順位に従って、優先順位の低い取引から順に取り
消すことで、優先順位の高い取引の決済を優先する。第
1,第2及び第4実施形態では、勘定日当日の取引につ
いては、決済完了性を与え、口座へのアクセスの有無に
関わらず、特別な事情のないかぎり取り消さない。
[First Embodiment] In the first embodiment, in the future-end completion processing system, when settlement cannot be performed on an account date or a future account date farther due to an account transfer on a current or near future account date. Then, cancel the transaction on the future account date that will not be settled. At this time, according to the priority order defined for each transaction, the higher priority transactions are settled by canceling the lower priority transactions in order. In the first, second, and fourth embodiments, the transaction on the day of the account is provided with settlement completion, and is not canceled unless there is special circumstances, regardless of whether the account is accessed.

【0047】図1は、第1実施形態の構成を示すブロッ
ク図である。図1に示すように、本実施形態による先日
付完結処理システムは、勘定日の取引等の口座処理要求
を受信する受信手段2と、この受信手段2にて受信した
口座処理要求を勘定日毎に演算する演算手段4と、この
演算手段4によって演算される結果を前記勘定日毎の出
金可能額等と関連した口座情報として記録するファイル
6とを備えている。そして、演算手段4が、当該演算を
行う演算日に対して同日又は先日付となる勘定日の口座
処理要求を当該勘定日の口座情報に基づいて処理する口
座処理部8と、この口座処理部8による口座処理によっ
て先日付の勘定日での口座処理要求が決済不能となる場
合には当該決済不能となる勘定日での複数の決済済みの
口座処理要求のうち優先順位の低い口座処理要求を当該
優先順位の低い順序にて取り消す取消処理部10とを備
えている。
FIG. 1 is a block diagram showing the configuration of the first embodiment. As shown in FIG. 1, the future-end completion processing system according to the present embodiment includes a receiving unit 2 for receiving an account processing request such as a transaction on an account date, and an account processing request received by the receiving unit 2 for each account date. It has a calculating means 4 for calculating, and a file 6 for recording the result calculated by the calculating means 4 as account information related to the possible withdrawal amount for each account date. An arithmetic processing unit for processing an account processing request on the same or a later date as to the calculation date on which the calculation is performed based on the account information on the account date; In the case where the account processing request on the future date of the account cannot be settled due to the account processing by No. 8, the account processing request with a low priority among the plurality of settled account processing requests on the account date on which the account cannot be settled is issued. A cancellation processing unit 10 for canceling in the order of the lower priority.

【0048】受信手段2は、ネットワーク3を介して、
ATM1Aや、窓口端末1Bと接続されている。そし
て、受信手段2は、公共料金等の引落データが格納され
た外部持込媒体や、融資や自動定期化サービス等の情報
等を格納した内部各種DBの登録内容などに基づいて直
接又は間接に口座処理要求を受信する。また、インター
ネットや専用ネットワーク等を介して顧客のコンピュー
タから口座処理要求を受信するようにしても良い。
The receiving means 2 is connected via the network 3
It is connected to the ATM 1A and the counter terminal 1B. Then, the receiving means 2 directly or indirectly based on the contents of the external bring-in medium storing the withdrawal data such as utility bills and the internal various DBs storing the information such as the loan and the automatic periodic service. Receive an account processing request. Further, an account processing request may be received from a customer's computer via the Internet or a dedicated network.

【0049】演算手段4は、1台又は複数台のコンピュ
ータである。演算手段4が有する種々の手段や各部、各
機能は、所定のプログラムを実行するコンピュータのC
PUによって実現できる。図1に示す例では、先日付完
結処理を用いた優先順位の反映のうち、取消に関して必
要な種々の機能のうち、原理的に重要な部分を抽出して
いる。
The calculation means 4 is one or a plurality of computers. The various means, each unit, and each function of the arithmetic means 4 correspond to a computer C that executes a predetermined program.
This can be realized by a PU. In the example shown in FIG. 1, in the reflection of the priority using the post-done completion processing, portions important in principle among various functions necessary for cancellation are extracted.

【0050】口座処理部8は、当該演算を行う演算日に
対して同日又は先日付となる勘定日の口座処理要求を当
該勘定日の口座情報に基づいて処理する。「演算日」は
実際にCPUを動作させている日であり、今日現在であ
る。今日現在が3日であるとすると、「演算日」及び
「演算日に対して同日」は3日であり、「先日付」は4
日以後(4日,5日,…)である。口座処理部8は、口
座処理要求の勘定日にて残高が算出されていない場合に
は、直近の残高に基づいて当該勘定日の残高を生成す
る。例えば演算日が3日で、勘定日が先日付となる4日
で、直近の最終取引が2日であった場合、2日の残高に
基づいて4日の残高を算出し、その4日の残高に基づい
て4日を勘定日とする口座処理を実行する。例えば、2
日に30,000の残高があり、4日を勘定日として
6,000の振替(口座処理要求)と、4,000の振
替とがあったとすると、4日の残高は20,000とな
る。その後、3日当日に16,000の出金要求がある
とする。この場合、口座処理部8は、2日の残高に基づ
いて3日の残高を30,000とし、これから16,0
00を減額して14,000とする。そして、先日付の
4日の残高についても、16,000を減額して4,0
00とする。
The account processing unit 8 processes an account processing request for an account date on the same day or a future date with respect to the calculation date for performing the calculation based on the account information on the account date. The “calculation date” is the day on which the CPU is actually operated, and is the current date. Assuming that today is three days, the “calculation date” and “the same day as the calculation date” are three days, and the “future date” is four days.
Days after (4th, 5th, ...). When the balance is not calculated on the account date of the account processing request, the account processing unit 8 generates a balance on the account date based on the latest balance. For example, if the calculation date is 3 days, the account date is 4 days that is the future date, and the last final transaction is 2 days, the balance of 4 days is calculated based on the balance of 2 days, and the balance of 4 days is calculated. Based on the balance, account processing is performed with four days as an account date. For example, 2
Assuming that there are 30,000 balances per day, and there are 6,000 transfers (account processing requests) and 4,000 transfers with the fourth day as the account date, the balance on the fourth day is 20,000. Then, it is assumed that there are 16,000 withdrawal requests on the third day. In this case, the account processing unit 8 sets the balance on the third day to 30,000 based on the balance on the two days,
00 is reduced to 14,000. Then, the balance on the 4th day of the future date is reduced by 16,000 to 4,0
00.

【0051】3日に、さらに5,000の出金要求があ
るとする。この場合、3日の残高は14,000である
ため出金可能で、3日の残高は9,000となる。そし
て、4日の残高を更新する。4,000から5,000
を減算するとマイナス1,000となる。4日にて残高
(出金可能額)がマイナスとなると、取消処理部10
は、当該4日にて成立していた口座処理要求のうち最も
優先順位の低い取引を取り消す。すなわち、4日にて成
立していた6,000の振替と4,000の振替との優
先順位を比較し、優先順位の低い振替を取り消す。例え
ば、6,000の振替を取り消すと、4日の残高は、マ
イナス1,000から5,000となる。
Assume that there is a further 5,000 withdrawal request on the third day. In this case, since the balance on the 3rd is 14,000, it is possible to withdraw money, and the balance on the 3rd is 9,000. Then, the balance on the fourth day is updated. 4,000 to 5,000
Is subtracted to give a value of minus 1,000. If the balance (possible withdrawal amount) becomes negative on the fourth day, the cancellation processing unit 10
Cancels the lowest priority transaction among the account processing requests made on the fourth day. That is, the priority of the transfer of 6,000 and the transfer of 4,000 established on the fourth day are compared, and the transfer with the lower priority is canceled. For example, if the transfer of 6,000 is canceled, the balance on the fourth day will be from minus 1,000 to 5,000.

【0052】このように、先日付の取引は、その決済完
了性が至るまでは取り消される可能性がある。ここで
は、日付変更処理を行い勘定日当日を迎えた時に、その
ときまでに成立していた当該勘定日の口座処理にファイ
ナリティを与え、確定させる。従って、取消処理部10
にて取消の対象として選定されるのは、先日付で成立し
ている取引である。
As described above, the transaction of the future date may be canceled until the settlement is completed. Here, when the date change processing is performed and the day of the accounting day is reached, finality is given to the account processing of the accounting day that has been established up to that time, and the account processing is finalized. Therefore, the cancellation processing unit 10
The transactions that are selected for cancellation at are those that were completed on a future date.

【0053】例えば、4日を勘定日として未成立である
6,000の振替は、5日への日付変更が完了するまで
に、4日の残高が1,000以上増加した場合には再カ
ットされ、一方、残高の増加のないまま5日への日付変
更処理が完了すると、決済不能として振替を依頼した依
頼者へ報告する。
For example, a transfer of 6,000 which is not completed with the fourth day as the account date will be recut if the balance on the fourth day increases by 1,000 or more before the date change to the fifth day is completed. On the other hand, when the date change processing to the 5th is completed without an increase in the balance, a settlement is reported to the requester who made the transfer as impossible.

【0054】図2は、ファイル6のデータ構造の一例を
示す説明図である。ファイル6は、口座情報として、前
記口座処理部8による処理順序で処理した前記口座処理
要求を取引明細として記録する取引明細セグメント12
と、勘定日毎の残高を格納する残高明細セグメント14
とを備えている。取引明細セグメント12には、実際に
処理を行った演算日と、その口座処理の決済を行う日で
ある勘定日と、口座処理の通番と、取引の種別と、その
口座処理の優先順位と、口座処理の取引金額と、処理結
果とが格納される。優先順位は、1から10までの数字
としてもよいし、アルファベットとしてもよいし、3桁
の数字としてもよい。優先順位を数字で表す場合には、
ここでは、数値の小さいものが優先順位が高いものとす
る。すなわち、優先順位1の口座処理Aと、優先順位2
の口座処理Bとでは、口座処理Aの優先順位が高い。
「結果」は、その取引が成立したか否かを示す情報であ
る。残高明細セグメント14には、勘定日と残高とが格
納されている。残高明細は、新しい勘定日での口座処理
が実行されるときに生成される。例えば、10日と13
日に残高明細があった場合に、12日での口座処理要求
があった場合には、10日の残高に基づいて12日の残
高明細を作成する。この12日の口座処理要求が決済不
能で未成立となる場合であっても、12日の残高明細を
生成する。
FIG. 2 is an explanatory diagram showing an example of the data structure of the file 6. The file 6 includes, as account information, a transaction statement segment 12 for recording the account processing request processed in the processing order by the account processing unit 8 as a transaction statement.
And a balance detail segment 14 for storing the balance for each account date
And In the transaction details segment 12, the calculation date of the actual processing, the account date that is the date of the settlement of the account processing, the serial number of the account processing, the type of transaction, the priority of the account processing, The transaction amount of the account processing and the processing result are stored. The priority order may be a number from 1 to 10, an alphabet, or a three-digit number. If the priority is represented by a number,
Here, it is assumed that a smaller numerical value has a higher priority. That is, account processing A of priority 1 and priority 2
In account processing B, account processing A has a higher priority.
“Result” is information indicating whether or not the transaction has been established. The balance detail segment 14 stores an account date and a balance. A balance statement is generated when account processing is performed on a new account date. For example, 10 days and 13
If there is a balance statement on the day and an account processing request is made on the 12th, a balance statement on the 12th is created based on the balance on the 10th. Even if the account processing request on the 12th is unsuccessful due to the inability to settle, the balance statement on the 12th is generated.

【0055】図2に示す取引明細セグメント12を有す
る場合、取消処理部10は、この取引明細セグメントの
各取引明細毎の勘定日及び優先順位を参照して前記取消
対象の口座処理要求を特定する取消対象特定機能21を
備える。取消対象特定機能21は、出金可能額がマイナ
スとなった勘定日を取消対象勘定日として、この取消対
象勘定日に成立している一又は複数の口座処理要求を特
定し、この口座処理要求群のなかで優先順位が最も低い
口座処理要求を特定する。
In the case of having the transaction statement segment 12 shown in FIG. 2, the cancellation processing unit 10 specifies the account processing request to be canceled by referring to the account date and priority of each transaction statement of this transaction statement segment. A cancellation target specifying function 21 is provided. The cancellation target specifying function 21 specifies one or a plurality of account processing requests established on the cancellation target account date as the cancellation target account date with the account date on which the withdrawable amount becomes negative, and Identify the lowest priority account processing request in the group.

【0056】一般的に、公共料金の引落等は振替日当日
のみに引落を行う。このため、その振替日(勘定日)に
残高に不足があり最終的に決済不能であると、公共料金
の支払いができず、来月に再度口座振替処理を行うこと
となる。一方、自動的に積立を行う契約などでは、積立
をする振替日(勘定日)のみならず、次回の振替日の前
日まで残高がある場合には積立を行う。この場合、勘定
日は1か月間となる。勘定日の初日を勘定日と呼び、振
替日の前日など再カットを行う期限を再カット期限と呼
ぶこともある。
Generally, withdrawals of utility charges are made only on the day of transfer. For this reason, if the balance is insufficient on the transfer date (account date) and the settlement is finally impossible, the utility charges cannot be paid, and the account transfer process will be performed again next month. On the other hand, in a contract for automatic funding, funding is performed not only on the transfer date (account date) for funding but also when there is a balance up to the day before the next transfer date. In this case, the accounting date is one month. The first day of the account date may be referred to as an account date, and a deadline for performing recutting such as the day before the transfer date may be referred to as a recut deadline.

【0057】一定期間の勘定日を有する口座処理では、
例えば、10日を勘定日の初日としている場合、10日
には残高が不足し、一方、11日には先日付での入金が
あるため決済可能であるとすると、10日で未成立とし
た後に、11日を勘定日として口座処理を行う。その
後、10日に入金がある場合には、11日の口座処理で
はなく、10日の口座処理とすることが好ましい。例え
ば、融資の返済等で11日を勘定日とすると延滞金が発
生するような局面も想定されるため、先日付で成立して
いる口座処理を、より前の勘定日へ前倒することが望ま
しい。
In account processing having a certain period of account date,
For example, if the 10th day is the first day of the account date, if the balance is insufficient on the 10th, and if the settlement is possible because there is a deposit on the 11th on the future date, it is determined that the account is not established on the 10th. Later, account processing is performed with the 11th as an account date. After that, if there is a payment on the 10th, it is preferable to make the account processing on the 10th instead of the account processing on the 11th. For example, if a repayment of a loan is made 11 days as an account date, there may be a situation in which a arrears may occur. desirable.

【0058】この前倒を行う例では、図1に示す口座処
理部8が、口座処理要求を実行した後に、当該実行対象
の勘定日以後の日時を勘定日とする口座処理要求のうち
決済済の口座処理要求を取り消すと共に、当該取り消し
た口座処理要求を前記実行対象の勘定日での口座処理要
求として再実行する先日時前倒制御機能を備えると良
い。この先日時前倒制御機能により、一定期間の勘定日
を有する口座処理を、口座残高の異動があった時に、決
済可能なより前の勘定日での取引とすることができる。
In this example of moving forward, after the account processing unit 8 shown in FIG. 1 executes the account processing request, the account processing unit 8 shown in FIG. And an earlier date / time advance control function of re-executing the canceled account processing request and re-executing the canceled account processing request as the account processing request on the execution target account date. With the advance date and time advance control function, account processing having a certain period of account date can be treated as a transaction on an earlier account date that can be settled when an account balance is changed.

【0059】図3(A)は、取消、再カット及び前倒処
理を含めた先日付完結処理の動作例を示す説明図であ
る。第1実施形態乃至第4実施形態は、図3に示す動作
をそれぞれの局面で機能強化したものである。図3
(A)中、口座処理は、取引の内容を示し、残高(口座
情報)は、取引の結果を示す。演算日は、口座処理要求
を実行する日である。勘定日は、取引を行うべき日で、
自振通番は、自動振込や自動振替等の自振を個別に識別
するための番号である。取引は、口座からの出金や、口
座への入金などであり、取引種類にその具体的な取引内
容が格納される。取引金額は自振等の金額であり、結果
は、その口座処理(取引)が成立したか否かを記録する
ものである。
FIG. 3A is an explanatory diagram showing an example of the operation of the future completion processing including the cancellation, re-cut, and forward processing. In the first to fourth embodiments, the operation shown in FIG. 3 is enhanced in each aspect. FIG.
In (A), the account processing indicates the contents of the transaction, and the balance (account information) indicates the result of the transaction. The calculation date is a date on which the account processing request is executed. The account date is the date on which the transaction should take place,
The self-oscillation serial number is a number for individually identifying self-oscillation such as automatic transfer or automatic transfer. The transaction is withdrawal from the account, payment to the account, and the like, and the specific transaction content is stored in the transaction type. The transaction amount is an amount such as self-oscillation, and the result records whether or not the account processing (transaction) has been established.

【0060】まず、10日の残高が30,000である
とする。10日に、先日付である11日を勘定日とする
電気料引落(自振番号001)が行われるとする。この
場合、口座処理部8は、まず、11日の勘定日の直近の
勘定日である10日の残高に基づいて、11日の残高を
30,000とする。出金10,000は決済可能であ
るため、電気料引落による出金を成立させる。すると、
11日の残高は20,000となる。このとき、10日
の残高にはなんら変更がない。
First, it is assumed that the balance on the tenth day is 30,000. On the 10th, it is assumed that the electricity charge withdrawal (self-oscillation number 001) is performed with the 11th, which is the future date, as the account date. In this case, the account processing unit 8 first sets the balance on the 11th to 30,000 based on the balance on the 10th, which is the most recent account date on the 11th. Since the withdrawal 10,000 can be settled, the withdrawal by the withdrawal of the electricity fee is established. Then
The balance on the 11th will be 20,000. At this time, there is no change in the balance on the 10th.

【0061】続いて、10日に、12日を勘定日として
振込による50,000の入金があるとする。口座処理
部4は、直近の勘定日である11日の残高を12日の残
高として展開し、さらに50,000を加算する。この
結果、12日の残高は70,000となる。さらに、1
0日当日にATMによる現金出金(支払)があるとす
る。10日の残高は30,000であるため、25,0
00は出金可能であり、取引は成立する。10日の残高
は5,000となる。口座処理部4は、10日の残高を
更新したため、この25,000の出金を11日及び1
2日の残高へ反映させるATMでの25,000の出金
が完了した状態での各勘定日の出金可能額を算出した例
を図3(B)に示す。図3(B)に示すテーブルを、日
付チェックテーブルと呼ぶ。図3(A)及び(B)に示
すように、11日の残高が−5,000となり、取消必
要額が5,000である。
Next, suppose that there are 50,000 payments by bank transfer on the 10th, with the 12th as the accounting day. The account processing unit 4 develops the balance on the 11th, which is the latest account date, as the balance on the 12th, and adds 50,000. As a result, the balance on the 12th is 70,000. In addition, 1
It is assumed that there is a cash withdrawal (payment) by the ATM on the day 0. Since the balance on the 10th is 30,000, 25.0
00 can be withdrawn and the transaction is completed. The balance on the 10th will be 5,000. The account processing unit 4 updated the balance on the 10th, so the 25,000 withdrawal was made on the 11th and the 1st.
FIG. 3B shows an example of calculating the possible amount of sunrise for each account when 25,000 withdrawals have been completed at the ATM to be reflected in the balance on the two days. The table shown in FIG. 3B is called a date check table. As shown in FIGS. 3A and 3B, the balance on the 11th is -5,000, and the necessary amount of cancellation is 5,000.

【0062】取消処理部10は、11日の残高がマイナ
ス(出金可能額よりも口座処理による出金額が大きい)
となったため、出金可能額がマイナスとなった11日に
て成立している口座処理要求のうち、最も優先順位の低
い取引を取り消す。ここでは、電気料引落による出金処
理(自振番号001)を取り消す。この取消により、電
気料引落は未成立となる。取消金額は10,000であ
るため、11日の残高は5,000となり、残高不足で
の出金という状態が解消された。12日の残高は55,
000となる。
In the cancellation processing section 10, the balance on the 11th is minus (the withdrawal amount by the account processing is larger than the withdrawable amount).
Therefore, the transaction with the lowest priority among the account processing requests made on the 11th when the possible withdrawal amount becomes negative is canceled. Here, the withdrawal processing (self-oscillation number 001) due to the withdrawal of the electricity fee is canceled. As a result of this cancellation, electricity charges will not be deducted. Since the cancellation amount was 10,000, the balance on the 11th was 5,000 and the situation of withdrawal due to insufficient balance was resolved. The balance on the 12th is 55,
000.

【0063】勘定日を11日(実際の勘定日の期間は契
約による)とし、再カット期限を約定返済日の翌々々月
とする融資の返済を口座振替で行う場合、11日での決
済が不能であると、12日に決済を行う場合がある。例
えば、図3(A)に示す例では、11日では決済不能で
あるため、11日を勘定日とする融資返済は未成立とな
る。この例では、再カット期限内である12日を勘定日
とする決済が可能であるため、12日を勘定日として口
座振替を行う。約定返済日が11日の融資返済を12日
に返済すると、融資返済の元金に対して延滞利息が発生
する。ここでは、一日分の延滞利息は10円として説明
する。融資返済は成立し、12日の残高は14,990
となる。
If the account date is set to 11 days (the actual account date period depends on the contract) and the loan is refunded with a recut deadline of two months after the contract repayment date, the settlement on the 11th is required. If it is impossible, payment may be made on the 12th. For example, in the example shown in FIG. 3A, settlement cannot be made on the 11th, so that the loan repayment with the 11th as the account date is not completed. In this example, since settlement can be performed with the 12th day within the recut deadline as the account date, the account transfer is performed with the 12th day as the account date. If the loan repayment with a contract repayment date of 11 is repaid on the 12th, delinquent interest will accrue on the principal of the loan repayment. Here, it is assumed that the delinquent interest for one day is 10 yen. The loan was repaid and the balance on the 12th was 14,990
Becomes

【0064】10日に、11日を勘定日とする振込によ
る入金があると、まず、11日の残高が65,000と
なる。これにより、12日を勘定日として成立していた
融資返済処理は、11日にて決済可能となる。先日時前
倒制御機能は、12日にて成立していた融資返済を取り
消し、11日の勘定日として再カットする。12日の残
高は、一旦40,010の取り消しにより増加する。続
いて、11日での再カットの残高が反映されて、75,
000となる。この前倒制御により、先日付の入金に応
じて、延滞利息が発生する12日での取引を取り消すこ
とができる。また、11日を勘定日とする電気料引落が
未成立であったため、当該電気料10,000を再カッ
トする。10日に実行した口座処理はこれが最終であ
り、このまま11日を迎える。11日になると、10日
の残高5,000ではなく、11日の残高15,000
にアクセスする。この15,000の残高は、振込によ
る入金と、融資の返済と、電気料の引落とが完了した残
高である。このように、先日付完結処理では、バッチ処
理と同様の結果をオンライン処理時間中に実行すること
ができる。また、バッチ処理を行わずに24時間連続し
てオンライン処理を稼働することができる。
On the 10th, if there is a deposit by transfer with the 11th as the account date, the balance on the 11th will be 65,000. As a result, the loan repayment process that was completed on the 12th as the account date can be settled on the 11th. The advance date and time advance control function cancels the loan repayment established on the 12th and re-cuts it as the 11th accounting day. The balance on the 12th is increased by the cancellation of 40,010 once. Then, the balance of the recut on the 11th is reflected, and 75,
000. By this advance control, it is possible to cancel the transaction on the 12th day when the interest on the arrears is generated in accordance with the payment on the future date. In addition, since the deduction of the electricity charge with the 11th as the account date has not been established, the electricity charge 10,000 is cut again. This is the final account processing executed on the 10th, and the 11th will be reached as it is. On the 11th, the balance on the 11th is 15,000 instead of the 5,000 on the 10th.
To access. This 15,000 balance is a balance in which payment by transfer, repayment of a loan, and withdrawal of an electricity fee have been completed. As described above, in the future completion processing, the same result as the batch processing can be executed during the online processing time. Further, online processing can be continuously performed for 24 hours without performing batch processing.

【0065】図3(A)に示すように、先日付の取引を
オンライン処理中に行い、勘定日別の残高を持ち、AT
M等による取引は当日の残高に基づいて処理を行うこと
により、振替や振込等の事前にほぼ取引の内容が判明し
ている口座処理を勘定日よりも前の日時にて完結させる
ことができる。これにより、振替等のバッチ処理を無く
し、24時間365日の連続稼働が可能となる。また、
24時間稼働としない場合であっても、夜間や早朝のバ
ッチ処理が不要となるため、口座処理の運用コストを低
下させ、且つ、夜間の短時間でのCPUの処理能力を増
加させるための投資を不要とする。また、顧客サービス
という点からも、日付が変化した時には新たな残高に基
づいて直ちに取引を開始することができるため、インタ
ーネットを介した取引等を24時間連続してシームレス
に行うことができる。
As shown in FIG. 3 (A), a future transaction is performed during online processing, and a balance for each account date is held.
Transactions by M, etc. are processed based on the balance of the day, so that account processing for which the details of the transaction, such as transfer or transfer, are almost clear in advance can be completed at a date and time before the account date. . This eliminates batch processing such as transfer, and enables continuous operation for 24 hours and 365 days. Also,
Even if the operation is not performed for 24 hours, no batch processing is required at night or early in the morning, so the investment cost for lowering the operation cost of the account processing and increasing the processing capacity of the CPU in the short time at night. Is unnecessary. Further, from the viewpoint of customer service, when the date changes, the transaction can be started immediately based on the new balance, so that transactions and the like via the Internet can be performed seamlessly continuously for 24 hours.

【0066】取消処理部10は、出金可能額がマイナス
となった勘定日がある場合に、その勘定日に成立してい
た口座処理を取り消す。出金可能額は、図3(A)に示
す例では残高のみとした。しかし、担保定期等自動融資
がある場合には、残高と出金可能額とが異なることがあ
る。例えば、口座に対して担保となる定期預金等がある
場合に、この定期預金を担保として普通預金に自動融資
を行うサービスがある。100,000の担保定期があ
る場合には、一般的には、その9割の90,000が貸
越極度となる。残高が10,000である場合には、こ
の10,000に貸越極度の90,000を加算した1
00,000が出金可能額である。担保定期が設定され
ている場合には、残高がマイナスであっても、貸越極度
の範囲内であれば、出金可能額はプラスである。
If there is an account date on which the withdrawable amount has become negative, the cancellation processing unit 10 cancels the account processing established on that account date. In the example shown in FIG. 3A, the possible withdrawal amount is only the balance. However, when there is automatic financing such as collateral, the balance may differ from the available amount. For example, there is a service in which when there is a time deposit or the like serving as security for an account, an automatic loan is made to the ordinary deposit using the time deposit as security. If there is a 100,000 security period, 90% of the 90,000 of the security period is generally the overdraft limit. If the balance is 10,000, the overdraft of 90,000 is added to this 10,000, which is 1
00,000 is the withdrawable amount. When the security period is set, even if the balance is negative, the withdrawable amount is positive if the balance is within the extreme of overdraft.

【0067】手形や小切手等については、不渡通知がな
い場合に出金可能な残高に組み込むことが行われてい
る。この場合、残高明細セグメントが、資金化日での資
金化を予定する未資金化残データと、出金可能な残高を
示す実残データ(残高)とを備える。そして、不渡連絡
時刻後の資金化処理を口座処理要求によって実行し、未
資金化残を残高に組み込む。
Bills, checks, and the like are incorporated into a withdrawable balance in the absence of a notice of non-delivery. In this case, the balance detail segment includes unfunded remaining data that is scheduled to be funded on the funding date and actual remaining data (balance) indicating a withdrawable balance. Then, the funding process after the non-delivery contact time is executed according to the account processing request, and the unfunded balance is incorporated into the balance.

【0068】例えば、10日を資金化日とする小切手に
よる入金100,000が既に先日付の口座処理要求で
残高明細に反映されているとする。この100,000
をそのまま実際の残高である実残に加算してしまうと、
現金出金後に不渡連絡を受信する可能性に対応できなく
なる。このため、資金化日である10日には、100,
000を未資金化残として残高明細に格納する。一方、
先日付である11日については、不渡連絡を待たずに実
残に組み込む。これは、11日は先日付であるため、仮
に資金化が不能となった場合に資金化処理を取り消せば
良く、また、11日を勘定日とする残高は、10日に現
金出金することもできず、さらに、一般的には不渡通知
を受信せず、正常に資金化できる可能性が高く、その場
合、先日付の出金などが未成立とならない可能性が高ま
ることによる。実際、10日の不渡連絡の受信前に先日
付での振替で250,000の出金が有る場合には、5
0,000の残高とし、未成立の口座処理による取消や
再カット処理の発生を防止することができる。
For example, it is assumed that a deposit of 100,000 by check with a funding date of 10 days has already been reflected in the balance statement by a post-dated account processing request. This 100,000
Is added to the actual balance, which is the actual balance.
Possibility to receive the possibility of receiving a non-delivery notification after cash withdrawal. Therefore, on the 10th day, which is the day of funding, 100,
000 is stored in the balance statement as an unfunded balance. on the other hand,
The 11th day, which is the future date, is incorporated into the actual balance without waiting for non-delivery. This is because the eleventh day is a future date, so if the monetization becomes impossible, the monetization process should be canceled and the balance with the eleventh day as the account date should be cashed out on the tenth. In addition, it is generally impossible to receive a non-delivery notice, and there is a high possibility that funds can be properly funded. In this case, there is a high possibility that withdrawals and the like on the future date will not be established. In fact, if you received 250,000 withdrawals on the future date before receiving the 10th non-delivery notice, 5
By setting the balance to 0000, it is possible to prevent cancellation or re-cut processing due to an unestablished account processing.

【0069】資金化日である10日の11:30までに
不渡連絡がなかった場合には、資金化処理を実行し、未
資金化残を実残に組み込む。一方、不渡連絡を受けた場
合には、資金化を行わず、また、11日を勘定日とする
残高についても100,000減少させる。
If there is no non-delivery report by 11:30 on the 10th day of the funding, the funding process is executed, and the unfunded balance is incorporated into the real balance. On the other hand, if a non-delivery notification is received, no funding is performed, and the balance with an account date of 11 days is reduced by 100,000.

【0070】再度図1を参照すると、取消処理部10
は、前記口座処理部によって口座処理が行われる毎に前
記残高明細セグメントに基づいて先日付の勘定日毎の出
金可能額を算出する日付チェックテーブル生成機能20
と、出金可能額がマイナスとなる勘定日がある場合には
当該勘定日での決済済みの口座処理要求を前記優先順位
の低い順序で前記出金可能額がプラスとなるまで取り消
す制御をするマイナス時取消制御機能22とを備えてい
る。日付チェックテーブル生成機能20は、口座残高に
異動があった場合に、図3(B)に示すような日付チェ
ックテーブルを生成する。日付チェックテーブルを生成
すると、出金可能額がマイナスとなっている勘定日と、
その勘定日よりも将来の先日付での口座処理の有無等を
特定することができる。
Referring back to FIG. 1, the cancellation processing unit 10
A date check table generation function 20 for calculating a possible withdrawal amount for each future date based on the balance statement segment each time the account processing is performed by the account processing unit 20
If there is an account date on which the withdrawable amount is negative, control is performed to cancel the account processing request settled on that account date in the order of the lower priority order until the withdrawable amount becomes positive. A minus-time cancellation control function 22 is provided. The date check table generation function 20 generates a date check table as shown in FIG. 3B when there is a change in the account balance. If you generate a date check table, the account date that the withdrawable amount is negative,
It is possible to specify, for example, whether or not account processing is to be performed at a future date later than the account date.

【0071】出金可能額がマイナスとなるのは、そのマ
イナスとなった勘定日に出金を行う口座処理要求がある
ためである。従って、その勘定日に成立している出金要
求を取り消す。出金可能額がマイナスとなっている勘定
日の前日等が先日付である場合には、その前日での出金
を取り消すと出金可能額がプラスとなることはあり得る
が、勘定日当日に残高がある場合に振替を行うという契
約の元では、出金可能額がマイナスとなっている前日以
前にて成立している口座処理要求を取り消すことはな
い。
The reason why the withdrawable amount is negative is that there is an account processing request for withdrawing on the negative account date. Therefore, the withdrawal request established on the account date is canceled. If the day before the day of the account on which the withdrawable amount is negative is a future date, canceling the withdrawal on the previous day may increase the withdrawable amount. Under the contract to make a transfer when there is a balance, there is no cancellation of an account processing request that was made before the day before the withdrawable amount is negative.

【0072】マイナス時取消制御機能22は、日付チェ
ックテーブルを参照して、出金可能額がマイナスとなる
勘定日がある場合には当該勘定日での決済済みの口座処
理要求を前記優先順位の低い順序で前記出金可能額がプ
ラスとなるまで取り消す制御をする。これにより、先日
付完結処理を実行しつつ、残高が不足している状態での
決済の成立を防止する。
The negative-time cancellation control function 22 refers to the date check table, and when there is an account date on which the withdrawable amount is negative, the account processing request settled on the account date is determined according to the priority. Cancellation control is performed in the lower order until the payable amount becomes positive. As a result, the settlement in the state where the balance is insufficient is prevented while executing the future date completion processing.

【0073】この取消制御を図4に示すフローチャート
を参照して説明する。先日付完結処理システムの前記演
算手段4を使用して口座処理を行う先日付完結処理方法
は、演算手段4にて演算を行う演算日に対して同日又は
先日付となる勘定日の口座処理要求を当該勘定日の口座
情報に基づいて処理する口座処理工程S1と、この口座
処理工程S1での口座処理によって先日付の勘定日での
口座処理要求が決済不能となるか否かを判定する取消要
否判定工程S2,S3と、この取消要否判定工程S3に
て取消要と判定されている場合には当該決済不能となる
勘定日での複数の決済済みの口座処理要求のうち優先順
位の低い口座処理要求を当該優先順位の低い順序にて取
り消す口座処理要求を前記口座処理工程にて実行させる
取消処理制御工程S4とを備えている。取消要否判定工
程S3は、日付チェックテーブルを生成する日付チェッ
クテーブル生成工程S2と、日付チェックテーブルにて
出金可能額がマイナスとなっている勘定日について取消
が必要と判定する工程S3とを備えるとよい。
The cancellation control will be described with reference to the flowchart shown in FIG. The future date completion processing method for performing an account process using the arithmetic means 4 of the future date completion processing system is a method for processing an account on the same date or a future date as to the calculation date on which the arithmetic means 4 performs the calculation. Processing on the basis of the account information of the account date, and canceling to determine whether the account processing in the account processing step S1 makes it impossible to settle the account processing request on the future account date. In the necessity judging steps S2 and S3, and when the necessity is judged in the cancellation necessity judging step S3, the priority order of the plurality of settled account processing requests on the account date on which the settlement becomes impossible is determined. A cancellation processing control step S4 for executing an account processing request for canceling a low account processing request in the order of the lower priority in the account processing step. The cancellation necessity determination step S3 includes a date check table generation step S2 for generating a date check table, and a step S3 for determining that cancellation is necessary for an account date in which the withdrawable amount is negative in the date check table. It is good to have.

【0074】図4に示す例では、通常の口座処理要求を
ステップS1にて行い、さらに、口座処理の取消をステ
ップS1にて行う。このため、出金可能額がマイナスと
なっている勘定日がある場合に、まず、最も優先順位の
低い口座処理を取り消し、そして、この取り消し後の状
態で再度日付チェックテーブルを生成して取り消しの要
否を判定し、出金可能額のマイナスが解消しない場合に
は次に優先順位の低い口座処理の取り消しを制御する。
これを繰り返すことで、優先順位の高い口座処理の決済
を残しつつ、出金可能額のマイナスを解消させることが
できる。すなわち、出金可能額の範囲内で、優先順位の
高い決済を実行することができる。
In the example shown in FIG. 4, a normal account processing request is made in step S1, and the cancellation of the account processing is made in step S1. Therefore, if there is an account date for which the withdrawable amount is negative, first cancel the account processing with the lowest priority, and then generate a date check table again in the state after this cancellation and cancel the cancellation. The necessity is determined, and if the minus of the withdrawable amount does not disappear, the cancellation of the account processing with the next lowest priority is controlled.
By repeating this, it is possible to eliminate the minus of the withdrawable amount while leaving the settlement of the account processing with a high priority. In other words, a payment with a high priority can be executed within the range of the withdrawable amount.

【0075】演算手段4は、所定のプログラム(指令)
に従って各種の演算を行うCPUを備えている。CPU
は、勘定日別の口座処理を行うための指令や、勘定日別
の口座情報を格納するための指令や、融資契約をファイ
ル6の融資マスタDB等に登録するための指令や、出金
可能額がマイナスとなった勘定日での最も優先順位の低
い口座処理の取り消しを制御する指令等の先日付完結処
理用プログラムを実行することで、図1に示す口座処理
部8や、取消処理部10として動作する。これらのプロ
グラムはCPUに併設されたプログラム記憶部に格納さ
れる。また、基本的な入出力を行うオペレーティングシ
ステムや、データベースの管理やログによる復帰や、ト
ランザクションの管理などを行うプログラム群について
も、このプログラム記憶部に格納されている。
The arithmetic means 4 is provided with a predetermined program (command)
And a CPU for performing various calculations according to. CPU
Is a command for performing account processing for each account date, a command for storing account information for each account date, a command for registering a loan contract in the loan master DB of the file 6, etc. The account processing unit 8 and the cancellation processing unit shown in FIG. 1 are executed by executing a program for the future completion processing such as a command for controlling the cancellation of the lowest priority account processing on the account date when the amount becomes negative. It operates as 10. These programs are stored in a program storage unit provided with the CPU. Further, an operating system that performs basic input / output, and a group of programs that perform management of a database, restoration by logs, management of a transaction, and the like are also stored in the program storage unit.

【0076】このような先日付完結処理用プログラム
は、CPU(演算手段)を動作させる指令を備える。例
えば、演算日に対して同日又は先日付となる勘定日の口
座処理要求を当該勘定日の口座情報に基づいて処理させ
る口座処理指令を備えている。CPUが口座処理指令を
実行することで、このCPUは図1に示す口座処理部8
として動作し、図4に示す口座処理工程S1を実行す
る。本実施形態による先日付完結処理用プログラムは、
この口座処理指令に応じてCPUにて実行される口座処
理によって先日付の勘定日での口座処理要求が決済不能
となるか否かを判定させる取消要否判定指令と、この取
消要否判定指令にて取消要と判定される場合には当該決
済不能となる勘定日での複数の決済済みの口座処理要求
のうち優先順位の低い口座処理要求を当該優先順位の低
い順序にて取り消す口座処理要求を前記口座処理指令を
用いて実行させる取消処理制御指令とを備える。
Such a pre-date completion processing program includes a command for operating the CPU (arithmetic means). For example, there is provided an account processing command for processing an account processing request on an account date that is the same day or a future date with respect to the calculation date based on the account information on the account date. When the CPU executes the account processing command, the CPU executes the account processing unit 8 shown in FIG.
And executes the account processing step S1 shown in FIG. The program for future completion processing according to the present embodiment is:
A cancellation necessity judgment command for judging whether or not an account processing request on a future account date cannot be settled by account processing executed by the CPU in response to the account processing instruction, and a cancellation necessity judgment instruction If it is determined that the cancellation is necessary, the account processing request for canceling the account processing request with the lower priority in the order of the lower priority among the plurality of settled account processing requests on the account date on which the settlement is not possible. Is executed using the account processing command.

【0077】また、先日付完結処理システムにて実現す
べき各手段、各部又は各機能や、フローチャートの各工
程に応じた指令を備えることで、CPUは種々の機能を
有する演算手段2として動作する。先日付完結処理用プ
ログラムは、磁気テープ(MT)やディスク等の記録媒
体11Aに格納されて搬送され、媒体読取部11によっ
て読み取られる。記録媒体に格納されていた先日付完結
処理用プログラムは、媒体読取部11にて読み取られた
後、プログラム記憶部に格納される。また、他のホスト
装置から通信回線を経由してプログラム記憶部にプログ
ラムを提供することもできる。
The CPU operates as the calculating means 2 having various functions by providing each means, each section or each function to be realized by the future date completion processing system, and commands corresponding to each step of the flowchart. . The future completion processing program is stored and transported on a recording medium 11A such as a magnetic tape (MT) or a disk, and is read by the medium reading unit 11. The program for the future completion processing stored on the recording medium is read by the medium reading section 11 and then stored in the program storage section. Also, a program can be provided from another host device to the program storage unit via a communication line.

【0078】プログラムについて、CPU(演算手段)
を「動作させる指令」というときには、各指令のみでC
PUを動作させる指令と、プログラム記憶部に予め格納
されているオペレーティングシステム等の他のプログラ
ムに依存して当該CPUを動作させる指令とのいずれか
または双方を含む。例えば、取消処理制御指令は、優先
順位が最も低い口座処理の取消の起動要求をオペレーテ
ィングシステムに引き渡す指令のみでもよい。このよう
に、当該先日付完結処理用プログラムを記憶する記録媒
体11Aであって、当該プログラムをユーザへ搬送する
用途の記録媒体11Aには、例えば「優先順位が最も低
い口座処理の取消の起動をオペレーティングシステムに
要求する指令」のみが格納され、実際の取消処理のスケ
ジューリング等はオペレーティングシステムが行う場合
がある。これは、動作させようとするコンピュータのオ
ペレーティングシステム等との関係で定る。この点、通
信回線を介してプログラム(指令)を提供する場合も同
様である。このプログラムとシステム又は方法、搬送媒
体等に関する説明は後述する実施形態及び実施例におい
ても同様である。
About the program, CPU (arithmetic means)
Is referred to as a "command to operate".
The command includes one or both of a command for operating the PU and a command for operating the CPU depending on another program such as an operating system stored in the program storage unit in advance. For example, the cancellation processing control command may be only a command for transferring a start request for cancellation of account processing with the lowest priority to the operating system. As described above, the recording medium 11A that stores the future completion processing program and the recording medium 11A that is used to convey the program to the user includes, for example, “starting the cancellation of the account processing with the lowest priority. Only the command requested by the operating system is stored, and the operating system may perform the scheduling of the actual cancellation processing and the like. This depends on the relationship with the operating system of the computer to be operated. In this regard, the same applies when a program (command) is provided via a communication line. The description regarding the program, the system or method, the transport medium, and the like is the same in embodiments and examples described later.

【0079】図5は第1実施形態による処理例を示す説
明図である。図5(A)に示すように、演算日を10日
とし、10日での残高を30,000とする。先日付で
の8,000の支払Bと、10,000の支払Aと、
2,000の支払Cとをこの順序で処理すると、11日
付けの残高は10,000となる。支払の優先順位は支
払Aが一番高く、支払Cが一番低い。この状態で、10
日当日にATMでの現金出金20,000があると、1
0日付の残高は30,000であるから出金可能で、1
0日の残高は10,000となる。10日にて減額した
20,000を11日に反映すると、11日の残高(出
金可能額)はマイナスになる。
FIG. 5 is an explanatory diagram showing a processing example according to the first embodiment. As shown in FIG. 5A, the calculation date is set to 10 days, and the balance on the 10th day is set to 30,000. 8,000 payments B and 10,000 payments A at a future date,
If 2,000 payments C were processed in this order, the balance as of the 11th would be 10,000. Payment A has the highest payment priority and payment C has the lowest priority. In this state, 10
If there is a cash withdrawal of 20,000 at the ATM on the day, 1
Since the balance on the 0th day is 30,000, it can be withdrawn and 1
The balance on day 0 is 10,000. If 20,000 reduced on the 10th is reflected on the 11th, the balance (possible withdrawal amount) on the 11th will be negative.

【0080】このATM出金があった状態を最終状態と
すると、11日を勘定日とする口座処理要求のすべてを
決済することはできない。単純に成立順に取り消すので
あれば、支払Bと支払Aとが取り消される。成立の逆順
の場合には支払Cと支払Aとが取り消される。本実施形
態では、図4を参照して説明すると、ATM現金出金が
完了した時点で(ステップS1)、日付チェックテーブ
ルを作成する(ステップS2)。日付チェックテーブル
を参照すると、11日にて取消が必要と判定される(ス
テップS3)。図1に示す取消処理部10は、11日に
て成立している口座処理のうち、優先順位の最も低い口
座処理を取り消す制御をする(ステップS4)。する
と、ステップS1にて支払Cを取り消す。
If the state in which the ATM has been paid out is regarded as the final state, it is not possible to settle all the account processing requests whose 11th day is the account date. If the payment is simply canceled in the order of establishment, the payment B and the payment A are canceled. In the case of the reverse order, the payment C and the payment A are canceled. In the present embodiment, referring to FIG. 4, when the ATM cash withdrawal is completed (step S1), a date check table is created (step S2). Referring to the date check table, it is determined that cancellation is necessary after 11 days (step S3). The cancellation processing unit 10 shown in FIG. 1 performs control for canceling the account process with the lowest priority among the account processes established on the 11th (step S4). Then, payment C is canceled in step S1.

【0081】支払Cを取り消した状態での日付チェック
テーブルでは、11日の出金可能額は−8,000であ
り(ステップS2)、取消処理部10は、取消が必要と
判定する(ステップS3)。支払Bと支払Aとでは、支
払Bの優先順位が低い。このため、ステップS4にて支
払Bの取消を制御する。支払Bを取り消すと、11日の
残高は0となり、マイナスの状態が解消された。この支
払Bを取り消した状態を図5(B)に示す。図5(B)
に示すように、11日の10,000の残高を最も優先
順位の高い支払Aの決済に用いることができる。
In the date check table in a state where the payment C has been canceled, the available amount for 11 sunrise money is -8,000 (step S2), and the cancellation processing unit 10 determines that the cancellation is necessary (step S3). Payment B has a lower priority in payment B and payment A. Therefore, cancellation of payment B is controlled in step S4. When payment B was canceled, the balance on the 11th became zero, and the negative situation was resolved. FIG. 5B shows a state in which the payment B is canceled. FIG. 5 (B)
As shown in, the balance of 10,000 on the 11th can be used to settle payment A having the highest priority.

【0082】このように本実施形態では、口座処理の実
行順序にかかわらず、残高が不足する場合に、予め定義
した優先順位に従った決済を行うことができる。従っ
て、口座処理の実行順序を厳格に定める必要がなくな
り、演算手段4のオペレーションでの負担が格段に軽く
なる。また、先日付の口座処理及び必要な取消が完了し
た段階で、日付変更時になんら処理を行わずに、優先順
位の高い支払Aの口座処理が確定するため、24時間稼
働を実現することができる。
As described above, in this embodiment, regardless of the order in which the account processes are executed, settlement can be performed in accordance with a predetermined priority when the balance is insufficient. Therefore, it is not necessary to strictly determine the order in which the account processing is executed, and the load on the operation of the arithmetic unit 4 is significantly reduced. Further, at the stage when the account processing of the future date and the necessary cancellation are completed, the account processing of the payment A having a higher priority is determined without performing any processing when the date is changed, so that it is possible to realize 24-hour operation. .

【0083】また、未成立となった支払B及び支払Cに
ついては、12日を迎える以前に入金があった場合に
は、残高が増加し、再実行(再カット)により決済を成
立させることができる。この再カット処理にて優先順位
を反映させる手法を第2実施形態として開示する。
In the case of unsuccessful payments B and C, if payment is made before the twelfth day, the balance is increased, and settlement may be completed by re-execution (re-cut). it can. A method of reflecting the priority in the re-cut processing is disclosed as a second embodiment.

【0084】[0084]

【第2実施形態】先日付完結処理では、最後の口座処理
要求を実行した結果(残高等)に基づいて、先日付での
口座処理を実行する。このため、口座残高の異動に応じ
て、先日付で決済不能であった口座処理を再カットする
ことができる。また、特開昭59−77573号公報に
開示されているように、未成立であった口座処理につい
て当日に入金があった時についても再カットするように
しても良い。第2実施形態では、再カットを実行すると
き、優先順位の高い取引から再カットを試みることで、
優先順位に従った決済を図る。
[Second Embodiment] In the future date completion processing, the future day account processing is executed based on the result (balance etc.) of executing the last account processing request. Therefore, according to the change of the account balance, it is possible to re-cut the account processing that could not be settled at a future date. Further, as disclosed in Japanese Patent Application Laid-Open No. 59-77573, it may be possible to re-cut the account processing that has not been established even when payment is made on the day. In the second embodiment, when performing re-cutting, by trying re-cutting from a transaction having a higher priority,
Settle payments according to priority.

【0085】図6は、第2実施形態の構成例を示すブロ
ック図であり、演算手段の構成とファイル6内部の構成
以外は図1に示すシステムと同様である。図6に示す例
では、演算手段4が、当該演算を行う演算日に対して同
日又は先日付となる勘定日の口座処理要求を当該勘定日
の口座情報に基づいて処理する口座処理部8と、この口
座処理部8による口座処理によって当該口座処理の勘定
日と同日又は先日付の勘定日で未成立であった口座処理
要求が決済可能となる場合には、当該決済可能となる勘
定日での複数の未決済の口座処理要求のうち、優先順位
の高い口座処理要求を当該優先順位の高い順序にて処理
する再カット処理部24とを備えている。
FIG. 6 is a block diagram showing an example of the configuration of the second embodiment. The configuration is the same as that of the system shown in FIG. In the example shown in FIG. 6, the calculating means 4 includes an account processing unit 8 that processes an account processing request for an account date on the same day or a future date based on the account information on the account date on which the calculation is performed. If the account processing by the account processing unit 8 enables settlement of an unsatisfied account processing request on the same day as the account date of the account processing or on the account date of the future date, the account date on which the settlement is possible is performed. Of the plurality of unsettled account processing requests, the re-cut processing unit 24 that processes the account processing requests having a higher priority in the order of the higher priority.

【0086】残高の異動を生じさせる口座処理の勘定日
が演算日(今日現在)であれば、口座処理の勘定日と
「同日」は、演算日である。勘定日が先日付である場合
には、勘定日と同日も先日付である。従って、再カット
の対象は、勘定日以後に未成立であった口座処理要求で
ある。異なる複数の先日付での勘定日がある場合、残高
の異動を生じさせた口座処理の勘定日に最も近い将来の
勘定日から再カットを試み、最も遠い将来の勘定日での
再カットの試みが完了した時点で再カット処理の全体が
終了する。
If the account date of the account processing that causes a change in the balance is the calculation date (as of today), the account date of the account processing and “same day” are the calculation dates. If the account date is a future date, the same date as the account date is also a future date. Therefore, the target of the recut is an account processing request that has not been completed after the account date. If there are multiple different future dates, the system will attempt to recut from the nearest future account date and the farthest future date on the account processing account that caused the balance change. Is completed, the entire recut processing ends.

【0087】再カット処理部24は、口座処理部8によ
る口座処理によって、当該口座処理の勘定日と同日又は
先日付の勘定日で未成立であった口座処理要求が決済可
能となる場合に再カットの対象となる口座処理の特定を
行う。この再カットの対象は、当該決済可能となる勘定
日での複数の未決済の口座処理要求のうち、優先順位の
高い口座処理要求である。
The re-cut processing unit 24 re-executes the account processing by the account processing unit 8 when an account processing request that has not been established on the same day as the account date of the account processing or on the previous account date can be settled. Specify the account processing to be cut. The target of the re-cut is an account processing request having a higher priority order among a plurality of unsettled account processing requests on the account date that can be settled.

【0088】第1実施形態では、取消の対象を取引明細
セグメントから抽出した。第2実施形態では、決済不能
で未成立の口座処理を残不足明細として格納する残不足
明細セグメント16を用いるとよい。残不足明細セグメ
ント16は、前記残不足明細毎に、当該口座処理要求の
勘定日と、当該口座処理要求の他の口座処理要求に対す
る優先順位と、取引金額等を記録する。再カットが可能
であるということは、この取引金額よりも出金可能額が
多いということである。
In the first embodiment, the object of cancellation is extracted from the transaction details segment. In the second embodiment, it is preferable to use a remaining shortage detail segment 16 that stores account processing that cannot be settled and that has not been established as remaining shortage details. The remaining shortage statement segment 16 records, for each of the remaining shortage statements, an account date of the account processing request, a priority order of the account processing request with respect to another account processing request, a transaction amount, and the like. The fact that re-cutting is possible means that the withdrawable amount is larger than this transaction amount.

【0089】図6を参照すると、再カット処理部24
は、前記残不足明細セグメントの各残不足明細毎の勘定
日及び優先順位を参照して再カット処理対象の口座処理
要求を特定する再カット対象特定機能26を備える。再
カット対象特定機能は、複数の残不足明細のうち、残不
足明細セグメントに記録された優先順位を参照して、優
先順位の最も高い口座処理要求の再カットを試みる。こ
の口座処理要求の取引金額では再カットが不能の場合に
は、次に優先順位が高い取引の再カットを試みる。
Referring to FIG. 6, the recut processing unit 24
Has a recut target specifying function 26 that specifies an account processing request to be recut by referring to the account date and priority of each remaining shortage detail segment in the remaining shortage detail segment. The recut target specifying function attempts to recut the account processing request having the highest priority with reference to the priority recorded in the remaining shortage detail segment among the plurality of remaining shortage details. If re-cut is not possible with the transaction amount of this account processing request, an attempt is made to re-cut the next highest priority transaction.

【0090】さらに、本実施形態では、再カット処理部
24は、前記口座処理部24によって口座処理が行われ
る毎に前記残高明細セグメントに基づいて当該口座処理
の勘定日以後の各勘定日毎の出金可能額を算出する日付
チェックテーブル生成機能20と、前記残不足明細セグ
メントに格納された口座処理要求である出金要求を優先
順位の高い順序で且つ勘定日順に前記出金可能額と比較
すると共に出金可能額を下回る出金要求が発見された場
合に当該出金要求を口座処理要求として前記口座処理部
に実行させるプラス時再カット制御機能28とを備えて
いる。
Further, in this embodiment, each time the account processing is performed by the account processing section 24, the re-cut processing section 24 outputs, based on the balance detail segment, for each account date after the account date of the account processing. The date check table generation function 20 for calculating the possible amount of payment and the withdrawal amount, which is the account processing request stored in the remaining shortage / detailed detail segment, are compared with the possible amount of withdrawal in the order of the priority and in the order of the account date. And a plus-time recut control function 28 for causing the account processing unit to execute the withdrawal request as an account processing request when a withdrawal request less than the withdrawable amount is found.

【0091】プラス時再カット制御機能28により、口
座残高に異動がある毎に再カットの可能性を順次探索す
ることができる。10日の出金可能額が0から30,0
00へと変化した場合、11日の50,000の未成立
の口座処理要求は優先順位が高くても再カットすること
はできないが、20,000の口座処理要求は再カット
することができる。また、12日にて5,000の口座
処理要求が未成立であれば、10日の30,000の入
金によって、この12日の5,000の口座処理要求も
再カットすることができる。一方、12日にて15,0
00の口座処理要求が未成立であった場合には、11日
の20,000を再カットしたことで、12日の残高は
10,000となるため、この15,000の口座処理
要求は再カットできない。処理の最終結果において、1
2日の口座処理要求を11日の口座処理要求よりも優先
することはない。決済予定日(勘定日)の残高に基づい
て振替等を行うため、優先順位はあくまでも同一勘定日
内での口座処理要求の優先順位を定めるものとなる。
The plus-time recut control function 28 can sequentially search for the possibility of recut each time there is a change in the account balance. 10 sunrise possible amount from 0 to 30,0
If it changes to 00, 50,000 uncompleted account processing requests on the 11th cannot be recut even if they have a higher priority, but 20,000 account processing requests can be recut. If 5,000 account processing requests have not been fulfilled on the 12th, the 5,000 account processing requests on the 12th can be cut again by depositing 30,000 on the 10th. On the other hand, on the 12th, 15.0
If the account processing request of 00 was not established, the balance of 20,000 on the 12th would be 10,000 by re-cutting 20,000 on the 11th. I can't cut. In the final result of the processing, 1
No two-day account processing request takes precedence over the eleventh-day account processing request. Since the transfer and the like are performed based on the balance of the scheduled settlement date (account date), the priority order determines the priority order of account processing requests within the same account date.

【0092】日付チェックテーブル生成機能は、口座残
高に異動が生じた勘定日以後に成立又は未成立の口座処
理要求が存在する日付の出金可能額を算出する。プラス
時再カット制御機能28は、日付チェックテーブルが生
成されると、演算日当日または最も近い日付(日付チェ
ックテーブルのすべての日付のなかでは、最も古い日
付、日付チェックテーブルの先頭日又は先頭勘定日と呼
ぶ)での出金可能額と、その日付を勘定日とする残不足
明細とを比較する。すなわち、最も現在に近い日付から
再カットを試み、元も遠い将来での再カットの判定で完
了する。勘定日で前記残不足明細セグメントに格納され
た口座処理要求(出金要求)を、優先順位の高い順序で
出金可能額と比較する。再カット可能な口座処理要求を
発見した場合、発見された口座処理要求は、出金可能額
内で再カット可能な口座処理要求のうち優先順位の最も
高い口座処理要求である。再カット処理部24は、この
口座処理要求の再カットを起動する。
The date check table generation function calculates a possible withdrawal amount on a date when an account processing request is established or not established after the account date on which the account balance is changed. When the date check table is generated, the recut control function 28 at the time of plus adds the current date or the closest date (the oldest date among all the dates in the date check table, the first date or the first account of the date check table). ), And the remaining shortage details with that date as the account date. In other words, re-cutting is attempted from the date closest to the present date, and is completed by re-cutting determination in the distant future. The account processing request (withdrawal request) stored in the remaining shortage / detailed detail segment on the account date is compared with the withdrawable amount in the order of higher priority. If a recuttable account processing request is found, the found account processing request is the highest priority account processing request among the recuttable account processing requests within the payable amount. The recut processing unit 24 activates the recut of the account processing request.

【0093】この再カットによって、口座残高に異動が
生じる。このため、再カット処理部24は、再カット後
の最新の口座残高に基づいて日付チェックテーブルを作
成する。そして、新しい出金可能額内で再カット可能な
口座処理要求を優先順位に従って探索する。日付チェッ
クテーブルの日付のうち最も現在に近い日付(先頭日,
例えば10日)での残不足には、再カット可能な対象が
ない場合には、その次の勘定日(例えば12日)に処理
を移す。この次の勘定日(12日)にて先日付の口座処
理要求が成立している場合には、10日の出金可能額と
12日の出金可能額は異なる。したがって、再カット処
理部24は、次の勘定日(12日)の出金可能額に基づ
いて、その日付を勘定日とする未成立の口座処理要求の
再カットを優先順位に従って試みる。このように、日付
チェックテーブルに存在するすべての日付の探索が完了
したときに、再カットの判定・起動処理を終了する。
The re-cut causes a change in the account balance. Therefore, the recut processing unit 24 creates a date check table based on the latest account balance after the recut. Then, an account processing request that can be recut within the new possible withdrawal amount is searched according to the priority. The date closest to the current date in the date check table (first date,
If there is no target that can be recut in the remaining shortage on (for example, 10 days), the process is moved to the next accounting day (for example, 12 days). When the account processing request of the future date is satisfied on the next account date (12th), the possible amount of 10 sunrise money and the available amount of 12 sunrise money are different. Therefore, the recut processing unit 24 attempts to recut an unsuccessful account processing request with that date as the account date based on the payable amount on the next account date (12th) in accordance with the priority order. As described above, when the search for all dates existing in the date check table is completed, the recut determination / startup process is terminated.

【0094】本実施形態では、残不足明細は勘定日毎
に、そして同一勘定日内では優先順位に従って判定対象
として読み出される。従って、残不足明細セグメントの
データ構造を、勘定日を第1キーとし優先順位を第2キ
ーとして勘定日順に、そして、当該勘定日内では優先順
位順に論理的に並べられた状態とすることが好ましい。
この場合、プラス時再カット制御機能28は、前記残不
足明細セグメントのデータ構造に従った順序で前記出金
可能額と比較する機能を備えるとよい。
In the present embodiment, the remaining shortage details are read out as judgment objects for each accounting day, and within the same accounting day in accordance with the priority order. Therefore, it is preferable that the data structure of the remaining / deficient detail segments is logically arranged in the order of the account date using the account date as the first key and the priority order as the second key, and within the account date in the order of priority. .
In this case, the plus-time recut control function 28 may include a function of comparing with the payable amount in the order according to the data structure of the remaining shortage detail segment.

【0095】なお、残不足明細のデータ構造は処理の内
容に依存して定まる。本実施形態では、説明を簡単にす
るために前倒制御についてふれず、また、好ましい実施
例で採用する優先順位のグループについては言及しな
い。これらの前提による残不足明細の好ましいデータ構
造については、第1実施例に開示される。例えば、勘定
日がその当日のみでなく、再カット可能な期間(再カッ
ト期限)が一定期間ある口座処理要求を第1群とし、再
カット期限が振替日当日のみであるものを第2群とする
場合には、勘定日を第1のキーではなく、優先順位が第
1群であることを示す値を第1のキーとすると良い。
Note that the data structure of the remaining shortage details is determined depending on the contents of the processing. In the present embodiment, for the sake of simplicity, the forward control will not be described, and the priority groups employed in the preferred embodiment will not be described. A preferred data structure of the remaining shortage specification based on these assumptions is disclosed in the first embodiment. For example, an account processing request in which the account date is not only the same day but also a re-cuttable period (re-cut deadline) is a fixed period is defined as a first group, and an account processing request in which the re-cut period is only on the transfer day is referred to as a second group. In such a case, it is preferable that the account date is not the first key, but a value indicating that the priority is the first group is the first key.

【0096】再カットの判定および起動処理を図8のフ
ローチャートを用いて再度説明する。先日付完結処理シ
ステムの演算手段4を使用して口座処理を行う先日付完
結処理方法は、図8に示すように、演算手段4にて演算
を行う演算日に対して同日又は先日付となる勘定日の口
座処理要求を当該勘定日の口座情報に基づいて処理する
口座処理工程S11と、この口座処理工程S12での口
座処理によって当該口座処理の勘定日と同日又は先日付
の勘定日で未成立であった口座処理要求が決済可能とな
るか否かを当該口座処理要求の優先順位の高い順に判定
する再カット可否判定工程S12乃至S17と、この再
カット可否判定工程S12乃至S17にて再カット可能
と判定された場合には当該再カット可能な口座処理要求
を前記口座処理工程にて実行させる再カット処理制御工
程S18とを備えている。
The re-cut determination and start-up processing will be described again with reference to the flowchart of FIG. As shown in FIG. 8, in the future completion processing method for performing the account processing using the arithmetic means 4 of the future completion processing system, the calculation date on which the calculation is performed by the calculation means 4 is the same day or the future date. An account processing step S11 for processing the account processing request of the account date based on the account information of the account day, and an account processing in the account processing step S12, the account processing in the account processing in the account processing step S12 is not the same as the account processing date or a future date. The re-cut permission / non-permission determination steps S12 to S17, which determine whether the account processing request that has been established can be settled in the order of the priority of the account processing request, and the re-cut permission / non-permission determination steps S12 to S17 are repeated. And a recut processing control step S18 for executing the recuttable account processing request in the account processing step when it is determined that the cut is possible.

【0097】口座処理工程S11にて口座処理を行う
と、まず、日付チェックテーブルを作成する(ステップ
S12)。このとき、口座処理の勘定日が10日であれ
ば、10日が当日であるか先日付であるかにかかわら
ず、10日を日付チェックテーブルの先頭日とする。そ
して、残高明細を参照して、先頭日以降で残高が格納さ
れている日付の出金可能額を算出する。例えば、12日
と13日にて先日付の未決済残不足があり、14日以後
を勘定日とする口座処理がない場合には、10日と、1
2日と、13日の出金可能額を算出する。先日付の勘定
日にて出金可能額にマイナスがある場合には、第1実施
形態による取消を行う。
When the account processing is performed in the account processing step S11, first, a date check table is created (step S12). At this time, if the account processing account date is 10 days, the 10th day is set as the first date of the date check table regardless of whether the 10th day is the current day or the future date. Then, with reference to the balance statement, the withdrawable amount on the date when the balance is stored after the first date is calculated. For example, if there is a shortage of unsettled balance on the 12th and 13th days and there is no account processing with the account date after the 14th, the 10th and 1st
Two days and 13 sunrise possible money are calculated. If there is a minus in the possible withdrawal amount on the account date of the future date, the cancellation according to the first embodiment is performed.

【0098】再カット可否判定工程では、まず、ステッ
プS11にて処理した口座処理要求の勘定日を先頭日と
して、この先頭日以後の残高明細セグメントに基づいて
日付チェックテーブルを生成する(ステップS11)。
日付チェックテーブルは、ステップS1にて口座に直接
の異動があった勘定日を先頭日として、それよりも先日
付で口座処理が行われている場合に、その口座処理に応
じて作成された残高明細に基づいて、出金可能額を算出
する。続いて、ステップS13では、再カットの判定を
行う対象日を特定する。日付チェックテーブルの生成直
後の場合には、先頭日を対象勘定日とし、その出金可能
額を特定する。そして、対象勘定日を勘定日とする残不
足明細セグメントから、未判定で最も優先順位の高い口
座処理を特定する。未判定の口座処理要求は、対象勘定
日を勘定日として残不足明細に格納された口座処理要求
であって、ステップS15による再カット可否の判定を
行っていない口座処理要求である。残不足明細が優先順
位順に読み出せる場合には、読み出した口座処理要求が
対象とすべき勘定日で且つ最も優先順位の高い口座処理
要求となる。
In the recut availability determination step, first, a date check table is generated based on the balance detail segment after the first date, with the account date of the account processing request processed in step S11 as the first date (step S11). .
The date check table indicates that, when the account date at which the account was directly transferred in step S1 is set as the first date, and the account process is performed at a later date than that, the balance created according to the account process. The withdrawal amount is calculated based on the details. Subsequently, in step S13, a target date on which recut determination is performed is specified. In the case immediately after the generation of the date check table, the head date is set as the target account date, and the withdrawable amount is specified. Then, an undetermined and highest-priority account process is specified from the remaining shortage detail segments having the target account date as the account date. The undetermined account processing request is an account processing request stored in the remaining shortage statement with the target account date as the account date, and the account processing request for which the determination of whether or not recut is to be performed in step S15 has not been made. If the remaining shortage details can be read out in order of priority, the read out account processing request is the account date to be processed and is the account processing request with the highest priority.

【0099】さらに、ステップS14にて特定した口座
処理要求の取引金額と、対象勘定日の出金可能額とを比
較することで、再カットの可否を判定する(ステップS
15)。再カット可能であれば、当該ステップS14に
て特定した口座処理要求の再カットを起動し、ステップ
S11の口座処理工程にて再カットさせる(ステップS
18)。ステップS11にて再カットを実行すると、再
度日付チェックテーブルを生成する(ステップS1
2)。当初の先頭日(例えば、10日)よりも先日付
(より将来,例えば、12日)の勘定日の口座処理要求
を再カットした場合には、再カット完了後の日付チェッ
クテーブルでは、先頭日がより将来の勘定日(12日)
へとシフトする。
Further, by comparing the transaction amount of the account processing request specified in step S14 with the target account sunrise possible amount, it is determined whether recutting is possible (step S14).
15). If re-cutting is possible, re-cutting of the account processing request specified in step S14 is started, and re-cutting is performed in the account processing step of step S11 (step S11).
18). When re-cutting is performed in step S11, a date check table is generated again (step S1).
2). When the account processing request on the account date that is earlier (eg, 12 days) than the original first date (eg, 10 days) is recut, the first date is displayed in the date check table after the recut is completed. Is a future account date (12 days)
Shift to

【0100】ステップS15にて再カット可能でなけれ
ば、さらに対象勘定日内での次の残不足明細を探索する
(ステップS16)。残不足明細がある場合には、ステ
ップS14にて当該口座処理要求を特定し、再カット可
能か否かを判定する(ステップS15)。ステップS1
3にて対象勘定日が特定された後、S14,S15,S
16を繰り返すことで、特定の対象勘定日での残不足明
細を優先順位順にすべて探索することができる。
If re-cut is not possible in step S15, the next remaining shortage details within the target account date are searched (step S16). If there is a remaining shortage statement, the account processing request is specified in step S14, and it is determined whether recut is possible (step S15). Step S1
After the target account date is specified in step 3, S14, S15, S
By repeating step 16, it is possible to search all remaining shortage details on a specific target account date in order of priority.

【0101】ステップS16にて対象勘定日での残不足
明細のがすべて完了した場合には、続いて、日付チェッ
クテーブルにて出金可能額が算出された日付のうち、対
象勘定日に最も近い将来の日付を対象勘定日として特定
する(ステップS17,S13)。例えば、日付チェッ
クテーブルの先頭日が10日で、12日と13日の出金
可能額が算出されており、10日を勘定日とする残不足
明細の再カットがすべて不能であった場合には、ステッ
プS17にて日付チェックテーブルを参照する。そし
て、対象勘定日(10日)の次の勘定日が日付チェック
テーブルに存在する(12日)ため、ステップS13に
て対象勘定日を再設定し、その再設定した対象勘定日
(12日)での出金可能額を特定する。
If all the remaining shortage details on the target account date have been completed in step S16, subsequently, the date closest to the target account date among the dates on which the withdrawable amount was calculated in the date check table. A future date is specified as the target account date (steps S17, S13). For example, if the first day of the date check table is 10 days, the possible amounts of sunrise on the 12th and 13th are calculated, and it is impossible to re-cut all remaining shortage details with the 10th as the account date, In step S17, the date check table is referred to. Since the account date following the target account date (10 days) exists in the date check table (12 days), the target account date is reset in step S13, and the reset target account date (12 days) is set. Specify the amount that can be withdrawn in.

【0102】そして、12日及び13日を勘定日とする
未成立の口座処理要求を探索する。13日を勘定日とす
る口座処理要求のうち、最も優先順位の低い口座処理が
再カット不能であると(ステップS15)、対象勘定日
内に次の残不足明細がなく、そして、対象勘定日よりも
先日付の日付は日付チェックテーブルに存在しない。こ
のため、再カットの判定及び起動処理を終了する。
Then, an unsatisfied account processing request with the 12th and 13th as accounting dates is searched. If the account processing with the lowest priority among the account processing requests with the account date of 13th cannot be recut (step S15), there is no next remaining shortage statement within the target account date, and Even future dates do not exist in the date check table. Therefore, the recut determination and the start-up processing are terminated.

【0103】図8に示す例では、演算日当日の再カット
と、先日付での再カットとを特に区別することなく同一
の処理で実行することができる。当日の再カットと先日
付での再カットは、日付チェックテーブルの先頭日が当
日であるか先日付であるかの相違だけである。もちろ
ん、当日の再カットについては、再カットした時点で決
済完了性を有し、確定する。
In the example shown in FIG. 8, the re-cut on the day of the calculation day and the re-cut on the previous date can be executed by the same process without distinction. The re-cut on the current day and the re-cut on the future date are only the difference between whether the first date of the date check table is the current day or the future date. Of course, the re-cut of the day has settlement completeness at the time of the re-cut and is determined.

【0104】第1実施形態と同様に、演算手段8のCP
Uが複数の指令からなるプログラムを実行することで、
図6に示す構成や、図8に示す処理を実現することがで
きる。第2実施形態では、先日付完結処理用プログラム
は前記演算手段を動作させる指令として、演算手段4に
て演算を行う演算日に対して同日又は先日付となる勘定
日の口座処理要求を当該勘定日の口座情報に基づいて処
理させる口座処理指令と、この口座処理指令に応じた口
座処理によって当該口座処理の勘定日と同日又は先日付
の勘定日で未成立であった口座処理要求が決済可能とな
るか否かを当該口座処理要求の優先順位の高い順に判定
させる再カット可否判定指令と、この再カット可否判定
指令に応じて再カット可能と判定される場合には当該再
カット可能な口座処理要求を前記口座処理工程にて実行
させる再カット処理制御指令とを備えている。再カット
可否判定指令は、図8に示すステップS12からステッ
プS17までの各工程に対応する指令を備えると良い。
As in the first embodiment, the CP
U executes a program consisting of multiple commands,
The configuration shown in FIG. 6 and the processing shown in FIG. 8 can be realized. In the second embodiment, the program for the completion processing of the future date includes, as a command for operating the arithmetic means, an account processing request on the same day or a future date of the arithmetic day on which the arithmetic operation by the arithmetic means 4 is performed. An account processing command to be processed based on the account information of the day and an account processing corresponding to this account processing command can settle an account processing request that was not completed on the same day as the account date of the account processing or a future date. A re-cut permission / non-permission determination command for determining whether or not the account processing request is higher in the priority order of the account processing request. And a recut processing control command for executing a processing request in the account processing step. The recut permission / inhibition determination command may include a command corresponding to each step from step S12 to step S17 shown in FIG.

【0105】図9は、第2実施形態による動作例を示す
説明図である。図9(A)に示す例では、図5に示す2
0,000のATM現金出金に続いて、11日を勘定日
として通番004の振込入金があった場合である。11
日を勘定日とする入金であるため、残高は0から9,0
00となった。図8を参照すると、振込入金を口座処理
として実行し(ステップS11)、続いて、日付チェッ
クテーブルを生成する(ステップS12)。日付チェッ
クテーブルは、11日のみであり、先頭日は11日とな
る(ステップS13)。図9に示す例では、残不足明細
に未成立の口座処理として支払B,支払Cが格納されて
いる。最も優先順位が高い口座処理は支払いBであるた
め(ステップS14)、支払Bの取引金額8,000と
11日の出金可能額9,000とを比較する。取引金額
が出金可能額よりも小さいため、再カット可能であり、
ステップS18にて当該支払Bの再カットを起動する。
FIG. 9 is an explanatory diagram showing an operation example according to the second embodiment. In the example shown in FIG. 9A, 2 shown in FIG.
This is the case where, following the ATM cash withdrawal of 000, a deposit with a serial number 004 is made with the 11th as an account date. 11
The balance is from 0 to 9,0 because the payment is made on the day
It became 00. Referring to FIG. 8, the transfer is executed as an account process (step S11), and subsequently, a date check table is generated (step S12). The date check table has only 11 days, and the first date is 11 days (step S13). In the example shown in FIG. 9, payment B and payment C are stored in the remaining shortage statement as unsettled account processing. Since the account processing with the highest priority is payment B (step S14), the transaction amount 8,000 of the payment B is compared with the available amount 11,000 of sunrise money. Since the transaction amount is smaller than the withdrawable amount, it can be recut,
In step S18, re-cut of the payment B is started.

【0106】ステップS11にて支払Bを再カットし、
日付チェックテーブルを作成すると、11日の出金可能
額は1,000である。支払Cの再カットはできないた
め、ステップS16にて11日内の次の残不足明細の有
無を確認すると、残不足明細は支払Cで最後である。そ
して、11日を基準とした先日付の残高明細は存在しな
い(日付チェックテーブルに日付がない)。このため、
図8に示す処理を完了する。この状態を図9(B)に示
す。本実施形態によると、図9(B)に示すように、振
込入金による口座異動に応じて、優先順位の高い支払B
の決済を行うことができた。
At step S11, payment B is recut,
When the date check table is created, the possible amount of money for 11 sunrise money is 1,000. Since payment C cannot be re-cut, if it is confirmed in step S16 whether there is a next remaining shortage statement within 11 days, the remaining shortage statement is the last payment shortfall. Then, there is no future-dated balance statement based on the 11th (there is no date in the date check table). For this reason,
The processing shown in FIG. 8 is completed. This state is shown in FIG. According to the present embodiment, as shown in FIG. 9 (B), payment B having a high priority
Was able to make payments.

【0107】[0107]

【第3実施形態】第3実施形態では、先日付完結処理に
おいて、先日付の取消と再カットとを組み合わせること
で、優先順位が定義された複数の操作にとって共通資源
を最適な状態で利用する仕組みを開示する。この第3実
施形態では、決済のみに限定することなく、基幹系の業
務全般への適用可能である。
[Third Embodiment] In the third embodiment, in the future completion processing, the common resource is used in an optimal state for a plurality of operations with defined priorities by combining the cancellation of the future and re-cutting. Disclose the mechanism. In the third embodiment, the present invention is not limited to settlement only, but can be applied to all core businesses.

【0108】図10は、本実施形態による先日付資源利
用最適化システムの構成例を示すブロック図である。図
10に示すように、先日付資源利用最適化システムは、
業務処理要求の実行可否を定める資源の状態を一定期間
別に先日付で記録した資源状態ファイル7と、この資源
状態ファイルに記録された情報に基づいて各業務処理要
求を処理する演算手段4とを備えている。資源状態ファ
イル6は、資源の状態を過去から現在並びに将来となる
先日付まで日単位等の一定期間毎に格納する資源明細セ
グメント7Aと、過去又は先日付で成立した業務処理要
求を当該業務処理の優先順位付きで成立順に格納する取
引明細セグメント7Bと、先日付にて資源不足で未成立
の業務処理要求を当該優先順位付きで格納する未成立明
細セグメント7Cとを備えている。
FIG. 10 is a block diagram showing a configuration example of the future resource utilization optimizing system according to the present embodiment. As shown in FIG. 10, the future-dated resource utilization optimization system includes:
A resource status file 7 which records the status of resources that determine whether a business process request can be executed or not for a certain period of time and a computing unit 4 that processes each business process request based on information recorded in the resource status file. Have. The resource status file 6 includes a resource description segment 7A for storing the resource status from the past to the present and future future dates at regular intervals, such as on a daily basis, and a business process request made in the past or the future date. And a transaction detail segment 7B for storing business processing requests that have not been completed due to lack of resources at a later date with the priorities.

【0109】本実施形態で管理対象となる資源として
は、第1、第2実施形態での口座の残高が該当する。そ
の他、座席数や空室数を資源として予約処理に適用して
もよいし、また、数量や納期が限られた商品やサービス
の販売管理などに応用しても良い。本実施形態は、有限
の共通資源に対して複数の処理要求(ここでは、業務処
理要求と呼ぶ)が競合する場合に、業務処理要求の種類
等に応じて予め定められた優先順位に従って共通資源を
配分するシステムである。
The resources to be managed in this embodiment correspond to the account balances in the first and second embodiments. In addition, the number of seats and the number of vacancies may be applied as resources to the reservation processing, or may be applied to sales management of goods and services with limited quantities and deadlines. In the present embodiment, when a plurality of processing requests (herein referred to as business processing requests) compete with a finite common resource, the common resources are determined in accordance with a priority determined in advance according to the type of the business processing request. It is a system that distributes.

【0110】図10に示す例では、演算手段4は、業務
処理要求を実行すると共に当該業務処理要求が成立した
場合には前記取引明細セグメント7Bに記録する一方、
前記資源の不足で未成立の場合には前記未成立明細セグ
メント7Cに記録する業務処理部38と、この業務処理
部38による処理の結果先日付にて前記資源に不足が生
じた場合には、当該不足が生じた期間(決済の例では、
勘定日)内で前記取引明細セグメント7Bに記録された
業務処理要求群から優先順位の低い順に前記資源不足が
解消するまで順次業務処理要求を取り消す取消処理部4
0と、業務処理部38による処理の結果、当日又は先日
付にて資源が増加した場合には当該増加した期間以後で
前記未成立明細セグメント7Cに記録された業務処理群
から前記資源不足とならない利用可能資源の範囲内で前
記未成立の業務処理要求を優先順位の高い順に実行する
再実行処理部42とを備えている。
In the example shown in FIG. 10, the calculating means 4 executes the business processing request and, when the business processing request is satisfied, records it in the transaction detail segment 7B.
If the resource is insufficient and the resource is insufficient, the business processing unit 38 records the unsatisfied detail segment 7C. If the resource is insufficient at a future date as a result of the processing by the business processing unit 38, The period during which the shortfall occurred (in the example of settlement,
Cancellation processing unit 4 for sequentially canceling business processing requests from the group of business processing requests recorded in the transaction detail segment 7B in the order of lower priority within the account date) until the resource shortage is resolved.
0, as a result of the processing by the business processing unit 38, if the resource increases on the current day or the future date, the resource shortage does not occur from the business processing group recorded in the unsuccessful detailed segment 7C after the increased period. And a re-execution processing unit 42 for executing the unsatisfied business processing requests in the range of available resources in descending order of priority.

【0111】業務処理部38は、業務の内容に応じて、
サービスの提供や、商品の販売などの予約などの要求を
処理する。このとき、先日付での予約を受け付ける一
方、確定した予約として取り扱わず、当日又は直前まで
の取消を許容すると良い。取消処理部40は、業務処理
の結果、資源に不足が生じた場合には、資源不足が解消
するまで順次業務処理要求を取り消す。このとき、優先
順位の低い業務処理から順に取り消していくことで、優
先順位の高い業務処理に優先して資源を割り当てる。
The business processing unit 38, according to the contents of the business,
It processes requests such as provision of services and reservations for sale of products. At this time, it is preferable that the reservation on the previous date is accepted, but the reservation is not handled as a fixed reservation, but is canceled on the day or immediately before. When a resource shortage occurs as a result of the business processing, the cancellation processing unit 40 sequentially cancels the business processing request until the resource shortage is resolved. At this time, resources are assigned in priority to business processes with higher priorities by canceling business processes with lower priorities in order.

【0112】また、再実行処理部42は、業務処理によ
る処理の結果、資源が増加した場合には、未成立明細セ
グメント7Cに格納された業務処理要求をその優先順位
の高い順に再実行を試行する。優先順位の高い順に業務
処理要求の再実行を制御することで、優先順位の高い業
務処理に優先して資源を割り当てることができる。
When the resources have increased as a result of the processing by the business processing, the re-execution processing unit 42 attempts to re-execute the business processing requests stored in the unsuccessful detailed segment 7C in the order of their priority. I do. By controlling the re-execution of the business process request in descending order of priority, resources can be allocated in preference to the business process of higher priority.

【0113】一般的に、トランザクション管理では、ア
ボート(処理の中断及び処理開始前への復帰)の連鎖を
避けるべきであるといわれている。連鎖的なアボート
は、不正な値に従ったトランザクションをアボートし、
このトランザクションのアボートがさらに他のトランザ
クションのアボートを引き起こし、これが連鎖的に生じ
ることをいう。連鎖的なアボートの発生は処理性能上大
きな問題となるため、その発生を回避すべきであるとさ
れる。連鎖的アボートは、トランザクションが、取り消
される可能性のある値に基づいて処理を行わないことを
保証すると、連鎖的アボートは生じない。
It is generally said that in transaction management, a chain of aborts (interruption of processing and return to before starting processing) should be avoided. A cascading abort aborts a transaction according to an invalid value,
An abort of this transaction causes an abort of another transaction, which occurs in a chain. Since the occurrence of a chained abort poses a serious problem in processing performance, it is said that the occurrence should be avoided. A cascading abort does not occur if it guarantees that the transaction does not take action based on a value that can be canceled.

【0114】先日付完結処理(予約等を含む)では、将
来の資源の利用については確定させていない。決済を例
にすると、先日付での資源の利用については決済完了性
を与えず、取消を可能としている。また、飲食や宿泊施
設の予約は、当日の一定期間前までのキャンセルや変更
が可能である。従って、先日付完結処理では、資源の利
用の取消が生じ得る。そして、先日付でさらに各業務処
理や口座処理に優先順位を与えるには、取消や再実行を
多用しなければならず、連鎖的なアボートと同様の事態
が生じ得る。
In the future date completion processing (including reservation etc.), the use of resources in the future is not fixed. Taking the settlement as an example, the use of the resources on the future date can be canceled without giving the settlement completeness. In addition, the reservation of food and drink and accommodation facilities can be canceled or changed up to a certain period before the day. Therefore, the use of resources may be canceled in the future completion processing. Then, in order to give priorities to the respective business processes and account processes on a future date, cancellation and re-execution must be frequently used, and the same situation as a chain abort may occur.

【0115】例えば、業務処理に優先順位を割り当て、
優先順位の高い業務処理を実行し、優先順位の低い業務
処理の取消を行うことで、優先順位に従った業務処理の
入れ替えを行うのは、業務処理をトランザクションとし
て考えると、業務処理の連鎖的なアボートと同様の状態
となってしまう。すなわち、トランザクションの入れ替
えを行おうとすると、一旦成立しているトランザクショ
ンを次々とアボートする必要性が生じてしまう。
For example, priorities are assigned to business processes,
By executing high-priority business processes and canceling low-priority business processes, the replacement of business processes in accordance with the priority order is a matter of considering business processes as transactions. It will be in the same state as a simple abort. In other words, when attempting to exchange transactions, it is necessary to abort the transactions once established one after another.

【0116】本実施形態では、単純なトランザクション
処理システムではなく、取引明細セグメントと、未成立
明細セグメントとを利用して、業務処理(トランザクシ
ョン)の入れ替えを行うものである。すなわち、連鎖的
なアボートが生じる状況を未成立明細セグメント及び取
引明細セグメントとして管理しつつ、取消処理と再実行
処理とを組み合わせることで、優先順位に応じた業務処
理の入れ替えや再構築を行う。これにより、連鎖的なア
ボートと同様の事態によるシステム不安定さを回避しつ
つ、先日付での優先順位の反映を実現する。
In the present embodiment, instead of a simple transaction processing system, business processes (transactions) are exchanged using a transaction detail segment and an unsuccessful detail segment. That is, while managing the situation in which a chain of aborts occurs as an unsatisfied detail segment and a transaction detail segment, a combination of the cancellation processing and the re-execution processing performs replacement or restructuring of the business processing according to the priority. As a result, the priorities can be reflected at a later date while avoiding system instability due to the same situation as a chain of aborts.

【0117】具体的には、取消処理部による取消や、再
実行処理部による再実行を、トランザクションとしての
ACID特性を満たすようにすることでトランザクショ
ンの連鎖的アボートを防ぎ、一方、個別のトランザクシ
ョンの結果を未成立明細セグメントや取引明細セグメン
トとして安定な状態で記録する。すると、取消処理や再
実行処理は、トランザクション管理システムのレベルで
は厳格に安定して実行することができる。しかし、業務
の目的からすると、成立させるべき業務処理要求が実行
されずに未成立明細セグメントに格納されたままとなる
と、業務レベルでの一貫性、整合性を保てない。この業
務レベルでの一貫性を保つように、図10に示す取消処
理部40及び再実行処理部42の構成を設計する。端的
には、資源の状態に異動があったときには、取消又は再
実行を検討するというものである。
More specifically, the cancellation by the cancellation processing unit and the re-execution by the re-execution processing unit satisfy the ACID characteristics as a transaction, thereby preventing a chain abort of transactions. The result is recorded in a stable state as an unsuccessful statement segment or a transaction statement segment. Then, the cancellation processing and the re-execution processing can be executed strictly and stably at the level of the transaction management system. However, from the viewpoint of the business, if the business processing request to be satisfied is not executed and is stored in the unsatisfied detail segment, consistency and consistency at the business level cannot be maintained. The configurations of the cancellation processing unit 40 and the re-execution processing unit 42 shown in FIG. 10 are designed so as to maintain consistency at the business level. In short, when there is a change in the state of the resource, cancellation or re-execution is considered.

【0118】資源に不足が生じたときに取消を行い、資
源が充足した場合に再実行を行うことで、業務レベルで
の一貫性を保つことができる。そして、予め業務処理要
求の種類等に応じて定めた優先順位を参照して、取消又
は再実行を行うことで、資源の状態に応じて業務処理の
実行順序等を変化させることができる。これにより、資
源の状態変化に応じて実行すべき業務処理の最適化を行
うことができる。
By canceling when a resource shortage occurs and re-executing when the resource is full, consistency at the business level can be maintained. Then, by referring to a priority determined in advance according to the type of the business processing request or the like and canceling or re-executing the processing, the execution order of the business processing can be changed according to the state of the resource. As a result, it is possible to optimize the business process to be executed according to the resource state change.

【0119】また、取消と再実行とを組み合わせること
で、業務処理の強制的な入れ替えを自動化することがで
きる。具体的には、未成立明細セグメントのなかで優先
順位が最も高い業務処理要求(高順位要求)を特定し、
この高順位要求よりも優先順位が低く、すでに成立して
いる口座処理要求と入れ替える。この高順位の未成立業
務処理要求と、低順位の成立済み業務処理要求の入れ替
えを、修正再実行(第4実施形態では、修正再カット)
と呼ぶ。
Further, by combining the cancellation and the re-execution, it is possible to automate the forcible replacement of the business process. Specifically, the business process request (high-order request) having the highest priority among the unsuccessful item segments is specified,
An account processing request that has a lower priority than this high-order request and has already been established is replaced. The replacement of the high-ranked uncompleted business processing request and the low-ranked completed business processing request is re-executed (in the fourth embodiment, re-cut is performed).
Call.

【0120】修正再実行を行う例では、演算手段4が、
前記業務処理要求の実行の結果前記資源の状態に変化が
あった場合には、前記未成立明細セグメント7Cに記録
された先日付の業務処理要求のうち、最も優先順位が高
い業務処理要求を未成立高順位要求として特定する未成
立高順位要求特定部44を備えている。また、演算手段
4は、取引明細セグメント7Bに記録された先日付の業
務処理要求のうち、前記未成立高順位要求の優先順位よ
りも相対的な優先順位の低い業務処理要求群によって利
用予定の資源の一覧又は総量を修正利用可能資源として
算出する修正利用可能資源算出部46を備える。
In the example of performing the correction re-execution, the arithmetic means 4
If the status of the resource has changed as a result of the execution of the business processing request, the business processing request having the highest priority among the business processing requests of the future date recorded in the unsatisfied detail segment 7C is not An unsatisfied high-rank request specifying unit 44 for specifying as a satisfied high-rank request is provided. Further, the calculating means 4 is to use the business processing request group having a lower relative priority than the unsatisfied high-priority request among the business processing requests of the future date recorded in the transaction detail segment 7B. A modified available resource calculation unit 46 for calculating a list or total amount of resources as modified available resources is provided.

【0121】この例では、さらに、演算手段4が、未成
立高順位要求によって要求する資源が前記修正利用可能
資源にて充足する場合には、当該未成立高順位要求を実
行すると共に前記取消処理部に優先順位の低い業務処理
要求群の取消を依頼する修正再実行処理部48を備え
る。
In this example, if the resource requested by the unsatisfied high-rank request is satisfied by the modified available resource, the calculating means 4 executes the unsatisfied high-rank request and executes the cancellation processing. A modification / re-execution processing unit 48 for requesting the unit to cancel a business processing request group having a low priority.

【0122】未成立高順位要求特定部44は、未成立明
細セグメント7Cに記録された業務処理要求のうち、最
も優先順位の高い業務処理要求を特定する。この未成立
高順位要求とすでに成立している低順位の業務処理要求
との入れ替えを試みる。成立している業務処理要求は、
取引明細セグメント7Bに記録されている。修正利用可
能資源算出部46は、取引明細セグメントに7B記録さ
れ、未成立高順位要求の優先順位よりも相対的な優先順
位の低い業務処理要求群によって利用予定の資源の一覧
又は総量を修正利用可能資源として算出する。
The unsatisfied high-rank request specifying unit 44 specifies the highest-priority business process request among the business process requests recorded in the unsatisfied detailed segment 7C. An attempt is made to replace the unsatisfied high-rank request with a low-rank business processing request that has already been satisfied. The established business processing request is
Recorded in transaction detail segment 7B. The modified available resource calculation unit 46 modifies and uses the list or the total amount of resources scheduled to be used by a group of business processing requests recorded in 7B in the transaction detail segment and having a lower relative priority than the priority of the uncompleted high-order request. Calculate as possible resources.

【0123】そして、修正再実行処理部48は、未成立
高順位要求によって要求する資源が前記修正利用可能資
源にて充足する場合には当該未成立高順位要求を実行す
る。これにより、未成立であった業務処理要求に資源を
割り当てることができる。この高順位要求の修正再実行
をした直後は、高順位要求と優先順位の低い業務処理要
求群とで共通資源への競合が発生し、資源不足の状態と
なる。取消処理部40は、この資源不足の状態を解消す
るために、優先順位の低い順にすでに成立している業務
処理要求を取り消す。これにより、優先順位に応じた業
務処理要求(トランザクション)の入れ替えを行う。
Then, when the resources requested by the unsatisfied high-rank request are satisfied with the corrected available resources, the correction re-execution processing unit 48 executes the unsatisfied high-rank request. As a result, resources can be allocated to business process requests that have not been established. Immediately after this high-order request is corrected and re-executed, a conflict with the common resource occurs between the high-order request and a group of business processing requests with a low priority, resulting in a resource shortage state. The cancellation processing unit 40 cancels business processing requests that have already been established in the order of lower priority in order to resolve this resource shortage state. As a result, the business process requests (transactions) are exchanged according to the priority.

【0124】ここで、資源の一例として宿泊施設Aの部
屋考え、この予約での優先順位の反映について説明す
る。例えば、パック旅行の宿泊の予約と、宿泊施設Aへ
の直接の予約とが競合する。パック旅行の申込者は宿泊
施設を指定していないため、パック旅行での宿泊施設A
への予約を行う業務処理要求の優先順位は、直接の予約
を行う業務処理要求と比較して低く設定できるとする。
すなわち、直接の予約を行う業務処理要求の優先順位が
高いとする。
Here, a description will be given of a room in accommodation facility A as an example of resources and the reflection of priority in this reservation. For example, the reservation of the accommodation of the package travel and the reservation of the accommodation facility A directly conflict. Since the applicant of the package travel has not specified accommodation facilities, accommodation facility A for the package travel
It is assumed that the priority of the business process request for making a reservation to the user can be set lower than that of the business process request for making a direct reservation.
That is, it is assumed that the priority of the business process request for making a direct reservation is high.

【0125】パック旅行の宿泊予約が時間的に早く実行
され、宿泊施設Aの全部屋の利用予定が取引明細セグメ
ントに登録されている場合、直接の予約を行う業務処理
要求が行われると、資源が不足するため実行できず、一
旦未成立取引明細セグメント7Cに格納される。する
と、未成立高順位要求特定部44は、この直接の予約を
行う業務処理要求を特定する。そして、修正利用可能資
源算出部46は、取引明細セグメントに格納されたパッ
ク旅行の予約を行う業務処理要求によって利用予定の資
源を特定する。宿泊施設であれば、部屋のタイプや部屋
数等を特定する。
If the accommodation reservation of the packaged tour is executed earlier in time and the use schedules of all the rooms of the accommodation facility A are registered in the transaction statement segment, if a business processing request for direct reservation is made, the resource Cannot be executed because of the shortage, and is temporarily stored in the unsuccessful transaction detail segment 7C. Then, the unsatisfied high-rank request specifying unit 44 specifies the business processing request for performing the direct reservation. Then, the corrected available resource calculation unit 46 specifies the resource to be used in accordance with a business processing request for making a reservation for a pack trip stored in the transaction detail segment. If it is an accommodation facility, the type and number of rooms are specified.

【0126】修正実行処理部48は、直接の予約を行う
業務処理要求によって利用要求された資源が、修正利用
可能資源算出部46によって特定された資源で充足でき
るか否かを判定する。充足する場合、まず、直接予約を
行う業務処理要求を実行する。すると、資源に競合が生
じる(ダブルブッキング状態となる)ため、より優先順
位の低いパック旅行の予約のうち、最も優先順位の低い
予約を取り消す。これにより、宿泊施設Aへの予約の入
れ替えが完了する。取り消されたパック旅行は、同地域
への他の宿泊施設への予約処理等を行う。
The modification execution processing unit 48 determines whether the resource requested by the business processing request for making a direct reservation can be satisfied by the resource specified by the modification available resource calculation unit 46. If it is satisfied, first, a business process request for making a direct reservation is executed. Then, a conflict occurs in resources (becomes a double booking state), and therefore, the reservation with the lowest priority among the reservations of the pack travel with lower priority is canceled. Thus, the replacement of the reservation with the accommodation facility A is completed. The canceled pack trip is used to make a reservation for another accommodation facility in the same area.

【0127】図10に示す例では、資源の充足及び不足
に応じて、多数の取消処理又は再実行処理が発生するこ
とがある。これら多数の取消や再カットを1つのトラン
ザクションとして実行するには、システム的な制限があ
るほか、応答時間を悪化させてしまう。このため、取消
や再実行については、起動側のトランザクションとは別
のトランザクションとして実行される派生トランザクシ
ョンを用いると良い。
In the example shown in FIG. 10, a large number of cancellation processes or re-execution processes may occur depending on whether the resources are sufficient or insufficient. Executing such a large number of cancellations and recuts as one transaction has system limitations and degrades the response time. Therefore, for cancellation and re-execution, it is preferable to use a derived transaction that is executed as a transaction different from the transaction on the activation side.

【0128】一方、資源の利用の要求処理と、この利用
要求される資源の管理とは、別系統の処理とすると開発
がしやすい。しかし、資源の利用の要求処理と、資源利
用の許可等の管理とに矛盾を生じさせることはできな
い。例えば、宿泊施設の予約が成功したという結論と、
宿泊施設に予約を登録する処理とは、原始性を満たさな
ければならない。このような場合に、資源の利用の要求
処理と、資源の管理処理とを連動させ、1つのトランザ
クションとして実行するとよい。
On the other hand, if the process of requesting the use of resources and the management of the resources requested to be used are processes of different systems, development is easy. However, it is not possible to cause inconsistency between resource use request processing and management of resource use permission and the like. For example, the conclusion that the accommodation reservation was successful,
The process of registering a reservation at an accommodation facility must satisfy the primitiveness. In such a case, the resource use request process and the resource management process may be linked and executed as one transaction.

【0129】このように、本実施形態では、応答性を確
保しつつ複雑な処理を実行するために、2種類のトラン
ザクションの起動手法を使い分けている。1つは連動取
引(連鎖トランザクション,入れ子トランザクション)
であり、もう一つは派生取引(非連鎖トランザクショ
ン)である。連動取引は、決済を例とすると、自動定期
化を行うために、普通預金口座から出金して、定期預金
口座に入金する場合に、普通預金口座からの出金を行う
処理と定期預金口座に入金する処理とを連動(chain)
させ、一つのトランザクションとして処理する。すなわ
ち、連動取引は、どれだけ複雑な入れ子状態となろうと
も、また、連動を多数回繰り返すとしても、それは1ト
ランザクションである。トランザクションの隔離性によ
り、連動取引によりなんらかの処理が実行されている場
合には、当該連動取引によって利用されている資源は隠
蔽される。また、トランザクションの原始性により、連
動されているすべての処理が成功しなければ、端末等へ
の応答は戻らない。
As described above, in the present embodiment, in order to execute complicated processing while ensuring responsiveness, two types of transaction activation methods are selectively used. One is linked transactions (chained transactions, nested transactions)
And the other is a derivative transaction (unchained transaction). In the case of a linked transaction, as an example of settlement, the process of withdrawing from a savings account and depositing it into a time deposit account to perform automatic periodicity Link with the process of depositing money (chain)
And process as one transaction. That is, a linked transaction is one transaction, no matter how complicated the nesting is, and even if the linkage is repeated many times. Due to transaction isolation, if any processing is being performed by a linked transaction, the resources used by the linked transaction are hidden. Further, if all the linked processes are not successful due to the primitiveness of the transaction, no response is returned to the terminal or the like.

【0130】ここでは、連動取引を起動する側を起動業
務、起動業務により起動される処理を受動業務と呼ぶ。
連動取引は、一般的に、連動回数に制限が有るほか、1
トランザクションとして実行するため、連動すべき取引
数が多数になる場合には、上記のように、オンライン取
引の応答時間を一定時間以内とすることができなくな
る。すなわち、1つの予約の成立により多数の予約を取
り消したり、また、ある口座に対する入金に応じて多数
の口座処理を実行するなどの数の予想が難しい処理につ
いては、連動処理には限界がある。
[0130] Here, the side that starts the linked transaction is called a start-up business, and the process started by the start-up business is called a passive business.
Linked transactions generally have a limited number of links,
Since the transaction is executed as a transaction, if the number of transactions to be linked becomes large, the response time of the online transaction cannot be kept within a certain time as described above. That is, there is a limit to the interlocking process for processes in which the number is difficult to predict, such as canceling a large number of reservations when one reservation is made, or executing a large number of account processes in response to payment for a certain account.

【0131】派生取引は、1つのトランザクションを完
了させ、そのトランザクションとは別の他のトランザク
ションを派生させるものである。派生取引(非連鎖トラ
ンザクション)には取扱困難な部分もあるが、本実施形
態及び第4実施形態,第1実施例等においては、取消す
べき業務処理(口座処理)の数を事前に限定することが
難しいため、連動取引にて取消や再カットを行うには限
界があり、派生トランザクションを活用する。
A derivative transaction completes one transaction and derives another transaction different from that transaction. Derived transactions (unchained transactions) have some difficult parts to handle, but in the present embodiment, the fourth embodiment, the first example, etc., the number of business processes (account processes) to be canceled is limited in advance. Is difficult, so there is a limit to canceling or re-cutting in a linked transaction, and use derivative transactions.

【0132】図11は、連動トランザクションと派生ト
ランザクションとを併用して資源状態の最適化を行う構
成を示すブロック図である。図11に示す例では、演算
手段4が、資源の予約又は使用等の資源に対する操作を
起動業務として実行すると共に、当該実行中の起動業務
プログラム群と単一のトランザクションとしての連動を
所定の受動業務処理部に依頼する起動業務処理部50
と、この起動業務処理部50によって連動依頼される前
記資源状態の更新管理等の受動業務を実行すると共に、
当該受動業務の実行によって前記資源の状態が変化した
場合には、起動業務及び受動業務が連動した単一のトラ
ンザクションとは異なる他の派生トランザクションとし
て、所定の取消再実行メインプログラムを起動する受動
業務処理部52とを備えている。
FIG. 11 is a block diagram showing a configuration for optimizing the resource state by using both the linked transaction and the derived transaction. In the example illustrated in FIG. 11, the arithmetic unit 4 executes an operation on a resource such as resource reservation or use as a start-up operation, and performs a predetermined passive operation with the active start-up operation program group as a single transaction. Startup business processing unit 50 requesting the business processing unit
And executing a passive task such as update management of the resource status requested to be linked by the startup task processing unit 50,
When the state of the resource changes due to the execution of the passive business, a passive business that starts a predetermined cancellation / re-execution main program as another derived transaction different from a single transaction in which the starting business and the passive business are linked. And a processing unit 52.

【0133】演算手段4はさらに、取消再実行メインプ
ログラムが派生トランザクションとして起動されたとき
に、当該起動された際の前記受動業務によって管理され
る資源の状態に基づいて前記起動業務の取消又は再実行
の要否を判定すると共に、当該判定結果と各起動業務の
優先順位に基づいて前記起動業務の取消又は再実行を当
該取消再実行メインプログラムとは異なる他の派生トラ
ンザクションとして前記起動業務処理部50に実行させ
る取消再実行メイン処理部54を備えている。
When the cancellation / re-execution main program is started as a derived transaction, the calculating means 4 further cancels or restarts the started service based on the state of resources managed by the passive service at the time of the start. In addition to judging the necessity of execution, based on the judgment result and the priority of each start-up task, the start-up task processing unit is configured to cancel or re-execute the start-up task as another derivative transaction different from the cancellation / re-execution main program. 50 is provided with a cancellation / re-execution main processing unit 54 to be executed by the 50.

【0134】好ましい例では、取消再実行メイン処理部
54は、起動業務処理部50と受動業務処理部52との
連動トランザクションが同期点に達した後に、前記取消
再実行メインプログラムを開始させる機能を備えるとよ
い。システム的なトランザクション管理としては、起動
業務が取消再実行メインプログラムを派生起動するよう
にしても良いが、取消再実行メインプログラムは資源の
最適化を図るものであり、受動業務側で派生起動を制御
するほうが、論理的に扱いやすい。また、起動処理は共
通資源の利用を要求する処理であるため、起動処理とな
るプログラムは多数ある一方、受動処理は資源の管理を
行うものであるため、受動処理側のプログラムは少な
い。このため、取消再カットメインの派生起動を受動処
理側で行うことが好ましい。
In a preferred example, the cancellation / re-execution main processing unit 54 has a function of starting the cancellation / re-execution main program after the linked transaction between the start-up business processing unit 50 and the passive business processing unit 52 reaches a synchronization point. It is good to have. As a system-based transaction management, the starting business may start the cancellation / re-execution main program, but the cancellation / re-execution main program is for optimizing resources. Control is logically easier to handle. In addition, the startup process is a process for requesting the use of a common resource, and therefore, there are many programs to be the startup process, whereas the passive process is for managing resources, so that there are few programs on the passive processing side. For this reason, it is preferable that the derivation of the cancellation / recut main be performed on the passive processing side.

【0135】取消再実行メインプログラムは、演算手段
4を動作させる指令として、当該取消再実行メインプロ
グラムが派生トランザクションとして起動されたときに
当該起動された際の前記受動業務によって管理される資
源の状態に基づいて前記起動業務の取消又は再実行の要
否を判定させる取消再実行判定指令と、この取消再実行
判定指令に応じた判定結果と各起動業務の優先順位に基
づいて前記起動業務の取消又は再実行を当該取消再実行
メインプログラムとは異なる他の派生トランザクション
として前記起動業務処理部に実行させる取消再実行メイ
ン処理指令とを備えている。これら各指令が演算手段4
によって実行されると、演算手段4は取消再実行メイン
処理54として機能する。
When the cancellation / re-execution main program is started as a derivative transaction, the cancellation / re-execution main program receives the state of the resource managed by the passive service when the cancellation / re-execution main program is started as a derivative transaction. And a cancellation re-execution determination command for determining whether or not the startup business is required to be canceled or re-executed, based on the determination result according to the cancellation re-execution determination command and the priority of each startup business, and Or, a re-execution main processing command for causing the start-up business processing unit to execute re-execution as another derived transaction different from the cancellation re-execution main program. Each of these commands is calculated by the arithmetic means 4
When executed, the calculation means 4 functions as a cancellation / re-execution main process 54.

【0136】本実施形態では、連鎖的アボートと同様な
処理負荷を生じることも想定できる。すなわち、1つの
トランザクションが完了した結果、多数の業務処理の取
消や再カットが生じるのである。取消再実行メインプロ
グラムは、どの業務処理を取消すか、又は再カットする
かを次々と判定する必要がある。しかし、取消再実行メ
インにより取消又は再実行を起動制御し、実行される
と、資源の状態が変化する。取消再実行メインは、この
変化した状態で最適な取消又は再実行を制御しなければ
ならない。このため、本実施形態では、派生トランザク
ションを次々と起動させつつ資源の利用法を最適化する
スパイラル処理を採用する。
In the present embodiment, it can be assumed that a processing load similar to that of a chained abort occurs. That is, as a result of the completion of one transaction, many business processes are canceled or recut. The cancellation re-execution main program needs to determine one after another which business process is to be canceled or re-cut. However, when the cancellation or re-execution is started and controlled by the cancellation / re-execution main, and executed, the resource status changes. The cancellation and re-execution main must control the optimum cancellation or re-execution in this changed state. For this reason, in the present embodiment, spiral processing for optimizing the use of resources while sequentially starting derived transactions is adopted.

【0137】図11を参照すると、取消再実行メイン処
理部54は、前記起動業務の取消又は再実行を派生トラ
ンザクションとして起動した場合には、当該起動内容を
示す派生管理フラグを前記起動業務処理及び当該起動業
務処理部50によって連動される受動業務処理に渡すフ
ラグ渡し制御機能56を備えている。このフラグは、取
消再カットの進行状況を表すフラグである。そして、取
消再実行メイン処理部54は、前記受動業務処理部52
から前記取消再実行メインプログラムが派生トランザク
ションとして起動された場合には、前記派生管理フラグ
を参照して当該資源に対する同種類の判定及び実行を前
記資源状態ファイルに対象となるセグメントがなくなる
まで連続させるスパイラル処理制御機能54とを備えて
いる。
Referring to FIG. 11, when the cancellation or re-execution of the start-up business is started as a derived transaction, the cancellation / re-execution main processing unit 54 sets the derivation management flag indicating the contents of the start-up business to the start business process and the start business process. A flag passing control function 56 for passing to the passive business process linked by the startup business processing unit 50 is provided. This flag is a flag indicating the progress of cancellation / recut. Then, the cancellation / re-execution main processing unit 54
When the cancellation / re-execution main program is started as a derived transaction, the same type of determination and execution for the resource are continued by referring to the derived management flag until there is no target segment in the resource status file. And a spiral processing control function 54.

【0138】スパイラル処理制御機能54は、派生トラ
ンザクションの連続性を管理するものである。図12
は、スパイラル処理の動作例を示す説明図である。図1
2に示す例では、まず、資源の利用等の要求が起動処理
によってなされる(ステップS21A)。起動業務処理
部50は、受動業務に連動し、資源の確保を依頼する。
受動処理は、資源の確保が完了すると(ステップS21
B)、起動処理S21Aに連動を戻す。これにより、起
動処理S21Aは同期点に達する。一方、受動処理は、
資源の確保が完了すると、取消再実行メインプログラム
を派生起動する。この取消再実行メインプログラムは、
起動処理S21Aが同期点に達した後に実行を開始する
と良い。取消再実行メインS21Cでは、資源の状態に
応じて、未成立の業務処理要求の再実行か、または成立
済みの業務処理要求の取消の必要性を判定する。
The spiral processing control function 54 manages the continuity of the derived transaction. FIG.
FIG. 8 is an explanatory diagram showing an operation example of spiral processing. Figure 1
In the example shown in FIG. 2, first, a request for resource use or the like is made by a start-up process (step S21A). The startup task processing unit 50 requests the securing of resources in conjunction with the passive task.
In the passive processing, when the securing of resources is completed (step S21)
B), the operation is returned to the start processing S21A. As a result, the activation process S21A reaches the synchronization point. On the other hand, passive processing
When the securing of the resources is completed, the cancellation and re-execution main program is derived and started. This cancel rerun main program is
It is preferable to start the execution after the start processing S21A reaches the synchronization point. In the cancellation re-execution main S21C, the necessity of re-executing an unsatisfied business processing request or canceling a completed business processing request is determined according to the state of the resource.

【0139】ここでは、宿泊施設が一部改装を決定し、
突然に資源不足が生じたとする。取消再実行メインS2
1Cでは、優先順位の最も低い予約の取消を派生トラン
ザクションとして起動する。この取消起動により、取消
再カットメインは同期点に達する。起動された取消処理
は、起動処理として実行される(ステップS22A)。
受動処理S22Bへの連動等は同様である。このとき、
取消再実行メインS21Cでの判定結果(取消起動)等
に対応した派生管理フラグは、起動処理S22A、受動
処理S22Bを介して取消再実行メインS22Cに渡さ
れる。
Here, the accommodation facility has decided to partially renovate,
Suppose a sudden resource shortage occurs. Cancel re-execution main S2
In 1C, the cancellation of the reservation with the lowest priority is started as a derived transaction. With this cancellation start, the cancellation re-cut main reaches the synchronization point. The activated cancellation processing is executed as activation processing (step S22A).
Interlocking with the passive process S22B is the same. At this time,
The derivation management flag corresponding to the determination result (cancellation activation) in the cancellation re-execution main S21C is passed to the cancellation re-execution main S22C via the activation process S22A and the passive process S22B.

【0140】取消再実行メインS22Cでは、前回取消
起動した業務処理要求の次に優先順位の低い業務処理要
求を取消の対象として特定し、その取消を起動する。こ
の取消処理はS23にて処理され、再度取消再実行メイ
ンS24Cが起動される。各工程S21,S22,S2
3,…では、実行されている取消再実行メインはそれぞ
れ異なるトランザクションであるが、派生管理フラグに
よってその処理の連続性を確保している。この派生管理
フラグを用いた取消・再実行の連続的な起動を、ここで
はスパイラル処理と呼称している。スパイラル処理は、
優先順位の反映などデータや処理に対する連続的な判定
が必要な場合に適している。
In the cancellation re-execution main S22C, a business process request having the next lowest priority after the previously canceled business process request is specified as an object to be canceled, and the cancellation is started. This cancellation process is performed in S23, and the cancellation re-execution main S24C is started again. Each step S21, S22, S2
In 3, 3,..., The executed re-execution main is a different transaction, but continuity of the processing is ensured by the derivation management flag. The continuous activation of cancellation / re-execution using the derivation management flag is referred to herein as spiral processing. Spiral processing is
It is suitable when continuous determination of data or processing is required, such as reflection of priority.

【0141】再度図11を参照すると、図10に示した
修正再カットの機能は、図11に示す例では、取消再カ
ットメインの機能として実装されている。図11に示す
例では、取消再実行メイン処理部54は、前記受動業務
の実行によって前記資源状態が変化した場合に未成立で
あった起動業務のうち最も優先順位の高い起動業務を高
優先業務として特定する高優先業務特定機能60と、成
立済みの起動業務のうち前記高優先業務の優先順位より
も優先順位の低い起動業務群によって利用される資源の
一覧又は総量を修正利用可能資源として算出する修正利
用可能資源算出機能62と、前記高優先業務によって利
用要求されている資源が前記修正利用可能資源内で利用
可能である場合には前記高優先業務である起動業務を再
実行させる修正再実行制御機能64とを備えている。こ
れにより、修正再実行を実現する。また、修正再実行に
より資源に不足が生じた場合には、優先順位の低い順に
業務処理を取り消す。また、この例では、取消再カット
メインプログラムは、これらの各機能60,62,64
に応じた指令を備える。
Referring again to FIG. 11, the function of the correction re-cut shown in FIG. 10 is implemented as the function of the cancellation re-cut main in the example shown in FIG. In the example illustrated in FIG. 11, the cancellation / re-execution main processing unit 54 assigns the highest-priority startup service to the highest-priority startup service among the startup services that have not been established when the resource status has changed due to the execution of the passive service. A high-priority task identification function 60, and a list or total amount of resources used by a startup task group having a lower priority than the priority of the high-priority task among established startup tasks is calculated as a modifiable available resource. A modification available resource calculation function 62 for re-executing the start-up operation which is the high-priority operation when the resource requested to be used by the high-priority operation is available in the modified available resource. An execution control function 64 is provided. Thereby, the re-execution is realized. Further, when resources become insufficient due to the re-execution, the business process is canceled in the order of lower priority. Further, in this example, the cancellation / recut main program includes these functions 60, 62, 64.
Is provided.

【0142】図13は、第3実施形態の動作例を示す説
明図である。図13に示す例では、レストランの席での
眺めの良い窓側や、宿泊施設の部屋での広さやなど、資
源にランクがある場合に、予約の種別や他の条件に応じ
て優先順位を設定し、この優先順位と資源のランク(第
1資源がより高ランクとする)との整合性を保つ例であ
る。図13(A)に示す例では、通番001,002,
003, 004が成立している。優先順位の高い通番0
01及び002について上級の第1資源を割り当ててい
る。ここで、通番005として優先順位の高い予約であ
る業務処理要求が入力される。優先予約の場合に第1資
源又は第2資源とする例では、この通番005は資源不
足で実行できないため、一旦未成立取引明細に格納され
る。または、優先予約で優先順位が1である場合には取
消再実行メインによる最適化を実行するよにしてもよ
い。
FIG. 13 is an explanatory diagram showing an operation example of the third embodiment. In the example shown in FIG. 13, when resources are ranked, such as a window side with a good view at a restaurant seat or the size of a room at an accommodation facility, priority is set according to the type of reservation and other conditions. However, this is an example of maintaining consistency between the priority and the rank of the resource (the first resource is assumed to have a higher rank). In the example shown in FIG. 13A, the serial numbers 001, 002,
003 and 004 are established. Serial number 0 with high priority
Advanced first resources are allocated for 01 and 002. Here, a business process request that is a reservation with a high priority is input as the serial number 005. In the case of the first resource or the second resource in the case of the priority reservation, since the serial number 005 cannot be executed due to a shortage of resources, it is temporarily stored in the unsuccessful transaction statement. Alternatively, when the priority is 1 in the priority reservation, the optimization by the cancellation re-execution main may be executed.

【0143】取消再実行メイン処理部54は、高優先業
務特定機能60により、通番005の業務処理を特定す
る。修正利用可能資源算出機能62は、優先順位の低い
通番002に割り当てられた第1資源を修正利用可能資
源として特定する。修正再実行制御機能64は、通番0
05に第1資源を割り当てることができると判定し、当
該通番005の業務処理要求の修正再カットを起動す
る。図12に示す例では、S21Cの取消再実行メイン
が、通番005の業務処理要求の再カットを起動する。
起動業務処理部50は、通番005の業務処理要求を実
行し、第1資源の確保を受動処理S22Bに依頼する。
受動処理は、通番005に第1資源を確保すると、取消
再実行メインS22Cを派生起動する。起動処理S22
A及び受動処理S22Bは同期点に達する。取消再実行
メインS22Cでは、第1資源に競合が発生しているた
め、第1資源を利用する業務処理要求のうち、優先順位
の最も低い通番002の業務処理を特定し、この取消を
派生起動する。
The cancellation / re-execution main processing unit 54 specifies the business process of the serial number 005 by using the high-priority business specifying function 60. The modified available resource calculation function 62 specifies the first resource allocated to the serial number 002 having a lower priority as the modified available resource. The modification re-execution control function 64 sets the serial number 0
It is determined that the first resource can be allocated to the task number 05, and the correction recut of the business process request with the serial number 005 is started. In the example shown in FIG. 12, the cancellation re-execution main in S21C activates the re-cut of the business process request with the serial number 005.
The start-up business processing unit 50 executes the business process request with the serial number 005, and requests the passive process S22B to secure the first resource.
In the passive process, when the first resource is secured at the serial number 005, the cancellation re-execution main S22C is derived and activated. Start-up processing S22
A and the passive process S22B reach the synchronization point. In the cancellation re-execution main S22C, since a conflict has occurred in the first resource, of the business processing requests using the first resource, the business processing with the serial number 002 having the lowest priority is specified, and this cancellation is derived and started. I do.

【0144】S23にて当該通番002の取消が完了す
る。S23Cの取消再カットメインでは、この優先順位
2の通番002の修正再実行を検討する。第2資源を利
用している業務処理(通番003, 004)の優先順
位が低いため、通番002の修正再実行を派生起動す
る。ステップS24にて通番002の修正再実行が完了
する。取消再実行メインS24Cでは、第2資源を利用
している業務処理要求のうち、優先順位の最も低い通番
004の取消を起動する。ステップS25にて通番00
4の業務処理が取り消される。取消再実行メインS25
Cでは、第3資源に空きがあることから、通番004の
再実行を派生起動する。通番004の再カットにより、
第3資源も終了となる。ステップS26にて通番004
の再実行が完了する。取消再実行メインS26Cでは、
資源に不足がないため取り消す対象がなく、修正再カッ
トの対象がなく、さらに、再カットの対象もないことか
ら、スパイラル処理を完了する。図13に示す例では、
再実行と取消を交互に繰り返したが、スパイラル処理の
例によっては、例えばすべての業務処理を取り消し、つ
いで優先順位に従って再実行するようにしてもよい。こ
れは、派生管理フラグの設定の仕方と利用の仕方を定め
ることで実現できる。
At S23, the cancellation of the serial number 002 is completed. In the cancellation re-cut main in S23C, the correction re-execution of the serial number 002 of the priority order 2 is considered. Since the priority of the business process (serial number 003, 004) using the second resource is low, the re-execution of the serial number 002 is derived and started. In step S24, the re-execution of the serial number 002 is completed. In the cancellation re-execution main S24C, the cancellation of the serial number 004 having the lowest priority among the business processing requests using the second resources is started. Serial number 00 in step S25
4 business processing is canceled. Cancel re-execution main S25
In C, since there is a vacancy in the third resource, re-execution of the serial number 004 is derived and started. By re-cutting serial number 004,
The third resource also ends. Serial number 004 in step S26
Is completed. In the cancellation re-execution main S26C,
Since there is no shortage of resources, there is no object to be canceled, no object for correction re-cut, and no object for re-cut, so that the spiral processing is completed. In the example shown in FIG.
Although the re-execution and the cancellation are alternately repeated, depending on the example of the spiral processing, for example, all business processes may be canceled and then re-executed according to the priority. This can be realized by determining how to set and use the derivation management flag.

【0145】[0145]

【第4実施形態】第4実施形態では、第3実施形態にて
開示した手法を用いて、口座残高を用いた決済に優先順
位を反映させる先日付完結処理を開示する。第4実施形
態では、取消及び再カットの組み合わせにより口座処理
要求による決済の最適化を図る。すなわち、限られた残
高で優先順位の高い口座処理要求を決済する。ここで
は、各口座処理要求の勘定日の期限(再カット期限)
は、予め定められた1日間のみとする。指定された日付
での決済が不能であれば、決済を依頼した依頼者に決済
不能であった旨を連絡する。
[Fourth Embodiment] In a fourth embodiment, a future completion process for reflecting a priority order in settlement using an account balance using the technique disclosed in the third embodiment will be disclosed. In the fourth embodiment, settlement by an account processing request is optimized by a combination of cancellation and recut. That is, an account processing request with a high priority is settled with a limited balance. Here, the deadline for the account date of each account processing request (recut deadline)
Is for a predetermined one day only. If the settlement on the specified date is not possible, the requester of the settlement is notified that the settlement was impossible.

【0146】そして、第4実施形態では、すべての口座
処理要求を修正出金可能額による入れ替えの対象とす
る。この前提とは異なる前提の処理例は、第1実施例と
して後述する。第1実施例との比較では、第4実施形態
の優先順位はすべて第1優先順位群(≠9x)で、優先
順位のグループが1つで、かつ、再カット期限が勘定日
当日のみであるため前倒がない。また、ソフトウエアの
枠組みは第3実施形態と同様である。従って、第4実施
形態は、第3実施形態を預金口座を用いた決済に利用し
た具体例である。図14は、第4実施形態による先日付
完結処理システムの構成例を示すブロック図である。図
14に示す例では、先日付完結処理システムは、第1及
び第2実施形態と同様に、受信手段2と、演算手段4
と、ファイル6とを備えている。そして、ファイル6
は、口座情報として、図7に示す例と同様に、取引明細
セグメント12と、残高明細セグメント14と、残不足
明細セグメント16とを備ている。決済に利用する口座
としては、普通預金口座や、当座預金口座を想定する。
従って、例えば、残高明細セグメント14には預金者の
口座残高が勘定日毎に格納されている。担保定期等によ
る自動融資がある場合には、この残高明細セグメントに
担保明細セグメントを併設する。残高明細セグメントに
は、先日付の残高がその勘定日毎に格納される。残高明
細に先日付の残高が格納されるのは、先日付の口座処理
が実行された場合である。ここでは、仮に残不足明細に
格納され、口座に異動がないとしても、残高明細セグメ
ントにその残不足明細に格納された口座処理の勘定日で
の残高を格納する。
In the fourth embodiment, all account processing requests are to be replaced by the corrected withdrawable amount. A processing example based on a premise different from this premise will be described later as a first embodiment. In comparison with the first example, the priorities of the fourth embodiment are all the first priority group ($ 9x), there is only one priority group, and the recut deadline is only on the account day. Because there is no advance. The software framework is the same as in the third embodiment. Therefore, the fourth embodiment is a specific example in which the third embodiment is used for settlement using a deposit account. FIG. 14 is a block diagram illustrating a configuration example of a future completion processing system according to the fourth embodiment. In the example shown in FIG. 14, the future completion processing system includes the receiving unit 2 and the arithmetic unit 4 as in the first and second embodiments.
And a file 6. And file 6
Has, as the account information, a transaction statement segment 12, a balance statement segment 14, and a remaining shortage statement segment 16 as in the example shown in FIG. It is assumed that the account used for settlement is a savings account or a checking account.
Therefore, for example, the balance statement segment 14 stores the account balance of the depositor for each account date. If there is an automatic loan based on a collateral period, a security description segment is added to this balance description segment. The balance detail segment stores the balance of the future date for each account date. The future date balance is stored in the balance statement when the future date account processing is executed. Here, even if the account is stored in the remaining shortage and there is no change in the account, the balance on the account date of the account processing stored in the remaining shortage is stored in the balance detail segment.

【0147】図14に示すように、本実施形態では、演
算手段4が、前記勘定日毎の残高を使用した出金又は入
金の決済を要求する口座処理要求を起動業務として実行
すると共に当該実行中の起動業務プログラム群と単一の
トランザクションとしての連動を所定の受動業務処理部
に依頼する起動業務処理部66と、この起動業務処理部
66によって連動依頼される前記勘定日毎の口座残高の
出金又は入金等の受動業務を前記各セグメントを用いて
実行すると共に当該受動業務の実行によって前記勘定日
毎の残高明細が変化した場合には所定の取消再カットメ
インプログラムを当該起動業務及び受動業務が連動した
単一のトランザクションとは異なる他の派生トランザク
ションとして起動する受動業務処理部68とを備えてい
る。
As shown in FIG. 14, in the present embodiment, the arithmetic means 4 executes an account processing request for requesting settlement of withdrawal or deposit using the balance for each account date as a start-up operation, and executes the execution. Startup business processing unit 66 for requesting a predetermined passive business processing unit to interlock with the startup business program group as a single transaction, and withdrawal of the account balance for each account date requested by the startup business processing unit 66 to be interlocked Alternatively, when the passive business such as payment is executed by using each of the segments, and the execution of the passive business changes the balance statement for each account date, the predetermined cancellation / recut main program is linked with the starting business and the passive business. And a passive business processing unit 68 which is started as another derived transaction different from the single transaction described above.

【0148】受動業務処理部68は、ファイル6に格納
された残高を管理し、口座処理を実行する毎に、取引明
細セグメント12、残高明細セグメント14、残不足明
細セグメント16を更新する。起動業務処理部66は、
公共料金の引落のために預金口座からの出金を要求した
り、融資の回収(返済)のために預金口座からの出金を
要求する処理などである。公共料金等の外部から依頼さ
れる自動振替を外部自振といい、融資の返済や定期積金
等の金融機関内部での自動振替を内部自振と呼ぶ。
The passive business processing unit 68 manages the balance stored in the file 6, and updates the transaction details segment 12, the balance details segment 14, and the remaining shortage details segment 16 every time the account processing is executed. The startup task processing unit 66
The processing includes requesting withdrawal from a savings account in order to withdraw a utility bill, and requesting withdrawal from a savings account in order to collect (repay) loans. The automatic transfer requested from the outside, such as a utility bill, is called external self-financing, and the automatic transfer within a financial institution, such as repayment of a loan or a fixed-term deposit, is called internal self-financing.

【0149】図14に示すように、本実施形態では、演
算手段4が、前記受動業務処理部68によって取消再カ
ットメインプログラムが派生トランザクションとして起
動されたときに、当該起動された際の前記各セグメント
12,14,16の状態に基づいて前記起動業務の取消
又は再カットの要否を判定すると共に、当該判定結果と
各起動業務となる口座処理要求の優先順位とに基づいて
前記起動業務の取消又は再カットを当該取消再カットメ
インプログラムとは異なる他の派生トランザクションと
して前記起動業務処理部66に実行させる取消再カット
メイン処理部70を備えている。
As shown in FIG. 14, in the present embodiment, when the passive business processing unit 68 activates the cancellation / recut main program as a derived transaction, The necessity of canceling or re-cutting the start-up business is determined based on the state of the segments 12, 14, and 16, and the start-up business is determined based on the determination result and the priority of the account processing request to be each start-up business. There is provided a cancellation / recut main processing unit 70 for causing the start-up business processing unit 66 to execute cancellation / recut as another derivative transaction different from the cancellation / recut main program.

【0150】取消再カットメイン処理部70は、すでに
成立している口座処理の取消や、未成立の口座処理の再
カットを派生トランザクションとして起動する。すなわ
ち、トランザクション管理システムからみると、取消処
理や再カット処理はACID特性を満たすトランザクシ
ョンである。取消処理は、すでに成立しているトランザ
クションのアボートではなく、成立しているトランザク
ションを未成立へと変化させ、未成立の状態へ各セグメ
ントを更新する新たなトランザクションである。従っ
て、取消再カットメイン処理部70によって起動される
取消処理は、連鎖的アボートではなく、厳格にスケジュ
ールされるトランザクションである。
The cancellation / recut main processing unit 70 activates cancellation of an already established account process or recut of an unestablished account process as a derived transaction. That is, from the viewpoint of the transaction management system, the cancellation processing and the recut processing are transactions that satisfy the ACID characteristics. The cancellation process is not an abort of an already established transaction, but a new transaction that changes an established transaction to unestablished and updates each segment to an unestablished state. Therefore, the cancellation process started by the cancellation / recut main processing unit 70 is not a chain abort but a strictly scheduled transaction.

【0151】図15は取消再カットメイン処理部70の
詳細構成を示すブロック図である。図15に示す例で
は、取消再カットメイン処理部70は、第1実施形態で
の取消処理部10と同様の機能を実現するために、残高
明細セグメント14に格納された勘定日別の残高明細に
基づいて、勘定日毎の出金可能額を算出すると共に、先
日付の勘定日での当該出金可能額がマイナスとなり決済
不能となる場合には、当該決済不能となる勘定日での複
数の決済済みの口座処理要求のうち優先順位の低い口座
処理要求の取消を前記起動業務処理部に派生トランザク
ションとして実行させる取消起動制御機能72を備えて
いる。
FIG. 15 is a block diagram showing a detailed configuration of the cancel / recut main processing section 70. In the example shown in FIG. 15, the cancellation / recut main processing unit 70 executes the balance statement for each account date stored in the balance statement segment 14 in order to realize the same function as the cancellation processing unit 10 in the first embodiment. Based on the above, the amount that can be withdrawn on each account day is calculated, and if the amount that can be withdrawn on the account date of the future date becomes negative and settlement becomes impossible, a plurality of A cancellation activation control function 72 is provided for causing the activation business processing unit to execute cancellation of a low-priority account processing request among the settled account processing requests as a derived transaction.

【0152】このように、本実施形態では、決済不能な
状況の発見の直後にそのトランザクションのアボートを
行うのではなく、先日付での決済不能な状況を一旦残高
明細に記録し、この記録の成功によってその決済不能な
状況をもたらした口座処理の同期点処理を完了させる。
そして、決済不能な状況をもたらした口座処理が同期点
に達した後に、派生トランザクションとして取消を行
う。これにより、例えばATM等での出金を早期にコミ
ットさせ、その後に先日付での業務的な一貫性を保つた
めに先日付での口座処理要求の取消を行う。
As described above, in this embodiment, instead of aborting the transaction immediately after finding the unsettled situation, the unsettled situation at the future date is temporarily recorded in the balance statement, and this record is recorded. Complete the sync point process of the account process that resulted in the unsettled situation due to success.
Then, after the account processing that has caused the settlement impossible state reaches the synchronization point, the transaction is canceled as a derived transaction. As a result, for example, the withdrawal at the ATM or the like is committed early, and thereafter, the account processing request is canceled at the future date in order to maintain business consistency at the future date.

【0153】また、取消再カットメイン処理部70は、
第2実施形態での再カット処理部24と同様の機能を実
現するために、残高明細に基づいて勘定日毎の出金可能
額を算出すると共に、演算日時当日又は先日付の勘定日
での出金可能額に基づいて、前記残不足明細に格納され
た当日又は先日付の勘定日で未成立の口座処理要求のう
ち優先順位の高い順に各口座処理要求が決済可能となる
か否かを判定する再カット可否判定機能74と、この再
カット可否判定機能74によって決済可能と判定された
未成立の口座処理要求がある場合には当該口座処理要求
の再カットを前記起動業務処理部に派生トランザクショ
ンとして実行させる再カット起動制御機能76とを備え
ている。
The cancel / recut main processing unit 70
In order to realize the same function as the re-cut processing unit 24 in the second embodiment, the withdrawal amount for each account date is calculated based on the balance statement, and the withdrawal amount is calculated on the calculation date / time or the future date. Based on the available amount of money, it is determined whether or not each account processing request can be settled in descending order of priority among account processing requests that have not been completed on the current day or the future account date stored in the remaining shortage statement. If there is an unprocessed account processing request determined to be settled by the recut availability determination function 74, the recut of the account processing request is sent to the start-up business processing unit. And a recut activation control function 76 to be executed as

【0154】再カットについても、取消の場合と同様
に、ATMによる現金の入金という口座処理要求自体
は、残高明細の更新に成功したことで同期点に達する。
その後、先日付にて増加した残高に基づいて、再カット
の可否を判定し、再カット可能であれば当該再カットを
派生トランザクションとして起動する。再カット処理
は、図14に示す起動業務処理部66によって実行され
る。起動業務処理部66は、再カットによる出金を受動
業務処理部68に依頼する。受動業務処理部68はその
勘定日の残高に基づいて出金の可否を判定する。出金可
能であれば、口座残高を減額すると共に、それよりも先
日付の残高を更新する。受動業務による残高の更新が行
われると、取消再カットメインが派生トランザクション
として起動され、次に再カット可能な未成立の口座処理
要求の有無を判定する。このように、一回の口座処理要
求の実行毎に同期点に達する構成としたことで、システ
ムの運用効率を高めつつ、1つの原因で多数発生するか
もしれない取消処理及び再カット処理の安定した厳格な
実行を実現している。
In the case of re-cutting, as in the case of the cancellation, the account processing request for depositing cash by ATM itself reaches the synchronization point by successfully updating the balance statement.
Thereafter, based on the balance increased at a future date, it is determined whether recutting is possible, and if recutting is possible, the recutting is started as a derived transaction. The re-cut processing is executed by the startup task processing unit 66 shown in FIG. The startup operation processing unit 66 requests the passive operation processing unit 68 to dispense by re-cutting. The passive business processing unit 68 determines whether to make a withdrawal based on the balance on the account day. If the withdrawal is possible, the balance of the account is reduced and the balance at a later date is updated. When the balance is updated by the passive business, the cancellation re-cut main is started as a derived transaction, and it is determined whether there is an unsatisfied account processing request that can be re-cut next. As described above, by adopting a configuration in which the synchronization point is reached each time an account processing request is executed, the operation efficiency of the system is enhanced, and the cancellation processing and re-cut processing that may occur many times due to one cause are stabilized. Strict execution.

【0155】また、図15に示す例では、第3実施形態
での修正再実行と同様の機能を実現するために、取消再
カットメイン処理部70が、残不足明細セグメントに格
納され先日付の口座処理要求である起動業務のうち、最
も優先順位の高い起動業務を高優先業務として特定する
高優先業務特定機能78と、取引明細セグメント12に
格納され先日付で成立済みの起動業務のうち前記高優先
業務の優先順位よりも優先順位の低い起動業務群によっ
て利用された出金額の合計額を先日付の勘定日での修正
出金可能額として算出する修正出金可能額算出機能80
と、先日付の勘定日での修正出金可能額に基づいて前記
残不足明細に格納された前記高優先業務の口座処理要求
が決済可能となるか否かを判定する修正再カット可否判
定機能82と、この修正再カット可否判定機能82によ
って前記高優先業務が決済可能と判定された場合には当
該口座処理要求の修正再カットを前記起動業務処理部に
派生トランザクションとして実行させる修正再カット起
動制御機能84とを備えている。
In the example shown in FIG. 15, in order to realize the same function as the correction and re-execution in the third embodiment, the cancellation / re-cut main processing unit 70 stores the remaining shortage detail segment in A high-priority service specifying function 78 for specifying the highest-priority startup service as a high-priority service among the startup services that are account processing requests; A function 80 for calculating a possible withdrawal amount that calculates the total amount of withdrawal amounts used by the start-up business group having a lower priority than the priority of the high-priority business as a possible withdrawal amount on a future date.
And a function of determining whether or not the account processing request of the high-priority business stored in the remaining shortage statement can be settled based on the corrected withdrawable amount on the future date of the accounting date. 82, when the high-priority business is determined to be settleable by the correction / recut availability determination function 82, the correction / recut activation that causes the activation business processing unit to execute the correction / recut of the account processing request as a derived transaction. And a control function 84.

【0156】この機能78,80,82,84により、
トランザクションの入れ替えを行う。すなわち、先日付
で成立している優先順位の低い口座処理要求を取り消し
て、より優先順位の高い口座処理要求を決済することが
できる。このため、口座処理要求の処理順序に関わら
ず、残高が不足する場合には、予め定めた優先順位に従
った決済を行うことができる。
With these functions 78, 80, 82 and 84,
Replace the transaction. That is, it is possible to cancel an account processing request with a lower priority established on a future date and settle an account processing request with a higher priority. For this reason, regardless of the processing order of the account processing requests, if the balance is insufficient, settlement can be performed according to the predetermined priority.

【0157】本実施形態が、修正再カットの機能と再カ
ットの機能との両方を有するのは、演算日当日に口座残
高が増加した場合、当日に取引明細に格納されている取
引の取消は行わないため、修正再カットではなく、再カ
ットするためである。すなわち、修正再カットは他の口
座処理要求の取消を前提とするため、取消が可能な先日
付の勘定日の取引にのみ用いられる。また、優先順位を
詳細に設定し、一定以上の優先順位の場合に修正再カッ
トを行うようにしてもよい。特に優先すべき種類の口座
処理要求についてのみ修正再カットを行うと、多少であ
るがシステムの運用負荷が小さくなる。
The present embodiment has both the function of the modified re-cut and the function of the re-cut. When the account balance is increased on the day of the calculation, the cancellation of the transaction stored in the statement on the day is not possible. This is because the cut is not performed, and the cut is not re-cut. That is, since the modified recut is based on the cancellation of another account processing request, it is used only for the transaction of the future date which can be canceled. Further, the priorities may be set in detail, and the correction and re-cut may be performed when the priorities are higher than a certain level. In particular, if the correction re-cut is performed only for the type of account processing request that should be prioritized, the operation load of the system is slightly reduced.

【0158】また、本実施形態においても、応答性を確
保しつつ複雑な処理を実現するために、派生管理フラグ
を用いたスパイラル処理制御により、派生トランザクシ
ョンを活用する。すなわち、取消再カットメイン処理部
は、どのような理由で自らが起動され、前回の処理がど
こまで進行したかを、派生管理フラグにより判断するこ
とができる。
Also, in the present embodiment, in order to realize complicated processing while ensuring responsiveness, a derived transaction is utilized by spiral processing control using a derived management flag. In other words, the cancellation / recut main processing unit can determine the reason why the main unit itself has been activated and how far the previous processing has progressed, based on the derivation management flag.

【0159】図15に示す例では、取消再カットメイン
処理部70は、前記起動業務の取消又は再カットを派生
トランザクションとして起動した場合には当該起動内容
を示す派生管理フラグを前記起動業務処理及び当該起動
業務処理部によって連動される受動業務処理に渡すフラ
グ渡し制御機能86と、前記受動業務処理部から前記取
消再カットメインプログラムが派生トランザクションと
して起動された場合には、前記派生管理フラグを参照し
て前記再カット起動制御機能76又は前記修正再カット
起動制御機能84を前記残不足明細セグメントに対象と
なる残不足明細がなくなるまで連続させるスパイラル処
理制御機能88とを備えている。
In the example shown in FIG. 15, when the cancellation or re-cut of the start-up business is started as a derived transaction, the cancellation / re-cut main processing unit 70 sets the derivation management flag indicating the contents of the start-up business to the start business process and the start business process. Refer to the flag passing control function 86 to pass to the passive business process linked by the starting business processing unit, and to the derivation management flag when the passive reprocessing main program is started as a derived transaction from the passive business processing unit. And a spiral processing control function 88 for continuing the recut activation control function 76 or the modified recut activation control function 84 until there is no target remaining shortage detail in the remaining shortage detail segment.

【0160】「対象となる残不足明細がなくなる」とい
うのは、優先順位に従って順に再カット又は修正再カッ
トしていき、最後に最も優先順位の低い口座処理要求の
再カット可否の判定及び可能な場合の再カット起動が完
了した、ということである。また、先日付の勘定日が複
数ある場合には、本実施形態では再カット期限を振替日
当日のみとして説明しているため、演算日当日の再カッ
トを優先し、続いて、演算日に最も近い将来の勘定日か
ら遠い将来の勘定日まで順に処理すると良い。近い先日
付から処理し、遠い先日付に至る順序で再カットを行う
と、再カット完了後に取消を行う必要がない。
"The target remaining shortage is lost" means that re-cutting or correction re-cutting is performed in order according to the priority order, and finally, it is determined whether the account processing request with the lowest priority can be re-cut or not. In that case, the recut activation is completed. Further, in the case where there are a plurality of account dates of the future date, in the present embodiment, the recut deadline is described only on the day of the transfer date, so the recut on the day of the arithmetic day is prioritized, and then the most It is good to process in order from the near future date to the far future date. If processing is performed from the near future date and re-cutting is performed in the order from the far future date, there is no need to cancel after the re-cut is completed.

【0161】図16は取消再カットメイン処理部70に
よるスパイラル処理の一例を示す説明図である。図16
に示す例では、起動処理と受動処理とは連動し、1つの
トランザクションとして実行される。例えば取消処理を
行う起動処理S31は、取消による口座残高の増額を受
動処理S32に連動依頼する。この起動及び受動処理
は、受動処理が成立し、その成立に応じた処理が起動処
理側で完了したときに、同期点に達する(C5)。取消
再カットメインを派生起動するタイミングは任意である
が、この起動及び受動業務が同期点に達した後に取消再
カットメインの処理が開始されるようにするとよい。す
なわち、起動及び受動の連動トランザクションと、取消
再カットメインとなる派生トランザクションとは、直列
性を保つと良い。
FIG. 16 is an explanatory diagram showing an example of the spiral processing by the cancellation / recut main processing section 70. FIG.
In the example shown in (1), the activation process and the passive process are linked and executed as one transaction. For example, the start-up process S31 for performing the cancellation process requests the passive process S32 to increase the account balance due to the cancellation. This activation and passive processing reaches the synchronization point when the passive processing is established and the processing according to the establishment is completed on the activation processing side (C5). The timing for deriving and starting the cancellation recut main is arbitrary, but it is preferable that the processing of the cancellation recut main be started after the start and the passive work have reached the synchronization point. In other words, it is preferable to maintain seriality between the startup and passive interlocking transactions and the derived transaction that is the cancellation / recut main.

【0162】取消再カットメインは、派生管理フラグ
と、各セグメント12,14,16とを参照して、口座
を最適化(または、業務としての一貫性の回復)のため
にどのような処理をすべきかを判定し、その判定結果に
従って取消処理や、修正再カット処理や、再カット処理
を派生トランザクションとして起動する。取消再カット
メインは、まず、先日付の勘定日にて出金可能額がマイ
ナスとなっているか否かを判定する。そして、マイナス
となっている場合には(分岐B1)、マイナスとなって
いる勘定日での優先順位が最も低い口座処理要求を取り
消す取消処理を派生起動する。取消処理を派生起動する
と、取消再カットメインは同期点に達し、終了する。
The cancellation re-cut main refers to the derivation management flag and each of the segments 12, 14, and 16, and what processing is performed to optimize the account (or restore consistency as a business). It is determined whether or not it should be performed, and the cancellation processing, the modified recut processing, or the recut processing is started as a derived transaction according to the determination result. The cancellation re-cut main first determines whether or not the withdrawable amount is negative on the account date of the future date. If the value is negative (branch B1), a cancellation process for canceling the account processing request with the lowest priority on the negative account date is derived and activated. When the cancellation process is derived and started, the cancellation recut main reaches the synchronization point and ends.

【0163】起動処理S31及び受動処理S32の連動
によって取消が行われ、取り消された金額分口座残高が
更新された後に、取消再カットメインは再度出金可能額
を確認し、マイナスであれば、この時点で最も優先順位
の低い口座処理要求の取消処理を派生起動し、その後コ
ミットC1する。この取消処理の繰り返しを、ここでは
取消スパイラルSP1と呼ぶ。取消スパイラルSP1
は、出金可能額のマイナスがなくなると終了する。
After the cancellation is performed by the interlocking of the activation process S31 and the passive process S32, and the account balance is updated by the canceled amount, the cancellation re-cut main again checks the possible withdrawal amount. At this point, the process for canceling the account processing request with the lowest priority is derived and started, and then the commit C1 is performed. This repetition of the cancellation process is herein referred to as a cancellation spiral SP1. Cancel spiral SP1
Ends when there is no longer a minus in the withdrawable amount.

【0164】口座残高が増額された場合や、出金可能額
のマイナスがなくなった場合には(分岐B2)、修正再
カットの可否を判定する。図15に示す各機能78,8
0,82を用いて、修正出金可能額と最高位の口座処理
要求の比較を行う。修正再カットが可能であれば(分岐
B3)、修正再カット処理を派生トランザクションとし
て起動する。修正再カットを起動すると、取消再カット
メインは同期点C2に達し、処理を完了する。
When the account balance is increased or when the possible amount of withdrawal is no longer negative (branch B2), it is determined whether or not a re-cut is necessary. Each function 78, 8 shown in FIG.
By using 0,82, the corrected withdrawable amount is compared with the highest account processing request. If the modified recut is possible (branch B3), the modified recut process is started as a derived transaction. When the correction recut is started, the cancellation recut main reaches the synchronization point C2, and the processing is completed.

【0165】修正再カットが起動処理S34及び受動処
理S35の連動によって実行され、同期点C5に達する
と、取消再カットメインが起動される。取消再カットメ
インは、修正再カットによって出金可能額がマイナスに
なった勘定日について、取消スパイラル処理SP1を実
行する。出金可能額がプラスとなると(分岐B2)、再
度修正再カットの判定を行う。このときには、未成立で
残不足明細セグメント16に格納されていた口座処理要
求のうち、もっとも優先順位の高かった口座処理要求は
すでに修正再カットされている。一方、優先順位の低い
口座処理要求が残不足明細に新たに格納されている。修
正再カットを繰り返すと、取引明細に格納された口座処
理要求の優先順位が、残不足明細に格納された口座処理
要求群の優先順位よりも高くなる。この状態では、修正
出金可能額の算出ができなくなるため、修正再カットは
不要と判定される(分岐B4)。
The correction recut is executed in conjunction with the start process S34 and the passive process S35, and when the synchronous point C5 is reached, the cancel recut main is started. The cancellation recut main executes the cancellation spiral processing SP1 for the account date on which the payable amount has become negative due to the correction recut. When the possible withdrawal amount becomes positive (branch B2), the judgment of the correction re-cut is performed again. At this time, the account processing request having the highest priority among the account processing requests that have not been established and are stored in the remaining shortage detail segment 16 has already been corrected and recut. On the other hand, an account processing request having a lower priority is newly stored in the remaining shortage statement. When the correction recut is repeated, the priority of the account processing request stored in the transaction statement becomes higher than the priority of the group of account processing requests stored in the remaining shortage statement. In this state, it becomes impossible to calculate the corrected withdrawable amount, so that it is determined that the correction re-cut is unnecessary (branch B4).

【0166】修正再カットができない口座処理要求が、
再カットされることはない。再カットの判定では、修正
再カットの対象となっていない口座処理要求の再カット
を検討する。ここでは、当日の口座処理要求や、修正再
カットを行わないと判定された優先順位の低い口座処理
要求の再カット可否を判定する。具体的には、処理対象
とする勘定日(例えば、演算日当日)を勘定日とする未
成立の口座処理要求のうち、最も優先順位の高い口座処
理要求の取引金額(出金額)と対象勘定日の出金可能額
とを比較する。取引金額が出金可能額より小さければ、
再カット可能であるため、その口座処理要求の再カット
を派生トランザクションとして起動し、コミットC3す
る。
An account processing request that cannot be corrected and re-cut
It will not be recut. In the determination of re-cut, re-cut of an account processing request that is not a target of the correction re-cut is considered. Here, it is determined whether the re-cut of the account processing request of the day or the low-priority account processing request that is determined not to perform the correction re-cut is performed. More specifically, the transaction amount (withdrawal amount) of the highest priority account processing request and the target account among the uncompleted account processing requests whose account date is the account date to be processed (for example, the day of operation). Compare with sunrise possible amount. If the transaction amount is smaller than the withdrawable amount,
Since re-cutting is possible, re-cutting of the account processing request is started as a derived transaction, and commit C3 is performed.

【0167】起動処理S37及び受動処理S38は連動
して再カット処理を行い、同期点に達した後に再度派生
再カットメインが起動される。再カットによってその勘
定日での出金可能額がマイナスとなることはないが、そ
れよりも先日付にてマイナスになることはある。この場
合、まず取消スパイラルにより取消SP1を行う。再カ
ットを行った場合、修正再カットの判定をせずに再カッ
トの判定を行う。これは、派生管理フラグを用いると良
い。再カットを行った勘定日にて、さらに別に未成立の
口座処理要求があれば、その中で最も優先順位の高い口
座処理要求の再カットを判定し、再カット可能であれ
ば、派生トランザクションとして再カットを起動する。
この再カットスパイラルSP2によって、各勘定日のす
べての口座処理要求の再カットを試みる。残高と取引金
額の関係によっては、優先順位の高い口座処理要求が決
済できず、優先順位の低い口座処理要求が決済できるこ
ともある。
The start processing S37 and the passive processing S38 perform recut processing in conjunction with each other, and after reaching the synchronization point, the derived recut main is started again. The recut does not make the withdrawable amount on that account date negative, but it may become negative on a later date. In this case, cancellation SP1 is first performed by the cancellation spiral. When the re-cut is performed, the re-cut is determined without determining the corrected re-cut. This may be achieved by using a derivation management flag. If there is another unfinished account processing request on the account date on which the recut was performed, the re-cut of the account processing request with the highest priority among them is determined. Initiate a recut.
The re-cut spiral SP2 attempts to re-cut all account processing requests on each account day. Depending on the relationship between the balance and the transaction amount, it may not be possible to settle a high-priority account processing request and settle a low-priority account processing request.

【0168】出金可能額にマイナスがなく、修正再カッ
トが完了し、再カットの対象がない場合には、取消再カ
ットメインは処理を完了する。一般的には、残高が減少
した場合には取消スパイラルSP1が動作し、残高が増
加した場合には修正再カット及び再カットスパイラルS
P2が動作する。図16に示すように、起動及び受動に
よる連動トランザクションと、取消再カットメインでの
トランザクションを別のトランザクションとしたため、
起動及び受動による連動トランザクションはその処理の
完了の直後同期点に達し、これにより、端末等に対する
良好な応答性を確保することができる。また、取消再カ
ットメインが、この派生トランザクションを活用して口
座処理の最適化を順次実行するため、先日付での取消の
発生を前提とした先日付完結処理を厳格に実行すること
ができ、さらには、優先順位による決済という複雑な処
理を安定して実現することができ、また、先日付完結処
理であるため、優先順位に基づいた処理を行いつつ、2
4時間連続稼働を行うことができる。さらに、取消再カ
ットメインが、口座残高に異動が生じるごとに口座処理
要求の優先順位に基づいた最適化を実行するため、口座
処理要求の実行順序が限定されることがなくなる。
If there is no minus in the possible withdrawal amount, the modified re-cut is completed, and there is no re-cut target, the cancellation re-cut main completes the processing. Generally, when the balance decreases, the cancellation spiral SP1 operates, and when the balance increases, the modified recut and recut spiral S1 operate.
P2 operates. As shown in FIG. 16, since the interlocking transaction by the activation and the passive and the transaction in the cancellation / recut main are different transactions,
The linked transaction by activation and passive reaches the synchronization point immediately after the completion of the processing, whereby good responsiveness to the terminal or the like can be secured. In addition, since the cancellation re-cut main executes the optimization of account processing sequentially using this derived transaction, it is possible to strictly execute the future completion processing assuming the occurrence of cancellation at the future date, Furthermore, complicated processing of settlement by priority can be stably realized, and since the processing is completed at a future date, processing based on the priority is performed while performing processing based on priority.
It can operate continuously for 4 hours. Further, the cancellation re-cut main executes optimization based on the priority of the account processing request each time the account balance is changed, so that the execution order of the account processing request is not limited.

【0169】図17は、本実施形態による取消再カット
メイン処理部による修正再カット処理を含めた処理例を
示すフローチャートである。図17に示すように、先日
付完結処理方法では、まず、勘定日毎の出金可能額を日
付チェックテーブルとして算出する(ステップS4
1)。続いて、出金可能額のマイナスがあるか否かを判
定し(ステップS42)、出金可能額マイナスの勘定日
がある場合には取消処理を起動して終了する。一方、出
金可能額にマイナスがなければ、残不足明細セグメント
に格納され先日付の口座処理要求である起動業務のうち
最も優先順位の高い起動業務を高優先業務として特定す
る(ステップS44,高優先業務特定工程)。
FIG. 17 is a flowchart showing a processing example including the correction re-cut processing by the cancellation re-cut main processing unit according to the present embodiment. As shown in FIG. 17, in the future date completion processing method, first, a withdrawable amount for each account date is calculated as a date check table (step S4).
1). Subsequently, it is determined whether there is a minus in the withdrawable amount (step S42). If there is an account date in which the withdrawable amount is minus, the canceling process is started and the processing ends. On the other hand, if there is no minus in the possible withdrawal amount, the start service having the highest priority among the start services stored in the remaining shortage detail segment and being the account processing request of the future date is specified as the high priority service (step S44, high). Priority work identification process).

【0170】続いて、取引明細セグメントに格納され先
日付で成立済みの起動業務のうち、前記高優先業務の優
先順位よりも優先順位の低い起動業務群によって利用さ
れた出金額の合計額を先日付の勘定日での修正出金可能
額として算出する(ステップS45,修正出金可能額算
出工程)。さらに、先日付の勘定日での修正出金可能額
に基づいて、前記残不足明細に格納された前記高優先業
務の口座処理要求が決済可能となるか否かを判定する
(ステップS46,修正再カット可否判定工程)。そし
て、この修正再カット可否判定工程にて前記高優先業務
が決済可能と判定された場合には当該口座処理要求の修
正再カットを前記起動業務処理部に派生トランザクショ
ンとして実行する(ステップS47,修正再カット工
程)。修正再カットを実行すると、処理を終了する。
Subsequently, of the startup jobs stored in the transaction detail segment and completed at a later date, the total sum of the withdrawal amounts used by the startup job group having a lower priority than the priority of the high-priority job is calculated first. It is calculated as a corrected withdrawable amount on the date of the accounting date (step S45, a corrected withdrawable amount calculation step). Further, it is determined whether or not the account processing request for the high-priority business stored in the remaining shortage statement can be settled based on the corrected withdrawable amount on the future date of the accounting date (step S46, correction). Recut availability determination step). Then, when it is determined that the high-priority business can be settled in the correction re-cut availability determination step, a correction re-cut of the account processing request is executed as a derivative transaction in the startup business processing unit (step S47, correction). Re-cutting process). When the correction re-cut is executed, the processing ends.

【0171】取消再カットメインのスパイラル制御によ
って、この修正再カット工程S47によって修正再カッ
トが制御され、その後、先日付の勘定日での出金可能額
がマイナスとなった場合には、当該勘定日の取引明細セ
グメントに格納された口座処理要求のうち優先順位の低
い順に当該出金可能額がプラスとなるまで口座処理要求
を取り消すこととなる(修正再カット後取消工程)。
By the spiral control of the cancellation / recut main, the correction / recut is controlled by the correction / recut step S47, and when the possible withdrawal amount on the account date of the future becomes negative, Of the account processing requests stored in the transaction details segment on the day, the account processing requests are canceled in the descending order of priority until the payable amount becomes positive (cancellation process after modified recut).

【0172】修正再カットの対象がなければ、再カット
の対象が再カット可能であるか否かを判定し(ステップ
S48)、再カット可能であれば当該再カットを起動す
る(ステップS49)。
If there is no correction recut target, it is determined whether the recut target is recuttable (step S48). If recut is possible, the recut is started (step S49).

【0173】単純に再カットを演算日当日、修正再カッ
トを先日付とする場合には、再カットの判定を修正再カ
ットの判定よりも先に行うようにしても良い。先日付完
結処理では、当日の再カットよりも先日付の再カットの
方が処理数が多いため、図17に示す順序とし、当日の
再カットによって先日付にて出金可能額がマイナスとな
った場合にのみ、先日付の取引を取り消すようにしても
よい。
In the case where the re-cut is simply taken as the calculation date and the modified re-cut is taken as the future date, the re-cut determination may be performed before the modified re-cut determination. In the final date completion processing, since the number of processes is larger in the recut of the future date than in the recut of the current day, the order shown in FIG. 17 is used. Only when this occurs, the transaction of the future date may be canceled.

【0174】図15、図16に示す取消再カットメイン
処理部の機能や、図16に示す取消再カットメイン処理
の処理工程は、図15に示す演算手段4が取消再カット
メインプログラムを実行することで実現できる。例え
ば、取消再カットメインプログラムは、前記演算手段4
を動作させる指令として、残高明細に基づいて勘定日毎
の出金可能額を算出すると共に、先日付の勘定日での当
該出金可能額がマイナスとなり決済不能となる場合に
は、当該決済不能となる勘定日での複数の決済済みの口
座処理要求のうち優先順位の低い口座処理要求の取消を
前記起動業務処理部に派生トランザクションとして実行
させる取消起動制御指令を備える。これにより、図16
に示すステップS33の部分や、図17に示すステップ
S41,S24,S43等の処理を実現できる。
The functions of the cancel / recut main processing unit shown in FIGS. 15 and 16 and the processing steps of the cancel / recut main process shown in FIG. 16 are executed by the arithmetic means 4 shown in FIG. This can be achieved by: For example, the cancellation / recut main program is executed by the arithmetic means 4
As a command to operate, calculate the withdrawable amount for each account date based on the balance statement, and if the withdrawable amount on the future date's account date becomes negative and payment cannot be A cancel activation control command for causing the activation business processing unit to execute a cancellation of a low-priority account processing request among a plurality of settled account processing requests on a certain account date as a derived transaction. As a result, FIG.
And the processing of steps S41, S24, S43, etc. shown in FIG. 17 can be realized.

【0175】取消再カットメインプログラムは、また、
残高明細に基づいて勘定日毎の出金可能額を算出させる
と共に、演算日時当日又は先日付の勘定日での出金可能
額に基づいて前記残不足明細に格納された当日又は先日
付の勘定日で未成立の口座処理要求のうち優先順位の高
い順に各口座処理要求が決済可能となるか否かを判定さ
せる再カット可否判定指令と、この再カット可否判定機
能によって決済可能と判定された未成立の口座処理要求
がある場合には当該口座処理要求の再カットを前記起動
業務処理部に派生トランザクションとして実行させる再
カット起動制御指令とを備える。
The cancel / recut main program also includes
The withdrawal amount for each account date is calculated based on the balance statement, and the current or future account date stored in the balance shortage statement is calculated based on the withdrawal amount at the calculation date and time or the future account date. Among the unsatisfied account processing requests, a re-cut enable / disable determination command for determining whether each account processing request can be settled in descending order of priority; And a recut activation control command for causing the activation operation processing unit to execute the recut of the account processing request as a derived transaction when the account processing request is satisfied.

【0176】さらに、修正再カットを行う機能78,8
0,82,84や、その処理工程(S44,S45,S
46,S47及びマイナス後の取消S42,S43)に
応じて、各種の指令を備えるようにしてもよい。この場
合、取消再カットメインプログラムは、残不足明細セグ
メントに格納され先日付の口座処理要求である起動業務
のうち最も優先順位の高い起動業務を高優先業務として
特定させる高優先業務特定指令と、取引明細セグメント
に格納され先日付で成立済みの起動業務のうち前記高優
先業務の優先順位よりも優先順位の低い起動業務群によ
って利用された出金額の合計額を先日付の勘定日での修
正出金可能額として算出させる修正出金可能額算出指令
と、先日付の勘定日での修正出金可能額に基づいて前記
残不足明細に格納された前記高優先業務の口座処理要求
が決済可能となるか否かを判定させる修正再カット可否
判定指令と、この修正再カット可否判定機能によって前
記高優先業務が決済可能と判定された場合には当該口座
処理要求の修正再カットを前記起動業務処理部に派生ト
ランザクションとして実行させる修正再カット起動制御
指令とを備える。
Further, functions 78 and 8 for performing correction and re-cutting
0, 82, 84 and the processing steps (S44, S45, S
46, S47 and the cancellation after the minus (S42, S43), various commands may be provided. In this case, the cancellation re-cut main program includes a high-priority task identification command for identifying the highest-priority startup task among the startup tasks stored in the remaining shortage detail segment and being the post-dated account processing request as the high-priority task, Correction of the total amount of withdrawal amounts used by the start-up business group having a lower priority than the priority of the high-priority business among the start-up businesses that are stored in the transaction statement segment and completed at the future date on the account date of the future The high-priority business account processing request stored in the balance shortage statement can be settled based on the corrected withdrawable amount calculation command to be calculated as the withdrawable amount and the corrected withdrawable amount on the previous date of the account date. And a correction re-cut feasibility determination command for determining whether or not the high priority business is settled by the correction re-cut feasibility determination function. A positive re-cut and a modified re-cut start control command to be executed as a derivative transaction to the start business processing unit.

【0177】図18は修正再カット処理の一例を示す説
明図である。図18に示す例では、通番001の支払B
1,通番002の支払A1,通番003の支払B2がこ
の順で実行されている。11日の当初の残高は30,0
00で、支払B2の成立時の残高は10,000とな
る。ここで、通番004の支払A2が入力されたとす
る。残高10,000に対して、出金額19,000で
あるため、決済できず、受動処理は、この支払A2を残
不足明細に格納し、続いて、取消再カットメインを起動
する。
FIG. 18 is an explanatory diagram showing an example of the correction re-cut processing. In the example shown in FIG.
1, payment A1 of serial number 002 and payment B2 of serial number 003 are executed in this order. The initial balance on the 11th was 30,0
At 00, the balance at the time of establishment of the payment B2 is 10,000. Here, it is assumed that payment A2 of serial number 004 is input. Since the outgoing amount is 19,000 with respect to the balance 10,000, it cannot be settled, and the passive processing stores the payment A2 in the remaining shortage details, and subsequently activates the cancellation recut main.

【0178】図16を参照すると、取消再カットメイン
では、まず、出金可能額のマイナスがあるか否かを判定
する(S33)。出金可能額のマイナスはないため(分
岐B2)、続いて修正再カットの可否を試みる。残不足
明細に格納された口座処理要求は支払A2のみであると
すると、支払A2の優先順位が最も高いものとなる。図
17を参照すると、支払A2が高優先業務となる(ステ
ップS44)。この高優先業務の優先順位1よりも優先
順位が低く、11日を勘定日として成立している口座処
理要求は、支払B1とB2とである。その取引金額の合
計は10,000であり、出金可能額が10,000で
あるため、これを合計した修正出金可能額は20,00
0である(ステップS45)。続いて、再カット可能で
あるか否かを判定する。再カットは可能であるため(ス
テップS46)、修正再カットを派生トランザクション
として起動する。
Referring to FIG. 16, in the cancellation / recut main, first, it is determined whether or not the payable amount is negative (S33). Since there is no minus in the possible withdrawal amount (branch B2), it is subsequently attempted to determine whether or not the modified re-cut is to be performed. Assuming that only the payment A2 is the account processing request stored in the remaining shortage statement, the payment A2 has the highest priority. Referring to FIG. 17, the payment A2 becomes a high-priority business (step S44). Account processing requests having a priority lower than the priority 1 of the high-priority business and having the 11th as an account date are payments B1 and B2. Since the total transaction amount is 10,000 and the possible withdrawal amount is 10,000, the corrected withdrawable amount obtained by adding this is 20,000.
It is 0 (step S45). Subsequently, it is determined whether or not recut is possible. Since recut is possible (step S46), the modified recut is started as a derived transaction.

【0179】再度図17を参照すると、起動処理S34
と受動処理S35の連動により、支払A2が再カットさ
れる。そして、受動処理S35は残高を更新し、11日
の残高はマイナス9,000となる。受動処理S35に
よって起動された取消再カットメインは、出金可能額が
マイナスであるため、取消スパイラルSP1により、支
払B1及びB2を取り消す。受動処理S32は、これら
を残不足明細セグメントに登録する。これにより、優先
順位の低い支払B1,B2と、優先順位の高い支払A2
とを実行順序に関わらず入れ替えることができた。
Referring again to FIG. 17, the start-up process S34
The payment A2 is cut again by the interlocking of the passive process S35 with the payment A2. Then, the passive process S35 updates the balance, and the balance on the 11th becomes minus 9,000. The cancellation recut main activated by the passive processing S35 cancels the payments B1 and B2 by the cancellation spiral SP1 because the payable amount is minus. The passive process S32 registers these in the remaining shortage detail segment. As a result, the lower priority payments B1 and B2 and the higher priority payment A2
Could be replaced regardless of the execution order.

【0180】支払B1及びB2の取消後、取消再カット
メインは出金可能額を確認する。11日の出金可能額は
1,000であり、プラスである。次に、修正再カット
を検討し、修正出金可能額を算出しようとするが、支払
B1,B2の優先順位よりも優先順位の低い業務は成立
していないため、修正出金可能額の算出ができない。再
カットについても、残不足取引金額が8,000、2,
000であるため、残高の1,000では決済できな
い。従って、この決済の状態が優先順位に従った決済で
ある。このため、取消再カットメインのスパイラル制御
は終了する。
After the cancellation of the payments B1 and B2, the cancellation recut main checks the payable amount. 11 Sunrise possible amount is 1,000, which is a plus. Next, the re-cutting is considered, and an attempt is made to calculate the corrected withdrawable amount. However, since a business having a priority lower than the priority of the payments B1 and B2 has not been established, the corrected withdrawable amount is calculated. Can not. Regarding re-cut, the remaining shortage transaction amount is 8,000, 2,
Since it is 000, it cannot be settled with the balance of 1,000. Therefore, the state of the settlement is the settlement according to the priority. Therefore, the spiral control of the cancel / recut main is ended.

【0181】[0181]

【第1実施例】次に、本発明の実施例を図面を参照して
説明する。本実施例では、口座処理要求について、二桁
の数値による優先順位が予め定義されている。優先順位
は、00から99までであり、00から89(≠9x、
x=0,1,2,…)までを優先順位の第1群とし、9
0から99(9x)までを優先順位の第2群としてい
る。優先順位としては、00が一番高く最高位で、99
が最も低い。優先順位が同一の場合、当初の入力処理順
等に従って取消又は再カットの順序を定める。再カット
期限が2日以上のものは、処理の関係上もあり、優先順
位の第1群に属するものとしている。再カット期限が振
替日当日のみのものは、9x(第2群)に属する。再カ
ット期限が2日以上ある場合には、例えば、10日から
3ヶ月間再カット可能な口座処理要求では、先日付の1
0日に決済不能であっても、より先日付の11日での決
済が可能な場合がある。このときには、11日で決済す
る。一方、10日の残高が増加した場合には、第1実施
形態で概説したように、11日の口座処理要求を取り消
し、10日を勘定日として決済とする。これを前倒と呼
ぶ。
First Embodiment Next, an embodiment of the present invention will be described with reference to the drawings. In this embodiment, the priority of the account processing request is defined in advance by a two-digit numerical value. The priorities are from 00 to 99, and from 00 to 89 ($ 9x,
x = 0, 1, 2,...) as the first group of priorities, and 9
The second group of the priority order is from 0 to 99 (9x). As the priority, 00 is the highest and highest, 99
Is the lowest. If the priorities are the same, the order of cancellation or re-cut is determined according to the initial input processing order or the like. Those with a recut time limit of 2 days or more also have a processing relationship and belong to the first group of the priority order. Those whose re-cut deadline is only on the day of the transfer day belong to 9x (second group). If the recut time limit is 2 days or more, for example, in the case of an account processing request that can be recut for 10 days to 3 months, 1
Even if settlement is not possible on day 0, settlement may be possible on the 11th day, which is the future date. At this time, settlement is made in 11 days. On the other hand, when the balance on the 10th has increased, as outlined in the first embodiment, the account processing request on the 11th is canceled and the settlement is made with the 10th as the account date. This is called forward.

【0182】その他、本実施例では、公共料金の振替な
ど外部から依頼される自動振替による決済(外部自振)
や、融資回収や定期積金のために預金口座から出金を行
う内部自振を実現するための各種マスタやデータベース
についても簡単に説明する。さらに、第4実施形態にて
説明した起動処理及び受動処理と実際に実行するプログ
ラムとの関係を開示する。
In addition, in this embodiment, settlement by automatic transfer requested from the outside, such as transfer of a utility bill (external self-oscillation)
In addition, various masters and databases for realizing internal self-oscillation for withdrawing money from a deposit account for loan collection and periodic deposit are also briefly described. Further, the relationship between the activation process and the passive process described in the fourth embodiment and the program to be actually executed is disclosed.

【0183】そして、本実施例では、優先順位に2群あ
り、再カット期限が2日以上の可能性があるという前提
での取消再カットメインの詳細と、その動作例を開示す
る。
In this embodiment, details of the cancellation re-cut main on the premise that there are two groups in the priority order and the re-cut time limit may be two days or more, and an operation example thereof will be disclosed.

【0184】図19は、本実施例による先日付完結処理
システムを含む勘定系のシステム構成例を示すブロック
図である。図1等に示す受信手段2は、図19に示す例
では、通信制御装置101と、所定のプログラムを実行
するCPUと、媒体読取部100Aによって実現され
る。媒体読取部100Aとは、外部から持ち込まれる持
ち込み媒体100Bに記録された自振の依頼用データ等
を読み取る。
FIG. 19 is a block diagram showing an example of an accounting system configuration including the future completion processing system according to this embodiment. In the example illustrated in FIG. 19, the receiving unit 2 illustrated in FIG. 1 and the like is realized by the communication control device 101, a CPU that executes a predetermined program, and the medium reading unit 100A. The medium reading unit 100A reads self-vibration request data and the like recorded on a carry-in medium 100B brought in from the outside.

【0185】通信制御装置101は、内部(行内)ネッ
トワーク3Aと、対外ネットワーク3Bと接続されてい
る。各ネットワーク3A,3Bは、物理的、論理的に多
数のネットワークを含むようにしても良い。通信制御装
置101は、内部ネットワーク3Aを介して、顧客との
オンライン取引に用いられるCD/ATM1Aと、営業
店内に配置され営業店の担当者によって操作される営業
店端末1Bと、顧客からの電話による取引を遂行するた
めのテレフォンバンキングセンタ1Cと接続されてい
る。
The communication control device 101 is connected to the internal (in-line) network 3A and the external network 3B. Each of the networks 3A and 3B may include a large number of networks physically and logically. The communication control apparatus 101 includes, via the internal network 3A, a CD / ATM 1A used for online transactions with a customer, a sales office terminal 1B located in the sales office and operated by a sales representative, and a telephone call from the customer. Is connected to a telephone banking center 1C for carrying out transactions by.

【0186】また、通信制御装置101は、対外ネット
ワーク3Bを介して他の金融機関との為替等の通信を制
御する全銀センタ1Dや、その他の外部センタ1Eや、
ファームバンキングやインターネットバンキングを行う
顧客のパーソナルコンピュータ等の顧客PC1Fや、携
帯電話等の顧客携帯端末1Gと接続されている。
The communication control device 101 includes a Zengin Center 1D that controls communication such as exchange with another financial institution via the external network 3B, another external center 1E,
It is connected to a customer PC 1F such as a personal computer of a customer who performs firm banking and Internet banking, and a customer portable terminal 1G such as a mobile phone.

【0187】各端末1A,1B,1C,1F,1Gや、
センタ1D,1E等から、通信制御装置101を介して
CPUに入金や出金の要求が入力される。全銀センタ1
Dは、全国銀行データ通信システムのセンタである。個
人情報センタや、他行コンピュータセンタと接続されて
いる。振込、送金等の為替取引を行う要求指令(電文)
が送受信される。
Each of the terminals 1A, 1B, 1C, 1F, 1G,
Requests for deposit and withdrawal are input to the CPU from the centers 1D and 1E via the communication control device 101. Zengin Center 1
D is the center of the national bank data communication system. It is connected to a personal information center and another-line computer center. Request command (telegram) for performing exchange transactions such as transfer and remittance
Is transmitted and received.

【0188】外部センタ1Eは、金融機関の業態別に構
築された各種のネットワーク(地方銀行のACS,都市
銀行のBANCS,全国キャッシュサービスのMICS
等)のセンタや、ファームバンキング(FB)やエレク
トロニックバンキング(EB)や、テレフォンバンキン
グに必要なデータの送受信を行うためのセンタ(例え
ば、ANSER)や、販売店のPOSシステムやクレジ
ットカード決済用の端末との通信を行うためのセンタ
(例えば、CAFISやDCS)である。この外部セン
タからは、通知、照会、資金移動など、金融機関窓口で
可能な種々の取引を行う要求指令(電文)が入力され
る。
The external center 1E includes various networks (ACS of regional banks, BANCS of city banks, and MICS of nationwide cash services) constructed according to the type of business of the financial institution.
Etc.), a firm bank (FB), an electronic banking (EB), a center for transmitting and receiving data necessary for telephone banking (for example, ANSER), a POS system of a store, and a credit card settlement system. It is a center (for example, CAFIS or DCS) for communicating with terminals. From this external center, a request command (telegram) for performing various transactions that can be made at a financial institution window, such as notification, inquiry, and fund transfer, is input.

【0189】通信制御装置101は、それぞれのプロト
コルに従って要求指令を受信し、オンライン演算手段4
を構成するCPUに入力する。CPUは、各端末からそ
れぞれの形態で入力される要求指令を予め定められた形
式の口座処理要求に変換して、口座処理を行うプログラ
ムに引き渡す。
The communication control device 101 receives the request command according to each protocol, and
Is input to the CPU that constitutes. The CPU converts a request command input in each form from each terminal into an account processing request in a predetermined format and delivers the account processing request to a program for performing account processing.

【0190】また、公共料金の振替等(外部自振)は、
持ち込み媒体100Bにて持ち込まれる。CPUは、媒
体読取部100Aによって読み取られた外部自振原デー
タと他のデータベース(DB)を用いて口座処理要求を
生成する。
In addition, the transfer of utility charges (external self-oscillation)
It is carried by the carry-in medium 100B. The CPU generates an account processing request using the external self-oscillation original data read by the medium reading unit 100A and another database (DB).

【0191】図19に示す例では、勘定系システムを構
成する先日付完結処理システムは、振替又は振込等の預
金口座を用いた決済に関するデータを管理する外部自振
関連DB100と、自動積立や融資返済等の入出金に関
するデータを管理する内部自振関連DB102と、決済
又は入出金に用いられる預金口座に関するデータを管理
する預金マスタDB104と、自動支払機や店頭端末等
との口座処理要求に応答すると共に前記入出金又は決済
を実行するセンターカットを口座処理要求として処理す
るCPUとを備えている。
In the example shown in FIG. 19, the future completion processing system constituting the accounting system includes an external self-financing-related DB 100 for managing data relating to settlement using a deposit account such as transfer or transfer, and an automatic funding / financing system. Respond to account processing requests from internal self-oscillation-related DB 102 that manages data related to deposits and withdrawals such as repayment, deposit master DB 104 that manages data related to deposit accounts used for settlement or deposit and withdrawal, and automatic payment machines and store terminals. And a CPU for processing the center cut for executing the deposit / withdrawal or settlement as an account processing request.

【0192】前記預金マスタDBは、図7等に示したフ
ァイル6と同様に、口座処理の順序に従った順序で口座
処理要求を取引明細として勘定日及び優先順位を含めて
格納する取引明細セグメント12と、前記勘定日毎の残
高を格納する残高明細セグメント14と、決済不能で未
成立の口座処理要求を残不足明細として勘定日及び優先
順位を含めて格納する残不足明細セグメント16とを備
えている。
The deposit master DB stores the account processing request as the transaction statement including the account date and the priority in the order according to the order of the account processing, similarly to the file 6 shown in FIG. 12, a balance detail segment 14 for storing the balance for each account date, and a remaining shortage detail segment 16 for storing account settlement requests that cannot be settled and that have not been completed, including account dates and priorities, as remaining shortage details. I have.

【0193】図19に示す例では、先日付完結処理シス
テムは、外部自振関連DB100や、内部自振関連DB
102から抽出した外部自振原データ又は内部自振デー
タをそれぞれ編集すると共に、1又は複数の口座処理要
求からなるセンターカット電文を生成する自振入力ファ
イル生成手段105を備えている。自振入力ファイル生
成手段105は、各自振データを編集して、口座処理要
求を生成し、さらに、必要に応じて複数の口座処理要求
を1つの電文へブロッキングしたり、電文の並べ替え等
を行う。
In the example shown in FIG. 19, the future date completion processing system includes an external self-oscillation-related DB 100 and an internal self-oscillation-related DB.
A self-oscillation input file generating means 105 is provided for editing the external self-oscillation original data or the internal self-oscillation data extracted from 102 and generating a center cut message including one or a plurality of account processing requests. The self-oscillation input file generation means 105 edits each self-oscillation data, generates an account processing request, and further, if necessary, blocks a plurality of account processing requests into one message, sorts the messages, etc. Do.

【0194】本実施例での先日付完結処理システムは、
このオンライン演算手段4へ前記自振入力ファイル生成
手段105Aによって生成されたセンターカット電文を
入力するセンターカット電文入力手段105Bを備えて
いる。自振入力ファイル生成手段105Aが、外部自振
データと内部自振データをそれぞれ生成又は抽出してお
き、これらの自振データからセンターカット電文を生成
する。この自振入力ファイルのデータ構造を予め定めら
れた形式としておくことで、外部自振と内部自振とを並
行又は連続して実行することができる。
In the present embodiment, the future completion processing system is as follows.
A center cut message input means 105B for inputting the center cut message generated by the self-oscillation input file generating means 105A to the online operation means 4 is provided. The self-oscillation input file generation means 105A generates or extracts external self-oscillation data and internal self-swing data, respectively, and generates a center cut message from these self-swing data. By setting the data structure of the self-oscillation input file to a predetermined format, external self-oscillation and internal self-oscillation can be executed in parallel or continuously.

【0195】さらに、オンライン演算手段4は、外部自
振関連DB100、内部自振関連DB102から抽出し
たデータに基づくセンターカット電文や、オンライン応
答部106Aを介して入力される口座処理要求を処理す
る起動業務処理部108と、預金マスタDBを管理する
受動業務処理部110とを備えている。図19に示す例
では、説明を簡略化するために、預金マスタDB104
に残高が格納されている預金を用いた決済の要求を処理
する例を説明する。この預金マスタDBを用いた決済処
理のほか、オンライン演算手段4は、通帳への記帳の要
求や、融資実行の登録や、データベースの再編成など種
々の業務処理要求を種々の資源を用いて処理する。
Further, the online computing means 4 starts processing for processing a center cut message based on data extracted from the external self-oscillation-related DB 100 and the internal self-oscillation-related DB 102 and an account processing request input via the online response unit 106A. The system includes a business processing unit 108 and a passive business processing unit 110 that manages a deposit master DB. In the example shown in FIG. 19, in order to simplify the description, the deposit master DB 104
An example of processing a request for settlement using a deposit whose balance is stored in the first embodiment will be described. In addition to the settlement processing using the deposit master DB, the online computing means 4 processes various business processing requests such as a request for bookkeeping in a passbook, registration of loan execution, and reorganization of the database using various resources. I do.

【0196】また、オンライン演算手段は、ATM1A
等からの口座処理要求をリアルタイムに実行するオンラ
イン応答処理部106Aを備えている。オンライン応答
処理部106Aは、当日の入出金指令に応答するほか、
振込予約等を受け付ける。
The on-line operation means is ATM1A.
And the like, and an online response processing unit 106A for executing an account processing request from the same in real time. The online response processing unit 106A responds to the deposit / withdrawal command on the day,
Accepts transfer reservations, etc.

【0197】図19に示す例では、起動業務処理部10
8は、センターカット電文による口座処理要求と、オン
ライン応答部106Aを介した口座処理要求とを、勘定
日毎の残高明細セグメント14に基づいて処理する。起
動業務処理部108は、実行中の起動業務プログラム群
と単一のトランザクションとしての連動を受動業務処理
部110に依頼する。受動業務処理部110は、起動業
務処理部108によって連動依頼される勘定日毎の口座
残高の出金又は入金等の受動業務を前記各セグメント1
2,14,16を用いて実行する。この受動業務は、残
高の確認処理、要求された残高の預金マスタDBへの更
新処理、及び残高が更新された場合の先日付の勘定日で
の残高の更新処理等を含む。受動業務処理部110は、
当該受動業務の実行によって前記勘定日毎の残高明細が
変化した場合には、取消再カットメインプログラムを当
該起動業務及び受動業務が連動した単一のトランザクシ
ョンとは異なる他の派生トランザクションとして起動す
る。
In the example shown in FIG.
8 processes the account processing request by the center cut message and the account processing request via the online response unit 106A based on the balance statement segment 14 for each account date. The startup business processing unit 108 requests the passive business processing unit 110 to link the running startup business program group with a single transaction. The passive business processing unit 110 performs the passive business such as withdrawal or deposit of the account balance for each account date requested by the startup business processing unit 108 in conjunction with each of the segments 1.
This is performed using 2, 14, and 16. This passive work includes a process of checking the balance, a process of updating the requested balance to the deposit master DB, and a process of updating the balance on a future account date when the balance is updated. The passive business processing unit 110
If the balance statement for each account date changes due to the execution of the passive business, the cancellation / recut main program is started as another derived transaction different from a single transaction in which the starting business and the passive business are linked.

【0198】取消再カットメインプログラムが派生トラ
ンザクションとして起動されると、オンライン演算手段
の一部は取消再カットメイン処理部112として機能す
る。取消再カットメイン処理部112は、受動業務処理
部110によって起動された状態の前記残高明細セグメ
ントに基づいて各勘定日毎の出金可能額を日付チェック
テーブルとして算出すると共に、生成した日付チェック
テーブルに基づいて一つの口座処理の取消又は再カット
を派生トランザクションとして起動する。取消処理又は
再カット処理を派生トランザクションとして起動する
と、起動業務処理部108は、この取消処理又は再カッ
ト処理を実行する。
When the cancel / recut main program is started as a derived transaction, a part of the online calculation means functions as the cancel / recut main processing unit 112. The cancellation / recut main processing unit 112 calculates a withdrawable amount for each account date as a date check table based on the balance statement segment activated by the passive business processing unit 110, and generates the date check table. Activate the cancellation or re-cut of one account process as a derived transaction based on it. When the cancellation process or the re-cut process is started as a derived transaction, the startup business processing unit 108 executes the cancellation process or the re-cut process.

【0199】この取消再カットメイン処理部112は、
第4実施形態と同様に、前記取消又は再カットとして起
動するトランザクションに派生管理フラグを渡すと共に
当該起動した起動業務と受動業務からなるトランザクシ
ョンから渡される派生管理フラグに基づいて前記各セグ
メントに対する探索を継続するスパイラル処理制御機能
114を備えている。
The cancellation / recut main processing unit 112
Similarly to the fourth embodiment, a derivation management flag is passed to the transaction started as the cancellation or recut, and the search for each segment is performed based on the derivation management flag passed from the started transaction and the passive business. A continuous spiral processing control function 114 is provided.

【0200】また、オンライン演算手段(または起動業
務処理部108)は、口座処理要求の種別に応じて各D
B100,102,103,104を参照して口座処理
内容を算出するセンターカット時参照機能を備えるよう
にしても良い。この場合、定期の利率や、融資の利息や
延滞金の額や、カードローン自動融資額などを、口座処
理時に確定し、処理する。センターカット時参照機能に
より、最新の情報に基づいた先日付処理が可能となり、
また、口座処理要求の書式や、口座処理要求の実行プロ
グラムや、自振入力ファイル生成手段の構成を簡略化す
ることができる。この場合、取消再カットメイン処理部
112は、実際に再カットできるか否かを問うことな
く、当初に実行された際の取引金額に基づいて、再カッ
トができそうであれば再カットを起動する。また、取消
については、優先順位がもっとも低い口座処理要求を取
り消し、再度起動されたときに出金可能額を確認する。
このため、取消再カットメイン処理部112が、起動業
務処理部108によって実行されるすべての処理内容を
把握する必要はない。
[0200] The on-line computing means (or the start-up business processing unit 108) executes each D in accordance with the type of the account processing request.
A center cut reference function for calculating account processing contents with reference to B100, 102, 103, and 104 may be provided. In this case, the regular interest rate, the loan interest and the amount of the arrears, the card loan automatic loan amount, and the like are determined and processed at the time of account processing. The reference function at the time of center cut enables future date processing based on the latest information,
Further, the format of the account processing request, the execution program of the account processing request, and the configuration of the self-oscillation input file generating means can be simplified. In this case, the cancellation / recut main processing unit 112 starts the recut if the recut is likely to be performed based on the transaction amount at the time of the initial execution without asking whether or not the recut can be actually performed. I do. As for the cancellation, the account processing request with the lowest priority is canceled, and when it is started again, the amount that can be withdrawn is confirmed.
For this reason, it is not necessary for the cancellation / recut main processing unit 112 to grasp all the processing contents executed by the startup business processing unit 108.

【0201】また、勘定系システムは、図1等に示すフ
ァイル6や融資マスタDB等を記憶するファイル記憶部
と、CPUによって実行される各種プログラムを記憶す
るプログラム記憶部と、CPUによる口座処理や各種契
約の登録等の実行結果をログとして記憶するログ記憶部
と、顧客に発送する帳票等を印刷する印刷部とを備え
る。
The accounting system includes a file storage for storing the file 6 and the loan master DB shown in FIG. 1 and the like, a program storage for storing various programs executed by the CPU, The system includes a log storage unit that stores results of execution of registration of various contracts as a log, and a printing unit that prints a form or the like to be sent to a customer.

【0202】図20は、預金マスタを用いた決済(自動
振替,自振)に関連するデータベースの一例を示す説明
図である。自振のタイプとして、勘定日をキーとして口
座処理要求を読み出すタイプと、勘定日の特定時刻をキ
ーとして実行するタイプとがある。通常の外部自振や内
部自振は、勘定日をキーとする口座処理である。外部か
らの持ち込み媒体100Bによる口座振替や、顧客PC
1F等の操作に応じた振込や振替は、自振原データファ
イルに格納される。融資の約定返済日を勘定日とする口
座振替での返済や、自動的な定期化サービスなどによる
定期預金への入金などは、内部の各種DBへの登録デー
タに基づいて口座処理要求が抽出される。
FIG. 20 is an explanatory diagram showing an example of a database related to settlement (automatic transfer, self-payment) using the deposit master. There are two types of self-oscillation: a type in which an account processing request is read using an account date as a key, and a type in which a specific time on an account date is used as a key. The normal external or internal self-oscillation is an account process using the account date as a key. Debit transfer using external media 100B, customer PC
Transfers and transfers according to operations such as 1F are stored in the original vibration original data file. For repayment by account transfer with the loan repayment date as the account date, payment to time deposits by automatic periodic service, etc., account processing requests are extracted based on registration data in various internal DBs. You.

【0203】融資の返済や、積立や、自動定期化サービ
スなどは、特約管理DBへ蓄積された情報に基づいて内
部自振データが抽出される。定期の期間が満了したとき
に自動継続するための口座処理などについては、期日管
理DBに蓄積された情報に基づいて内部自振データが抽
出される。
In the case of repayment of loans, savings, automatic periodical services, and the like, internal self-oscillation data is extracted based on information accumulated in the special contract management DB. For account processing and the like for automatically continuing when the regular period expires, internal self-vibration data is extracted based on information accumulated in the due date management DB.

【0204】勘定日の特定時刻をキーとする自振として
は、例えば手形小切手の資金化や、カードローンの自動
融資などがある。これは、勘定日が満了するまで又は所
定の入金待ち終了時刻に至ったときに決済不能である場
合には、カードローンによる自動融資を行うものであ
る。このカードローンによる自動融資は、担保定期によ
る貸越極度内の自動融資と異なり、ローンの対象とする
口座処理が限定され、且つ、勘定日の満了直前に入金が
無い場合に自動融資するものである。このような特定時
刻をキーとする自振の管理には、再カット管理DBを用
いる。再カット管理DBは、所定の勘定日の予め定めら
れた時刻以降に処理する口座処理を管理する。自振入力
ファイル生成手段105Aは、この再カット管理DBに
管理される口座処理要求のうち、勘定日が当日である口
座処理要求を、口座処理要求の種別に応じて予め定めら
れた時刻以後に抽出する。
Examples of the self-oscillation using a specific time on the account day as a key include, for example, funding of a check and automatic lending of a card loan. In this case, if the settlement is not possible until the account date expires or when a predetermined payment waiting end time is reached, an automatic loan by a card loan is performed. This automatic loan using a card loan is different from the automatic loan in the extreme of overdraft with a collateral period, in which the processing of the account targeted for the loan is limited and the automatic loan is performed when there is no deposit immediately before the expiration of the account date. . The recut management DB is used for such self-management using the specific time as a key. The recut management DB manages account processing to be performed after a predetermined time on a predetermined account date. The self-oscillation input file generation unit 105A converts the account processing request of which account date is the current day out of the account processing requests managed by the recut management DB after a predetermined time according to the type of the account processing request. Extract.

【0205】また、自動定期化サービスを実行するべ
く、先日付で普通預金口座からの出金と定期預金口座へ
の入金を処理した後に、当該勘定日の満了前に定期入金
の金額の変更等が依頼されることがある。この場合、営
業店の端末のオペレーションにより、既に実行した関連
する口座処理の取消と、新たな契約での口座処理の実行
を行う。このような勘定日又はその直前での変更による
口座処理要求は、追い上げ分DBに登録される。
Further, in order to execute the automatic periodical service, after processing the withdrawal from the savings account and the deposit into the time deposit account at a future date, the amount of the term deposit is changed before the expiration of the account date. May be requested. In this case, the operation of the terminal of the branch office cancels the already executed related account processing and executes the account processing with a new contract. Such an account processing request due to a change on or just before the account date is registered in the catch-up DB.

【0206】図21は、外部自振を処理するオンライン
演算手段4の一部構成を示すブロック図である。外部自
振の先日付センターカットでは、持ち込み媒体からの入
力処理を行い、続いて、口座の照合及び抽出処理を行
い、そして、センターカット電文を生成する。まず、事
前に、電力会社等の自振の依頼先を介して、口座を用い
た自振を行う旨の受託契約書を受け取る。この受託契約
を、受託契約管理DB等に登録する。受託契約管理DB
には、自振の依頼者(振替等の委託者)に関する情報が
登録される。自振契約者(振替を口座で行う口座の名義
人等)に関する情報については、例えば預金氏名ファイ
ル100D等を使用する。外部自振としては、電気、ガ
ス、水道、税金、年会費の支払、企業等の口座からの給
与の振込などの出金や、従業員の口座への給与振込等の
入金などがある。
FIG. 21 is a block diagram showing a partial configuration of the online calculation means 4 for processing external self-oscillation. In the post-date center cut of the external self-oscillation, input processing from a carry-in medium is performed, subsequently, account collation and extraction processing are performed, and a center cut message is generated. First, a contract for contracting self-vibration using an account is received via a self-vibration request destination such as a power company. This trust contract is registered in a trust contract management DB or the like. Contract management DB
In the field, information on a requester of self-oscillation (a consignor of a transfer or the like) is registered. For information regarding the self-financing contractor (the holder of the account performing the transfer with the account), for example, a deposit name file 100D or the like is used. Examples of the external self-payment include payment of electricity, gas, water, tax, annual membership fee, payment such as transfer of salary from an account of a company or the like, and payment such as transfer of salary to an employee's account.

【0207】そして、例えば毎月の特定日に、MTや、
FDなどの持込媒体100Bや、FB端末となるPC1
Fや、インターネットバンキングを行うPC1F等を介
して、口座振替の依頼を受け取る。入力処理では、受託
契約管理DBの内容と、持込媒体100B等による口座
振替の依頼とを照合し、支店や口座が存在しない等のエ
ラーが生じた場合を除いて、口座振替の依頼を予め定め
られたデータ構造である自振原データファイル100C
に変換する。このとき、外部自振の決済状況を管理する
種別決済状況DBや、外部自振の進行を管理する受託運
行管理DBに自振の情報を登録する。また、自振通番
は、この自振原データへの登録時に採番する。自振の種
類毎の優先順位をこの自振原データ登録時に付与するよ
うにしても良い。この場合、自振入力ファイル生成手段
105Aが、口座処理要求毎にその種別に応じた優先順
位を付与する優先順位付与部105Dを備える。
Then, for example, on a specific day of each month, MT,
Carry-in medium 100B such as FD, and PC1 which is an FB terminal
F or a request for fund transfer via PC1F for Internet banking. In the input process, the contents of the trust agreement management DB are compared with the account transfer request using the carry-in medium 100B or the like. Self-oscillation original data file 100C having a defined data structure
Convert to At this time, the information of the self-oscillation is registered in the type settlement status DB for managing the settlement status of the external self-swing or the commissioned operation management DB for managing the progress of the external self-swing. The self-oscillation serial number is assigned when the self-oscillation original data is registered. A priority order for each type of self-oscillation may be assigned at the time of the self-oscillation original data registration. In this case, the self-oscillation input file generation unit 105A includes a priority assigning unit 105D that assigns a priority according to the type of each account processing request.

【0208】図21に示す例では、自振入力ファイル生
成手段105Aは、各DBの自振関連情報を照合し、デ
ータを抽出する自振データ抽出部105Cを備えてい
る。自振データ抽出部105Cは、外部自振に関して
は、預金者の氏名等を登録した預金者氏名ファイルと、
自振原データファイル100Cに格納された自振原デー
タとを照合し、依頼者から自振の依頼を受けた口座番号
等に関してエラーがあるか否かを判定する。正常であれ
ば、自振入力ファイル生成手段105Aは、自振原デー
タからセンターカット電文を生成する。例えば、5つの
口座処理要求を1つの電文へとブロッキングする。
In the example shown in FIG. 21, the self-oscillation input file generating means 105A includes a self-oscillation data extraction unit 105C for checking the self-oscillation related information of each DB and extracting data. The self-oscillation data extraction unit 105C includes, for the external self-oscillation, a depositor name file in which the names of the depositors are registered,
The self-oscillation original data stored in the self-oscillation original data file 100C is collated, and it is determined whether or not there is an error regarding the account number or the like for which the request for self-oscillation has been received from the requester. If normal, the self-oscillation input file generation means 105A generates a center cut message from the self-oscillation original data. For example, five account processing requests are blocked into one message.

【0209】センターカット電文の実行は、例えば、口
座処理要求の勘定日の前営業日に行う。すると、口座処
理要求は先日付にて決済される。口座処理が決済される
と、種別決済状況DB100Eにて決済金額等を集計す
る。そして、自振原データ100Cにも決済済み又は決
済不能の情報を登録する。自振原データ100Cに予め
決済済みというビットを登録しておく場合には、決済で
きた場合には何も処理を行わない。残不足にて決済不能
であった場合に、自振原データファイルに当該口座での
決済が不能であったことを示すビットを付する。これら
の外部自振関連のDBの管理は、起動業務側が行う。ま
た、決済不能の場合には不渡管理DBにも情報登録する
ようにしても良い。この場合、センターカット不渡り一
覧の照会が可能となり、店頭等での事務処理効率が向上
する。
The center cut message is executed, for example, on the business day before the account processing request account date. Then, the account processing request is settled at a future date. When the account processing is settled, the settlement amount and the like are totaled in the type settlement status DB 100E. Then, information indicating that payment has been made or payment is impossible is also registered in the original vibration original data 100C. When a bit indicating that payment has been completed is registered in advance in the self-oscillation original data 100C, no processing is performed if the payment is successful. If the settlement is not possible due to the remaining shortage, a bit is added to the self-oscillation original data file to indicate that the settlement with the account is impossible. The startup business manages these external vibration-related DBs. If payment is impossible, information may be registered in the non-delivery management DB. In this case, it is possible to refer to the list of center cut disapproval, and the efficiency of business processing at stores and the like is improved.

【0210】外部自振が再カットされた場合や、取り消
された場合には、自振原データファイル100Cのビッ
トや、種別決済状況DB100Eの内容を更新する。そ
して、振替日当日を迎えたときに、決済済みの口座処理
要求は確定する。また、勘定日当日にて再カットされた
場合は、その再カットの口座処理要求が確定する。一
方、勘定日当日に入金の可能性がなくなった場合や、勘
定日当日から次の営業日へと日付変更されたときに、決
済不能であることが確定する。これらの口座処理要求の
確定に従って、自振原データファイルに登録された決済
不能であったビットも確定する。
When the external self-oscillation is cut again or canceled, the bit of the self-oscillation original data file 100C and the contents of the type settlement status DB 100E are updated. Then, when the day of the transfer date is reached, the account processing request that has been settled is determined. If the cut is made again on the same day as the account date, the account processing request for the cut is fixed. On the other hand, when the possibility of payment disappears on the account day or when the date is changed from the account day to the next business day, it is determined that settlement is impossible. In accordance with the determination of these account processing requests, the unregisterable bits registered in the self-oscillation original data file are also determined.

【0211】外部自振が確定すると、受託運行管理DB
や、種別決済状況DBに登録された自振金額等に基づい
て、口座振替によって振り替えた総額を集計し、自振の
依頼者への資金決済を行う。この資金決済もセンターカ
ットにて実行する。また、内部的に、支店間の決済等も
行う。これら自振関連DBを用いた外部自振の進行管理
は、起動業務側での処理となる。受動業務側では、起動
業務から出金要求や取消による入金(増額)の要求を受
けたときに、この起動業務と連動して預金マスタDBを
管理する。
When the external self-oscillation is determined, the commissioned operation management DB
Alternatively, the total amount transferred by account transfer is totaled based on the amount of self-oscillation registered in the type settlement status DB and the like, and the funds are settled to the client of the self-oscillation. This fund settlement is also executed at the center cut. It also internally performs settlement between branches. The management of the progress of the external self-oscillation using these self-oscillation-related DBs is a process on the startup task side. When the passive business receives a withdrawal request or a deposit (increase) request by cancellation from the starting business, the passive business manages the deposit master DB in conjunction with the starting business.

【0212】図22は、融資の回収を自動引落を用いて
行う場合の構成を示すブロック図である。融資の回収を
センターカットで実行するには、内部自振関連DBの一
種である特約管理DB102Bを用いる。特約管理DB
は、図20に示すように勘定日をキーとして口座処理要
求を読み出すためのDBである。まず、融資が実行され
ると、融資マスタ102Cに種々の情報を登録する。こ
のとき、融資の回収のための自動振替の振替日を、特約
管理DBに登録しておく。特約管理DBでは、融資を特
定する番号と、振替を行う口座番号等の口座処理要求の
契機となる情報のみを登録している。
FIG. 22 is a block diagram showing a configuration in the case where the collection of a loan is performed using automatic debit. To execute the collection of the loan in the center cut, a special contract management DB 102B, which is a kind of the internal self-vibration related DB, is used. Special contract management DB
Is a DB for reading out an account processing request using an account date as a key as shown in FIG. First, when a loan is executed, various information is registered in the loan master 102C. At this time, the transfer date of the automatic transfer for collecting the loan is registered in the special contract management DB. In the special contract management DB, only information that triggers an account processing request such as a number specifying a loan and an account number to be transferred is registered.

【0213】自振入力ファイル生成手段105Aは、特
約管理DBから勘定日をキーとして融資返済のための口
座処理要求をセンターカット電文として生成する。この
口座処理要求は、先日付にて入力される。起動業務処理
部108は、回収額の算出を行う。これは、元金に約定
利息を加算したものである。すなわち、融資回収のセン
ターカットは、実行されるまで出金金額は不明である。
このとき、約定利息は、変動利率の場合にも、先日付の
勘定日での利率で算出する。これら回収額の算出に必要
な情報は、起動業務処理部が収集する。このように、融
資等の内部自振の場合には、その最初の実行時に詳細が
定まることがある。このため、図22に示す例では、起
動業務処理部108が、口座処理要求毎にその種別に応
じた優先順位を付与する優先順位付与部105Dを備え
るようにしてもよい。
The self-oscillation input file generation means 105A generates an account processing request for loan repayment as a center cut message from the special contract management DB using the account date as a key. This account processing request is input at a future date. The start-up business processing unit 108 calculates a collection amount. This is the principal plus the contracted interest. That is, the withdrawal amount is unknown until the center cut of loan collection is executed.
At this time, the contracted interest is calculated based on the interest rate on the account date of the future date even in the case of the floating interest rate. The information required for calculating the collection amount is collected by the startup task processing unit. Thus, in the case of internal self-oscillation such as financing, details may be determined at the first execution. For this reason, in the example shown in FIG. 22, the startup task processing unit 108 may include a priority assigning unit 105D that assigns a priority according to the type of each account processing request.

【0214】回収額が算出されると、振替口座への出金
を連動取引にて要求する。受動業務処理部110は、当
該勘定日の残高明細に基づいて出金の可否を判定し、支
払または支払不能を返す。受動業務処理部110は、出
金した場合には残高を更新し、出金不能であった場合に
は当該回収額と共に残不足明細に登録する。
[0214] When the collection amount is calculated, a request for withdrawal to the transfer account is made in a linked transaction. The passive business processing unit 110 determines whether withdrawal is possible based on the balance details of the account date, and returns payment or inability to pay. The passive business processing unit 110 updates the balance when a withdrawal is made, and registers in the remaining shortage details together with the collected amount when the withdrawal is impossible.

【0215】融資回収の起動業務側では、出金できた場
合には、融資取引履歴DBの登録や、融資マスタ102
の融資実行明細セグメントの洗替えを行う。例えば、次
回償還日、利率、償還額、約定残高等を更新する。ま
た、支店別の極度枠等の残高を更新する。そして、銀行
側の会計に必要な日計勘定等の更新を行う。一方、出金
不能であった場合には、延滞処理を行う。融資マスタ1
02の延滞管理セグメントへの登録や、不渡管理DB1
02Aへの登録などである。
On the loan collection start-up business side, if the withdrawal is successful, the loan transaction history DB is registered and the loan master 102
Of the loan execution statement segment of For example, the next redemption date, interest rate, redemption amount, contract balance, etc. are updated. In addition, the balance such as the extreme limit for each branch is updated. Then, the daily account required for the accounting on the bank side is updated. On the other hand, if the withdrawal is not possible, deferral processing is performed. Loan Master 1
02 in the delinquency management segment and the non-delivery management DB1
02A.

【0216】この融資回収の起動業務側では、現に実行
している口座処理が後に取り消される場合や、再カット
される場合に備えて、当該口座処理にて変更する融資マ
スタ102C等の直前のデータや、回収額等を洗替え前
情報として登録すると良い。この口座処理要求が取り消
される場合には、種々の情報に基づいて再度融資マスタ
を更新するのではなく、洗替え前情報にもとづいて取消
を行うことで、取消処理に要する処理量を減少させるこ
とができる。
On the loan collection start-up business side, in preparation for the case where the currently executed account processing is later canceled or re-cut, the immediately preceding data of the loan master 102C or the like to be changed by the account processing is changed. Alternatively, it is preferable to register the collection amount and the like as pre-replacement information. When this account processing request is canceled, the amount of processing required for the cancellation processing is reduced by performing the cancellation based on the information before the renewal, instead of updating the loan master again based on various information. Can be.

【0217】また、融資回収の場合には、一般的に、再
カット期限を3ヶ月としている。従って、約定返済日か
ら数日後に再カットされる場合がある。融資回収の起動
業務では、再カット処理を行う際に、約定返済日から再
カットする勘定日までの延滞利息を回収額に加算する。
従って、取消再カットメインが再カット(または、修正
再カット)可能と判定したが、実際には再カットできな
い場合も生じる。再カットに成功すると、融資回収の起
動業務は、融資マスタや不渡管理DB102Aの内容を
更新する。
In the case of loan collection, the recut period is generally set to three months. Therefore, it may be cut again several days after the contract repayment date. In the loan collection start-up operation, when performing the re-cutting process, the delinquent interest from the contract repayment date to the account date to be re-cut is added to the collected amount.
Accordingly, although the cancellation recut main determines that recut (or correction recut) is possible, there may be cases where recut cannot be actually performed. If the re-cut succeeds, the loan collection starting operation updates the contents of the loan master and the non-delivery management DB 102A.

【0218】定期積金や、定期の更新などについても、
ほぼ同様の仕組みで実現することができる。
[0218] Regarding the regular deposit and regular renewal,
It can be realized by almost the same mechanism.

【0219】次に、起動業務と受動業務と、実際に実行
されるプログラムとの関係を説明する。図23(A)
は、先日付完結処理の一部構成を示すブロック図であ
る。図23(A)に示す例では、先日付完結処理システ
ムは、オンラインの口座処理要求及び自振データによる
口座処理要求の全部又は一部を処理するサブプログラム
データを複数記憶したプログラム記憶手段106Bと、
前記口座処理要求の実行時に使用するサブプログラム名
及びサブプログラムの実行順序が前記口座処理要求の種
別を示すオペコード別に格納されたオペコードテーブル
を記憶したオペコードテーブル記憶手段106Cとを備
えている。オペコードは、例えば数値列で、普通預金入
金や、定期入金の取消など、口座処理要求の種別を表す
コードである。本実施例では、このオペコードと、勘定
日や取引金額の組み合わせが、口座処理要求である。
Next, a description will be given of the relationship between the starting task, the passive task, and the program actually executed. FIG. 23 (A)
FIG. 4 is a block diagram showing a partial configuration of a future date completion process. In the example shown in FIG. 23 (A), the future completion processing system includes a program storage unit 106B storing a plurality of subprogram data for processing all or a part of an online account processing request and all or a part of an account processing request based on self-generated data. ,
An operation code table storage unit 106C stores an operation code table in which the names of subprograms used when executing the account processing request and the execution order of the subprograms are stored for each operation code indicating the type of the account processing request. The operation code is, for example, a numerical sequence, and is a code representing the type of account processing request, such as deposit of ordinary deposit and cancellation of regular deposit. In this embodiment, the combination of the operation code, the account date and the transaction amount is an account processing request.

【0220】そして、サブプログラムがそれぞれ、前記
オンラインの口座処理要求及び前記自振入力データによ
る口座処理要求に共通した処理を実行させる共通指令
と、当該サブプログラムの起動形態に応じた当該サブプ
ログラムの戻り又は他のサブプログラムの起動を行う処
理を実行させる戻り/起動指令とを備えている。
[0220] Then, the subprogram respectively executes a common command for executing a process common to the online account processing request and the account processing request based on the self-oscillation input data, and A return / start command for executing a process of returning or starting another subprogram.

【0221】さらに、プログラム記憶手段106Bが、
前記サブプログラムの実行中に起動され当該口座処理後
に当該口座に対する口座処理がないと仮定した場合の先
日付となる勘定日での口座状態を生成するために取消又
は再カットする口座処理を特定する取消/再カットメイ
ンプログラムを記憶している。
Further, the program storage means 106B stores
Identify account transactions that are invoked during the execution of the subprogram and that are to be canceled or recut to generate an account status at a future date, assuming that there is no account transaction for the account after the account transaction. Cancel / recut main program is stored.

【0222】図23(B)はオペコードテーブルの一例
を示す説明図である。オペコードテーブルは、起動処理
と受動処理とに区別して生成すると良い。起動処理とし
ては、公共料金の引落等の外部自振や、融資や、定期
や、定積に関する内部自振がある。これらの起動処理と
連動して処理される受動処理の例としては、普通預金
や、当座預金や、情報登録等の口座処理がある。図23
(B)に示す例では、口座処理を受動処理と起動処理と
に分け、さらにそれぞれの業務毎にオペコードテーブル
を作成している。
FIG. 23B is an explanatory diagram showing an example of the operation code table. The operation code table may be generated separately for the activation process and the passive process. The start-up processing includes external self-oscillations such as withdrawal of public utility charges, internal self-oscillations related to financing, fixed-term and fixed-price products. Examples of the passive processing performed in conjunction with the activation processing include an ordinary deposit, a checking account, and an account processing such as information registration. FIG.
In the example shown in (B), account processing is divided into passive processing and activation processing, and an opcode table is created for each task.

【0223】図24は、オペコードテーブルの内容の一
例を示す説明図である。図24は、普通預金のオペコー
ドテーブルである。普通預金出金のオペコードが、「0
1001」であるとする。オペコードテーブルには、こ
のオペコードの動作環境指定が記述されている。例え
ば、普通預金の出金は、土曜日にも動作し、先日付処理
を行うセンター一括も行う。一方、動作のための個別の
承認処理は不要である。好ましい実施例では、ある口座
処理要求の取消を行うための口座処理要求を、元の口座
処理要求のオペコードに一定数(例えば、500)を加
えることとするとよい。起動業務側のオペコードは、取
引明細セグメントや、残不足明細セグメントの項目とす
ると良い。すると、取消再カットメインでの取消や再カ
ットの起動処理をオペコードを用いて直接に行うことが
できる。例えば、取消明細セグメントに格納された口座
処理要求の取消を派生トランザクションとして起動する
には、その取消明細に格納されたオペコードに500を
加算したオペコードの派生起動を業務メインに入力す
る。
FIG. 24 is an explanatory diagram showing an example of the contents of the operation code table. FIG. 24 is an operation code table of the ordinary deposit. If the operation code for savings and withdrawal is "0
1001 ”. The operation code specification describes the operation environment specification of the operation code. For example, the withdrawal of ordinary deposits also operates on Saturdays, and also performs central lump processing for future date processing. On the other hand, individual approval processing for operation is unnecessary. In a preferred embodiment, an account processing request for revoking an account processing request may include adding a fixed number (eg, 500) to the opcode of the original account processing request. The operation code on the start-up business side may be an item of a transaction detail segment or a remaining shortage detail segment. Then, it is possible to directly execute the cancellation and recut activation processing in the cancellation / recut main using the operation code. For example, in order to activate the cancellation of the account processing request stored in the cancellation detail segment as a derived transaction, a derivative activation of an operation code obtained by adding 500 to the operation code stored in the cancellation details is input to the business main.

【0224】オペコードテーブルは、各オペコードで指
定される口座処理要求が予め定められた動作環境以外で
動作することを防止する。例えば、何らかの不具合でセ
ンター一括処理で行わないオペコードがセンター一括処
理として入力された場合であっても、このオペコードテ
ーブルの動作環境指定を参照することで、オンライン演
算手段4はエラー出力することができる。
The operation code table prevents an account processing request specified by each operation code from operating in a state other than a predetermined operation environment. For example, even if an operation code that is not performed in the central batch processing is input as the central batch processing due to some problem, the online operation unit 4 can output an error by referring to the operation environment specification in the operation code table. .

【0225】普通預金の出金(オペコード01001)
を例として考えると、ATMからオンライン処理として
実行される場合と、外部自振や定期入金等の先日付処理
で実行される場合とでは処理内容の詳細が一致しない場
合がある。一方、普通預金の出金であれば、どの起動形
態でも共通している処理も存在する。また、勘定日及び
勘定日以後の残高を展開する処理などは、普通預金の入
金及び出金で共通する処理となる。これらの口座処理と
プログラムの関係を、本実施例では、図24に示すオペ
コード別のプログラムリストで調整する。
Withdrawal of savings account (operation code 01001)
As an example, the details of the processing contents may not match between the case where the processing is executed as an online processing from the ATM and the case where the processing is executed in the future processing such as external self-oscillation or periodic payment. On the other hand, there is a process that is common to all the activation modes as long as the ordinary deposit is withdrawn. In addition, the processing of developing the account date and the balance after the account date and the like are common to the deposit and withdrawal of ordinary deposits. In this embodiment, the relationship between the account processing and the program is adjusted by a program list for each operation code shown in FIG.

【0226】プログラムの起動形態としては、B:営業
店端末1BやATM1A等の端末からその口座処理要求
(オペコード)が初回に入力された場合と、C:同様の
端末から連続して同一の口座処理要求が入力される場合
と、D:定期の入金に対する普通預金の出金など、受動
処理として単一のトランザクションの一部として起動さ
れる「被連動」の場合と、E:先日付処理にて普通預金
の入金等の残高に異動があった場合の取消や再カット等
を行うために、入金等のトランザクションとは異なる他
のトランザクションとして起動される「被派生」とがあ
る。
The program can be started in the following manner: B: when the account processing request (operation code) is first input from a terminal such as the branch office terminal 1B or ATM 1A, and C: the same account continuously from the same terminal. A case where a processing request is input, a case where “D-linked” is started as a part of a single transaction as a passive process such as withdrawal of a savings account for a periodic deposit, and a case where E: future-date processing. There is a "derivation" that is started as another transaction different from a transaction such as a deposit in order to cancel or re-cut the balance of the deposit or the like of the ordinary deposit.

【0227】前記オンライン演算手段4は、口座処理要
求が入力された時に当該口座処理要求のオペコードに基
づいて前記オペコードテーブルを特定する機能と、特定
されたオペコードテーブルにて指定される順序で前記サ
ブプログラムを単一のトランザクションとして実行する
機能とを備えている。例えば、図24に示す例では、オ
ペコード01001で特定される口座処理要求がセンタ
ー一括にて起動された場合には、サブプログラム10,
11,12をこの順で一つのトランザクションとして実
行する。
The on-line computing means 4 has a function of specifying the operation code table based on the operation code of the account processing request when the account processing request is input, and the sub-operation in the order specified by the specified operation code table. And a function to execute the program as a single transaction. For example, in the example shown in FIG. 24, when the account processing request specified by the operation code 01001 is activated collectively by the center, the subprogram 10,
11 and 12 are executed as one transaction in this order.

【0228】サブプログラムの処理例を例示する。残高
明細更新処理は受動業務の出金及び入金で共通して利用
可能なサブプログラムであり、口座処理要求が成立して
口座残高に異動が生じる場合に起動される。続いて、預
金マスタDB104から、残高明細セグメントを読み出
す。そして、勘定日の古い順に残高明細を展開する。続
いて、受動処理として実行中の口座処理要求の勘定日に
ついて、残高明細が有るか否かを確認する。当該勘定日
の残高明細が無い場合には、勘定日当日分の残高明細エ
リアを作成する。続いて、その勘定日以降の先日付の各
種残高を更新する。さらに、更新した残高明細セグメン
トを預金マスタDB104へ更新する。そして、起動形
態に応じて業務メイン等に戻る処理を行う。
A processing example of the subprogram will be exemplified. The balance statement update process is a subprogram that can be commonly used for withdrawal and deposit of passive business, and is started when an account processing request is satisfied and a change occurs in the account balance. Subsequently, the balance detail segment is read from the deposit master DB 104. Then, the balance details are developed in the order of the oldest account date. Subsequently, it is confirmed whether or not there is a balance statement for the account date of the account processing request being executed as passive processing. If there is no balance statement on the account date, a balance statement area for the account day is created. Subsequently, various balances of the future date after the account date are updated. Further, the updated balance detail segment is updated to the deposit master DB 104. Then, processing for returning to the business main or the like is performed according to the activation mode.

【0229】口座残高に異動を生じさせる口座処理要求
として、通常入金処理と、通常出金処理の処理内容を説
明する。通常入金処理では、まず、営業店端末や、AT
Mや、例えば振込を行うトランザクションなどの起動業
務から、入金処理要求を受信する。続いて、この入金処
理要求のフォーマットや、入金対象の口座の有無や状態
を確認し、異常があればエラー処理を行う。正常であれ
ば、入金の取引明細を作成する。続いて、上記残高明細
更新処理を実行する。残高明細の更新が正常に完了する
と、入金の取引ログを出力する。この取引ログは、種々
の帳票の印刷や、また、管理用のデータベースの構築
(ディレード処理)等に利用しても良い。そして、金融
機関側の会計を管理する日計を更新する。さらに、未成
立の取引の有無をチェックする。例えば、残不足明細の
有無をチェックする。未成立の取引がある場合には、取
消/再カットメインを派生取引として起動する。取消/
再カットメインの処理完了を待たずに、通常入金処理は
完了する。残高明細の更新処理や、日計の更新等は、種
々の口座処理で共通するため、オペコードテーブルのプ
ログラムリストを用いて同一のプログラムを各種の口座
処理に流用すると良い。
As the account processing request that causes a change in the account balance, the processing contents of the normal payment processing and the normal payment processing will be described. In the normal payment processing, first, the branch office terminal, AT
A payment processing request is received from M or an activation operation such as a transfer transaction. Subsequently, the format of the payment processing request, the presence / absence of the account to be paid, and the status are checked, and if there is an abnormality, error processing is performed. If it is normal, a receipt transaction statement is created. Subsequently, the balance statement updating process is executed. When the update of the balance statement is completed normally, a transaction log of payment is output. This transaction log may be used for printing various forms, constructing a management database (delay processing), and the like. Then, the daily schedule managing the accounting of the financial institution is updated. Further, it checks whether there is any uncompleted transaction. For example, the presence or absence of the remaining shortage details is checked. If there is an uncompleted transaction, the cancellation / recut main is started as a derivative transaction. cancel/
The normal payment processing is completed without waiting for the completion of the recut main processing. Since the updating process of the balance statement and the updating of the daily total are common to various account processes, it is preferable to use the same program for various account processes using the program list of the operation code table.

【0230】通常出金処理では、起動業務から出金処理
要求を受信すると、まず、フォーマット及び口座のチェ
ックを行う。口座が取引停止等の場合には、それに応じ
たエラー処理を行う。フォーマット等が正常であれば、
口座処理要求の残高明細にから出金可能額を算出し、出
金要求額と出金可能額を比較する。出金要求額に対して
出金可能額が不足で有れば、残高なしとしてエラー処理
を行う。入金処理と同様に、取引明細の作成や、残高明
細更新処理の起動及び戻りや、取引ログの出力や、日計
の更新を行う。
In the normal dispensing process, when a dispensing process request is received from the starting operation, first, the format and the account are checked. If the account is suspended, error processing is performed accordingly. If the format is normal,
The withdrawable amount is calculated from the balance statement of the account processing request, and the withdrawal request amount and the withdrawable amount are compared. If the possible withdrawal amount is insufficient for the withdrawal request amount, error processing is performed assuming that there is no balance. In the same manner as the payment processing, the processing of creating a transaction statement, starting and returning the balance statement update processing, outputting a transaction log, and updating the daily total are performed.

【0231】続いて、更新した勘定日毎の残高明細に基
づいて、出金可能額がマイナスとなっている勘定日の有
無をチェックする。出金可能額がマイナスとなっている
勘定日があれば、取消/再カットメインを派生取引とし
て起動し、取消/再カットメインの処理の終了を待たず
に通常出金処理は終了する。一方、マイナスの出金可能
額が無い場合にも、通常出金処理は終了する。受動業務
を構成する通常入金処理や通常出金処理の終了は、ま
ず、入出金の成否を起動業務に報告し、その後、起動業
務が同期点に達するまで待機する。起動業務が正常に処
理を完了すると、受動業務と起動業務とは原子性を保ち
つつ同期点に達する。起動業務エラーがありアボートさ
れる場合には、受動業務側の入出金もアボートし、処理
開始前の状況へと復帰させる。
Subsequently, based on the updated balance statement for each account date, it is checked whether or not there is an account date on which the withdrawable amount is negative. If there is an account date on which the withdrawable amount is negative, the cancel / recut main is started as a derivative transaction, and the normal withdrawal process ends without waiting for the end of the cancel / recut main process. On the other hand, even when there is no negative withdrawable amount, the normal withdrawal processing is terminated. The end of the normal deposit processing and the normal withdrawal processing that constitutes the passive business first reports the success or failure of the deposit / withdrawal to the start-up business, and then waits until the start-up business reaches the synchronization point. When the startup task completes the process normally, the passive task and the startup task reach a synchronization point while maintaining atomicity. If there is an activation operation error and the operation is aborted, the deposit and withdrawal on the passive operation side is also aborted, and the state is returned to the state before the processing was started.

【0232】図25は、本実施例にて最も特徴的な構成
となる取消再カットメイン処理部112の詳細を中心と
したオンライン演算手段4の構成を示すブロック図であ
る。図25に示す例では、受動業務処理部110は、当
日に出金可能額がマイナスとなる口座処理要求をエラー
とする一方、先日付の勘定日での出金可能額のマイナス
を許容する決済完了性設定機能116を備えている。そ
して、取消再カットメイン処理部112は、前記受動業
務処理部による口座処理要求の処理の結果先日付の勘定
日での出金可能額がマイナスになった場合には当該出金
可能額がマイナスとなった日付の出金要求を優先順位の
低い順に取り消す制御をする取消起動制御機能118を
備える。
FIG. 25 is a block diagram showing the configuration of the online operation means 4 focusing on the details of the cancellation / recut main processing section 112 which is the most characteristic configuration in this embodiment. In the example illustrated in FIG. 25, the passive business processing unit 110 sets an error in an account processing request in which the withdrawable amount becomes negative on the day, while setting a payment that permits the withdrawal amount in the future account date to be negative. A completeness setting function 116 is provided. Then, the cancellation / recut main processing unit 112 determines that the possible withdrawal amount on the future date of the accounting day becomes negative as a result of the processing of the account processing request by the passive business processing unit, And a cancel activation control function 118 for canceling the withdrawal requests on the date of the order from the lowest priority.

【0233】決済完了性設定機能116は、各取引に直
接ファイナリティを与えるものではなく、例えば演算日
当日に実行した口座処理は取り消さないが、先日付の口
座処理は取消可能とするような設定である。他の実施例
として、当日であっても口座にアクセスされるまでは演
算日当日に成立した口座処理要求の取消を可能とする設
定もシステム的には可能である。
The settlement completeness setting function 116 does not directly give finality to each transaction. For example, it does not cancel the account processing executed on the day of the calculation, but makes it possible to cancel the account processing of the future date. It is. As another embodiment, it is systematically possible to set such that an account processing request made on the day of the calculation day can be canceled until the account is accessed even on the day.

【0234】図25に示す例では、取消再カットメイン
処理部112は、スパイラル処理制御機能114による
制御に従って動作する複数のサブコントローラ(SC)
を備えている。このサブコントローラの構成は、口座処
理が、決済又は入出金の期限となる再カット期限が2日
以上の可能性があり優先順位の高い第1群か、または、
第1群よりも優先順位が低く再カット期限が1日である
第2群とのいずれかに分類されるという前提で構築され
ている。
In the example shown in FIG. 25, the cancel / recut main processing section 112 operates in accordance with the control of the spiral processing control function 114 to control a plurality of sub-controllers (SC).
It has. The configuration of this sub-controller is such that the account processing is a first group having a high priority in which a re-cut deadline which is a deadline for settlement or deposit / withdrawal may be 2 days or more, or
It is constructed on the premise that it is classified into one of the second group which has a lower priority than the first group and has a recut deadline of one day.

【0235】具体的には、取消再カットメイン処理部1
12は、スパイラル制御により起動される毎に前記残高
明細セグメントに基づいて取引のある日付毎の出金可能
額を算出する日付チェックテーブル生成サブコントロー
ラ120を備えている。取消再カットメインは、第4実
施形態にて説明したように、スパイラル制御により繰り
返し起動される。日付チェックテーブルは、その繰り返
し毎に、最新の情報に基づいて作成する。取消再カット
メインが起動される毎に、日付チェックテーブルを作成
することで、起動時での取引明細セグメント及び残不足
明細セグメントの構成(なにを成立させて、どの処理を
未成立とするか)で、出金可能額がマイナスという業務
レベルでの整合性(一貫性)のない状態を検出する。
More specifically, the cancellation / recut main processing section 1
Reference numeral 12 includes a date check table generation sub-controller 120 for calculating a possible withdrawal amount for each date of a transaction based on the balance statement segment each time it is activated by the spiral control. The cancellation re-cut main is repeatedly started by the spiral control as described in the fourth embodiment. The date check table is created based on the latest information for each repetition. By creating a date check table every time the cancel recut main is activated, the configuration of the transaction details segment and the remaining shortage details segment at the time of activation (what is established and what processing is not established) ), A state in which there is no consistency (consistency) at the business level that the withdrawable amount is negative is detected.

【0236】また、日付チェックテーブル生成SC12
0は、種々の理由により、取消再カットメインが最初に
起動された、スパイラル制御の起点となる原始の口座処
理の勘定日を先頭の日付(先頭勘定日)として、それ以
後で先日付取引があった日付を残高明細から抽出し、そ
れぞれの日付での出金可能額を算出する。そして、取消
再カットメインは起動されたときに、当該取消再カット
メインを起動した口座処理要求に関する情報を得る。従
って、派生起動した受動業務にて口座残高に異動が生じ
た場合、その異動が生じた日付は日付チェックテーブル
内に含まれる。通常、この異動が生じた日付以降の調整
を行うが、修正再カットSCから再カットSCへ移行す
る場合などでは、日付チェックテーブル内の先の日付へ
と処理がシフトした後に、原始勘定日へと処理を戻す。
日付チェックテーブルを参照すると、先日付のどの日付
に取引があるかを特定することができるという意味で、
この勘定日毎の出金可能額を格納するテーブルを日付チ
ェックテーブルと呼ぶ。
The date check table generation SC12
0 means that, for various reasons, the date of the original account processing, which is the starting point of the spiral control at which the cancellation recut main was first activated, is the first date (the first account date), and thereafter, the future date transaction is started. The date of occurrence is extracted from the balance statement, and the withdrawable amount on each date is calculated. Then, when the cancellation re-cut main is activated, information on the account processing request that activated the cancellation re-cut main is obtained. Therefore, when a change occurs in the account balance in the passive operation that is derived and started, the date on which the change occurs is included in the date check table. Normally, adjustments are made after the date when this change occurs. However, in the case of shifting from the modified recut SC to the recut SC, for example, the processing is shifted to the earlier date in the date check table and then to the original account date. And return the process.
By referring to the date check table, it is possible to identify on which date of the future there is a transaction,
The table storing the possible withdrawal amount for each account date is called a date check table.

【0237】預金マスタDB104が、当該預金口座の
担保となる担保明細セグメントを備える例では、日付チ
ェックテーブル生成SC120は、前記担保明細セグメ
ントに基づいて前記残高明細セグメントの残高に当該担
保明細による極度を加算した額を出金可能額として算出
する極度加算機能130を備える。
In the example in which the deposit master DB 104 includes a collateral description segment serving as collateral for the deposit account, the date check table generation SC 120 determines the extreme of the collateral description based on the collateral description segment based on the collateral description segment. An extreme addition function 130 is provided for calculating the added amount as a withdrawable amount.

【0238】取消再カットメイン処理部112は、残不
足明細セグメント16に格納された決済済みの口座処理
要求のうち優先順位が第1群(≠9x)で先日付の出金
要求がなくなるまで前記スパイラル制御により当該口座
処理要求を取り消す先日付第1群取消サブコントローラ
122を備えている。残不足明細に格納されたというこ
とは、約定返済日等の勘定日の初日での決済が不能であ
ったか、または取り消されたことを意味する。そして、
その後、決済済みに変化した場合には、当初勘定日が、
それ以後の再カット期限内の勘定日のいずれかに決済さ
れている。従って、前倒制御を行わなければならない可
能性がある。「スパイラル制御により」というときに
は、本実施形態では、「1つの取消処理を起動して同期
点に達し、その後取消処理の受動側から起動され、次の
取消処理を起動する」という派生トランザクションの繰
り返しによる制御を意味する。
The cancellation / recut main processing section 112 sets the priority among the account settlement requests settled in the remaining shortage detail segment 16 in the first group ($ 9x) until there are no more withdrawal requests at a future date. A future first group cancellation sub-controller 122 for canceling the account processing request by spiral control is provided. The fact that the information is stored in the remaining shortage statement means that the settlement on the first day of the account date such as the contract repayment date has been impossible or has been canceled. And
After that, if it changes to Settled, the original account date will be
It has been settled on any of the account dates within the subsequent recut deadline. Therefore, there is a possibility that forward control must be performed. In the present embodiment, when "by spiral control" is used, the derived transaction is repeated as follows: "one cancellation process is started, the synchronization point is reached, and then the cancellation process is started from the passive side, and the next cancellation process is started." Means the control by.

【0239】また、第1群(≠9x)の口座処理要求
は、修正再カットの対象である。第1群(≠9x)の口
座処理が多数成立し、一方未成立のものもある場合に
は、すべての組み合わせの比較を修正再カットとして行
うのではなく、第1群(≠9x)の口座処理を一旦すべ
て取り消しておき、その後、優先順位の高い順に再カッ
ト又は修正再カットする方が、優先順位の反映として確
実である。例えば、起動業務と受動業務とで分離し、受
動業務側では融資返済の再カットでの回収額の算出を行
わない(延滞金の加算をしない)場合には、実際に再カ
ットしてみなければその後の正確な残高は判明しない。
このため、第1群内(≠9x)内で正確に優先順位を反
映させるには、第1群の優先順位の口座処理要求を一旦
すべて取り消し、その後に優先順位の高い順に再カット
または修正再カットを検討することが望ましい。
Further, the account processing request of the first group ($ 9x) is a target of the correction re-cut. If a large number of accounts in the first group ($ 9x) are established, while some are not established, the comparison of all combinations is not performed as a modified recut, but the account in the first group ($ 9x) is used. It is more reliable to cancel all processes once and then re-cut or correct and re-cut in order of higher priority as a reflection of the priority. For example, if the start-up business and the passive business are separated, and the passive business does not calculate the recovery amount in re-cutting the loan repayment (does not add delinquent money), it can be considered as actually re-cutting The exact balance after that is not known.
Therefore, in order to accurately reflect the priority order within the first group ($ 9x), all account processing requests of the first group priority are temporarily canceled, and then re-cut or revised again in descending order of priority. It is desirable to consider cutting.

【0240】第1群連続取消制御機能132は、一度派
生トランザクションとして先日付第1群取消を起動した
場合には、次回以降に取消再カットメインが派生起動さ
れた場合であっても、この先日付第1群取消の対象がな
くなるまで他のSCの処理を行わずに先日付第1群の取
消を連続させる機能である。具体的には、派生管理フラ
グを参照してこの連続取消を制御する。
[0240] Once the first group cancellation is activated as a derived transaction once, the first group continuous cancellation control function 132 determines whether or not the cancellation re-cut main has been derived and activated since the next time. This is a function to continue the cancellation of the first group of the previous date without performing the processing of other SCs until there is no object of the first group cancellation. Specifically, the continuous cancellation is controlled with reference to the derivation management flag.

【0241】図25に示すように、取消再カットメイン
処理部112は、先日付第1群取消SC122によるス
パイラル制御が完了した後に、前記日付チェックテーブ
ルを参照して出金可能額がマイナスとなっている勘定日
があるか否かを確認し、マイナスの勘定日がある場合に
は、当該勘定日に成立し前記取引明細セグメントに格納
された口座処理要求を優先順位の低い順に前記出金可能
額がプラスとなるまで前記スパイラル制御により当該口
座処理要求を取り消させるマイナス時取消サブコントロ
ーラ124を備えている。上述した取消制御機能118
は、このマイナス時取消SC124により実現する。マ
イナス時の取消については、第1実施形態や第4実施形
態に開示した手法と同様である。
As shown in FIG. 25, after the spiral control by the first group cancellation SC122 of the previous date is completed, the cancellation / recut main processing unit 112 refers to the date check table to make the withdrawable amount negative. Check if there is a negative account date, and if there is a negative account date, it is possible to withdraw the account processing requests that were established on that account day and stored in the transaction statement segment in order of lower priority A negative cancellation sub-controller 124 is provided to cancel the account processing request by the spiral control until the amount becomes positive. Cancellation control function 118 described above
Is realized by the minus-time cancellation SC124. The cancellation at the time of minus is the same as the method disclosed in the first embodiment or the fourth embodiment.

【0242】図25に示す例では、出金可能額がマイナ
スと成る場合の取消制御機能134のほか、口座残高が
予め定められた金額を超えた場合に、先日付の入金を取
り消す制御をするオーバー時取消制御機能136を備え
ている。オーバー時取消制御機能136は、例えばマル
優口座にてマル優の金額を超えた額が入金される場合
に、先日付にてその入金によりマル優オーバーすること
が判明した時点で、その口座名義人に連絡する等のサー
ビスに活用できる。また、この機能130は、複数の口
座を使い分け、ある口座での残高の上限を定めておき、
余剰の入金は他の口座へ入金する場合などにも活用でき
る。
In the example shown in FIG. 25, in addition to the cancellation control function 134 when the possible withdrawal amount is negative, a control for canceling the payment of the future date is performed when the account balance exceeds a predetermined amount. An overtime cancellation control function 136 is provided. The over-time cancellation control function 136 is, for example, when an amount exceeding the amount of Maru Yu is deposited in the Maru Yu account, when the deposit is found to be over due to the deposit on the previous date, the account holder is notified. It can be used for services such as doing. In addition, this function 130 uses a plurality of accounts properly, sets an upper limit of the balance in a certain account,
Surplus deposits can also be used when depositing into other accounts.

【0243】取消再カットメイン処理部112は、先日
付第1群取消SC122及び前記マイナス時取消SC1
24による各スパイラル制御が完了した後、前記第1群
(≠9x)の優先順位で前記残不足明細セグメント16
に格納された先日付の口座処理要求を、各勘定日の出金
可能額又は所定の修正出金可能額に基づいて出金可能額
がマイナスとなるか又は残不足明細セグメントの走査が
完了するまで前記スパイラル制御により当該口座処理要
求を再カットさせる修正再カットサブコントローラ12
6を備えている。
The cancellation / recut main processing unit 112 includes a first group cancellation SC122 of the future date and the cancellation SC1 at the time of minus.
24, after the completion of each spiral control by the first group ($ 9x),
The account processing request of the future date stored in the above is updated until the amount that can be withdrawn is negative based on the amount that can be withdrawn at each account or the predetermined amount that can be withdrawn, or until the scanning of the remaining shortage detailed segment is completed. Modified recut subcontroller 12 for recutting the account processing request by spiral control
6 is provided.

【0244】第4実施形態と異なり、本実施例では、修
正再カットSC126は、修正再カットのみならず、再
カットも行う。そして、修正再カットSC126で処理
対象とする口座処理要求は、第1群(≠9x)の優先順
位を有する口座処理要求である。出金可能額の定義や、
修正出金可能額の定義は第4実施形態と同様である。修
正再カットを行うと出金可能額がマイナスとなる。この
場合、マイナス時の取消が優先するため、修正再カット
を連続して行うことはない。しかし、図25に示す修正
再カットSC126は、出金可能額での決済が可能であ
ればその出金可能額で再カットを行う。この場合、再カ
ットが連続することはある。
Unlike the fourth embodiment, in the present embodiment, the modified recut SC 126 performs not only the modified recut but also the recut. The account processing request to be processed in the modified recut SC 126 is an account processing request having a priority of the first group ($ 9x). Definition of withdrawable amount,
The definition of the corrected withdrawable amount is the same as in the fourth embodiment. When the revised re-cut is performed, the withdrawable amount becomes negative. In this case, since the cancellation at the minus time has priority, the correction re-cut is not performed continuously. However, the modified recut SC 126 shown in FIG. 25 performs recut with the payable amount when settlement with the payable amount is possible. In this case, the recut may be continuous.

【0245】一方、本実施例では、再カット期限が3ヶ
月の口座処理要求もある。従って、残不足明細セグメン
トの中から、ある勘定日の口座処理要求群のみを確認す
るのではなく、再カットの判定対象となる日付(対象勘
定日)が再カット期限内である口座処理要求を抽出す
る。そして、その中で最も優先順位の高い口座処理要求
を高順位口座処理要求とする。また、先日付完結処理で
は、先日付での入金も行う。従って、先日付である10
日には決済不能な場合であっても、11日に決済可能な
場合もある。このため、同一の残不足明細である口座処
理要求を、10日を対象勘定日として読みとり、決済不
能であった場合には、11日を対象勘定日として再カッ
ト可否を検討する。この点で、本実施例では、第4実施
形態よりも修正再カットの処理が複雑になる。
On the other hand, in this embodiment, there is also an account processing request whose re-cut time limit is three months. Therefore, instead of checking only the account processing request group of a certain account date from the remaining shortage detail segment, an account processing request whose recut determination date (target account date) is within the recut time limit is set. Extract. Then, the account processing request with the highest priority is set as the high-priority account processing request. In the future date completion process, payment is made on the future date. Therefore, the future date of 10
Even if settlement is not possible on the day, settlement may be possible on the 11th. For this reason, the same account processing request that is the remaining shortage statement is read as the target account date on the 10th, and if settlement is not possible, whether the recut is possible is considered on the 11th as the target account date. In this regard, in the present embodiment, the process of the correction re-cut is more complicated than in the fourth embodiment.

【0246】図25に示す例では、修正再カットSC1
26による修正再カットの対象の走査が完了した後、す
なわち、修正再カット可能な残不足明細が日付チェック
テーブルのすべての日付にて存在しない場合に、前記第
1群及び第2群の優先順位で出金可能額内の出金要求を
優先順位の高い順に前記スパイラル制御により当該口座
処理要求を再カットさせる再カットサブコントローラ1
28を備えている。再カットSC128は、優先順位が
第2群(9x)の先日付取引の再カットと、優先順位が
第1群(≠9x)又は第2群(9x)の双方の演算日当
日を勘定日とする再カットとを対象とする。出金可能額
が増加した場合の再カット処理については、第2実施形
態と同様である。
In the example shown in FIG. 25, the modified recut SC1
26, after the scan of the target of the correction recut is completed, that is, when there are no remaining shortage details that can be corrected and recut at all dates of the date check table, the first group and the second group are prioritized. A re-cut sub-controller 1 for re-cutting the account processing request by the spiral control in the order of higher priority of the withdrawal requests within the withdrawable amount.
28. The re-cut SC 128 includes the re-cut of the future transaction with the priority of the second group (9x) and the operation date of both the first group ($ 9x) and the second group (9x) as the account date. To be re-cut. The re-cut processing when the possible withdrawal amount increases is the same as in the second embodiment.

【0247】図26は、取消再カットメインによる処理
の構成を示す説明図である。図16に示す例と同様に、
起動業務と受動業務とは連動し、受動処理は取消再カッ
トメインを派生トランザクションとして起動する。ま
た、取消再カットメインは、各SC122,122,…
による判定に従って分岐する。取消再カットメインは、
なんらかの処理を派生起動した場合には、ハッチングを
施した部分C11,C12…にて同期点に達し、一旦処
理を終了する。一旦処理を終了するものの、取消再カッ
トメインでの判定結果は派生管理フラグとして起動処理
に渡される。ここでは、派生起動中ビット(Dビット)
のON,OFFと、情報フラグ1,2,3,A,4とを
派生管理フラグとして使用する。
FIG. 26 is an explanatory diagram showing the configuration of the processing based on the cancellation / recut main. As in the example shown in FIG.
The start job and the passive job are linked, and the passive process starts the cancellation / recut main as a derived transaction. In addition, the cancellation and re-cut main is performed for each of the SCs 122, 122,.
Branch according to the judgment by. Cancel re-cut main
When some process is derived and activated, the synchronization point is reached at the hatched portions C11, C12,..., And the process is temporarily terminated. Although the processing is temporarily ended, the result of the determination in the cancellation / recut main is passed to the activation processing as a derivation management flag. Here, the derived start bit (D bit)
And information flags 1, 2, 3, A, and 4 are used as derivation management flags.

【0248】取消再カットメインは、先日付第1群取消
スパイラルSPF1、マイナス時取消スパイラルSPF
2,オーバー時取消スパイラルSPF3の順に判定、実
行する。そして、修正再カットSCでは、残不足明細に
格納された第1群(≠9x)の口座処理要求のうち、対
象勘定日が再カット期限内で未成立の口座処理要求群を
特定する。この中での最高位の口座処理要求の出金可能
額による再カットを試みる。再カットした場合には、ス
パイラルSPFAによって再度修正再カットSCに戻
り、その対象勘定日で次に優先順位の高い取引の再カッ
トを試みる。再カット不能である場合には、成立済みの
優先順位の低い取引の取消を前提とした修正出金可能額
を算出し、修正再カットを試みる。修正再カット可能な
場合には、次の取消再カットメインではマイナス時取消
スパイラル制御SPF1に入り、出金可能額がプラスと
なれば修正再カットSC126に戻る。
The cancel re-cut main is the first group cancel spiral SPF1 of the previous date, the cancel spiral SPF at minus.
(2) Determine and execute in the order of the over-time cancellation spiral SPF3. Then, in the modified recut SC, among the account processing requests of the first group ($ 9x) stored in the remaining shortage details, an account processing request group whose target account date is not satisfied within the recut deadline is specified. Attempt to re-cut the highest-level account processing request with the possible withdrawal amount. In the case of re-cut, the spiral SPFA returns to the modified re-cut SC again, and attempts to re-cut the next highest priority transaction on the target account date. If the recut is not possible, the revisable amount is calculated based on the assumption that the established low-priority transaction is canceled, and the recut is attempted. If the correction re-cut is possible, the next cancellation re-cut main enters the negative-time cancellation spiral control SPF1.

【0249】対象勘定日にて修正再カットの判定まで行
っていない≠9xの残不足明細がなくなると、日付チェ
ックテーブルを参照して対象勘定日を次の勘定日にシフ
トさせる。そして、新しい対象勘定日が再カット期限内
である口座処理要求の再カット、修正再カットを試み
る。修正再カットの同期点C14にて、再カット可能
(B18)とあるのは、再カット可能又は修正再カット
可能という意味である。この分岐B18でのON,Aと
いうのは、派生再カット中ビット(Dビット)がON
で、情報フラグがAであることを意味する。各SCは、
それぞれ情報フラグが異なる。従って、前回どのSCで
処理をしたかを情報フラグを参照することで特定するこ
とができる。
When there is no remaining shortage of $ 9x for which the determination of the correction re-cut has not been made on the target account date, the target account date is shifted to the next account date with reference to the date check table. Then, re-cutting and correction re-cutting of the account processing request whose new target account date is within the re-cut time limit is attempted. The fact that recut is possible (B18) at the synchronization point C14 of the correction recut means that recut is possible or correction recut is possible. ON and A in the branch B18 means that the derived re-cutting bit (D bit) is ON.
Means that the information flag is A. Each SC
Each has a different information flag. Therefore, it is possible to specify which SC has been processed last time by referring to the information flag.

【0250】以下、この派生管理フラグを用いたスパイ
ラル制御について、各SCの処理工程を参照しつつ説明
する。図26に示すように、最初の起動処理及び受動処
理の連動トランザクションS51から起動された直後に
は、派生再カット中ビットはOFFで、情報フラグはな
い(または、1,2,3,A,4以外)。この最初に取
消再カットメインを起動するそもそもの口座残高に異動
を生じさせた口座処理要求を、原始口座処理と呼ぶ。原
始口座処理の勘定日を、原始勘定日と呼ぶ。日付チェッ
クテーブルはスパイラル処理中(又は、修正再カットS
C126から再カットSCへ移行した直後)は原始勘定
日を起点として作成する。この場合、原始勘定日は日付
チェックテーブルの先頭の日付であり、演算日又は演算
日に最も近い勘定日(先頭勘定日)となる。
Hereinafter, the spiral control using the derivation management flag will be described with reference to the processing steps of each SC. As shown in FIG. 26, immediately after being started from the linked transaction S51 of the first start process and the passive process, the derived recutting bit is OFF and there is no information flag (or 1, 2, 3, A, Except 4). The first account processing request that causes a change in the original account balance that activates the cancellation / recut main is referred to as a primitive account processing. The account date of the primitive account processing is called a primitive account date. The date check table is in spiral processing (or modified recut S
Immediately after shifting from C126 to re-cut SC), it is created starting from the original account date. In this case, the original account date is the head date of the date check table, and is the calculation date or the account date (head account date) closest to the calculation date.

【0251】図27は、先日付第1群取消SC122に
よる処理例を示すフローチャートである。日付チェック
テーブルが生成されると、先日付第1群取消SC122
では、まず、「派生再カット中ビット(Dビット)がO
Nで情報フラグが1でない」という条件を満たさないこ
とを確認する。派生再カット中ビットがONである場合
には、原始口座処理による残高異動に応じてなんらかの
取消、再カット処理が行われたことを意味する。「情報
フラグが1でない」ことが真(イエス)である場合に
は、先日付第1群取消以外の処理が行われていることを
意味する。なんらかの取消再カット処理が行われ、その
処理が先日付第1群取消でない場合には、先日付第1群
再カットのスパイラル処理が完了したか、またはその対
象が無い場合である。従って、ステップS61がイエス
である場合には、先日付第1群取消処理を行わない。
FIG. 27 is a flowchart showing an example of processing by the first date cancellation first group SC122. When the date check table is generated, the future first group cancellation SC122
Then, first, "Derivation re-cutting bit (D bit) is O
N does not satisfy the condition that the information flag is not 1 ". If the derived re-cutting bit is ON, it means that some sort of cancellation or re-cut processing has been performed in accordance with the balance change due to the original account processing. If “information flag is not 1” is true (yes), it means that processing other than the cancellation of the first group of the previous date is being performed. If any cancellation / recut processing is performed and the processing is not the first-group first-group cancellation, it means that the spiral processing for the first-group first-group recut has been completed or there is no target. Therefore, if step S61 is YES, the first group cancel processing of the future date is not performed.

【0252】原始口座処理による口座残高の異動から最
初に取消再カットメインが起動された場合には、派生再
カット中ビット(Dビット)がオフであるため、情報フ
ラグがなんであれ、S61の条件を満たさない。従っ
て、最初に起動された場合には、ステップS62に進
む。また、一度以上先日付第1群取消を起動している場
合には、情報フラグが1となっている。従って、前回の
取消再カットメインの判定結果が先日付第1群取消であ
った場合には、ステップS61の条件を満たさず、ステ
ップS62に進む。派生再カット中ビット(Dビット)
はこの最初の取消再カットメインの起動であるか否かの
判定に用いられ、情報ビットは前回の判定が自らのSC
か他のSCかの判定に用いられる。この点、他のSCで
も同様である。
When the cancellation re-cut main is first activated from the transfer of the account balance due to the source account processing, the derived re-cutting bit (D bit) is off, so that whatever the information flag is, the condition of S61 Does not satisfy Therefore, if the program is started first, the process proceeds to step S62. In addition, when the first group cancellation is activated at least once, the information flag is “1”. Therefore, if the previous cancellation re-cut main determination result is the first group cancellation of the previous date, the condition of step S61 is not satisfied, and the process proceeds to step S62. Derived during re-cutting bit (D bit)
Is used to determine whether or not the first cancellation / re-cut main is to be activated.
Or other SC. In this regard, the same applies to other SCs.

【0253】図27のステップS62では、残不足明細
セグメント16に先日付で、決済済みで、且つ優先順位
が第1群(≠9x)である口座処理要求が存在するか否
かを確認する。この条件を満たす口座処理要求は勘定日
の初日以外の再カット期限内で決済されている可能性が
あるため、前倒を行うためにまず取消を行う。また、こ
の取消は、修正再カット処理を少なくし、より優先順位
に従った再カットを行う役割も果たす。
In step S62 in FIG. 27, it is confirmed whether or not there is an account processing request in the remaining shortage detail segment 16 which has been settled and has the first group ($ 9x) in priority. Since there is a possibility that the account processing request satisfying this condition has been settled within the re-cut time limit other than the first day of the account date, the cancellation is first performed in order to advance the request. This cancellation also serves to reduce the correction re-cutting process and perform re-cutting in accordance with a higher priority.

【0254】ステップS62の条件を満たす決済済みの
残不足明細がある場合には、派生再カット中ビット(D
ビット)をON、情報フラグを1にセットする(ステッ
プS64)。そして、この口座処理要求の取消を当該派
生管理フラグ(Dビット=ON,情報フラグ=1)を付
した派生トランザクションとして前記起動業務処理部1
08に実行させる(ステップS64)。この一連のステ
ップS61,S62,S63,S64によって実現する
機能を図25に示す例では、第1群連続取消制御機能1
32と呼ぶ。
If there is a settled remaining shortage statement that satisfies the condition of step S62, the derived recutting bit (D
Bit) is turned ON, and the information flag is set to 1 (step S64). Then, the cancellation of the account processing request is regarded as a derivative transaction to which the derivative management flag (D bit = ON, information flag = 1) is attached.
08 (step S64). In the example shown in FIG. 25, the function realized by this series of steps S61, S62, S63, S64 is the first group continuous cancellation control function 1
Called 32.

【0255】図27に示すように、先日付で、第1群
で、決済済み残不足明細を連続して取り消す制御SPF
1は、ステップS61での判定と、ステップS64での
派生管理フラグの更新による。
As shown in FIG. 27, the control SPF for continuously canceling the settled remaining shortage details in the first group on the future date.
1 is based on the determination in step S61 and the update of the derivation management flag in step S64.

【0256】図28は、マイナス時取消SC124によ
る処理例を示すフローチャートである。まず、日付チェ
ックテーブルを参照して出金可能額がマイナスとなって
いる勘定日があるか否かを判定する(ステップS7
1)。この判定は、例えば日付チェックテーブルを作成
したときに出金可能額のマイナスの有無を判定し、マイ
ナスがある場合に日付にマイナスを示すビットを付し、
ステップS71にてこのビットを確認するようにしても
よい。
FIG. 28 is a flow chart showing an example of processing by the cancellation at minus SC 124. First, with reference to the date check table, it is determined whether there is an account date in which the withdrawable amount is negative (step S7).
1). For this determination, for example, when a date check table is created, it is determined whether the withdrawable amount is negative, and if there is a negative, a bit indicating a negative is added to the date,
This bit may be confirmed in step S71.

【0257】出金可能額がマイナスである場合には、元
の派生再カット中ビットや情報フラグの値にかかわら
ず、取消を行う。このため、最初に、派生再カット中ビ
ット(Dビット)をON、情報フラグを2にセットする
(ステップS72)。そして、出金可能額がマイナスと
なった勘定日について、当該勘定日に成立した前記取引
明細セグメントに格納された口座処理要求のうち最も優
先順位が低い出金の口座処理要求を特定し(ステップS
73)、この口座処理要求の取消を当該派生管理フラグ
を付した派生トランザクションとして前記起動業務処理
部108に実行させる(ステップS74)。このステッ
プS71,S72,S73,S74による機能を、図2
5に示す例ではマイナス時取消制御機能と呼ぶ。出金可
能額がマイナスである限り、前回の処理がどのSCによ
って行われたかに関わらず、このマイナス時取消制御を
行う(SPF2)。また、先日付の勘定日(日付チェッ
クテーブルの日付)が2日以上ある場合には、近い将来
の勘定日での口座処理を取消、遠い将来の勘定日での出
金可能額のマイナスが解消されない場合には、近い将来
に続いて遠い将来の勘定日での出金を取り消す。
If the possible withdrawal amount is negative, cancellation is performed irrespective of the value of the original derived re-cutting bit or the information flag. Therefore, first, the derived recutting bit (D bit) is set to ON and the information flag is set to 2 (step S72). Then, for the account date on which the possible withdrawal amount has become negative, the account processing request of the withdrawal with the lowest priority is specified among the account processing requests stored in the transaction statement segment established on the account date (step). S
73), the starting business processing unit 108 executes the cancellation of the account processing request as a derived transaction with the derived management flag attached (step S74). The functions of steps S71, S72, S73, and S74 are described in FIG.
In the example shown in FIG. 5, it is called a minus-time cancellation control function. As long as the withdrawable amount is negative, this negative cancellation control is performed regardless of which SC has performed the previous processing (SPF2). In addition, if there are two or more future account dates (date check table date), cancel the account processing on the near future account date, and eliminate the minus of the withdrawable amount on the far future account date If not, cancel the withdrawal in the near future and in the distant future accounting date.

【0258】ステップS71にて出金可能額がマイナス
の日付がないと判定された場合には、入金オーバーの判
定を行う(ステップS75)。この入金オーバーについ
ても、日付チェックテーブル作成時に入金オーバービッ
トを付しておき、これに基づいて判定すると良い。そし
て、所定の入金上限額を超えた先日付の勘定日がある場
合には、派生再カット中ビットをON、情報フラグを3
にセットする(ステップS76)。続いて、先日付の勘
定日にて成立した入金の口座処理要求の取消を当該派生
管理フラグを付した派生トランザクションとして起動業
務処理部に実行させる(ステップS77,S78)。図
25に示す例では、このステップ75からS78に至る
処理をオーバー時取消制御機能136と呼ぶ。
If it is determined in step S71 that the withdrawable amount does not have a negative date, it is determined that the deposit is over (step S75). Regarding the over-payment, it is preferable to add a over-payment bit when the date check table is created, and to judge based on this. If there is a future account date exceeding the predetermined deposit upper limit, the derived recutting bit is turned ON, and the information flag is set to 3
(Step S76). Subsequently, the activation business processing unit is made to execute the cancellation of the account processing request for the payment made on the account date of the future date as a derivative transaction with the derivative management flag attached (steps S77 and S78). In the example shown in FIG. 25, the processing from step 75 to S78 is called an overtime cancellation control function 136.

【0259】ステップS72,S75にて情報フラグに
値を登録するため、これらの取消が行われた次の取消再
カットメインで、ステップS27による先日付第1群取
消が行われることはない。すなわち、ステップS61に
て情報フラグが2又は3であるため、情報フラグが1で
ないという条件を満たし、マイナス時取消SCへと処理
が移る(ステップS65)。
Since the values are registered in the information flags in steps S72 and S75, the first group cancellation in the future at step S27 is not performed in the cancellation re-cut main after the cancellation. That is, since the information flag is 2 or 3 in step S61, the condition that the information flag is not 1 is satisfied, and the processing shifts to the minus cancellation SC (step S65).

【0260】図29は、残不足明細のデータ構造例を示
す説明図である。本実施例では、残不足明細セグメント
16は、優先順位の第1群又は第2群を示す第1優先順
位を第1のキーとして優先順位の高い順に、各口座処理
要求の勘定日を第2のキーとして勘定日の近い順に、各
優先順位の郡内での優先順位を第3のキーとして優先順
位の高い順に読み出されるデータ構造を有する。優先順
位の第1群と第2群とを分けるのは、優先順位の9xと
いうときの9の桁である。図29に示す例では、自振通
番002の優先順位は25で、第1優先順位が「2」、
第2優先順位が「5」である。
FIG. 29 is an explanatory diagram showing an example of the data structure of the remaining shortage details. In the present embodiment, the remaining shortage detailed segment 16 sets the account date of each account processing request to the second in the descending order of priority using the first priority indicating the first group or the second group of the priority as the first key. Has a data structure in which the priorities within each county's county are read out in descending order of the date of priority as the third key. What separates the first group and the second group of the priority is the nine digits when the priority is 9x. In the example shown in FIG. 29, the priority order of the self-oscillation serial number 002 is 25, the first priority order is “2”,
The second priority is “5”.

【0261】図29に示す例では、すべての勘定日を2
日としているが、勘定日の異なる残不足明細がある場
合、残不足明細は勘定日順には並ばない。これは、再カ
ット期限と対象勘定日との関係によるものである。優先
順位と勘定日の関係では、例えば次のような並び順とな
る。
In the example shown in FIG.
However, when there are remaining shortage details with different account dates, the remaining shortage details are not arranged in the order of the account date. This is due to the relationship between the recut deadline and the target account date. The relationship between the priority and the account date is, for example, as follows.

【0262】 優先順位25、 勘定日2日、再カット期限3ヶ月 優先順位27、 勘定日2日、再カット期限3ヶ月 優先順位23、 勘定日3日、再カット期限3ヶ月Priority 25, account date 2 days, recut date 3 months Priority 27, account date 2 days, recut date 3 months Priority 23, account date 3 days, recut date 3 months

【0263】2日を対象勘定日として最も優先順位の高
い取引を特定すると、先頭の優先順位25であり、2日
については、優先順位順に並んでいる。3日を対象勘定
日とすると、優先順位25,27の取引共に再カット期
限内である。しかし、優先順位23が一番高いため、3
日を対象勘定日とすると、残不足明細の全体を読みと
り、比較しなければ最高位は特定されない。勘定日を第
1のキーとした場合も、残不足の全体を読み出さなけれ
ばならない。第1優先順位を第1のキー、第2優先順位
を第2のキーとすると、勘定日の順序がより前後してし
まう。図29に示す残不足明細の内容については、具体
例と共に後述する。このように、再カット期限が2日以
上の残不足明細の探索では、一旦すべてを読みとらなけ
れば、最高位の特定ができない。一方、9xのみを考え
ると、勘定日順に並んでいることとなる。このため、9
xの順次再カットは、単純に残不足を読み出した読み出
し順に再カット可否を判定できる。
When the transaction with the highest priority is specified with two days as the target account date, the transaction with the highest priority is 25, and the two days are arranged in the priority order. Assuming that the 3rd day is the target account date, the transactions of the priorities 25 and 27 are both within the recut deadline. However, since priority 23 is the highest, 3
If the day is the target account date, the highest order will not be specified unless the entire remaining shortage statement is read and compared. Even when the account date is used as the first key, the entire remaining shortage must be read. If the first priority is the first key and the second priority is the second key, the order of the accounting dates will be further changed. The details of the remaining shortage details shown in FIG. 29 will be described later together with specific examples. As described above, in the search for the remaining shortage with a recut deadline of two days or more, the highest rank cannot be specified unless all the items are read once. On the other hand, if only 9x is considered, they are arranged in the order of the accounting date. For this reason, 9
In the sequential re-cut of x, it is possible to determine whether re-cut is possible or not simply in the reading order in which the remaining or insufficient is read.

【0264】図30は、修正再カットSC126の処理
内容を示すフローチャートである。先日付第1群取消サ
ブコントローラ及びマイナス時取消サブコントローラで
の取消制御用の条件を満たさない場合に、修正再カット
SCに処理が移る。修正再カットSCでは、まず、「派
生再カット中ビットがONで情報フラグが4」という条
件を満たさないか否かを判定する。ステップS81にて
イエスとなる場合には、再カットSC128によるスパ
イラル処理SPF4中であることを意味する。
FIG. 30 is a flowchart showing the processing contents of the modified recut SC126. If the conditions for cancellation control by the first group cancellation sub-controller and the minus cancellation sub-controller of the previous date are not satisfied, the process proceeds to the modified recut SC. In the modified recut SC, first, it is determined whether or not the condition of “the derived recutting bit is ON and the information flag is 4” is not satisfied. If the result of step S81 is YES, it means that the spiral processing SPF4 by the recut SC128 is in progress.

【0265】続いて、「情報フラグがAで、前記日付チ
ェックテーブルの全日付の判定完了」という条件を満た
さないか否かを判定する(ステップS82)。最初に取
消再カットメインが起動された場合には、派生再カット
中ビットがOFFであるため、ステップS82はノーと
なる。情報フラグがAであれば、前回再カットを派生起
動したことを意味する。修正再カットを行った場合に
は、前回の取消再カットメインでは取消をしているた
め、情報フラグは2である。
Subsequently, it is determined whether or not the condition "the information flag is A and the determination of all dates in the date check table is completed" is not satisfied (step S82). If the cancel recut main is activated first, the step S82 is NO because the derived recut in-progress bit is OFF. If the information flag is A, it means that the recut was previously derived and started. When the correction re-cut is performed, the information flag is 2 because the previous cancellation re-cut main has been canceled.

【0266】このステップS82では、修正再カットS
Cでの処理対象が無ければ処理を再カットSCへ移すも
のである。ここでは、前回修正再カットで再カットを派
生起動し、再カットがなされて起動された場合で、その
前回の再カットをした口座処理要求が対象勘定日での最
後の未成立且つ未判定で決済可能な口座処理要求であっ
た場合で、その再カットの勘定日よりも将来の勘定日が
日付チェックテーブルにない場合には、再カットSCへ
処理を移す。
In this step S82, the correction recut S
If there is no processing target in C, the processing is shifted to the recut SC. Here, the re-cut is derived and activated by the last modified re-cut, and the re-cut is performed after the re-cut is performed. If the account processing request can be settled, and there is no account date in the date check table beyond the account date of the recut, the process is shifted to the recut SC.

【0267】ステップS83では、最初にこのステップ
S82に入った場合には、残不足明細セグメント中の口
座処理要求のうち、前記日付チェックテーブルの日付の
うち最も現在に近い日付である先頭勘定日を対象勘定日
として、「優先順位が第1群(≠9x)で、当該対象勘
定日が再カット期限内で、未決済、且つ未判定」の口座
処理要求を読み出す。この条件を満たす口座処理要求が
一又は複数存在する場合には、ステップS85へ処理を
移す。
In step S83, when step S82 is entered first, among the account processing requests in the remaining shortage detail segment, the head account date which is the date closest to the present date among the dates in the date check table is set. As the target account date, an account processing request of “the priority is the first group ($ 9x), the target account date is within the recut deadline, unsettled, and undetermined” is read. If there is one or more account processing requests that satisfy this condition, the process moves to step S85.

【0268】一方、該当する口座処理要求がない場合に
は、対象勘定日を日付チェックテーブルの日付がなくな
るまで対象勘定日を先へとシフトさせて当該条件の口座
処理要求を読み出させる(ステップS84)。ここで、
日付チェックテーブルの前日付の探索が終了し、次の先
日付勘定日が日付チェックテーブルにない場合には、再
カットSCへと処理を移す。
On the other hand, if there is no corresponding account processing request, the target account date is shifted forward until the date in the date check table is exhausted, and the account processing request under the relevant condition is read (step S1). S84). here,
If the search for the previous date in the date check table has been completed and the next future date account date is not in the date check table, the process moves to recut SC.

【0269】前回再カットした又は修正再カットしたこ
とに応じて起動された場合には、その再カットによって
残高に異動が生じた勘定日を対象勘定日として、ステッ
プS83の処理を行うと、判定に必要な処理数を少なく
することができる。
If the processing is started in response to the last re-cut or modified re-cut, it is determined that the processing of step S83 is performed with the account date on which the balance has changed due to the re-cut as the target account date. Can reduce the number of processes required.

【0270】ステップS83にて対象勘定日での未成立
で≠9xの口座処理要求を残不足明細から読み出せた場
合には、この対象勘定日について読み出した口座処理要
求のうち当該対象勘定日内で最も優先順位の高い口座処
理要求を最高位口座処理要求として特定する(ステップ
S85)。これは、例えば、残不足明細から口座処理要
求を読み出し、今までに一番優先順位の高い口座処理要
求の内容をセーブしておき、このセーブした口座処理要
求の優先順位よりも優先順位の高い口座処理要求を読み
出したときにセーブした内容を入れ替えることで、最高
位の口座処理を特定するようにしても良い。このステッ
プS81乃至S85による処理を、図25に示す例で
は、第1群最高位口座処理要求特定機能138と呼ぶ。
In step S83, if the account processing request of $ 9x has not been established on the target account date and the account processing request of $ 9x can be read from the remaining shortage statement, the account processing request read out for the target account date falls within the target account date. The highest priority account processing request is specified as the highest account processing request (step S85). This is because, for example, the account processing request is read from the remaining shortage statement, the contents of the account processing request with the highest priority so far are saved, and the priority is higher than the priority of the saved account processing request. The highest-ranked account processing may be specified by replacing the saved contents when the account processing request is read. The processing in steps S81 to S85 is referred to as a first group highest account processing request specifying function 138 in the example shown in FIG.

【0271】続いて、この最高位口座処理要求特定機能
138によってステップS85にて特定された最高位口
座処理要求の出金額が出金可能額以内であるか否かを判
定して(ステップS86)、出金可能額以内であれば、
派生再カット中ビットをON、情報フラグをAにセット
して(ステップS87)、当該口座処理要求の再カット
を当該派生管理フラグ付きの派生トランザクションとし
て前記起動業務に実行させる(ステップS88)。この
ステップS86乃至S88による再カット起動を、図2
5に示す例では、第1群再カット起動機能140と呼
ぶ。
Subsequently, the highest account processing request specifying function 138 determines whether or not the withdrawal amount of the highest account processing request specified in step S85 is within the allowable amount (step S86). , Within the withdrawable amount,
The derived re-cutting bit is set to ON, the information flag is set to A (step S87), and the re-cutting of the account processing request is executed by the starting task as a derived transaction with the derived management flag (step S88). The recut activation in steps S86 to S88 is performed as shown in FIG.
In the example shown in FIG. 5, the first group recut activation function 140 is called.

【0272】ステップS86にて、最高位口座処理要求
の出金額が出金可能額を越える場合には、まず、当該最
高位口座処理要求の優先順位よりも低い優先順位の口座
処理要求によって使用される出金額の総額を修正出金可
能額として算出する(ステップS89,修正出金可能額
算出機能142)。次に、この最高位口座処理要求の出
金額が前記修正出金可能額以内であるか否かを判定し
(ステップS90)、修正出金可能額以内であれば、派
生再カット中ビットをON、情報フラグをAにセットし
て(ステップS91)、当該最高位口座処理要求の再カ
ットを当該派生管理フラグ付きの派生トランザクション
として前記起動業務に実行させる(ステップS92)。
このステップS90乃至S92による処理を、第1群修
正再カット起動機能144と呼ぶ。
In step S86, if the withdrawal amount of the highest-level account processing request exceeds the possible withdrawal amount, first, the highest-level account processing request is used by an account processing request having a lower priority than the priority of the highest-level account processing request. Is calculated as the corrected withdrawable amount (step S89, the corrected withdrawable amount calculation function 142). Next, it is determined whether or not the withdrawal amount of the highest-level account processing request is within the corrected withdrawable amount (step S90). Then, the information flag is set to A (step S91), and the start job is executed by the re-cutting of the highest-level account processing request as a derivative transaction with the derivative management flag (step S92).
The processing in steps S90 to S92 is referred to as a first group correction recut activation function 144.

【0273】そして、ステップS90にて、最高位口座
処理要求の出金額が修正出金可能額を越えている場合に
は、当該口座処理要求を判定済みとして前記最高位口座
処理特定機能138に処理を戻す(修正再カット対象探
索制御機能146)。図30に示す例では、ステップS
83に処理を移す。
If the withdrawal amount of the highest account processing request exceeds the corrected withdrawable amount at step S90, the account processing request is determined to have been determined and processed by the highest account processing specifying function 138. (Correction recut target search control function 146). In the example shown in FIG.
The processing moves to 83.

【0274】ステップS83では、ステップS90にて
判定されていない口座処理要求のうち、同一の対象勘定
日にて、ステップS83の条件を満たす口座処理要求を
読みとる。この読取により特定された口座処理要求は、
前回ステップS90で判定された口座処理要求と同一の
優先順位か、又はその次に優先順位の低い口座処理要求
である。一方、ステップS83にて対象勘定日が再カッ
ト期限内の未成立且つ≠9xの口座処理要求が無い場合
には、すなわち、この対象勘定日での探索が完了する
と、対象勘定日を次の日付へと移す。この対象勘定日の
全探索が完了する途中で決済可能な口座処理があった場
合には、再カット又は修正再カットを起動し、その勘定
日を対象勘定日としてこのステップS83に戻る。この
場合、前回またはそれ以前に再カット又は修正再カット
された口座処理要求は残不足明細では決済済みとなって
いるため、このステップS83で読み込まれることはな
い。通常に最高位を特定すると、前回又はそれ以前に再
カットした口座処理要求の次に優先順位が高い口座処理
が最高位として特定される。
In step S83, of the account processing requests not determined in step S90, an account processing request that satisfies the condition of step S83 is read on the same target account date. The account processing request specified by this reading is:
The account processing request has the same priority as the account processing request determined in the previous step S90, or has the next lower priority. On the other hand, in step S83, when the target account date is not established within the recut deadline and there is no account processing request of $ 9x, that is, when the search on this target account date is completed, the target account date is changed to the next date. Move to If there is an account process that can be settled in the course of completing the entire search for the target account date, recut or correction recut is started, and the process returns to step S83 with that account date as the target account date. In this case, the account processing request that has been recut or corrected and recut last time or before has already been settled in the remaining shortage statement, and is not read in this step S83. Normally, when the highest rank is specified, the account processing having the next highest priority after the account processing request previously or previously recut is specified as the highest rank.

【0275】最後の日付で、最後の口座処理要求が修正
再カットされた場合、残不足明細にステップS83の条
件を満たす口座処理要求がなくなっているか、もしく
は、ステップS90,ステップS84を介して再カット
SCへと処理が移る。最後の口座処理要求が再カットさ
れた場合、ステップS82にて再カットSCへと処理が
移る。
If the last account processing request is modified and re-cut on the last date, there is no account processing request satisfying the condition of step S83 in the remaining shortage statement, or the account processing request is re-entered via steps S90 and S84. Processing shifts to cut SC. If the last account processing request has been recut, the process proceeds to recut SC in step S82.

【0276】この図30に示す処理により、再カット期
限が3ヶ月等の期間の口座処理要求の再カット及び修正
再カットを良好に処理することができる。また、一旦修
正再カットSC126で修正再カット又は再カットされ
た口座処理要求が、そのスパイラル処理中に先日付第1
群取消SC122で取り消されることはない。これは、
修正再カットでは情報フラグをAとし、一方、先日付第
1群取消SC122では派生再カットが開始され、Dビ
ットがONである場合に、情報フラグが1以外であれ
ば、先日付第1群取消を行わないためである。このよう
に、情報フラグは、スパイラル処理において、不要なル
ープが生じないように制御する役割を果たす。
The processing shown in FIG.
Re-cut and modify account processing requests for a period such as three months
The recut can be satisfactorily processed. Also, once
Corrected recut or recut in forward recut SC126
Account processing request, during the spiral processing,
It is not canceled by the group cancellation SC122. this is,
In the modified recut, the information flag is set to A, while
In group 1 cancellation SC122, derivative recut is started and
If the information flag is other than 1 when the
This is because the first group cancellation in the future is not performed. like this
In addition, information flags are unnecessary
Plays a role in controlling so that no loops occur.

【0277】図31は、再カットサブコントローラ12
8の処理例を示すフローチャートである。図31に示す
例では、前記修正再カットSCでの第1群再カット又は
第1群修正再カットの条件を満たす残不足明細がない場
合に処理が始まる。まず、「前記派生再カット中ビット
がON、情報フラグが4且つ日付チェックテーブルの全
日付の判定完了」という条件を満たさないか否かを判定
する。前回の再カットで、最後の対象勘定日での最後
(最も優先順位が低い)の口座処理要求を再カットした
場合には、取消再カットの全判定処理を完了する(ステ
ップS110)。
FIG. 31 shows the re-cut sub controller 12
8 is a flowchart illustrating a processing example of No. 8; In the example illustrated in FIG. 31, the process starts when there is no first-group re-cut or the first-group correct-re-cut SC that satisfies the condition of the first-group re-cut SC. First, it is determined whether or not the condition of “the derived recutting bit is ON, the information flag is 4, and the determination of all dates in the date check table is completed” is not satisfied. When the last (lowest priority) account processing request on the last target account date is recut in the last recut, all the cancellation recut determination processing is completed (step S110).

【0278】最初に起動され派生再カット中ビット(D
ビット)がオフであった場合や、すべての口座処理要求
の再カット可否の判定が完了していない場合には、ステ
ップS102に処理を移す。図31に示す例では、残不
足明細セグメントから、再カット期限内で未決済取引で
未判定の残不足明細を読み出す(ステップS102)。
そして、当該読み出した口座処理要求を最高位口座処理
要求として特定する(ステップS103,最高位口座処
理要求特定機能148)。一方、該当する残不足明細が
無い場合には、取消再カットメインの全判定を終了す
る。ステップS102では、残不足明細のデータ構造に
従って順に口座処理を読み出し、口座処理要求の対象勘
定日が変化した場合には、その勘定日を対象勘定日とす
る。修正再カットSC126により、≠9xの先日付の
残不足はすべて判定終了し、再カット可能なものがない
ため、ステップS102にて残不足明細のデータ構造順
に読み出す。すると、9xの範囲内では、勘定日順、且
つ、優先順位順(第2優先順位)に読み出される。従っ
て、修正再カットSC126で行ったような最高位の探
索処理を不要とすることができる。
The bit which is started first and is being derived and recut (D
If bit) is off, or if the determination of whether or not all account processing requests can be recut has not been completed, the process proceeds to step S102. In the example illustrated in FIG. 31, the remaining shortage details that have not been determined in the unsettled transactions within the recut deadline are read from the remaining shortage detail segment (step S <b> 102).
Then, the read account processing request is specified as the highest account processing request (step S103, highest account processing request specifying function 148). On the other hand, when there is no corresponding remaining shortage statement, all the determinations of the cancellation re-cut main are ended. In step S102, the account processing is sequentially read out according to the data structure of the remaining shortage statement, and when the target account date of the account processing request changes, the account date is set as the target account date. With the modified recut SC126, all the remaining shortage of the future date of $ 9x has been determined, and there is no recut that can be recut. Then, within the range of 9x, they are read out in order of the accounting date and in order of priority (second priority). Therefore, it is not necessary to perform the highest-order search processing as performed in the modified recut SC126.

【0279】ステップS103に続いて、この最高位口
座処理要求に自動融資が設定されている場合には当該口
座処理要求に再カット派生を設定する(ステップS10
4(自動融資再カット派生設定機能150)。また、最
高位口座処理要求の出金額が前記出金可能額以内である
場合には、当該最高位口座処理要求に再カット派生を設
定する(ステップS105、出金可能額再カット派生設
定機能152)。ここでは、再カット派生の設定はステ
ップS106へ処理を進めることであるが、好ましく
は、再カット派生ビットを付し、そのビットの有無に従
ってステップS106へ進むようにする。このように再
カット派生が設定されている場合には、当該最高位口座
処理要求の再カットを当該派生管理フラグ付きの派生ト
ランザクションとして前記起動業務に実行させる(ステ
ップS107,再カット起動機能156)。
[0279] Subsequent to step S103, if automatic financing is set in the highest-level account processing request, re-cut derivation is set in the account processing request (step S10).
4 (automatic loan recut derivation setting function 150). In addition, if the output amount of the highest-level account processing request is within the allowable amount, the re-cut derivation is set in the highest-level account processing request (step S105, the allowable amount re-cut derivation setting function 152). ). Here, the setting of the recut derivation is to advance the process to step S106. However, it is preferable to add a recut derivation bit and to proceed to step S106 according to the presence or absence of the bit. When the recut derivation is set in this way, the starting task is caused to execute the recut of the highest-level account processing request as a derived transaction with the derivation management flag (step S107, recut start function 156). .

【0280】ステップS105にて、最高位口座処理要
求の出金額が前記出金可能額を超える場合には、当該口
座処理要求を判定済みとして前記最高位口座処理要求特
定機能に処理を戻す(再カット対象探索制御機能15
4)。
If the withdrawal amount of the highest account processing request exceeds the possible withdrawal amount in step S105, the account processing request is determined to have been determined, and the processing is returned to the highest account processing request specifying function (retry). Cut target search control function 15
4).

【0281】図25等に示す構成は、演算手段4が取消
再カットメインプログラムを実行することでその一部と
して実現することができる。このような取消再カットメ
インプログラムは、前記演算手段を動作させる指令とし
て、各SCに対応する指令を備える。具体的には、取消
再カットメインプログラムが起動される毎に前記残高明
細セグメントに基づいて取引のある日付毎の出金可能額
を算出させる日付チェックテーブル生成指令M31と、
残不足明細セグメントに格納された決済済みの口座処理
要求のうち優先順位が第1群で先日付の出金要求がある
場合には当該口座処理要求を取り消す制御をさせる先日
付第1群取消指令M32と、この先日付第1群取消指令
M32に応じて前記優先順位が第1群で先日付にて決済
済みの出金要求がない場合に、前記日付チェックテーブ
ルを参照して出金可能額がマイナスとなっている勘定日
がある場合には、当該勘定日に成立し前記取引明細セグ
メントに格納された口座処理要求のうち最も低い口座処
理要求を取り消させるマイナス時取消指令M33とを備
える。
The configuration shown in FIG. 25 and the like can be realized as a part of the operation means 4 executing the cancel / recut main program. Such a cancellation / recut main program includes a command corresponding to each SC as a command for operating the arithmetic unit. Specifically, a date check table generation command M31 for calculating a possible withdrawal amount for each date of a transaction based on the balance statement segment each time the cancellation / recut main program is started;
A first-destination first-group cancellation command for controlling the cancellation of the account processing request when there is a withdrawal request of the first priority in the first group among the settled account processing requests stored in the remaining shortage detail segment. M32, and if there is no withdrawal request that has been settled at the prior date in the first group according to the future first group cancellation command M32, the possible withdrawal amount is referred to the date check table. When there is a negative account date, a negative-time cancellation command M33 that is established on the relevant account date and cancels the lowest account processing request among the account processing requests stored in the transaction statement segment is provided.

【0282】取消再カットメインプログラムは、さら
に、先日付第1群取消指令M32及びマイナス時取消指
令M33に応じた取消制御が完了下後に、前記第1群の
優先順位で前記残不足明細セグメントに格納された先日
付の口座処理要求を優先順位の高い順に各勘定日の出金
可能額又は所定の修正出金可能額に基づいて再カットが
可能であるか否かを判定させると共に再カット可能な場
合には当該口座処理要求を再カットさせる修正再カット
指令M3Aを備えてる。また、取消再カットメインプロ
グラムは、修正再カット指令M3Aによる再カットの対
象の走査が完了した後、前記第1群及び第2群の優先順
位で出金可能額内の出金要求を優先順位の高い順に再カ
ットさせる再カット指令M34とを備える。
[0282] After the cancellation control in accordance with the first group first cancellation command M32 and the negative cancellation command M33 is completed, the cancellation re-cut main program further stores the remaining first and second shortage detail segments in the priority order of the first group. When the stored future-dated account processing requests are judged to be re-cuttable based on the possible sunrise deposit amount or the predetermined corrected withdrawable amount for each account in the descending order of priority, and the re-cut is possible. Has a modified re-cut command M3A for re-cutting the account processing request. In addition, after the completion of scanning of the recut target by the modified recut command M3A, the cancel recut main program gives priority to the withdrawal requests within the withdrawable amount in the first group and the second group. And a recut command M34 for recutting in the descending order.

【0283】また、上記各指令が、図27乃至図31に
示す処理工程に応じた指令を備えることで、より具体的
な処理を実現することができる。
Further, by providing each of the above commands with commands corresponding to the processing steps shown in FIGS. 27 to 31, more specific processing can be realized.

【0284】図25に示した構成により、派生トランザ
クションの繰り返しとして優先順位に基づいた決済の最
適化を行うことで、先日付完結処理を他のオンライン処
理による口座処理に遅れを生じさせない状態でオンライ
ン処理と並行して処理することができる。例えば、派生
取引等に他のトランザクションによるプロセスに対する
優先度の設定等を行わなくとも、派生取引の同時最大数
等の規制により、オンラインの応答時間に影響を与えず
に、口座振替等の従来バッチ処理で行っていた口座処理
をオンライン処理中に処理することができる。
With the configuration shown in FIG. 25, by optimizing the settlement based on the priority as the repetition of the derived transaction, the future completion processing can be performed online without delaying the account processing by other online processing. Processing can be performed in parallel with the processing. For example, even if you do not set priorities for processes by other transactions in derivative transactions, etc., conventional batches such as account transfer etc. can be performed without affecting online response time due to regulations such as the maximum number of concurrent transactions. The account processing performed in the processing can be processed during the online processing.

【0285】図32乃至図38は、本実施例による先日
付完結処理の具体的な処理例を示す説明図である。この
例では、先日付完結処理の説明のための口座処理の組み
合わせである。図32を参照すると、取引明細セグメン
トは、演算日、勘定日、取引等の項目を有する。これに
応じて、残不足明細セグメントのうち再カット期限や結
果の項目を記述している。残不足明細は、その本来の並
び順ではなく、取引明細セグメントを更新したときに、
残不足明細セグメントに与える更新を併記したものであ
る。
FIGS. 32 to 38 are explanatory diagrams showing specific processing examples of the future date completion processing according to the present embodiment. In this example, it is a combination of account processing for explaining the future completion processing. Referring to FIG. 32, the transaction details segment has items such as an operation date, an account date, and a transaction. Accordingly, items of the recut time limit and the result in the remaining shortage detail segment are described. When you update a statement line segment instead of its original order,
The update given to the remaining shortage detail segment is also described.

【0286】通番001は、演算日を1日として、先日
付の2日を勘定日として、20,000の出金をしてい
る。演算日の項目の左側に、図32中0から13までの
番号が振られている。この番号を、処理番号と呼ぶ。通
番001の取引種類は電気料の引落である。この電気料
の引落は、処理番号1の行で、且つEの列に記載されて
いる。列の番号は図中下側(処理番号13の次の行)に
定義されている。図33は、図32の取引の結果を示す
残高明細セグメント及び担保明細セグメントであり、処
理番号は同一の処理に対してのものである。
In the serial number 001, 20,000 is paid out with the calculation date as one day and the two days ahead as the accounting date. Numbers from 0 to 13 in FIG. 32 are assigned to the left side of the calculation date item. This number is called a processing number. The transaction type of the serial number 001 is a withdrawal of electricity charges. The deduction of this electricity charge is described in the row of the processing number 1 and in the column of E. The column numbers are defined in the lower part of the figure (the row following the processing number 13). FIG. 33 shows a balance statement segment and a collateral statement segment showing the results of the transaction in FIG. 32, and the processing numbers are for the same processing.

【0287】まず、上記取消再カットメインによってど
のように口座残高を推移させるかを説明する。1日の当
初の残高として50,000(図33、0N)、担保定
期が50,000で貸越極度が45,000。出金可能
額を計算すると95,000(図33,0P)である。
この状態で、2日を勘定日として、処理番号1,3,4
にあるように、通番001の電気料引落、通番003の
定期積金入金、通番004の担保定期入金が成立してい
る。一方、通番002の融資返済は、その結果(図3
2,2H)が極度超となっている。すなわち、融資返済
の108,000は残不足で未成立である。この融資返
済を、残不足明細に記録する(図32,2Gから2
M)。
[0287] First, how the account balance is changed by the above-mentioned cancellation re-cut main will be described. The initial balance of the day is 50,000 (0N in FIG. 33), the security period is 50,000, and the overdraft is 45,000. The calculated possible withdrawal amount is 95,000 (FIG. 33, 0P).
In this state, the process number 1, 3, 4
As shown in the above, the deduction of the electricity fee of serial number 001, the payment of the periodic deposit of serial number 003, and the periodic payment of the security number 004 are established. On the other hand, the repayment of the loan with serial number 002
2,2H) is exceedingly extreme. In other words, 108,000 of the loan repayment has not been completed due to the remaining shortage. This loan repayment is recorded in the remaining shortage statement (FIG. 32, 2G to 2G).
M).

【0288】処理番号5から9は、1日にATM入金2
0,000があった場合に、この入金を原始口座処理と
して取消再カットメインを起動したことによる処理結果
である。1日現在の残高50,000(図33,0
N)、貸越極度45,000、従って、出金可能額を計
算すると95,000となる。2日の残高は−30,0
00(図33,4R)、処理番号4による極度増額によ
り、貸越極度54,000で、出金可能額は24,00
0である。2日を勘定日とする先日付の出金として、電
気料20,000、定期積金50,000、担保定期預
金10,000があり、残不足取引として融資返済10
8,000が存在する。
Processing Nos. 5 to 9 are for ATM deposit 2 per day
When there is 0000, this is the processing result by starting the cancellation re-cut main as this payment as the original account processing. Balance 50,000 as of 1 day (Fig. 33,0
N), the overdraft limit is 45,000, and therefore, the calculated possible withdrawal amount is 95,000. The balance on the 2nd is -30,0
00 (FIG. 33, 4R), due to the extreme increase by the processing number 4, the overdraft is 54,000, and the withdrawable amount is 24,000.
0. As a withdrawal with 2 days as an account date, there are 20,000 electricity bills, 50,000 fixed term deposits, and 10,000 fixed term deposits.
There are 8,000.

【0289】このときに、1日にATM入金20,00
0される(図32,5C)。1日の残高は50,000
に入金額20,000を加算して70,000となる
(図33,5N)。1日の出金可能額は115,000
(図33,5P)となる。2日の残高も20,000の
増額される。2日の出金可能額は44,000(図3
3,5T)であるため、残不足となっている融資返済1
08,000は出金可能額よりも多く、通常の再カット
はできない。融資返済の優先順位より優先順位の低い決
済済み取引である電気料(通番001)、定期積金(通
番003)、担保定期入金(004)を取り消すことを
前提とした修正出金可能額は124,000(図33,
5U)となる。このため、融資返済の修正再カットが行
われる。修正再カット後、2日の出金可能額がマイナス
となる(図33,6T)ため、優先順位の低い順(電気
料→担保定期預金→定期積金)に先日付決済済み取引の
取消を行う。これにより、2日の残高−38,000、
貸越極度45,000、出金可能額7,000(図3
3,9T)となる。
At this time, ATM payments of 20,000 per day were made.
0 (FIG. 32, 5C). The daily balance is 50,000
Is added to 20,000 to obtain 70,000 (FIG. 33, 5N). The amount that can be paid per sunrise is 115,000
(FIG. 33, 5P). The two-day balance will also be increased by 20,000. 2 The amount of money available for sunrise is 44,000 (Fig. 3
3,5T), so there is a shortage of loans 1
08,000 is more than the amount that can be withdrawn and cannot be recut normally. The adjusted withdrawable amount is 124 based on the assumption that the electricity charge (serial number 001), the periodic deposit (serial number 003), and the collateral periodic deposit (004), which are settlement transactions whose priority is lower than the loan repayment priority, are cancelled. 000 (FIG. 33,
5U). Therefore, a re-cut of the loan repayment is performed. After the correction and re-cut, the possible amount of money for two sunrises becomes negative (6T in FIG. 33), and therefore, the transactions that have been settled in the future are canceled in the order of lower priority (electricity fee → secured time deposit → term deposit). As a result, the balance of 2 days-38,000,
Overdraft 45,000, possible withdrawal 7,000 (Figure 3
3,9T).

【0290】処理番号10から13は、1日に50,0
00の定期入金があった場合の取消再カットメインによ
る調整である。取消再カットメインが起動すると、ま
ず、残不足に格納された成立済みで≠9xの有無を探索
する。融資返済が該当するため、まずこれを取り消す
(図32,処理番号11)。その後の2日の残高は5
2,000(図33,12T)であるため、残不足で決
済済みの口座処理要求のうち最も優先順位の高い定期積
金入金が再カットされる。52,000から50,00
0が減額され、2日の出金可能額は2,000となる
(図33,13T)。他に再カット可能な口座処理要求
がないため、取消再カットメインはスパイラル処理を終
了する。
The processing numbers 10 to 13 are 50,0 per day.
This is an adjustment by cancellation re-cut main when there is a regular payment of 00. When the cancel / recut main is started, first, the presence / absence of $ 9x that has been established and stored in the remaining shortage is searched. Since the loan repayment is applicable, this is first canceled (FIG. 32, process number 11). The balance for the next two days is 5
Since it is 2,000 (12T in FIG. 33), the highest-priority fixed-term deposit of the account processing request that has been settled due to the remaining shortage is recut. 52,000 to 50,000
0 is reduced, and the possible amount of money for the second sunrise becomes 2,000 (FIG. 33, 13T). Since there is no other account processing request that can be recut, the cancel recut main ends the spiral processing.

【0291】図34に示す処理番号14から18では、
先日付第1群による取消と、修正再カットとが行われ
る。処理番号19から25では、先日付第1群の取消が
行われた後、優先順位に従って再カットを行う。ここで
は、2日付けの28,000の振込入金によって担保定
期入金と電気料引落の再カットができた(図34,24
E,25E)。
In processing numbers 14 to 18 shown in FIG.
Cancellation by the first group of the future and correction re-cut are performed. In the processing numbers 19 to 25, after the first group is cancelled, re-cutting is performed according to the priority order. Here, 28,000 remittances on 2nd made it possible to re-cut the collateral periodic deposit and the electricity charge withdrawal (Figs. 34, 24).
E, 25E).

【0292】図36に示す処理番号26から30では、
1日の残高70,000(図33,5Nからの異動はな
い)、貸越極度90,000(図33,10O)、従っ
て、出金可能額160,000(図33,10P)、2
日の出金可能額は8,000(図35,25T)。2日
を勘定日とする先日付の出金要求として、融資返済10
8,000、定期積金50,000、担保定期預金1
0,000、年会費1,000がある。残不足として
は、電気料20,000が存在する。この状態で、1日
にATM出金120,000を行ったとする(図36,
26E)。1日の出金可能額が40,000(図35,
26P)となり、2日の出金可能額は−112,000
(図35,26T)となる。まず、優先順位が≠9xで
ある先日付決済済み取引である融資返済と定期積金を優
先順位の低い順に取り消す(処理27,28)と、2日
の出金可能額は46,000(図37,28P)とな
る。このため、残不足となっている定期積み金引落の再
カットは行われない状態に見える。しかし定期積み金引
落の優先順位よりも低い先日付決済済み取引である電気
料、年会費の出金を取り消す前提での修正出金可能額は
67,000(図37,28P)となるため、定期積金
引落の修正再カットを行う。再カット後、2日の出金可
能額がマイナスとなっている(図37,29P)ため、
電気料の引落の先日付決済済み取引の取消を行う。これ
により、2日の残高−83,000(図37,30
N)、貸越極度99,000、出金可能額16,000
となる。
In processing numbers 26 to 30 shown in FIG. 36,
The daily balance 70,000 (no change from 5N in FIG. 33), the overdraft limit 90,000 (100 in FIG. 33), and therefore, the possible withdrawal amount 160,000 (FIG. 33, 10P), 2
The possible amount of sunrise money is 8,000 (Fig. 35, 25T). As a future withdrawal request with 2 days as the account date, loan repayment 10
8,000, fixed deposit 50,000, secured time deposit 1
There are 0000 and annual membership fee of 1,000. As the remaining shortage, there is an electric charge of 20,000. In this state, it is assumed that 120,000 ATM payments are made per day (FIG.
26E). The amount that can be paid per sunrise is 40,000 (Fig. 35,
26P) and the amount of money available for 2nd sunrise is -112,000
(FIG. 35, 26T). First, the loan repayment and the fixed-term deposit, which are the transactions settled in the future with the priority of $ 9x, are canceled in the order of the lower priority (processing 27, 28). 28P). For this reason, it seems that the re-cut of the periodic deposit withdrawal that is insufficient is not performed. However, the revised withdrawal amount is 67,000 (see FIG. 37, 28P) assuming that the withdrawal of the electricity bill and the annual membership fee, which are lower-priority transactions that are lower than the priority of the periodic deposit, is canceled. Correction and re-cut of the periodic deposit withdrawal. After re-cutting, the possible amount of money for the second sunrise is minus (Fig. 37, 29P),
Cancel postdated settlement of electricity charges. As a result, the balance on the two days minus 83,000 (FIG. 37, 30)
N), extreme overdraft 99000, withdrawable amount 16,000
Becomes

【0293】図36に示す処理31では、3日を勘定日
として給与振込がある。32との出金可能額が116,
000となるため、2日に決済できなかった融資返済を
3日で決済することができる(処理32)。
In the processing 31 shown in FIG. 36, there is a salary transfer with the third day as the accounting day. Withdrawable amount with 32 is 116,
000, the loan repayment that could not be settled in two days can be settled in three days (process 32).

【0294】処理番号33から38では、2日の残高−
83,000(図37,30N)、貸越極度99,00
0、このため出金可能額は16,000となる。3日の
出金可能額は8,000(図37,32T)である。2
日を勘定日とする成立済みの口座処理としては、定期積
金、担保定期預金、年会費1,000がある。未成立で
残不足明細の格納された取引としては、電気料20,0
00がある。融資返済108,000は、3日を勘定日
として成立している。
[0294] In the processing numbers 33 to 38, the balance of two days-
83,000 (Fig. 37, 30N), extreme overdraft 99,00
0, so the possible withdrawal amount is 16,000. The possible amount of money for the three sunrises is 8,000 (32T in FIG. 37). 2
The account processing that has been completed with the day as the account date includes time deposit, secured time deposit, and annual membership fee of 1,000. As a transaction that has not been completed and the remaining shortage details have been stored, the electric charge is 20,0
00. The loan repayment of 108,000 has been settled with three days as an accounting date.

【0295】この状態で、1日に2日付けでの入金6
2,000を行ったとする。2日の出金可能額は78,
000(図37,33P)となり、3日の出金可能額は
70,000となる。≠9xで、成立済み残不足の先日
付第1群取消の対象として、2日の定期積金と3日の融
資返済とがある。これを優先順位の低い順に取り消す
と、2日の出金可能額は128,00となるため、融資
返済を2日付けで再カットする。再カットすると、2日
の出金可能額は20,000(図37,36P)、3日
は120,000となる。
[0295] In this state, deposit 6 on two days a day
Assume that 2,000 has been performed. 2 Sunrise gold available amount is 78,
000 (FIG. 37, 33P), and the possible amount of money for three sunrises becomes 70,000. In the case of $ 9x, the target of cancellation of the first group of the completed remaining shortage is the regular deposit on the 2nd and the loan repayment on the 3rd. If this is canceled in the order of lower priority, the possible amount of money for the second sunrise becomes 128,00, so the loan repayment is cut again on two days. When re-cut, the possible amount of money for the second sunrise is 20,000 (P in FIG. 37, 36) and 120,000 on the third day.

【0296】次に、優先順位が高く、再カット期限内で
ある定期積金を再カットする。これにより、3日の出金
可能額は70,000となる。≠9xの再カットの終了
後、2日の出金可能額が20,000であるため、電気
料引落の先日付再カットを行う。2日の出金可能額が0
(図37P)、3日の出金可能額が50,000(図3
7,38T)となる。もし、3日の出金可能額がマイナ
スとなる場合には、3日付け先日付取引のうち、最優先
順位の口座処理を取り消す。
Next, the regular deposit with a higher priority and within the recut deadline is cut again. As a result, the possible amount of money for the three sunrises becomes 70,000. After the re-cut of $ 9x is completed, since the possible amount of money for the second sunrise is 20,000, the re-cut of the future date after the deduction of the electricity fee is performed. 2 Sunrise possible amount is 0
(Fig. 37P) The amount of money available for 3 sunrise is 50,000 (Fig. 3
7, 38T). If the possible amount of money for the three sunrises becomes negative, the highest priority account processing among the three-day future transactions is canceled.

【0297】処理38から処理39の間に、日付変更が
ある。この日付変更により、2日を勘定日として成立し
ていた取引は決済完了性を有する。すなわち、担保定期
入金(処理25),融資返済(処理36)、電気料引落
(処理38)は確定する。2日当日では、先日付の取引
は3日を勘定日とする定期積金入金である(処理3
7)。処理39では、クレジット代金の引落を処理しよ
うとするが、残不足で未成立となる。このクレジット代
金の引落で残不足がある場合に、カードローンによる自
動融資を行うとする。3日を迎え、その自動融資を実行
する時間までに入金がないと、クレジットローンの自動
融資が実行される(図38,42E)。このとき、3日
の出金可能額50,000に対して、クレジット代金引
落に不足している額は80,000であるため、80,
000を自動融資する(図38,42F)これにより、
クレジット代金の当日再カットが行われ、3日付けの出
金可能額は0となる。
There is a date change between Steps 38 and 39. As a result of this date change, a transaction that has been completed with the second day as the account date has settlement completeness. That is, the security fixed payment (process 25), loan repayment (process 36), and electricity charge withdrawal (process 38) are determined. On the second day, the future-dated transaction is a regular deposit deposit with the third day as the account date (process 3).
7). In the processing 39, an attempt is made to process the debit of the credit amount, but the processing is not established due to insufficient remaining amount. If there is a shortage remaining due to the deduction of the credit amount, it is assumed that automatic financing by card loan is performed. If three days have passed and there is no payment by the time the automatic loan is executed, the automatic loan of a credit loan is executed (FIG. 38, 42E). At this time, the amount that is insufficient for the credit withdrawal is 80,000 for the possible sunrise amount of 50,000 for 3 sunrises.
000 is automatically financed (FIGS. 38 and 42F).
The credit amount is re-cut on the day, and the withdrawable amount on the third day becomes zero.

【0298】次に、各サブコントローラのフローチャー
ト等を参照して、取消再カットメインによるスパイラル
制御を詳述する。処理番号5によって開始するスパイラ
ル制御では、図26を参照すると、まず通番005のA
TM入金が起動処理及び受動処理の連動S51にて実行
される。すると、取消再カットメインでは、まず、日付
チェックテーブルを作成する。日付は1日と2日で、1
日の出金可能額が95,000、2日が15,000で
ある。先日付第1群取消SC122では、Dビットフラ
グがオフで、情報フラグがないため、図27に示すステ
ップS62にて前倒の対象があるか否かを確認する。処
理番号5の完了時には、決済済み残不足で≠9xはない
ため、マイナス時取消SCへ移る。出金可能額のマイナ
スや、入金オーバーもないため、修正再カットSC12
6に進行する。図30を参照すると、Dビットフラグが
OFFであるため、ステップS81,S82がノーとな
り、ステップS83にて、未決済、未判定、先日付、再
カット期限内、且つ≠9xを読み出す。1日での口座残
高の異動であるため、まず1日を対象勘定日として読み
出すが、1日を再カット期限内とする残不足明細は存在
しないため、ステップS84にて日付チェックテーブル
を参照して対象勘定日を2日にシフトさせる。2日を対
象勘定日とすると、通番002の融資返済が残不足とし
て格納されている。他の残不足はないため、この融資返
済108,000が最高順位となる(ステップS8
5)。2日の出金可能額は15,000であるため、出
金可能額での再カットはできない(ステップS86)。
修正出金可能額を算出すると、上述したように124,
000となるため、修正再カットを派生起動する(ステ
ップS92)。このとき、派生再カット中ビット=O
N、情報フラグ=Aが図26に示す起動処理S55に渡
される。
Next, the spiral control based on the cancellation / re-cut main will be described in detail with reference to the flowchart of each sub-controller. In the spiral control started by the process number 5, referring to FIG.
TM payment is executed in the interlocking operation S51 of the start-up process and the passive process. Then, in the cancellation / recut main, first, a date check table is created. The date is 1 day and 2 days, 1
The sunrise possible amount is 95,000, and the second day is 15,000. Since the D-bit flag is OFF and there is no information flag in the first group cancellation SC122 of the future date, it is checked in step S62 shown in FIG. 27 whether there is an object to be moved forward. At the completion of the processing number 5, since there is no $ 9x due to the remaining shortage of the settlement, the processing shifts to the minus cancellation SC. Corrected re-cut SC12 because there is no minus in the withdrawable amount or over payment
Proceed to 6. Referring to FIG. 30, since the D-bit flag is OFF, steps S81 and S82 are NO, and in step S83, unsettled, undetermined, future date, recut deadline, and $ 9x are read. Since the account balance is changed in one day, first, one day is read as the target account date. However, since there is no remaining shortage detail in which one day is within the recut deadline, the date check table is referred to in step S84. To shift the target account date to two days. Assuming that 2 days is the target account date, the loan repayment of serial number 002 is stored as the remaining shortage. Since there is no remaining shortage, this loan repayment of 108,000 is ranked highest (step S8).
5). 2 Since the possible amount of sunrise is 15,000, re-cutting cannot be performed with the possible amount of withdrawal (step S86).
When the corrected withdrawable amount is calculated, as described above,
000, the modified recut is derived and activated (step S92). At this time, the derived recutting bit = O
N and the information flag = A are passed to the startup processing S55 shown in FIG.

【0299】ステップS55の起動及び受動の連動処理
にて、融資返済の修正再カットを行い、受動処理は残高
明細を更新して、取消再カットメインを起動する。この
とき、派生再カット中ビット=ON、情報フラグ=Aで
ある。日付チェックテーブルを作成すると、2日の出金
可能額マイナス64,000となる(図33,6T)。
取消再カットメインでは、先日付第1群取消処理のステ
ップS61にてイエスとなり、マイナス時取消SCへ移
る。出金可能額がマイナス64,000であるため、最
も優先順位の低い口座処理要求(ここでは、通番00
1)を特定し(図28のステップS73)、図26のS
53に示す起動処理に取消を依頼する。このときの情報
フラグは2である。出金可能額がマイナスの間このスパ
イラル処理SPF2が継続し、マイナスが解消したとき
に修正再カット及び再カットの検討を行う。ここでは、
再カット可能な対象が存在しないため、スパイラル処理
を完了する。すなわち、図32の処理番号9によって起
動される取消再カットメインは、なにも行わずに同期点
C16を迎える。
In the startup and passive interlocking process in step S55, the loan repaid is modified and recut, and the passive process updates the balance statement and starts the cancellation recut main. At this time, the derived recutting bit = ON and the information flag = A. When the date check table is created, the possible amount of money for the second sunrise is minus 64,000 (FIG. 33, 6T).
In the cancellation re-cut main, the answer is yes in step S61 of the first group cancellation processing of the previous date, and the process proceeds to the minus cancellation SC. Since the withdrawable amount is minus 64,000, the account processing request having the lowest priority (here, serial number 00
1) is specified (step S73 in FIG. 28), and S in FIG.
A request for cancellation is issued to the activation process shown in 53. The information flag at this time is 2. This spiral processing SPF2 is continued while the possible withdrawal amount is minus, and when the minus is eliminated, the re-cut and re-cut are examined. here,
Since there is no recuttable target, the spiral processing is completed. That is, the cancellation / recut main activated by the process number 9 in FIG. 32 reaches the synchronization point C16 without performing anything.

【0300】処理9終了時の残不足明細セグメントを図
29(A)に示す。優先順位の高い通番002が成立
し、他の処理は残不足で決済不能となっている。ここ
で、50,000の定期入金があるとする(処理番号1
0)。残高は増加しないが、貸越極度が増加する。これ
により残高(出金可能額)に異動が生じたとして、取消
再カットメインを起動する。先日付第1群取消SCに
て、一旦融資返済を取り消す。その後、修正再カットS
C126にて2日を勘定日とする最高位を特定すると、
今取り消した融資返済であるため、これを再カットする
(ステップS88)。情報フラグ=Aとして再度取消再
カットメインが起動されると、修正再カットSC126
では、再度2日での最高位取引を探索する。図29に示
すように、自振通番002の優先順位が高いため、取引
金額と出金金額とを比較する(ステップS86)。再カ
ット可能であるため、定期積金入金を再カットする(処
理番号13)。この再カットにより、再度取消再カット
メインが起動される。ステップS83にて2日の残不足
を探索すると、担保定期及び電気料の優先順位は第2群
であるため、ステップS83にて口座処理要求なしと判
定される。2日を基準とした先日付取引があるか否か
(先日付の残不足明細があるか否か)を判定すると(ス
テップS84)、日付チェックテーブルの最終日は2日
であるため、3日以後の先日付勘定日は存在しない。こ
のため、再カットSCへ処理が移る(ステップS94
3)。
FIG. 29A shows the remaining insufficient detail segment at the end of process 9. A serial number 002 having a higher priority is established, and other processes are not available due to a shortage. Here, it is assumed that there are 50,000 periodic deposits (processing number 1
0). The balance does not increase, but the overdraft increases. As a result, it is determined that a change has occurred in the balance (payable amount), and the cancellation / recut main is activated. Cancel the loan repayment once at the first day cancellation SC of the first group. After that, re-cut S
When the highest ranking with 2 days as the accounting date is specified in C126,
Since the loan has been repaid, it is cut again (step S88). When the cancellation / recut main is activated again with the information flag = A, the corrected recut SC126
Let's search for the top trading again in two days. As shown in FIG. 29, since the priority of the self-oscillation serial number 002 is high, the transaction amount and the withdrawal amount are compared (step S86). Since re-cutting is possible, the regular deposit is re-cut (process number 13). By this re-cut, the cancel re-cut main is activated again. When the shortage of two days is searched for in step S83, the priority order of the security period and the electric charge is the second group, so that it is determined in step S83 that there is no account processing request. When it is determined whether or not there is a future transaction based on two days (whether there is a remaining shortage statement of the future date) (step S84), the last day of the date check table is two days, so three days There are no future future account dates. Therefore, the processing shifts to the recut SC (step S94)
3).

【0301】図31を参照すると、派生再カット中ビッ
ト(Dビット)がONであるが、情報フラグがAである
ため、ステップS101でノーとなる。残不足から再カ
ット期限内の口座処理を読み出すと、2日の通番004
が読み出される。担保定期への入金額(預金口座からの
出金額)は10,000であり、2日の出金可能額は
2,000であるため(ステップS105)、再カット
できない。すると、ステップS102に処理が戻り、次
の残不足明細を読む。ここでは、通番001の電気料が
読み込まれる。電気料は20,000であるため、やは
り、再カットできない。再度ステップS105からS1
02に処理が戻るが、その次の残不足明細は存在しな
い。このため、取消再カットメインの判定を終了する
(ステップS110)
Referring to FIG. 31, although the derived recutting bit (D bit) is ON, the information flag is A, so the result is NO in step S101. When the account processing within the recut deadline is read from the remaining shortage, the serial number 004 on the 2nd
Is read. The deposit amount (payment amount from the deposit account) for the security period is 10,000, and the possible amount for two sunrise payments is 2,000 (step S105), so it cannot be cut again. Then, the process returns to step S102 to read the next remaining shortage statement. Here, the electricity charge of serial number 001 is read. Since the electricity charge is 20,000, it cannot be cut again. Again from step S105 to S1
The process returns to 02, but there is no next remaining shortage detail. Therefore, the determination of the cancellation / recut main is ended (step S110).

【0302】図36に示す処理33では、2日を勘定日
として62,000入金されている。これのため、取消
再カットメインが起動される。まず、先日付第1群取消
SCのスパイラル制御SPF1により、定期積金と融資
返済とが取り消される。この処理35終了時の残不足明
細を図29(B)に示す。≠9xの融資返済及び定期積
金入金、9xの電気料が未成立である。一方、担保定期
入金は成立している。
In the process 33 shown in FIG. 36, 62,000 have been paid with 2 days as the account date. For this reason, the cancellation / recut main is activated. First, the fixed deposit and the loan repayment are canceled by the spiral control SPF1 of the first group cancellation SC at a later date. The details of the remaining shortage at the end of the process 35 are shown in FIG. $ 9x loan repayment and fixed deposit payment, 9x electricity charges have not been established. On the other hand, collateral periodic deposit has been established.

【0303】処理番号33以下では、原始口座処理は2
日を勘定日としている。このため、図30に示す処理で
は、まず2日を対象勘定日として残不足未決済≠9xの
口座処理要求を探索する。融資返済、定期積金ともに対
象勘定日の2日は再カット期限内である。そして、融資
返済の優先順位が高い。このため、まず、融資返済の再
カットを起動する。この再カット完了に応じて取消再カ
ットメインが起動されると、修正再カットSCでは、2
日を対象勘定日とする残不足を探索する。ここでは、定
期積金入金が最高位として特定される(ステップS8
5)。2日の出金可能額は20,000であるため、再
カットできない。担保定期の取消を前提とした修正出金
可能額も30,00であるため、修正再カットもできな
い。このため、ステップS83に処理が戻る。
[0303] For the processing number 33 or lower, the source account processing is 2
The day is the account date. For this reason, in the process shown in FIG. 30, first, an account processing request of $ 9x for the remaining unsettled unsettled $ 9x is searched for with the second day as the target account date. Both the repayment of the loan and the fixed deposit are within the re-cut deadline on the 2nd day of the target account. And the priority of loan repayment is high. Therefore, first, re-cut the loan repayment. When the cancel recut main is started in response to the completion of the recut, the modified recut SC is set to 2
Search for the remaining shortage with the day as the target account date. Here, the periodic deposit is specified as the highest order (step S8).
5). The re-cut is not possible because the amount of money available at 2nd sunrise is 20,000. Since the corrected withdrawable amount on the premise that the collateral period is canceled is 30,000, it is not possible to perform the re-cutting again. Therefore, the process returns to step S83.

【0304】ステップS83では、2日を対象勘定日と
して未読の対象口座処理要求を探索するが、発見できな
い。このため、ステップS84で対象勘定日を次の先日
付へとシフトさせる。日付チェックテーブルを参照する
と、3日にも先日付取引があり、出金可能額は120,
000である。3日を対象勘定日として残不足明細セグ
メントからステップS83の条件を満たす口座処理要求
を検索すると、定期積金入金の再カット期限は次回振替
日前日であるため、3日は再カット期限内である。従っ
て、3日の最高位口座処理要求は定期積金入金となる。
再カット可能であるため、勘定日を3日として定期積金
入金を再カットする。この定期積金入金は3日を対象日
とする最後の口座処理要求である。
In step S83, an unread target account processing request is searched for with the second day as the target account date, but cannot be found. Therefore, the target account date is shifted to the next future date in step S84. Referring to the date check table, there is a future transaction on the third day, and the withdrawable amount is 120,
000. When the account processing request that satisfies the condition of step S83 is searched from the remaining shortage detail segment with 3 days as the target account date, the recut deadline for the periodic deposit is the day before the next transfer, so 3 days is within the recut deadline. is there. Accordingly, the highest account processing request on the third day is a regular deposit payment.
Since re-cutting is possible, the regular deposit is re-cut with the account date being 3 days. This regular deposit is the last account processing request with the target date of 3 days.

【0305】この定期積金再カットの完了によって取消
再カットメインが再度起動されると、直前の処理の対象
勘定日は3日である。しかし、ここでは、原始口座処理
の対象勘定日である2日を起点として日付チェックテー
ブルを作成する。修正再カットSCでは、ステップS8
2にて、前回探索完了した3日である対象勘定日よりも
先日付の勘定日があるか否かを判定する。4日以後の先
日付取引は存在しないため、再カットSCへ処理を移
す。また、定期積金入金が3日での最後の口座処理要求
でなくとも、ステップS83,S84を介して先日付勘
定日がないとして再カットSCへ処理が移る。
When the cancellation re-cut main is started again by the completion of the re-cutting of the periodic deposit, the target account date of the immediately preceding process is three days. However, here, a date check table is created starting from two days, which is the target account date of the source account processing. In the modified recut SC, step S8
In 2, it is determined whether or not there is an account date that is ahead of the target account date, which is the three days for which the previous search was completed. Since there is no future transaction after 4 days, the processing is shifted to the recut SC. Further, even if the regular deposit is not the last account processing request in three days, the processing shifts to the recut SC via steps S83 and S84 assuming that there is no future account date.

【0306】再カットSCでは、直前に再カットされた
定期積金の勘定日(3日)ではなく、原始口座処理であ
る入金(通番011)の勘定日である2日を基準として
再カットを判定する。2日を対象勘定日として残不足明
細を読みとると、電気料が探索される。電気料の出金額
は2日の出金可能額と等しいため、電気料が再カットさ
れる。
[0306] In the recut SC, the recut is performed not on the basis of the account date (three days) of the periodic deposit that was recut immediately before but on the basis of two days that is the account date of the deposit (serial number 011) as the source account processing. judge. When the remaining shortage statement is read with two days as the target account date, the electricity charge is searched. Since the withdrawal amount of the electricity fee is equal to the amount that can be paid for two days, the electricity fee is cut again.

【0307】上述したように本実施例によると、口座処
理が幾つかの勘定日について予め予測できない順序で実
行されたとしても、さらに、再カット期限が3ヶ月等で
ある場合であっても、図26等に示すスパイラル制御に
より、勘定日別の残高セグメントを用いて、優先順位を
反映した決済が可能となる。
As described above, according to the present embodiment, even if the account processing is executed in an unpredictable order for some account dates, and even if the recut time limit is three months or the like, With the spiral control shown in FIG. 26 and the like, it is possible to perform the settlement reflecting the priority using the balance segment for each account date.

【0308】[0308]

【第2実施例】第2実施例では、決済完了性を日付では
なく時間やアクセスの有無で設定することで、より柔軟
な処理を可能とする。ここでは、取消処理部が、口座処
理部による口座処理によって当日又は先日付の勘定日で
の口座処理要求が決済不能となる場合には当該決済不能
となる勘定日での決済完了性を有さない複数の決済済み
の口座処理要求のうち優先順位の低い口座処理要求を当
該優先順位の低い順序にて取り消す。
[Second Embodiment] In the second embodiment, the settlement completion is set not by the date but by the time or the presence or absence of access, thereby enabling more flexible processing. Here, when the account processing by the account processing unit makes it impossible to settle an account processing request on the current day or the future date, the cancellation processing unit has a settlement completion on the account date on which the settlement is impossible. Of account settlement requests that have not been settled are canceled in the order of lower priority.

【0309】例えば、決済完了性を振替日当日の19:
00とすると、振替日当日の19:00まで取消、再カ
ットが可能となる。一方、19:00をすぎた直後に決
済を完了させる。この場合、19:00以前の口座残高
と、19:00以後の口座残高とを有するようにしても
良い。また、当日にその口座にアクセスがあるまでは取
消が可能であるとしても良い。
[0309] For example, the settlement completeness is determined on the day of the transfer at 19:
If 00 is set, cancellation and re-cutting are possible until 19:00 on the day of transfer. On the other hand, the settlement is completed immediately after 19:00. In this case, an account balance before 19:00 and an account balance after 19:00 may be provided. The cancellation may be possible until the account is accessed on the day.

【0310】[0310]

【発明の効果】本発明は以上のように構成され機能する
ので、これによると、口座処理部が、演算日に対して同
日又は先日付となる勘定日の口座処理要求を当該勘定日
の口座情報に基づいて処理し、先日付の勘定日毎の残高
を管理するため、日付変更後に参照すべき口座情報が予
め先日付にて作成されているため、日付変更前後に大量
の口座に対する種々の処理を一時期にまとめて処理する
必要がなく、例えば、公共料金の振替等を夜間バッチ処
理にて行う必要がなく、先日付での口座処理を前もって
平準化した状態で日中又はオンライン処理中に処理する
ことができ、すなわち、ATM等の端末を用いた入出金
等のオンライン処理と並列して口座振替や利息の入金等
の種々の取引を処理することができ、従って、24時間
連続サービスを演算手段の処理能力を増強せずに実施す
ることがでる。さらに、第1群の発明では、取消処理部
が、口座処理部による口座処理によって先日付の勘定日
での口座処理要求が決済不能となる場合には当該決済不
能となる勘定日での複数の決済済みの口座処理要求のう
ち優先順位の低い口座処理要求を当該優先順位の低い順
序にて取り消すため、口座残高が不足する場合に、先日
付での取引を予め定められた優先順位に従って決済する
ことができる。第2群の発明では、再カット処理部が、
口座処理部による口座処理によって当該口座処理の勘定
日と同日又は先日付の勘定日で未成立であった口座処理
要求が決済可能となる場合には、当該決済可能となる勘
定日での複数の未決済の口座処理要求のうち優先順位の
高い口座処理要求を当該優先順位の高い順序にて処理す
るため、口座残高が不足していた後、増加した場合であ
っても、予め定められた優先順位に従って当日又は先日
付にて決済を行うことができる。第4群の発明では、先
日付で一旦成立させた口座処理の取消や、未成立であっ
た口座処理の再カットにて優先順位に従った処理を行う
ため、実際の口座処理の順序に関わらず、その時々の残
高に応じて最適な決済を提供することができる。さら
に、第4群での実施形態では、上述した修正出金可能額
を用いた修正再カットを行うため、成立済みの取引と未
成立の取引の入れ替えを行うことができるため、より優
先順位を反映した決済の提供が可能となる。このよう
に、本発明では、通常のオンライン処理と並行して口座
を用いた決済を提供でき、これにより24時間稼働に対
応することができ、しかも、その口座を用いた振替等の
決済について残高が不足する場合には予め定められた優
先順位に従った決済をすることができる。
According to the present invention, since the present invention is constructed and functions as described above, the account processing unit issues an account processing request for an account date on the same day or a future date to the calculation date. Processing based on the information and managing the balance of each future account date, the account information to be referred to after the date change is created in advance, so various processes for a large number of accounts before and after the date change It is not necessary to process all at once, for example, there is no need to transfer utility bills etc. by night batch processing, and during the day or online processing with the account processing at the future date leveled in advance In other words, it is possible to process various transactions such as account transfer and interest payment in parallel with online processing such as depositing and withdrawing using a terminal such as an ATM, and therefore, a 24-hour continuous service is performed. It comes out to implement without enhancing the processing capability of the unit. Further, in the first group of inventions, when the account processing by the account processing unit makes it impossible to settle an account processing request on a future account date, the cancellation processing unit sets a plurality of In order to cancel low-priority account processing requests among the settled account processing requests in the order of the lowest priority, if the account balance is insufficient, the transaction at the future date is settled according to the predetermined priority. be able to. In the invention of the second group, the re-cut processing unit includes:
If the account processing by the account processing unit can settle an account processing request that has not been completed on the same date as the account date of the account process or on the future date, a plurality of account requests on the account date In order to process high-priority account processing requests among unsettled account processing requests in the order of high priority, even if the account balance is insufficient and then increases, a predetermined priority Payment can be made on the current day or on the future date according to the order. In the invention of the fourth group, since the processing according to the priority is performed in the cancellation of the account processing once established on the previous date and the re-cutting of the account processing that has not been completed, the processing is performed regardless of the actual order of the account processing. Instead, it is possible to provide an optimal settlement according to the balance at that time. Further, in the embodiment of the fourth group, since the modified re-cut using the above-mentioned modified withdrawable amount is performed, it is possible to replace the completed transaction with the uncompleted transaction. It is possible to provide reflected payments. As described above, in the present invention, it is possible to provide settlement using an account in parallel with the normal online processing, thereby being able to cope with 24-hour operation, and furthermore, with respect to settlement such as transfer using the account, Is insufficient, settlement can be made in accordance with a predetermined priority.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施形態の構成を示すブロック図であ
る。
FIG. 1 is a block diagram showing a configuration of an embodiment of the present invention.

【図2】第1実施形態等で用いるファイルのデータ構造
例を示す説明図である。
FIG. 2 is an explanatory diagram illustrating an example of a data structure of a file used in the first embodiment and the like.

【図3】各実施形態で使用する先日付完結処理の一例を
示す説明図であり、図3(A)は取引例の内容を示す図
で、図3(B)は日付チェックテーブルの一例を示す図
である。
3A and 3B are explanatory diagrams illustrating an example of a future date completion process used in each embodiment. FIG. 3A is a diagram illustrating details of a transaction example, and FIG. 3B is an example of a date check table. FIG.

【図4】第1実施形態での処理例を示すフローチャート
である。
FIG. 4 is a flowchart illustrating a processing example according to the first embodiment.

【図5】図5(A)及び(B)は第1実施形態での動作
例を示す説明図である。
FIGS. 5A and 5B are explanatory diagrams illustrating an operation example in the first embodiment.

【図6】本発明の第2実施形態の構成を示すブロック図
である。
FIG. 6 is a block diagram showing a configuration of a second embodiment of the present invention.

【図7】第2実施形態等で利用する口座情報のデータ構
造の一例を示す説明図である。
FIG. 7 is an explanatory diagram showing an example of a data structure of account information used in the second embodiment and the like.

【図8】第2実施形態での処理例を示すフローチャート
である。
FIG. 8 is a flowchart illustrating a processing example according to the second embodiment.

【図9】図9(A)及び(B)は第2実施形態での動作
例を示す説明図である。
FIGS. 9A and 9B are explanatory diagrams showing an operation example in the second embodiment.

【図10】第3実施形態の構成例を示す説明図である。FIG. 10 is an explanatory diagram showing a configuration example of a third embodiment.

【図11】図10に示す各機能をトランザクション管理
技術を用いて実現する構成を示すブロック図である。
FIG. 11 is a block diagram showing a configuration for realizing each function shown in FIG. 10 using a transaction management technique.

【図12】図11に示した構成によるスパイラル処理の
一例を示すフローチャートである。
FIG. 12 is a flowchart illustrating an example of a spiral process performed by the configuration illustrated in FIG. 11;

【図13】図13(A)及び(B)は第3実施形態の動
作の一例を示す説明図である。
FIGS. 13A and 13B are explanatory diagrams showing an example of the operation of the third embodiment.

【図14】本発明の第4実施形態の構成例を示すブロッ
ク図である。
FIG. 14 is a block diagram illustrating a configuration example of a fourth embodiment of the present invention.

【図15】図14に示す取消再カットメイン処理部の詳
細構成を示すブロック図である。
FIG. 15 is a block diagram illustrating a detailed configuration of a cancellation / recut main processing unit illustrated in FIG. 14;

【図16】図4に示す構成でのスパイラル処理を実現す
る取消再カットメイン等の構造を示すブロック図であ
る。
16 is a block diagram showing a structure of a cancel / recut main or the like for realizing the spiral processing in the configuration shown in FIG. 4;

【図17】図15に示す取消再カットメインの処理例を
示すフローチャートである。
FIG. 17 is a flowchart illustrating an example of processing of cancellation / recut main illustrated in FIG. 15;

【図18】図18(A)及び(B)は、第4実施形態で
の動作例を示す説明図である。
FIGS. 18A and 18B are explanatory diagrams illustrating an operation example in the fourth embodiment.

【図19】本発明の第1実施例(第4実施形態の具体
例)の構成を示すブロック図である。
FIG. 19 is a block diagram showing a configuration of a first example (a specific example of the fourth embodiment) of the present invention.

【図20】図19に示す構成で利用するデータベースの
一例を示す説明図である。
FIG. 20 is an explanatory diagram showing an example of a database used in the configuration shown in FIG. 19;

【図21】外部自振の処理工程を説明するためのブロッ
ク図である。
FIG. 21 is a block diagram for explaining an external self-oscillation processing step.

【図22】内部自振の処理工程を説明するためのブロッ
ク図である。
FIG. 22 is a block diagram for explaining a process of internal self-oscillation.

【図23】本実施例で利用するオペコードテーブルの説
明図であり、図23(A)はプログラム記憶手段等を備
えた例を示す図で、図23(B)は業務別のオペコード
テーブルの例を示す説明図である。
23A and 23B are explanatory diagrams of an operation code table used in the present embodiment. FIG. 23A is a diagram illustrating an example including a program storage unit, and FIG. 23B is an example of an operation code table for each task. FIG.

【図24】普通預金オペコードテーブルの一例を簡略化
して示す説明図である。
FIG. 24 is an explanatory diagram showing a simplified example of an ordinary deposit operation code table.

【図25】本実施例での取消再カットメイン処理部の詳
細構成を示すブロック図である。
FIG. 25 is a block diagram illustrating a detailed configuration of a cancellation / recut main processing unit according to the embodiment.

【図26】図25に示す構成にてスパイラル処理を実現
する場合の取消再カットメイン等の構造を示すブロック
図である。
26 is a block diagram showing a structure of a cancel / recut main or the like in a case where a spiral process is realized by the configuration shown in FIG. 25;

【図27】図25に示す先日付第1群取消SCによる処
理例を示すフローチャートである。
FIG. 27 is a flowchart showing a processing example by the first date cancellation SC shown in FIG. 25;

【図28】図25に示すマイナス時取消SCによる処理
例を示すフローチャートである。
FIG. 28 is a flowchart showing a processing example by the minus-time cancellation SC shown in FIG. 25;

【図29】図29(A)及び(B)は本実施例で用いる
残不足明細セグメントの一例を示す説明図である。
FIGS. 29A and 29B are explanatory diagrams showing an example of a remaining / deficient detail segment used in the embodiment.

【図30】図25に示す修正再カットSCによる処理例
を示すフローチャートである。
30 is a flowchart showing a processing example by the modified recut SC shown in FIG. 25.

【図31】図25に示す再カットSCによる処理例を示
すフローチャートである。
FIG. 31 is a flowchart illustrating a processing example by the recut SC illustrated in FIG. 25;

【図32】本実施例による優先順位を反映する先日付完
結処理の例を示す説明図であり、処理番号0から13ま
での取引明細セグメントと残不足明細セグメントの一例
を示す図である。
FIG. 32 is an explanatory diagram showing an example of the future date completion process reflecting the priority order according to the embodiment, and is a diagram showing an example of a transaction detail segment with process numbers 0 to 13 and a remaining shortage detail segment.

【図33】図32に示す取引による残高等を示す説明図
である。
FIG. 33 is an explanatory diagram showing balances and the like resulting from the transaction shown in FIG. 32;

【図34】図32に続いて処理番号14から25までの
取引明細セグメント等を示す図である。
FIG. 34 is a diagram showing transaction details segments and the like of process numbers 14 to 25, following FIG. 32;

【図35】図34に示す取引による残高等を示す説明図
である。
FIG. 35 is an explanatory diagram showing a balance and the like resulting from the transaction shown in FIG. 34;

【図36】図34に続いて処理番号26から38までの
取引明細セグメント等を示す図である。
FIG. 36 is a diagram showing transaction details segments and the like of process numbers 26 to 38 subsequent to FIG. 34;

【図37】図36に示す取引による残高等を示す説明図
である。
FIG. 37 is an explanatory diagram showing a balance and the like resulting from the transaction shown in FIG. 36;

【図38】図38(A)は図36に続いて処理番号39
から43までの取引明細セグメント等を示す図であり、
図38(B)は図38(A)に示す取引による残高等を
示す説明図である。
FIG. 38A is a processing number 39 following FIG. 36;
It is a diagram showing a transaction statement segment from to 43,
FIG. 38B is an explanatory diagram showing the balance and the like resulting from the transaction shown in FIG.

【符号の説明】[Explanation of symbols]

2 受信手段 4 演算手段 6 ファイル 8 口座処理部(実施例では、オンライン演算手段の一
部) 10 取消処理部 12 取引明細セグメント 14 残高明細セグメント 16 残不足明細セグメント 24 再カット処理部
2 Receiving means 4 Computing means 6 File 8 Account processing unit (in the embodiment, a part of online computing means) 10 Cancellation processing unit 12 Transaction detail segment 14 Balance detail segment 16 Remaining shortage detail segment 24 Recut processing unit

───────────────────────────────────────────────────── フロントページの続き (51)Int.Cl.7 識別記号 FI テーマコート゛(参考) // G07D 9/00 436 G07D 9/00 436B ──────────────────────────────────────────────────続 き Continued on the front page (51) Int.Cl. 7 Identification symbol FI Theme coat ゛ (Reference) // G07D 9/00 436 G07D 9/00 436B

Claims (36)

【特許請求の範囲】[Claims] 【請求項1】 勘定日の取引等の口座処理要求を受信す
る受信手段と、この受信手段にて受信した口座処理要求
を勘定日毎に演算する演算手段と、この演算手段によっ
て演算される結果を前記勘定日毎の出金可能額等と関連
した口座情報として記録するファイルとを備え、 前記演算手段が、当該演算を行う演算日に対して同日又
は先日付となる勘定日の口座処理要求を当該勘定日の口
座情報に基づいて処理する口座処理部と、この口座処理
部による口座処理によって先日付の勘定日での口座処理
要求が決済不能となる場合には当該決済不能となる勘定
日での複数の決済済みの口座処理要求のうち優先順位の
低い口座処理要求を当該優先順位の低い順序にて取り消
す取消処理部とを備えたことを特徴とする先日付完結処
理システム。
1. A receiving means for receiving an account processing request such as a transaction on an account date, an arithmetic means for calculating the account processing request received by the receiving means for each account date, and a result calculated by the arithmetic means. A file for recording as account information related to the possible withdrawal amount for each account date, etc., wherein the calculating means sends an account processing request on the same or a later date as to the calculation date for performing the calculation. An account processing unit that processes based on the account information of the account date, and, if the account processing by the account processing unit makes it impossible to settle the account processing request on the future date of the account, A post-done completion processing system, comprising: a cancellation processing unit for canceling a low-priority account processing request among a plurality of settled account processing requests in the low-priority order.
【請求項2】 前記ファイルは、前記口座情報として前
記口座処理部による処理順序で処理した前記口座処理要
求を取引明細として記録する取引明細セグメントを備
え、 前記取引明細セグメントは、前記取引明細毎に、当該口
座処理要求の成立した勘定日と、当該口座処理要求の他
の口座処理要求に対する優先順位とを格納し、 前記取消処理部が、前記取引明細セグメントの各取引明
細毎の勘定日及び優先順位を参照して前記取消対象の口
座処理要求を特定する取消対象特定機能を備えたことを
特徴とする請求項1記載の先日付完結処理システム。
2. The file includes a transaction statement segment that records the account processing request processed as the account information in a processing order by the account processing unit as a transaction statement. Storing the account date of the account processing request and the order of priority of the account processing request with respect to other account processing requests; 2. The future completion processing system according to claim 1, further comprising a cancellation target specifying function of specifying the cancellation target account processing request by referring to a ranking.
【請求項3】 前記ファイルが前記口座情報として、前
記勘定日毎の残高を格納する残高明細セグメントを備
え、 前記取消処理部が、前記口座処理部によって口座処理が
行われる毎に前記残高明細セグメントに基づいて先日付
の勘定日毎の出金可能額を算出する日付チェックテーブ
ル生成機能と、出金可能額がマイナスとなる勘定日があ
る場合には当該勘定日での決済済みの口座処理要求を前
記優先順位の低い順序で前記出金可能額がプラスとなる
まで取り消す制御をするマイナス時取消制御機能とを備
えたことを特徴とする請求項2記載の先日付完結処理シ
ステム。
3. The file includes a balance statement segment for storing a balance for each account date as the account information, and the cancellation processing unit includes a balance statement segment for each account processing performed by the account processing unit. A date check table generating function for calculating a possible withdrawal amount for each future date based on a future date, and, if there is an account date on which the withdrawable amount is negative, the account processing request settled on the account date 3. The post-done completion processing system according to claim 2, further comprising a negative-time cancellation control function for performing control to cancel until the withdrawable amount becomes positive in the order of lower priority.
【請求項4】 勘定日の取引等の口座処理要求を受信す
る受信手段と、この受信手段にて受信した口座処理要求
を勘定日毎に演算する演算手段と、この演算手段によっ
て演算される結果を前記勘定日毎の出金可能額等と関連
した口座情報として記録するファイルとを備えた先日付
完結処理システムの前記演算手段を使用して口座処理を
行う先日付完結処理方法であって、 前記演算手段にて演算を行う演算日に対して同日又は先
日付となる勘定日の口座処理要求を当該勘定日の口座情
報に基づいて処理する口座処理工程と、この口座処理工
程での口座処理によって先日付の勘定日での口座処理要
求が決済不能となるか否かを判定する取消要否判定工程
と、この取消要否判定工程にて取消要と判定されている
場合には当該決済不能となる勘定日での複数の決済済み
の口座処理要求のうち優先順位の低い口座処理要求を当
該優先順位の低い順序にて取り消す口座処理要求を前記
口座処理工程にて実行させる取消処理制御工程とを備え
たことを特徴とする先日付完結処理方法。
4. Receiving means for receiving an account processing request such as a transaction on an account date, calculating means for calculating the account processing request received by the receiving means for each account date, and a result calculated by the calculating means. A method for performing account processing using the calculating means of the future completion processing system including a file for recording as account information related to the possible withdrawal amount and the like for each accounting day, An account processing request for processing an account processing request on the same or a later date as to the calculation date on which the calculation is performed by the means based on the account information of the account date; A cancellation necessity determination step for determining whether an account processing request on the account date of the date becomes unsettled, and if the cancellation necessity determination step determines that cancellation is necessary, the settlement is not possible On account date And a cancel processing control step of executing in the account processing step an account processing request for canceling a lower priority account processing request among the plurality of settled account processing requests in the lower priority order. The future date completion processing method to be used.
【請求項5】 勘定日の取引等の口座処理要求を受信す
る受信手段と、この受信手段にて受信した口座処理要求
を勘定日毎に演算する演算手段と、この演算手段によっ
て演算される結果を前記勘定日毎の出金可能額等と関連
した口座情報として記録するファイルとを備えた先日付
完結処理システムの前記演算手段を使用して口座処理を
行うための先日付完結処理用プログラムであって、記憶
媒体に格納され、 該先日付完結処理用プログラムは前記演算手段を動作さ
せる指令として、 前記演算手段にて演算を行う演算日に対して同日又は先
日付となる勘定日の口座処理要求を当該勘定日の口座情
報に基づいて処理させる口座処理指令と、この口座処理
指令に応じた口座処理によって先日付の勘定日での口座
処理要求が決済不能となるか否かを判定させる取消要否
判定指令と、この取消要否判定指令にて取消要と判定さ
れる場合には当該決済不能となる勘定日での複数の決済
済みの口座処理要求のうち優先順位の低い口座処理要求
を当該優先順位の低い順序にて取り消す口座処理要求を
前記口座処理指令を用いて実行させる取消処理制御指令
とを備えたことを特徴とする先日付完結処理プログラ
ム。
5. A receiving means for receiving an account processing request such as an account date transaction, an arithmetic means for calculating the account processing request received by the receiving means for each accounting day, and a result calculated by the arithmetic means. A file for a future completion processing for performing an account processing using the arithmetic means of the future completion processing system provided with a file for recording as account information related to the withdrawable amount and the like for each accounting day. Stored in a storage medium, wherein the program for completing the future date processing includes, as a command to operate the arithmetic means, an account processing request on the same day or a future date as to the arithmetic day on which the arithmetic means performs the arithmetic operation. An account processing command to be processed based on the account information on the account date, and whether the account processing corresponding to the account processing command will not be able to settle the account processing request on the future date of the account. And a low-priority account processing among a plurality of settled account processing requests on the account date on which the settlement becomes impossible if the cancellation necessity determination command determines that cancellation is necessary. A cancellation processing control command for executing an account processing request for canceling the request in the order of the lower priority using the account processing command.
【請求項6】 勘定日の取引等の口座処理要求を受信す
る受信手段と、この受信手段にて受信した口座処理要求
を勘定日毎に演算する演算手段と、この演算手段によっ
て演算される結果を前記勘定日毎の出金可能額等と関連
した口座情報として記録するファイルとを備え、 前記演算手段が、当該演算を行う演算日に対して同日又
は先日付となる勘定日の口座処理要求を当該勘定日の口
座情報に基づいて処理する口座処理部と、この口座処理
部による口座処理によって当該口座処理の勘定日と同日
又は先日付の勘定日で未成立であった口座処理要求が決
済可能となる場合には当該決済可能となる勘定日での複
数の未決済の口座処理要求のうち優先順位の高い口座処
理要求を当該優先順位の高い順序にて処理する再カット
処理部とを備えたことを特徴とする先日付完結処理シス
テム。
6. A receiving means for receiving an account processing request such as an account date transaction, an arithmetic means for calculating the account processing request received by the receiving means for each accounting day, and a result calculated by the arithmetic means. A file for recording as account information related to the possible withdrawal amount for each accounting day, etc., wherein the arithmetic means sends an account processing request on the same or a later date as to the arithmetic date for performing the arithmetic. An account processing unit that processes based on the account information of the account date, and that the account processing by the account processing unit can settle an account processing request that was not completed on the same date as the account date of the account processing or on a future date. A re-cut processing unit for processing, in a higher priority order, a higher priority account processing request among a plurality of unsettled account processing requests on the account date at which the settlement is possible in the higher priority order. To Complete processing system with the other day that the butterflies.
【請求項7】 前記ファイルは、前記口座情報として決
済不能で未成立の口座処理要求を残不足明細として記録
する残不足明細セグメントを備え、 前記残不足明細セグメントは、前記残不足明細毎に、当
該口座処理要求の勘定日と、当該口座処理要求の他の口
座処理要求に対する優先順位とを記録し、 前記再カット処理部は、前記残不足明細セグメントの各
残不足明細毎の勘定日及び優先順位を参照して再カット
処理対象の口座処理要求を特定する再カット対象特定機
能を備えたことを特徴とする請求項6記載の先日付完結
処理システム。
7. The file includes a remaining shortage detail segment that records an unsettled account processing request that cannot be settled as the account information as a remaining shortage detail. The account date of the account processing request and the order of priority of the account processing request with respect to other account processing requests are recorded. 7. The future completion processing system according to claim 6, further comprising a recut target specifying function of specifying an account processing request to be recut by referring to the order.
【請求項8】 前記ファイルが前記口座情報として、前
記勘定日毎の残高を記録する残高明細セグメントを備
え、 前記再カット処理部が、前記口座処理部によって口座処
理が行われる毎に前記残高明細セグメントに基づいて当
該口座処理の勘定日以後の各勘定日毎の出金可能額を算
出する日付チェックテーブル生成機能と、前記残不足明
細セグメントに格納された口座処理要求である出金要求
を優先順位の高い順序で且つ勘定日順に前記出金可能額
と比較すると共に出金可能額を下回る出金要求が発見さ
れた場合に当該出金要求を口座処理要求として前記口座
処理部に実行させるプラス時再カット制御機能とを備え
たことを特徴とする請求項7記載の先日付完結処理シス
テム。
8. The file includes a balance statement segment for recording the balance for each account day as the account information, wherein the recut processing unit executes the account statement segment every time the account processing is performed by the account processing unit. A date check table generation function for calculating a possible withdrawal amount for each account date after the account date of the account processing based on the account processing request, and a withdrawal request, which is an account processing request stored in the remaining shortage detail segment, in priority order. When a withdrawal request that is smaller than the withdrawable amount is found in comparison with the withdrawable amount in the order of the highest and the order of the account date, the withdrawal request is executed by the account processing unit as an account processing request. 8. The future completion processing system according to claim 7, further comprising a cut control function.
【請求項9】 前記残不足明細セグメントが、勘定日を
第1キーとし優先順位を第2キーとして勘定日順及び当
該勘定日内では優先順位順に論理的に並べられた状態で
読み出され、 前記プラス時再カット制御機能は、前記残不足明細セグ
メントのデータ構造に従った順序で前記出金可能額と比
較する機能を備えたことを特徴とする請求項8記載の先
日付完結処理システム。
9. The system according to claim 1, wherein the remaining shortage detail segments are logically arranged in the order of the account date and the priority order within the account date using the account date as the first key and the priority as the second key, and 9. The post-done completion processing system according to claim 8, wherein the plus-time recut control function has a function of comparing with the payable amount in an order according to the data structure of the remaining shortage detail segment.
【請求項10】 勘定日の取引等の口座処理要求を受信
する受信手段と、この受信手段にて受信した口座処理要
求を勘定日毎に演算する演算手段と、この演算手段によ
って演算される結果を前記勘定日毎の出金可能額等と関
連した口座情報として記録するファイルとを備えた先日
付完結処理システムの前記演算手段を使用して口座処理
を行う先日付完結処理方法であって、 前記演算手段にて演算を行う演算日に対して同日又は先
日付となる勘定日の口座処理要求を当該勘定日の口座情
報に基づいて処理する口座処理工程と、この口座処理工
程での口座処理によって当該口座処理の勘定日と同日又
は先日付の勘定日で未成立であった口座処理要求が決済
可能となるか否かを当該口座処理要求の優先順位の高い
順に判定する再カット可否判定工程と、この再カット可
否判定工程にて再カット可能と判定された場合には当該
再カット可能な口座処理要求を前記口座処理工程にて実
行させる再カット処理制御工程とを備えたことを特徴と
する先日付完結処理方法。
10. Receiving means for receiving an account processing request such as an account date transaction, calculating means for calculating the account processing request received by the receiving means for each accounting day, and a result calculated by the calculating means. A method for performing account processing using the calculating means of the future completion processing system including a file for recording as account information related to the possible withdrawal amount and the like for each accounting day, An account processing step of processing an account processing request on the account date that is the same day or a future date with respect to the calculation day on which the calculation is performed by the means based on the account information of the account day; A recut feasibility determination step of determining whether an account processing request that has not been completed on the same day as the account processing account date or a future date can be settled in the order of priority of the account processing request. And a re-cut processing control step of executing the re-cuttable account processing request in the account processing step when it is determined that the re-cut is possible in the re-cut permission determining step. Future date completion processing method.
【請求項11】 勘定日の取引等の口座処理要求を受信
する受信手段と、この受信手段にて受信した口座処理要
求を勘定日毎に演算する演算手段と、この演算手段によ
って演算される結果を前記勘定日毎の出金可能額等と関
連した口座情報として記録するファイルとを備えた先日
付完結処理システムの前記演算手段を使用して口座処理
を行うための先日付完結処理用プログラムであって、記
憶媒体に格納され、 該先日付完結処理用プログラムは前記演算手段を動作さ
せる指令として、 前記演算手段にて演算を行う演算日に対して同日又は先
日付となる勘定日の口座処理要求を当該勘定日の口座情
報に基づいて処理させる口座処理指令と、この口座処理
指令に応じた口座処理によって当該口座処理の勘定日と
同日又は先日付の勘定日で未成立であった口座処理要求
が決済可能となるか否かを当該口座処理要求の優先順位
の高い順に判定させる再カット可否判定指令と、この再
カット可否判定指令に応じて再カット可能と判定される
場合には当該再カット可能な口座処理要求を前記口座処
理工程にて実行させる再カット処理制御指令とを備えた
ことを特徴とする先日付完結処理プログラム。
11. A receiving means for receiving an account processing request such as a transaction on an account day, an arithmetic means for calculating the account processing request received by the receiving means for each account date, and a result calculated by the arithmetic means. A file for a future completion processing for performing an account processing using the arithmetic means of the future completion processing system provided with a file for recording as account information related to the withdrawable amount and the like for each accounting day. Stored in a storage medium, wherein the program for completing the future date processing includes, as a command to operate the arithmetic means, an account processing request on the same day or a future date as to the arithmetic day on which the arithmetic means performs the arithmetic operation. An account processing instruction to be processed based on the account information of the account date and an account processing in accordance with the account processing instruction, and the account processing corresponding to the account processing instruction date is not completed on the same date as the account processing date or a future date. A re-cut permission / non-permission determination command for determining whether the account processing request that has been settled can be settled in the order of priority of the account processing request, and when it is determined that re-cut is possible according to the re-cut permission / prohibition determination command A recut processing control command for executing the recuttable account processing request in the account processing step.
【請求項12】 業務処理要求の実行可否を定める資源
の状態を一定期間別に先日付で記録した資源状態ファイ
ルと、この資源状態ファイルに記録された情報に基づい
て各業務処理要求を処理する演算手段とを備え、 前記資源状態ファイルは、資源の状態を過去から現在並
びに将来となる先日付まで日単位等の一定期間毎に格納
する資源明細セグメントと、過去又は先日付で成立した
業務処理要求を当該業務処理の優先順位付きで成立順に
格納する取引明細セグメントと、先日付にて資源不足で
未成立の業務処理要求を当該優先順位付きで格納する未
成立明細セグメントとを備え、 前記演算手段は、 前記業務処理要求を実行すると共に当該業務処理要求が
成立した場合には前記取引明細セグメントに記録する一
方、前記資源の不足で未成立の場合には前記未成立明細
セグメントに記録する業務処理部と、 この業務処理部による処理の結果先日付にて前記資源に
不足が生じた場合には当該不足が生じた期間内で前記取
引明細セグメントに記録された業務処理要求群から優先
順位の低い順に前記資源不足が解消するまで順次業務処
理要求を取り消す取消処理部と、 前記業務処理部による処理の結果、当日又は先日付にて
資源が増加した場合には当該増加した期間以後で前記未
成立明細セグメントに記録された業務処理群から前記資
源不足とならない利用可能資源の範囲内で前記未成立の
業務処理要求を優先順位の高い順に実行する再実行処理
部とを備えたことを特徴とする先日付資源利用最適化シ
ステム。
12. A resource status file that records the status of a resource that determines whether a business process request can be executed or not for a predetermined period of time, and an operation that processes each business process request based on information recorded in the resource status file. The resource status file, wherein the resource status file stores the resource status from the past to the present and future future dates at regular intervals, such as on a daily basis, and a business process request established in the past or the future date. A transaction detail segment that stores the business process requests with priorities of the business processes in the order of success, and an unsuccessful detail segment that stores business processes requests that have not been completed due to resource shortage with the priorities in the future. Executes the business processing request and records the business processing request in the transaction detail segment when the business processing request is satisfied; In the case, the business processing unit that records in the unsatisfied detail segment, and, if the resource becomes insufficient at a future date as a result of the processing by the business processing unit, the transaction detail segment within a period in which the shortage occurs A cancellation processing unit for sequentially canceling the business processing requests from the group of business processing requests recorded in the order of lower priority until the resource shortage is resolved, and as a result of the processing by the business processing unit, the resources increase on the current day or the future date In this case, the unsatisfied business processing requests are executed in the order of higher priority within the range of available resources that do not cause the resource shortage from the business processing group recorded in the unsatisfied detailed segment after the increased period. A future resource utilization optimizing system comprising a re-execution processing unit.
【請求項13】 前記演算手段が、前記業務処理要求の
実行の結果前記資源の状態に変化があった場合には、前
記未成立明細セグメントに記録された先日付の業務処理
要求のうち最も優先順位が高い業務処理要求を未成立高
順位要求として特定する未成立高順位要求特定部と、 前記取引明細セグメントに記録された先日付の業務処理
要求のうち前記未成立高順位要求の優先順位よりも相対
的な優先順位の低い業務処理要求群によって利用予定の
資源の一覧又は総量を修正利用可能資源として算出する
修正利用可能資源算出部と、 前記未成立高順位要求によって要求する資源が前記修正
利用可能資源にて充足する場合には当該未成立高順位要
求を実行すると共に前記取消処理部に優先順位の低い業
務処理要求群の取消を依頼する修正再実行処理部とを備
えたことを特徴とする請求項12記載の資源利用最適化
処理システム。
13. When the state of the resource is changed as a result of the execution of the business processing request, the arithmetic unit selects the highest priority among the future business processing requests recorded in the unsatisfied detail segment. An unsatisfied high-rank request specifying unit that specifies a high-ranked business process request as an unsatisfied high-rank request, and a priority of the unsatisfied high-rank request among the future-dated business process requests recorded in the transaction detail segment. A corrected available resource calculation unit that calculates a list or total amount of resources to be used as a corrected available resource according to a group of business processing requests having lower relative priorities; and Correction re-execution processing for executing the unsatisfied high-order request and requesting the cancellation processing unit to cancel a group of low-priority business processing requests when the resource is satisfied with available resources Resource use optimization processing system of claim 12, wherein further comprising and.
【請求項14】 業務処理要求の実行可否を定める資源
の状態を一定期間別に先日付で記録した資源状態ファイ
ルと、この資源状態ファイルに記録された情報に基づい
て各業務処理要求を処理する演算手段とを備え、 前記演算手段は、 前記資源の予約又は使用等の資源に対する操作を起動業
務として実行すると共に当該実行中の起動業務プログラ
ム群と単一のトランザクションとしての連動を所定の受
動業務処理部に依頼する起動業務処理部と、 この起動業務処理部によって連動依頼される前記資源状
態の更新管理等の受動業務を実行すると共に当該受動業
務の実行によって前記資源の状態が変化した場合には所
定の取消再実行メインプログラムを当該起動業務及び受
動業務が連動した単一のトランザクションとは異なる他
の派生トランザクションとして起動する受動業務処理部
と、 取消再実行メインプログラムが派生トランザクションと
して起動されたときに当該起動された際の前記受動業務
によって管理される資源の状態に基づいて前記起動業務
の取消又は再実行の要否を判定すると共に当該判定結果
と各起動業務の優先順位に基づいて前記起動業務の取消
又は再実行を当該取消再実行メインプログラムとは異な
る他の派生トランザクションとして前記起動業務処理部
に実行させる取消再実行メイン処理部とを備えたことを
特徴とする資源利用最適化システム。
14. A resource status file that records the status of a resource that determines whether a business process request can be executed or not for a predetermined period of time, and an operation that processes each business process request based on information recorded in the resource status file. Means for executing operations on resources such as reservation or use of the resources as start-up work, and linking the running start-up business program group with a single transaction as a single transaction. A startup service processing unit that requests a unit, and executes a passive service such as update management of the resource status requested to be linked by the startup service processing unit, and when the resource status changes due to execution of the passive service. The specified cancellation / re-execution main program is executed by another derived transaction different from a single transaction in which the startup service and the passive service are linked. A passive business processing unit that is started as an application, and when the cancellation / re-execution main program is started as a derived transaction, cancellation or restart of the started business based on the state of resources managed by the passive business at the time of the start. The start-up processing unit determines whether or not execution is necessary and cancels or re-executes the start-up operation as another derivative transaction different from the cancellation and re-execution main program based on the determination result and the priority of each start-up operation. And a cancellation / re-execution main processing unit to be executed by the system.
【請求項15】 前記取消再実行メイン処理部は、前記
連動トランザクションが同期点に達した後に前記取消再
実行メインプログラムを開始させる機能を備えたことを
特徴とする請求項14記載の資源利用最適化システム。
15. The resource utilization optimization according to claim 14, wherein the cancellation / re-execution main processing unit has a function of starting the cancellation / re-execution main program after the synchronous transaction reaches a synchronization point. System.
【請求項16】 前記取消再実行メイン処理部は、前記
起動業務の取消又は再実行を派生トランザクションとし
て起動した場合には当該起動内容を示す派生管理フラグ
を前記起動業務処理及び当該起動業務処理部によって連
動される受動業務処理に渡すフラグ渡し制御機能と、前
記受動業務処理部から前記取消再実行メインプログラム
が派生トランザクションとして起動された場合には前記
派生管理フラグを参照して当該資源に対する同種類の判
定及び実行を前記資源状態ファイルに対象となるセグメ
ントがなくなるまで連続させるスパイラル処理制御機能
とを備えたことを特徴とする請求項14又は15記載の
資源利用最適化システム。
16. When the cancellation or re-execution of the start-up business is started as a derived transaction, the cancellation / re-execution main processing unit sets a derivation management flag indicating the contents of the start-up business as the start-up business process and the start-up business processing unit. A flag passing control function for passing to a passive business process linked by the same, and the same type for the resource by referring to the derivation management flag when the cancellation / re-execution main program is started as a derived transaction from the passive business processing unit 16. The resource use optimization system according to claim 14, further comprising: a spiral processing control function for continuing the determination and execution until the target segment is exhausted from the resource status file.
【請求項17】 前記取消再実行メイン処理部は、前記
受動業務の実行によって前記資源状態が変化した場合に
未成立であった起動業務のうち最も優先順位の高い起動
業務を高優先業務として特定する高優先業務特定機能
と、成立済みの起動業務のうち前記高優先業務の優先順
位よりも低い優先順位の起動業務群によって利用される
資源の一覧又は総量を修正利用可能資源として算出する
修正利用可能資源算出機能と、前記高優先業務によって
利用要求されている資源が前記修正利用可能資源内で利
用可能である場合には前記高優先業務である起動業務を
再実行させる修正再実行制御機能とを備えたことを特徴
とする請求項14又は16記載の資源利用最適化システ
ム。
17. The cancellation / re-execution main processing unit identifies, as a high-priority service, a startup service having the highest priority among startup services that have not been established when the resource status has changed due to execution of the passive service. A high-priority task specifying function, and a correction utilization that calculates a list or a total amount of resources used by a startup task group having a lower priority than the priority of the high-priority task among the established startup tasks as a modifiable resource. A possible resource calculation function, and a modification re-execution control function for re-executing the startup task that is the high-priority task if the resource requested by the high-priority task is available in the modified available resource. 17. The resource utilization optimizing system according to claim 14, comprising:
【請求項18】 業務処理要求の実行可否を定める資源
の状態を一定期間別に先日付で記録した資源状態ファイ
ルと、この資源状態ファイルに記録された情報に基づい
て各業務処理要求を処理する演算手段とを備え、 前記演算手段が、前記資源の予約又は使用等の資源に対
する操作を起動業務として実行すると共に当該実行中の
起動業務プログラム群と単一のトランザクションとして
の連動を所定の受動業務処理部に依頼する起動業務処理
部と、この起動業務処理部によって連動依頼される前記
資源状態の更新管理等の受動業務を実行すると共に当該
受動業務の実行によって前記資源の状態が変化した場合
には所定の取消再実行メインプログラムを当該起動業務
及び受動業務が連動した単一のトランザクションとは異
なる他の派生トランザクションとして起動する受動業務
処理部とを備えた資源利用最適化システムの前記演算手
段にて実行される前記取消再実行メインプログラムであ
って、記憶媒体に格納され、 該取消再実行メインプログラムは前記演算手段を動作さ
せる指令として、 当該取消再実行メインプログラムが派生トランザクショ
ンとして起動されたときに当該起動された際の前記受動
業務によって管理される資源の状態に基づいて前記起動
業務の取消又は再実行の要否を判定させる取消再実行判
定指令と、 この取消再実行判定指令に応じた判定結果と各起動業務
の優先順位に基づいて前記起動業務の取消又は再実行を
当該取消再実行メインプログラムとは異なる他の派生ト
ランザクションとして前記起動業務処理部に実行させる
取消再実行メイン処理指令とを備えたことを特徴とする
取消再実行メインプログラム。
18. A resource status file in which the status of a resource that determines whether a business process request can be executed or not is recorded for a certain period of time at a future date, and an operation for processing each business process request based on information recorded in the resource status file. Means for executing an operation on a resource such as reservation or use of the resource as a start-up operation, and cooperating with the running start-up operation program group as a single transaction in a predetermined passive operation process. A startup service processing unit requesting a unit, and executing a passive service such as update management of the resource status requested to be linked by the startup service processing unit, and executing the passive service when the resource status changes. The specified cancellation / re-execution main program is executed by another derived transaction different from the single transaction in which the startup service and passive service are linked. The cancellation / re-execution main program executed by the computing means of the resource utilization optimizing system having a passive business processing unit started as an application, and stored in a storage medium, wherein the cancellation / re-execution main program is As a command for operating the arithmetic means, when the cancellation / re-execution main program is started as a derived transaction, cancellation or re-starting of the startup business based on the state of resources managed by the passive business at the time of the startup. A cancellation re-execution determination command for determining the necessity of execution, and a cancellation / re-execution main program for canceling or re-executing the startup service based on a determination result according to the cancellation re-execution determination command and the priority of each startup service. And a cancellation / re-execution main processing command to be executed by the startup business processing unit as another derived transaction different from the And a cancellation / re-execution main program.
【請求項19】 勘定日の取引等の口座処理要求を受信
する受信手段と、この受信手段にて受信した口座処理要
求を勘定日毎に演算する演算手段と、この演算手段によ
って演算される結果を前記勘定日毎の出金可能額等と関
連した口座情報として記録するファイルとを備え、 前記ファイルが前記口座情報として、前記勘定日毎の残
高を格納する残高明細セグメントと、前記口座処理部に
よる処理順序で処理した前記口座処理要求を取引明細と
して勘定日及び優先順位を含めて格納する取引明細セグ
メントと、決済不能で未成立の口座処理要求を残不足明
細として勘定日及び優先順位を含めて格納する残不足明
細セグメントとを備え、 前記演算手段は、 前記勘定日毎の残高を使用した出金又は入金の決済を要
求する口座処理要求を起動業務として実行すると共に当
該実行中の起動業務プログラム群と単一のトランザクシ
ョンとしての連動を所定の受動業務処理部に依頼する起
動業務処理部と、 この起動業務処理部によって連動依頼される前記勘定日
毎の口座残高の出金又は入金等の受動業務を前記各セグ
メントを用いて実行すると共に当該受動業務の実行によ
って前記勘定日毎の残高明細が変化した場合には所定の
取消再カットメインプログラムを当該起動業務及び受動
業務が連動した単一のトランザクションとは異なる他の
派生トランザクションとして起動する受動業務処理部
と、 取消再カットメインプログラムが派生トランザクション
として起動されたときに当該起動された際の前記各セグ
メントの状態に基づいて前記起動業務の取消又は再カッ
トの要否を判定すると共に当該判定結果と各起動業務と
なる口座処理要求の優先順位とに基づいて前記起動業務
の取消又は再カットを当該取消再カットメインプログラ
ムとは異なる他の派生トランザクションとして前記起動
業務処理部に実行させる取消再カットメイン処理部とを
備え、 前記取消再カットメイン処理部は、 前記残高明細に基づいて勘定日毎の出金可能額を算出す
ると共に、先日付の勘定日での当該出金可能額がマイナ
スとなり決済不能となる場合には、当該決済不能となる
勘定日での複数の決済済みの口座処理要求のうち優先順
位の低い口座処理要求の取消を前記起動業務処理部に派
生トランザクションとして実行させる取消起動制御機能
と、 前記残高明細に基づいて勘定日毎の出金可能額を算出す
ると共に、演算日時当日又は先日付の勘定日での出金可
能額に基づいて前記残不足明細に格納された当日又は先
日付の勘定日で未成立の口座処理要求のうち優先順位の
高い順に各口座処理要求が決済可能となるか否かを判定
する再カット可否判定機能と、 この再カット可否判定機能によって決済可能と判定され
た未成立の口座処理要求がある場合には当該口座処理要
求の再カットを前記起動業務処理部に派生トランザクシ
ョンとして実行させる再カット起動制御機能とを備えた
ことを特徴とする先日付完結処理システム。
19. A receiving means for receiving an account processing request such as a transaction on an account day, an arithmetic means for calculating the account processing request received by the receiving means for each account day, and a result calculated by the arithmetic means. A file for recording as account information relating to the possible withdrawal amount for each account date, etc., wherein the file stores the balance for each account day as the account information, and a processing order by the account processing unit. A transaction statement segment for storing the account processing request processed as described above in a transaction statement including an account date and a priority, and an account settlement request that cannot be settled and not completed is stored as a remaining shortage statement including an account date and a priority. And a balance shortage segment, wherein the calculating means sets an account processing request for requesting settlement of a withdrawal or a deposit using the balance for each of the account dates as a starting operation. A startup business processing unit that requests a predetermined passive business processing unit to interlock with the currently running startup business program group and a single transaction; and for each of the accounting dates requested to be linked by the startup business processing unit. The passive business such as withdrawal or deposit of the account balance is executed by using each of the segments, and when the balance details for each of the account dates change due to the execution of the passive business, the predetermined cancellation / recut main program is started. And a passive business processing unit that is started as another derived transaction different from a single transaction in which the passive business is linked, and when the cancellation / recut main program is started as a derived transaction, The necessity of canceling or re-cutting the start-up work is determined based on the state, and the Cancellation for causing the startup service processing unit to execute or cancel the startup service as another derivative transaction different from the cancellation / recut main program based on the fixed result and the priority of the account processing request to be each startup service. A re-cut main processing unit, wherein the cancellation re-cut main processing unit calculates a withdrawable amount for each account date based on the balance statement, and the withdrawable amount on the future date account date is minus. In the case where settlement is not possible, cancellation of causing the start-up business processing unit to execute, as a derivative transaction, cancellation of a low-priority account processing request among a plurality of settled account processing requests on the account date on which settlement is impossible Start-up control function, Calculates the withdrawable amount for each account date based on the balance statement, and allows for withdrawal on the day of the calculation date and time or the future date. Re-cut to determine whether or not each account processing request can be settled in descending order of priority among account processing requests that have not been completed on the current or future account date stored in the remaining shortage statement based on the amount An availability determination function, and a re-cut that causes the activation business processing unit to execute the re-cut of the account processing request as a derivative transaction when there is an unsatisfied account processing request determined to be settled by the re-cut availability determination function. A future-end completion processing system comprising an activation control function.
【請求項20】 前記取消再カットメイン処理部は、 前記残不足明細セグメントに格納され先日付の口座処理
要求である起動業務のうち最も優先順位の高い起動業務
を高優先業務として特定する高優先業務特定機能と、 前記取引明細セグメントに格納され先日付で成立済みの
起動業務のうち前記高優先業務の優先順位よりも優先順
位の低い起動業務群によって利用された出金額の合計額
を先日付の勘定日での修正出金可能額として算出する修
正出金可能額算出機能と、 前記先日付の勘定日での修正出金可能額に基づいて前記
残不足明細に格納された前記高優先業務の口座処理要求
が決済可能となるか否かを判定する修正再カット可否判
定機能と、 この修正再カット可否判定機能によって前記高優先業務
が決済可能と判定された場合には当該口座処理要求の修
正再カットを前記起動業務処理部に派生トランザクショ
ンとして実行させる修正再カット起動制御機能とを備え
たことを特徴とする請求項19記載の先日付完結処理シ
ステム。
20. The high-priority job that identifies the highest-priority start-up operation among the start-up operations stored in the remaining shortage detail segment and that is an account processing request of the future date, as the high-priority operation. A business identification function, and the total amount of withdrawals used by a startup business group having a lower priority than the priority of the high-priority business among startup businesses stored in the transaction detail segment and completed at a future date. A corrected withdrawable amount calculation function for calculating as a corrected withdrawable amount on the account date, and the high-priority work stored in the remaining shortage details based on the corrected withdrawable amount on the future date account date. A function for determining whether or not the high-priority business can be settled by the modified recut possibility determination function for determining whether or not the account processing request can be settled; Recently with complete processing system according to claim 19, characterized in that a modified re-cut start control function to perform corrective recut loci processing request as a derivative transaction to the start business processing unit.
【請求項21】 前記取消再カットメイン処理部は、前
記起動業務の取消又は再カットを派生トランザクション
として起動した場合には当該起動内容を示す派生管理フ
ラグを前記起動業務処理及び当該起動業務処理部によっ
て連動される受動業務処理に渡すフラグ渡し制御機能
と、前記受動業務処理部から前記取消再カットメインプ
ログラムが派生トランザクションとして起動された場合
には前記派生管理フラグを参照して前記再カット起動制
御機能又は前記修正再カット起動制御機能を前記残不足
明細セグメントに対象となる残不足明細がなくなるまで
連続させるスパイラル処理制御機能とを備えたことを特
徴とする請求項20記載の先日付完結処理システム。
21. The cancellation / recut main processing unit sets a derivation management flag indicating the contents of the activation when the cancellation or recut of the activation operation is activated as a derivative transaction. A flag passing control function for passing to the passive business process linked by the re-cut start control with reference to the derivation management flag when the cancellation / recut main program is started as a derived transaction from the passive business processing unit 21. The future completion processing system according to claim 20, further comprising a spiral processing control function for continuing the function or the modified recut activation control function until the remaining shortage detail segment has no target remaining shortage detail. .
【請求項22】 勘定日の取引等の口座処理要求を受信
する受信手段と、この受信手段にて受信した口座処理要
求を勘定日毎に演算する演算手段と、この演算手段によ
って演算される結果を前記勘定日毎の出金可能額等と関
連した口座情報として記録するファイルとを備え、 前記ファイルが前記口座情報として、前記勘定日毎の残
高を格納する残高明細セグメントと、前記口座処理部に
よる処理順序で処理した前記口座処理要求を取引明細と
して勘定日及び優先順位を含めて格納する取引明細セグ
メントと、決済不能で未成立の口座処理要求を残不足明
細として勘定日及び優先順位を含めて格納する残不足明
細セグメントとを備えた先日付完結処理システムの前記
演算手段を使用して口座処理を行う先日付完結処理方法
であって、 前記残高明細セグメントに異動が生じた場合には当該残
不足明細セグメントに格納され先日付の口座処理要求で
ある起動業務のうち最も優先順位の高い起動業務を高優
先業務として特定する高優先業務特定工程と、 前記取引明細セグメントに格納され先日付で成立済みの
起動業務のうち前記高優先業務の優先順位よりも優先順
位の低い起動業務群によって利用された出金額の合計額
を先日付の勘定日での修正出金可能額として算出する修
正出金可能額算 出工程と、 前記先日付の勘定日での修正出金可能額に基づいて前記
残不足明細に格納された前記高優先業務の口座処理要求
が決済可能となるか否かを判定する修正再カット可否判
定工程と、 この修正再カット可否判定工程にて前記高優先業務が決
済可能と判定された場合には当該口座処理要求の修正再
カットを前記起動業務処理部に派生トランザクションと
して実行する修正再カット工程と、 この修正再カット工程にて先日付の勘定日で出金可能額
を前記残高明細セグメントに基づいて算出すると共に当
該出金可能額がマイナスとなった場合には当該勘定日の
取引明細セグメントに格納された口座処理要求のうち優
先順位の低い順に当該出金可能額がプラスとなるまで口
座処理要求を取り消す修正再カット後取消工程とを備え
たことを特徴とする先日付完結処理方法。
22. Receiving means for receiving an account processing request such as an account date transaction, calculating means for calculating the account processing request received by the receiving means for each accounting day, and a result calculated by the calculating means. A file for recording as account information related to the possible withdrawal amount for each of the account days, wherein the file contains the account information as the account information, a balance detail segment for storing the balance for each of the account days, and a processing order by the account processing unit. A transaction statement segment for storing the account processing request processed as described above in a transaction statement including an account date and a priority, and an account settlement request that cannot be settled and not completed is stored as a remaining shortage statement including an account date and a priority. A future completion processing method for performing account processing using the arithmetic means of the future completion processing system having a remaining shortage detail segment, wherein the balance statement A high-priority service specifying step of specifying, as a high-priority service, a startup service with the highest priority among startup services that are stored in the remaining shortage detail segment and are a post-dated account processing request when a change occurs in the segment; The sum of the withdrawal amounts used by the start-up business group having a lower priority than the priority of the high-priority business among the start-up businesses that are stored in the transaction detail segment and completed at a future date is calculated at the future date. Calculating a corrected withdrawable amount calculated as a corrected withdrawable amount; and an account processing request for the high-priority business stored in the remaining shortage statement based on the corrected withdrawable amount on the future date of the accounting date. A re-cuttable / non-possible decision step for determining whether or not the high-priority business can be settled in the re-cuttable / possible decision step. A modified re-cutting step for executing the cut as a derivative transaction in the start-up business processing unit; and in the modified re-cutting step, a possible withdrawal amount is calculated based on the balance detail segment at a future date, and the withdrawal is performed. If the possible amount becomes negative, cancel the account processing request until the withdrawable amount becomes positive in the order of lower priority among account processing requests stored in the transaction statement segment on the relevant account day After adjustment recut A future date completion processing method comprising a cancellation step.
【請求項23】 勘定日の取引等の口座処理要求を受信
する受信手段と、この受信手段にて受信した口座処理要
求を勘定日毎に演算する演算手段と、この演算手段によ
って演算される結果を前記勘定日毎の出金可能額等と関
連した口座情報として記録するファイルとを備え、 前記ファイルが前記口座情報として、前記勘定日毎の残
高を格納する残高明細セグメントと、前記口座処理部に
よる処理順序で処理した前記口座処理要求を取引明細と
して勘定日及び優先順位を含めて格納する取引明細セグ
メントと、決済不能で未成立の口座処理要求を残不足明
細として勘定日及び優先順位を含めて格納する残不足明
細セグメントとを備え、 前記演算手段は、前記勘定日毎の残高を使用した出金又
は入金の決済を要求する口座処理要求を 起動業務として実行すると共に当該実行中の起動業務プ
ログラム群と単一のトランザクションとしての連動を所
定の受動業務処理部に依頼する起動業務処理部と、 この起動業務処理部によって連動依頼される前記勘定日
毎の口座残高の出金又は入金等の受動業務を前記各セグ
メントを用いて実行すると共に当該受動業務の実行によ
って前記勘定日毎の残高明細が変化した場合には所定の
取消再カットメインプログラムを当該起動業務及び受動
業務が連動した単一のトランザクションとは異なる他の
派生トランザクションとして起動する受動業務処理部
と、 取消再カットメインプログラムが派生トランザクション
として起動されたときに当該起動された際の前記各セグ
メントの状態に基づいて前記起動業務の取消又は再カッ
トの要否を判定すると共に当該判定結果と各起動業務と
なる口座処理要求の優先順位とに基づいて前記起動業務
の取消又は再カットを当該取消再カットメインプログラ
ムとは異なる他の派生トランザクションとして前記起動
業務処理部に実行させる取消再カットメイン処理部とを
備えた先日付完結処理システムの前記演算手段を使用し
て口座処理を実行するための取消再カットメインプログ
ラムであって、記録媒体に格納され、 該取消再カットメインプログラムは前記演算手段を動作
させる指令として、 前記残高明細に基づいて勘定日毎の出金可能額を算出す
ると共に、先日付の勘定日での当該出金可能額がマイナ
スとなり決済不能となる場合には、当該決済不能となる
勘定日での複数の決済済みの口座処理要求のうち優先順
位の低い口座処理要求の取消を前記起動業務処理部に派
生トランザクションとして実行させる取消起動制御指令
と、 前記残高明細に基づいて勘定日毎の出金可能額を算出さ
せると共に、演算日時当日又は先日付の勘定日での出金
可能額に基づいて前記残不足明細に格納された当日又は
先日付の勘定日で未成立の口座処理要求のうち優先順位
の高い順に各口座処理要求が決済可能となるか否かを判
定させる再カット可否判定指令と、 この再カット可否判定機能によって決済可能と判定され
た未成立の口座処理要求がある場合には当該口座処理要
求の再カットを前記起動業務処理部に派生トランザクシ
ョンとして実行させる再カット起動制御指令とを備えた
ことを特徴とする取消再カットメインプログラム。
23. Receiving means for receiving an account processing request such as a transaction on an account day, calculating means for calculating the account processing request received by the receiving means for each account day, and a result calculated by the calculating means. A file for recording as account information related to the possible withdrawal amount for each of the account dates, wherein the file contains, as the account information, a balance detail segment for storing a balance for each of the account days, and a processing order by the account processing unit. A transaction statement segment for storing the account processing request processed as described above in a transaction statement including an account date and a priority, and an account settlement request that cannot be settled and not completed is stored as a remaining shortage statement including an account date and a priority. A balance shortage segment, wherein the calculation means sets an account processing request for requesting settlement of withdrawal or deposit using the balance for each of the account dates as a start-up operation. A startup business processing unit that requests a predetermined passive business processing unit to interlock with the currently running startup business program group and a single transaction; and for each of the accounting dates requested to be linked by the startup business processing unit. The passive business such as withdrawal or deposit of the account balance is executed by using each of the segments, and when the balance details for each of the account dates change due to the execution of the passive business, the predetermined cancellation / recut main program is started. And a passive business processing unit that is started as another derived transaction different from a single transaction in which the passive business is linked, and when the cancellation / recut main program is started as a derived transaction, The necessity of canceling or re-cutting the start-up work is determined based on the state, and the Cancellation for causing the start-up business processing unit to execute or cancel the start-up business as another derived transaction different from the cancellation / re-cut main program based on the fixed result and the priority of the account processing request to be each start-up business. A cancellation recut main program for executing an account process using the arithmetic means of the future completion processing system having a recut main processing unit, the cancellation recut main program being stored in a recording medium; Is a command to operate the calculating means, calculates the withdrawable amount for each account date based on the balance statement, and when the withdrawable amount on the future date of the account becomes negative and the settlement becomes impossible, Canceling a low-priority account processing request among a plurality of settled account processing requests on the account date on which the settlement becomes impossible The cancellation start control command to be executed by the unit as a derivative transaction, and the withdrawable amount for each account date is calculated based on the balance statement, and based on the withdrawable amount on the calculation date / time or the future date. A recut availability determination command for determining whether or not each account processing request can be settled in the order of higher priority among account processing requests that have not been completed on the current day or the future account date stored in the remaining shortage statement, When there is an unsatisfied account processing request determined to be settled by the recut availability determination function, a recut activation control command for causing the activation business processing unit to execute the recut of the account processing request as a derived transaction. A cancellation / re-cut main program characterized by having:
【請求項24】 前記残不足明細セグメントに格納され
先日付の口座処理要求である起動業務のうち最も優先順
位の高い起動業務を高優先業務として特定させる高優先
業務特定指令と、 前記取引明細セグメントに格納され先日付で成立済みの
起動業務のうち前記高優先業務の優先順位よりも優先順
位の低い起動業務群によって利用された出金額の合計額
を先日付の勘定日での修正出金可能額として算出させる
修正出金可能額算出指令と、 前記先日付の勘定日での修正出金可能額に基づいて前記
残不足明細に格納された前記高優先業務の口座処理要求
が決済可能となるか否かを判定させる修正再カット可否
判定指令と、 この修正再カット可否判定機能によって前記高優先業務
が決済可能と判定された場合には当該口座処理要求の修
正再カットを前記起動業務処理部に派生トランザクショ
ンとして実行させる修正再カット起動制御指令とを備え
たことを特徴とする請求項23記載の取消再カットメイ
ンプログラム。
24. A high-priority service specifying command for specifying a start service having the highest priority among start services stored in the remaining shortage detail segment and being a post-dated account processing request as a high-priority service, and the transaction detail segment. The sum of the withdrawal amounts used by the start-up work group having a lower priority than the priority of the high-priority work among the start-up work that has been completed at a later date can be corrected and withdrawn at the future date. The account processing request for the high-priority business stored in the remaining shortage statement can be settled based on the corrected withdrawable amount calculation command to be calculated as the amount and the corrected withdrawable amount on the future date of the accounting date. And a correction recut availability determination command for determining whether or not the high priority business is settled by the correction recut availability determination function. 24. The cancellation / recut main program according to claim 23, further comprising: a correction / recut start control command for causing the start operation processing unit to execute the derivative transaction as a derived transaction.
【請求項25】 振替又は振込等の預金口座を用いた決
済に関するデータを管理する外部自振関連DBと、自動
積立や融資返済等の入出金に関するデータを管理する内
部自振関連DBと、決済又は入出金に用いられる預金口
座に関するデータを管理する預金マスタDBと、自動支
払機や店頭端末等との口座処理要求に応答すると共に前
記入出金又は決済を実行するセンターカットを口座処理
要求として処理するオンライン演算手段とを備え、 前記預金マスタDBは、前記勘定日毎の残高を格納する
残高明細セグメントと、前記口座処理部による処理順序
で処理した前記口座処理要求を取引明細として勘定日及
び優先順位を含めて格納する取引明細セグメントと、決
済不能で未成立の口座処理要求を残不足明細として勘定
日及び優先順位を含めて格納する残不足明細セグメント
とを備え、 前記オンライン演算手段は、 前記外部自振関連DB、内部自振関連DB又は前記店頭
端末等の要求に応じて、各口座処理要求の当日又は先日
付となる勘定日毎の残高明細セグメントに基づいて、前
記決済又は入出金の口座処理要求を処理すると共に、当
該実行中の起動業務プログラム群と単一のトランザクシ
ョンとしての連動を所定の受動業務処理部に依頼する起
動業務処理部と、 この起動業務処理部によって連動依頼される前記勘定日
毎の口座残高の出金又は入金等の受動業務を前記各セグ
メントを用いて実行すると共に当該受動業務の実行によ
って前記勘定日毎の残高明細が変化した場合には所定の
取消再カットメインプログラムを当該起動業務及び受動
業務が連動した単一のトランザクションとは異なる他の
派生トランザクションとして起動する受動業務処理部
と、 前記受動業務処理部によって起動された状態の前記残高
明細セグメントに基づいて各勘定日毎の出金可能額を日
付チェックテーブルとして算出すると共に生成した日付
チェックテーブルに基づいて一つの口座処理の取消又は
再カットを派生トランザクションとして起動する取消再
カットメイン処理部とを備え、 この取消再カットメイン処理部は、前記取消又は再カッ
トとして起動するトランザクションに派生管理フラグを
渡すと共に当該起動した起動業務と受動業務からなるト
ランザクションから渡される派生管理フラグに基づいて
前記各セグメントに対する探索を継続するスパイラル処
理制御機能を備えたことを特徴とする先日付完結処理シ
ステム。
25. An external self-oscillation-related DB for managing data relating to settlement using a deposit account such as transfer or transfer, an internal self-assembly-related DB for managing data relating to deposits and withdrawals such as automatic funding and loan repayment, and settlement. Alternatively, a deposit master DB that manages data related to a deposit account used for depositing and withdrawing, and a center cut that responds to an account processing request with an automatic teller machine, an in-store terminal, and executes the depositing and withdrawing or settlement as an account processing request. The deposit master DB includes a balance statement segment for storing the balance for each account date, and the account processing request processed in the processing order by the account processing unit as a transaction statement. Include transaction details segment including ranking, and account settlement requests that cannot be settled and have not been completed, including account date and priority as remaining shortage details The on-line calculation means is the same date or future date of each account processing request in response to a request from the external self-oscillation-related DB, the internal self-oscillation-related DB, or the in-store terminal. Based on the balance statement segment for each account date, process the settlement or deposit / withdrawal account processing request, and request a predetermined passive business processing unit to link with the running startup business program group as a single transaction. A start-up business processing unit, and performing passive business such as withdrawal or deposit of the account balance for each account date requested by the start business processing unit in conjunction with each other by using each of the segments; If the balance statement changes, the specified cancellation / recut main program is executed in a single A passive business processing unit that is started as another derivative transaction different from the passive business processing unit, and calculates a possible withdrawal amount for each account date as a date check table based on the balance statement segment that is started by the passive business processing unit. And a cancel / recut main processing unit that starts cancellation or recut of one account process as a derived transaction based on the date check table generated together with the cancel process. The cancel / recut main processing unit starts as the cancel or recut. A spiral processing control function of passing a derivative management flag to the transaction to be executed and continuing the search for each segment based on the derivative management flag passed from the started transaction and the passive transaction. Date completion processing system.
【請求項26】 前記受動業務処理部は、当日に出金可
能額がマイナスとなる口座処理要求をエラーとする一
方、先日付の勘定日での出金可能額のマイナスを許容す
る決済完了性設定機能を備え、 前記取消再カットメイン処理部は、前記受動業務処理部
による口座処理要求の処理の結果先日付の勘定日での出
金可能額がマイナスになった場合には当該出金可能額が
マイナスとなった日付の出金要求を優先順位の低い順に
取り消す制御をする取消起動制御機能を備えたことを特
徴とする請求項25記載の先日付完結処理システム。
26. The passive business processing unit sets an error in an account processing request in which the withdrawable amount becomes negative on the day, and sets a settlement completion permitting a negative withdrawable amount in a future date. It has a setting function, and the cancellation / re-cut main processing unit can withdraw if the possible withdrawal amount on the account date of the future date becomes negative as a result of processing the account processing request by the passive business processing unit. 26. The post-done completion processing system according to claim 25, further comprising a cancel activation control function for performing control of canceling a withdrawal request on a date when the amount becomes negative in order of lower priority.
【請求項27】 前記口座処理要求は、数字の小さい方
が優先順位の高いことを示す数字で他の口座処理要求に
対する相対的な優先順位が各口座処理要求毎に定義され
ると共に、当該口座処理要求は、決済又は入出金の期限
となる再カット期限が2日以上の可能性があり優先順位
の高い第1群と、第1群よりも優先順位が低く再カット
期限が1日である第2群とのいずれかに分類され、 前記取消再カットメイン処理部は、 前記スパイラル制御により起動される毎に前記残高明細
セグメントに基づいて取引のある日付毎の出金可能額を
算出する日付チェックテーブル生成サブコントローラ
と、 前記残不足明細セグメントに格納された決済済みの口座
処理要求のうち優先順位が第1群で先日付の出金要求が
なくなるまで前記スパイラル制御により当該口座処理要
求を取り消す先日付第1群取消サブコントローラと、 この先日付第1群取消サブコントローラによる取消のス
パイラル制御が完了した後に前記日付チェックテーブル
を参照して出金可能額がマイナスとなっている勘定日が
ある場合には当該勘定日に成立し前記取引明細セグメン
トに格納された口座処理要求を優先順位の低い順に前記
出金可能額がプラスとなるまで前記スパイラル制御によ
り当該口座処理要求を取り消させるマイナス時取消サブ
コントローラと、 前記先日付第1群サブコントローラ及び前記マイナス時
取消サブコントローラによる各スパイラル制御が完了し
た後、前記第1群の優先順位で前記残不足明細セグメン
トに格納された先日付の口座処理要求を各勘定日の出金
可能額又は所定の修正出金可能額に基づいて出金可能額
がマイナスとなるか又は残不足明細セグメントの走査が
完了するまで前記スパイラル制御により当該口座処理要
求を再カットさせる修正再カットサブコントローラと、 前記修正再カットサブコントローラによる修正再カット
の対象の走査が完了した後、前記第1群及び第2群の優
先順位で出金可能額内の出金要求を優先順位の高い順に
前記スパイラル制御により当該口座処理要求を再カット
させる再カットサブコントローラとを備えたことを特徴
とする請求項26記載の先日付完結処理システム。
27. The account processing request is defined by a number indicating that a smaller number has a higher priority, and a relative priority with respect to other account processing requests is defined for each account processing request. The processing request has a possibility that the re-cut deadline, which is the deadline for settlement or deposit / withdrawal, may be two or more days, and the first group has a higher priority, and the lower priority is lower than the first group and the re-cut deadline is one day. A second group, wherein the cancellation / recut main processing unit calculates a withdrawable amount for each date of a transaction based on the balance statement segment each time the main unit is activated by the spiral control. A check table generation sub-controller, and the spiral control is performed by the spiral control until there is no withdrawal request in the first group in the first group among account settlement requests settled stored in the remaining shortage statement segment. The future date first group cancellation sub-controller for canceling the account processing request and the future date first group cancellation sub-controller after the completion of the spiral control of the cancellation, the date check table is referred to and the possible withdrawal amount becomes negative. If there is a certain account date, the account processing request that is established on the account day and stored in the transaction statement segment is processed by the spiral control until the payable amount becomes positive in the order of lower priority. After each spiral control by the negative first cancellation subcontroller and the first group subcontroller and the negative cancellation subcontroller to be canceled is stored in the remaining shortage detail segment in the priority order of the first group. Account processing requests based on the future date of each account, based on the amount available for each account A re-cut sub-controller for re-cutting the account processing request by the spiral control until the possible withdrawal amount becomes negative or the scanning of the remaining shortage detail segment is completed; After the scanning of the target is completed, re-cutting the account processing requests by the spiral control in the order of higher priority of the withdrawal requests within the withdrawable amount according to the priority of the first group and the second group. 27. The future completion processing system according to claim 26, further comprising a sub-controller.
【請求項28】 前記預金マスタDBが、当該預金口座
の担保となる担保明細セグメントを備え、 前記日付チェックテーブル生成サブコントローラは、前
記担保明細セグメントに基づいて前記残高明細セグメン
トの残高に当該担保明細による極度を加算した額を出金
可能額として算出する極度加算機能を備えたことを特徴
とする請求項27記載の先日付完結処理システム。
28. The deposit master DB includes a collateral statement segment serving as collateral for the deposit account, and the date check table generation sub-controller adds the collateral statement segment to the balance of the balance statement segment based on the collateral statement segment. 28. The post-done completion processing system according to claim 27, further comprising an extreme addition function of calculating an amount obtained by adding an extreme amount according to the amount as a withdrawable amount.
【請求項29】 前記派生管理フラグが、前記派生トラ
ンザクションの繰り返しによるスパイラル処理中である
か否かを示す派生再カット中ビットと、各サブコントロ
ーラでの処理により取消又は再カットが起動されたか否
かを示す情報フラグとを有し、 前記先日付第1群取消サブコントローラは、前記日付チ
ェックテーブルが生成された後に、 「派生再カット中ビットがONで情報フラグが1でな
い」という条件を満たさない場合で、且つ、 残不足明細セグメントに先日付で決済済み且つ優先順位
が第1群である口座処理要求が存在する場合には、 派生再カット中ビットをON、情報フラグを1にセット
すると共に、 当該口座処理要求の取消を当該派生管理フラグを付した
派生トランザクションとして前記起動業務処理部に実行
させる第1群連続取消制御機能を備えたことを特徴とす
る請求項28記載の先日付完結処理システム。
29. The derivation management flag indicates whether or not spiral processing is being performed due to repetition of the derivation transaction, and a dere-cutting in-progress bit, and whether or not cancellation or re-cut has been activated by processing in each sub-controller. The first date group cancellation sub-controller satisfies the condition that the derived flag is not set to 1 and the information flag is not 1 after the date check table is generated. If not, and if there is an account processing request in the remaining shortage detail segment that has been settled in the future and has the first priority, the derived recutting bit is set to ON and the information flag is set to 1. In addition, a step of causing the startup business processing unit to execute the cancellation of the account processing request as a derivative transaction with the derivative management flag attached. Recently with complete processing system of claim 28, wherein further comprising a group continuous cancellation control function.
【請求項30】 前記マイナス時取消サブコントローラ
が、前記日付チェックテーブルを参照して出金可能額が
マイナスとなっている勘定日がある場合には、 派生再カット中ビットをON、情報フラグを2にセット
すると共に、 出金可能額がマイナスとなった勘定日について当該勘定
日に成立した前記取引明細セグメントに格納された口座
処理要求のうち最も優先順位が低い出金の口座処理要求
の取消を当該派生管理フラグを付した派生トランザクシ
ョンとして前記起動業務処理部に実行させるマイナス時
取消制御機能を備えたことを特徴とする請求項29記載
の先日付完結処理システム。
30. The cancellation-at-minus sub-controller refers to the date check table, and if there is an account date on which the withdrawable amount is negative, turns on the derived recutting bit and sets the information flag. Set to 2 and cancel the account processing request of the withdrawal with the lowest priority among the account processing requests stored in the transaction statement segment that was established on the account date when the possible withdrawal amount became negative. 30. The negative date cancellation processing system according to claim 29, further comprising a minus-time cancellation control function for causing the start-up business processing unit to execute the derivation transaction with the derivation management flag.
【請求項31】 前記マイナス時取消サブコントローラ
が、前記日付チェックテーブルを参照して所定の入金上
限額を超えた先日付の勘定日がある場合には、 派生再カット中ビットをON、情報フラグを3にセット
すると共に、 当該先日付の勘定日にて成立した入金の口座処理要求の
取消を当該派生管理フラグを付した派生トランザクショ
ンとして前記起動業務処理部に実行させるオーバー時取
消制御機能を備えたことを特徴とする請求項30記載の
先日付完結処理システム。
31. When the minus cancellation sub-controller refers to the date check table, if there is a future date that exceeds a predetermined deposit upper limit, a derived recutting bit is turned on, and an information flag is set. Is set to 3, and an over-time cancellation control function is provided for causing the startup business processing unit to execute the cancellation of the account processing request of the deposit made on the future date account date as a derivative transaction with the derivative management flag. 31. The postdated completion processing system according to claim 30, wherein:
【請求項32】 前記残不足明細セグメントは、優先順
位の第1群又は第2群を示す第1優先順位を第1のキー
として優先順位の高い順に、各口座処理要求の勘定日を
第2のキーとして勘定日の近い順に、各優先順位の郡内
での優先順位を第3のキーとして優先順位の高い順に読
み出されるデータ構造を有することを特徴とする請求項
30記載の先日付完結処理システム。
32. The account shortage date of each account processing request is set to a second order in descending order of priority with the first priority indicating the first or second group of priorities as a first key. 31. The post-done completion processing according to claim 30, wherein a data structure is read out in ascending order of the date of the account as a key, and in order of priority in the county as a third key, in descending order of the priority. system.
【請求項33】 前記修正再カットサブコントローラ
が、前記先日付第1群取消サブコントローラ及びマイナ
ス時取消サブコントローラでの取消制御用の条件を満た
さない場合で、 「派生再カット中ビットがONで情報フラグが4」とい
う条件を満たさない場合で、 「派生再カット中ビットがONで情報フラグがAで、前
記日付チェックテーブルの全日付の判定完了」という条
件を満たさない場合で、且つ、 残不足明細セグメント中の口座処理要求のうち、前記日
付チェックテーブルの日付のうち最も現在に近い先頭日
を対象勘定日として、「優先順位が第1群で、当該対象
勘定日が再カット期限内で、未決済」の口座処理要求を
読み出し、該当する口座処理要求がない場合には対象勘
定日を日付チェックテーブルの日付がなくなるまで先へ
とシフトさせて当該条件の口座処理要求を読み出し、 前記対象勘定日について読み出した口座処理要求のうち
当該対象勘定日内で最も優先順位の高い口座処理要求を
最高位口座処理要求として特定する第1群最高位口座処
理要求特定機能と、 この最高位口座処理要求特定機能によって特定された最
高位口座処理要求の出金額が出金可能額以内であるか否
かを判定して、出金可能額以内であれば、派生再カット
中ビットをON、情報フラグをAにセットして当該口座
処理要求の再カットを当該派生管理フラグ付きの派生ト
ランザクションとして前記起動業務に実行させる第1群
再カット起動機能と、 前記最高位口座処理要求の出金額が出金可能額を越える
場合には、当該最高位口座処理要求の優先順位よりも低
い優先順位の口座処理要求によって使用される出金額の
総額を修正出金可能額として算出する修正出金可能額算
出機能と、 当該最高位口座処理要求の出金額が前記修正出金可能額
以内であれば、派生再カット中ビットをON、情報フラ
グをAにセットして当該最高位口座処理要求の再カット
を当該派生管理フラグ付きの派生トランザクションとし
て前記起動業務に実行させる第1群修正再カット起動機
能と、 当該最高位口座処理要求の出金額が修正出金可能額を越
えている場合には、当該口座処理要求を判定済みとして
前記最高位口座処理特定機能に処理を戻す修正再カット
対象探索制御機能とを備えたことを特徴とする請求項3
2記載の先日付完結処理システム。
33. When the modified recut sub-controller does not satisfy the conditions for cancellation control in the first group cancel sub-controller and the negative cancellation sub-controller, a condition that “the derived re-cutting bit is ON and If the condition of "information flag is 4" is not satisfied, and the condition of "the derived re-cutting bit is ON and the information flag is A and the determination of all dates in the date check table is completed" is not satisfied, and Of the account processing requests in the shortage segment, the first date closest to the present date in the date check table is set as the target account date, and the priority is “first group, and the target account date is within the recut deadline. , Unsettled "account processing request, and if there is no corresponding account processing request, move the target account date until the date in the date check table is gone A first group of the account processing requests having the highest priority within the target account date among the account processing requests read for the target account date, which are identified as the highest account processing requests. The highest-level account processing request specifying function and the highest-level account processing request specified by the highest-level account processing request specifying function determine whether the withdrawal amount is within the withdrawable amount, and within the withdrawable amount If so, the first-group recut activation function for setting the information processing flag to ON, setting the information flag to A, and executing the re-cutting of the account processing request as the derived transaction with the derivation management flag in the starting operation. If the amount of money of the highest-level account processing request exceeds the amount that can be withdrawn, an account processing request with a lower priority than the priority of the highest-level account processing request Function to calculate the total amount of withdrawal to be used as the adjusted withdrawable amount, and if the withdrawal amount of the highest-level account processing request is within the adjusted withdrawable amount, the derivative re-cut A first group modified recut activation function for setting the middle bit to ON, setting the information flag to A, and causing the activation task to execute the recut of the highest-level account processing request as a derivative transaction with the derivative management flag, A correction recut target search control function that returns the processing to the highest-level account processing specifying function when the withdrawal amount of the higher-level account processing request exceeds the corrected withdrawable amount. 4. The method according to claim 3, wherein
2. The postdated completion processing system described in 2.
【請求項34】 前記再カットサブコントローラが、前
記修正再カットサブコントローラでの第1群再カット又
は第1群修正再カットの条件を満たす残不足明細がな
く、 「前記派生再カット中ビットがON、情報フラグが4且
つ日付チェックテーブルの全日付の判定完了」という条
件を満たさない場合で、 前記残不足明細セグメントに、再カット期限内で未決済
取引で未判定の残不足明細がある場合には、当該読み出
した口座処理要求を最高位口座処理要求として特定する
最高位口座処理要求特定機能と、 この最高位口座処理要求に自動融資が設定されている場
合には当該口座処理要求に再カット派生を設定する自動
融資再カット派生設定機能と、 前記最高位口座処理要求の出金額が前記出金可能額以内
である場合には当該最高位口座処理要求に再カット派生
を設定する出金可能額再カット派生設定機能と、 前記最高位口座処理要求の出金額が前記出金可能額を超
える場合には当該口座処理要求を判定済みとして前記最
高位口座処理要求特定機能に処理を戻す再カット対象探
索制御機能と、 前記再カット派生が設定されている場合には、当該最高
位口座処理要求の再カットを当該派生管理フラグ付きの
派生トランザクションとして前記起動業務に実行させる
再カット起動機能とを備えたことを特徴とする請求項3
3記載の先日付完結処理システム。
34. The re-cut sub-controller, if there is no remaining shortage or shortage statement that satisfies the condition of the first group re-cut or the first group correct re-cut in the modified re-cut sub-controller, ON, the information flag is 4 and the determination of all dates in the date check table is completed ", and the remaining shortage details segment has undetermined remaining shortage details in unsettled transactions within the recut deadline. The highest-level account processing request identification function for specifying the read account processing request as the highest-level account processing request, and the automatic processing of the account processing request when automatic financing is set for the highest-level account processing request. Automatic loan re-cut derivation setting function to set derivation of cuts, and processing of the highest-level account when the amount of the highest-level account processing request is within the allowable withdrawal amount Withdrawal amount setting function to set re-cut derivation for the request The recut target search control function that returns the process to the account processing request specifying function, and if the recut derivation is set, the recut of the highest account processing request is set as the derived transaction with the derivation management flag. 4. A re-cut start function to be executed by a start operation.
3. The postdated completion processing system described in 3.
【請求項35】 振替又は振込等の預金口座を用いた決
済に関するデータを管理する外部自振関連DBと、自動
積立や融資返済等の入出金に関するデータを管理する内
部自振関連DBと、決済又は入出金に用いられる預金口
座に関するデータを管理する預金マスタDBと、自動支
払機や店頭端末等との口座処理要求に応答すると共に前
記入出金又は決済を実行するセンターカットを口座処理
要求として処理するオンライン演算手段とを備え、 前記預金マスタDBは、前記勘定日毎の残高を格納する
残高明細セグメントと、前記口座処理部による処理順序
で処理した前記口座処理要求を取引明細として勘定日及
び優先順位を含めて格納する取引明細セグメントと、決
済不能で未成立の口座処理要求を残不足明細として勘定
日及び優先順位を含めて格納する残不足明細セグメント
とを備え、 前記オンライン演算手段は、 前記外部自振関連DB、内部自振関連DB又は前記店頭
端末等の要求に応じて、各口座処理要求の当日又は先日
付となる勘定日毎の残高明細セグメントに基づいて、前
記決済又は入出金の口座処理要求を処理すると共に、当
該実行中の起動業務プログラム群と単一のトランザクシ
ョンとしての連動を所定の受動業務処理部に依頼する起
動業務処理部と、 この起動業務処理部によって連動依頼される前記勘定日
毎の口座残高の出金又は入金等の受動業務を前記各セグ
メントを用いて実行すると共に当該受動業務の実行によ
って前記勘定日毎の残高明細が変化した場合には所定の
取消再カットメインプログラムを当該起動業務及び受動
業務が連動した単一のトランザクションとは異なる他の
派生トランザクションとして起動する受動業務処理部と
を備えた先日付完結処理システムの前記演算手段を使用
して前記各セグメントの状態に応じて前記口座処理の取
消又は再カットの実行を制御するための取消再カットメ
インプログラムであって、記録媒体に格納され、 当該取消再カットメインプログラムは、前記演算手段を
動作させる指令として、 当該取消再カットメインプログラムが起動される毎に前
記残高明細セグメントに基づいて取引のある日付毎の出
金可能額を算出させる日付チェックテーブル生成指令
と、 前記残不足明細セグメントに格納された決済済みの口座
処理要求のうち優先順位が第1群で先日付の出金要求が
ある場合には当該口座処理要求を取り消す制御をさせる
先日付第1群取消指令と、 この先日付第1群取消指令に応じて前記優先順位が第1
群で先日付にて決済済みの出金要求がない場合に、前記
日付チェックテーブルを参照して出金可能額がマイナス
となっている勘定日がある場合には、当該勘定日に成立
し前記取引明細セグメントに格納された口座処理要求の
うち最も低い口座処理要求を取り消させるマイナス時取
消指令と、 前記先日付第1群取消指令及びマイナス時取消指令に応
じた取消制御が完了下後に、前記第1群の優先順位で前
記残不足明細セグメントに格納された先日付の口座処理
要求を優先順位の高い順に各勘定日の出金可能額又は所
定の修正出金可能額に基づいて再カットが可能であるか
否かを判定させると共に再カット可能な場合には当該口
座処理要求を再カットさせる修正再カット指令と、 前記修正再カットサブコントローラによる再カットの対
象の走査が完了した後、前記第1群及び第2群の優先順
位で出金可能額内の出金要求を優先順位の高い順に再カ
ットさせる再カット指令とを備えたことを特徴とする取
消再カットメインプログラム。
35. An external self-oscillation-related DB for managing data relating to settlement using a deposit account such as transfer or transfer, an internal self-association-related DB for managing data relating to deposits and withdrawals such as automatic funding and loan repayment, and settlement. Alternatively, a deposit master DB that manages data relating to a deposit account used for depositing and withdrawing, and a center cut that responds to an account processing request with an automatic teller machine, a store terminal, etc., and executes the deposit and withdrawal or settlement as an account processing request. The deposit master DB includes a balance statement segment for storing the balance for each account date, and the account processing request processed in the processing order by the account processing unit as a transaction statement. Include transaction details segment including ranking, and account settlement requests that cannot be settled and have not been completed, including account date and priority as remaining shortage details The on-line calculation means is the same date or future date of each account processing request in response to a request from the external self-oscillation-related DB, the internal self-oscillation-related DB, or the in-store terminal. Based on the balance statement segment for each account date, process the settlement or deposit / withdrawal account processing request, and request a predetermined passive business processing unit to link with the running startup business program group as a single transaction. A start-up business processing unit, and performing passive business such as withdrawal or deposit of the account balance for each account date requested by the start business processing unit in conjunction with each other by using each of the segments; If the balance statement changes, the specified cancellation / recut main program is executed in a single Execution or cancellation of the account processing according to the state of each segment using the arithmetic means of the future completion processing system having a passive business processing unit started as another derivative transaction different from the transaction processing. Is a main program for canceling and re-cutting stored in a recording medium, wherein the main program for canceling and re-cutting is executed every time the main program for canceling and re-cutting is started as a command for operating the arithmetic means. The first group has a priority order of a first group among a date check table generation command for calculating a possible withdrawal amount for each date of a transaction based on the balance statement segment, and a settled account processing request stored in the remaining shortage statement segment. If there is a withdrawal request at a future date, a first group cancellation command at a future date for controlling to cancel the account processing request; The priority is first according to the date first group cancellation order
If there is no withdrawal request that has been settled on the previous date in the group, and if there is an account date with a negative withdrawable amount by referring to the date check table, A negative cancellation command for canceling the lowest account processing request among the account processing requests stored in the transaction statement segment, and after the completion of the cancellation control according to the preceding first group cancellation command and the negative cancellation command, the It is possible to re-cut the post-dated account processing requests stored in the remaining / deficient detail segment in the priority order of the first group on the basis of each account's possible sunrise amount or a predetermined corrected withdrawal amount in descending order of priority. A modified recut command for re-cutting the account processing request if it is possible to determine whether or not there is a recut, and scanning the recut target by the modified recut subcontroller After completion, a re-cut command for re-cutting withdrawal requests within the withdrawable amount in the order of priority of the first and second groups in descending order of priority. program.
【請求項36】 勘定日の取引等の口座処理要求を受信
する受信手段と、この受信手段にて受信した口座処理要
求を勘定日毎に演算する演算手段と、この演算手段によ
って演算される結果を前記勘定日毎の出金可能額等と関
連した口座情報として記録するファイルとを備え、 前記演算手段が、当該演算を行う演算日に対して同日又
は先日付となる勘定日の口座処理要求を当該勘定日の口
座情報に基づいて処理する口座処理部と、この口座処理
部による口座処理によって当日又は先日付の勘定日での
口座処理要求が決済不能となる場合には当該決済不能と
なる勘定日での決済完了性を有さない複数の決済済みの
口座処理要求のうち優先順位の低い口座処理要求を当該
優先順位の低い順序にて取り消す取消処理部とを備えた
ことを特徴とする先日付完結処理システム。
36. Receiving means for receiving an account processing request such as a transaction on an account date, calculating means for calculating the account processing request received by the receiving means for each accounting day, and a result calculated by the calculating means. A file for recording as account information related to the possible withdrawal amount for each accounting day, etc., wherein the arithmetic means sends an account processing request on the same or a later date as to the arithmetic date for performing the arithmetic. An account processing unit that processes based on the account information on the account date, and an account date on which the account processing by this account processing unit cannot be settled if the account processing request on the current day or the future date is not possible And a cancellation processing unit for canceling a low-priority account processing request among a plurality of settled account processing requests having no settlement completion in the order of the low priority. Complete processing system.
JP2001078306A 2001-03-19 2001-03-19 System, method and program for completion process of the previous date, program for cancel / recut main process used therefor, resource optimization system, program and program for cancel / reexecute main process used therefor Expired - Lifetime JP3611110B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001078306A JP3611110B2 (en) 2001-03-19 2001-03-19 System, method and program for completion process of the previous date, program for cancel / recut main process used therefor, resource optimization system, program and program for cancel / reexecute main process used therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001078306A JP3611110B2 (en) 2001-03-19 2001-03-19 System, method and program for completion process of the previous date, program for cancel / recut main process used therefor, resource optimization system, program and program for cancel / reexecute main process used therefor

Publications (2)

Publication Number Publication Date
JP2002279191A true JP2002279191A (en) 2002-09-27
JP3611110B2 JP3611110B2 (en) 2005-01-19

Family

ID=18934942

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001078306A Expired - Lifetime JP3611110B2 (en) 2001-03-19 2001-03-19 System, method and program for completion process of the previous date, program for cancel / recut main process used therefor, resource optimization system, program and program for cancel / reexecute main process used therefor

Country Status (1)

Country Link
JP (1) JP3611110B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002342138A (en) * 2001-05-14 2002-11-29 Hachijuni Bank Ltd System and method for controlling on-line transaction
KR100907590B1 (en) 2001-06-11 2009-07-14 교와 핫꼬 바이오 가부시키가이샤 Oligosaccharide Crystals and Methods of Making Oligosaccharide Crystals
JP2013501973A (en) * 2009-08-07 2013-01-17 アリババ グループ ホールディング リミテッド Account parallel processing method and system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002342138A (en) * 2001-05-14 2002-11-29 Hachijuni Bank Ltd System and method for controlling on-line transaction
KR100907590B1 (en) 2001-06-11 2009-07-14 교와 핫꼬 바이오 가부시키가이샤 Oligosaccharide Crystals and Methods of Making Oligosaccharide Crystals
JP2013501973A (en) * 2009-08-07 2013-01-17 アリババ グループ ホールディング リミテッド Account parallel processing method and system

Also Published As

Publication number Publication date
JP3611110B2 (en) 2005-01-19

Similar Documents

Publication Publication Date Title
US8671032B2 (en) Providing payment software application as enterprise services
JP5876802B2 (en) Portfolio optimization ordering system
WO2009029331A1 (en) Methods and systems for executing a plurality of money transfers having a fluctuating parameter
KR20050018865A (en) System and method for managing accumulative fund connected to the use of credit card
CN103748602A (en) Paying non-settlement transactions
AU2004323839B2 (en) Computer-based payment transaction system and repository
WO1992004679A1 (en) Transaction processor
JP2009110125A (en) Settlement processor between accounts and processing method of settlement between accounts utilizing electronic recording credit
JP5103488B2 (en) Securities trading system and method, and program
JP3732113B2 (en) Transaction control system, method and program
CN112785262B (en) Mobile loan management method, mobile loan management system, mobile loan management server, and mobile loan management storage medium
JP2008135017A (en) Investment information processor, system, method, program, and program for investment information processing system
JP2002279191A (en) Predated completing process system and its method
JP4481754B2 (en) Securities trading system and method, and program
JP3471728B2 (en) Future date completion processing system and method
JP5461121B2 (en) Financial product transaction support system
JP3903471B2 (en) Complete processing system with date and time
KR100725465B1 (en) Foreign currency deposit system being capable of multiple fixed foreign currency deposit
KR100706083B1 (en) Complex system for managing capital adjustment and a method for the same
JP2003288490A (en) Automatic processing system, aggregation server and automatic processing method
CN110458661A (en) A kind of method and device carrying out the recommendation of Enterprise Financing scheme according to enterprise&#39;s cash flow
US20100305985A1 (en) Contract management system
JP2005085133A (en) Loan transaction system, computer program and method
JP3941946B2 (en) A recording medium recording a program for completion processing of a previous date and a program for canceling / recutting main processing
EP1591933A1 (en) A method and system for automated &#34;delivery-versus-payment&#34; settlements

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040225

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040423

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040714

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20040909

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20041013

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20041013

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 3611110

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20071029

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101029

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101029

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131029

Year of fee payment: 9

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term