JP2002162103A - Bath boiler device with hot water supply function - Google Patents

Bath boiler device with hot water supply function

Info

Publication number
JP2002162103A
JP2002162103A JP2000360834A JP2000360834A JP2002162103A JP 2002162103 A JP2002162103 A JP 2002162103A JP 2000360834 A JP2000360834 A JP 2000360834A JP 2000360834 A JP2000360834 A JP 2000360834A JP 2002162103 A JP2002162103 A JP 2002162103A
Authority
JP
Japan
Prior art keywords
hot water
bath
water supply
flow rate
filling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000360834A
Other languages
Japanese (ja)
Inventor
Hidekazu Fukui
秀和 福井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Noritz Corp
Original Assignee
Noritz Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Noritz Corp filed Critical Noritz Corp
Priority to JP2000360834A priority Critical patent/JP2002162103A/en
Publication of JP2002162103A publication Critical patent/JP2002162103A/en
Pending legal-status Critical Current

Links

Landscapes

  • Control For Baths (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a bath boiler device with a hot water supply function formed that an actual preparation completion time approaches a set bath preparation completion time and announcement of bath preparation completion is different from a bath preparation completion time. SOLUTION: A bath boiler device with a hot water supply function is formed that in addition to reheating of bath tube water operation, a bath automatic hot water supply function is provided, and by pre-engaging a bath preparation completion time, pre-engaging operation to complete bath preparation of a bath before a pre-engaged bath preparation completion time is practicable. The bath boiler device comprises a flow rate regulating means 19 to regulate a flow rate of automatic hot water-filling hot water supply; and a controller 40 to compute a given hot water filling time and a hot water filling starting time by using a hot water filling total amount for automatic hot water filling hot water supply and a hot water filling flow rate for computation based on a pre-engaged bath preparation completion time. The controller 40 controls the flow rate regulating means 19 so that an actually flowing hot water filling flow rate is adjusted to the hot water filling flow rate for computation.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は給湯機能付き風呂釜
装置に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a bath kettle having a hot water supply function.

【0002】[0002]

【従来の技術】従来、浴槽水の追い焚き加熱運転の他
に、上水道からの水を熱交換加熱して得た温水を浴槽へ
も自動給湯できるようにした給湯機能を備え、予約時刻
設定手段により風呂の入浴準備完了時刻を予約すること
で、該予約した入浴準備完了時刻以前に風呂設定温度で
浴槽への自動湯張り給湯を完了するようにした予約運転
ができる給湯機能付き風呂釜装置が提供されている。こ
の風呂入浴の予約運転ができる給湯機能付き風呂釜装置
においては、浴槽への湯張り総量と単位時間当たりの湯
張り流量とから湯張りの完了に必要な所要湯張り時間を
逆算して、湯張り開始時刻を求めていた。
2. Description of the Related Art Conventionally, in addition to a reheating heating operation of bathtub water, a hot water supply function for automatically supplying hot water to a bathtub by heat exchange and heating of water from a water supply is provided, and a reservation time setting means is provided. By reserving the bath preparation completion time of the bath, a bath cooker device with a hot water supply function capable of performing a reserved operation to complete the automatic hot water supply to the bathtub at the bath set temperature before the reserved bath preparation completion time is provided. Provided. In this bath kettle device with a hot water supply function capable of performing a reserved bath bath operation, the required hot water filling time required to complete the hot water filling is calculated back from the total amount of hot water filling the bathtub and the hot water flow rate per unit time. I was asking for the start time.

【0003】[0003]

【発明が解決しようとする課題】ところが、上記所要湯
張り時間を演算するための単位時間当たりの湯張り流量
に関しては、上水道から供給される水の水圧が低水圧状
態であることを想定した固定値を用いて所要湯張り時間
の計算をしていたため、高水圧地域等では実際の所要湯
張り時間が短くなり、予約した入浴準備完了時刻よりか
なり早く実際の湯張りがなされて入浴準備が完了してし
まう問題があった。しかも場合によっては、実際の入浴
準備が完了した後の保温燃焼に入った状態においても未
だ予約した入浴準備完了時刻ではないので、入浴準備完
了のお知らせが鳴らないといったことが生じ、放熱ロス
を伴うと共に、ユーザの立場からして好ましくない状態
が生じていた。
However, with regard to the flow rate of filling water per unit time for calculating the required filling time, it is assumed that the pressure of the water supplied from the water supply system is low. Since the required hot water filling time was calculated using the values, the actual hot water filling time was shortened in high water pressure areas, etc., and the actual hot water was filled much earlier than the reserved bath preparation completion time, and the bath preparation was completed. There was a problem. Moreover, depending on the case, even in the state where the warming combustion has been started after the actual bathing preparation is completed, the bathing preparation completion time is not the reserved bathing preparation completion time yet, so that the notification of the bathing preparation completion does not sound, resulting in heat dissipation loss. At the same time, an unfavorable state has arisen from the viewpoint of the user.

【0004】そこで本発明は、上記従来における入浴の
予約運転ができる給湯機能付き風呂釜装置における不都
合を解消し、設定した入浴準備完了時刻に対して実際に
入浴準備が完了した時刻を近づけることができ、入浴準
備完了のお知らせと実際の入浴準備完了の時刻とがかけ
離れてしまわないようにすることができる給湯機能付き
風呂釜装置の提供を課題とする。
Accordingly, the present invention solves the above-mentioned disadvantages in the conventional bath kettle apparatus having a hot-water supply function capable of performing a reserved bathing operation, and makes the time when the bathing preparation is actually completed closer to the set bathing preparation completion time. It is an object of the present invention to provide a bath kettle device with a hot water supply function that can prevent a notice of completion of bathing preparation and a time of completion of actual bathing preparation from being far apart.

【0005】[0005]

【課題を解決するための手段】上記課題を解決するた
め、本発明の給湯機能付き風呂釜装置は、浴槽水の追い
焚き加熱運転の他に、上水道からの水を熱交換加熱して
得た温水を浴槽へも自動給湯できるようにした給湯機能
を備え、予約時刻設定手段により風呂の入浴準備完了時
刻を予約することで、該予約した入浴準備完了時刻以前
に風呂設定温度で浴槽への自動湯張り給湯を完了するよ
うにした予約運転ができる給湯機能付き風呂釜装置であ
って、少なくとも前記自動湯張り給湯の流量を調節する
流量調節手段と、前記予約された入浴準備完了時刻に基
づいて自動湯張り給湯の湯張り総量と演算用湯張り流量
とを用いて所要湯張り時間と湯張り開始時刻を演算する
ようにしたコントローラとを設備し、且つコントローラ
は、実際に流れる湯張り流量が前記演算用湯張り流量に
なるように、前記流量調節手段の制御を行う構成とした
ことを第1の特徴としている。また本発明の給湯機能付
き風呂釜装置は、上記第1の特徴に加えて、湯張り開始
初期において、湯張り流量の流量調節手段を一旦全開状
態として、その全開流量を記憶し、この全開流量を次回
の予約運転の際の演算用湯張り流量とすることを第2の
特徴としている。また本発明の給湯機能付き風呂釜装置
は、上記第1又は第2の特徴に加えて、予約を行わない
普通の自動湯張り給湯運転の場合は、湯張り流量の流量
調節手段を全開状態とすることを第3の特徴としてい
る。
Means for Solving the Problems In order to solve the above-mentioned problems, a bath kettle apparatus with a hot-water supply function of the present invention is obtained by performing heat exchange heating of water from a water supply in addition to reheating heating operation of bathtub water. A hot water supply function that enables automatic supply of hot water to the bathtub is also provided, and the bathing preparation completion time of the bath is reserved by the reservation time setting means, so that the bathtub is automatically set at the bath set temperature before the reserved bathing preparation completion time. A bath kettle device with a hot water supply function capable of performing a reserved operation so as to complete hot water supply, wherein at least a flow rate adjusting means for adjusting a flow rate of the automatic hot water supply and a reserved bath preparation completion time based on the reserved time A controller that calculates the required filling time and the filling start time using the total filling amount of the automatic filling water supply and the calculating filling flow rate is provided. Ri so that the flow rate is the arithmetic water filling flow, and the first, characterized in that the arrangement for controlling the flow rate adjusting means. Further, in addition to the first feature, the bath kettle device with a hot water supply function of the present invention, in the initial stage of filling, first sets the flow control means for filling flow once in a fully opened state, stores the fully opened flow, and stores the fully opened flow. The second feature is that is used as the calculation filling water flow rate in the next reserved operation. In addition, in addition to the first or second feature, in the case of a normal automatic hot water supply operation without making a reservation, the bath water supply device with a hot water supply function of the present invention sets the flow control means of the hot water supply flow rate to a fully open state. Is a third feature.

【0006】[0006]

【発明の実施の形態】以下、本発明の実施の形態を図面
を参照しながら説明する。図1は本発明の実施形態を示
す給湯機能付き風呂釜装置の全体概略図、図2はリモコ
ンの風呂予約を行う部分の概略を示す図、図3はコント
ローラによる制御形態を示すフローチャート、図4はコ
ントローラによる他の制御形態を示すフローチャートで
ある。
Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is an overall schematic diagram of a bath kettle device with a hot water supply function according to an embodiment of the present invention, FIG. 2 is a diagram schematically illustrating a portion of a remote controller for performing bath reservation, FIG. 3 is a flowchart illustrating a control mode by a controller, FIG. 9 is a flowchart showing another control mode by the controller.

【0007】先ず図1において、給湯機能付き風呂釜装
置は、給湯回路10と風呂追い焚き循環路30とを有す
る。前記給湯回路10は、入水路11、給湯用熱交換器
12、出湯路13、バイパス14、一般給湯路15、風
呂自動給湯路16、バイパス水量調節器17、給湯水量
調節器18、風呂自動給湯流量調節器19からなる。前
記給湯用熱交換器12は瞬間加熱式とし、図示しないバ
ーナによって加熱される。前記風呂自動給湯流量調節器
19は、代わりに電磁式等の風呂自動給湯開閉器と流量
調節器とで構成してもよい。上水道等からの水が入水路
11を通って給湯用熱交換器12で瞬間加熱され、出湯
路13を通って、一般給湯路15から台所等に一般給湯
される。21は入水流量センサ、22は入水温度セン
サ、23は給湯温度センサで、24は風呂自動給湯流量
センサである。
First, in FIG. 1, the bath water heater device with a hot water supply function has a hot water supply circuit 10 and a bath reheating circuit 30. The hot water supply circuit 10 includes a water supply channel 11, a hot water supply heat exchanger 12, a hot water supply channel 13, a bypass 14, a general hot water supply channel 15, a bath automatic hot water supply channel 16, a bypass water flow controller 17, a hot water flow controller 18, and a bath automatic hot water supply. It comprises a flow controller 19. The hot water supply heat exchanger 12 is of an instantaneous heating type and is heated by a burner (not shown). The bath automatic hot water supply flow rate regulator 19 may alternatively be constituted by a bath automatic hot water supply switch such as an electromagnetic type and a flow rate regulator. Water from the water supply or the like is instantaneously heated by the hot water supply heat exchanger 12 through the water inlet channel 11, and is supplied to the kitchen or the like from the general hot water supply channel 15 through the hot water supply channel 13. 21 is an incoming water flow sensor, 22 is an incoming water temperature sensor, 23 is a hot water supply temperature sensor, and 24 is a bath automatic hot water supply flow sensor.

【0008】前記風呂追い焚き循環路30は、浴槽31
から風呂追い焚き用熱交換器32への戻り路33、風呂
追い焚き用熱交換器32から浴槽31への往き路34、
循環ポンプ35等からなる。前記風呂追い焚き用熱交換
器32は瞬間加熱式とし、図示しないバーナによって加
熱される。風呂追い焚き運転は循環ポンプ35の駆動に
より、浴槽31内の湯が戻り路33を通って風呂追い焚
き用熱交換器33に流れ、瞬間加熱されて往き路34を
通って浴槽31に戻ることで行われる。
The bath reheating circuit 30 includes a bathtub 31.
Return path 33 from the bath to the heat exchanger 32 for bath reheating, outgoing path 34 from the heat exchanger 32 for the bath reheating to the bathtub 31,
It comprises a circulation pump 35 and the like. The heat exchanger for bath reheating 32 is of an instantaneous heating type and is heated by a burner (not shown). In the bath reheating operation, the hot water in the bathtub 31 flows through the return path 33 to the heat exchanger 33 for bath reheating by driving the circulation pump 35, and is heated instantaneously and returns to the bathtub 31 through the outward path 34. Done in

【0009】40はコントローラ、50はリモコンであ
る。コントローラ40はセンサ類からの情報を入力し、
またリモコン50からの指令に基づいて装置各部に所定
の動作指令を行う。
Reference numeral 40 is a controller, and 50 is a remote controller. The controller 40 inputs information from sensors and the like,
Also, it issues a predetermined operation command to each section of the device based on a command from the remote controller 50.

【0010】上記の給湯機能付き風呂釜装置において、
浴槽31へ自動湯張りを行う場合には、リモコン50の
図示しない風呂自動湯張りスイッチをオンすることで、
前記給湯用熱交換器12を通って加熱された温水が風呂
設定温度等に調整され、風呂自動給湯調節器19によっ
て開放された風呂自動給湯路16を通って、風呂追い焚
き循環路30に入り、両搬送で戻り路33と往き路34
とを通って浴槽31に給湯される。
[0010] In the above bath kettle device having a hot water supply function,
When performing automatic hot water filling to the bathtub 31, by turning on a bath automatic hot water filling switch (not shown) of the remote controller 50,
The hot water heated through the hot water supply heat exchanger 12 is adjusted to a bath set temperature or the like, enters the bath automatic hot water supply passage 16 opened by the bath automatic hot water supply controller 19, and enters the bath reheating circuit 30. , Return path 33 and forward path 34 for both transports
And hot water is supplied to the bathtub 31.

【0011】次に図2を参照して、風呂の予約運転につ
いて説明する。予約運転は、例えばリモコン50の予約
運転設定部51で設定する。予め時計合わせボタン51
aで正確な現在時刻に合わせておき、先ずふろ予約ボタ
ン51bを押し、次に時刻設定ボタン51cで入浴準備
完了時刻を表示部51d上に表示しながら設定する。時
刻の設定が終わると、前記予約ボタンを再度押して、予
約運転を確定することで行う。
Next, the reservation operation of the bath will be described with reference to FIG. The reservation operation is set, for example, by the reservation operation setting section 51 of the remote controller 50. Clock setting button 51 in advance
First, the bath reservation button 51b is depressed, and then the bathing preparation completion time is set on the display section 51d by the time setting button 51c. When the time is set, the reservation button is pressed again to confirm the reservation operation.

【0012】前記リモコン50による風呂の予約運転が
設定された場合のコントローラ40による制御動作を、
図3のフローチャートを参照して説明する。コントロー
ラ40は入浴準備完了時刻Tが予約されると(ステッ
プS1でイエス)、予め設定された湯張り総量Qと演
算用湯張り流量Rとから所要湯張り時間Hを、H
=Q/Rの演算式で求める(ステップS2)。そし
て更に所要湯張り時間Hと前記入浴準備完了時刻T
とから湯張り開始時刻Tを演算する(ステップS
3)。
The control operation by the controller 40 when the bath reservation operation by the remote controller 50 is set,
This will be described with reference to the flowchart of FIG. The controller 40 when the bathing preparation completion time T r is reserved (YES in step S1), the required hot water filling time H n from the preset water filling amount Q t and calculating water filling flow R c, H n
= Determined by the arithmetic expression of Q t / R c (step S2). And further the required hot water filling time H n and the bathing preparation completion time T r
To calculate the hot water filling start time T s from the (step S
3).

【0013】前記湯張り総量Qは、浴槽31の大きさ
や形状に応じて所定の湯張り水位となるように、予め定
めた定量の湯張り総量Qとすることができる。また予
約者によって浴槽水位が設定されると、浴槽31の底面
積×設定水位等の演算により湯張り総量Qを求めるこ
とができる。また前記演算用湯張り流量Rは、前記風
呂自動給湯調節器19によって調節可能な固定の流量を
予め定めておくことができる。
[0013] The hot water filling amount Q t is such that a predetermined water filling level according to the size and shape of the bathtub 31 may be a hot water filling amount Q t of a predetermined quantitative. Also the bath water level is set by the subscriber, it is possible to obtain a hot water filling amount Q t by calculation, such as the bottom area × set water level of the bathtub 31. Also the arithmetic water filling flow R c is can be predetermined flow rate adjustable fixed by the bath automatic hot water supply controller 19.

【0014】以上のようにして湯張り開始時刻Tが演
算されると、コントローラ40は時刻を監視し、湯張り
開始時刻Tになると(ステップS4でイエス)、自動
湯張り給湯を開始する(ステップS5)。湯張り給湯
は、湯張り完了時に浴槽温度が風呂設定温度となるよう
に行う。自動湯張り給湯の期間中、コントローラ40
は、浴槽31に流れる実際の湯張り流量Rが前記演算
用湯張り流量Rになるように風呂自動給湯調節器19
を制御する(ステップS6)。
[0014] hot water filling start time T s is calculated as described above, the controller 40 monitors the time, at the water filling start time T s (YES in step S4), and starts the automatic water filling hot water (Step S5). The hot water supply is performed such that the bathtub temperature reaches the bath set temperature when the hot water filling is completed. During the automatic hot water supply, the controller 40
The actual hot water filling flows through the bath 31 the flow rate R j is the arithmetic water filling rate R baths automatic hot water supply so that the c adjuster 19
Is controlled (step S6).

【0015】所定の湯張り総量Qの給湯量が風呂自動
給湯流量センサ24によって検出されると、自動湯張り
給湯が完了し(ステップS7でイエス)、コントローラ
40は、保温運転を開始する(ステップS8)。この保
温運転は、浴槽温度が風呂設定温度未満になると追い焚
き運転を行うことで行うことができる。そしてコントロ
ーラ40は、時刻が入浴準備完了時刻Tになると(ス
テップS9でイエス)、入浴準備完了のお知らせを行う
(ステップS10)。このお知らせは、リモコン50等
を通じて音声と表示にて行うことができる。そして保温
運転は継続させる(ステップS11)。なお前記入浴準
備完了のお知らせに加えて、前記入浴準備完了時刻T
の少し前に、例えば「あと何分で入浴できます。」とい
った入浴準備完了の予告を報知するようにすることもで
きる。実際の入浴準備完了時刻を予約した入浴準備完了
時刻に近づけることができることで、この予告報知の価
値が上がる。
[0015] hot water supply amount of the predetermined hot water filling amount Q t is detected by the bath automatic hot water supply flow sensor 24, an automatic water filling hot water supply is completed (YES at step S7), and the controller 40 starts the maintenance operation ( Step S8). This warming operation can be performed by performing a reheating operation when the bathtub temperature falls below the bath set temperature. Then, when the time reaches the bath preparation completion time Tr (Yes in step S9), the controller 40 notifies completion of bath preparation (step S10). This notification can be made by voice and display through the remote controller 50 or the like. Then, the warming operation is continued (step S11). In addition to the notification of the completion of the bath preparation, the bath preparation completion time Tr
Shortly before, a notice of completion of bath preparation, for example, "You can take a bath in another minute." Since the actual bathing preparation completion time can be made closer to the reserved bathing preparation completion time, the value of this advance notice increases.

【0016】以上のようにして、風呂自動湯張り給湯に
おける実際の湯張り給湯流量Rを所要湯張り時間の演
算用湯張り流量Rになるように制御することで、実際
の入浴準備完了時刻を予約した入浴準備完了時刻T
近づけることができる。勿論、予約した入浴準備完了時
刻Tより遅れないように実際の湯張り給湯流量R
演算用湯張り流量Rより若干多くし、或いは湯張り開
始時刻Tを若干早めるように調節するようにしてもよ
い。
[0016] As described above, by controlling so that the actual water filling hot water flow rate R j at the bath automatic hot water filling hot water in the calculation hot water filling rate R c of the required water filling time, the actual bath ready The time can be made closer to the reserved bath preparation completion time Tr . Of course, slightly more than the actual hot water filling the hot water flow rate R j an operation for hot water filling flow rate R c so as not later than the bathing preparation completion time T r reserved, or to adjust the hot water filling start time T s to advance slightly You may do so.

【0017】図4を参照して、コントローラ40による
他の制御形態を説明する。この制御形態では、図3で説
明した制御例とは、ステップS2における所要湯張り時
間Hの演算に用いる演算用湯張り流量Rの定め方が
異なるのと、ステップS5−1において湯張りをする場
合、その開始初期に風呂自動給湯調節器19を一旦全開
状態として(ステップS5−2)、その際に流れる全開
流量を検出して記憶し(ステップS5−3)、次回の予
約運転の際の演算用湯張り流量Rとして用いることが
相違する。他のステップS1、S3〜S4、S5−1、
S6〜S11については、それぞれ図3のフローにおけ
るステップS1、S3〜S4、S5、S6〜S11と同
じである。この図4のフローにおけるステップS2は、
予約された入浴準備完了時刻Tに基づいてコントロー
ラ40が所要湯張り時間Hを演算するステップであ
る。本実施形態では、この所要湯張り時間Hの算出に
用いる演算用湯張り流量Rとして、前回の予約運転の
際にコントローラ40に記憶させた風呂自動給湯の全開
流量を用いる。この全開流量は風呂自動給湯調節器19
を全開状態とすることで得ることができる。
Referring to FIG. 4, another control form by the controller 40 will be described. In this control mode, the control example described in FIG. 3, a method of determining the calculating water filling rate R c used for calculation of the required water filling time H n differs from the step S2, hot water filling in step S5-1 In the early stage of the operation, the bath automatic hot water supply controller 19 is once fully opened (step S5-2), the fully opened flow rate flowing at that time is detected and stored (step S5-3), and the next reserved operation is performed. it is different from that used as the calculation hot water filling rate R c of the time. Other steps S1, S3 to S4, S5-1,
Steps S6 to S11 are the same as steps S1, S3 to S4, S5, and S6 to S11 in the flow of FIG. 3, respectively. Step S2 in the flow of FIG.
Controller 40 on the basis of the reserved bathing preparation completion time T r is the step of calculating the required water filling time H n. In the present embodiment, as the calculation hot water filling rate R c used for calculation of the required water filling time H n, using a full flow of bath automatic hot water that is stored in the controller 40 during their last reservation operation. The fully open flow rate is controlled by the bath automatic hot water supply controller 19.
Can be obtained by fully opening.

【0018】前回の予約運転での全開流量を演算用湯張
り流量Rとすることで、所要湯張り時間Hを短縮す
ることができ、それだけ入浴準備を短時間で行うことが
できる。勿論、実際の入浴準備完了時刻を予約の入浴準
備完了時刻Tに近づけることは、既述の実施形態の場
合と同様である。なお演算用湯張り流量Rとしては、
前回の予約運転の際に得た全開流量よりも多少低い流量
を用いて流量制御の確実性を確保することができる。こ
のような全開流量よりも多少低い流量を用いる場合も、
本発明では全開流量の範囲に入るものとする。前回の予
約運転時の全開流量を用いるのは、前回における全開流
量の傾向は最新の風呂自動給湯の状況を示すものと考え
られ、今回の運転の場合にも通じると考えられるからで
ある。また前回の予約運転の際に正しく流量を検出でき
なかった場合には、その前回における流量は記憶される
ことなく前々回の記憶が保持されて用いられることにな
る。
[0018] By an operation for hot water filling rate R c of the full flow in the previous reservation operation, it is possible to reduce the required water filling time H n, can be performed much bathing preparation in a short time. Of course, bringing the actual bath preparation completion time close to the reserved bath preparation completion time Tr is the same as in the above-described embodiment. Note The calculation hot water filling flow R c,
Using a flow rate slightly lower than the full open flow rate obtained in the previous reserved operation, the reliability of the flow rate control can be ensured. When using a flow rate slightly lower than such a full open flow rate,
In the present invention, it is assumed that the flow rate falls within the range of the full open flow rate. The reason why the fully opened flow rate at the time of the previous reserved operation is used is that the tendency of the fully opened flow rate at the previous time is considered to indicate the latest state of bath automatic hot water supply, and is considered to be applicable to the current operation. If the flow rate cannot be detected correctly at the time of the last reserved operation, the flow rate at the previous time is not stored, and the memory of the previous two times is retained and used.

【0019】図4において、コントローラ40は自動湯
張り給湯を開始すると(ステップS5−1)、一旦、風
呂自動給湯調節器19を全開状態にする(ステップS5
−2)。そしてその全開状態での全開流量を風呂自動給
湯流量センサ24で検出し、これをコントローラ40内
の記憶部に記憶させる(ステップS5−3)。この記憶
は次回の予約運転の際の演算用湯張り流量Rとして用
いられる。なお、コントローラ40が全開流量を記憶す
る際、前記風呂自動給湯流量センサ24でその値が正し
く検出されない場合や、記憶しようとした値が考えられ
る流量の値の範囲外になっている場合は、その値を記憶
することなく既存の値を保持することとする。前記範囲
外か否かの範囲は、予め実験等により定めておくことが
できる。
In FIG. 4, when the controller 40 starts the automatic hot water supply (step S5-1), the bath automatic hot water supply controller 19 is once fully opened (step S5).
-2). Then, the fully open flow rate in the fully open state is detected by the bath automatic hot water supply flow rate sensor 24, and this is stored in the storage unit in the controller 40 (step S5-3). The storage is used as the calculation hot water filling rate R c at the time of the next reservation operation. When the controller 40 stores the fully open flow rate, if the value is not correctly detected by the bath automatic hot water supply flow rate sensor 24, or if the value to be stored is out of the range of possible flow rate values, It is assumed that an existing value is retained without storing the value. The range outside the above range can be determined in advance by experiments or the like.

【0020】[0020]

【発明の効果】本発明は以上の構成、作用からなり、請
求項1に記載の給湯機能付き風呂釜装置によれば、浴槽
水の追い焚き加熱運転の他に、上水道からの水を熱交換
加熱して得た温水を浴槽へも自動給湯できるようにした
給湯機能を備え、予約時刻設定手段により風呂の入浴準
備完了時刻を予約することで、該予約した入浴準備完了
時刻以前に風呂設定温度で浴槽への自動湯張り給湯を完
了するようにした予約運転ができる給湯機能付き風呂釜
装置であって、少なくとも前記自動湯張り給湯の流量を
調節する流量調節手段と、前記予約された入浴準備完了
時刻に基づいて自動湯張り給湯の湯張り総量と演算用湯
張り流量とを用いて所要湯張り時間と湯張り開始時刻を
演算するようにしたコントローラとを設備し、且つコン
トローラは、実際に流れる湯張り流量が前記演算用湯張
り流量になるように、前記流量調節手段の制御を行う構
成としたので、設定した入浴準備完了時刻に対して実際
に入浴準備が完了した時刻を近づけることができ、入浴
準備完了のお知らせと実際の入浴準備完了の時刻とがか
け離れてしまわないようにすることができる。またこれ
によって、実際の入浴準備完了から予約した入浴準備完
了時刻までに消費する余分な放熱等を抑えることができ
る。また請求項2に記載の給湯機能付き風呂釜装置によ
れば、上記請求項1に記載の構成による効果に加えて、
湯張り開始初期において、湯張り流量の流量調節手段を
一旦全開状態として、その全開流量を記憶し、この全開
流量を次回の予約運転の際の演算用湯張り流量とするこ
ととしたので、入浴準備に要する時間を十分に短縮した
上で、実際の入浴準備完了時刻を予約した入浴準備完了
時刻に近づけることができる。また請求項3に記載の給
湯機能付き風呂釜装置によれば、上記請求項1又は2に
記載の構成による効果に加えて、予約を行わない普通の
自動湯張り給湯運転の場合は、湯張り流量の流量調節手
段を全開状態とすることとしたので、最短時間で入浴準
備を整えることができ、入浴予定者の希望にそうことが
できる。
According to the present invention having the above-described structure and operation, according to the first aspect of the present invention, in addition to the reheating heating operation of the bathtub water, the water exchange from the water supply system is carried out. A hot water supply function is provided that enables hot water obtained by heating to be automatically supplied to the bathtub, and the bath preparation completion time is reserved by the reservation time setting means, so that the bath setting temperature is set before the reserved bath preparation completion time. A bath water heater device with a hot water supply function capable of performing a reserved operation in which the automatic hot water supply to the bathtub is completed, wherein at least a flow rate adjusting means for adjusting a flow rate of the automatic hot water supply, and the reserved bath preparation A controller that calculates the required filling time and filling start time using the total filling amount of the automatic filling water supply and the filling amount for calculation based on the completion time; Since the configuration is such that the flow rate adjusting means is controlled so that the flowing hot water flow rate becomes the operation hot water flow rate, it is possible to bring the time at which the bathing preparation is actually completed close to the set bathing preparation completion time. It is possible to prevent the notification of the completion of bathing preparation and the actual time of bathing completion from being far apart. In addition, this makes it possible to suppress unnecessary heat dissipation or the like consumed from the completion of the actual bath preparation to the reserved bath preparation completion time. According to the bath kettle device with a hot water supply function of the second aspect, in addition to the effect of the configuration of the first aspect,
At the beginning of the filling operation, the flow control means for the filling flow is once set to the fully open state, the fully opened flow is stored, and the fully opened flow is used as the calculating filling flow for the next reserved operation. After sufficiently reducing the time required for preparation, the actual bathing preparation completion time can be made closer to the reserved bathing preparation completion time. According to the third aspect of the present invention, in addition to the effects of the first and second aspects, in the case of a normal automatic hot water supply hot water supply operation without making a reservation, the hot water supply operation is performed. Since the flow rate adjusting means is set to the fully open state, preparation for bathing can be prepared in the shortest time, and it is possible to meet the wishes of the person who will take a bath.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施形態を示す給湯機能付き風呂釜装
置の全体概略図である。
FIG. 1 is an overall schematic diagram of a bath kettle device with a hot water supply function showing an embodiment of the present invention.

【図2】リモコンの風呂予約を行う部分の概略を示す図
である。
FIG. 2 is a diagram schematically showing a portion of the remote controller for performing a bath reservation.

【図3】コントローラによる制御形態を示すフローチャ
ートである。
FIG. 3 is a flowchart showing a control mode of a controller.

【図4】コントローラによる他の制御形態を示すフロー
チャートである。
FIG. 4 is a flowchart showing another control mode of the controller.

【符号の説明】[Explanation of symbols]

10 給湯回路 11 入水路 12 給湯用熱交換器 13 出湯路 15 一般給湯路 16 風呂自動給湯路 19 風呂自動給湯調節器 21 入水流量センサ 22 入水温度センサ 23 給湯温度センサ 24 風呂自動給湯流量センサ 30 風呂追い焚き循環路 31 浴槽 32 風呂追い焚き用熱交換器 33 戻り路 34 往き路 35 循環ポンプ 40 コントローラ 50 リモコン Hn 所要湯張り時間 Qt 湯張り総量 Rc 演算用湯張り流量 Rj 実際の湯張り流量 Tr 入浴準備完了時刻 Ts 湯張り開始時刻 DESCRIPTION OF SYMBOLS 10 Hot-water supply circuit 11 Water inlet 12 Heat exchanger for hot-water supply 13 Hot-water outlet 15 General hot-water supply 16 Automatic bath hot-water supply 19 Automatic bath hot-water supply controller 21 Water flow sensor 22 Water temperature sensor 23 Hot-water supply temperature sensor 24 Bath automatic hot-water flow sensor 30 Bath Reheating circuit 31 Bath tub 32 Heat exchanger for bath reheating 33 Return path 34 Outgoing path 35 Circulation pump 40 Controller 50 Remote control Hn Required filling time Qt Total filling Rc Calculation filling flow Rj Actual filling flow Tr Tr bathing Preparation completion time Ts Filling start time

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 浴槽水の追い焚き加熱運転の他に、上水
道からの水を熱交換加熱して得た温水を浴槽へも自動給
湯できるようにした給湯機能を備え、予約時刻設定手段
により風呂の入浴準備完了時刻を予約することで、該予
約した入浴準備完了時刻以前に風呂設定温度で浴槽への
自動湯張り給湯を完了するようにした予約運転ができる
給湯機能付き風呂釜装置であって、少なくとも前記自動
湯張り給湯の流量を調節する流量調節手段と、前記予約
された入浴準備完了時刻に基づいて自動湯張り給湯の湯
張り総量と演算用湯張り流量とを用いて所要湯張り時間
と湯張り開始時刻を演算するようにしたコントローラと
を設備し、且つコントローラは、実際に流れる湯張り流
量が前記演算用湯張り流量になるように、前記流量調節
手段の制御を行う構成としたことを特徴とする給湯機能
付き風呂釜装置。
1. A hot water supply function for automatically heating hot water obtained by heat-exchanging water from a water supply to a bath tub in addition to a reheating heating operation of bath tub water. A bath-cooker device with a hot-water supply function capable of performing a reserved operation in which an automatic hot water supply to the bathtub is completed at a bath set temperature before the reserved bathing preparation completion time by reserving the bathing preparation completion time of the bath. At least a flow rate adjusting means for adjusting a flow rate of the automatic hot water supply, and a required hot water filling time using a total hot water supply amount and a calculation hot water flow rate based on the reserved bathing preparation completion time. And a controller configured to calculate the filling level, and the controller controls the flow rate adjusting means so that the actual filling level becomes the calculating filling level. A bath kettle device with a hot water supply function, characterized in that:
【請求項2】 湯張り開始初期において、湯張り流量の
流量調節手段を一旦全開状態として、その全開流量を記
憶し、この全開流量を次回の予約運転の際の演算用湯張
り流量とすることを特徴とする請求項1に記載の給湯機
能付き風呂釜装置。
2. At the beginning of the filling operation, the flow control means for the filling flow is once set to the fully open state, and the full opening flow is stored, and the full opening flow is used as the calculating filling flow for the next reserved operation. The bath kettle device with a hot water supply function according to claim 1, characterized in that:
【請求項3】 予約を行わない普通の自動湯張り給湯運
転の場合は、湯張り流量の流量調節手段を全開状態とす
ることを特徴とする請求項1又は2に記載の給湯機能付
き風呂釜装置。
3. The bath kettle with a hot water supply function according to claim 1, wherein in a normal automatic hot water supply operation without reservation, the flow rate adjusting means of the hot water supply flow rate is fully opened. apparatus.
JP2000360834A 2000-11-28 2000-11-28 Bath boiler device with hot water supply function Pending JP2002162103A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000360834A JP2002162103A (en) 2000-11-28 2000-11-28 Bath boiler device with hot water supply function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000360834A JP2002162103A (en) 2000-11-28 2000-11-28 Bath boiler device with hot water supply function

Publications (1)

Publication Number Publication Date
JP2002162103A true JP2002162103A (en) 2002-06-07

Family

ID=18832366

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000360834A Pending JP2002162103A (en) 2000-11-28 2000-11-28 Bath boiler device with hot water supply function

Country Status (1)

Country Link
JP (1) JP2002162103A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006183956A (en) * 2004-12-28 2006-07-13 Tokyo Gas Co Ltd Hot water supply system
JP2008128556A (en) * 2006-11-21 2008-06-05 Rinnai Corp Cogeneration system
JP2011141101A (en) * 2010-01-08 2011-07-21 Paloma Co Ltd Water heater
JP2011149592A (en) * 2010-01-20 2011-08-04 Paloma Co Ltd Water heater
JP2017106663A (en) * 2015-12-09 2017-06-15 株式会社パロマ Bath hot water supply system
JP2019060516A (en) * 2017-09-25 2019-04-18 リンナイ株式会社 Hot water system

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006183956A (en) * 2004-12-28 2006-07-13 Tokyo Gas Co Ltd Hot water supply system
JP2008128556A (en) * 2006-11-21 2008-06-05 Rinnai Corp Cogeneration system
JP4680870B2 (en) * 2006-11-21 2011-05-11 リンナイ株式会社 Cogeneration system
JP2011141101A (en) * 2010-01-08 2011-07-21 Paloma Co Ltd Water heater
JP2011149592A (en) * 2010-01-20 2011-08-04 Paloma Co Ltd Water heater
JP2017106663A (en) * 2015-12-09 2017-06-15 株式会社パロマ Bath hot water supply system
JP2019060516A (en) * 2017-09-25 2019-04-18 リンナイ株式会社 Hot water system

Similar Documents

Publication Publication Date Title
JP2002162103A (en) Bath boiler device with hot water supply function
JPH08166163A (en) Bath boiler with hot water heater
CN112577099B (en) Heating water heater, control method thereof and computer readable storage medium
JP3898670B2 (en) Hot water supply / memorial equipment
JP2005274090A (en) Hot-water storage type water heater
JPH0654184B2 (en) Bath equipment
JP2562661B2 (en) How to control the temperature of the water heater
JP7066564B2 (en) Bath water heater
JPH05118644A (en) Automatic bathwater warming method
JP2000274810A (en) Full automatic bath hot water supply apparatus
JPH01212860A (en) Automatic water supplementing device for bath
JPH08200800A (en) Bath boiler with water heater
JP3382692B2 (en) Stabilization control method of re-spring hot water temperature in water heater
JP3267150B2 (en) Bath kettle with water heater
JP2017227391A (en) Water heater
JP3091808B2 (en) Bath kettle with water heater
JP3810210B2 (en) Automatic bath equipment and method of chasing it
JP3566414B2 (en) Hot water supply device for bathtub
JP2565042B2 (en) Automatic bath filling method
JPH1123055A (en) Bath reheating device
JP3273000B2 (en) Water heater
JP2914857B2 (en) Hot water supply temperature control device for fully automatic bath equipment
JP2023070211A (en) bath water heater
JP2023116945A (en) Hot water supply system
JPH0814664A (en) Automatic refilling method for bath tub