JP2002244712A JP2001036276A JP2001036276A JP2002244712A JP 2002244712 A JP2002244712 A JP 2002244712A JP 2001036276 A JP2001036276 A JP 2001036276A JP 2001036276 A JP2001036276 A JP 2001036276A JP 2002244712 A JP2002244712 A JP 2002244712A
Authority
JP
Japan
Prior art keywords
belt
information
production
ribbed
cutting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2001036276A
Other languages
Japanese (ja)
Inventor
Koji Watanabe
幸二 渡邉
Masahide Naya
政秀 納谷
Norihisa Wakamiya
典久 若宮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bando Chemical Industries Ltd
Original Assignee
Bando Chemical Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bando Chemical Industries Ltd filed Critical Bando Chemical Industries Ltd
Priority to JP2001036276A priority Critical patent/JP2002244712A/en
Publication of JP2002244712A publication Critical patent/JP2002244712A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Abstract

PROBLEM TO BE SOLVED: To provide a production control system for a V-ribbed belt capable of simplifying a production control after die punching of the V-ribbed belt. SOLUTION: An ID card 18 is issued for a belt material 16A made by cutting a belt formed body 16 after die punching into a width according to the number of rib crests of each product belt 16B. From a lot guarantee card 15 recording individual information on each belt material 16A of the belt formed body 16, the information is successively transferred to each ID card 18. Based on the information of each ID card 18, a series of works are executed for every belt material 16A.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、多品種混合生産
されることが多いVリブドベルトの生産管理システムに
関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a production management system for V-ribbed belts, which is often produced in a mixed production of various kinds.

【0002】[0002]

【従来の技術】従来、伝動ベルト、例えばVリブドベル
トの生産ラインは、例えば図3に示すように、加硫成型
後、成形金型から型抜きされた後のベルト成形体を、各
リブ山数に応じた幅にカットしてベルト素材とする分割
カット工程S1、前記ベルト素材を研削してリブ山形状
を加工するリブ山加工工程S2、そのリブ山加工後のベ
ルト素材を反転する反転工程S3(バフ粉の除去を含
む)、リブ山加工後反転されたベルト素材にマークをイ
ンクジェット印刷するマーク印刷工程S4およびマーク
を印刷終了後のベルト素材を一定寸法の製品幅に小割カ
ットして製品ベルトとし検尺する小割カット・検尺工程
S5を順次施し、最終的に仕上げ検査S6をして、製品
ベルトを得るのが一般的である。
2. Description of the Related Art Conventionally, a production line of a power transmission belt, for example, a V-ribbed belt, as shown in, for example, FIG. A split cutting step S1 in which the belt material is cut to a width corresponding to the width, a rib ridge processing step S2 in which the belt material is ground to form a rib ridge shape, and a reversing step S3 in which the belt material after the rib ridge processing is reversed. (Including removal of buff powder), mark printing step S4 of ink-jet printing the mark on the inverted belt material after rib crest processing, and the belt material after the mark printing is cut into small parts to a product width of a certain size. In general, it is a general practice to sequentially perform a small cutting / measuring step S5 for measuring a belt and finally perform a finish inspection S6 to obtain a product belt.

【0003】そして、そのようなベルト成形体を搬送し
つつ、そのベルト成形体に対して、一連の作業を施しつ
つ、最終的に製品ベルトを得る生産ラインにおいて、一
連の作業をできるだけ効率よく管理したいという要求が
あることから、そのような生産ラインにおいて、磁気記
録手段を前記ベルト成形体に関連づけ、前記磁気記録手
段にベルト成形体についての情報を書き込んだり前記磁
気記録手段よりベルト成形体についての情報を読み込ん
だりし、その情報に基づいて生産管理を行うことが考え
られることから、出願人は、複数種類の製品ベルトを含
むベルト成形体ごとに一連の作業を施すものにおいて、
各ベルト成形体の管理を効率よく行うことができる磁気
記録手段による生産管理システムを先に提案している
(特開平11−170146号公報参照)。
[0003] In a production line for finally obtaining a product belt, a series of operations are performed on the belt molded body while conveying the belt molded body, and the series of operations are managed as efficiently as possible. In such a production line, a magnetic recording means is associated with the belt molded body, and information on the belt molded body is written in the magnetic recording means, or the magnetic recording means is used for the belt molded body. Since it is conceivable to read information and perform production management based on that information, the applicant has performed a series of operations for each belt molded body including multiple types of product belts,
A production management system using magnetic recording means capable of efficiently managing each formed belt has been proposed (see Japanese Patent Application Laid-Open No. H11-170146).

【0004】その生産管理システムにおいては、図3に
示すように、磁気記録手段として親記録手段101と子
記録手段102とを用い、分割カット工程S1は、親記
録手段101に記録されている情報に基づいてベルト成
形体103を複数のベルト素材103A(種類の異なる
製品ベルトのもととなる)とする分割カットを実行し、
研削工程S2においては、まず、ベルト素材103Aに
対応する子記録手段102毎に、親記録手段101から
各子記録手段102にベルト素材103A毎の生産計画
情報が転送され、それからその子記録手段102に記録
されている情報に基づき、各工程S3〜S5において各
作業の情報を取り出し、その情報に基づき一連の工程S
3〜S5について各ベルト素材103Aごとの作業を管
理しつつ、一連の工程の終了後に、親記録手段101
に、ベルト成形体(製品ベルト103B)についての新
たな情報を記録するという具合に、ベルト成形体毎の管
理が可能となり、多種多様な管理ができる。また、1つ
のベルト成形体についての情報は1つの親記録手段10
1に記録されていることとなるので、1つのベルト成形
体の生産管理を一括して行うことができるようにしてい
る。また、2つのベルト成形体に跨って、一連の工程が
行われるようになっても、流れを停滞させることなく、
それらを識別して、生産管理を行うことができるように
もなっている。
In the production management system, as shown in FIG. 3, a parent recording means 101 and a child recording means 102 are used as magnetic recording means. And performing a divided cut using the belt molded body 103 as a plurality of belt materials 103A (based on different types of product belts) based on
In the grinding step S2, first, production planning information for each belt material 103A is transferred from the parent recording means 101 to each child recording means 102 for each child recording means 102 corresponding to the belt material 103A. Based on the recorded information, information of each operation is extracted in each of steps S3 to S5, and a series of steps S is performed based on the information.
While the work for each belt material 103A is managed for 3 to S5, the parent recording unit 101
Furthermore, management of each belt molded body becomes possible, for example, recording new information on the belt molded body (product belt 103B), and various kinds of management can be performed. Information on one belt molded body is stored in one parent recording unit 10.
Therefore, the production management of one belt molded body can be performed collectively. Also, even if a series of processes are performed over two belt molded bodies, without stopping the flow,
They can be identified and production control can be performed.

【0005】[0005]

【発明が解決しようとする課題】しかしながら、そのよ
うな親記録手段101と子記録手段102を併用するの
は、それらの管理が面倒であるので、前述したような記
録手段を用いて、より一層効率よく管理したいという要
求がある。
However, using such a parent recording means 101 and a child recording means 102 together is troublesome to manage, so that the above-mentioned recording means is used to further improve the management. There is a demand for efficient management.

【0006】そこで、発明者は、前記第1のカット工程
から第2のカット工程までの間は、親記録手段を用いる
ことなく、子記録手段のみを用いることで管理でき、第
1のカット工程の前に、各ベルト素材毎の情報を、それ
に対応する磁気記録手段(子記録手段に相当)に記録
し、ベルト素材毎に管理するようにすれば、親記録手段
を省略できることに着想し、本発明をなすに至ったもの
である。
Therefore, the present inventor can manage from the first cutting step to the second cutting step by using only the child recording means without using the parent recording means. Before, the information for each belt material is recorded in the corresponding magnetic recording means (corresponding to the child recording means), and if the information is managed for each belt material, the idea that the parent recording means can be omitted, The present invention has been accomplished.

【0007】この発明は、Vリブドベルトの型抜き以降
の生産管理を簡素化できるVリブドベルトの生産管理シ
ステムを提供することを目的とする。
SUMMARY OF THE INVENTION An object of the present invention is to provide a V-ribbed belt production management system capable of simplifying the production management after the V-ribbed belt is removed from the mold.

【0008】[0008]

【課題を解決するための手段】本発明に係るVリブドベ
ルトの生産管理システムは、型抜き後のベルト成形体
を、各製品ベルトのリブ山数に応じた幅にカットしてベ
ルト素材とする第1のカット工程、前記ベルト素材を研
削してリブ山形状を加工するリブ山加工工程、リブ山加
工後のベルト素材を一定寸法の製品幅にカットして製品
ベルトとする第2のカット工程を順に有するVリブドベ
ルトの生産ラインにおいて、前記ベルト成形体毎の情報
が記録される第1の記録手段と、前記各ベルト素材に対
応して設けられ前記ベルト素材毎の情報が記録される第
2の記録手段とを用い、前記各記録手段に記録されてい
る情報に基づいてVリブドベルトの生産を管理するVリ
ブドベルトの生産管理システムにおいて、前記Vリブド
ベルトについて生産計画情報が、日毎にかつベルト成形
体毎に整理して記憶される生産計画情報記憶手段と、前
記生産計画情報記憶手段に記憶されている前記ベルト成
形体毎の情報を前記第1の記録手段に書き込む第1の情
報書込手段と、前記第1のカット工程において、前記第
1の記録手段から、第1のカット工程から第2のカット
工程までのベルト成形体毎の情報を読み取る情報読取手
段と、前記第1のカット工程の終了後に、前記ベルト成
形体毎の情報を、前記ベルト素材毎の情報に振り分けて
前記第2の記録手段に転送する情報転送手段と、前記第
2の記録手段を、前記ベルト素材のリブ山加工工程から
第2のカット工程までの移動に対応させて搬送する搬送
コンベヤ手段とを備えるものである。
According to a production control system for a V-ribbed belt according to the present invention, a belt molded body after cutting is cut into a belt material by cutting into a width corresponding to the number of rib ridges of each product belt. (1) a cutting step, a rib ridge processing step of grinding the belt material to form a rib ridge shape, and a second cutting step of cutting the belt material after the rib ridge processing to a product width of a certain dimension to obtain a product belt. In the production line of the V-ribbed belt having the order, a first recording means for recording information for each of the belt moldings, and a second recording means provided for each of the belt materials and for recording the information for each of the belt materials. A V-ribbed belt production management system for managing the production of the V-ribbed belt based on information recorded in each of the recording means by using a recording unit. Production plan information storage means for storing image information on a daily basis and for each belt molded body; and storing the information for each belt molded body stored in the production plan information storage means in the first recording means. A first information writing means for writing the information on each belt molded body from a first cutting step to a second cutting step from the first recording means in the first cutting step; Means, information transfer means for distributing information for each of the belt compacts to information for each of the belt materials after the first cutting step, and transferring the information to the second recording means; and Means for transporting the belt material in accordance with the movement of the belt material from the rib crest processing step to the second cutting step.

【0009】このようにすれば、Vリブドベルトについ
ての生産計画情報が生産計画情報記憶手段によって、日
毎にベルト成形体毎に整理して記憶されおり、生産する
予定の日になると、生産計画情報記憶手段に記憶されて
いる前記ベルト成形体毎の情報が、第1の情報書込手段
によって、第1の記録手段に書き込まれる。
In this way, the production plan information on the V-ribbed belt is stored by the production plan information storage means on a day-by-day basis for each of the belt compacts. The information for each of the belt moldings stored in the means is written to the first recording means by the first information writing means.

【0010】そして、前記第1のカット工程において、
まず、前記第1の記録手段から、情報読取手段によっ
て、第1のカット工程から第2のカット工程まで作業に
必要なベルト成形体毎の情報が読み取られる。前記第1
のカット工程の終了後に、情報転送手段によって、前記
ベルト成形体毎の生産計画情報が、前記ベルト素材毎の
情報に振り分けて前記第2の記録手段に転送される。こ
の第2の記録手段は、前記各ベルト素材に対応している
ものであり、搬送コンベヤ手段によって、前記各ベルト
素材の各工程間の移動に対応させて、リブ山加工工程か
ら第2のカット工程まで搬送され、順次必要な情報が読
み取られ、それに基づいて各工程での作業が行われる。
In the first cutting step,
First, from the first recording unit, information for each belt molded body necessary for the operation from the first cutting step to the second cutting step is read by the information reading unit. The first
After the completion of the cutting step, the information transfer means distributes the production plan information for each of the belt compacts to the information for each of the belt materials and transfers the information to the second recording means. The second recording means corresponds to each of the belt materials, and the conveyor means conveys the belt materials in accordance with the movement of each belt material between the respective steps. The information is conveyed to the process, necessary information is sequentially read, and operations in each process are performed based on the information.

【0011】請求項2に記載のように、前記搬送コンベ
ヤ手段は、前記第2の記録手段を、搬送ベース上に載置
した状態で搬送するようにすることが望ましい。
It is preferable that the conveyor means conveys the second recording means in a state of being placed on a conveyance base.

【0012】このようにすれば、第2の記録手段の搬送
が繰り返し行われても、搬送ベースが摩耗するだけであ
るので、搬送ベースのみを交換することで、長期間にわ
たって第2の記録手段を利用することができる。
With this configuration, even if the transport of the second recording means is repeatedly performed, the transport base is only worn out. Therefore, by replacing only the transport base, the second recording means can be maintained for a long time. Can be used.

【0013】請求項3に記載のように、前記第2のカッ
ト工程の終了後、前記ベルト素材毎の加工情報を、前記
第1の記録手段に記録されているベルト成形体毎の情報
と比較し、仕上げ検査を行う検査手段を備えることが望
ましい。
According to a third aspect of the present invention, after the end of the second cutting step, the processing information of each belt material is compared with the information of each belt molded body recorded in the first recording means. It is desirable to provide an inspection means for performing a final inspection.

【0014】このようにすれば、第1の記録手段に記録
されているベルト成形体毎の情報と、ベルト素材毎の加
工情報とを比較することで、検査手段によって、ベルト
成形体(ベルト素材)が、希望通りに生産されているか
否かが簡単にチェックされる。
[0014] According to this configuration, by comparing the information for each belt molded body recorded in the first recording means with the processing information for each belt material, the inspection means allows the belt molded body (belt material) to be compared. ) Is easily checked to see if it is produced as desired.

【0015】請求項4に記載のように、前記生産計画情
報記憶手段は、各生産工場に設けられており、電気通信
回線を通じて、日毎の生産計画情報を作成するサーバー
から前記日毎の生産計画情報が送られるようにすること
ができる。
According to a fourth aspect of the present invention, the production plan information storage means is provided at each production factory, and is provided from a server which creates the daily production plan information through a telecommunication line. Can be sent.

【0016】このようにすれば、サーバーにおいて、各
生産工場の日毎の生産計画がなされ、それらが、日毎の
生産計画情報として、電気通信回線を通じて各生産工場
の生産計画情報記憶手段に送られることとなり、各生産
工場での生産計画が、サーバーにおいて集中管理され
る。
In this way, the server makes daily production plans of the respective production factories and sends them as daily production plan information to the production plan information storage means of the respective production factories via the electric communication line. The production plan at each production factory is centrally managed in the server.

【0017】請求項5に記載のように、前記サーバー
は、パソコンなどの通信端末によって、生産を必要とす
るVリブドベルトについての注文情報が入力され、一定
の条件に従って前記注文情報を整理して、日毎の生産計
画情報を作成するようにできる。
According to a fifth aspect of the present invention, the server receives, by a communication terminal such as a personal computer, order information on a V-ribbed belt requiring production and sorts the order information according to a certain condition. Daily production plan information can be created.

【0018】このようにすれば、サーバーに、パソコン
などの通信端末によって、生産を必要とするVリブドベ
ルトについての注文情報が順次入力され、その注文情報
が一定の条件に従って整理され、日毎の生産計画情報が
効率よく作成される。
According to this configuration, order information on V-ribbed belts requiring production is sequentially input to the server by a communication terminal such as a personal computer, and the order information is arranged according to certain conditions, and a daily production plan is prepared. Information is created efficiently.

【0019】[0019]

【発明の実施の形態】以下、この発明の実施の形態を図
面に沿って説明する。
Embodiments of the present invention will be described below with reference to the drawings.

【0020】図1は本発明に係るVリブドベルトの生産
管理システムの概略構成を示す説明図、図2は同Vリブ
ドベルトの生産管理システムの処理の流れを示す説明図
である。
FIG. 1 is an explanatory diagram showing a schematic configuration of a V-ribbed belt production management system according to the present invention, and FIG. 2 is an explanatory diagram showing a processing flow of the V-ribbed belt production management system.

【0021】本発明は、型抜き後のベルト成形体を、各
製品ベルトのリブ山数に応じた幅にカットしてベルト素
材とする第1のカット工程、前記ベルト素材を研削して
リブ山形状を加工するリブ山加工工程、リブ山加工後の
ベルト素材を一定寸法の製品幅にカットして製品ベルト
とする第2のカット工程を順に有するVリブドベルトの
生産ラインにおいて、Vリブドベルトの生産を管理する
生産管理システムである。
According to the present invention, there is provided a first cutting step in which a belt molded body after die-cutting is cut into a width corresponding to the number of rib ridges of each product belt to obtain a belt material. The production of a V-ribbed belt is performed in a production line of a V-ribbed belt having a rib cutting process for processing a shape and a second cutting process for sequentially cutting a belt material after the rib cutting into a product width of a certain size to form a product belt. It is a production management system that manages.

【0022】本発明に係るVリブドベルトの生産管理シ
ステムは、図1に概略構成を示すように、特定の複数の
利用者によって、パソコンなどの通信端末11によって
生産を必要とするVリブドベルトについての注文情報を
電子化したものが、電気通信回線を通じてサーバー12
に伝送され、該サーバー12において、一定の条件に従
って前記注文情報を整理して、日毎の生産計画情報を作
成するようになっている。ここで、日毎の生産計画情報
は、注文情報を振り分けて一日毎に生産する予定のベル
トを振り分けたものであり、ベルト成形体毎に整理され
ており、そのベルト成形体からどのような製品ベルトを
生産するかを含む。
The production control system for a V-ribbed belt according to the present invention, as schematically shown in FIG. 1, has an order for a V-ribbed belt that requires production by a specific plurality of users by a communication terminal 11 such as a personal computer. The computerized information is transmitted to the server 12 through a telecommunication line.
The server 12 arranges the order information in accordance with certain conditions and creates daily production plan information. Here, the daily production plan information is obtained by allocating order information and allocating belts to be produced on a daily basis, and is arranged for each belt molded body. Including producing.

【0023】それから、サーバー12より、電気通信回
線を通じて各生産工場毎に設けられているパソコンなど
からなる生産計画情報記憶装置13に、その生産工場の
日毎の生産計画情報が伝送される。
Then, the daily production plan information of the production factory is transmitted from the server 12 to the production plan information storage device 13 composed of a personal computer or the like provided at each production factory via an electric communication line.

【0024】前記生産計画情報記憶装置13は、前記サ
ーバー12より送られてきたVリブドベルトの日毎の生
産計画情報がベルト成形体毎に整理して記憶されてお
り、この生産計画情報記憶装置13に記憶されている前
記日毎の生産計画情報が、第1の情報書込手段14に
て、1つのベルト成形体毎(ロット毎)に、バーコード
として記録される第1の記録手段であるロット保証カー
ド15に書き込まれる。なお、後述するように、第2の
カット工程が終了した後に、ロット保証カード15に記
録されているベルト成形体毎の情報と、ベルト成形体
(ベルト素材)毎の加工情報とを比較して、希望通りに
生産されているか否かのチェックを行うようにしている
が、その情報をロット保証カード15に書き込み、それ
を読み取ることで生産計画情報記憶装置13に入力し、
さらに、サーバー12にその情報を送るようにしてもよ
い。さらに、この情報を、サーバー12を介して通信端
末11に電気通信回線を通じて送るようにしてもよい。
The production plan information storage device 13 stores the daily production plan information of the V-ribbed belt sent from the server 12 organized for each belt molded body. The stored daily production plan information is recorded as a bar code by the first information writing means 14 for each belt molding (for each lot) as a first recording means. It is written on the card 15. As will be described later, after the second cutting step is completed, the information of each belt molded body recorded on the lot guarantee card 15 is compared with the processing information of each belt molded body (belt material). It is checked whether or not the product is produced as desired. However, the information is written into the lot guarantee card 15 and read therefrom to be input to the production plan information storage device 13,
Further, the information may be sent to the server 12. Further, this information may be sent to the communication terminal 11 via the server 12 via an electric communication line.

【0025】前記ロット保証カード15は、ベルト成形
体16を形成するための金型17と一緒に搬送され、第
1のカット工程S11(分割カット)において、まず、
情報読取手段であるバーコードリーダー21にて、ロッ
ト保証カード15のバーコードから、第1のカット工程
から第2のカット工程までにおいて必要とされるベルト
成形体毎の情報が読み取られ、パソコンなどからなり第
1のカット工程S11での作業を管理する第1の管理装
置22に取り込まれる。
The lot guarantee card 15 is conveyed together with a mold 17 for forming a belt molded body 16, and in a first cutting step S11 (divided cutting), first,
The barcode reader 21 serving as information reading means reads information from the barcode of the lot assurance card 15 for each belt molded body required from the first cutting step to the second cutting step, and outputs the information to a personal computer or the like. And is taken into the first management device 22 which manages the work in the first cutting step S11.

【0026】そして、その情報に基づき、まず、各製品
ベルトのリブ山数に応じた幅に、第1のカット機(図示
せず)にて分割カットしてベルト素材16A、・・・と
する(第1のカット工程S11)。その第1のカット工
程S11の終了後に、情報転送手段としても機能する前
記管理装置22によって、前記ベルト成形体毎の情報を
前記ベルト素材16A毎の情報に振り分け、前記各ベル
ト素材16Aに対応して設けられる前記第2の記録手段
であるIDカード18(磁気記録手段)に転送され、前
記ベルト素材16A毎の情報がリーダー・ライター19
にて記録される。そして、そのIDカード18に記録さ
れている情報が、第2の管理装置23によって順次読み
込まれ、その情報に基づいて、それ以降の工程について
の加工がベルト素材16A毎に順次実施される。よっ
て、前記ロット保証カード15とIDカード18とに記
録されている生産計画情報に基づいて、生産管理が行わ
れることになる。
Then, based on the information, first, a first cutting machine (not shown) divides the product belt into widths corresponding to the number of rib ridges of each product belt to obtain belt materials 16A,. (First cutting step S11). After the end of the first cutting step S11, the management device 22, which also functions as information transfer means, sorts information for each of the belt compacts into information for each of the belt materials 16A, and corresponds to each of the belt materials 16A. The information is transferred to an ID card 18 (magnetic recording means), which is the second recording means provided by the user, and the information for each belt material 16A is read and written by a reader / writer 19.
Recorded in. Then, the information recorded on the ID card 18 is sequentially read by the second management device 23, and processing for the subsequent steps is sequentially performed for each belt material 16A based on the information. Therefore, production management is performed based on the production plan information recorded on the lot guarantee card 15 and the ID card 18.

【0027】このIDカード18は、図2に示すよう
に、前記ベルト素材16Aのリブ山加工工程から第2の
カット工程までの移動に対応させて、搬送コンベヤ手段
20によって搬送され、第2のカット工程の終了後リブ
山加工工程まで戻すようにされる。よって、前記IDカ
ード18は、リブ山加工工程と第2のカット工程との間
を循環するようになっている。
As shown in FIG. 2, the ID card 18 is transported by the transport conveyor means 20 in accordance with the movement of the belt material 16A from the rib ridge processing step to the second cutting step. After the end of the cutting process, the process is returned to the rib ridge machining process. Accordingly, the ID card 18 circulates between the rib cutting step and the second cutting step.

【0028】また、前記搬送コンベヤ手段20は、前記
IDカード18を、搬送ベース(図示せず)上に載置し
た状態で搬送するものである。そして、前記搬送コンベ
ヤ手段20は、研削工程S12、反転工程S13、マー
ク印刷工程S14、および小割・検尺工程S15におい
て情報の遣り取りを行うために停止する4つの停止位置
を有する。
The transport conveyor means 20 transports the ID card 18 while being mounted on a transport base (not shown). The transport conveyor means 20 has four stop positions for stopping information exchange in the grinding step S12, the reversing step S13, the mark printing step S14, and the small splitting / inspecting step S15.

【0029】前記小割・検尺工程S15(第2のカット
工程)の終了後、情報読取手段24にてロット保証カー
ド15からベルト成形体毎の情報(生産計画情報)を読
み取り、パソコンなどからなる仕上げ検査手段25によ
って、前記情報と前記ベルト成形体(ベルト素材)毎の
加工情報とを比較して、希望通り生産されているか否か
のチェックが行われる(仕上げ検査S16)。それか
ら、チェックを合格した製品ベルト16Bは、荷箱に梱
包され、出荷される。
After the completion of the above-mentioned splitting / inspecting step S15 (second cutting step), the information reading means 24 reads information (production planning information) for each belt molded body from the lot guarantee card 15 and reads it from a personal computer or the like. The finishing inspection means 25 compares the information with the processing information for each belt molded body (belt material) to check whether or not the belt is manufactured as desired (finish inspection S16). Then, the product belt 16B that has passed the check is packed in a packing box and shipped.

【0030】上記構成のシステムによれば、まず、生産
計画情報記憶装置13によって、ロット保証カード15
にベルト成形体毎の情報が、バーコードとして記録され
る。
According to the system having the above configuration, first, the production plan information storage device 13 stores the lot guarantee card 15
The information of each belt molded body is recorded as a bar code.

【0031】ロット保証カード15は、まず、金型17
と共に搬送されつつ、帆布挿入、コード巻き、テープ巻
き、底ゴム巻き、および加硫等の一連の加工がなされ
る。その後、加硫後のベルト成形体16が型抜きされ、
第1のカット工程S11に移行することになる。
First, the lot guarantee card 15 is provided with a mold 17.
, A series of processes such as canvas insertion, cord winding, tape winding, bottom rubber winding, and vulcanization are performed. Thereafter, the vulcanized belt molded body 16 is die-cut,
The process shifts to the first cutting step S11.

【0032】それから、第1のカット工程S11におい
て、ロット保証カード15から、必要な情報が読み込ま
れ、その情報に基づいて、型抜き後のベルト成形体16
が、各製品ベルトのリブ山数に応じた幅に第1のカット
機(図示せず)にて幅カットされ、ベルト素材16Aと
される。なお、ロット保証カード15は、作業者によっ
て適宜持ち運ばれる。
Then, in a first cutting step S11, necessary information is read from the lot guarantee card 15, and based on the information, the belt molded body 16 after die-cutting is read.
Is cut into a width corresponding to the number of rib ridges of each product belt by a first cutting machine (not shown) to obtain a belt material 16A. The lot guarantee card 15 is carried by an operator as appropriate.

【0033】そして、幅カットが終了すると、ベルト素
材16A毎の管理に移行する。そして、ベルト素材16
A毎に、IDカード18が発行されることになるので、
それに1つのベルト成形体16の各ベルト素材16Aに
ついての個別の情報が、各ベルト素材16Aに対応する
IDカード18に転送され、その情報がIDカード18
に順次書き込まれる。即ち、ベルト成形体16が、例え
ば4つに切断される場合には、4つのベルト素材16A
によって、1つのロットであるベルト成形体16が形成
されるので、1つのロット保証カード15に対して4つ
のIDカード18が対応することとなり、各IDカード
18それぞれに対し4つのベルト素材16Aそれぞれの
情報が書き込まれる。ベルト素材16A毎の情報が記録
され、それに基づいて、以降の加工が実行される。
When the width cutting is completed, the process shifts to the management for each belt material 16A. And the belt material 16
Since the ID card 18 will be issued for each A,
In addition, individual information about each belt material 16A of one belt molded body 16 is transferred to the ID card 18 corresponding to each belt material 16A, and the information is transferred to the ID card 18.
Are written sequentially. That is, when the belt molded body 16 is cut into, for example, four pieces, four belt materials 16A
As a result, the belt molded body 16 as one lot is formed, so that four ID cards 18 correspond to one lot guarantee card 15 and four belt materials 16A correspond to each ID card 18 respectively. Is written. Information for each belt material 16A is recorded, and subsequent processing is executed based on the information.

【0034】従って、IDカード18は、各ベルト成形
体16に含まれる製品ベルトの種類に対応する数だけ発
行する必要があるが、IDカード18は、搬送コンベヤ
手段20にて循環しているので、繰り返し再利用される
ことになる。すなわち、ベルト素材16Aの流れに対応
して前記各位置に順次移動させるようになっており、I
Dカード18は、循環可能なるように構成され、一連の
工程の各工程、例えばリブ山加工位置、反転位置、マー
キング位置、小割カット・検尺位置において停止するよ
うになっている。それから、各ベルト素材16Aについ
ての一連の工程S12〜S14が、IDカード18に記
録されている情報に基づき、管理装置23によって、各
ベルト素材16A毎に独立に管理される。また、各工程
において新たな情報が発生した場合は、その情報が、各
ベルト素材16Aに対応するIDカード18に書き込ま
れる。
Therefore, it is necessary to issue the ID cards 18 in a number corresponding to the type of the product belt included in each belt molded body 16, but since the ID cards 18 are circulated by the conveyor means 20, Will be reused repeatedly. That is, the belt material 16A is sequentially moved to each of the positions according to the flow of the belt material 16A.
The D card 18 is configured to be able to circulate, and stops at each step of a series of steps, for example, at a rib crest processing position, an inversion position, a marking position, and a small cutting / measuring position. Then, a series of steps S12 to S14 for each belt material 16A is independently managed by the management device 23 for each belt material 16A based on the information recorded on the ID card 18. When new information is generated in each step, the information is written to the ID card 18 corresponding to each belt material 16A.

【0035】前記ベルト素材16Aは、まず、研削機
(リブ山加工機)にて研削してリブ山形状が加工される
(リブ山加工工程S12)。そのリブ山加工後のベルト
素材16Aが反転機(図示せず)によって反転され(反
転工程S13)、インクジェットプリンタ(図示せず)
によってベルト素材16A裏面に必要なマークが印刷さ
れる(印刷工程S14)。
The belt material 16A is first ground by a grinding machine (rib ridge processing machine) to form a rib ridge shape (rib ridge processing step S12). The belt material 16A after the rib ridge processing is reversed by a reversing machine (not shown) (reversing step S13) and an ink jet printer (not shown).
Thereby, necessary marks are printed on the back surface of the belt material 16A (printing step S14).

【0036】それから、リブ山加工後反転されマークが
印刷されたベルト素材16Aを、第2のカット機(図示
せず)にて一定寸法の製品幅に小割カットして検尺され
(第2のカット工程S15)、最終的に製品ベルト16
Bとされ、仕上げ検査工程S16を経て出荷される。な
お、IDカード18は第2カット工程S15が終了する
と、リブ山加工工程S12まで戻されるように循環さ
れ、次いで搬送されてくるベルト素材16Aに対し再利
用される。
Then, the belt material 16A on which the mark has been printed after the rib ridge processing has been inverted is cut into small pieces of a predetermined width by a second cutting machine (not shown), and is scaled (second measurement). Cutting step S15), and finally the product belt 16
B and shipped after the finish inspection step S16. When the second cutting step S15 is completed, the ID card 18 is circulated so as to return to the rib ridge processing step S12, and is reused for the belt material 16A that is subsequently transported.

【0037】このようにして、IDカード18の移動と
ベルト素材16Aの生産ラインでの移動とを同期して行
うようにしているので、生産計画情報とベルト素材16
Aとの流れを一致させて、ベルト素材16Aの情報を把
握することが容易となる。
As described above, the movement of the ID card 18 and the movement of the belt material 16A on the production line are performed in synchronization with each other.
It is easy to grasp the information of the belt material 16A by matching the flow with A.

【0038】1つのベルト成形体16Aについての一連
の工程の終了後にはロット保証カード15は、仕上げ検
査工程S16にまで作業者によって運ばれており、ベル
ト成形体16に対応するIDカード18からロット保証
カード15に対し各ベルト素材16Aについて各工程に
おいて発生した新たな情報が転送され、ベルト成形体1
6についての情報が更新される。
After completion of a series of steps for one belt molded body 16A, the lot guarantee card 15 is carried by the operator to the finish inspection step S16, and the lot guarantee card 15 is transferred from the ID card 18 corresponding to the belt molded body 16 to the lot. New information generated in each process for each belt material 16A is transferred to the warranty card 15 and the belt molding 1
The information about 6 is updated.

【0039】このように、1つのベルト成形体16に含
まれる各ベルト素材16Aは、異なるIDカード18に
て管理するようにしているので、各ベルト成形体16に
含まれるベルト素材16Aに、種類の異なるものが含ま
れていても、種類の異なるものは異なるIDカード18
の生産計画情報にて管理されることとなり、種類の相異
による間違いを生ずることなく、管理することが可能と
なる。それに加えて、2つのベルト成形体16に跨っ
て、一連の工程が行われるようになっても、流れを停滞
させることなく、それらを識別して、生産管理を行うこ
とができる。
As described above, since each belt material 16A included in one belt molded body 16 is managed by a different ID card 18, the type of the belt material 16A included in each belt molded body 16 is different. Of different types are included in different ID cards 18
, And can be managed without causing an error due to a difference in type. In addition, even if a series of processes are performed over the two belt molded bodies 16, the flow can be identified and production control can be performed without stopping the flow.

【0040】さらに、前記IDカード18の情報は最終
的にはロット保証カード15に戻すようにしているの
で、1つのロットについての情報はロット保証カード1
5に記録されていることとなり、一括して管理すること
が実現される。
Further, since the information of the ID card 18 is finally returned to the lot guarantee card 15, the information on one lot is
5, so that collective management is realized.

【0041】[0041]

【発明の効果】この発明は、以上に説明したように実施
され、以下に述べるような効果を奏する。
The present invention is embodied as described above, and has the following effects.

【0042】本発明に係るVリブドベルトの生産管理シ
ステムは、日毎の生産計画情報や加工情報を書き込んだ
り読み込んだりする第1の記録手段を作業者が搬送する
一方、ベルト素材についての情報を記録する第2の記録
手段のみを搬送コンベヤ手段にて搬送するようにしてい
るので、Vリブドベルトの型抜き以降の生産管理を簡素
化することができる。
In the production control system for a V-ribbed belt according to the present invention, an operator transports first recording means for writing and reading daily production plan information and processing information, while recording information on a belt material. Since only the second recording unit is conveyed by the conveyor unit, the production management after the die cutting of the V-ribbed belt can be simplified.

【0043】請求項2に記載のようにすれば、第2の記
録手段を、搬送ベース上に載置した状態で搬送するの
で、搬送ベースのみを交換するだけで、長期にわたって
使用することができる。
According to the second aspect of the present invention, since the second recording means is conveyed while being mounted on the conveyance base, it can be used for a long time only by changing the conveyance base alone. .

【0044】請求項3に記載のように、第2のカット工
程の終了後、第1の記録手段に記録されているベルト成
形体毎の情報と、ベルト成形体毎(ベルト素材毎)の加
工情報とを、検査手段によって比較するようにすれば、
希望通りに生産されているか否かを簡単にチェックする
ことができる。
According to a third aspect of the present invention, after completion of the second cutting step, information for each belt molded body recorded in the first recording means and processing for each belt molded body (for each belt material). By comparing the information with the inspection means,
You can easily check whether it is produced as you want.

【0045】請求項4に記載のように、サーバーにおい
て、各生産工場の日毎の生産計画を作成し、それらを日
毎の生産計画情報として、電気通信回線を通じて各生産
工場の生産計画情報記憶手段に送るようにすれば、各生
産工場での生産計画を、サーバーにおいて集中管理する
ことができる。
According to a fourth aspect of the present invention, the server creates daily production plans of each production plant and stores them as daily production plan information in the production plan information storage means of each production plant through a telecommunication line. If sent, the production plan at each production factory can be centrally managed by the server.

【0046】請求項5に記載のように、サーバーに、パ
ソコンなどの通信端末によって、生産を必要とするVリ
ブドベルトについての注文情報を順次入力するようにす
れば、その注文情報を一定の条件に従って整理し、日毎
の生産計画情報を効率よく作成することができる。
According to a fifth aspect of the present invention, if the order information on the V-ribbed belt requiring production is sequentially input to the server by a communication terminal such as a personal computer, the order information can be input in accordance with certain conditions. It is possible to organize and efficiently create daily production plan information.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係るVリブドベルトの生産管理システ
ムの概略構成を示す説明図である。
FIG. 1 is an explanatory diagram showing a schematic configuration of a V-ribbed belt production management system according to the present invention.

【図2】同Vリブドベルトの生産管理システムの処理の
流れを示す説明図である。
FIG. 2 is an explanatory diagram showing a processing flow of the production control system for the V-ribbed belt.

【図3】従来例についての図2と同様の図である。FIG. 3 is a view similar to FIG. 2 for a conventional example.

【符号の説明】[Explanation of symbols]

11 通信端末 12 サーバー 13 生産計画情報記憶装置 14 第1の情報書込手段 15 ロット保証カード(第1の記録手段) 16 ベルト成形体 16A ベルト素材 16B 製品ベルト 17 金型 18 IDカード(第2の記録手段) 19 リーダーライター 20 搬送コンベヤ手段 21 バーコードリーダー(情報読取手段) 22 第1の管理装置 23 第2の管理装置 Reference Signs List 11 communication terminal 12 server 13 production plan information storage device 14 first information writing means 15 lot guarantee card (first recording means) 16 belt molded body 16A belt material 16B product belt 17 mold 18 ID card (second Recording means) 19 reader / writer 20 transport conveyor means 21 barcode reader (information reading means) 22 first management device 23 second management device

───────────────────────────────────────────────────── フロントページの続き (72)発明者 若宮 典久 兵庫県神戸市兵庫区明和通3丁目2番15号 バンドー化学株式会社内 Fターム(参考) 3C100 AA03 AA34 BB39 CC08 CC11 DD05 DD14 DD33 EE20  ────────────────────────────────────────────────── ─── Continued on the front page (72) Inventor Norihisa Wakamiya 3-2-1-15 Meiwadori, Hyogo-ku, Kobe-shi, Hyogo F-term in Bando Chemical Co., Ltd. 3C100 AA03 AA34 BB39 CC08 CC11 DD05 DD14 DD33 EE20

Claims (5)

【特許請求の範囲】[Claims] 【請求項1】 型抜き後のベルト成形体を、各製品ベル
トのリブ山数に応じた幅にカットしてベルト素材とする
第1のカット工程、前記ベルト素材を研削してリブ山形
状を加工するリブ山加工工程、リブ山加工後のベルト素
材を一定寸法の製品幅にカットして製品ベルトとする第
2のカット工程を順に有するVリブドベルトの生産ライ
ンにおいて、前記ベルト成形体毎の情報が記録される第
1の記録手段と、前記各ベルト素材に対応して設けられ
前記ベルト素材毎の情報が記録される第2の記録手段と
を用い、前記各記録手段に記録されている情報に基づい
てVリブドベルトの生産を管理するVリブドベルトの生
産管理システムにおいて、 前記Vリブドベルトについて生産計画情報が、日毎にか
つベルト成形体毎に整理して記憶される生産計画情報記
憶手段と、 前記生産計画情報記憶手段に記憶されている前記ベルト
成形体毎の情報を前記第1の記録手段に書き込む第1の
情報書込手段と、 前記第1のカット工程において、前記第1の記録手段か
ら、第1のカット工程から第2のカット工程までのベル
ト成形体毎の情報を読み取る情報読取手段と、 前記第1のカット工程の終了後に、前記ベルト成形体毎
の情報を、前記ベルト素材毎の情報に振り分けて前記第
2の記録手段に転送する情報転送手段と、 前記第2の記録手段を、前記ベルト素材のリブ山加工工
程から第2のカット工程までの移動に対応させて搬送す
る搬送コンベヤ手段とを備えることを特徴とするVリブ
ドベルトの生産管理システム。
1. A first cutting step of cutting a belt molded body after die cutting into a width corresponding to the number of rib ridges of each product belt to form a belt material, and grinding the belt material to form a rib ridge shape. In the production line of the V-ribbed belt having a rib cutting process for processing and a second cutting process in which the belt material after the rib cutting is cut into a product width of a certain dimension to form a product belt, Using a first recording means for recording information on each of the belt materials, and a second recording means for recording information for each of the belt materials, the information being recorded on each of the belt materials. A production management system for managing the production of V-ribbed belts on the basis of V-ribbed belts, wherein production planning information on the V-ribbed belts is arranged and stored for each day and for each belt molding. An information storage unit; a first information writing unit that writes information for each of the belt compacts stored in the production plan information storage unit into the first recording unit; Information reading means for reading information from the first recording means for each belt molded body from the first cutting step to the second cutting step; and information for each of the belt molded bodies after the first cutting step is completed. Information transfer means for distributing the information to the information for each belt material and transferring the information to the second recording means, and moving the second recording means from a rib crest processing step of the belt material to a second cutting step. And a conveyor means for conveying the V-ribbed belt in accordance with the above.
【請求項2】 前記搬送コンベヤ手段は、前記第2の記
録手段を、搬送ベース上に載置した状態で搬送するもの
である請求項1記載のVリブドベルトの生産管理システ
ム。
2. The V-ribbed belt production management system according to claim 1, wherein said conveyor means conveys said second recording means in a state of being placed on a conveyance base.
【請求項3】 前記第2のカット工程の終了後、前記ベ
ルト成形体毎の加工情報を、前記第1の記録手段に記録
されているベルト成形体毎の情報と比較し、仕上げ検査
を行う検査手段を備える請求項1又は2記載のVリブド
ベルトの生産管理システム。
3. After the completion of the second cutting step, the processing information for each of the belt compacts is compared with the information for each of the belt compacts recorded in the first recording means, and a finishing inspection is performed. 3. The production control system for a V-ribbed belt according to claim 1, further comprising an inspection unit.
【請求項4】 前記生産計画情報記憶手段は、各生産工
場に設けられており、電気通信回線を通じて、日毎の生
産計画情報を作成するサーバーから前記日毎の生産計画
情報が送られるものである請求項1〜3のいずれかに記
載のVリブドベルトの生産管理システム。
4. The production plan information storage means is provided in each production factory, and the daily production plan information is sent from a server that creates daily production plan information through an electric communication line. Item 4. A production control system for a V-ribbed belt according to any one of Items 1 to 3.
【請求項5】 前記サーバーは、パソコンなどの通信端
末によって、生産を必要とするVリブドベルトについて
の注文情報が入力され、一定の条件に従って前記注文情
報を整理して、各生産工場での日毎の生産計画情報を作
成するものである請求項4記載のVリブドベルトの生産
管理システム。
5. The server receives, by a communication terminal such as a personal computer, order information on V-ribbed belts that require production, sorts the order information according to certain conditions, and stores the order information at each production plant on a daily basis. 5. The production management system for a V-ribbed belt according to claim 4, wherein the production planning information is created.
JP2001036276A 2001-02-14 2001-02-14 Production control system for v-ribbed belt Pending JP2002244712A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001036276A JP2002244712A (en) 2001-02-14 2001-02-14 Production control system for v-ribbed belt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001036276A JP2002244712A (en) 2001-02-14 2001-02-14 Production control system for v-ribbed belt

Publications (1)

Publication Number Publication Date
JP2002244712A true JP2002244712A (en) 2002-08-30

Family

ID=18899572

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001036276A Pending JP2002244712A (en) 2001-02-14 2001-02-14 Production control system for v-ribbed belt

Country Status (1)

Country Link
JP (1) JP2002244712A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005052705A1 (en) * 2003-11-28 2005-06-09 Matsushita Electric Industrial Co., Ltd. Circuit substrate manufacturing method and system, substrate used for the same, and circuit substrate using the same

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2005052705A1 (en) * 2003-11-28 2005-06-09 Matsushita Electric Industrial Co., Ltd. Circuit substrate manufacturing method and system, substrate used for the same, and circuit substrate using the same

Similar Documents

Publication Publication Date Title
CN105388860B (en) A kind of intelligent manufacturing system of multiple-unit containing robot based on smart-RFID labels
US7006883B2 (en) Production system for composite product and production method for manufacturing of same
US7028890B2 (en) Identification tag and identified object
CN101681466A (en) Order fulfillment and content management systems and methods
JP2006039903A (en) System for using work instruction with ic tag
JP2002244712A (en) Production control system for v-ribbed belt
EP3392810A1 (en) Method for elaborating work orders to be executed by a mes/mom system
JPH04179184A (en) Printed wiring board and manufacture thereof
KR20130004888A (en) Carrier member having barcode carved
JP4660902B2 (en) Workpiece manufacturing management system
JPH0561878A (en) Production control information processing system
JP2000219307A (en) Product inspecting and sorting system
CN102576413A (en) Personalizing card-shaped data carriers
CN211281750U (en) Automatic binding equipment for product boxing information
JP2009123037A (en) Apparatus for generating mounting board nesting layout display, and mounting board nesting device
JP4812965B2 (en) Production management system for transmission belt production line
JP2006113903A (en) Manufacturing system
CN210722154U (en) Two-dimensional code identifier and identification system for steel cold machining process
EP1688810A1 (en) Circuit substrate manufacturing method and system, substrate used for the same, and circuit substrate using the same
CN110286662A (en) Flexible manufacturing system based on C2M mode
JP2003131715A (en) Device, method and program for production instruction
JPH04175116A (en) Control device for production line
JPS63267601A (en) Mask management facility
JP2005040982A (en) Material data control system for tire manufacturing equipment
JP2024006335A (en) Carrier tape manufacturing method, management system, management method and management program