JP2002073922A - Method for automatically planning schedule management - Google Patents

Method for automatically planning schedule management

Info

Publication number
JP2002073922A
JP2002073922A JP2000255811A JP2000255811A JP2002073922A JP 2002073922 A JP2002073922 A JP 2002073922A JP 2000255811 A JP2000255811 A JP 2000255811A JP 2000255811 A JP2000255811 A JP 2000255811A JP 2002073922 A JP2002073922 A JP 2002073922A
Authority
JP
Japan
Prior art keywords
schedule
days
work
terminal
automatic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000255811A
Other languages
Japanese (ja)
Inventor
Osamu Takeda
修 武田
Shinji Koyama
伸治 小山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Token Corp
Original Assignee
Token Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Token Corp filed Critical Token Corp
Priority to JP2000255811A priority Critical patent/JP2002073922A/en
Publication of JP2002073922A publication Critical patent/JP2002073922A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a method for automatically planning schedule management making it possible to automatically produce a schedule and recognize that a scheduled date is approaching and, even if the schedule is not observed, automatically change the entire unprocessed portion of the schedule. SOLUTION: The method includes the step of inputting a scheduled number of days as the number of days required for each kind of predetermined work, and storing it in a server computer 24; the step of inputting the expected start date of a work schedule and the kind of work from a responsible person's terminal and storing them in the server computer; the step of producing a schedule by adding the scheduled number of days to the expected start date of the work schedule according to the kind of work; and the step of providing the schedule onto a network.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、業務や私用等を管
理するための日程管理自動計画方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a schedule management automatic planning method for managing business and private use.

【0002】[0002]

【従来の技術】従来、コンピュータを用いた作業日程管
理は、スケジューラーと呼ばれる多くのスケジュールソ
フトが出回っており、これをコンピュータにインストー
ルして使用するなどしていた。
2. Description of the Related Art Conventionally, for work schedule management using a computer, many schedule software called a scheduler have been circulated, and these have been installed on a computer and used.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、一般に
従来のスケジュールソフトは、単に日程を入力して日程
表を画面表示させるものであるか、或いは、期日になっ
たときにアラームを起動させるだけの単純なものであっ
た。
However, generally, conventional schedule software simply inputs a schedule and displays a schedule on a screen, or simply activates an alarm when a due date is reached. It was something.

【0004】そのため、日程をいちいち入力しなければ
ならず、その作業に多くの時間と労力が費やされてい
た。
[0004] Therefore, it is necessary to input a schedule, and a lot of time and labor have been spent on the work.

【0005】また、単に日程表を画面表示させるだけで
は、常に注意して見ていないと気が付いたときには日程
の期日が近づいていて、その日程の期日までに予定され
た作業を完了するのに十分な時間がないということがあ
った。
[0005] In addition, simply displaying the schedule table on the screen, when the user notices that he / she is not always paying attention to the schedule, is nearing the date of the schedule and is not enough to complete the scheduled work by the date of the schedule. There was no time.

【0006】また、期日にアラームを起動させる場合
は、期日になるまでアラームが起動しないため、アラー
ムが起動したときには予定の作業を処理する時間がなく
なっている場合もあった。
When an alarm is activated on a due date, the alarm is not activated until the due date, so that when the alarm is activated, there is a case in which there is no time to process scheduled work.

【0007】さらに、汎用のスケジュールソフトを用い
てネットワーク上で業務管理を行う場合においても、各
担当者が入力したスケジュールをネットワークを通じて
チェックする管理者にとって、上記と同様の問題があっ
た。
[0007] Further, in the case where business management is performed on a network by using general-purpose schedule software, there is a similar problem as described above for an administrator who checks a schedule input by each person in charge through the network.

【0008】また、日程が守れず作業遅延が発生した時
は、未処理分の日程見直しを行うが、同じ問題の繰り返
しとなることもあった。
When the schedule cannot be maintained and a work delay occurs, the schedule for unprocessed parts is reviewed, but the same problem may be repeated.

【0009】そこで、本発明は、上記問題点を解消すべ
く、日程の作成を自動的に行い、日程の期日が近づくこ
とを事前に把握し、更に日程が守れたかった時において
も未処理分の全日程変更を自動で行うことを可能とする
日程管理自動計画方法を提供することを目的とする。
Therefore, in order to solve the above-mentioned problems, the present invention automatically prepares a schedule, recognizes in advance that the date of the schedule is approaching, and furthermore, even if it is desired to keep the schedule, the unprocessed portion is not processed. It is an object of the present invention to provide a schedule management automatic planning method that enables automatic change of all schedules.

【0010】[0010]

【課題を解決するための手段】本発明の上記目的は、複
数の作業が順次行われる場合において、作業の種類毎に
必要な日数として予め定めた予定日数を入力し記憶させ
るステップと、作業日程の開始予定日及び作業種類を入
力し記憶させるステップと、前記作業種類に応じて前記
開始予定日に前記予定日数を加算することにより期日を
算出して日程表を作成し画面表示させるステップと、を
有することを特徴とする日程管理自動計画方法(以下、
第1の手段と言う。)により達成される。
SUMMARY OF THE INVENTION It is an object of the present invention to input and store a predetermined number of days required for each type of work when a plurality of works are sequentially performed; Inputting and storing the scheduled start date and the type of work, and calculating the due date by adding the planned number of days to the planned start date according to the work type, creating a schedule, and displaying the screen, Schedule management automatic planning method characterized by having
This is called the first means. ).

【0011】上記第1の手段において、開始予定日を過
ぎた作業について日の経過に応じて期日迄の残日数を算
出し画面表示させるとともに、前記残日数の変動に応じ
て段階的に変化する警告を画面表示させるステップを更
に有することが好ましい。
[0011] In the first means, the number of days remaining until the due date is calculated and displayed on the screen according to the progress of the day for the work whose scheduled start date has passed, and the work is changed stepwise according to the change in the number of remaining days. Preferably, the method further includes the step of displaying a warning on a screen.

【0012】また、本発明の上記目的は、サーバーコン
ピュータと担当者用端末と管理者用端末とをネットワー
クにより接続して日程を管理する日程管理自動計画方法
において、所定作業の種類毎に必要な日数として予め定
めた予定日数を入力し前記サーバーコンピュータに記憶
させるステップと、作業日程の開始予定日及び作業種類
を前記担当者用端末から入力し前記サーバーコンピュー
タに記憶させるステップと、前記サーバーコンピュータ
において前記作業種類に応じて前記開始予定日に前記予
定日数を加算することにより日程表を作成するステップ
と、作成された前記日程表を前記ネットワーク上に提供
するステップと、と有することを特徴とする日程管理自
動計画方法(以下、第2の手段と言う。)により達成さ
れる。
It is another object of the present invention to provide a schedule management automatic planning method for managing a schedule by connecting a server computer, a staff terminal, and a manager terminal via a network. A step of inputting a predetermined number of days as a predetermined number of days and storing the same in the server computer; a step of inputting a scheduled work start date and a type of work from the terminal for the person in charge and storing the same in the server computer; Creating a schedule by adding the scheduled number of days to the scheduled start date according to the work type; and providing the created schedule to the network. This is achieved by a schedule management automatic planning method (hereinafter, referred to as a second means).

【0013】上記第2の手段において、前記サーバーコ
ンピュータにおいて日の経過に応じて期日迄の残日数を
算出し前記ネットワーク上に提供し、前記残日数の変動
に応じて段階的に変化する警告を前記ネットワーク上に
提供するステップを更に有することが好ましい(以下、
第3の手段という。)。
[0013] In the second means, the server computer calculates the number of days remaining until the date according to the passage of the day and provides the calculated number to the network, and issues a warning that changes stepwise according to the change in the number of days remaining. Preferably, the method further comprises the step of providing the information on the network (hereinafter, referred to as
This is called the third means. ).

【0014】上記第3の手段において、前記残日数が予
め定めた事前警告日数内に該当した時に警告として遅延
申請の入力を担当者用端末に要求する画面表示を行うス
テップと、入力された遅延申請を管理者端末に画面表示
するステップとを有することが好ましい(以下、第4の
手段と言う。)。
In the third means, a step of displaying a screen requesting a terminal for a person in charge to input a delay request as a warning when the number of remaining days falls within a predetermined advance warning number of days, And a step of displaying the application on the manager terminal on a screen (hereinafter, referred to as a fourth means).

【0015】上記第3又は第4の手段において、前記残
日数が無くなった場合に、遅延報告の入力を担当者用端
末に要求する画面表示を行うステップと、該遅延報告の
要求を行ったことを管理者用端末に画面表示するステッ
プと、入力された遅延報告を管理者用端末に画面表示す
るステップと、を有することが好ましい(以下、第5の
手段と言う。)。
[0015] In the third or fourth means, when the remaining days are exhausted, a step of displaying a screen for requesting a terminal for a person in charge to input a delay report; and Is displayed on the manager terminal and a step of displaying the input delay report on the manager terminal is preferable (hereinafter, referred to as fifth means).

【0016】上記第3〜第5の手段の何れかにおいて、
前記残日数が無くなった場合に、未処理作業の調整が予
め定められた予備日数を前記未処理作業の日程に加算す
ることにより行われるステップと、未処理作業を調整し
て未処理分の全日程を自動変更するステップとを更に有
することが好ましい(以下、第6の手段と言う。)。
[0016] In any one of the third to fifth means,
When the remaining days are exhausted, the adjustment of the unprocessed work is performed by adding a predetermined number of spare days to the schedule of the unprocessed work. It is preferable to further include a step of automatically changing the schedule (hereinafter, referred to as a sixth means).

【0017】上記第3〜第6の手段の何れかにおいて、
前記残日数が残っている場合に、未処理作業の完了予定
日を入力することにより自動計画変更するステップを有
することが好ましい(以下、第7の手段と言う。)。
[0017] In any one of the third to sixth means,
It is preferable to include a step of changing the automatic plan by inputting a scheduled completion date of the unprocessed work when the remaining days remain (hereinafter, referred to as a seventh means).

【0018】前記第2〜第7の手段の何れかにおいて、
前記サーバーコンピュータにおいて作成された日程表
が、担当者毎、所属組織毎、作業種類毎に読み出し可能
とされていることが好ましい。
In any one of the second to seventh means,
It is preferable that the schedule created in the server computer can be read out for each person in charge, for each organization, and for each type of work.

【0019】[0019]

【発明の実施の形態】本発明の好ましい実施形態につい
て、マンション建築における契約から着工までの業務に
関する作業日程管理を例として、以下に図面を参照して
説明する。
BEST MODE FOR CARRYING OUT THE INVENTION A preferred embodiment of the present invention will be described below with reference to the drawings, taking as an example work schedule management relating to work from contract to start of construction in an apartment building.

【0020】図1は、マンションを建築する場合の契約
から着工までの業務に関する作業種類の流れを概略的に
示すブロック図である。契約1後に三者挨拶(建築、営
業、仲介)2を行い、諸申請3及び建築確認申請4、融
資申請5及び融資申請正式許可6、発注準備7及び発注
8、地鎮祭9等の作業を各々別ルート(A〜D)で並行
して進められ、着工10に至る。着工10までの期間
は、遅くとも契約から25日が通常である。それぞれの
作業には、予め予定された日数が定められており、日程
が組まれる。
FIG. 1 is a block diagram schematically showing the flow of work types related to work from contract to start of construction when constructing an apartment. After the contract 1, a three-party greeting (construction, sales, mediation) 2 is made, and various applications 3 and construction confirmation application 4, loan application 5 and loan application formal permission 6, order preparation 7 and order 8, groundbreak festival 9, etc. It is advanced in parallel by another route (A to D), and reaches the start of construction 10. The period until the start of construction 10 is usually at least 25 days from the contract. For each operation, a predetermined number of days is determined in advance, and a schedule is set.

【0021】例えば、三者挨拶2は契約日1から7日以
内、農地転用申請等の諸申請3は三者挨拶2から7日以
内、建築確認申請4は諸申請3から6日以内、融資申請
5は三者挨拶2から6日以内、融資正式許6は融資申請
5から8日以内、発注準備7は三者挨拶2から8日以
内、発注8は発注準備7から5日以内、地鎮祭9は三者
挨拶2から7日以内であり、着工10はこれらの全ての
作業が完了した日から4日以内である。
For example, a three-party greeting 2 is within 7 days from the contract date 1 to 7 days, various applications such as an application for conversion to farmland 3 are three-day greetings within 2 to 7 days, a building confirmation application 4 is within 6 days from various applications 3 Application 5 is within 3 to 6 days of the three-party greeting, Official Loan 6 is within 8 days from the loan application 5, Order preparation 7 is within 2 to 8 days of the three-party greeting, Order 8 is within 7 to 5 days of order preparation, and local festival Numeral 9 is a three-party greeting within 2 to 7 days, and start of construction 10 is within 4 days from the date when all these operations are completed.

【0022】図2は、本発明に係る日程管理自動計画方
法の一例を示すネットワーク図である。ネットワークの
接続は、一般にはケーブルによるネットワーク接続であ
るが、携帯端末等を利用した無線によるネットワークと
することもできる。このネットワークにより、本社2
1、事業所22、及び地区ブロック23が接続され、そ
れぞれの管理者用の端末及び各事業所における担当者用
端末に接続されている。また本社には、サーバーコンピ
ュータ24が設置され、ネットワークで接続されてい
る。サーバーコンピュータ24には、管理マスタファイ
ル、作業種情報ファイル、予定日数ファイル、物件情報
ファイル、物件管理ファイルが格納されている。
FIG. 2 is a network diagram showing an example of the automatic schedule management planning method according to the present invention. The network connection is generally a network connection using a cable, but may be a wireless network using a portable terminal or the like. With this network, Head Office 2
1, an office 22, and a district block 23 are connected, and are connected to a terminal for each manager and a terminal for a person in charge at each office. At the head office, a server computer 24 is installed and connected via a network. The server computer 24 stores a management master file, a work type information file, a scheduled days file, a property information file, and a property management file.

【0023】管理マスタファイルには、担当者、部署、
営業カレンダー等の基本管理を行うためのデータが記録
されている。作業種情報ファイルには、各種作業の順序
を管理するための作業種情報データが記録されている。
予定日数ファイルには、物件パターン毎及び作業種毎に
完了すべき予め定められた日数が記録されている。ここ
で物件パターンとは、アパート、マンション等の物件の
種類に関する作業種類をパターン化したものことであ
り、予定日数ファイルには、それらの作業種類別に各々
の作業が完了すべき許容日数や事前警告日数を経験則等
に従い定めたものである。物件情報ファイルには、物件
毎の作業期日及び実績日が記録されている。物件管理フ
ァイルには、物件毎の担当者、部署、作業の期日及び実
績日が記録されている。
The management master file includes a person in charge, a department,
Data for performing basic management such as a business calendar is recorded. In the work type information file, work type information data for managing the order of various works is recorded.
The scheduled days file records a predetermined number of days to be completed for each property pattern and each work type. Here, the property pattern is a pattern of work types related to the type of property such as an apartment and a condominium, and the scheduled days file includes an allowable number of days for each work to be completed for each of the work types and an advance warning. The number of days is determined according to rules of thumb. In the property information file, work dates and actual dates for each property are recorded. In the property management file, the person in charge, the department, the work due date and the actual date are recorded for each property.

【0024】図3は作業種情報ファイルのデータを画面
表示した表、図4は予定日数ファイルのデータを画面表
示した表、図5は管理マスタファイルの営業日カレンダ
ーデータを画面表示したカレンダー表、図6は物件情報
データファイルのデータを画面表示した表を、一例とし
て示している。
FIG. 3 is a table displaying the data of the work type information file on the screen, FIG. 4 is a table displaying the data of the scheduled days file on the screen, FIG. 5 is a calendar table displaying the business day calendar data of the management master file on the screen, FIG. 6 shows, as an example, a table displaying the data of the property information data file on a screen.

【0025】図3に示す表では、各々の作業種類が時系
列に並べられ、その各々の作業にIDコードが付与され
ている。図3の前条件作業IDコードは、先に完了しな
ければならない作業のIDコードを意味する。
In the table shown in FIG. 3, each work type is arranged in chronological order, and each work is assigned an ID code. The precondition work ID code in FIG. 3 means an ID code of a work that must be completed first.

【0026】図4に示す表では、物件パターン毎の作業
種類毎に作業IDコードが時系列で並べられ、各物件パ
ターンにおける各作業種のIDコードが完了しなければ
ならない許容日数が表示され、さらに各作業IDコード
毎に事前警告日数と、予備日数とが表示されている。事
前警告日数は、5段階に分けてあり、日数の大きい順に
シグナル1〜シグナル5に分類されている。このシグナ
ルは、各作業種類の各々の日程に近づくほど、遅延が発
生する危険度が高くなるように設定された指標日数であ
り、その表示は、シグナル1〜5の段階によって、動的
イメージや色彩等を使い分けて段階的に画面表示を変化
させることができる。例えば、シグナル1は青、シグナ
ル2は緑、シグナル3は黄、シグナル4はピンク、シグ
ナル5は赤といった具合である。予備日数は、最終作業
種類に至るまでに遅延が発生しても実際に影響のない余
裕日数を意味する。予備日数は、最も作業種類に日数が
必要な作業種類を基本として求められる。図4に示す表
の例では、物件パターン101、作業IDコード009
は、作業IDコード006に対して7日の猶予期間があ
る。
In the table shown in FIG. 4, the work ID codes are arranged in chronological order for each work type of each property pattern, and the allowable days in which the ID code of each work type in each property pattern must be completed are displayed. Further, the number of advance warning days and the number of spare days are displayed for each work ID code. The number of days of advance warning is divided into five stages, and is classified into signal 1 to signal 5 in descending order of the number of days. This signal is an index number of days set so that the risk of delay increases as approaching each schedule of each type of work. The screen display can be changed stepwise by using different colors or the like. For example, signal 1 is blue, signal 2 is green, signal 3 is yellow, signal 4 is pink, signal 5 is red, and so on. The number of spare days means a spare number of days that does not actually affect even if a delay occurs until the final work type is reached. The spare days are obtained on the basis of the type of work that requires the most days for the type of work. In the example of the table shown in FIG. 4, the property pattern 101, the work ID code 009
Has a grace period of 7 days for the work ID code 006.

【0027】図5に示す営業日カレンダーは、営業日カ
レンダーは、年月毎に31日分のフラグを持っており、
実際のカレンダーに合わせて、0は休業日とし、1は営
業日としている。計画の日程を算出する時、営業日のみ
をカウントするようにしている。計画の日程を算出する
時、営業日のみをカウントするようにしている。
The business day calendar shown in FIG. 5 has flags for 31 days for each year and month.
According to the actual calendar, 0 is a holiday and 1 is a business day. When calculating the schedule of the plan, only the business days are counted. When calculating the schedule of the plan, only the business days are counted.

【0028】図6に示す表には、物件毎に物件番号が付
され、物件番号毎に物件パターンと物件のプロセス完了
日及び実績日が表示されている。物件パターン及び開始
予定日を担当者が担当者用端末から入力すると、サーバ
ーコンピュータにおいて、作業種情報ファイル及び予定
日数ファイルのデータを参照して計画の日程を算出し、
各端末に画面表示できるようになっている。
In the table shown in FIG. 6, a property number is assigned to each property, and the property pattern, the process completion date and the actual date of the property are displayed for each property number. When the person in charge inputs the property pattern and the scheduled start date from the terminal for the person in charge, the server computer calculates the schedule of the plan by referring to the data of the work type information file and the scheduled days file,
The screen can be displayed on each terminal.

【0029】図7は、計画日程の登録及び実績日の登録
の流れを示すフローチャートである。各事業所の担当者
は、先ず担当者用端末から、物件パターン及び開始予定
日を入力する(S1)。担当者が物件パターン及び開始
予定日を入力すると、本社のサーバーコンピュータは、
格納されている作業種情報データ、予定日数データ、及
び管理マスタファイルを参照して、各作業種類の期日を
計算し、これが本社のサーバーに新規の物件情報として
記録が更新され、管理される(S2)。新規の物件情報
は、本社のサーバーコンピュータ24(図2)の物件管
理ファイルを更新する(S3)。
FIG. 7 is a flowchart showing the flow of registration of a planned schedule and registration of an actual date. The person in charge at each office first inputs the property pattern and the scheduled start date from the person in charge terminal (S1). When the person in charge enters the property pattern and the scheduled start date, the server computer at the head office
With reference to the stored work type information data, scheduled days data, and management master file, the due date of each work type is calculated, and the record is updated and managed as new property information on the server at the head office ( S2). The new property information updates the property management file of the server computer 24 (FIG. 2) at the head office (S3).

【0030】また、各担当者は、当該物件の作業種類毎
に作業完了日を担当者用端末から入力する。この入力デ
ータにより、物件情報ファイルが更新され、物件管理フ
ァイルが更新される。こうしてサーバーにおいて更新さ
れた物件管理ファイルにより作業日程管理が行われる。
Further, each person in charge inputs a work completion date for each kind of work of the property from the person in charge terminal. With this input data, the property information file is updated, and the property management file is updated. In this way, the work schedule is managed based on the property management file updated in the server.

【0031】図8は、日程を変更する場合に行うアルゴ
リズムを示すフローチャートである。日程に遅延が発生
した場合(M1)、サーバーコンピュータは、遅延報告
要求を担当者用端末に出し、担当者用端末に遅延報告を
要求する表示を画面表示させ、それに応じて担当者が遅
延報告を担当者用端末から入力する(M2)。
FIG. 8 is a flowchart showing an algorithm performed when the schedule is changed. When a delay occurs in the schedule (M1), the server computer issues a delay report request to the terminal for the person in charge, displays a display requesting the delay report on the terminal for the person on the screen, and the person in charge responds accordingly. Is input from the staff terminal (M2).

【0032】その遅延が計画変更を要する遅延か否か
を、物件情報ファイルの計画日と本日とを比較して計画
日が遅延しているかに従って判断する(M3)。例えば
融資機関による遅延等の外部要因による場合は、遅延に
なる前に担当者が担当者用端末から遅延後の完了予定日
を入力する(M4)。
Whether the delay is a delay requiring a plan change or not is determined by comparing the planned date in the property information file with today, according to whether the planned date is delayed (M3). For example, in the case of an external factor such as a delay due to a loan institution, the person in charge inputs a scheduled completion date after the delay from the terminal for person in charge before the delay (M4).

【0033】サーバコンピュータ24が、物件情報ファ
イルにおける計画の変更を要すると判断した場合、及び
外部要因により遅延が予想され遅延完了予定日が入力さ
れた場合には、遅延が発生した履歴レコードを旧区分デ
ータとして物件情報ファイルに記録する(M5)。
When the server computer 24 determines that a change in the plan in the property information file is required, or when a delay is expected due to an external factor and a scheduled delay completion date is input, the history record in which the delay has occurred is deleted. It is recorded in the property information file as classification data (M5).

【0034】サーバーコンピュータ24は、前記旧区分
データを基に、予定日数ファイルのデータ及び管理マス
タファイルのデータを用いて、計画日程を変更した新区
分の日程レコードを物件情報ファイルに作成する(M
6)。新区分の日程レコードを作成する際、内部要因に
よる遅延の場合は、その現実の日に該当する予定日数の
許容日数を加算することにより行われ、外部要因による
遅延の場合は、入力された遅延完成予定日に該当する予
定日数の許容日数を加算することにより行われる。こう
して新たに作成された物件情報ファイル(M7)の物件
情報データに基づき、物件管理ファイルの物件管理デー
タが更新される(M8)。
The server computer 24 creates a schedule record of the new category in which the planned schedule is changed in the property information file based on the old category data and the data of the planned number of days file and the data of the management master file (M
6). When creating a schedule record for a new category, in the case of delays due to internal factors, this is done by adding the allowable days of the expected number of days corresponding to the actual day, and in the case of delays due to external factors, the entered delay This is performed by adding the allowable number of days corresponding to the scheduled completion date. The property management data of the property management file is updated based on the property information data of the property information file (M7) thus newly created (M8).

【0035】図9は、本発明に係る日程管理自動計画方
法のアルゴリズムを示すフローチャートである。サーバ
ーコンピュータ24は、担当者により入力された日程デ
ータと本日とを差、即ち残日数を算出し(N1)、この
残日数と予定日数の事前警告日数とを比較する(N
2)。
FIG. 9 is a flowchart showing the algorithm of the automatic schedule management planning method according to the present invention. The server computer 24 calculates a difference between the schedule data input by the person in charge and today, that is, the number of remaining days (N1), and compares the number of remaining days with the number of advance warning days of the planned number of days (N1).
2).

【0036】サーバーコンピュータ24は、処理N2に
よって比較された残日数がシグナル1以前か否かを判断
し(N3)、残日数がシグナル1に該当する日数以下と
なった場合にシグナル1の警告信号を担当者用端末に送
信し画面表示させる(N31)。同様の処理をシグナル
2〜4について行う(N4〜N6、N41〜N61)。
The server computer 24 determines whether or not the number of remaining days compared in the process N2 is before the signal 1 (N3). If the number of remaining days becomes equal to or less than the number of days corresponding to the signal 1, the server 1 outputs a warning signal of the signal 1. Is transmitted to the person in charge terminal and displayed on the screen (N31). The same processing is performed for signals 2 to 4 (N4 to N6, N41 to N61).

【0037】シグナル3及びシグナル4に該当する場合
には、サーバーコンピュータ24は、担当者用端末に遅
延申請要求の信号を送信し、遅延申請要求を画面表示さ
せる(N7)。担当者は、遅延の遅れが外部要因による
ものであるか否かの判断を行い(N8)、外部要因であ
ると判断した場合は、外部要因を考慮して遅延完了予定
日を入力する(N9)。担当者の遅延完了予定日の入力
を受けたサーバーコンピュータは、履歴を作成して記録
するとともに新計画を作成して日程の計画変更を行う
(N10)。
If the signal corresponds to the signal 3 or the signal 4, the server computer 24 transmits a signal of the delay application request to the terminal for the person in charge, and displays the delay application request on the screen (N7). The person in charge determines whether or not the delay is due to an external factor (N8). If it is determined that the delay is an external factor, the person in charge inputs a scheduled completion date of the delay in consideration of the external factor (N9). ). The server computer, which receives the input of the delay completion date of the person in charge, creates and records the history and creates a new plan to change the schedule (N10).

【0038】残日数がシグナル5に該当する日数以下と
なった場合(N11)は、サーバーコンピュータは、担
当者用端末に遅延報告要求の信号を送ってこれを画面表
示させ、管理者用端末に遅延報告通知の信号を送ってこ
れを画面表示させ、その担当者が遅延報告要求を入力す
るとその信号がサーバーコンピュータを介して管理者用
端末に送信され、遅延報告がなされる(N12)。遅延
日数が予備日数に収まらない場合は、サーバーコンピュ
ータが履歴を記録するとともに新計画を作成する(N1
0)。該新計画の作成は、図8で説明したと同様にし
て、前記旧区分データを基に、予定日数ファイルのデー
タ及び管理マスタファイルのデータを用いて、計画日程
を変更した新区分の日程レコードを物件情報ファイルに
作成し、新区分の日程レコードを作成する際、内部要因
による遅延の場合は、その現実の日に該当する予定日数
の許容日数を加算することにより行われる。
When the number of remaining days becomes equal to or less than the number of days corresponding to the signal 5 (N11), the server computer sends a delay report request signal to the terminal for the person in charge and displays it on the screen for the terminal for the administrator, A delay report notification signal is sent and displayed on the screen, and when the person in charge inputs a delay report request, the signal is transmitted to the administrator terminal via the server computer, and a delay report is made (N12). If the number of delay days does not fit in the spare days, the server computer records the history and creates a new plan (N1).
0). The creation of the new plan is performed in the same manner as described with reference to FIG. 8, based on the old section data, using the data of the planned number of days file and the data of the management master file, and changing the schedule record of the new section in which the planned schedule is changed. Is created in the property information file, and when a schedule record of a new category is created, in the case of a delay due to an internal factor, this is performed by adding an allowable number of scheduled days corresponding to the actual day.

【0039】上記した遅延申請要求、遅延報告要求、遅
延報告通知は、一覧形式又は個別型式により各端末に画
面表示し、或いは電子メールによることとしても良い。
The above-described delay application request, delay report request, and delay report notification may be displayed on a screen in each terminal in a list format or individual format, or may be sent by e-mail.

【0040】上記したように、ホストコンピュータによ
りデータを記憶・処理する中央処理型式が処理速度の観
点から好ましいが、データ量が大量な場合等においては
担当者用端末においてデータを記憶・処理する分散処理
型式としても良い。
As described above, the central processing type in which data is stored and processed by the host computer is preferable from the viewpoint of processing speed. However, when the data amount is large, the distributed processing for storing and processing the data in the terminal for the person in charge is used. The processing type may be used.

【0041】以上の説明から明らかなように、上記日程
管理自動計画方法によれば、担当者は物件パターン等の
作業種類と日程の開始予定日だけを入力するだけで、日
程表が自動的に作成され、日程をいちいち入力する手間
が省かれる。
As is clear from the above description, according to the automatic schedule management planning method, the scheduler automatically enters the schedule just by inputting only the type of work such as the property pattern and the scheduled start date of the schedule. It is created and saves the trouble of inputting the schedules one by one.

【0042】そしてこれらの処理をサーバーコンピュー
タにより行い、ネットワーク上に提供することで、担当
者だけでなく管理者も管理者用端末を用いて監視するこ
とができる。
By performing these processes by the server computer and providing them on the network, not only the person in charge but also the manager can be monitored using the manager terminal.

【0043】また、残日数を表示させ、残日数が少なく
なるにつれて警告を画面表示し、その警告を残日数が少
なくなるにつれて変化させるようにしておくことで、日
程の期日が近づいていることを即座に確認することがで
き、期日までに作業を終わらせるのに必要な日数を確認
することが容易になる。従って、日程間近になって十分
な日数がなくなってしまっていることに気付くという不
具合が防止される。
Further, by displaying the number of remaining days, displaying a warning on the screen as the number of remaining days decreases, and changing the warning as the number of remaining days decreases, it is possible to confirm that the date of the schedule is approaching. It can be checked immediately, making it easier to check the number of days required to complete the work by the deadline. Therefore, a problem of noticing that the schedule is approaching and that sufficient days have been lost is prevented.

【0044】さらに、日程の期日が過ぎてしまった場合
でも、自動的に日程表を組み直してくれるので、日程変
更のための期間が短縮され、そのための労力も軽減され
る。
Further, even if the date of the schedule has passed, the schedule is automatically re-assembled, so that the period for changing the schedule is shortened, and the labor required for the change is reduced.

【0045】さらにまた、物件毎や担当者毎に、日程表
を引き出すことができるので、管理者にとって全体の進
捗状況の把握が容易となり、作業遅延の遅れに対して改
善指示が容易になり、迅速な対処が可能となる。
Furthermore, since it is possible to draw out a schedule for each property or each person in charge, it is easy for the manager to grasp the overall progress, and it is easy to give instructions for improvement with respect to delays in work. Quick response is possible.

【0046】また、サーバーコンピュータにより、自動
的に担当者に対して遅延報告を要求し、管理者に送るこ
とにより、管理者は担当者から口頭等による報告を待っ
て対処するということが無くなるので、作業の遅延を確
実に防止することが可能になる。
In addition, the server computer automatically requests the delay report from the person in charge and sends it to the manager, so that the manager does not have to wait for a report from the person in charge orally to take action. Thus, it is possible to reliably prevent the delay of the operation.

【0047】さらに、計画変更結果が記録されるため、
業績評価や人事評価に活用できるという利点もある。
Further, since the result of the plan change is recorded,
There is also an advantage that it can be used for performance evaluation and personnel evaluation.

【0048】上記実施形態では、管理者用端末と担当者
用端末とをネットワークで接続した例を示したが、これ
に限らず、スタンドアローン型即ち、担当者用端末に前
記した管理マスタファイル等のデータを全て蓄積し、作
業日程管理を行うようにすることもできる。
In the above embodiment, an example is shown in which the manager terminal and the staff terminal are connected via a network. However, the present invention is not limited to this. Can be stored to manage the work schedule.

【0049】上記した日程管理自動計画方法は、そのプ
ログラムをコンピュータ読取可能な記録媒体として利用
することもできる。
In the automatic schedule management method described above, the program can be used as a computer-readable recording medium.

【0050】[0050]

【発明の効果】以上の説明から明らかなように、本発明
によれば、日程の作成を自動的に行い、更に、日程の期
日が近づいていることを予知しやすくする。
As is apparent from the above description, according to the present invention, a schedule is automatically created, and further, it is easy to predict that the date of the schedule is approaching.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る日程管理自動計画方法を適用する
一例としてマンションを建築する場合の契約から着工ま
での業務に関する作業種類の流れを概略的に示すブロッ
ク図である。
FIG. 1 is a block diagram schematically showing a flow of work types related to work from contract to start of construction when constructing an apartment as an example of applying the automatic schedule management planning method according to the present invention.

【図2】本発明に係る日程管理自動計画方法の一例を示
すネットワーク図である。
FIG. 2 is a network diagram showing an example of an automatic schedule management planning method according to the present invention.

【図3】図2の日程管理自動計画方法において端末の画
面に表示される一例を示す表である。
FIG. 3 is a table showing an example displayed on a screen of a terminal in the automatic schedule management planning method of FIG. 2;

【図4】図2の日程管理自動計画方法において端末の画
面に表示される一例を示す表である。
FIG. 4 is a table showing an example displayed on a screen of a terminal in the automatic schedule management planning method of FIG. 2;

【図5】図2の日程管理自動計画方法において端末の画
面に表示される一例を示す表である。
FIG. 5 is a table showing an example displayed on a screen of a terminal in the automatic schedule management planning method of FIG. 2;

【図6】図2の日程管理自動計画方法において端末の画
面に表示される一例を示す表である。
6 is a table showing an example displayed on a screen of a terminal in the automatic schedule management planning method of FIG. 2;

【図7】図2の日程管理自動計画方法において、計画日
程の登録及び実績日の登録の流れの一例を示すフローチ
ャートである。
7 is a flowchart showing an example of a flow of registration of a planned schedule and registration of an actual date in the automatic schedule management planning method of FIG. 2;

【図8】図2の日程管理自動計画方法において、日程を
変更する場合に行うアルゴリズムを示すフローチャート
である。
FIG. 8 is a flowchart showing an algorithm performed when the schedule is changed in the automatic schedule management planning method of FIG. 2;

【図9】図2の日程管理自動計画方法のアルゴリズムを
示すフローチャートである。
9 is a flowchart showing an algorithm of the automatic schedule management method of FIG. 2;

Claims (9)

【特許請求の範囲】[Claims] 【請求項1】 複数の作業が順次行われる場合におい
て、作業の種類毎に必要な日数として予め定めた予定日
数を入力し記憶させるステップと、作業日程の開始予定
日及び作業種類を入力し記憶させるステップと、前記作
業種類に応じて前記開始予定日に前記予定日数を加算す
ることにより期日を算出して日程表を作成し画面表示さ
せるステップと、を有することを特徴とする日程管理自
動計画方法。
A step of inputting and storing a predetermined number of days required as a required number of days for each type of operation when a plurality of operations are sequentially performed; and inputting and storing a scheduled start date of the operation schedule and an operation type. Automatically adding a schedule to the scheduled start date according to the type of work, calculating a due date, creating a schedule, and displaying the schedule on a screen. Method.
【請求項2】 開始予定日を過ぎた作業について日の経
過に応じて期日迄の残日数を算出し画面表示させるとと
もに、前記残日数の変動に応じて段階的に変化する警告
を画面表示させるステップを更に有することを特徴とす
る請求項1記載の日程管理自動計画方法。
2. For the work that has passed the scheduled start date, the number of days remaining until the due date is calculated and displayed on the screen according to the progress of the day, and a warning that changes stepwise according to the change in the number of remaining days is displayed on the screen. The automatic schedule management method according to claim 1, further comprising a step.
【請求項3】 サーバーコンピュータと担当者用端末と
管理者用端末とをネットワークにより接続して日程を管
理する日程管理自動計画方法において、所定作業の種類
毎に必要な日数として予め定めた予定日数を入力し前記
サーバーコンピュータに記憶させるステップと、作業日
程の開始予定日及び作業種類を前記担当者用端末から入
力し前記サーバーコンピュータに記憶させるステップ
と、前記サーバーコンピュータにおいて前記作業種類に
応じて前記開始予定日に前記予定日数を加算することに
より日程表を作成するステップと、作成された前記日程
表を前記ネットワーク上に提供するステップと、を有す
ることを特徴とする日程管理自動計画方法。
3. In a schedule management automatic planning method for managing schedules by connecting a server computer, a terminal for staff, and a terminal for manager by a network, a predetermined number of days required for each type of predetermined work Inputting and storing in the server computer the scheduled start date and work type of the work schedule from the terminal for the person in charge and storing the work schedule in the server computer. A schedule management automatic planning method, comprising: a step of creating a schedule by adding the number of scheduled days to a scheduled start date; and a step of providing the created schedule to the network.
【請求項4】 前記サーバーコンピュータにおいて日の
経過に応じて期日迄の残日数を算出し前記ネットワーク
上に提供し、前記残日数の変動に応じて段階的に変化す
る警告を前記ネットワーク上に提供するステップを更に
有することを特徴とする請求項3記載の日程管理自動計
画方法。
4. The server computer calculates the number of days remaining until the due date according to the passage of days and provides the calculated number to the network, and provides a warning on the network that changes stepwise according to the change in the number of days remaining. 4. The automatic schedule management method according to claim 3, further comprising the step of:
【請求項5】 前記残日数が予め定めた事前警告日数内
に該当した時に警告として遅延申請の入力を担当者用端
末に要求する画面表示を行うステップと、入力された遅
延申請を管理者端末に画面表示するステップとを有する
ことを特徴とする請求項4に記載の日程管理自動計画方
法。
5. A step of displaying a screen for requesting a terminal for a person in charge to input a delay request as a warning when the number of remaining days falls within a predetermined number of warning days in advance, and displaying the input delay request as an administrator terminal 5. The automatic schedule management method according to claim 4, further comprising the step of:
【請求項6】 前記残日数が無くなった場合に、遅延報
告の入力を担当者用端末に要求する画面表示を行うステ
ップと、該遅延報告の要求を行ったことを管理者用端末
に画面表示するステップと、入力された遅延報告を管理
者用端末に画面表示するステップと、を有することを特
徴とする請求項4又は5に記載の日程管理自動計画方
法。
6. A step of displaying a screen for requesting input of a delay report to a terminal for a staff when the number of remaining days is exhausted, and displaying a screen for requesting the delay report on a terminal for an administrator. 6. A schedule management automatic planning method according to claim 4, further comprising the steps of: performing a delay report; and displaying the input delay report on a screen of the manager terminal.
【請求項7】 前記残日数が無くなった場合に、未処理
作業の調整が予め定められた予備日数を前記未処理作業
の日程に加算することにより行われるステップと、未処
理作業を調整して未処理分の全日程を自動変更するステ
ップとを更に有することを特徴とする請求項4〜6の何
れかに記載の日程管理自動計画方法。
7. A step in which when the remaining days are exhausted, adjustment of the unprocessed work is performed by adding a predetermined spare number of days to the schedule of the unprocessed work, and adjusting the unprocessed work. 7. The automatic schedule management method according to claim 4, further comprising a step of automatically changing all the unprocessed schedules.
【請求項8】 前記残日数が残っている場合に、未処理
作業の完了予定日を入力することにより自動計画変更す
るステップを有することを特徴とする請求項4〜7の何
れかに記載の日程管理自動計画方法。
8. The method according to claim 4, further comprising the step of changing an automatic plan by inputting a scheduled completion date of the unprocessed work when the number of remaining days remains. Schedule management automatic planning method.
【請求項9】 前記サーバーコンピュータにおいて作成
された日程表が、担当者毎、所属組織毎、作業種類毎に
読み出し可能とされていることを特徴とする請求項3〜
8の何れかに記載の日程管理自動計画方法。
9. The schedule table created in the server computer is readable for each person in charge, for each organization, and for each type of work.
8. The automatic schedule management planning method according to any one of 8.
JP2000255811A 2000-08-25 2000-08-25 Method for automatically planning schedule management Pending JP2002073922A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000255811A JP2002073922A (en) 2000-08-25 2000-08-25 Method for automatically planning schedule management

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000255811A JP2002073922A (en) 2000-08-25 2000-08-25 Method for automatically planning schedule management

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2006147745A Division JP2006260598A (en) 2006-05-29 2006-05-29 Schedule planning method

Publications (1)

Publication Number Publication Date
JP2002073922A true JP2002073922A (en) 2002-03-12

Family

ID=18744540

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000255811A Pending JP2002073922A (en) 2000-08-25 2000-08-25 Method for automatically planning schedule management

Country Status (1)

Country Link
JP (1) JP2002073922A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005293401A (en) * 2004-04-02 2005-10-20 Nec Corp Bank procedure work agent system
JP2008065552A (en) * 2006-09-06 2008-03-21 Epa System Inc Process chart preparation support device and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005293401A (en) * 2004-04-02 2005-10-20 Nec Corp Bank procedure work agent system
JP2008065552A (en) * 2006-09-06 2008-03-21 Epa System Inc Process chart preparation support device and method

Similar Documents

Publication Publication Date Title
US10282683B2 (en) Technician control system
US8165910B2 (en) Method and system for price planning
US6714829B1 (en) Dual path scheduling method
JP2011175683A (en) Computer executable workflow control system
JP4999051B2 (en) Asset management system, asset management method, and asset management program
JP2019175032A (en) Production planning device, production planning system, production planning method, and program
US20050182698A1 (en) Report generation and distribution system and method for a time and attendance recording system
JP2006260598A (en) Schedule planning method
JP5276607B2 (en) FORECAST MANAGEMENT SYSTEM, ITS CONTROL METHOD, AND ITS PROGRAM
US20190266544A1 (en) Techniques for managing process-flows across an enterprise
Talapov et al. The leading role of the customer in the organization of the information modeling process
JP2007041799A (en) Project management support system
EP1750225A1 (en) Supply scheduling
JP2002073922A (en) Method for automatically planning schedule management
US20040122724A1 (en) System and method for generating priorities of manufacturing orders
JP2004287584A (en) Method for displaying operation schedule chart and method and system for managing operation
JP2004094809A (en) Hotel reservation estimating model creating method
JP4318162B2 (en) Production schedule planning management method and production schedule planning management program
JP6559214B2 (en) Schedule management system and schedule management program
JP3296318B2 (en) Demand forecasting method, demand forecasting device, and storage medium storing demand forecasting program
JP2023032545A (en) Work plan creation support system and work plan creation support program
JP2000343388A (en) Production plan planning method, production plan planning device and recording medium
CN116881344A (en) Document data processing method and system
JP2004118788A (en) Method and system for managing working progress
JP2024046385A (en) Prime cost management device, prime cost management method and prime cost management program

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20041215

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20050214

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060329

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060529

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20060913