JP2002091543A - Production plan preparing method, information processor and production managing system - Google Patents

Production plan preparing method, information processor and production managing system

Info

Publication number
JP2002091543A
JP2002091543A JP2000283763A JP2000283763A JP2002091543A JP 2002091543 A JP2002091543 A JP 2002091543A JP 2000283763 A JP2000283763 A JP 2000283763A JP 2000283763 A JP2000283763 A JP 2000283763A JP 2002091543 A JP2002091543 A JP 2002091543A
Authority
JP
Japan
Prior art keywords
production plan
production
type
landslide
creating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000283763A
Other languages
Japanese (ja)
Inventor
Fusaji Orita
房治 折田
Yoshihide Kurihara
吉秀 栗原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Asahi Breweries Ltd
Original Assignee
Asahi Breweries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Asahi Breweries Ltd filed Critical Asahi Breweries Ltd
Priority to JP2000283763A priority Critical patent/JP2002091543A/en
Publication of JP2002091543A publication Critical patent/JP2002091543A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Abstract

PROBLEM TO BE SOLVED: To rapidly prepare a production plan. SOLUTION: At first, the required production amount of each management article kind at every ten days is heaped concerning the first priority order line of the first day (the eleventh of July) of the ten days in accordance with a article kind classification line priority order restriction. Then the violating portion of the restriction (a violation in a brand number, for example) is removed on the succeeding day (the twelfth of July). Moreover, the other restriction violating portions(beyond production ability, for example) are removed on the succeeding day (the thirteenth of July).

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、生産計画作成方
法、情報処理装置及び生産管理システムに係り、特に、
各々複数のラインを有する複数の工場において複数の品
種の製品を生産するための生産計画を作成する生産計画
作成方法、情報処理装置及びそれを制御するプログラム
を格納したメモリ媒体、並びに生産管理システムに関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a production plan creation method, an information processing apparatus, and a production management system.
The present invention relates to a production plan creation method for creating a production plan for producing a plurality of types of products in a plurality of factories each having a plurality of lines, an information processing apparatus, a memory medium storing a program for controlling the information processing apparatus, and a production management system. .

【0002】[0002]

【従来の技術】製品の生産計画は、例えば、品種別、工
場別、日別、ライン(製造ライン)別に作成する必要が
ある。従来、このような生産計画は、担当者の経験や勘
に頼って作成されていた。
2. Description of the Related Art It is necessary to prepare a product production plan for each product type, factory, day, and line (manufacturing line). Conventionally, such a production plan has been created based on the experience and intuition of the person in charge.

【0003】[0003]

【発明が解決しようとする課題】経験や勘に頼る従来の
生産計画の作成においては、多大な労力と時間を要す
る。例えば、本出願人の業務に係るビールの生産計画を
一例に挙げると、全国の工場における年間の生産計画を
作成するために膨大な工数を要する。ビールの生産量、
品種数、工場数、ライン数等に鑑みると、経験や勘に頼
った生産計画の作成においては、この工数を削減するこ
とは困難であると言える。
A great deal of labor and time are required for creating a conventional production plan relying on experience and intuition. For example, taking a beer production plan related to the work of the applicant as an example, an enormous number of man-hours are required to create an annual production plan in factories nationwide. Beer production,
In view of the number of varieties, the number of factories, the number of lines, and the like, it can be said that it is difficult to reduce the number of steps in creating a production plan that relies on experience and intuition.

【0004】また、従来の生産計画の作成方法は、工場
の設備、要員、製造工程等を熟知していなければ適正な
生産計画を作成することができず、そのため、生産計画
に関与する人材の育成に極めて長期間を要する。
[0004] In addition, the conventional method of creating a production plan cannot create an appropriate production plan unless the plant equipment, personnel, manufacturing processes and the like are well-known, so that the human resources involved in the production plan cannot be created. It takes a very long time to grow.

【0005】また、従来の生産計画の作成方法では、新
製品の生産を開始する際に、該新製品を含む全製品につ
いて支障なく生産が可能であるか否かを判断するために
相当な時間を要し、また、その判断に誤りが生じる可能
性がある。
Further, according to the conventional method of creating a production plan, when starting production of a new product, a considerable amount of time is required to determine whether or not all products including the new product can be produced without any trouble. And the judgment may be erroneous.

【0006】また、従来の生産計画の作成方法では、ラ
インの故障等が発生した場合に、生産計画を迅速且つ適
切に修正することが困難であった。
Further, according to the conventional method for creating a production plan, it is difficult to quickly and appropriately correct the production plan when a line failure or the like occurs.

【0007】本発明は、上記の背景に鑑みてなされたも
のであり、例えば、生産計画の作成を迅速化することを
目的とする。
[0007] The present invention has been made in view of the above background, and has as its object, for example, to speed up the creation of a production plan.

【0008】[0008]

【課題を解決するための手段】本発明の第1の側面に係
る生産計画作成方法は、各々複数のラインを有する複数
の工場において複数の品種の製品を生産するための生産
計画を情報処理装置を利用して作成することを特徴とす
る。
According to a first aspect of the present invention, there is provided a production plan creating method for processing an information processing apparatus for producing a plurality of types of products in a plurality of factories each having a plurality of lines. It is characterized in that it is created by using.

【0009】この生産計画作成方法は、例えば、各品種
についての全体売上見込及び予め設定された配分パラメ
ータに基づいて品種別工場別日別の必要生産量を決定す
る工程と、予め設定された制約及び前記品種別工場別日
別の必要生産量に基づいて前記複数の品種についてのラ
イン別日別の生産計画を作成する工程とを含む。
This production planning method includes, for example, a step of determining a required production amount for each type of plant and for each day based on an expected total sales of each type and a preset distribution parameter; And a step of creating a daily production plan for each of the plurality of types based on the required production amount for each type of factory for each type.

【0010】前記ライン別日別の生産計画を作成する工
程は、例えば、前記品種別工場別日別の必要生産量を、
該当する工場の複数のラインに対して、予め設定された
優先順位に基づいて割付る工程を含むことが好ましい。
In the step of preparing the daily production plan for each line, for example, the required production amount for each type of plant, for each plant,
It is preferable to include a step of allocating a plurality of lines of the relevant factory based on a preset priority.

【0011】或いは、前記ライン別日別の生産計画を作
成する工程は、前記品種別工場日別の必要生産量を、該
当する工場の複数のラインに対して、予め設定された第
1の制約に基づいて山積みする山積み工程と、前記山積
み工程で山積みした必要生産量のうち予め設定された第
2の制約に違反する制約違反分を山崩しする山崩し工程
とを含むことが好ましい。
Alternatively, the step of preparing a daily production plan for each line may include the step of setting the required production amount for each type of factory and each day for a plurality of lines of a corresponding factory by a first constraint set in advance. It is preferable to include a pile-up step of pile-up based on the above-mentioned, and a pile-breaking step of breaking down a part of the required production amount piled up in the pile-up step that violates a preset second constraint.

【0012】前記山崩し工程は、前記制約違反分を同日
における同一工場の他のラインに山崩しする工程、及び
/又は、前記制約違反分を同日における他の工場に山崩
しする工程、及び/又は、前記制約違反分を同一工場の
他の日に山崩しする工程を含むことが好ましい。ここ
で、前記制約違反分を同一工場の他の日に山崩しする工
程は、前記制約違反分を後倒しによって山崩しする工
程、及び/又は、前記制約違反分を前倒しによって山崩
しする工程を含み得る。
The crushing step is a step of crushing the constraint violation to another line of the same factory on the same day, and / or a step of crushing the constraint violation to another factory on the same day, and / or Alternatively, it is preferable that the method includes a step of breaking down the constraint violation on another day of the same factory. Here, the step of crushing the constraint violation on another day of the same factory includes the step of crushing the constraint violation by moving it backward, and / or the step of crushing the constraint violation by moving it forward. May be included.

【0013】また、前記山崩し工程は、前記制約違反分
を前倒ししながら他の工場に山崩しする工程を含むこと
が好ましい。
It is preferable that the landslide step includes a step of landslide to another factory while bringing forward the constraint violation.

【0014】本発明の第2の側面に係る生産計画作成方
法は、各々複数のラインを有する複数の工場において複
数の品種の製品を生産するための生産計画を情報処理装
置を利用して作成することを特徴とする。
A production plan creating method according to a second aspect of the present invention creates a production plan for producing a plurality of types of products in a plurality of factories each having a plurality of lines by using an information processing device. It is characterized by the following.

【0015】この生産計画作成方法は、各品種について
の全体売上見込及び予め設定された配分パラメータに基
づいて品種別工場別期間別の必要生産量を決定する工程
と、予め設定された制約及び前記品種別工場別期間別の
必要生産量に基づいて前記複数の品種についてのライン
別日別の生産計画を作成する工程とを含む。
This production planning method comprises the steps of: determining a required production amount for each type, for each plant, and for each period, based on the expected total sales for each type and a preset distribution parameter; Creating a daily production plan for each of the plurality of types based on a required production amount for each type of plant and for each period.

【0016】前記ライン別日別の生産計画を作成する工
程は、前記品種別工場別期間別の必要生産量を、該当す
る工場の複数のラインに対して、予め設定された優先順
位に基づいて割付る工程を含むことが好ましい。
In the step of preparing a daily production plan for each line, the required production amount for each type of plant and for each period is determined based on a preset priority order for a plurality of lines of the relevant factory. It is preferable to include an assignment step.

【0017】或いは、前記ライン別日別の生産計画を作
成する工程は、前記品種別工場別期間別の必要生産量
を、該当する期間の特定の日における該当する工場の複
数のラインに対して、予め設定された第1の制約に基づ
いて山積みする山積み工程と、前記山積み工程で山積み
した必要生産量のうち予め設定された第2の制約に違反
する制約違反分を山崩しする山崩し工程とを含むことが
好ましい。
Alternatively, the step of creating a daily production plan for each line is performed by dividing the required production amount for each type of plant and for each period with respect to a plurality of lines of the relevant factory on a specific day of the relevant period. A stacking step of stacking based on a preset first constraint, and a crushing step of crushing a constraint violation part of a required production amount stacked in the stacking step that violates a preset second constraint. It is preferable to include

【0018】前記山崩し工程は、前記制約違反分を同日
における同一工場の他のラインに山崩しする工程、及び
/又は、前記制約違反分を同日における他の工場に山崩
しする工程、及び/又は、前記制約違反分を該当する期
間の同一工場内で、例えば後倒しによって、山崩しする
工程、及び/又は、前記制約違反分を前の期間に前倒し
によって山崩しする工程を含むことが好ましい。
The crushing step is a step of crushing the constraint violation to another line on the same factory on the same day, and / or a step of crushing the constraint violation to another factory on the same day, and / or Alternatively, it is preferable that the method includes a step of crushing the constraint violation in the same factory for a corresponding period, for example, by moving backward, and / or a step of crushing the constraint violation by moving forward in the previous period. .

【0019】本発明の第1及び第2の側面に係る生産計
画作成方法は、例えば、ビールの生産計画の作成に好適
である。
The production plan creation methods according to the first and second aspects of the present invention are suitable, for example, for creating a beer production plan.

【0020】本発明の第3の側面に係る情報処理装置
は、各々複数のラインを有する複数の工場において複数
の品種の製品を生産するための生産計画を作成する情報
処理装置であって、各品種についての全体売上見込及び
予め設定された配分パラメータに基づいて品種別工場別
日別の必要生産量を決定する手段と、予め設定された制
約及び前記品種別工場別日別の必要生産量に基づいて前
記複数の品種についてのライン別日別の生産計画を作成
する手段とを備えることを特徴とする。
An information processing apparatus according to a third aspect of the present invention is an information processing apparatus for creating a production plan for producing a plurality of types of products in a plurality of factories each having a plurality of lines. Means for determining the required daily production amount for each type of plant based on the expected total sales of the type and the preset distribution parameters; and Means for creating a daily production plan for each of the plurality of types based on the line.

【0021】本発明の第4の側面に係る情報処理装置
は、各々複数のラインを有する複数の工場において複数
の品種の製品を生産するための生産計画を作成する情報
処理装置であって、各品種についての全体売上見込及び
予め設定された配分パラメータに基づいて品種別工場別
期間別の必要生産量を決定する手段と、予め設定された
制約及び前記品種別工場別期間別の必要生産量に基づい
て前記複数の品種についてのライン別日別の生産計画を
作成する手段とを含むことを特徴とする。
An information processing apparatus according to a fourth aspect of the present invention is an information processing apparatus for creating a production plan for producing a plurality of types of products in a plurality of factories each having a plurality of lines. Means for determining the required production amount for each type of plant and each period based on the expected total sales for the type and the preset distribution parameters; and Means for preparing a daily production plan for each of the plurality of types based on the plurality of types.

【0022】本発明の第5の側面に係るメモリ媒体は、
第1及び第2の側面に係る生産計画作成方法を情報処理
装置に実行させるためのプログラムを格納したことを特
徴とする。
A memory medium according to a fifth aspect of the present invention comprises:
A program for causing an information processing apparatus to execute the production plan creation method according to the first and second aspects is stored.

【0023】本発明の第6の側面に係る生産管理システ
ムは、各々複数のラインを有する複数の工場と、前記複
数の工場において複数の品種の製品を生産するための生
産計画を作成する情報処理装置とを備え、前記情報処理
装置は、各品種についての全体売上見込及び予め設定さ
れた配分パラメータに基づいて品種別工場別日別の必要
生産量を決定する手段と、予め設定された制約及び前記
品種別工場別日別の必要生産量に基づいて前記複数の品
種についてのライン別日別の生産計画を作成する手段と
を有し、前記複数の工場は、前記情報処理装置により作
成されたライン別日別の生産計画をネットワークを通じ
て参照する手段を有することを特徴とする。
A production management system according to a sixth aspect of the present invention comprises a plurality of factories each having a plurality of lines and information processing for creating a production plan for producing a plurality of types of products in the plurality of factories. Device, the information processing device, means for determining the required production amount by type, factory, day by day based on the expected total sales for each type and the preset distribution parameters, a preset constraint and Means for creating a daily production plan for each of the plurality of varieties based on the required production amount for each of the varieties and factories, wherein the plurality of factories are created by the information processing device. It is characterized by having means for referring to a production plan for each line and each day through a network.

【0024】本発明の第7の側面に係る生産管理システ
ムは、各々複数のラインを有する複数の工場と、前記複
数の工場において複数の品種の製品を生産するための生
産計画を作成する情報処理装置とを備え、前記情報処理
装置は、各品種についての全体売上見込及び予め設定さ
れた配分パラメータに基づいて品種別工場別期間別の必
要生産量を決定する手段と、予め設定された制約及び前
記品種別工場別期間別の必要生産量に基づいて前記複数
の品種についてのライン別日別の生産計画を作成する手
段とを有し、前記複数の工場は、前記情報処理装置によ
り作成されたライン別日別の生産計画をネットワークを
通じて参照する手段を有することを特徴とする。
According to a seventh aspect of the present invention, there is provided a production management system comprising: a plurality of factories each having a plurality of lines; and information processing for creating a production plan for producing a plurality of types of products in the plurality of factories. Device, the information processing device is a means for determining a required production amount for each plant type, for each type of plant based on the total sales forecast for each type and a preset distribution parameter, and a preset constraint and Means for creating a daily production plan for each of the plurality of varieties based on the required production amount for each of the varieties for each of the factories and for each period, wherein the plurality of factories are created by the information processing apparatus. It is characterized by having means for referring to a production plan for each line and each day through a network.

【0025】[0025]

【発明の実施の形態】以下、添付図面を参照しながら本
発明の好適な実施の形態を説明する。なお、以下の実施
の形態は、本発明をビールの生産計画に適用した例であ
る。
Preferred embodiments of the present invention will be described below with reference to the accompanying drawings. The following embodiment is an example in which the present invention is applied to a beer production plan.

【0026】図1は、本発明の好適な実施の形態に係る
生産管理システムの構成を概略的に示す図である。この
生産管理システムは、生産部10のコンピュータ11、
データベース20、営業部30のコンピュータ31、物
流部40のコンピュータ41、複数の工場(工場A、工
場B、工場C、工場D・・・)50、60、70、80・・・
のコンピュータ51、61、71、81・・・をネットワ
ーク10を介して接続することによって構築され得る。
このネットワーク10には、その他の部門、例えば購買
部のコンピュータが接続されてもよい。
FIG. 1 is a diagram schematically showing a configuration of a production management system according to a preferred embodiment of the present invention. The production management system includes a computer 11 of the production unit 10,
The database 20, the computer 31 of the sales department 30, the computer 41 of the distribution department 40, and a plurality of factories (factory A, factory B, factory C, factory D ...) 50, 60, 70, 80 ...
. Are connected via the network 10. The computers 51, 61, 71, 81,.
The network 10 may be connected to a computer of another department, for example, a purchasing department.

【0027】ネットワーク10は、例えば、双方向通信
が可能な通信回線(例えば、インターネット、専用回
線)で構成され得る。各部門(例えば、生産部)には、
複数のコンピュータが配置されてもよく、この場合、該
複数のコンピュータは、LAN等の通信回線で接続され
得る。
The network 10 can be constituted by, for example, a communication line capable of two-way communication (for example, the Internet or a dedicated line). Each department (for example, production department)
A plurality of computers may be arranged, and in this case, the plurality of computers may be connected by a communication line such as a LAN.

【0028】各コンピュータ11、31、41、51、
61、71、81・・・は、典型的にはパーソナルコンピ
ュータ等の一般的なコンピュータであり、例えば、マイ
クロプロセッサ(CPU)、メモリ(例えば、RAM、
ROM、ハードディスク等)、通信インターフェース
(例えば、モデム等)、ディスプレイ、スピーカ、キー
ボード、マウス等を含む。
Each of the computers 11, 31, 41, 51,
61, 71, 81... Are typically general computers such as personal computers, for example, a microprocessor (CPU), a memory (eg, a RAM,
ROM, hard disk, etc.), communication interface (eg, modem, etc.), display, speaker, keyboard, mouse, etc.

【0029】生産部10のコンピュータ11には、生産
計画作成プログラム11aがインストールされており、
該プログラム11aに従って生産計画を作成する。即
ち、コンピュータ11は、この生産管理システムにおい
て生産計画作成装置として機能する。プログラム11a
は、例えば、CD−ROM等のメモリ媒体に格納した状
態で流通され得る。
A production plan creation program 11a is installed in the computer 11 of the production unit 10.
A production plan is created according to the program 11a. That is, the computer 11 functions as a production plan creation device in this production management system. Program 11a
Can be distributed while being stored in a memory medium such as a CD-ROM.

【0030】データベース20には、生産管理(生産計
画を含む)に関する各種のデータが格納される。営業部
30のコンピュータ31は、例えば、売上目標に関する
情報、キャンペーンに関する情報等を入力するために利
用され得る。物流部40のコンピュータ41は、例え
ば、売上見込や売上実績に関する情報等を入力するため
に利用され得る。工場50、60、70、80・・・のコ
ンピュータ51、61、71、81・・・は、例えば、自
工場の各種の情報(例えば、稼働日)を入力したり、生
産部10のコンピュータ11により作成された生産計画
をネットワーク10を通じて参照したりするために利用
される。
The database 20 stores various data relating to production management (including production planning). The computer 31 of the sales department 30 can be used to input, for example, information on sales targets, information on campaigns, and the like. The computer 41 of the distribution unit 40 can be used, for example, for inputting information on expected sales and sales results. The computers 51, 61, 71, 81... Of the factories 50, 60, 70, 80. Is used to refer to the production plan created by the user through the network 10.

【0031】複数の工場50、60、70、80・・・
は、例えば、工場50及び60を含むブロックA、工場
70を含むブロックB、工場80を含むブロックC・・・
に分割され得る。より一般的には、この生産管理システ
ムに属する全工場は、各々1又は複数の工場を含む複数
のブロックに分割されている。
A plurality of factories 50, 60, 70, 80,...
Are, for example, a block A including factories 50 and 60, a block B including factory 70, a block C including factory 80, and so on.
Can be divided into More generally, all factories belonging to this production management system are divided into a plurality of blocks each including one or a plurality of factories.

【0032】この実施の形態では、生産計画は、比率
(売上見込を配分するための配分パラメータの一例)、
この生産管理システムによって管理される地域(例え
ば、全国)における各品種についての売上見込、マスタ
等の設定に基づいて作成され得る。これらの比率、売上
見込、マスタ等は、生産計画の作成に先立って、オペレ
ータ等によって設定され得る。
In this embodiment, the production plan includes a ratio (an example of an allocation parameter for allocating an expected sales),
It can be created based on the sales prospects, masters, and other settings for each product type in a region (for example, the whole country) managed by this production management system. These ratios, sales prospects, masters, and the like can be set by an operator or the like prior to creation of a production plan.

【0033】比率には、例えば、ブロック比率、旬比
率、曜日比率等が含まれ得る。
The ratio can include, for example, a block ratio, a seasonal ratio, a day of the week ratio, and the like.

【0034】ブロック比率は、該当するブロックに割当
るべき生産量と全国の生産量との比率である。例えば、
全国の工場がブロックA、ブロックB、ブロックCの3
つのブロックに分割されている場合、ブロックA、B、
Cについてのブロック比率は、例えば50%、30%、
20%というように設定され、3つのブロック比率の合
計は100%である。これは、ブロックAでは、全国の
生産量の50%、ブロックBでは、全国の生産量の30
%、ブロックCでは、全国の生産量の20%を生産する
ことを意味する。
The block ratio is a ratio between the production amount to be allocated to the corresponding block and the production amount in the whole country. For example,
Factories nationwide are Block A, Block B and Block C
If it is divided into two blocks, blocks A, B,
The block ratio for C is, for example, 50%, 30%,
20%, and the sum of the three block ratios is 100%. That is, in block A, 50% of the national production volume, and in block B, 30% of the national production volume.
%, Block C means that 20% of the national production is produced.

【0035】旬比率は、該当するブロックにおける該当
する旬(上旬、中旬、下旬)の生産量と1ヶ月の生産量
との比率である。上旬、中旬、下旬の旬比率は、例えば
50%、30%、20%というように設定され、3つの
旬比率の合計は100%である。これは、該当するブロ
ックにおいて、該当する月の生産量の50%を上旬に、
該当する月の生産量の30%を中旬に、該当する月の生
産量の20%を下旬に生産することを意味する。
The season ratio is a ratio between the production amount of the corresponding block in the corresponding block (early, middle, and late) and the production amount in one month. The seasonal ratios of early, middle, and late are set, for example, to 50%, 30%, and 20%, and the sum of the three seasonal ratios is 100%. This means that in the corresponding block, 50% of the corresponding month's production in early
This means that 30% of the production in the corresponding month is produced in the middle and 20% of the production in the corresponding month is produced in the late.

【0036】曜日比率は、該当する週における該当する
曜日(月曜日〜日曜日)の生産量と1週間の生産量との
比率である。月曜日〜日曜日の曜日比率は、例えば、2
0%、20%、15%、15%、30%、0%、0%と
いうよように設定され、7つの曜日比率の合計は100
%である。
The day-of-week ratio is a ratio between the production amount of the corresponding day (Monday to Sunday) in the relevant week and the production amount of one week. The day-to-day ratio of Monday to Sunday is, for example, 2
0%, 20%, 15%, 15%, 30%, 0%, 0%, etc., and the sum of the seven day-of-week ratios is 100
%.

【0037】この実施の形態では、製品は、日を単位と
して管理される日別管理品種と、旬を単位として管理さ
れる旬別管理品種とに分類してその生産が計画される。
なお、旬別管理品種に関しては、旬を単位として生産が
計画されるので、曜日比率の設定は不要である。
In this embodiment, the production is planned by classifying the products into daily managed varieties managed on a daily basis and seasonally managed varieties managed on a seasonal basis.
It should be noted that since the production of the seasonally managed varieties is planned in seasons, it is not necessary to set the day-of-week ratio.

【0038】全国の売上見込は、例えば、前年度の売上
実績を基礎とし、キャンペーンの企画、市場調査結果等
を考慮して、生産部10、営業部30、物流部40及び
他の部門のいずれか或いはこれらの全部又は一部の協力
により作成され得る。また、全国の売上見込は、製品の
品種別に作成される。
For example, the nationwide sales forecast is based on the sales results of the previous fiscal year, and takes into account the planning of campaigns, the results of market surveys, etc., and any of the production department 10, sales department 30, distribution department 40, and other departments. Alternatively, it can be created with the cooperation of all or some of them. Estimates of sales nationwide are created for each product type.

【0039】マスタには、生産に関する各種の制約が含
まれる。ここで、制約には、例えば、次の事項が含まれ
る。 (1)品種別製造可能ライン制約 品種別製造可能ライン制約とは、該当する品種を製造す
ることができるラインに関する制約である。 (2)工場別ブランド数制約 工場別ブランド数制約とは、該当する工場で同日に製造
することができるブランドの数に関する制約である。 (3)ブランド優先順位制約 ブランド優先順位制約とは、生産するブランドの優先順
位に関する制約である。 (4)ライン別容器種類優先順位制約 ライン別容器種類優先順位制約とは、該当するラインで
取り扱う容器の種類の優先順位に関する制約であり、ラ
イン別に定められる。 (5)品種別ライン優先順位制約 品種別ライン優先順位制約とは、該当する品種を生産す
るラインの優先順位に関する制約である。 (6)型替パターン制約 型替パターン制約とは、型(例えば、容器の種類、パッ
ケージの種類等)を変更することができるパターンに関
する制約である。例えば、該当するラインにおいて、容
器Aから容器Bに切替ることはできるが、容器Aから容
器Cに切替ることはできないというような制約である。 (7)液替時間制約 液替時間制約とは、液(ブランド)を変更する際に要す
る時間に関する制約である。 (8)型替時間制約 型替時間制約とは、型を変更する際に要する時間に関す
る制約である。 (9)型替回数制約 型替回数制約とは、型を変更する回数に関する制約であ
る。 (10)日別ライン別最大直数制約 日別ライン別最大直数制約とは、日別、ライン別に定め
られた最大直数に関する制約である。直は、1直、2
直、3直等の勤務形態である。 (11)工場間転送優先順位制約 工場間転送優先順位制約とは、1つの工場から他の工場
に生産計画を転送する際の制約である。 (12)在庫制約 在庫制約とは、確保すべき在庫量に関する制約である。
在庫制約は、日別管理品種については、例えば、確保す
べき在庫量の最小、適正、最大値を日数に換算して与え
られ、旬別管理品種については、例えば、旬の売上見込
に対する比率等で与えられ得る。 (13)その他の制約 その他の制約としては、例えば、ブロックの区分に関す
る制約、各ブロックに属する工場に関する制約、各工場
のラインに関する制約、ブランドの種類に関する制約、
品種に関する制約、容器の種類に関する制約等がある。
ここで、制約には、製品を製造する際に考慮すべきあら
ゆる事項が含まれ得る。
The master includes various restrictions on production. Here, the constraints include, for example, the following items. (1) Restriction on line that can be manufactured by type The restriction on line that can be manufactured by type is a restriction on a line that can be used to manufacture the corresponding type. (2) Restriction on the number of brands by factory Restriction on the number of brands by factory is a restriction on the number of brands that can be manufactured at the relevant factory on the same day. (3) Brand priority restriction Brand priority restriction is a restriction on the priority of the brand to be produced. (4) Line type container type priority restriction Line type container type priority restriction is a restriction on the priority of the type of container handled in the corresponding line, and is determined for each line. (5) Type-specific line priority restriction Type-specific line priority restriction is a restriction on the priority of the line that produces the relevant type. (6) Remodeling pattern restriction The remodeling pattern restriction is a restriction on a pattern that can change the type (for example, the type of container, the type of package, and the like). For example, there is a restriction that the container A can be switched from the container A to the container B on the corresponding line, but the container A cannot be switched from the container A to the container C. (7) Liquid change time restriction Liquid change time restriction is a restriction on the time required when changing the liquid (brand). (8) Remodeling time constraint The remodeling time constraint is a constraint on the time required to change the mold. (9) Type change frequency restriction The type change frequency restriction is a restriction on the number of times the type is changed. (10) Daily Maximum Line-Count Restriction The daily line-maximum direct-number constraint is a constraint on the maximum direct number defined for each day and for each line. Nao is one, two
It is a work style of direct shift, third shift, etc. (11) Transfer priority restriction between factories Transfer priority restriction between factories is a restriction when a production plan is transferred from one factory to another factory. (12) Inventory restrictions Inventory restrictions are restrictions on the amount of inventory to be secured.
The inventory constraint is given for daily managed varieties, for example, by converting the minimum, appropriate, and maximum values of stock quantity to be secured into days, and for seasonally managed varieties, for example, the ratio to the expected seasonal sales, etc. Can be given by (13) Other restrictions Other restrictions include, for example, restrictions on block division, restrictions on factories belonging to each block, restrictions on lines of each factory, restrictions on brand types,
There are restrictions on types, types of containers, and the like.
Here, the constraints may include all items to be considered when manufacturing a product.

【0040】図2は、生産部10のコンピュータ11に
インストールされた生産計画作成プログラム11aによ
る処理の概要を示す図である。ステップS101〜S1
03は、ステップS104(生産計画の作成処理)の実
行に先立って実行される入力処理である。
FIG. 2 is a diagram showing an outline of processing by the production plan creation program 11a installed in the computer 11 of the production unit 10. Steps S101 to S1
03 is an input process executed prior to execution of step S104 (production plan creation process).

【0041】ステップS101では、コンピュータ11
は、オペレータ等からの指示に従って各種の比率を設定
する。ステップS102では、コンピュータ11は、オ
ペレータ等からの指示に従って全国の品種別の売上見込
を設定する。ステップS103では、コンピュータ11
は、オペレータ等からの指示に従ってマスタを設定す
る。ここで、オペレータ等からの指示は、ネットワーク
10に接続された他のコンピュータから与えられてもよ
い。
In step S101, the computer 11
Sets various ratios according to instructions from an operator or the like. In step S102, the computer 11 sets a sales forecast for each product type in the whole country according to instructions from an operator or the like. In step S103, the computer 11
Sets a master according to instructions from an operator or the like. Here, the instruction from the operator or the like may be given from another computer connected to the network 10.

【0042】ステップS104では、コンピュータ11
は、ステップS101〜S103で設定された情報に基
づいて生産計画を作成する。
In step S104, the computer 11
Creates a production plan based on the information set in steps S101 to S103.

【0043】ステップS105では、コンピュータ11
は、ステップS104で作成された生産計画を出力す
る。出力先は、例えば、コンピュータ11のディスプレ
イであってもよいし、コンピュータ11又はネットワー
ク10に接続されたプリンタであってもよい。また、作
成された生産計画は、好適にはデータベース20に保存
される。この場合、営業部30、物流部40、工場5
0、60・・・等のコンピュータのオペレータは、データ
ベース20にアクセスすることにより、生産計画の全部
又は一部を参照することができる。また、出力先とし
て、データベース20以外に、営業部30、物流部4
0、工場50、60・・・等のコンピュータを指定するこ
ともできる。各工場では、作成された生産計画を検討
し、問題がある場合には、例えばネットワーク10を利
用して、その旨を生産部10に通知することができる。
ここで、当該問題は、主として、比率、全国の売上見
込、マスタの全部又は一部の設定の誤りに原因があると
考えられる。したがって、作成された生産計画に問題が
ある場合には、その原因となった設定を適切に変更し
(ステップS101〜S103)、再度、生産計画を作
成すればよい(ステップS104)。
In step S105, the computer 11
Outputs the production plan created in step S104. The output destination may be, for example, a display of the computer 11, or a printer connected to the computer 11 or the network 10. The created production plan is preferably stored in the database 20. In this case, the sales department 30, the distribution department 40, and the factory 5
By accessing the database 20, an operator of a computer such as 0, 60, etc. can refer to all or a part of the production plan. As the output destination, in addition to the database 20, the sales department 30, the distribution department 4
Computers such as 0, factories 50, 60, etc. can also be designated. At each factory, the created production plan is examined, and if there is a problem, the production unit 10 can be notified to that effect using, for example, the network 10.
Here, it is considered that the problem is mainly caused by an error in the setting of the ratio, the expected sales in the whole country, and all or some of the masters. Therefore, when there is a problem in the created production plan, the setting that caused the problem may be appropriately changed (steps S101 to S103), and the production plan may be created again (step S104).

【0044】図3は、図2のステップS104(生産計
画作成処理)の詳細を示す図である。まず、ステップS
201では、コンピュータ11は、品種別のブロック比
率に基づいて、品種別の売上見込を全ブロック(ブロッ
クA、ブロックB、ブロックC・・・)に按分(比例配
分)する。例えば、ある製品の売上見込を1000個、
ブロックAについてのブロック比率を30%とすると、
ブロックAには、300個の当該製品の生産計画が配分
される。これにより、品種別ブロック別の売上見込が作
成される。
FIG. 3 is a diagram showing details of step S104 (production plan creation processing) in FIG. First, step S
In 201, the computer 11 apportions (proportionally distributes) the sales prospects for each type to all blocks (block A, block B, block C,...) Based on the block ratio for each type. For example, the sales prospect of a certain product is 1000 pieces,
If the block ratio for block A is 30%,
In block A, 300 production plans of the product are allocated. As a result, a sales forecast is created for each product type and each block.

【0045】ステップS202では、コンピュータ11
は、ステップS201で按分がなされた品種のうち日別
管理品種について、旬比率及び曜日比率に基づいて、品
種別ブロック別売上見込を日別に按分する(品種別ブロ
ック別売上見込に該当する旬比率及び該当する曜日比率
を乗じる)。これにより、日別管理品種について、品種
別ブロック別日別の売上見込が作成される。
In step S202, the computer 11
In the varieties that have been apportioned in step S201, the daily sales varieties of the varieties managed by the varieties are distributed on a daily basis based on the seasonal ratio and the day of the week varieties (the seasonal ratio corresponding to the expected sales by varieties block). And the applicable day-of-week ratio). As a result, for each type of daily management, a sales forecast for each type of block for each day is created.

【0046】ステップS203では、コンピュータ11
は、ステップS201で按分がなされた品種のうち旬別
管理品種について、旬比率に基づいて、品種別ブロック
別売上見込を旬別に按分する(品種別ブロック別売上見
込に旬比率を乗じる)。これにより、旬別管理品種につ
いて、品種別ブロック別旬別の売上見込が作成される。
In step S203, the computer 11
In the varieties that have been apportioned in step S201, for the seasonally managed varieties, based on the seasonal ratio, the sales prospects for each type of block are apportioned for each season (the expected sales for each type of block are multiplied by the seasonal ratio). As a result, sales forecasts for the seasonally managed varieties are created for the varieties, the blocks, and the seasons.

【0047】ステップS204では、コンピュータ11
は、ステップS202で作成された品種別ブロック別日
別の売上見込及び在庫制約に基づいて、日別管理品種に
ついて、安全在庫量を確保するための品種別ブロック別
日別の必要生産量を算出すると共に、ステップS203
で作成された品種別ブロック別旬別の売上見込及び在庫
制約に基づいて、旬別管理品種について、安全在庫量を
確保するための品種別ブロック別旬別の必要生産量を算
出する。
In step S204, the computer 11
Calculates the required production amount by type, by block, and by day to secure the safety stock for the daily management type, based on the sales forecast and inventory constraint by type, by block, and by day created in step S202. Step S203
Based on the sales forecast and stock restrictions by type and block by type created in the above, the required production amount by type and block by type to secure the safety stock amount for the seasonally managed type is calculated.

【0048】具体的には、日別管理品種については、在
庫制約が、確保すべき在庫量の最小、適正、最大を日数
nに換算して与えられる場合、当該日末の安全在庫量
は、例えば、 (当該日末の安全在庫量)=(先のn日分の売上見込の
総和) で与えられる。
More specifically, for a daily managed variety, if the inventory constraint is given by converting the minimum, appropriate, and maximum of the stock amount to be secured into days n, the safety stock amount at the end of the day is: For example, (the safety stock amount at the end of the day) = (sum total of expected sales for the previous n days).

【0049】そして、当該日の必要生産量は、例えば、 (当該日の必要生産量)=(当該日末の安全在庫量)+
(当該日の売上見込)−(前日末の在庫量) で与えられる。
The required production amount for the day is, for example, (required production amount for the day) = (safety stock amount at the end of the day) +
(Estimated sales on that day)-(Inventory volume at the end of the previous day).

【0050】一方、旬別管理品種については、在庫制約
が、在庫比率で与えられる場合、当該旬末の安全在庫量
は、例えば、 (当該旬末の安全在庫量)=(翌旬の売上見込)×(在
庫比率) で与えられる。
On the other hand, when the inventory restriction is given by the inventory ratio for the seasonally managed varieties, the safety stock amount at the end of the season is, for example, (the safety stock amount at the end of the season) = (the expected sales amount of the next season) ) × (inventory ratio).

【0051】そして、当該旬の必要生産量は、例えば、 (当該旬の必要生産量)=(当該旬末の在庫量)+(当
該旬の売上見込)−(前旬末の在庫量) で与えられる。
The required production amount in the season is, for example, (required production amount in the season) = (stock amount at the end of the season) + (expected sales in the season) − (stock amount at the end of the previous season). Given.

【0052】ステップS205では、コンピュータ11
は、ステップS204で算出された品種別ブロック別日
別の必要生産量に基づいて、日別管理品種について、品
種別工場別日別の必要生産量を算出すると共に、ステッ
プS204で算出された品種別ブロック別旬別の必要生
産量に基づいて、旬別管理品種について、品種別工場別
旬別の必要生産量を算出する。
In step S205, the computer 11
Calculates the required production amount by type, factory, and day for the daily managed variety based on the required production amount by type, block, and day calculated in step S204, and calculates the product calculated in step S204. Based on the required production amount for each type of block and for each season, the required production amount for each type of plant and each season for the managed variety for each season is calculated.

【0053】ここで、ブロック内に1つの工場のみが属
する場合には、品種別ブロック別日別の必要生産量、品
種別ブロック別旬別の必要生産量をそのまま品種別工場
別日別の必要生産量、品種別工場別旬別の必要生産量と
することができる。
Here, when only one factory belongs to the block, the required production amount for each type of block and each season and the required production amount for each type of block and each season are directly used for each type of plant and each day. The required production amount can be determined according to the production amount, the type, the factory, and the season.

【0054】一方、ブロック内に複数の工場が属する場
合には、例えば、品種別ブロック別日別の必要生産量、
品種別ブロック別旬別の必要生産量を当該複数のブロッ
クに所定の規則(配分パラメータ)に従って配分するこ
とができる。この場合、典型的には、品種別ブロック別
日別の必要生産量、品種別ブロック別旬別の必要生産量
は、所定の比率(例えば、均等な比率)で当該複数のブ
ロックに按分され得る。
On the other hand, when a plurality of factories belong to a block, for example, the required production amount for each type, for each block, for each day,
The required production amount for each type and for each block can be distributed to the plurality of blocks according to a predetermined rule (distribution parameter). In this case, typically, the required production amount for each type of block and each day and the required production amount for each type of block and each season can be apportioned to the plurality of blocks at a predetermined ratio (for example, an equal ratio). .

【0055】ステップS206では、コンピュータ11
は、各種の制約を満たすように、ステップS205で作
成された品種別工場別日別の必要生産量、品種別工場別
旬別の必要生産量を達成することができるライン別日別
の生産計画を各工場について作成する。
In step S206, the computer 11
Is a line-by-line daily production plan that can achieve the required production amount by type and factory and the required production amount by type and factory at step S205 so as to satisfy various constraints. Is created for each factory.

【0056】図4は、図3のステップS206(ライン
別日別の生産計画の作成処理)の詳細を示す図である。
FIG. 4 is a diagram showing the details of step S206 of FIG. 3 (processing for creating a production plan for each line and day).

【0057】まず、ステップS301では、コンピュー
タ11は、旬別管理品種の必要生産量を第1の優先順位
のラインに山積み(仮割付)し、制約違反分の必要生産
量を順に山崩し(再割付)する。この際、コンピュータ
11は、必要生産量を該当工場内で山崩しできず該当ブ
ロック内でも山崩しできない場合は、他のブロックに山
崩し(他のブロックへ割付(ブロック間転送))する。
First, in step S301, the computer 11 piles up (provisionally assigns) the required production amount of the seasonally managed variety on the first priority line, and sequentially collapses the required production amount for the violation of the constraint (repeatedly). Assignment). At this time, if the required production amount cannot be landslide in the relevant factory and the landslide cannot be performed in the corresponding block, the computer 11 performs landslide to another block (assignment to another block (inter-block transfer)).

【0058】ステップS302では、コンピュータ11
は、日別管理品種の必要生産量を第1位の優先順位のラ
インに山積みし、制約違反分の必要生産量を順に山崩し
する。
In step S302, the computer 11
, The required production amount of the daily managed variety is piled up on the line of the first priority, and the required production amount for the violation of the constraint is sequentially collapsed.

【0059】ステップS303では、コンピュータ11
は、日別管理品種の必要生産量のうち制約違反分を他の
ブロックに山崩し(ブロック間転送)する。
In step S303, the computer 11
In the required production amount of the daily management type, the part that violates the constraint is crushed to another block (inter-block transfer).

【0060】これにより、各品種についてのライン別日
別の生産計画が作成される。コンピュータ11は、作成
した生産計画をディスプレイに表示したり、プリンタか
ら出力させたり、データベース20に保存したりするこ
とができる。
As a result, a production plan for each product line is created for each line. The computer 11 can display the created production plan on a display, output it from a printer, and save it in the database 20.

【0061】ここで、作成された生産計画に不具合があ
る場合には、制約や売上見込等を修正して、再度、コン
ピュータ11に生産計画作成プログラムを実行させれば
よい。
Here, if there is a defect in the created production plan, the computer 11 may execute the production plan creation program again by correcting the restrictions, the expected sales, and the like.

【0062】図5は、山積みを概念的に示す図である。
図5において、2字の英文字で示す記号(例えば、A
A)は品種を示す。ここで、先頭の英文字はブランドを
示し、末尾の英文字は容器を示す。これらの品種のうち
AA、AB、AC、ADは日別管理品種、AE、AF、
BA、BD、CC、CBは旬別管理品種である。
FIG. 5 is a diagram conceptually showing piles.
In FIG. 5, symbols represented by two English characters (for example, A
A) shows a variety. Here, the first letter of the alphabet indicates the brand, and the last letter of the alphabet indicates the container. Of these varieties, AA, AB, AC, and AD are daily managed varieties, AE, AF,
BA, BD, CC and CB are seasonally managed varieties.

【0063】また、C1〜C4はラインを示す。また、
「工場別必要生産量」はステップS205で作成される
1つの工場についての所定期間内の工場別必要生産量の
一例であり、「品種別ライン優先順」は制約の一例であ
る。
C1 to C4 indicate lines. Also,
The “required production amount by factory” is an example of the required production amount of one factory created in step S205 within a predetermined period, and the “prioritized line by product type” is an example of a constraint.

【0064】図5には、旬別管理品種の山積みが概念的
に示されている。この例では、7月中旬に生産すべき旬
別管理品種の必要生産量が当該旬の初日(7月11日)
の第1の優先順位のラインに積み上げられている。この
ような積み上げを山積み(仮割付)という。日別管理品
種の山積みについては、好適には、旬別管理品種の山積
み及び山崩しの後に行われる。
FIG. 5 conceptually shows a pile of seasonally managed varieties. In this example, the required production amount of the seasonally managed variety to be produced in the middle of July is the first day of the season (July 11).
In the first priority line. Such accumulation is called pile-up (temporary allocation). The stacking of the daily managed varieties is preferably performed after the seasonal managed varieties are stacked and crushed.

【0065】図6は、旬別管理品種の山崩しを概念的に
示す図である。図6に示す例において、ラインC1及び
C3で制約違反(例えば、同一のラインで1日に生産す
るブランドの種類の数)があったとすると、例えば、
(b)に示すように、ブランド単位((b)では、ブラ
ンドCの品種CB及びCC)を翌日のラインC1及びC
3に再割付する。この再割付の後も制約違反(例えば、
生産能力の超過)がある場合には、例えば、(c)に示
すように、品種単位((c)では、品種AF及びCC)
で、7月11日のラインC2に割付られた品種AFの一
部(生産能力の超過分)を7月12日のラインC2に再
割付すると共に、7月12日のラインC3に割付られた
品種CCの一部(生産能力の超過分)を7月13日のラ
イン3に再割付する。このような再割付を山崩しとい
う。
FIG. 6 is a diagram conceptually showing a landslide of a seasonally managed variety. In the example shown in FIG. 6, if there is a constraint violation on the lines C1 and C3 (for example, the number of types of brands produced on the same line per day), for example,
As shown in (b), the brand unit (in (b), the varieties CB and CC of the brand C) is assigned to the lines C1 and C
Reassign to 3. Constraint violations after this reassignment (for example,
If there is an excess of the production capacity), for example, as shown in FIG.
Thus, part of the variety AF (excess of the production capacity) assigned to the line C2 on July 11 was reassigned to the line C2 on July 12 and also assigned to the line C3 on July 12. Part of the product type CC (excess of production capacity) will be reallocated to line 3 on July 13. Such reassignment is called landslide.

【0066】なお、日別管理品種の山崩しについても、
旬別管理品種の山崩しと同様になされ得る。ここで、本
発明の好適な実施の形態では、旬別管理品種の山積み及
び山崩しが終了した後に、日別管理品種の山積み及び山
崩しが行われる。日別管理品種の山崩しは、本発明の好
適な実施の形態では、まず、同日における同一工場内で
行われ(第1段階の山崩し)、次いで、他の日における
同一工場内で行われる(第2段階の山崩し)。
The mountain landslide of the daily management variety was also
This can be done in the same way as a seasonally managed variety. Here, in the preferred embodiment of the present invention, after the seasonal management varieties are piled up and collapsed, the daily management varieties are piled up and collapsed. In a preferred embodiment of the present invention, the landslide of daily managed varieties is first performed in the same factory on the same day (first stage landslide), and then performed in the same factory on another day. (Second stage landslide).

【0067】図7は、日別管理品種の第2段階の山崩し
の前(即ち、第1段階の山崩しの直後)の生産計画の一
例を示す図である。図7に示す段階の生産計画では、仮
に生産能力を超過しないとすれば、計画上は適正な在庫
量を確保することができるが、生産すべき量が生産能力
を超過する場合には、図7に示すように、在庫量が適正
在庫量を下回る場合があり得る。このように適正在庫量
を下回る場合には、超過分を他の日に山崩しすることに
より在庫量を適正在庫量まで引き上げることができる場
合がある。これを図8を参照して説明する。
FIG. 7 is a diagram showing an example of a production plan of the daily managed variety before the second-level collapse (ie, immediately after the first-level collapse). In the production plan at the stage shown in FIG. 7, if the production capacity is not exceeded, a proper inventory amount can be ensured in the plan, but if the production amount exceeds the production capacity, As shown in FIG. 7, the inventory amount may be lower than the appropriate inventory amount. As described above, when the amount is less than the appropriate stock amount, the excess amount may be collapsed on another day to increase the stock amount to the appropriate stock amount in some cases. This will be described with reference to FIG.

【0068】図8は、日別管理品種の第2段階の山崩し
を概念的に示す図である。第2段階の山崩しでは、生産
能力の超過分を順次次の日に山崩しすることにより、在
庫量を適正在庫量まで引き上げる。このように生産能力
の超過分を順次次の日に山崩しする方式を玉突き方式と
定義する。
FIG. 8 is a diagram conceptually showing a second-stage mountain landslide of daily managed varieties. In the second stage of the landslide, the excess amount of the production capacity is sequentially landslide the next day to raise the inventory amount to the appropriate inventory amount. In this way, a method in which the excess of the production capacity is successively collapsed on the next day is defined as a ball-throw method.

【0069】以上の図5〜図8を参照して説明した山崩
しは、時間的に後ろに向かって山崩しする例であり、こ
れを後倒し又は後倒しによる山崩しと定義する。これに
対して、山崩しを時間的に前に向かって行うこともでき
る。これを前倒し又は前倒しによる山崩しと定義する。
図9は、日別管理品種の前倒しを概念的に示す図であ
る。なお、旬別管理品種に関しては、旬の初日に対して
山積みを行うため、好ましくは(他の山崩しにより生産
することができる場合には)、前倒しによる山崩しを行
うべきではない。
The landslide described above with reference to FIGS. 5 to 8 is an example of landslide backward in time, and this is defined as a landslide caused by falling backward or backwards. On the other hand, the landslide can be performed forward in time. This is defined as moving forward or moving forward.
FIG. 9 is a diagram conceptually illustrating that the daily managed varieties are brought forward. Incidentally, since the seasonally managed varieties are piled up on the first day of the season, preferably (when other landslides can be produced), landslides should not be carried out by moving forward.

【0070】図10は、ブロック間転送を概念的に示す
図である。ブロック間転送とは、自ブロックの工場から
他ブロックの工場へ生産計画の一部を転送(再割付或い
は山崩し)することをいう。図10に示す例では、日別
管理品種について前倒しをしながら生産能力の超過分を
他ブロックの工場に転送する。具体的には、図10に示
す例では、7月13日の工場AのラインC4に割付られ
た品種ADが、同日の他ブロックの工場CのラインC2
に転送され、7月12日の工場AのラインC3に前倒し
された品種AAの必要生産量の一部が、同日の他ブロッ
クの工場CのラインC1に転送され、7月10日の工場
AのラインC3に前倒しされた品種AAの必要生産量
が、同日の他ブロックの工場CのラインC1に転送され
ている。
FIG. 10 is a diagram conceptually showing inter-block transfer. The block-to-block transfer refers to transfer (re-allocation or landslide) of a part of the production plan from the factory of the own block to the factory of another block. In the example shown in FIG. 10, the excess of the production capacity is transferred to the factory of the other block while moving forward the daily managed variety. Specifically, in the example shown in FIG. 10, the type AD assigned to the line C4 of the factory A on July 13 is changed to the line C2 of the factory C in the other block on the same day.
A part of the required production amount of the variety AA which has been transferred to the line C3 of the factory A on July 12 is transferred to the line C1 of the factory C of the other block on the same day, and The required production amount of the product type AA which has been moved forward to the line C3 is transferred to the line C1 of the factory C in the other block on the same day.

【0071】以下、図4のS301、S302、S30
3の具体例を説明する。
Hereinafter, S301, S302, S30 of FIG.
A specific example 3 will be described.

【0072】[旬別管理品種の山積み・山崩し・ブロッ
ク間転送(S301)] (S401)ステップS401では、コンピュータ11
は、品種別ライン優先順位制約に従って、当該旬の初日
又は指定日の第1位の優先順位のラインに対して、各旬
別管理品種の必要生産量を山積みする。
[Pile of managed varieties according to season, pile collapse, transfer between blocks (S301)] (S401) In step S401, the computer 11
Accumulates the required production amount of each seasonal managed variety on the first priority line of the season or the first priority line on the designated date in accordance with the type-specific line priority constraint.

【0073】(S402)ステップS402では、コン
ピュータ11は、山積みした旬別管理品種の必要生産量
を同日の同日工場内で山崩しする。即ち、コンピュータ
11は、制約違反(例えば、最大直数制約違反による生
産能力の超過)のある旬別管理品種の当該制約違反分を
同一工場の他のラインに山崩しする。
(S 402) In step S 402, the computer 11 crushes the required production amount of the seasonally managed varieties piled up in the factory on the same day. That is, the computer 11 lands the constraint violation of the seasonally managed variety having a constraint violation (for example, an excess of production capacity due to the maximum number constraint violation) on another line of the same factory.

【0074】(S403)ステップS403では、コン
ピュータ11は、ステップS402で同一工場内で生産
計画を調整することができなかった場合に、当該制約違
反分を同一ブロック内の他の工場(当該ブロック内に他
の工場がある場合)のラインのうち当該品種を製造可能
なラインに山崩しする。
(S 403) In step S 403, if the computer 11 cannot adjust the production plan in the same factory in step S 402, the computer 11 compares the violation of the constraint with another factory in the same block (in the same block). (When there is another factory in the factory)).

【0075】(S404)ステップS404では、コン
ピュータ11は、ステップS402及びS403におい
て制約違反(例えば、最大直数制約違反による生産能力
の超過、ブランド数制約違反、型替回数制約違反等)に
より同日内で生産計画を調整することができない場合
に、その制約違反分を後倒しする。
(S 404) In step S 404, the computer 11 causes a constraint violation in step S 402 and S 403 (for example, a production capacity excess due to a maximum direct number constraint violation, a brand number constraint violation, a type change number constraint violation, etc.) within the same day. If the production plan cannot be adjusted by using, the part that violates the constraint is postponed.

【0076】(S405)ステップS405では、コン
ピュータ11は、ステップS404の実行によっても生
産計画を調整することができない制約違反分を他のブロ
ックの工場に山崩し(ブロック間転送)する。
(S 405) In step S 405, the computer 11 lands a constraint violation that cannot be adjusted in the production plan by executing step S 404 to another block factory (inter-block transfer).

【0077】(S406)ステップS406では、コン
ピュータ11は、ステップS405の実行によっても生
産計画を調整することができない制約違反分を前倒しに
よって調整する。
(S 406) In step S 406, the computer 11 adjusts the constraint violation, which cannot be adjusted by the execution of step S 405, ahead of schedule.

【0078】[日別管理品種の山積み・山崩し(S30
2)] (S501)ステップS501では、コンピュータ11
は、品種別ライン優先順位制約に従って、日別管理品種
の必要生産量を該当する日の第1位の優先順位のライン
に対して山積みする。
[Pile of daily managed varieties and landslides (S30
2)] (S501) In step S501, the computer 11
Accumulates the required production amount of the daily managed varieties with respect to the line having the first priority on the corresponding day according to the type-specific line priority constraint.

【0079】(S502)ステップS502では、コン
ピュータ11は、山積みした日別管理品種の必要生産量
を同日の同日工場内で山崩しする。即ち、コンピュータ
11は、制約違反(例えば、最大直数制約違反による生
産能力の超過)のある日別管理品種の当該制約違反分を
同一工場の他のラインに山崩しする。
(S 502) In step S 502, the computer 11 lands the required production amount of the piled daily management varieties in the factory on the same day. That is, the computer 11 collapses the constraint violation of the daily management type having the constraint violation (for example, the production capacity excess due to the maximum number constraint violation) to another line of the same factory.

【0080】(S503)ステップS503では、コン
ピュータ11は、ステップS502で同一工場内で生産
計画を調整することができなかった場合に、当該制約違
反分を同一ブロック内の他の工場(当該ブロック内に他
の工場がある場合)のラインのうち当該品種を製造可能
なラインに山崩しする。
(S 503) In step S 503, if the production plan cannot be adjusted in the same factory in step S 502, the computer 11 compares the constraint violation with another factory in the same block (in the same block). (When there is another factory in the factory)).

【0081】(S504)ステップS504では、コン
ピュータ11は、ステップS502及びS503におい
て制約違反(例えば、最大直数制約違反による生産能力
の超過、ブランド数制約違反、型替回数制約違反等)に
より同日内で生産計画を調整することができない場合
に、その制約違反分を後倒しする。この際、コンピュー
タ11は、ブロック内の安全在庫量が下限を下回らない
ように後倒しの量を調整する。
(S 504) In step S 504, the computer 11 causes a constraint violation in step S 502 and S 503 (for example, a production capacity excess due to a maximum direct number constraint violation, a brand number constraint violation, a type change count constraint violation, etc.), and the computer 11 within the same day. If the production plan cannot be adjusted by using, the part that violates the constraint is postponed. At this time, the computer 11 adjusts the amount of backward movement so that the safety stock amount in the block does not fall below the lower limit.

【0082】[日別管理品種のブロック間転送(S30
3)]このブロック間転送は、ステップS302の実行
の結果、在庫切れが生じる日別管理品種がある場合に実
行される。
[Transfer between blocks of daily management type (S30
3)] This inter-block transfer is executed when there is a daily management type that is out of stock as a result of execution of step S302.

【0083】(S601)ステップS601では、コン
ピュータ11は、在庫切れが生じる日別管理品種につい
て、前倒ししながら他ブロックの工場に転送する。
(S 601) In step S 601, the computer 11 forwards, to the factory in the other block, the daily managed products that are out of stock while moving forward.

【0084】(S602)ステップS602では、コン
ピュータ11は、ステップS601の実行によっても在
庫切れが解消しない場合に、他の日別管理品種につい
て、前倒ししながら他ブロックに転送することにより、
自ブロック内の生産余力を確保し、当該生産余力が生じ
たラインに在庫切れに係る日別管理品種を山崩しする。
(S 602) In step S 602, if the out-of-stock condition is not resolved by the execution of step S 601, the computer 11 transfers the other daily management types to other blocks while moving forward,
The production capacity within the own block is secured, and the daily managed varieties related to the stock-out are destroyed in the line where the production capacity is generated.

【0085】(S603)ステップS603では、コン
ピュータ11は、ステップS602の実行によっても在
庫切れが解消しない場合に、在庫に余裕のある日別管理
品種(在庫の下限を上まわっている日別管理品種)の生
産量を減らし、それによって生産余力が生じたラインに
在庫切れに係る日別管理品種を山崩しする。
(S 603) In step S 603, if the out-of-stock condition is not resolved by the execution of step S 602, the computer 11 determines whether or not the daily-managed products having a sufficient stock (daily-managed products that exceed the lower limit of the stock) ) To reduce the amount of production, and thereby destroy the daily management varieties related to out-of-stock in the line where the production capacity has arisen.

【0086】以上の調整によっても在庫切れが発生する
場合には、コンピュータ11は、作成された(不完全
な)生産計画と共に警告を出力する。
If the stock-out occurs even after the above adjustment, the computer 11 outputs a warning together with the created (incomplete) production plan.

【0087】上記の説明は、現実の制約と確定的な比率
及び売上見込に基づいて生産計画を作成する方法に関す
るが、制約、比率、売上見込として仮想的なパラメータ
を使用して、当該条件で適正な生産が可能であるか否か
をシミュレーションすることもできる。このシミュレー
ション機能を利用すれば、新規製品を投入する際に当該
製品を含む全製品を適正に生産することができるか否か
を短時間で判定することができる。
The above description relates to a method of creating a production plan based on actual constraints, determinate ratios, and sales prospects. It is also possible to simulate whether proper production is possible. If this simulation function is used, it is possible to determine in a short time whether or not all products including the new product can be appropriately produced when a new product is introduced.

【0088】上記の説明は、製品の品種を日別管理品種
と旬別管理品種とに分類して生産計画を作成する例に関
するが、これはビールの生産計画における特殊性を考慮
したものである。いうまでもなく、ビールにおいては鮮
度が極めて重要である。そこで、大量の売上が見込まれ
る商品に関しては、必要以上に在庫を抱えることなく、
かつ、売上見込を下回らないように、日別に必要な量だ
けを生産することが好ましい。一方、少量の売上しか見
込まれない商品(例えば、嗜好性の高い商品)に関して
は、毎日必要な量だけを生産することとするとラインの
使用効率が悪くなるため、旬を単位として、旬内の初日
等に必要な製品をまとめて生産することが好ましい。典
型的には、前者の品種が日別管理品種であり、後者の品
種が旬別管理品種である。ここで、旬よりも短い期間、
或いは、旬よりも長い期間を単位として製品を管理する
こともできる。
The above description relates to an example in which a product plan is created by classifying product varieties into daily managed varieties and seasonal managed varieties, but this takes into account the specificity of the beer production plan. . Needless to say, freshness is extremely important in beer. Therefore, for products that are expected to be sold in large quantities, do not have unnecessary inventory,
In addition, it is preferable to produce only a necessary amount on a daily basis so as not to fall below expected sales. On the other hand, for products that are expected to sell only a small amount (for example, products with high palatability), if only the required amount is produced every day, the efficiency of line usage will decrease, so the seasonal unit will be It is preferable to collectively produce necessary products on the first day or the like. Typically, the former variety is a daily managed variety, and the latter is a seasonally managed variety. Here, for a period shorter than the season,
Alternatively, products can be managed in units longer than the season.

【0089】以下、本発明の好適な実施の形態の効果を
挙げる。
The effects of the preferred embodiment of the present invention will be described below.

【0090】第1に、本発明の好適な実施の形態によれ
ば、工場の設備、要員、製造工程等を熟知していなくて
も、簡単かつ迅速に製品の生産計画を得ることができ
る。
First, according to the preferred embodiment of the present invention, a product production plan can be obtained easily and quickly without having to be familiar with factory facilities, personnel, manufacturing processes, and the like.

【0091】第2に、本発明の好適な実施の形態によれ
ば、生産能力に変更が生じた場合(例えば、ラインの故
障)や、売上見込や比率に変更が生じる場合(例えば、
天候の影響)に、マスタ、売上見込、比率のうち必要な
パラメータのみを変更するだけで生産計画を再作成する
ことができるため、生産計画のための工数を大幅に削減
することができる。
Second, according to the preferred embodiment of the present invention, when the production capacity is changed (for example, a line is broken) or when the expected sales or the ratio are changed (for example,
In addition, the production plan can be re-created only by changing the necessary parameters among the master, the expected sales, and the ratio, and the man-hour for the production plan can be greatly reduced.

【0092】第3に、シミュレーション機能を利用する
ことにより、例えば、営業方針の変更(例えば、製品の
入れ替え等)の可否を迅速かつ正確に確認することがで
きる。より具体的には、例えば、新規製品を投入する際
に当該製品を含む全製品を適正に生産することができる
か否かを迅速かつ正確に判定することができる。
Third, by using the simulation function, for example, it is possible to quickly and accurately confirm whether or not a change in business policy (for example, replacement of a product) is possible. More specifically, for example, when a new product is introduced, it is possible to quickly and accurately determine whether or not all products including the product can be appropriately produced.

【0093】第4に、ブロック間又は工場間で生産計画
を転送することにより、複数の工場の生産能力を有効に
利用することができる。
Fourth, by transferring a production plan between blocks or between factories, the production capacity of a plurality of factories can be effectively used.

【0094】[0094]

【発明の効果】本発明によれば、例えば、生産計画の作
成を迅速化することができる。
According to the present invention, for example, the production planning can be speeded up.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の好適な実施の形態に係る生産管理シス
テムの構成を概略的に示す図である。
FIG. 1 is a diagram schematically showing a configuration of a production management system according to a preferred embodiment of the present invention.

【図2】生産部のコンピュータにインストールされた生
産計画作成プログラムによる処理の概要を示す図であ
る。
FIG. 2 is a diagram showing an outline of processing by a production plan creation program installed on a computer of a production unit.

【図3】図2の生産計画作成処理の詳細を示す図であ
る。
FIG. 3 is a diagram showing details of a production plan creation process of FIG. 2;

【図4】図3のライン別日別の生産計画の作成処理の詳
細を示す図である。
FIG. 4 is a diagram showing details of processing for creating a production plan for each line in FIG. 3;

【図5】山積みを概念的に示す図である。FIG. 5 is a diagram conceptually showing a pile.

【図6】旬別管理品種の山崩しを概念的に示す図であ
る。
FIG. 6 is a diagram conceptually showing a landslide of a seasonally managed variety.

【図7】日別管理品種の第2段階の山崩しの前の生産計
画の一例を示す図である。
FIG. 7 is a diagram illustrating an example of a production plan before a second-level mountain landslide of daily managed varieties.

【図8】日別管理品種の第2段階の山崩しを概念的に示
す図である。
FIG. 8 is a diagram conceptually showing a second-level mountain landslide of a daily managed variety.

【図9】日別管理品種の前倒しを概念的に示す図であ
る。
FIG. 9 is a diagram conceptually showing that a daily managed variety is moved forward.

【図10】ブロック間転送を概念的に示す図である。FIG. 10 is a diagram conceptually showing inter-block transfer.

Claims (23)

【特許請求の範囲】[Claims] 【請求項1】 各々複数のラインを有する複数の工場に
おいて複数の品種の製品を生産するための生産計画を情
報処理装置を利用して作成する生産計画作成方法であっ
て、 各品種についての全体売上見込及び予め設定された配分
パラメータに基づいて品種別工場別日別の必要生産量を
決定する工程と、 予め設定された制約及び前記品種別工場別日別の必要生
産量に基づいて前記複数の品種についてのライン別日別
の生産計画を作成する工程と、 を含むことを特徴とする生産計画作成方法。
1. A production plan creating method for creating a production plan for producing a plurality of types of products in a plurality of factories each having a plurality of lines by using an information processing apparatus. A step of determining the required production amount for each type of plant and each day based on the sales forecast and the preset distribution parameters; and Creating a daily production plan for each product line by line.
【請求項2】 前記ライン別日別の生産計画を作成する
工程は、前記品種別工場別日別の必要生産量を、該当す
る工場の複数のラインに対して、予め設定された優先順
位に基づいて割付る工程を含むことを特徴とする請求項
1に記載の生産計画作成方法。
2. The step of creating a daily production plan for each line, wherein the required production amount for each type of plant and each day is set to a predetermined priority order for a plurality of lines of a corresponding factory. The method according to claim 1, further comprising a step of assigning the production plan based on the information.
【請求項3】 前記ライン別日別の生産計画を作成する
工程は、 前記品種別工場日別の必要生産量を、該当する工場の複
数のラインに対して、予め設定された第1の制約に基づ
いて山積みする山積み工程と、 前記山積み工程で山積みした必要生産量のうち予め設定
された第2の制約に違反する制約違反分を山崩しする山
崩し工程と、 を含むことを特徴とする請求項1に記載の生産計画作成
方法。
3. The step of creating a daily production plan for each line, comprising: setting a required production amount for each type of factory for each day to a first constraint set in advance for a plurality of lines of a corresponding factory. And a crushing step of crushing a constraint violation that violates a preset second constraint in the required production amount laid in the stacking step. The production plan creation method according to claim 1.
【請求項4】 前記山崩し工程は、前記制約違反分を同
日における同一工場の他のラインに山崩しする工程を含
むことを特徴とする請求項3に記載の生産計画作成方
法。
4. The production plan creation method according to claim 3, wherein the landslide step includes a step of landslide the constraint violation to another line of the same factory on the same day.
【請求項5】 前記山崩し工程は、前記制約違反分を同
日における他の工場に山崩しする工程を含むことを特徴
とする請求項3に記載の生産計画作成方法。
5. The production plan creation method according to claim 3, wherein the landslide step includes a step of landslide the constraint violation to another factory on the same day.
【請求項6】 前記山崩し工程は、前記制約違反分を同
一工場の他の日に山崩しする工程を含むことを特徴とす
る請求項3に記載の生産計画作成方法。
6. The production plan creation method according to claim 3, wherein the landslide step includes a step of landslide the constraint violation on another day of the same factory.
【請求項7】 前記山崩し工程は、前記制約違反分を後
倒しによって山崩しする工程を含むことを特徴とする請
求項6に記載の生産計画作成方法。
7. The production plan creation method according to claim 6, wherein the landslide step includes a step of sloping down the constraint violation portion by moving it backward.
【請求項8】 前記山崩し工程は、前記制約違反分を前
倒しによって山崩しする工程を含むことを特徴とする請
求項6に記載の生産計画作成方法。
8. The production plan creating method according to claim 6, wherein the landslide step includes a step of landslide by moving forward the constraint violation.
【請求項9】 前記山崩し工程は、前記制約違反分を前
倒ししながら他の工場に山崩しする工程を含むことを特
徴とする請求項3に記載の生産計画作成方法。
9. The production plan creation method according to claim 3, wherein the landslide step includes a step of landslide to another factory while moving forward the constraint violation.
【請求項10】 各々複数のラインを有する複数の工場
において複数の品種の製品を生産するための生産計画を
情報処理装置を利用して作成する生産計画作成方法であ
って、 各品種についての全体売上見込及び予め設定された配分
パラメータに基づいて品種別工場別期間別の必要生産量
を決定する工程と、 予め設定された制約及び前記品種別工場別期間別の必要
生産量に基づいて前記複数の品種についてのライン別日
別の生産計画を作成する工程と、 を含むことを特徴とする生産計画作成方法。
10. A production plan creating method for creating a production plan for producing a plurality of types of products in a plurality of factories each having a plurality of lines by using an information processing apparatus, comprising: A step of determining a required production amount for each type of plant and each period based on expected sales and a preset distribution parameter; and Creating a daily production plan for each product line by line.
【請求項11】 前記ライン別日別の生産計画を作成す
る工程は、前記品種別工場別期間別の必要生産量を、該
当する工場の複数のラインに対して、予め設定された優
先順位に基づいて割付る工程を含むことを特徴とする請
求項10に記載の生産計画作成方法。
11. The step of creating a daily production plan for each line comprises: setting a required production amount for each type of plant and for each period according to a predetermined priority order for a plurality of lines of the relevant factory. The method according to claim 10, further comprising a step of allocating the production plan based on the information.
【請求項12】 前記ライン別日別の生産計画を作成す
る工程は、 前記品種別工場別期間別の必要生産量を、該当する期間
の特定の日における該当する工場の複数のラインに対し
て、予め設定された第1の制約に基づいて山積みする山
積み工程と、 前記山積み工程で山積みした必要生産量のうち予め設定
された第2の制約に違反する制約違反分を山崩しする山
崩し工程と、 を含むことを特徴とする請求項10に記載の生産計画作
成方法。
12. The step of creating a line-by-line and day-by-day production plan includes: calculating a required production amount for each type of plant and for each period of time for a plurality of lines of a relevant factory on a specific day of the relevant period. A stacking step of stacking based on a preset first constraint, and a crushing step of crushing a constraint violation part of a required production amount stacked in the stacking step that violates a preset second constraint. The production plan creation method according to claim 10, comprising:
【請求項13】 前記山崩し工程は、前記制約違反分を
同日における同一工場の他のラインに山崩しする工程を
含むことを特徴とする請求項12に記載の生産計画作成
方法。
13. The production plan creating method according to claim 12, wherein the landslide step includes a step of landslide the constraint violation to another line of the same factory on the same day.
【請求項14】 前記山崩し工程は、前記制約違反分を
同日における他の工場に山崩しする工程を含むことを特
徴とする請求項12に記載の生産計画作成方法。
14. The production plan creation method according to claim 12, wherein the landslide step includes a step of landslide the constraint violation to another factory on the same day.
【請求項15】 前記山崩し工程は、前記制約違反分を
該当する期間の同一工場内で山崩しする工程を含むこと
を特徴とする請求項12に記載の生産計画作成方法。
15. The production plan creation method according to claim 12, wherein the landslide step includes a step of landslide the constraint violation in the same factory for a corresponding period.
【請求項16】 前記山崩し工程は、前記制約違反分を
後倒しによって山崩しする工程を含むことを特徴とする
請求項15に記載の生産計画作成方法。
16. The production plan creation method according to claim 15, wherein the landslide step includes a step of sloping down by violating the constraint violation.
【請求項17】 前記山崩し工程は、前記制約違反分を
前の期間に前倒しによって山崩しする工程を含むことを
特徴とする請求項12に記載の生産計画作成方法。
17. The production plan creation method according to claim 12, wherein the landslide step includes a step of landslide by moving the constraint violation portion forward in a previous period.
【請求項18】 前記製品は、ビールを含むことを特徴
とする請求項1乃至請求項17のいずれか1項に記載の
生産計画作成方法。
18. The production plan creation method according to claim 1, wherein the product includes beer.
【請求項19】 各々複数のラインを有する複数の工場
において複数の品種の製品を生産するための生産計画を
作成する情報処理装置であって、 各品種についての全体売上見込及び予め設定された配分
パラメータに基づいて品種別工場別日別の必要生産量を
決定する手段と、 予め設定された制約及び前記品種別工場別日別の必要生
産量に基づいて前記複数の品種についてのライン別日別
の生産計画を作成する手段と、 を備えることを特徴とする情報処理装置。
19. An information processing apparatus for creating a production plan for producing a plurality of types of products in a plurality of factories each having a plurality of lines, wherein an expected total sales and a preset distribution of each type are provided. Means for determining a required production amount for each type of plant based on parameters; and a daily limit for each of the plurality of types based on constraints set in advance and the required production amount for each type of plant. Means for creating a production plan of the information processing apparatus.
【請求項20】 各々複数のラインを有する複数の工場
において複数の品種の製品を生産するための生産計画を
作成する情報処理装置であって、 各品種についての全体売上見込及び予め設定された配分
パラメータに基づいて品種別工場別期間別の必要生産量
を決定する手段と、 予め設定された制約及び前記品種別工場別期間別の必要
生産量に基づいて前記複数の品種についてのライン別日
別の生産計画を作成する手段と、 を含むことを特徴とする情報処理装置。
20. An information processing apparatus for creating a production plan for producing a plurality of types of products in a plurality of factories each having a plurality of lines, wherein an overall sales forecast and a preset distribution for each type are provided. Means for determining the required production amount for each type of plant and each period based on parameters; and for each day of each line for the plurality of types based on preset constraints and the required amount of production for each type of plant and each period. Means for creating a production plan of the information processing apparatus.
【請求項21】 請求項1乃至請求項18のいずれか1
項に記載の生産計画作成方法を情報処理装置に実行させ
るためのプログラムを格納したことを特徴とするメモリ
媒体。
21. Any one of claims 1 to 18
A memory medium storing a program for causing an information processing apparatus to execute the production plan creation method described in the section.
【請求項22】 生産管理システムであって、 各々複数のラインを有する複数の工場と、 前記複数の工場において複数の品種の製品を生産するた
めの生産計画を作成する情報処理装置と、 を備え、 前記情報処理装置は、 各品種についての全体売上見込及び予め設定された配分
パラメータに基づいて品種別工場別日別の必要生産量を
決定する手段と、 予め設定された制約及び前記品種別工場別日別の必要生
産量に基づいて前記複数の品種についてのライン別日別
の生産計画を作成する手段とを有し、 前記複数の工場は、前記情報処理装置により作成された
ライン別日別の生産計画をネットワークを通じて参照す
る手段を有することを特徴とする生産管理システム。
22. A production management system, comprising: a plurality of factories each having a plurality of lines; and an information processing device for creating a production plan for producing a plurality of types of products in the plurality of factories. The information processing apparatus includes: means for determining a required production amount for each type of plant and for each day based on an expected total sales for each type and a preset distribution parameter; Means for creating a daily production plan for each of the plurality of varieties based on the required production amount for each day, and wherein the plurality of factories are arranged for each of the lines produced by the information processing apparatus. A production management system comprising means for referring to a production plan through a network.
【請求項23】 生産管理システムであって、 各々複数のラインを有する複数の工場と、 前記複数の工場において複数の品種の製品を生産するた
めの生産計画を作成する情報処理装置と、 を備え、 前記情報処理装置は、 各品種についての全体売上見込及び予め設定された配分
パラメータに基づいて品種別工場別期間別の必要生産量
を決定する手段と、 予め設定された制約及び前記品種別工場別期間別の必要
生産量に基づいて前記複数の品種についてのライン別日
別の生産計画を作成する手段とを有し、 前記複数の工場は、前記情報処理装置により作成された
ライン別日別の生産計画をネットワークを通じて参照す
る手段を有することを特徴とする生産管理システム。
23. A production management system, comprising: a plurality of factories each having a plurality of lines; and an information processing device for creating a production plan for producing a plurality of types of products in the plurality of factories. The information processing apparatus includes: means for determining a required amount of production for each type of plant and for each period based on an expected total sales for each type and a preset distribution parameter; Means for creating a daily production plan for each of the plurality of varieties based on the required production amount for each of the different periods. A production management system comprising means for referring to a production plan through a network.
JP2000283763A 2000-09-19 2000-09-19 Production plan preparing method, information processor and production managing system Pending JP2002091543A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000283763A JP2002091543A (en) 2000-09-19 2000-09-19 Production plan preparing method, information processor and production managing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000283763A JP2002091543A (en) 2000-09-19 2000-09-19 Production plan preparing method, information processor and production managing system

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2004350268A Division JP2005122760A (en) 2004-12-02 2004-12-02 Production planning method, information processing apparatus and production management system

Publications (1)

Publication Number Publication Date
JP2002091543A true JP2002091543A (en) 2002-03-29

Family

ID=18768081

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000283763A Pending JP2002091543A (en) 2000-09-19 2000-09-19 Production plan preparing method, information processor and production managing system

Country Status (1)

Country Link
JP (1) JP2002091543A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7222626B2 (en) 2003-03-25 2007-05-29 Focke & Co. (Gmbh & Co. Kg) Production and/or packaging installation, and method of operating the same
JP2011113140A (en) * 2009-11-24 2011-06-09 Nippon Steel Corp Sales and production plan producing apparatus, sales and production plan producing method, and computer program
JP2012104057A (en) * 2010-11-12 2012-05-31 Kobe Steel Ltd Production plan preparation method, production plan preparation program and production plan preparation device
JP2013061758A (en) * 2011-09-13 2013-04-04 Kobe Steel Ltd Production schedule creation device and production schedule creation method
KR102431107B1 (en) * 2021-12-01 2022-08-11 주식회사 시제 A method of calculating a production volume of the production line using artificial intelligence

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7222626B2 (en) 2003-03-25 2007-05-29 Focke & Co. (Gmbh & Co. Kg) Production and/or packaging installation, and method of operating the same
JP2011113140A (en) * 2009-11-24 2011-06-09 Nippon Steel Corp Sales and production plan producing apparatus, sales and production plan producing method, and computer program
JP2012104057A (en) * 2010-11-12 2012-05-31 Kobe Steel Ltd Production plan preparation method, production plan preparation program and production plan preparation device
JP2013061758A (en) * 2011-09-13 2013-04-04 Kobe Steel Ltd Production schedule creation device and production schedule creation method
KR102431107B1 (en) * 2021-12-01 2022-08-11 주식회사 시제 A method of calculating a production volume of the production line using artificial intelligence

Similar Documents

Publication Publication Date Title
Stefansson et al. Discrete and continuous time representations and mathematical models for large production scheduling problems: A case study from the pharmaceutical industry
Lambrecht et al. ACLIPS: A capacity and lead time integrated procedure for scheduling
US7225040B2 (en) Method and system for reducing lead-time in the packaging industry
Lu et al. Resource-constrained critical path analysis based on discrete event simulation and particle swarm optimization
US7412295B2 (en) Modeling manufacturing processes to include defined markers
Saidi-Mehrabad et al. Production planning and worker training in dynamic manufacturing systems
Irani et al. Value stream mapping of a complete product
JPH077431B2 (en) Sequential fixed production planning system
Delgoshaei et al. A multi-period scheduling of dynamic cellular manufacturing systems in the presence of cost uncertainty
Chargui et al. Berth and quay crane allocation and scheduling with worker performance variability and yard truck deployment in container terminals
CN102637272A (en) Method and device for distribution of residual plate blanks in hot-rolled plate blank front storeroom
US20180107961A1 (en) Task Support System and Task Support Method
CN106897832A (en) The production scheduling method of production line, the production scheduling system of production line
Gülşen et al. Double-row facility layout with replicate machines and split flows
CN114548020A (en) Layout design method of multi-model chip, chip prepared by same and terminal
CN102222285A (en) Multi-dimensional data linkage computing device and multi-dimensional data linkage computing method
Hatchuel et al. Towards a new planning and scheduling approach for multistage production systems
JP2002091543A (en) Production plan preparing method, information processor and production managing system
JP4135311B2 (en) Production planning method and system
JP4072102B2 (en) Project pre-evaluation method, project pre-evaluation apparatus and program
JP2004118429A (en) Reasonable inventory quantity calculation method and its system
JP2005122760A (en) Production planning method, information processing apparatus and production management system
JP2006178920A (en) Method and device for simulating production distribution, and a production method
Kazemi et al. A mathematical model for assessing the effects of a lot splitting feature on a dynamic cellular manufacturing system
Meybodi Integrating production activity control into a hierarchicalproduction‐planning model

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20040419

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20041004