JP2002104766A - Removing mechanism for heavy object hoist material - Google Patents

Removing mechanism for heavy object hoist material

Info

Publication number
JP2002104766A
JP2002104766A JP2000297831A JP2000297831A JP2002104766A JP 2002104766 A JP2002104766 A JP 2002104766A JP 2000297831 A JP2000297831 A JP 2000297831A JP 2000297831 A JP2000297831 A JP 2000297831A JP 2002104766 A JP2002104766 A JP 2002104766A
Authority
JP
Japan
Prior art keywords
ring
wire
lever
lifting
hook
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2000297831A
Other languages
Japanese (ja)
Other versions
JP4524031B2 (en
Inventor
Seiichiro Takai
征一郎 高井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TOOTETSU KK
Original Assignee
TOOTETSU KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TOOTETSU KK filed Critical TOOTETSU KK
Priority to JP2000297831A priority Critical patent/JP4524031B2/en
Publication of JP2002104766A publication Critical patent/JP2002104766A/en
Application granted granted Critical
Publication of JP4524031B2 publication Critical patent/JP4524031B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To make a winding wire extractable from a heavy object by a crane of short lift, by decreasing an extracting distance from the heavy object of the winding wire to shorten its extracting time. SOLUTION: A base end ring 14a and a tip end ring 14b are formed in both ends of a winding wire 14 wound to a heavy object 13, a first lower ring 11a and a first upper ring 11b are formed in a lower/upper end of a first wire 11. The first lower ring is engaged with the base end ring, the first upper ring is engaged with a hoist device 16. A second lower ring 12a and a second upper ring 12b are formed in a lower/upper end of a second wire 12, the second lower ring is engaged with the first lower ring through a lever 23. The second upper ring of a second hoist material applying tension is engaged with a wire engaging/disengaging means 19 provided in the hoist device, this wire engaging/ disengaging means automatically releases the second upper ring when tension to the second wire is released. The tip end ring is loosely fitted to the lever.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、防波堤や護岸の根
固めや保護に用いられるテトラポッド((株)テトラの
商標名)等の重量物を吊上げるワイヤ、ケーブル、化学
繊維系ロープ、チェーン等の重量物吊上げ材を重量物か
ら取外す機構に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a wire, a cable, a chemical fiber rope, and a chain for lifting heavy objects such as tetrapods (trade name of Tetra Co., Ltd.) used for solidifying and protecting breakwaters and seawalls. The present invention relates to a mechanism for removing a heavy lifting material from a heavy load.

【0002】[0002]

【従来の技術】従来、コンクリートブロック製のテトラ
ポッドを吊上げるには、図9〜図12に示すように、主
ワイヤ1及び巻付ワイヤ4を介して吊上げ装置6により
吊上げ、所定の場所に下ろしたときに自動的に巻付ワイ
ヤ4を取外せる機構が知られている。このワイヤ取外し
機構では、主ワイヤ1の下端にはロアリング1aが形成
され、上端にはアッパリング1bが形成される。また巻
付ワイヤ4の基端には基端リング4aが形成され、先端
には先端リング4bが形成される。吊上げ装置6はクレ
ーン(図示せず)と、このクレーンのビームの先端から
吊下げられたクレーン用フック7と、このクレーン用フ
ック7に係脱用ワイヤ8を介して吊下げられたワイヤ係
脱手段9とを有する。ワイヤ係脱手段9は係脱用ワイヤ
8の下端に取付けられた支軸9aと、中央が支軸9aに
回動可能に保持され基部9c及びフック本体9dからな
る係脱フック9bと、この係脱フック9bの基部9cに
設けられた重り9eとからなる。
2. Description of the Related Art Conventionally, a tetrapod made of concrete block is lifted by a lifting device 6 via a main wire 1 and a wrapping wire 4 as shown in FIGS. There is known a mechanism capable of automatically removing the wrapping wire 4 when it is lowered. In this wire removing mechanism, a lower ring 1a is formed at the lower end of the main wire 1, and an upper ring 1b is formed at the upper end. A proximal ring 4a is formed at the proximal end of the winding wire 4, and a distal ring 4b is formed at the distal end. The lifting device 6 includes a crane (not shown), a crane hook 7 suspended from the tip of a beam of the crane, and a wire disengagement hook disengaged from the crane hook 7 via a wire 8 for disengagement. Means 9. The wire engaging and disengaging means 9 includes a supporting shaft 9a attached to a lower end of the engaging and disengaging wire 8, an engaging and disengaging hook 9b having a center portion rotatably supported by the supporting shaft 9a and including a base 9c and a hook body 9d. And a weight 9e provided on a base 9c of the hook removal hook 9b.

【0003】また主ワイヤ1のロアリング1aはシャッ
クル5を介して巻付ワイヤ4の基端リング4aに係合
し、主ワイヤ1のアッパリング1bはクレーン用フック
7に係合し、更に巻付ワイヤ4の先端リング4bは係脱
フック9bのフック本体9dに係合可能に構成される。
更にワイヤ係脱手段9は係脱フック9bを支軸9aを中
心に回転させて重り9eを上昇させかつフック本体9d
を下降させた状態で、張力の掛った巻付ワイヤ4の先端
リング4bがフック本体9dに係合し、巻付ワイヤ4へ
の張力が解除されたときに、重り9eが下降しかつフッ
ク本体9dが上昇する方向に係脱フック9bが支軸9a
を中心に自動的に回転し、先端リング4bがフック本体
9dの先端から外れて自動的に解放されるように構成さ
れる。
The lower ring 1a of the main wire 1 is engaged with the base ring 4a of the winding wire 4 via a shackle 5, the upper ring 1b of the main wire 1 is engaged with a crane hook 7, and further wound. The distal end ring 4b of the wire 4 is configured to be able to engage with the hook body 9d of the hook 9b.
Further, the wire engaging and disengaging means 9 rotates the engaging and disengaging hook 9b about the support shaft 9a to raise the weight 9e, and the hook body 9d
When the tension is applied, the tip ring 4b of the wound wire 4 is engaged with the hook body 9d, and when the tension on the wound wire 4 is released, the weight 9e is lowered and the hook body 9d is lowered. The hook 9b engages with the support shaft 9a in the direction in which 9d rises.
, The tip ring 4b is detached from the tip of the hook body 9d and is automatically released.

【0004】このように構成されたワイヤ取外し機構を
用いて、テトラポッド3を吊上げるには、先ずクレーン
用フック7に主ワイヤ1のアッパリング1bを係合し、
かつ係脱用ワイヤ8を介してワイヤ係脱手段9を吊下げ
る。このとき主ワイヤ1のロアリング1aには巻付ワイ
ヤ4の基端リング4aをシャックル5を介して係合させ
る。この状態でクレーン用フック7がテトラポッド3の
上方に位置しかつ巻付ワイヤ4の下部がテトラポッド3
近傍の地面に着地するようにクレーンを操作する。次に
巻付ワイヤ4をテトラポッド3に巻付け、シャックル5
に通した後に、先端リング4bを係脱フック9bのフッ
ク本体9dに係合する。このとき巻付ワイヤ4には所定
の張力が掛っているので、先端リング4bはフック本体
9dに係合した状態に保持される(図9)。この状態で
クレーンを操作してクレーン用フック7を上昇させるこ
とにより、テトラポッド3を吊上げることができる。
In order to lift the tetrapod 3 using the wire removing mechanism configured as described above, first, the upper ring 1b of the main wire 1 is engaged with the crane hook 7,
In addition, the wire engaging / disengaging means 9 is suspended via the engaging / disengaging wire 8. At this time, the base ring 4 a of the winding wire 4 is engaged with the lower ring 1 a of the main wire 1 via the shackle 5. In this state, the crane hook 7 is located above the tetrapod 3 and the lower part of the winding wire 4 is
Operate the crane to land on the nearby ground. Next, the winding wire 4 is wound around the tetrapod 3 and a shackle 5
After that, the tip ring 4b is engaged with the hook main body 9d of the engaging / disengaging hook 9b. At this time, since a predetermined tension is applied to the wrapping wire 4, the tip ring 4b is held in a state of being engaged with the hook body 9d (FIG. 9). By operating the crane in this state and raising the crane hook 7, the tetrapod 3 can be lifted.

【0005】テトラポッド3が所定の場所の上方に位置
するようにクレーンを操作して、クレーン用フック7を
下降させると、テトラポッド3が所定の場所に着地する
(図9)。クレーン用フック7を更に下降させて主ワイ
ヤ1及び巻付ワイヤ4を緩めると、係脱フック9bが重
り9eの重力により支軸9aを中心に自動的に回転す
る、即ち重り9eが下降しかつフック本体9dが上昇す
るので、先端リング4bが自動的にフック本体9dの先
端から外れて解放される(図10)。この状態でクレー
ン用フック7を上昇させて主ワイヤ1を引上げると、巻
付ワイヤ4がシャックル5内を抜ける方向に摺動する
(図11)。主ワイヤ1を更に引上げると、巻付ワイヤ
4がシャックル5から抜けた後に(図12)、巻付ワイ
ヤ4をテトラポッド3から引抜くことができるようにな
っている。
When the crane is operated and the crane hook 7 is lowered so that the tetrapod 3 is located above the predetermined place, the tetrapod 3 lands at the predetermined place (FIG. 9). When the crane hook 7 is further lowered to loosen the main wire 1 and the wrapping wire 4, the hook 9b automatically rotates about the support shaft 9a by the gravity of the weight 9e, that is, the weight 9e is lowered and Since the hook body 9d rises, the tip ring 4b is automatically released from the tip of the hook body 9d and released (FIG. 10). When the main wire 1 is pulled up by raising the crane hook 7 in this state, the winding wire 4 slides in a direction to pass through the shackle 5 (FIG. 11). When the main wire 1 is further pulled up, the wound wire 4 can be pulled out from the tetrapod 3 after the wound wire 4 comes off from the shackle 5 (FIG. 12).

【0006】[0006]

【発明が解決しようとする課題】しかし、上記従来のワ
イヤ取外し機構では、巻付ワイヤのテトラポッドからの
引抜き距離が長いため、巻付ワイヤの引抜き時間が長く
なり、かつクレーン用フックの引上げ高さが高くなる不
具合があった。このため、揚程の短いクレーンではテト
ラポッドから巻付ワイヤを引抜くことができない問題点
があった。また、上記従来のワイヤ取外し機構では、巻
付ワイヤが長いため、巻付ワイヤを重量物から引抜くと
きに巻付ワイヤが突起物等に引っ掛かる確率が高くな
り、巻付ワイヤをテトラポッドから引抜くときの摩擦抵
抗が大きくなる。このため、巻付ワイヤが損傷し易い問
題点もあった。更に、上記従来のワイヤ取外し機構で
は、交換頻度の高い巻付ワイヤが長いため、巻付ワイヤ
の単価が高く、メンテナンス費用が増大する問題点もあ
った。
However, in the above-described conventional wire removing mechanism, since the distance of pulling out the wound wire from the tetrapod is long, the time required for pulling out the wound wire is long, and the lifting height of the crane hook is high. There was a problem that becomes high. For this reason, there was a problem that the winding wire could not be pulled out from the tetrapod with a crane having a short head. Further, in the above-described conventional wire removing mechanism, since the wound wire is long, when the wound wire is pulled out from a heavy object, the probability that the wound wire is caught by a projection or the like increases, and the wound wire is pulled from the tetrapod. Friction resistance when pulling out increases. For this reason, there was also a problem that the wound wire was easily damaged. Further, in the above-described conventional wire removing mechanism, there is also a problem that the winding wire whose replacement frequency is high is long, so that the unit price of the winding wire is high and the maintenance cost is increased.

【0007】本発明の第1の目的は、巻付吊上げ材の重
量物からの引抜き距離を短くすることができ、これによ
り巻付吊上げ材の引抜き時間を短縮できるとともに、揚
程の短い吊上げ装置でも重量物から巻付吊上げ材を引抜
くことができる、重量物吊上げ材の取外し機構を提供す
ることにある。本発明の第2の目的は、巻付吊上げ材の
全長を短くすることにより巻付吊上げ材を重量物から引
抜くときに巻付吊上げ材が突起物等に引っ掛かる確率を
低減することができ、これにより巻付吊上げ材の損傷を
少なくすることができる、重量物吊上げ材の取外し機構
を提供することにある。本発明の第3の目的は、交換頻
度の高い巻付吊上げ材の全長を短くすることができ、こ
れによりメンテナンス費用を低減できる、重量物吊上げ
材の取外し機構を提供することにある。本発明の第4の
目的は、重量物を吊上げるときにこの重量物に巻付けた
巻付吊上げ材の先端リングをレバーに速やかに遊嵌でき
る、重量物吊上げ材の取外し機構を提供することにあ
る。本発明の第5の目的は、第2吊上げ材、レバー及び
レバー用リングを個々に交換することができる、重量物
吊上げ材の取外し機構を提供することにある。
[0007] A first object of the present invention is to shorten the pulling distance of the wound hoisting material from the heavy object, thereby shortening the time required for pulling out the wound hoisting material. An object of the present invention is to provide a heavy lifting material removing mechanism capable of pulling out a wound lifting material from a heavy load. A second object of the present invention is to reduce the probability that the wound hoisting material is caught by a projection or the like when the wound hoisting material is pulled out from a heavy object by shortening the entire length of the wound hoisting material, Accordingly, it is an object of the present invention to provide a heavy lifting material detaching mechanism capable of reducing damage to the wound lifting material. A third object of the present invention is to provide a heavy lifting material detaching mechanism capable of shortening the overall length of a frequently-wound lifting material that is frequently replaced, thereby reducing maintenance costs. A fourth object of the present invention is to provide a heavy lifting material detaching mechanism capable of quickly fitting a tip ring of a wound lifting material wound around the heavy material to a lever when lifting the heavy material. It is in. A fifth object of the present invention is to provide a mechanism for removing a heavy lifting material, which can replace the second lifting material, the lever and the lever ring individually.

【0008】[0008]

【課題を解決するための手段】請求項1に係る発明は、
図1に示すように、両端に基端リング14a及び先端リ
ング14bが形成され重量物13に巻付けられる巻付吊
上げ材14と、下端に第1ロアリング11aが形成され
上端に第1アッパリング11bが形成され第1ロアリン
グ11aが基端リング14aに係合し第1アッパリング
11bが吊上げ装置16に係合する第1吊上げ材11
と、下端に第2ロアリング12aが形成され上端に第2
アッパリング12bが形成され第2ロアリング12aが
レバー23を介して第1ロアリング11aに係合する第
2吊上げ材12と、吊上げ装置16に設けられ張力の掛
った第2吊上げ材12の第2アッパリング12bが係合
し第2吊上げ材12への張力が解除されたときに第2ア
ッパリング12bを自動的に解放する吊上げ材係脱手段
19とを備えた重量物吊上げ材の取外し機構であって、
レバー23に先端リング14bが遊嵌されたことを特徴
とする重量物吊上げ材の取外し機構である。
The invention according to claim 1 is
As shown in FIG. 1, a base lifting ring 14 a and a distal end ring 14 b are formed at both ends, and a winding lifting material 14 wound around a heavy object 13, a first lower ring 11 a is formed at a lower end, and a first upper ring 11 b is formed at an upper end. Is formed, and the first lowering ring 11a is engaged with the base ring 14a and the first upper ring 11b is engaged with the lifting device 16.
And a second lowering 12a formed at the lower end and a second lowering 12a formed at the upper end.
A second lifting member 12 in which an upper ring 12b is formed and the second lower ring 12a is engaged with the first lower ring 11a via a lever 23; and a second upper member of the second lifting member 12 provided in the lifting device 16 and in tension. A lifting member engaging / disengaging means 19 for automatically releasing the second upper ring 12b when the ring 12b is engaged and the tension on the second lifting member 12 is released; hand,
This is a mechanism for removing a heavy lifting material, wherein the tip ring 14b is loosely fitted to the lever 23.

【0009】この請求項1に記載された重量物吊上げ材
の取外し機構では、重量物13を吊上げ装置16及び各
吊上げ材11,12,14を用いて吊上げ所定の場所に
下ろした後に、第1及び第2吊上げ材11,12を緩め
ると、第2吊上げ材12の第2アッパリング12bが吊
上げ材係脱手段19から自動的に解放される。この状態
で吊上げ装置16により第1吊上げ材11を引上げる
と、第2吊上げ材12が巻付吊上げ材14の先端リング
14b内を抜ける方向に摺動し、第1吊上げ材11を更
に引上げると、第2吊上げ材12が巻付吊上げ材14の
先端リング14bから抜けた後に、巻付吊上げ材14が
重量物13から引抜かれる。この結果、巻付吊上げ材1
4の重量物13からの引抜き距離を短くすることができ
るとともに、巻付吊上げ材14の全長を短くすることが
できる。
In the mechanism for removing a heavy object lifting material according to the first aspect of the present invention, after the heavy object 13 is lifted down to a predetermined place using the lifting device 16 and each of the lifting materials 11, 12, and 14, the first object is lifted. When the second lifting members 11 and 12 are loosened, the second upper ring 12b of the second lifting member 12 is automatically released from the lifting member engaging / disengaging means 19. When the first lifting member 11 is pulled up by the lifting device 16 in this state, the second lifting member 12 slides in a direction to pass through the inside of the tip ring 14b of the wound lifting member 14, and the first lifting member 11 is further pulled up. Then, after the second lifting member 12 has come off from the tip ring 14 b of the winding lifting member 14, the winding lifting member 14 is pulled out of the heavy object 13. As a result, the wound lifting material 1
4 can be shortened from the heavy load 13, and the entire length of the hoisting material 14 can be shortened.

【0010】請求項2に係る発明は、請求項1に係る発
明であって、更に図1に示すように、第1吊上げ材11
の第1ロアリング11aにレバー用フック24が取付け
られ、レバー23の一端23aにレバー用リング26が
取付けられ、レバー用リング26がレバー用フック24
に離脱可能に係止するように構成されたことを特徴とす
る。この請求項2に記載された重量物吊上げ材の取外し
機構では、重量物13に巻付けた巻付吊上げ材14の先
端リング14bをレバー用リング26側からレバー23
に遊嵌した後に、レバー用リング26をレバー用フック
24に係止し、更に第2吊上げ材12の第2アッパリン
グ12bを吊上げ材係脱手段19に係合するという、比
較的簡単な作業で重量物13の吊上げ作業を開始でき
る。このとき巻付吊上げ材14の先端リング14bをレ
バー用リング26側からレバー23に遊嵌することによ
り、巻付吊上げ材14の先端リング14bをレバー23
に速やかに遊嵌できる。
The invention according to claim 2 is the invention according to claim 1, and further includes a first lifting member 11 as shown in FIG.
A lever hook 24 is attached to the first lower ring 11a, a lever ring 26 is attached to one end 23a of the lever 23, and the lever ring 26 is attached to the lever hook 24.
Characterized in that it is configured to be releasably locked to the vehicle. In the mechanism for removing a heavy lifting material according to the second aspect of the present invention, the distal end ring 14b of the wound lifting material 14 wound around the heavy load 13 is moved from the lever ring 26 side to the lever 23.
After loosely fitting on the lever, the lever ring 26 is locked to the lever hook 24, and the second upper ring 12 b of the second lifting member 12 is engaged with the lifting member engaging / disengaging means 19. Thus, the lifting operation of the heavy object 13 can be started. At this time, the distal end ring 14b of the wound lifting member 14 is loosely fitted to the lever 23 from the lever ring 26 side, so that the distal ring 14b of the wound lifting member 14 is
Can be loosely fitted quickly.

【0011】請求項3に係る発明は、請求項1又は2に
係る発明であって、更に図5〜図7に示すように、レバ
ー用リング26がレバー23の一端23aに取外し可能
に取付けられ、第2吊上げ材12の第2ロアリング12
aがレバー23の他端23bに取外し可能に取付けられ
たことを特徴とする。この請求項3に記載された重量物
吊上げ材の取外し機構では、第2吊上げ材12の第2ロ
アリング12a及びレバー用リング26をレバー23か
らそれぞれ取外すことができるので、第2吊上げ材1
2、レバー23及びレバー用リング26を個々に交換す
ることができる。
The invention according to claim 3 is the invention according to claim 1 or 2, wherein the lever ring 26 is detachably attached to one end 23a of the lever 23, as shown in FIGS. , The second lowering 12 of the second lifting member 12
a is removably attached to the other end 23b of the lever 23. In the mechanism for removing a heavy lifting material according to the third aspect, the second lowering ring 12a and the lever ring 26 of the second lifting material 12 can be removed from the lever 23, respectively.
2. The lever 23 and the lever ring 26 can be individually exchanged.

【0012】[0012]

【発明の実施の形態】次に本発明の第1の実施の形態を
図面に基づいて説明する。図1に示すように、この実施
の形態では重量物13は中心から四方に脚13aが突出
するコンクリートブロック製のテトラポッド((株)テ
トラの商標名)である。このテトラポッド13には巻付
ワイヤ14が巻付けられ、この巻付ワイヤ14は第1及
び第2ワイヤ11,12を介して吊上げ装置16により
吊上げられるように構成される。巻付ワイヤ14の基端
には基端リング14aが形成され、先端には先端リング
14bが形成される。また第1ワイヤ11の下端には第
1ロアリング11aが形成され、上端には第1アッパリ
ング11bが形成される。更に第2ワイヤ12の下端に
は第2ロアリング12aが形成され、上端には第2アッ
パリング12bが形成される。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Next, a first embodiment of the present invention will be described with reference to the drawings. As shown in FIG. 1, in this embodiment, the weight 13 is a tetrapod (trade name of Tetra Corporation) made of a concrete block having legs 13a projecting from the center in all directions. A winding wire 14 is wound around the tetrapod 13, and the winding wire 14 is configured to be lifted by a lifting device 16 via the first and second wires 11 and 12. A proximal ring 14a is formed at the proximal end of the winding wire 14, and a distal ring 14b is formed at the distal end. A first lower ring 11a is formed at the lower end of the first wire 11, and a first upper ring 11b is formed at the upper end. Further, a second lower ring 12a is formed at a lower end of the second wire 12, and a second upper ring 12b is formed at an upper end.

【0013】吊上げ装置16はクレーン(図示せず)
と、このクレーンのビームの先端から吊下げられたクレ
ーン用フック17と、このクレーン用フック17に係脱
用ワイヤ18を介して吊下げられたワイヤ係脱手段19
とを有する。ワイヤ係脱手段19は係脱用ワイヤ18の
下端に取付けられた支軸19aと、中央が支軸19aに
回動可能に保持され基部19c及びフック本体19dか
らなる係脱フック19bと、この係脱フック19bの基
部19cに設けられた重り19eとにより構成される。
The lifting device 16 is a crane (not shown)
And a crane hook 17 suspended from the tip of the crane beam, and wire disengaging means 19 suspended from the crane hook 17 via a disengagement wire 18.
And The wire engaging and disengaging means 19 includes a supporting shaft 19a attached to a lower end of the engaging and disengaging wire 18, an engaging and disengaging hook 19b including a base 19c and a hook main body 19d whose center is rotatably held by the supporting shaft 19a. It comprises a weight 19e provided on the base 19c of the hook removal hook 19b.

【0014】第1ワイヤ11の第1ロアリング11aは
巻付ワイヤ14の基端リング14aに係合し、第1ワイ
ヤ11の第1アッパリング11bはクレーン用フック1
7に係合する。上記第1ロアリング11aと基端リング
14aとの間には第1シャックル21が介装される。ま
た第2ワイヤ12の第2ロアリング12aはレバー23
を介して第1ワイヤ11の第1ロアリング11aに係合
し、第2ワイヤ12の第2アッパリング12bは係脱フ
ック19bのフック本体19dに係合し、更にレバー2
3には巻付ワイヤ14の先端リング14bが遊嵌され
る。第1ロアリング11aには第2シャックル22を介
してレバー用フック24が取付けられ、レバー23の一
端23aにはレバー用リング26が取付けられる。レバ
ー用リング26はレバー用フック24に離脱可能に係止
するように構成される。
The first lower ring 11a of the first wire 11 is engaged with the proximal ring 14a of the wrapping wire 14, and the first upper ring 11b of the first wire 11 is
7 is engaged. A first shackle 21 is interposed between the first lower ring 11a and the base ring 14a. The second lowering 12 a of the second wire 12 is connected to the lever 23.
, The second upper ring 12b of the second wire 12 engages with the hook body 19d of the engaging / disengaging hook 19b, and furthermore, the lever 2
A distal end ring 14b of the wrapping wire 14 is loosely fitted in 3. A lever hook 24 is attached to the first lower ring 11 a via a second shackle 22, and a lever ring 26 is attached to one end 23 a of the lever 23. The lever ring 26 is configured to be detachably engaged with the lever hook 24.

【0015】巻付ワイヤ14の長さはこのワイヤ14を
テトラポッド13に巻付けたときに1周する長さに又は
それよりも僅かに長く設定される(図1及び図2)。ま
た第2ワイヤ12の長さはこの実施の形態では、第1ワ
イヤ11の下端に第2ワイヤ12(第2シャックル2
2、レバー用フック24、レバー用リング26及びレバ
ー23を含む。)及び巻付ワイヤ14(第1シャックル
21を含む。)を吊下げた状態で、第2ワイヤ12の下
端の方が巻付ワイヤ14の下端より上方に位置するよう
に設定される。これは巻付ワイヤ14をテトラポッド1
3から引抜くときに先端リング14bに遊挿されている
第2ワイヤ12が先端リング14bから抜ける前にテト
ラポッド13の下に潜り込むのを阻止するためである。
なお、巻付ワイヤ14をテトラポッド13から引抜くと
きに先端リング14bに遊挿されている第2ワイヤ12
が先端リング14bから抜ける前にテトラポッド13の
下方に潜り込むのを阻止できれば、 第1ワイヤ11の
下端に第2ワイヤ12(第2シャックル22、レバー用
フック24、レバー用リング26及びレバー23を含
む。)及び巻付ワイヤ14(第1シャックル21を含
む。)を吊下げた状態で、第2ワイヤ12の下端が巻付
ワイヤ14の下端とほぼ同一レベル(ほぼ同一高さ)に
なるように第2ワイヤ12の長さを設定してもよい。
The length of the wrapping wire 14 is set to a length that makes one round when the wire 14 is wrapped around the tetrapod 13 or slightly longer than that (FIGS. 1 and 2). In this embodiment, the length of the second wire 12 is equal to the length of the second wire 12 (the second shackle 2).
2, including a lever hook 24, a lever ring 26 and a lever 23. ) And the wrapping wire 14 (including the first shackle 21) are suspended such that the lower end of the second wire 12 is located above the lower end of the wrapping wire 14. This turns the winding wire 14 into the tetrapod 1
This is to prevent the second wire 12 loosely inserted into the distal ring 14b from being pulled under the tetrapod 13 before coming out of the distal ring 14b when the wire is pulled out of the distal ring 3.
When the winding wire 14 is pulled out from the tetrapod 13, the second wire 12
If the second wire 12 (the second shackle 22, the lever hook 24, the lever ring 26, and the lever 23) can be prevented from sinking below the tetrapod 13 before the And the winding wire 14 (including the first shackle 21) is suspended, so that the lower end of the second wire 12 is substantially at the same level (almost the same height) as the lower end of the winding wire 14. May be set to the length of the second wire 12.

【0016】上記レバー23は図5〜図7に示すように
略く字状に屈曲して形成され、レバー23の他端23b
は一端23aより厚く形成される。レバー23の他端2
3b近傍にはテーパ部23cが設けられ、このテーパ部
23cによりレバー23はその中央から他端23bに向
って次第に厚くなるように形成される。レバー23の一
端にはレバー用リング26を挿入可能な第1凹溝23d
と、第1ボルト31aを挿通可能な一対の第1通孔23
e,23eが形成される。またレバー23の他端23b
には第2ワイヤ12の第2ロアリング12aを挿入可能
な第2凹溝23fと、第2ボルト32aを挿通可能な一
対の第2通孔23g,23gと、第2ボルト32aの頭
部を挿入可能なボルト挿入穴23hと、第2ナット32
bを挿入可能なナット挿入凹部23iとが形成される。
As shown in FIGS. 5 to 7, the lever 23 is bent in a substantially rectangular shape, and the other end 23b of the lever 23 is formed.
Is formed thicker than one end 23a. The other end 2 of the lever 23
A taper portion 23c is provided near 3b, and the lever 23 is formed so as to be gradually thicker from the center toward the other end 23b by the taper portion 23c. A first concave groove 23d into which a lever ring 26 can be inserted is provided at one end of the lever 23.
And a pair of first through holes 23 through which the first bolt 31a can be inserted.
e and 23e are formed. The other end 23b of the lever 23
A second concave groove 23f into which the second lowering 12a of the second wire 12 can be inserted, a pair of second through holes 23g, 23g into which the second bolt 32a can be inserted, and a head of the second bolt 32a. Possible bolt insertion hole 23h and second nut 32
A nut insertion recess 23i into which b can be inserted is formed.

【0017】第1凹溝23dにレバー用リング26を挿
入した状態で一対の第1通孔23e,23eに第1ボル
ト31aを挿通してその先端に第1ナット31bを螺合
することにより、レバー用リング26がレバー23の一
端23aに取外し可能に取付けられる。また第2凹溝2
3fに第2ワイヤ12の第2ロアリング12aを挿入し
た状態で一対の第2通孔23g,23gに第2ボルト3
2aを挿通してその先端に第2ナット32bを螺合する
ことにより、第2ロアリング12aがレバー23の他端
23bに取外し可能に取付けられる。なお、第2ボルト
32aの頭部はボルト挿入穴23hに没入し、第2ナッ
ト32bはナット挿入凹部23iに没入するため、レバ
ー23に遊嵌された巻付ワイヤ14の先端リング14b
がレバー23から第2ワイヤ12に移動するときに、先
端リング14bが第2ボルト32aの頭部や第2ナット
32bに引っ掛かることを阻止できるようになってい
る。
With the lever ring 26 inserted into the first groove 23d, the first bolt 31a is inserted through the pair of first through holes 23e, 23e, and the first nut 31b is screwed into the end of the first bolt 31a. A lever ring 26 is detachably attached to one end 23 a of the lever 23. Second groove 2
In a state where the second lowering 12a of the second wire 12 is inserted into the pair 3f, the second bolt 3 is inserted into the pair of second through holes 23g, 23g.
The second lower ring 12a is detachably attached to the other end 23b of the lever 23 by inserting the 2a and screwing the second nut 32b to the end thereof. In addition, since the head of the second bolt 32a is inserted into the bolt insertion hole 23h and the second nut 32b is inserted into the nut insertion recess 23i, the tip ring 14b of the winding wire 14 loosely fitted to the lever 23.
When is moved from the lever 23 to the second wire 12, the tip ring 14b can be prevented from being caught on the head of the second bolt 32a or the second nut 32b.

【0018】図1に戻って、ワイヤ係脱手段19は係脱
フック19bを支軸19aを中心に回転させて重り19
eを上昇させかつフック本体19dを下降させた状態
で、張力の掛った第2ワイヤ12の第2アッパリング1
2bがフック本体19dに係合可能に構成され、かつこ
の係合状態が保持されるように構成される。またワイヤ
係脱手段19は第2ワイヤ12への張力が解除されたと
きに、重り19eが下降しかつフック本体19dが上昇
する方向に係脱フック19bが支軸19aを中心に自動
的に回転し、第2アッパリング12bがフック本体19
dの先端から外れて自動的に解放されるように構成され
る。
Returning to FIG. 1, the wire engaging and disengaging means 19 rotates the engaging and disengaging hook 19b about the support shaft 19a, and the weight 19
e with the hook body 19d lowered and the second upper ring 1 of the tensioned second wire 12
2b is configured to be engageable with the hook body 19d, and is configured to maintain this engaged state. Further, when the tension on the second wire 12 is released, the wire engaging / disengaging means 19 automatically rotates the engaging / disengaging hook 19b about the support shaft 19a in a direction in which the weight 19e falls and the hook body 19d rises. The second upper ring 12b is connected to the hook body 19
It is configured to be released automatically from the tip of d.

【0019】このように構成されたワイヤの取外し機構
の動作を図1〜図4に基づいて説明する。テトラポッド
13を吊上げるには、先ずクレーン用フック17に第1
ワイヤ11の第1アッパリング11bを係合し、かつ係
脱用ワイヤ18を介してワイヤ係脱手段19を吊下げ
る。このとき第1ワイヤ11の第1ロアリング11aに
は巻付ワイヤ14の基端リング14aを第1シャックル
21を介して係合させる。この状態でクレーン用フック
17がテトラポッド13の上方に位置しかつ巻付ワイヤ
14がテトラポッド13近傍の地面に着地するようにク
レーンを操作する。次に巻付ワイヤ14をテトラポッド
13に巻付け、第2ワイヤ12の第2ロアリング12a
にレバー23を介して取付けられたレバー用リング26
を巻付ワイヤ14の先端リング14bに遊挿した後に、
第1ワイヤ11の第1ロアリング11aに第2シャック
ル22を介して取付けられたレバー用フック24に係合
する。このとき先端リング14bはレバー23に遊嵌さ
れた状態に保持される。更に第2ワイヤ12の第2アッ
パリング12bを係脱フック19bのフック本体19d
に係合する。このとき第2ワイヤ12には所定の張力が
掛っているので、第2アッパリング12bはフック本体
19dに係合した状態に保持される(図1)。この状態
でクレーンを操作してクレーン用フック17を上昇させ
ることにより、テトラポッド13を吊上げることができ
る。このように比較的簡単な作業でテトラポッド13を
吊上げるための準備は完了し、テトラポッド13の吊上
げ作業を開始できる。
The operation of the above-configured wire removing mechanism will be described with reference to FIGS. To lift the tetrapod 13, first attach the crane hook 17
The first upper ring 11b of the wire 11 is engaged, and the wire engagement / disconnection means 19 is suspended via the engagement / disconnection wire 18. At this time, the base ring 14 a of the winding wire 14 is engaged with the first lower ring 11 a of the first wire 11 via the first shackle 21. In this state, the crane is operated so that the crane hook 17 is located above the tetrapod 13 and the winding wire 14 lands on the ground near the tetrapod 13. Next, the winding wire 14 is wound around the tetrapod 13, and the second lowering 12a of the second wire 12 is formed.
Ring for lever 26 attached to lever 23 via lever 23
After loosely inserted into the tip ring 14b of the winding wire 14,
The first wire 11 engages with a lever hook 24 attached to the first lower ring 11 a via the second shackle 22. At this time, the tip ring 14b is held in a state of being loosely fitted to the lever 23. Further, the second upper ring 12b of the second wire 12 is engaged with the hook body 19d of the hook 19b.
Engages. At this time, since a predetermined tension is applied to the second wire 12, the second upper ring 12b is held in a state of being engaged with the hook body 19d (FIG. 1). By operating the crane in this state and raising the crane hook 17, the tetrapod 13 can be lifted. Thus, the preparation for lifting the tetrapod 13 by a relatively simple operation is completed, and the lifting operation of the tetrapod 13 can be started.

【0020】クレーンを操作し、テトラポッド13を吊
上げ所定の場所の上方に位置させて、クレーン用フック
17を下降させると、テトラポッド13が所定の場所に
着地する(図1)。クレーン用フック17を更に下降さ
せて第1及び第2ワイヤ11,12を緩めると、係脱フ
ック19bが重り19eの重力により支軸19aを中心
に自動的に回転する、即ち重り19eが下降しかつフッ
ク本体19dが上昇するので、第2アッパリング12b
が自動的にフック本体19dの先端から外れて解放され
る(図2)。この状態でクレーン用フック17を上昇さ
せて第1ワイヤ11を引上げると、第2ワイヤ12が巻
付ワイヤ14の先端リング14b内を抜ける方向に摺動
する(図3)。第1ワイヤ11を更に引上げると、第2
ワイヤ12が巻付ワイヤ14の先端リング14bから抜
けた後に(図4)、巻付ワイヤ14がテトラポッド13
から引抜かれる。
When the crane is operated to lift the tetrapod 13 above the predetermined location and lower the crane hook 17, the tetrapod 13 lands at the predetermined location (FIG. 1). When the crane hook 17 is further lowered to loosen the first and second wires 11 and 12, the hook 19b is automatically rotated about the support shaft 19a by the gravity of the weight 19e, that is, the weight 19e is lowered. Also, since the hook body 19d rises, the second upper ring 12b
Is automatically released from the tip of the hook body 19d and released (FIG. 2). When the first wire 11 is pulled up by raising the crane hook 17 in this state, the second wire 12 slides in a direction to pass through the inside of the distal end ring 14b of the winding wire 14 (FIG. 3). When the first wire 11 is further pulled up, the second wire 11
After the wire 12 comes off from the tip ring 14b of the winding wire 14 (FIG. 4), the winding wire 14 is
Drawn from.

【0021】この結果、巻付ワイヤ14のテトラポッド
13からの引抜き距離を短くすることができるので、巻
付ワイヤ14の引抜き時間を短縮できるとともに、揚程
の短いクレーンでもテトラポッド13から巻付ワイヤ1
4を引抜くことができる。また巻付ワイヤ14を短くす
ることができるので、巻付ワイヤ14がテトラポッド1
3と地面との間の突起物に引っ掛かる確率が少なくな
り、巻付ワイヤ14をテトラポッド13から引抜くとき
の摩擦抵抗が低減され、これにより巻付ワイヤ14の損
傷を少なくすることができる。一方、交換頻度の高い巻
付ワイヤ14の全長を短くすることができるので、巻付
ワイヤ14の単価が安くなり、これによりメンテナンス
費用を低減することができる。
As a result, the pulling distance of the winding wire 14 from the tetrapod 13 can be shortened, so that the pulling time of the winding wire 14 can be shortened. 1
4 can be withdrawn. Further, since the winding wire 14 can be shortened, the winding wire 14 is
The probability of being caught on the protrusion between the ground 3 and the ground is reduced, and the frictional resistance when the winding wire 14 is pulled out from the tetrapod 13 is reduced, so that damage to the winding wire 14 can be reduced. On the other hand, since the entire length of the wrapping wire 14, which is frequently replaced, can be shortened, the unit price of the wrapping wire 14 is reduced, and thus the maintenance cost can be reduced.

【0022】なお、上記実施の形態では、吊上げ材とし
てワイヤを挙げたが、ケーブル、化学繊維系ロープ、チ
ェーン又はその他の吊上げ材を用いてもよい。また、上
記実施の形態では、第1ワイヤの第1アッパリングをク
レーンのフックに係合したが、第1ワイヤの第1アッパ
リングをワイヤ係脱手段の支軸に係合してもよい。ま
た、上記実施の形態では、重量物としてコンクリートブ
ロック製のテトラポッドを挙げたが、立方体状又は直方
体状のコンクリートブロック、魚礁、ケーソン(潜
函)、金属製若しくはコンクリート製の構造物、又はそ
の他の重量物でもよい。ここで、重量物には大型の重量
物の他に小型の重量物も含まれる。また、上記実施の形
態では、吊上げ装置により1個のテトラポッドを吊上げ
たが、2個又は3個以上のテトラポッド等の重量物を同
時に吊上げてもよい。
In the above embodiment, a wire is used as the lifting member. However, a cable, a chemical fiber rope, a chain, or another lifting member may be used. In the above embodiment, the first upper ring of the first wire is engaged with the hook of the crane. However, the first upper ring of the first wire may be engaged with the support shaft of the wire engaging and disengaging means. In the above embodiment, the concrete block is made of a tetrapod made of a concrete block as a heavy object. However, a cubic or rectangular concrete block, a fish reef, a caisson (submersible box), a metal or concrete structure, or other It may be heavy. Here, the heavy object includes a small heavy object in addition to a large heavy object. In the above embodiment, one tetrapod is lifted by the lifting device. However, two or three or more heavy objects such as tetrapods may be lifted at the same time.

【0023】また、上記実施の形態では、比較的小型の
テトラポッドを巻付ワイヤ、第1及び第2ワイヤを1本
ずつ用いて吊上げたが(いわゆる斜吊り)、数十トンに
も及ぶ極めて重いテトラポッド等の重量物を吊上げる場
合には、巻付ワイヤ、第1及び第2ワイヤをそれぞれ同
数の複数本ずつ(例えば、2本ずつ、4本ずつ、6本ず
つ)用いて吊上げてもよい(いわゆる蝶々吊りなど)。
また、上記実施の形態では、レバーの一端をレバー用リ
ング及びレバー用フックを介して第2シャックルに取付
けたが、図8に示すように、レバー23の一端を直接第
2シャックル22に取付けてもよい。
In the above embodiment, the relatively small tetrapod is lifted by using the winding wire and the first and second wires one by one (so-called slanting suspension). When a heavy object such as a heavy tetrapod is lifted, the winding wire, the first and second wires are each lifted using the same number of plural wires (for example, two wires, four wires, and six wires). Good (so-called butterfly hanging, etc.).
In the above-described embodiment, one end of the lever is attached to the second shackle via the lever ring and the lever hook. However, as shown in FIG. 8, one end of the lever 23 is attached directly to the second shackle 22. Is also good.

【0024】更に、上記実施の形態では、ワイヤ係脱手
段として、係脱用ワイヤの下端に取付けられた支軸と、
中央が支軸に支持され基部とフック本体からなる係脱フ
ックと、この係脱フックの基部に設けられた重りとによ
り構成されたものを挙げたが、特開平2000−153
986号公報や特開平7−25578号公報に示される
装置を用いてもよい。前者(特開平2000−1539
86号公報に示される装置)は第1ワイヤの第1アッパ
リングがベースに係合しかつ第2ワイヤの第2アッパリ
ングがマストに嵌入され、マストに上下動可能に設けら
れたスライダの上端が無荷重状態でスライダ用弾性体に
より少なくともマストの上端に一致するように押上げら
れ、スライダ下降手段がスライダを下降させ、ロック手
段が下降状態でスライダを固定し、更にロック解除手段
がスライダの固定を解除するように構成された重量物吊
上げ材の取外し装置である。この装置では、ベース内に
上下動可能に挿入されたセンサロッドがスライダに緊張
材を介して連絡し、ベースに枢着されたハンドルの先端
がセンサロッドに係止しかつ基端にベース外方に位置す
る操作部が設けられる。また上記ハンドルの操作時にセ
ンサロッドが上昇することによりスライダが下降するよ
うに構成される。
Further, in the above embodiment, as the wire engaging / disengaging means, the support shaft attached to the lower end of the engaging / disengaging wire,
Japanese Unexamined Patent Publication No. 2000-153 discloses an example in which a hook and a hook are provided at the center of the base and a hook and a main body, and a weight provided at the base of the hook and the hook.
A device disclosed in Japanese Patent Application Laid-Open No. 986 or Japanese Patent Application Laid-Open No. 7-25578 may be used. The former (JP-A-2000-1539)
No. 86), a first upper ring of a first wire is engaged with a base, a second upper ring of a second wire is fitted into a mast, and an upper end of a slider provided on the mast so as to be vertically movable. The slider is pushed up by the elastic body for the slider at least in a state of no load so that it coincides with at least the upper end of the mast, the slider lowering means lowers the slider, the locking means fixes the slider in the lowered state, and the unlocking means further moves the slider. It is a heavy lifting material removal device configured to release the fixing. In this device, a sensor rod inserted vertically into the base communicates with the slider via a tension member, a distal end of a handle pivotally attached to the base is locked to the sensor rod, and a base end is provided outside the base. Is provided. Also, the slider is lowered by raising the sensor rod when the handle is operated.

【0025】後者(特開平7−25578号公報に示さ
れる装置)はベースとクレーンのフックとの間に上部ワ
イヤが設けられ、第1ワイヤの第1アッパリングがベー
スに取付けられ、第2ワイヤの第2アッパリングがベー
スに立設されたマストに嵌入された重量物吊上げ材の取
外し装置である。この装置では、マストに摺動可能に嵌
入されたスライダが無荷重状態で第1弾性体によりその
上端が少なくともマストの上端に一致するように押上げ
られ、スライダ下降手段が第1弾性体の弾性力に打勝っ
てスライダを下降させるように構成される。またロック
手段がスライダの下降した状態でスライダ下降手段を一
時的に固定し、ロック解除手段がロック手段を解除する
ように構成される。
The latter (the device disclosed in JP-A-7-25578) has an upper wire provided between a base and a hook of a crane, a first upper ring of a first wire is attached to the base, and a second wire is provided. Is an apparatus for removing a heavy lifting material fitted into a mast erected on a base. In this device, the slider, which is slidably fitted to the mast, is pushed up by the first elastic body so that its upper end at least coincides with the upper end of the mast in a no-load state, and the slider lowering means is provided with an elasticity of the first elastic body. It is configured to overcome the force and lower the slider. Further, the slider lowering means is temporarily fixed while the locking means is lowered, and the lock releasing means releases the locking means.

【0026】[0026]

【発明の効果】以上述べたように、本発明によれば、第
1吊上げ材の第1ロアリングが巻付吊上げ材の基端リン
グに係合し、第1アッパリングが吊上げ装置に係合し、
第2吊上げ材の第2ロアリングがレバーを介して第1ロ
アリングに係合し、張力の掛った第2吊上げ材の第2ア
ッパリングが係合する吊上げ材係脱手段が第2吊上げ材
への張力が解除されたときに第2アッパリングを自動的
に解放し、更にレバーに先端リングを遊嵌したので、重
量物を所定の場所に下ろして第1及び第2吊上げ材を緩
めると、第2吊上げ材の第2アッパリングが吊上げ材係
脱手段から自動的に解放され、この状態で吊上げ装置に
より第1吊上げ材を引上げると、第2吊上げ材が巻付吊
上げ材の先端リングから抜けた後に、巻付吊上げ材が重
量物から引抜かれる。この結果、巻付吊上げ材の重量物
からの引抜き距離を短くすることができるので、巻付吊
上げ材の引抜き時間を短縮できるとともに、揚程の短い
吊上げ装置でも重量物から巻付吊上げ材を引抜くことが
できる。また巻付吊上げ材の全長を短くすることにより
巻付吊上げ材を重量物から引抜くときに巻付吊上げ材が
突起物等に引っ掛かる確率を低減することができるの
で、巻付吊上げ材の損傷を少なくすることができる。一
方、交換頻度の高い巻付吊上げ材の全長を短くすること
で、メンテナンス費用を低減することができる。
As described above, according to the present invention, the first lower ring of the first lifting member is engaged with the base ring of the wound lifting member, and the first upper ring is engaged with the lifting device. ,
The second lowering of the second lifting member engages with the first lowering via the lever, and the lifting member engaging / disengaging means with which the second upper ring of the tensioned second lifting member engages is connected to the second lifting member. When the tension is released, the second upper ring is automatically released, and the tip ring is loosely fitted on the lever. Therefore, when the heavy object is lowered to a predetermined place and the first and second lifting members are loosened, the second upper ring is loosened. (2) The second upper ring of the lifting member is automatically released from the lifting member engaging / disengaging means. In this state, when the first lifting member is pulled up by the lifting device, the second lifting member comes off the tip ring of the wound lifting member. After that, the wound lifting material is pulled out of the heavy object. As a result, the pulling distance of the wound lifting material from the heavy object can be shortened, so that the pulling time of the wound lifting material can be shortened, and the winding lifting material can be pulled out of the heavy object by the lifting device having a short lift. be able to. In addition, by shortening the entire length of the wrapped hoisting material, the probability of the wrapped hoisting material being caught on a projection or the like when the wrapped hoisting material is pulled out of a heavy object can be reduced. Can be reduced. On the other hand, the maintenance cost can be reduced by shortening the entire length of the wrapped lifting material that is frequently replaced.

【0027】また第1吊上げ材の第1ロアリングにレバ
ー用フックを取付け、レバーの一端にレバー用リングを
取付け、レバー用リングがレバー用フックに離脱可能に
係止するように構成すれば、重量物に巻付けた巻付吊上
げ材の先端リングをレバー用リング側からレバーに遊嵌
することにより、上記先端リングをレバーに速やかに遊
嵌できる。更にレバー用リングをレバーの一端に取外し
可能に取付け、第2吊上げ材の第2ロアリングをレバー
の他端に取外し可能に取付ければ、第2吊上げ材の第2
ロアリング及びレバー用リングをレバーからそれぞれ取
外すことができるので、第2吊上げ材、レバー及びレバ
ー用リングを個々に交換することができ、メンテナンス
費用を低減できる。
Further, if a lever hook is attached to the first lowering of the first lifting member, a lever ring is attached to one end of the lever, and the lever ring is detachably engaged with the lever hook, the weight is increased. By loosely fitting the tip ring of the wound lifting material wound around the object from the lever ring side to the lever, the tip ring can be quickly loosely fitted to the lever. Further, if the lever ring is detachably attached to one end of the lever and the second lower ring of the second lifting member is detachably attached to the other end of the lever, the second lifting member can be removed.
Since the lower ring and the lever ring can be detached from the lever, the second lifting member, the lever and the lever ring can be individually replaced, and maintenance costs can be reduced.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明第1実施形態のテトラポッドを吊上げ装
置及び各ワイヤを用いて吊上げる直前及び所定の場所に
下ろした直後の状態を示す正面図。
FIG. 1 is a front view showing a state immediately before lifting a tetrapod according to a first embodiment of the present invention using a lifting device and each wire and immediately after lowering the tetrapod to a predetermined place.

【図2】第1及び第2ワイヤを緩めて第2ワイヤの第2
アッパリングがワイヤ係脱手段から外れた状態を示す図
1に対応する正面図。
FIG. 2 is a view showing a state in which the first and second wires are loosened and the second
FIG. 2 is a front view corresponding to FIG. 1 and showing a state in which the upper ring is detached from the wire engaging / disengaging means.

【図3】吊上げ装置により第1ワイヤを引上げて、第2
ワイヤが巻付ワイヤの先端リング内を抜ける方向に摺動
している状態を示す図1に対応する正面図。
FIG. 3 is a diagram showing a state in which a first wire is pulled up by a lifting device and a second wire is pulled up;
FIG. 2 is a front view corresponding to FIG. 1, showing a state in which the wire is sliding in a direction to pass through a distal end ring of the wound wire.

【図4】吊上げ装置により第1ワイヤを更に引上げて、
第2ワイヤが巻付ワイヤの先端リングから抜けた状態を
示す図1に対応する正面図。
FIG. 4 further raises the first wire by a lifting device,
The front view corresponding to FIG. 1 which shows the state which the 2nd wire pulled out from the front-end ring of the winding wire.

【図5】レバー及びその周辺のワイヤを示す要部拡大
図。
FIG. 5 is an enlarged view of a main part showing a lever and wires around the lever.

【図6】図5のA−A線断面図。FIG. 6 is a sectional view taken along line AA of FIG. 5;

【図7】図5のB−B線断面図。FIG. 7 is a sectional view taken along line BB of FIG. 5;

【図8】本発明の第2実施形態を示す図1に対応する正
面図。
FIG. 8 is a front view corresponding to FIG. 1 showing a second embodiment of the present invention.

【図9】従来例のテトラポッドを吊上げ装置及び各ワイ
ヤを用いて吊上げる直前及び所定の場所に下ろした直後
の状態を示す正面図。
FIG. 9 is a front view showing a state immediately before the tetrapod of the conventional example is lifted by using the lifting device and each wire and immediately after being lowered to a predetermined place.

【図10】主ワイヤ及び巻付ワイヤを緩めて巻付ワイヤ
の巻付用アッパリングがワイヤ係脱手段から外れた状態
を示す図9に対応する正面図。
10 is a front view corresponding to FIG. 9, showing a state in which the main wire and the winding wire are loosened and the winding upper ring of the winding wire is detached from the wire engaging / disengaging means.

【図11】吊上げ装置により主ワイヤを引上げて、巻付
ワイヤがシャックル内を抜ける方向に摺動している状態
を示す図9に対応する正面図。
FIG. 11 is a front view corresponding to FIG. 9, showing a state in which the main wire is pulled up by the lifting device and the wound wire is sliding in a direction to pass through the inside of the shackle.

【図12】吊上げ装置により主ワイヤを更に引上げて、
巻付ワイヤがシャックルから抜けた状態を示す図9に対
応する正面図。
FIG. 12 The main wire is further pulled up by a lifting device,
FIG. 10 is a front view corresponding to FIG. 9, showing a state in which the winding wire has come off the shackle.

【符号の説明】[Explanation of symbols]

11 第1ワイヤ(第1吊上げ材) 11a 第1ロアリング 11b 第1アッパリング 12 第2ワイヤ(第2吊上げ材) 12a 第2ロアリング 12b 第2アッパリング 13 テトラポッド(重量物) 14 巻付ワイヤ(巻付吊上げ材) 14a 基端リング 14b 先端リング 16 吊上げ装置 19 ワイヤ係脱手段(吊上げ材係脱手段) 23 レバー 23a レバーの一端 23b レバーの他端 24 レバー用フック 26 レバー用リング 11 1st wire (1st lifting material) 11a 1st lowering 11b 1st upper ring 12 2nd wire (2nd lifting material) 12a 2nd lowering 12b 2nd upperring 13 Tetrapod (heavy material) 14 Winding wire ( 14a Base end ring 14b Tip ring 16 Lifting device 19 Wire engaging / disengaging means (Hanging material engaging / disengaging means) 23 Lever 23a One end of lever 23b The other end of lever 24 Hook for lever 26 Ring for lever

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】 両端に基端リング(14a)及び先端リング
(14b)が形成され重量物(13)に巻付けられる巻付吊上げ
材(14)と、 下端に第1ロアリング(11a)が形成され上端に第1アッ
パリング(11b)が形成され前記第1ロアリング(11a)が前
記基端リング(14a)に係合し前記第1アッパリング(11b)
が吊上げ装置(16)に係合する第1吊上げ材(11)と、 下端に第2ロアリング(12a)が形成され上端に第2アッ
パリング(12b)が形成され前記第2ロアリング(12a)がレ
バー(23)を介して前記第1ロアリング(11a)に係合する
第2吊上げ材(12)と、 前記吊上げ装置(16)に設けられ張力の掛った前記第2吊
上げ材(12)の第2アッパリング(12b)が係合し前記第2
吊上げ材(12)への張力が解除されたときに前記第2アッ
パリング(12b)を自動的に解放する吊上げ材係脱手段(1
9)とを備えた重量物吊上げ材の取外し機構であって、 前記レバー(23)に前記先端リング(14b)が遊嵌されたこ
とを特徴とする重量物吊上げ材の取外し機構。
1. A proximal ring (14a) and a distal ring at both ends.
(14b) formed and wound around a heavy load (13); a first lifting ring (11a) formed at the lower end; and a first upper ring (11b) formed at the upper end. The lower ring (11a) is engaged with the base ring (14a) and the first upper ring (11b)
A first lifting member (11) that engages with the lifting device (16), a second lower ring (12a) is formed at the lower end, and a second upper ring (12b) is formed at the upper end. A second lifting member (12) engaged with the first lowering (11a) via a lever (23), and a second lifting member (12) provided on the lifting device (16) and being tensioned; 2 upper ring (12b) is engaged and the second
The lifting member engaging / disengaging means (1) for automatically releasing the second upper ring (12b) when the tension on the lifting member (12) is released.
9), wherein the tip ring (14b) is loosely fitted to the lever (23).
【請求項2】 第1吊上げ材(11)の第1ロアリング(11
a)にレバー用フック(24)が取付けられ、 レバー(23)の一端(23a)にレバー用リング(26)が取付け
られ、 前記レバー用リング(26)が前記レバー用フック(24)に離
脱可能に係止するように構成された請求項1記載の重量
物吊上げ材の取外し機構。
2. A first lowering (11) of a first lifting member (11).
A lever hook (24) is attached to a), a lever ring (26) is attached to one end (23a) of the lever (23), and the lever ring (26) is detached from the lever hook (24). 2. The heavy lifting material removing mechanism according to claim 1, wherein the mechanism is configured to be locked as much as possible.
【請求項3】 レバー用リング(26)がレバー(23)の一端
(23a)に取外し可能に取付けられ、第2吊上げ材(12)の
第2ロアリング(12a)が前記レバー(23)の他端(23b)に取
外し可能に取付けられた請求項1又は2記載の重量物吊
上げ材の取外し機構。
3. A lever ring (26) is connected to one end of a lever (23).
The lever according to claim 1 or 2, wherein the second lifting member (12) is detachably attached to the other end (23b) of the lever (23). Heavy lifting material removal mechanism.
JP2000297831A 2000-09-29 2000-09-29 Heavy lifting material removal mechanism Expired - Fee Related JP4524031B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000297831A JP4524031B2 (en) 2000-09-29 2000-09-29 Heavy lifting material removal mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000297831A JP4524031B2 (en) 2000-09-29 2000-09-29 Heavy lifting material removal mechanism

Publications (2)

Publication Number Publication Date
JP2002104766A true JP2002104766A (en) 2002-04-10
JP4524031B2 JP4524031B2 (en) 2010-08-11

Family

ID=18779881

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000297831A Expired - Fee Related JP4524031B2 (en) 2000-09-29 2000-09-29 Heavy lifting material removal mechanism

Country Status (1)

Country Link
JP (1) JP4524031B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004026752A1 (en) * 2002-09-17 2004-04-01 Totetu Mfg. Co. Ltd. Link lever for hoisting heavy-weight article
CN104477773A (en) * 2014-11-25 2015-04-01 中国石油化工股份有限公司 High-altitude immediate-dismounting derrick device
JP2016088734A (en) * 2014-11-11 2016-05-23 あおみ建設株式会社 Remote unslinging device

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108731911B (en) * 2018-05-23 2019-10-29 中国船舶科学研究中心(中国船舶重工集团公司第七0二研究所) A kind of pool edge Liftable type wave absorber

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5917484A (en) * 1982-07-19 1984-01-28 株式会社芳賀自動車工場 Hanging and stopping device for crane work
JPH0286990U (en) * 1988-12-21 1990-07-10

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5917484A (en) * 1982-07-19 1984-01-28 株式会社芳賀自動車工場 Hanging and stopping device for crane work
JPH0286990U (en) * 1988-12-21 1990-07-10

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2004026752A1 (en) * 2002-09-17 2004-04-01 Totetu Mfg. Co. Ltd. Link lever for hoisting heavy-weight article
JP2016088734A (en) * 2014-11-11 2016-05-23 あおみ建設株式会社 Remote unslinging device
CN104477773A (en) * 2014-11-25 2015-04-01 中国石油化工股份有限公司 High-altitude immediate-dismounting derrick device

Also Published As

Publication number Publication date
JP4524031B2 (en) 2010-08-11

Similar Documents

Publication Publication Date Title
JP2017538881A (en) Pile appending system
JP2002104766A (en) Removing mechanism for heavy object hoist material
JP4835209B2 (en) Crane winch removal method and upper swing body
JP2004189433A (en) Manhole hanging tool
JP2005126212A (en) Crane
JP5331539B2 (en) Derrick for steel tower assembly and dismantling
JP2008081242A (en) Luffing jib device of crane
JP2612431B2 (en) Ball removal hook
JP6003556B2 (en) Jib fixing method for mobile tower crane
JP3069315B2 (en) Work method and device for leaderless auger
JP5504141B2 (en) Mobile crane
JP2547044B2 (en) Jib loading and unloading method and device in crane
EP4197957A1 (en) Crane, crane assembly method and disassembly method
JP3238976B2 (en) Jib removal device for jib boom
JP3357916B2 (en) Switching mechanism of the number of hoisting wire ropes of the inclined jib crane
CN216512342U (en) Hoisting pulling single crystal tool clamp
JP2659083B2 (en) Method and device for mounting wire on pedestal etc.
JP3174454B2 (en) Method and device for installing and removing leader from pile driver
JP6236605B2 (en) How to change auxiliary rope
JP7306091B2 (en) Handrails for assembling hoisting members of working machines
JP3012132B2 (en) Method and apparatus for assembling ground drill
JP2593051B2 (en) Long object drawing method and drawing device used for it
JPH11292422A (en) Installation method of hoist for installing elevator
KR20220137687A (en) Methods and hoisting yokes for lifting long objects
JP2736311B2 (en) Safety net for casing

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070830

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100513

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100518

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100531

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130604

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130604

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees