JP2002073751A - Device and method for planning supply plan, and program for planning supply plan - Google Patents

Device and method for planning supply plan, and program for planning supply plan

Info

Publication number
JP2002073751A
JP2002073751A JP2000263794A JP2000263794A JP2002073751A JP 2002073751 A JP2002073751 A JP 2002073751A JP 2000263794 A JP2000263794 A JP 2000263794A JP 2000263794 A JP2000263794 A JP 2000263794A JP 2002073751 A JP2002073751 A JP 2002073751A
Authority
JP
Japan
Prior art keywords
supply
personnel
type
unit
cost
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000263794A
Other languages
Japanese (ja)
Inventor
Hiroyoshi Suzuki
浩佳 鈴木
Kuniya Kaneko
邦也 金子
Toshihiro Nakamura
敏弘 中村
Hidetsugu Kojima
英嗣 小島
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toyota Motor Corp
Original Assignee
Toyota Motor Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toyota Motor Corp filed Critical Toyota Motor Corp
Priority to JP2000263794A priority Critical patent/JP2002073751A/en
Priority to US09/935,692 priority patent/US20020059089A1/en
Priority to EP01307349A priority patent/EP1217563A3/en
Publication of JP2002073751A publication Critical patent/JP2002073751A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Abstract

PROBLEM TO BE SOLVED: To rapidly set up a production plan to perform the production of commodities at a lower cost. SOLUTION: Based on the requested number of products Xi(t) of a commodity (i), the sum of the planned number of products Yij(t) in production lines (j) and the number of personnel Zj3k(t) required for producing the planned number of products Yij(t) in the production lines (j), a tact time Zj4(t), an over time Zj1(t), direct working times on holidays Zj2(t), and number of personnel Zj3k(t) are set up initially (S100 to S108). Evaluation loss as the cost requiring to produce the commodities (i) by the requested number of products Xi(t) by successively changing the number of personnel Zj3k(t), sum thereof, and planed number of products Yij(t) at with increments at prescribed intervals is calculated (S110 to S122). Then, a set value with the smallest evaluation value is output as a planned commodity supply value (S124, S126). According to these processings, a production plan capable of performing the production of the commodities at a low cost can be established rapidly.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、供給計画立案装置
および供給計画立案方法並びに供給計画立案用のプログ
ラムに関し、詳しくは、商品またはサービスの供給が可
能な複数の供給拠点における商品またはサービスの供給
計画を立案する供給計画立案装置およびその計画立案方
法並びにこうした供給計画立案用のプログラムに関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a supply planning device, a supply planning method, and a supply planning program, and more particularly to the supply of goods or services at a plurality of supply bases capable of supplying goods or services. The present invention relates to a supply planning device for preparing a plan, a method for preparing the same, and a program for preparing such a supply plan.

【0002】[0002]

【従来の技術】従来、この種の供給計画立案装置として
は、商品の生産に関わる種々の原価費用項目を細かく集
計するものが提案されている(例えば、特開平11−3
53375号公報など)。この装置では、ラインデータ
や部品データ,工数データ,基準費用データなどの細分
化された各種データに基づいて商品の生産に必要な工数
や要員数,費用などを計算して出力している。
2. Description of the Related Art Conventionally, as a supply planning device of this kind, there has been proposed a device which finely totals various cost and cost items related to the production of a product (for example, Japanese Patent Application Laid-Open No. 11-3)
No. 53375). This device calculates and outputs man-hours, the number of personnel, costs and the like required for product production based on various kinds of subdivided data such as line data, component data, man-hour data, and reference cost data.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、こうし
た供給計画立案装置では、最もコストの低い商品の生産
計画を立案するのは困難である。細分化された各種デー
タに基づいて商品の生産に必要な工数や要員数,費用等
を計算するだけでは、商品の生産コストを低くするため
に、要求される商品の生産量をどのラインでどれだけ稼
働し如何なる要員タイプの要員を如何なる人数とすれば
よいかを立案することはできない。人的な入力作業で複
数の条件を入力して複数の計算結果を得て商品の生産コ
ストを複数出力し、そのうち商品の生産コストが最も低
い条件を選択することはできるが、多くの作業量と多く
の時間を要すると共に得られる結果でも最も商品の生産
コストが低い条件とはならない。
However, it is difficult for such a supply planning device to formulate a production plan for a product with the lowest cost. Simply calculating the man-hours, the number of personnel, costs, etc., required for product production based on various types of subdivided data will reduce the production cost of the product and determine the production volume of the required product on which line. It is not possible to plan what kind of personnel should be used and how many personnel should be used. It is possible to input multiple conditions by human input work, obtain multiple calculation results, output multiple product production costs, and select the condition with the lowest product production cost among them. It takes a lot of time and the result obtained does not mean that the production cost of the product is the lowest.

【0004】本発明の供給計画立案装置および供給計画
立案方法は、商品やサービスの供給をより低コストで行
なう供給計画を立案することを目的の一つとする。ま
た、本発明の供給計画立案装置および供給計画立案方法
は、商品やサービスの低コストな供給計画を迅速に立案
することを目的の一つとする。本発明の供給計画立案用
プログラムは、コンピュータを商品やサービスの供給を
より低コストで行なう供給計画を迅速に立案する供給計
画立案装置として機能させることを目的とする。
An object of a supply planning device and a supply planning method of the present invention is to provide a supply plan for supplying goods and services at lower cost. Another object of the supply planning device and the supply planning method of the present invention is to quickly prepare a low-cost supply plan for a product or service. It is an object of the present invention to provide a supply planning program for causing a computer to function as a supply planning device for quickly preparing a supply plan for supplying goods and services at lower cost.

【0005】[0005]

【課題を解決するための手段およびその作用・効果】本
発明の供給計画立案装置および供給計画立案方法並び供
給計画立案用プログラムには、上述の目的の少なくとも
一部を達成するために以下の手段を採った。
Means for Solving the Problems and Actions and Effects Thereof The supply planning device, the supply planning method and the supply planning program of the present invention include the following means for achieving at least a part of the above objects. Was taken.

【0006】本発明の供給計画立案装置は、商品または
サービスの供給が可能な複数の供給拠点における商品ま
たはサービスの供給計画を立案する供給計画立案装置で
あって、単位当たりの商品またはサービスの供給に必要
な要員数と時間とに関する単位供給工数データと、要員
タイプ別の単位当たりの費用に関する単位要員タイプ別
費用データとを記憶するデータ記憶手段と、全体の商品
またはサービスの要求供給個数を入力する要求供給個数
入力手段と、該入力された要求供給個数を分配パラメー
タに基づいて各供給拠点からの供給個数である拠点供給
個数に分配する供給個数分配手段と、該分配された拠点
供給個数の商品またはサービスを供給するのに必要な拠
点供給工数を前記データ記憶手段に記憶された単位供給
工数データに基づいて演算すると共に該演算された拠点
供給工数を処理する要員タイプ別の要員数を要員パラメ
ータに基づいて設定する要員設定手段と、前記要員設定
手段により設定された要員タイプ別の要員数と前記デー
タ記憶手段に記憶された単位要員タイプ別費用データと
に基づいて前記複数の供給拠点からの拠点供給個数の供
給の際の全体の費用を演算する費用演算手段と、前記分
配パラメータと前記要員パラメータとを逐次変更するパ
ラメータ変更手段と、該パラメータ変更手段による分配
パラメータおよび要員パラメータの変更に伴って前記要
員設定手段により設定される要員タイプ別の要員数を用
いて前記費用演算手段により演算される全体の費用のう
ち該全体の費用が最小となる分配パラメータと要員パラ
メータとを選択し、該選択した分配パラメータと要員パ
ラメータとを用いて前記供給個数分配手段により分配さ
れる拠点供給個数と前記要員設定手段により設定される
各供給拠点の要員タイプ別の要員数とを供給計画として
設定する計画設定手段とを備えることを要旨とする。
A supply planning device according to the present invention is a supply planning device for preparing a supply plan of goods or services at a plurality of supply bases capable of supplying goods or services, and supplies goods or services per unit. Data storage means for storing the unit supply man-hour data relating to the number of personnel and time required for each unit, the cost data per unit personnel type relating to the cost per unit for each personnel type, and the required supply quantity of the whole goods or services Required supply number input means, supply number distribution means for distributing the input required supply number to the base supply number which is the supply number from each supply base based on the distribution parameter, and supply number distribution means for the distributed base supply number. Based on the unit supply man-hour data stored in the data storage means, a base supply man-hour required to supply a product or service is determined. Means for setting the number of personnel for each type of personnel for processing the calculated base supply man-hours based on personnel parameters, the number of personnel for each type of personnel set by the personnel setting means, and the data Cost calculation means for calculating the total cost when supplying the supply number of bases from the plurality of supply bases based on the unit personnel type-based cost data stored in the storage means; the distribution parameter and the personnel parameter; And a total number calculated by the cost calculating means using the number of personnel for each type of personnel set by the personnel setting means in accordance with the change of the distribution parameter and the personnel parameter by the parameter changing means. And selecting the distribution parameter and the personnel parameter that minimize the total cost of the Plan setting means for setting, as a supply plan, a base supply number distributed by the supply number distribution means using parameters and personnel parameters, and the number of personnel for each type of personnel at each supply base set by the personnel setting means. The gist is to provide.

【0007】この本発明の供給計画立案装置では、供給
個数分配手段により要求供給個数を各供給拠点からの供
給個数である拠点供給個数に分配する際に用いる分配パ
ラメータと、要員設定手段により拠点供給個数に対応す
る拠点供給工数を処理する要員タイプ別の要員数を設定
する際に用いられる要員パラメータとを逐次変更して演
算される全体の費用のうちこの全体の費用が最小となる
分配パラメータと要員パラメータとを選択し、この選択
した分配パラメータと要員パラメータとを用いて分配さ
れる拠点供給個数と設定される各供給拠点の要員タイプ
別の要員数とを供給計画として設定する。この結果、要
求供給個数の商品またはサービスの供給を全体の費用が
より小さな供給計画として立案することができる。
In the supply planning device according to the present invention, the distribution parameter used when the required supply number is distributed by the supply number distribution means to the number of base supply, which is the supply number from each supply base, and the base supply by the personnel setting means. A distribution parameter that minimizes the overall cost among the overall costs calculated by sequentially changing the personnel parameters used when setting the number of personnel for each type of personnel that processes the base supply man-hours corresponding to the number. A staff parameter is selected, and the number of base supplies to be distributed using the selected distribution parameter and the staff parameter, and the set number of personnel for each staff type at each supply base are set as a supply plan. As a result, the supply of the required number of goods or services can be planned as a supply plan with a lower overall cost.

【0008】こうした本発明の供給計画立案装置におい
て、前記パラメータ変更手段は、各供給拠点の供給可能
範囲内で前記分配パラメータを変更する手段であるもの
とすることもできる。こうすれば、各供給拠点の供給可
能範囲内で供給計画を立案することができる。この態様
の本発明の供給計画立案装置において、前記供給可能範
囲は定常業務により供給可能な定常供給可能範囲と非定
常業務により供給可能な非定常供給可能範囲とを含む範
囲であり、前記単位要員タイプ別費用データは定常業務
における要員タイプ別の単位当たりの費用に関する定常
業務用単位要員タイプ別費用データと非定常業務におけ
る要員タイプ別の単位当たりの費用に関する非定常業務
用単位要員タイプ別費用データとを含むデータであるも
のとすることもできる。こうすれば、定常業務と非定常
業務とを考慮して全体の費用がより小さくなる供給計画
を立案することができる。さらに、この態様の本発明の
供給計画立案装置において、前記非定常供給可能範囲は
残業により供給可能な残業供給可能範囲と休日出勤によ
る供給可能な休出供給可能範囲とを含む範囲であり、前
記非定常業務用単位要員タイプ別費用データは残業にお
ける要員タイプ別の単位当たりの費用に関する残業用単
位要員タイプ別費用データと休日出勤における要員タイ
プ別の単位当たりの費用に関する休出用単位要員タイプ
別費用データとを含むデータであるものとすることもで
きる。こうすれば、非定常業務を更に残業によるものと
休日出勤によるものとを考慮することができる。
In the supply planning device according to the present invention, the parameter changing means may be means for changing the distribution parameter within a supply range of each supply base. In this way, a supply plan can be made within the supply range of each supply base. In the supply planning device according to the aspect of the present invention, the suppliable range is a range including a steadily suppliable range that can be supplied by a routine operation and an unsteady suppliable range that can be supplied by an irregular operation. The cost data by type is the cost data by unit type for regular work related to the cost per unit by the personnel type in the regular work, and the cost data by unit type for the non-regular work related to the cost per unit by the work type in the irregular work. The data may include the following. In this way, it is possible to formulate a supply plan that reduces the overall cost in consideration of the regular work and the irregular work. Further, in the supply planning device according to the aspect of the present invention, the unsteady supplyable range is a range including an overtime supplyable range that can be supplied by overtime and a restable supplyable range that can be supplied by going to work on a holiday. The cost data per unit type for the unusual work unit is the cost data per unit type for overtime work per unit type and the cost data per unit type for overtime work and the leave unit per unit type for cost on holiday work. It may be data including cost data. In this way, it is possible to further consider the non-routine work due to overtime work and the work due to work on holidays.

【0009】また、本発明の供給計画立案装置におい
て、前記パラメータ変更手段は、各要員タイプの比率を
前記要員パラメータの一つとして変更する手段であるも
のとすることもできる。こうすれば、各要員タイプの比
率を考慮して全体の費用がより小さな供給計画を立案す
ることができる。この態様の本発明の供給計画立案装置
において、前記要員タイプは正規要員と複数種類の臨時
要員とを含み、前記パラメータ変更手段は前記複数種類
の臨時要員の構成比を変更することにより前記各要員タ
イプの比率を変更する手段であるものとすることもでき
る。こうすれば、正規要員については固定費扱いとして
臨時要員についての費用影響を全体の費用の変動に反映
させることができる。
Further, in the supply planning device according to the present invention, the parameter changing means may be means for changing a ratio of each type of personnel as one of the personnel parameters. In this way, it is possible to formulate a supply plan with a lower overall cost in consideration of the ratio of each type of personnel. In the supply planning device according to the aspect of the present invention, the personnel type includes a regular personnel and a plurality of types of temporary personnel, and the parameter changing unit changes the composition ratio of the plurality of types of temporary personnel to change each of the personnel. It may be a means for changing the type ratio. In this way, the regular staff can be treated as fixed costs, and the cost impact of the temporary staff can be reflected in the fluctuation of the overall cost.

【0010】さらに、本発明の供給計画立案装置におい
て、前記パラメータ変更手段は、各供給拠点毎の総要員
数を前記要員パラメータの一つとして変更する手段であ
るものとすることもできる。こうすれば、残業の多少や
休日出勤の多少を変更を全体の費用の変動に反映させる
ことができる。この態様の本発明の供給計画立案装置に
おいて、前記パラメータ変更手段は、前記供給拠点の総
要員数を各供給拠点の要員数変更範囲内で変更する手段
であるものとすることもできる。
Further, in the supply planning device according to the present invention, the parameter changing means may be means for changing the total number of personnel at each supply base as one of the personnel parameters. In this way, the change in the overall cost can be reflected in the change in the overall cost, such as the amount of overtime or the amount of work on holidays. In the supply planning device of this aspect of the present invention, the parameter changing means may be means for changing the total number of personnel at the supply base within a range of changing the number of personnel at each supply base.

【0011】あるいは、本発明の供給計画立案装置にお
いて、前記パラメータ変更手段は、各パラメータ毎に設
定された所定の刻み幅で逐次変更する手段であるものと
することもできる。こうすれば、各パラメータを変更可
能なすべての値について逐次変更する場合に比して迅速
に計画を立案することができる。
Alternatively, in the supply planning device according to the present invention, the parameter changing means may be means for sequentially changing the parameter at a predetermined interval set for each parameter. In this way, it is possible to draft a plan more quickly than in the case where each parameter is sequentially changed for all changeable values.

【0012】また、本発明の供給計画立案装置におい
て、前記複数の供給拠点は商品を生産する生産ラインで
あり、前記単位供給工数データは一個の商品を生産する
のに必要な要員数と時間とに関するデータであるものと
することもできる。こうすれば、全体の費用が最小の供
給計画を全体の生産コストが最小の商品の生産計画とし
て立案することができる。
Further, in the supply planning device according to the present invention, the plurality of supply bases are production lines for producing a product, and the unit supply man-hour data is the number of personnel, time, and the number of persons required to produce one product. The data may be data relating to In this way, the supply plan with the minimum overall cost can be formulated as the production plan for the product with the minimum overall production cost.

【0013】この他、本発明の供給計画立案装置におい
て、前記複数の供給拠点は所定のサービスを提供する拠
点であり、前記単位供給工数データは一回の所定のサー
ビスの提供に必要な要員数と時間とに関するデータであ
るものとすることもできる。こうすれば、全体の費用が
最小の供給計画を全体の所定のサービスの提供コストが
最小のサービスの提供計画として立案することができ
る。
In addition, in the supply planning device according to the present invention, the plurality of supply bases are bases that provide a predetermined service, and the unit supply man-hour data is the number of personnel required to provide the predetermined service at one time. And time data. In this way, the supply plan with the minimum overall cost can be formulated as the service provision plan with the minimum total service cost.

【0014】本発明の供給計画立案用のプログラムは、
コンピュータを、各種態様のいずれかの本発明の供給計
画立案装置として機能させることを要旨とする。
The supply planning program according to the present invention comprises:
The gist of the present invention is to cause a computer to function as the supply planning device of the present invention in any of various aspects.

【0015】この本発明の供給計画立案用のプログラム
によれば、コンピュータを各種態様のいずれかの本発明
の供給計画立案装置として機能させることができる。
According to the supply planning program of the present invention, a computer can be made to function as the supply planning device of any of various aspects of the present invention.

【0016】本発明の供給計画立案方法は、商品または
サービスの供給が可能な複数の供給拠点における商品ま
たはサービスの供給計画を立案する供給計画立案方法で
あって、(a)商品またはサービスの要求供給個数を分
配パラメータを逐次変更して各供給拠点からの供給個数
である拠点供給個数に分配し、(b)該分配された拠点
供給個数の商品またはサービスを供給するのに必要な拠
点供給工数を単位当たりの商品またはサービスの供給に
必要な要員数と時間とに関する単位供給工数データに基
づいて演算すると共に該演算された拠点供給工数を処理
する要員タイプ別の要員数を要員パラメータを逐次変更
して設定し、(c)該設定された要員タイプ別の要員数
と要員タイプ別の単位当たりの費用に関する単位要員タ
イプ別費用データとに基づいて前記複数の供給拠点から
の拠点供給個数の供給の際の全体の費用を演算し、
(d)前記分配パラメータおよび前記要員パラメータの
変更に伴って演算される前記全体の費用が最小となる分
配パラメータと要員パラメータとを選択し、該選択した
分配パラメータと要員パラメータとを用いて分配される
拠点供給個数と設定される各供給拠点の要員タイプ別の
要員数とを供給計画として設定することを要旨とする。
The supply planning method of the present invention is a supply planning method for preparing a supply plan of goods or services at a plurality of supply bases capable of supplying goods or services. The supply number is sequentially changed by distributing parameters and distributed to the base supply number, which is the supply number from each supply base, and (b) the base supply man-hour required for supplying the distributed base supply number of goods or services. Is calculated based on the unit supply man-hour data relating to the number of personnel and time required for supplying goods or services per unit, and the number of personnel for each type of personnel who processes the computed base supply man-hour is sequentially changed. (C) Cost data by unit personnel type relating to the set number of personnel by personnel type and the cost per unit by personnel type It calculates the overall cost of the time of supply of the base supply quantity from said plurality of supply base based on,
(D) selecting a distribution parameter and a personnel parameter that minimize the overall cost calculated in accordance with the change of the distribution parameter and the personnel parameter, and distributing using the selected distribution parameter and the personnel parameter; The point is that the number of supply sites to be supplied and the number of personnel for each type of personnel at each supply site to be set are set as a supply plan.

【0017】この本発明の供給計画立案方法によれば、
分配パラメータと要員パラメータとを逐次変更して演算
される全体の費用が最小となる分配パラメータと要員パ
ラメータとを選択すると共にこの選択した分配パラメー
タと要員パラメータとを用いて分配される拠点供給個数
と設定される各供給拠点の要員タイプ別の要員数とを供
給計画として設定するから、商品またはサービスの供給
に要する全体の費用が最小の供給計画を立案することが
できる。
According to the supply planning method of the present invention,
The distribution parameters and the personnel parameters are sequentially changed to calculate the distribution parameters and the personnel parameters that minimize the overall cost, and the number of base supplies to be distributed using the selected distribution parameters and the personnel parameters. Since the set number of personnel for each type of personnel at each supply base is set as a supply plan, it is possible to formulate a supply plan that minimizes the total cost of supplying goods or services.

【0018】こうした本発明の供給計画立案方法におい
て、前記ステップ(a)は、各供給拠点の供給可能範囲
内で前記分配パラメータを変更するステップであるもの
とすることもできる。こうすれば、各供給拠点の供給可
能範囲内で供給計画を立案することができる。この態様
の本発明の供給計画立案方法において、前記供給可能範
囲は定常業務により供給可能な定常供給可能範囲と非定
常業務により供給可能な非定常供給可能範囲とを含む範
囲であり、前記単位要員タイプ別費用データは定常業務
における要員タイプ別の単位当たりの費用に関する定常
業務用単位要員タイプ別費用データと非定常業務におけ
る要員タイプ別の単位当たりの費用に関する非定常業務
用単位要員タイプ別費用データとを含むデータであるも
のとすることもできる。こうすれば、定常業務と非定常
業務とを考慮して全体の費用がより小さくなる供給計画
を立案することができる。さらに、この態様の本発明の
供給計画立案方法において、前記非定常供給可能範囲は
残業により供給可能な残業供給可能範囲と休日出勤によ
る供給可能な休出供給可能範囲とを含む範囲であり、前
記非定常業務用単位要員タイプ別費用データは残業にお
ける要員タイプ別の単位当たりの費用に関する残業用単
位要員タイプ別費用データと休日出勤における要員タイ
プ別の単位当たりの費用に関する休出用単位要員タイプ
別費用データとを含むデータであるものとすることもで
きる。こうすれば、非定常業務を更に残業によるものと
休日出勤によるものとを考慮することができる。
In the supply planning method according to the present invention, the step (a) may be a step of changing the distribution parameter within a supplyable range of each supply base. In this way, a supply plan can be made within the supply range of each supply base. In the supply planning method according to the aspect of the present invention, the suppliable range is a range including a regular suppliable range that can be supplied by a regular operation and an unsteady suppliable range that can be supplied by an irregular operation. The cost data by type is the cost data by unit type for regular work related to the cost per unit by the personnel type in the regular work, and the cost data by unit type for the non-regular work related to the cost per unit by the work type in the irregular work. The data may include the following. In this way, it is possible to formulate a supply plan that reduces the overall cost in consideration of the regular work and the irregular work. Further, in the supply planning method of the present invention according to this aspect, the unsteady supplyable range is a range including an overtime supplyable range that can be supplied by overtime and a restable supplyable range that can be supplied by going to work on a holiday. The cost data per unit type for the unusual work unit is the cost data per unit type for overtime work per unit type and the cost data per unit type for overtime work and the leave unit per unit type for cost on holiday work. It may be data including cost data. In this way, it is possible to further consider the non-routine work due to overtime work and the work due to work on holidays.

【0019】また、本発明の供給計画立案方法におい
て、前記ステップ(a)は、所定の刻み幅で前記分配パ
ラメータを逐次変更するステップであるものとすること
もできる。こうすれば、迅速に供給計画を立案すること
ができる。
Further, in the supply planning method of the present invention, the step (a) may be a step of sequentially changing the distribution parameter at a predetermined step size. In this case, a supply plan can be quickly drafted.

【0020】さらに、本発明の供給計画立案方法におい
て、前記ステップ(b)は、各要員タイプの比率を前記
要員パラメータの一つとして変更するステップであるも
のとすることもできる。こうすれば、各要員タイプの比
率を考慮して全体の費用がより小さな供給計画を立案す
ることができる。この態様の本発明の供給計画立案方法
において、前記要員タイプは正規要員と複数種類の臨時
要員とを含み、前記ステップ(b)は前記複数種類の臨
時要員の構成比を変更することにより前記各要員タイプ
の比率を変更するステップであるものとすることもでき
る。こうすれば、正規要員については固定費扱いとして
臨時要員についての費用影響を全体の費用の変動に反映
させることができる。
Further, in the supply planning method of the present invention, the step (b) may be a step of changing a ratio of each type of personnel as one of the personnel parameters. In this way, it is possible to formulate a supply plan with a lower overall cost in consideration of the ratio of each type of personnel. In the supply planning method according to the aspect of the present invention, the personnel types include regular personnel and a plurality of types of temporary personnel, and the step (b) comprises changing the composition ratio of the plural kinds of temporary personnel to change each of the personnel types. It may be a step of changing the ratio of the personnel types. In this way, the regular staff can be treated as fixed costs, and the cost impact of the temporary staff can be reflected in the fluctuation of the overall cost.

【0021】あるいは、本発明の供給計画立案方法にお
いて、前記ステップ(b)は、各供給拠点毎の総要員数
を前記要員パラメータの一つとして変更するステップで
あるものとすることもできる。こうすれば、残業の多少
や休日出勤の多少を変更を全体の費用の変動に反映させ
ることができる。この態様の本発明の供給計画立案方法
において、前記ステップ(b)は、前記供給拠点の総要
員数を各供給拠点の要員数変更範囲内で変更するステッ
プであるものとすることもできる。
Alternatively, in the supply planning method of the present invention, the step (b) may be a step of changing the total number of personnel at each supply base as one of the personnel parameters. In this way, the change in the overall cost can be reflected in the change in the overall cost, such as the amount of overtime or the amount of work on holidays. In the supply planning method of the present invention according to this aspect, the step (b) may be a step of changing the total number of personnel at the supply base within a range of changing the number of personnel at each supply base.

【0022】また、本発明の供給計画立案方法におい
て、前記ステップ(b)は、所定の刻み幅で前記要員パ
ラメータを逐次変更するステップであるものとすること
もできる。こうすれば、より迅速に供給計画を立案する
ことができる。
In the supply planning method according to the present invention, the step (b) may be a step of sequentially changing the personnel parameters at a predetermined step size. In this way, a supply plan can be drafted more quickly.

【0023】[0023]

【発明の実施の形態】次に、本発明の実施の形態を実施
例を用いて説明する。図1は本発明の一実施例である商
品供給計画立案装置20の構成の概略を機能ブロックと
して示す構成図であり、図2は実施例の商品供給計画立
案装置20のハード構成を例示する構成図である。
Next, embodiments of the present invention will be described with reference to examples. FIG. 1 is a configuration diagram showing, as functional blocks, a schematic configuration of a product supply planning device 20 according to an embodiment of the present invention, and FIG. 2 is a configuration illustrating a hardware configuration of the product supply planning device 20 of the embodiment. FIG.

【0024】実施例の商品供給計画立案装置20は、図
2に示すように、ハード構成としては、中央演算処理装
置としてのCPU42を中心とする汎用のコンピュータ
として構成されている。CPU42に接続されたバス4
4には、キャッシュメモリ46やそのキャッシュコント
ローラ48,メインメモリ50,CRT54が接続され
たグラフィックスコントローラ52,キーボード58や
マウス60が接続されたキーボードインタフェース5
6,ハードディスク装置64やフロッピー(登録商標)
ディスク装置66などが接続された入出力インタフェー
ス62などが接続されている。
As shown in FIG. 2, the commodity supply planning device 20 of the embodiment has a hardware configuration as a general-purpose computer centered on a CPU 42 as a central processing unit. Bus 4 connected to CPU 42
Reference numeral 4 denotes a cache memory 46, its cache controller 48, a main memory 50, a graphics controller 52 to which a CRT 54 is connected, and a keyboard interface 5 to which a keyboard 58 and a mouse 60 are connected.
6, Hard disk drive 64 and floppy (registered trademark)
The input / output interface 62 to which the disk device 66 and the like are connected is connected.

【0025】また、実施例の商品供給計画立案装置20
は、図1に示すように、機能ブロックとしては、各種デ
ータや制約条件を記憶するデータ記憶部22と、各種デ
ータや要求供給個数などを入力するデータ入力部24
と、要求供給個数を分配パラメータに基づいて各供給拠
点に分配する供給個数分配部26と、各供給拠点で分配
された拠点供給個数を供給するのに必要な要員を要員パ
ラメータを用いて設定する要員設定部28と、供給個数
分配部26で用いられる分配パラメータと要員設定部2
8で用いられる要員パラメータとを逐次変更するパラメ
ータ変更部30と、要員設定部28で設定された要員に
基づいて要求供給個数を各供給拠点から供給するのに必
要な全体の費用を演算する費用演算部32と、全体の費
用が最小となる供給個数の分配や要員の設定を選択して
商品供給計画値に設定する計画設定部34と、設定され
た商品供給計画を出力する計画出力部36とを備える。
こうした実施例の商品供給計画立案装置20が備える各
機能部は、前述した図2に例示するハード構成と後述す
るソフトウエアとが一体となって実現されるものであ
る。
Further, the commodity supply planning device 20 of the embodiment
As shown in FIG. 1, the functional blocks include a data storage unit 22 for storing various data and constraints, and a data input unit 24 for inputting various data and the number of requested supplies.
And a supply number distribution unit 26 that distributes the required supply number to each supply base based on the distribution parameter, and sets the personnel required to supply the base supply number distributed at each supply base using the personnel parameter. Personnel setting unit 28, distribution parameters used in supply number distribution unit 26, and personnel setting unit 2
A parameter changing unit 30 for sequentially changing the personnel parameters used in step 8, and a cost for calculating the total cost required to supply the required number of supplies from each supply base based on the personnel set by the personnel setting unit 28 A calculation unit 32, a plan setting unit 34 for selecting the distribution of the number of supplies to minimize the overall cost and setting of the personnel and setting the product supply plan value, and a plan output unit 36 for outputting the set product supply plan And
Each functional unit included in the product supply planning device 20 of the embodiment is realized by integrating the hardware configuration illustrated in FIG. 2 described above and software described later.

【0026】データ記憶部22には、生産ラインjにお
ける単位当たりの商品iの生産に必要な要員数と時間と
の積として表わされる単位供給工数Sij[人・時/
台]や生産ラインjにおけるt月の稼働直数Aj(t)
[直/月],生産ラインjにおける直当たりの定時稼働
時間Tj[時/直]などの商品iの生産ラインjに関す
る商品生産用データ、正規従業員や契約社員や一時雇い
の臨時従業員,パートなどの要員タイプkの定時稼働時
の工数当たりの費用C0k[円/人・時]や要員タイプ
kの残業時の工数当たりの費用C1k[円/人・時],
要員タイプkの休日出勤時の工数当たりの費用C2k
[円/人・時]などの要員タイプ別費用データ、商品i
の生産ラインjにおけるt月の生産台数計画値Yij
(t)[台/月]の変更可能範囲Lyや生産台数計画値
Yij(t)を変更する際の刻み幅zy[台/時]など
分配パラメータの変更に関するデータ、生産ラインjの
t月の直当たりの残業時間Zj1(t)[時/直]の変
更可能範囲L1や残業時間Zj1(t)を変更する際の
刻み幅z1[時/直],生産ラインjのt月の直当たり
の休日出勤時の直数としての休出直数Zj2(t)[直
/月]の変更可能範囲L2や休出直数Zj2(t)を変
更する際の刻み幅z2[直/月]などの残業や休日出勤
に関するデータ、要員タイプkの生産ラインjのt月の
要員数Zj3k(t)[人]の総和の変更可能範囲L3
や要員数Zj3k(t)の変更可能範囲Lkおよび要員
数Zj3k(t)を変更する際の刻み幅z3[人]など
の要員パラメータの変更に関するデータ、生産ラインj
におけるt月のタクトタイムZj4(t)[時/台]の
変更可能範囲L4やタクトタイムZj4を変更する際の
刻み幅z4[時/台]などの他の制約条件に関するデー
タなどが記憶されている。これらの各データは、キーボ
ード58などのデータ入力部24により入力される。
The data storage unit 22 stores a unit supply man-hour Sij [person / hour / hour] expressed as a product of the number of personnel required to produce the product i per unit on the production line j and time.
Units] and the production number Aj (t) of the production line j in t months
[Direct / month], data for product production on the production line j of the product i, such as the regular operating time Tj [hour / direct] for the direct hit on the production line j, regular employees, contract employees, temporary employees, and temporary employees. Cost C0k [yen / person / hour] per man-hour during regular operation of personnel type k such as part, Cost C1k [yen / person-hour] per man-hour during overtime of personnel type k,
Cost per man-hour during work on holidays for staff type k C2k
Cost data by personnel type such as [yen / person / hour], product i
Planned production amount Yij for t month on production line j
(T) Data on change of distribution parameters such as changeable range Ly of [vehicle / month] and step size zy [veh / hour] when changing planned production number Yij (t), The changeable range L1 of the overtime hours Zj1 (t) [hours / shifts] and the step width z1 [hours / shifts] when changing the overtime hours Zj1 (t), and the direct hit of the production line j in t months The changeable range L2 of the number of direct shifts Zj2 (t) [direct / month] as the direct number when going to work on a holiday, the step width z2 [direct / month] when changing the direct shift number Zj2 (t), etc. Data on overtime and work on holidays, changeable range L3 of total number of employees Zj3k (t) [persons] in t-months of production line j of personnel type k
For changing the parameter of the personnel such as the changeable range Lk of the number of personnel and the number of personnel Zj3k (t) and the step width z3 [person] when the number of personnel Zj3k (t) is modified, the production line j
And data on other constraint conditions such as the changeable range L4 of the tact time Zj4 (t) [hour / unit] of t month and the step width z4 [hour / unit] when changing the tact time Zj4. I have. Each of these data is input by the data input unit 24 such as the keyboard 58.

【0027】供給個数分配部26は、データ入力部24
により入力される商品iの計画対象月tの要求供給個数
としての要求生産台数Xi(t)[台/月]を初期値お
よびパラメータ変更部30により変更された分配パラメ
ータに基づいて各供給拠点としての各生産ラインjにお
ける生産台数計画値Yij(t)に分配する。分配パラ
メータは、実施例では、初期値としては前回計画された
ときの計画値の際の値を用いるものとした。例えば、前
回1〜3月の商品供給計画を立案し、今回2〜4月の商
品供給計画を立案するようにローリングプランの場合に
は、2月,3月に対する分配パラメータとしては前回の
値を用い、4月に対する分配パラメータとしては前月の
3月の値を用いるものとすればよい。ここで、前回の値
を用いるとは、要求生産台数Xi(t)[台/月]は月
ごとに変化するから、前回と同一の比例配分の意であ
る。なお、実施例では、分配パラメータの初期値として
前回の値を用いるものとしたが、予め定められた初期値
を用いるものとしてもよい。
The supply number distribution unit 26 includes a data input unit 24
The required production quantity Xi (t) [vehicle / month] as the required supply quantity of the product i in the planning target month t is input as the respective supply bases based on the initial value and the distribution parameter changed by the parameter changing unit 30. Is distributed to the planned production number Yij (t) of each production line j. In the embodiment, as the distribution parameter, the value at the time of the plan value at the time of the previous plan is used as the initial value. For example, in the case of a rolling plan in which a product supply plan for the previous January to March is made and a product supply plan for the current February to April is made, the previous value is used as the distribution parameter for February and March. The distribution parameter for April may use the value of March of the previous month. Here, the use of the previous value means that the required production quantity Xi (t) [vehicle / month] changes every month, and thus means the same proportional distribution as the previous time. In the embodiment, the previous value is used as the initial value of the distribution parameter. However, a predetermined initial value may be used.

【0028】要員設定部28は、供給個数分配部26に
より分配された生産台数計画値Yij(t)に基づいて
各生産ラインjの単位供給工数Sij[人・時/台]を
求めると共に初期値や変更された要員パラメータや各制
約条件に基づいて生産ラインjのt月の直当たりの残業
時間Zj1(t)や休日出勤時の直数Zj2(t),要
員タイプkの生産ラインjのt月の要員数Zj3k
(t),タクトタイムZj4(t)などを設定する。設
定手法については後述する。
The personnel setting unit 28 obtains a unit supply man-hour Sij [person / hour / unit] for each production line j based on the production number plan value Yij (t) distributed by the supply number distribution unit 26, and sets an initial value. And the overtime hours Zj1 (t) per t month of the production line j, the number Zj2 (t) at work on holidays, and the t of the production line j of the personnel type k, based on the changed personnel parameters and each constraint condition. Monthly staffing number Zj3k
(T), tact time Zj4 (t) and the like are set. The setting method will be described later.

【0029】費用演算部32では、供給個数分配部26
で各生産ラインjに分配された要求生産台数Xi(t)
と、要員設定部28で設定された生産ラインjのt月の
直当たりの残業時間Zj1(t)や休出直数Zj2
(t),要員タイプkの生産ラインjのt月の要員数Z
j3k(t),タクトタイムZj4(t)と、データ記
憶部22に記憶された要員タイプkの定時稼働時の工数
当たりの費用C0kや残業時の工数当たりの費用C1
k,休日出勤時の工数当たりの費用C2kなどの要員タ
イプ別費用データとに基づいて一般式として次式
(1)、具体例として式(2)に示す評価式を用いて費
用計算する。式(2)は、要員タイプkの代わりにk’
を用いている。このk’は、定時稼働分が変動費として
計上されるkのみを用いることを意味している。即ち、
通常の要員については稼働の有無に関係なく定時分の給
与が支払われるから、この分については固定費として取
り扱い、評価式に含めないのである。なお、k’に代え
て要員タイプkを用いれば、固定費を含む全体の費用を
算出することになる。
In the cost calculation section 32, the supply number distribution section 26
Production quantity Xi (t) distributed to each production line j at
And the overtime hours Zj1 (t) per t month of the production line j set by the personnel setting unit 28 and the number of shifts Zj2
(T), the number of personnel Z of the production line j of the personnel type k in t months
j3k (t), the tact time Zj4 (t), the cost C0k per man-hour during regular operation of the personnel type k stored in the data storage unit 22, and the cost C1 per man-hour during overtime work
The cost is calculated using the following formula (1) as a general formula and a specific formula (2) as a specific example based on the cost data for each type of personnel, such as k, the cost per man-hour C2k at work on holidays. Equation (2) replaces the personnel type k with k '
Is used. This k 'means that only k for which the scheduled operation is recorded as a variable cost is used. That is,
Regular employees are paid a fixed amount of salary regardless of whether they are operating or not, so this amount is treated as fixed cost and not included in the evaluation formula. If the staff type k is used instead of k ', the entire cost including the fixed cost is calculated.

【0030】[0030]

【数1】 (Equation 1)

【0031】計画設定部34は、分配パラメータや要員
パラメータを刻み幅で変更した際に費用演算部32で評
価式を用いて演算された評価値のうち最小の評価値とな
る分配パラメータと要員パラメータとを用いて演算され
る生産ラインjに分配された要求生産台数Xi(t)
と、要員設定部28で設定された生産ラインjのt月の
直当たりの残業時間Zj1(t)や休出直数Zj2
(t),要員タイプkの生産ラインjのt月の要員数Z
j3k(t),タクトタイムZj4(t)とを商品供給
計画値として設定する。そして、計画出力部36は計画
設定部34により設定された商品供給計画値をCRT5
4などに出力する。
The plan setting unit 34 is a distribution parameter and a personnel parameter which are minimum evaluation values among the evaluation values calculated by the cost calculation unit 32 using the evaluation formula when the distribution parameters and the personnel parameters are changed by the step size. And the required production number Xi (t) distributed to the production line j calculated using
And the overtime hours Zj1 (t) per t month of the production line j set by the personnel setting unit 28 and the number of shifts Zj2
(T), the number of personnel Z of the production line j of the personnel type k in t months
j3k (t) and tact time Zj4 (t) are set as the commodity supply plan values. Then, the plan output unit 36 outputs the commodity supply plan value set by the plan setting unit 34 to the CRT 5.
4 and so on.

【0032】次に、こうして構成された実施例の商品供
給計画立案装置20の動作について図3の商品供給計画
立案処理ルーチンに基づいて説明する。本ルーチンが実
行されると、実施例の商品供給計画立案装置20のCP
U42は、まず、要求生産台数Xi(t)を入力し(ス
テップS100)、入力した要求生産台数Xi(t)を
初期値として設定された分配パラメータに基づいて各供
給拠点としての各生産ラインjにおける生産台数計画値
Yij(t)に初期分配する(ステップS102)。要
求生産台数Xi(t)の生産台数計画値Yij(t)へ
の初期分配については前述した。なお、要求生産台数X
i(t)の生産台数計画値Yij(t)への分配は、各
生産ラインjの生産台数計画値Yij(t)の総和が要
求生産台数Xi(t)に等しくなるよう行なわれるのは
言うまでもない。
Next, the operation of the merchandise supply plan drafting apparatus 20 of the embodiment configured as described above will be described based on the commodity supply plan drafting processing routine of FIG. When this routine is executed, the CP of the commodity supply planning device 20 of the embodiment is
The U42 first inputs the required production number Xi (t) (step S100), and based on the distribution parameter set with the input required production number Xi (t) as an initial value, each production line j as each supply base j. Is initially distributed to the planned production number Yij (t) in (step S102). The initial distribution of the required production number Xi (t) to the production number plan value Yij (t) has been described above. Note that the required production quantity X
It goes without saying that the distribution of i (t) to the planned production number Yij (t) is performed so that the sum of the planned production numbers Yij (t) of each production line j becomes equal to the required production number Xi (t). No.

【0033】続いて、要員タイプkの生産ラインjのt
月の要員数Zj3k(t)の総和を設定する。この要員
数Zj3k(t)の総和の設定は、前述の要員数Zj3
k(t)の総和の変更可能範囲L3と次式(3)を用い
て行なわれる。ここで、式(3)は、式(4)と式
(5)から導き出される。ここで、式(4)は、各生産
ラインjで生産される商品毎に算出する台数の基準時間
を乗じたものの総和がその月に生産ラインjに投入され
る要員数に総稼働時間を乗じたものに等しく、総稼働時
間が定時稼働時間に残業時間および休日出勤による時間
を加えたものに等しいことから導き出されるものであ
り、式(5)は、生産ラインjで生産される商品の総台
数がその生産ラインの総稼働時間を商品の生産に必要な
時間、即ちタクトタイムで除したものに等しいことから
導き出される。
Subsequently, t of the production line j of the personnel type k
The sum of the number of monthly personnel Zj3k (t) is set. The setting of the sum of the number of personnel Zj3k (t) is based on the number of personnel Zj3 described above.
This is performed using the changeable range L3 of the total sum of k (t) and the following equation (3). Here, equation (3) is derived from equations (4) and (5). Here, the equation (4) is obtained by multiplying the reference time of the number of products calculated for each product produced on each production line j, and multiplying the total number of personnel put into the production line j in the month by the total operation time. And the total operation time is derived from the fact that the total operation time is equal to the regular operation time plus the time for overtime work and work on holidays. It is derived from the fact that the number is equal to the total operating time of the production line divided by the time required for the production of the product, ie the takt time.

【0034】[0034]

【数2】 (Equation 2)

【0035】式(3)を見ると、ステップS102で生
産台数計画値Yij(t)が設定されているから、設定
されていない変数はタクトタイムZj4(t)と要員数
Zj3k(t)の総和である。ここで、タクトタイムZ
j4(t)を前月の値、即ちタクトタイムZj4(t−
1)を用いて初期設定する。すると、式(3)の未知数
は要員数Zj3k(t)の総和だけとなるから、要員数
Zj3k(t)の総和を設定することができる。ステッ
プS104の処理はこうした要員数Zj3k(t)の総
和の設定手法による処理である。
Referring to equation (3), since the planned production number Yij (t) is set in step S102, the variable not set is the sum of the tact time Zj4 (t) and the number of personnel Zj3k (t). It is. Here, the tact time Z
j4 (t) is the value of the previous month, that is, the tact time Zj4 (t−
Initialize using 1). Then, since the unknowns in Equation (3) are only the sum of the number of personnel Zj3k (t), the sum of the number of personnel Zj3k (t) can be set. The process of step S104 is a process based on a method of setting the total sum of the number of personnel Zj3k (t).

【0036】次に残業時間Zj1(t)と休出直数Zj
2(t)とを設定する(ステップS106)。上述の式
(5)では、生産台数計画値Yij(t)とタクトタイ
ムZj4(t)とが設定されているから、残業時間Zj
1(t)と休出直数Zj2(t)との一方を設定すれ
ば、式(5)により他方が設定される。残業時間Zj1
(t)と休出直数Zj2(t)は各々変更可能範囲L
1,L2の範囲内で設定すればよいが、通常、休出の費
用>残業の費用の関係があるから、実施例では、まず残
業時間Zj1(t)を変更可能範囲L1の範囲内で最大
となるよう設定し、その残余を式(5)から休出直数Z
j2(t)として設定するものとした。なお、休出の費
用<残業の費用の関係の場合には、逆の手法により休出
直数Zj2(t)を変更可能範囲L2の範囲内で最大と
なるよう設定し、その残余を式(5)から残業時間Zj
1(t)として設定すればよい。休出の費用=残業の費
用の関係では、いずれの手法により設定してもよく、あ
るいは残業時間Zj1(t)と休出直数Zj2(t)と
を一つのパラメータとして取り扱ってもよい。
Next, the overtime hours Zj1 (t) and the number of immediate shifts Zj
2 (t) is set (step S106). In the above equation (5), the planned production number Yij (t) and the tact time Zj4 (t) are set, so that the overtime hours Zj
If one of 1 (t) and the number of rests Zj2 (t) is set, the other is set by equation (5). Overtime hours Zj1
(T) and the number of rests Zj2 (t) can be changed L
1, L2 may be set. However, since there is usually a relationship of the cost of rest> the cost of overtime, in this embodiment, the overtime time Zj1 (t) is first set to the maximum within the changeable range L1. And the remainder is calculated from equation (5) as Z
j2 (t). In the case of the relationship of the cost of rest <the cost of overtime, the number of immediate breaks Zj2 (t) is set to be the maximum within the changeable range L2 by the reverse method, and the remainder is expressed by the formula ( 5) From overtime hours Zj
It may be set as 1 (t). In the relationship of the cost of rest = the cost of overtime, any method may be used, or the overtime hours Zj1 (t) and the number of immediate work Zj2 (t) may be treated as one parameter.

【0037】そして、要員数Zj3k(t)を設定する
(ステップS108)。要員数Zj3k(t)は、要員
数Zj3k(t)の総和が設定した値に等しくなるよ
う、定時稼働分の費用が固定費として扱われる要員タイ
プ、定時稼働時の工数当たりの費用C0kが小さい要員
タイプ、残業時の工数当たりの費用C1kが小さい要員
タイプ、休日出勤時の工数当たりの費用C2kが小さい
要員タイプの優先順位で各要員タイプの変更可能範囲L
kの範囲内で最大となるまで充当することにより設定す
る。即ち、定時分を充当した後に残業分を充当し、それ
でも不足する分を休日出勤分として充当するのである。
この優先順位は、固定費として扱われる分については変
動しないから最優先に充当すると共に休出の費用>残業
の費用の関係を考慮したものである。したがって、休出
の費用<残業の費用であれば、残業時の工数当たりの費
用C1kが小さい要員タイプより休日出勤時の工数当た
りの費用C2kが小さい要員タイプが優先される。
Then, the number of personnel Zj3k (t) is set (step S108). The number of personnel Zj3k (t) is such that the total cost of the number of personnel Zj3k (t) is equal to a set value, and the type of personnel in which the cost of the regular operation is treated as a fixed cost, and the cost C0k per man-hour during the regular operation are small. The changeable range L of each personnel type in the priority order of the personnel type, the personnel type with a small cost C1k per man-hour when working overtime, and the personnel type with a small cost C2k per man-hour when working on holidays
It is set by applying the maximum value within the range of k. That is, the overtime work is allocated after the fixed time is allocated, and the shortage is allocated as the holiday attendance.
This priority is applied to the highest priority since the portion treated as a fixed cost does not fluctuate, and also takes into account the relationship between the cost of rest and the cost of overtime. Therefore, if the cost of leave is less than the cost of overtime, a personnel type with a small cost C2k per man-hour at work on holidays has priority over a personnel type with a small cost C1k per man-hour during overtime.

【0038】こうして要員数Zj3k(t)が設定され
ると、前述の式(2)を用いて評価値を演算すると共に
各設定した値と評価値とをハードディスク装置64など
の記憶装置に格納する(ステップS110)。
When the number of personnel Zj3k (t) is set in this way, the evaluation value is calculated using the above-mentioned equation (2), and the set value and the evaluation value are stored in a storage device such as the hard disk device 64. (Step S110).

【0039】そして、要員数Zj3k(t)を刻み幅z
3で変更する処理(ステップS112)と、変更された
要員数Zj3k(t)を用いて式(2)を用いる評価値
の演算と各設定値と評価値との格納処理(ステップS1
10)とを要員数Zj3k(t)の刻み幅z3による変
更が終了するまで繰り返す(ステップS114)。こう
した処理により、要員数Zj3k(t)の刻み幅z3毎
の各設定値と評価値とがハードディスク装置64に格納
されることになる。
Then, the number of personnel Zj3k (t) is calculated by the step width z.
3 (step S112), the calculation of the evaluation value using equation (2) using the changed number of personnel Zj3k (t), and the storage processing of each set value and the evaluation value (step S1)
10) is repeated until the change of the number of personnel Zj3k (t) by the step width z3 is completed (step S114). By such processing, each set value and evaluation value of the number of personnel Zj3k (t) for each step width z3 are stored in the hard disk device 64.

【0040】要員数Zj3k(t)の変更に伴う繰り返
し処理が終了すると、タクトタイムZj4(t)を刻み
幅z4で変更することにより要員数Zj3k(t)の総
和を変更し(ステップS116)、要員数Zj3k
(t)の総和の変更が終了するまでステップS106〜
S118の処理を繰り返す。ステップS104の処理で
はタクトタイムZj4(t)に前月の値であるタクトタ
イムZj4(t−1)を設定することにより式(3)か
ら要員数Zj3k(t)の総和を設定した。したがっ
て、このステップS116の処理では、タクトタイムZ
j4(t)を刻み幅z4で変更可能範囲L4の範囲内で
タクトタイムZj4(t)を変更することにより要員数
Zj3k(t)の総和を変更するのである。なお、ステ
ップS106〜S118の処理では、要員数Zj3k
(t)の刻み幅z3による変更に伴う繰り返し処理(ス
テップS110〜S114)が含まれるから、要員数Z
j3k(t)の総和が変更される毎に要員数Zj3k
(t)を刻み幅z3で変更して評価値を演算すると共に
演算した評価値と各設定値を格納する処理が繰り返し実
行される。
When the repetition processing accompanying the change in the number of personnel Zj3k (t) is completed, the total of the number of personnel Zj3k (t) is changed by changing the tact time Zj4 (t) by the step width z4 (step S116). Number of personnel Zj3k
Steps S106 to S106 until the change of the sum of (t) is completed.
Step S118 is repeated. In the process of step S104, by setting the tact time Zj4 (t-1), which is the value of the previous month, as the tact time Zj4 (t), the total sum of the number of personnel Zj3k (t) is set from Expression (3). Therefore, in the processing of step S116, the tact time Z
By changing the tact time Zj4 (t) within the changeable range L4 of j4 (t) with a step width z4, the total sum of the number of personnel Zj3k (t) is changed. In the processing of steps S106 to S118, the number of personnel Zj3k
Since the repetition process (steps S110 to S114) accompanying the change in the step width z3 of (t) is included, the number of personnel Z
Each time the total sum of j3k (t) is changed, the number of personnel Zj3k
The process of calculating the evaluation value by changing (t) by the step size z3 and storing the calculated evaluation value and each set value are repeatedly executed.

【0041】要員数Zj3k(t)の総和の変更に伴う
繰り返し処理が終了すると、生産台数計画値Yij
(t)を刻み幅zyで変更し(ステップS120)、生
産台数計画値Yij(t)の変更が終了するまでステッ
プS104〜S122の処理を繰り返す。生産台数計画
値Yij(t)の刻み幅zyによる変更は、生産台数計
画値Yij(t)の商品iに関する総和が要求生産台数
Xi(t)に等しいという条件を満たす範囲内で行なわ
れる。ステップS104〜S122の処理では、要員数
Zj3k(t)の総和の変更に伴う繰り返し処理(ステ
ップS106〜S118)が含まれるから、生産台数計
画値Yij(t)が変更される毎に要員数Zj3k
(t)の総和の変更に伴う繰り返し処理が繰り返し実行
される。
When the repetitive processing according to the change of the total number of personnel Zj3k (t) is completed, the planned production number Yij
(T) is changed by the step size zy (step S120), and the processing of steps S104 to S122 is repeated until the change of the production number plan value Yij (t) is completed. The change of the planned production number Yij (t) by the step size zy is performed within a range that satisfies the condition that the total sum of the production number planned value Yij (t) regarding the product i is equal to the required production number Xi (t). Since the processes of steps S104 to S122 include a repetition process (steps S106 to S118) accompanying the change of the total number of personnel Zj3k (t), the number of personnel Zj3k is changed every time the planned production number Yij (t) is changed.
The repetition processing accompanying the change of the sum of (t) is repeatedly executed.

【0042】こうして生産台数計画値Yij(t)の変
更に伴う繰り返し処理が終了すると、ハードディスク装
置64に格納した評価値のうち最も小さな評価値を選択
し、その評価値を演算する際に設定された各設定値、即
ち生産台数計画値Yij(t),残業時間Zj1
(t)、休出直数Zj2(t),要員数Zj3k
(t),タクトタイムZj4(t)を商品供給計画値と
して設定し(ステップS124)、設定した商品供給計
画値をCRT54などに出力して(ステップS12
6)、本ルーチンを終了する。
When the repetitive processing according to the change of the planned production number Yij (t) is completed, the smallest evaluation value among the evaluation values stored in the hard disk drive 64 is selected and set when the evaluation value is calculated. Set values, that is, the planned production number Yij (t), overtime hours Zj1
(T), number of off-shifts Zj2 (t), number of personnel Zj3k
(T), the tact time Zj4 (t) is set as a commodity supply plan value (step S124), and the set commodity supply plan value is output to the CRT 54 or the like (step S12).
6), end this routine.

【0043】以上説明した実施例の商品供給計画立案装
置20によれば、評価値、即ち費用が最小の商品供給計
画、即ち商品生産計画を立案することができる。しか
も、変数の変更を予め定めた刻み幅を用いて変更可能範
囲内で変更して繰り返し処理するから、刻み幅出なく単
位毎に変更する場合に比して迅速に計画を立案すること
ができる。
According to the product supply planning device 20 of the embodiment described above, an evaluation value, that is, a product supply plan with a minimum cost, that is, a product production plan can be prepared. In addition, since the change of the variable is changed within a changeable range using a predetermined step size and is repeatedly processed, a plan can be drafted more quickly than in a case where the change is performed for each unit without a step size. .

【0044】実施例の商品供給計画立案装置20では、
説明の容易のために、商品iを複数の生産ラインjによ
り生産して供給する供給計画を立案するものとして説明
したが、複数の商品iを複数の生産ラインjで生産して
供給するものに適用できるのは勿論である。図4に複数
の商品iを複数の生産ラインjで生産して供給する場合
の概念図を示す。
In the commodity supply planning device 20 of the embodiment,
For ease of explanation, a supply plan has been described in which a product i is produced and supplied on a plurality of production lines j. However, a product plan for producing and supplying a plurality of products i on a plurality of production lines j is described. Of course, it can be applied. FIG. 4 shows a conceptual diagram in the case where a plurality of products i are produced and supplied on a plurality of production lines j.

【0045】実施例の商品供給計画立案装置20では、
供給計画の単位tを月単位としたが、如何なる期間を単
位として供給計画を立案するものとしてもよい。例え
ば、週を単位として供給計画を立案したり、季節を単位
として供給計画を立案するものとしてもよい。
In the commodity supply planning device 20 of the embodiment,
Although the unit t of the supply plan is the month unit, the supply plan may be made in any period. For example, a supply plan may be made in units of weeks, or a supply plan may be made in units of seasons.

【0046】本発明の実施の形態の一つとして商品を複
数の生産ラインで生産して供給する商品供給計画を立案
する商品供給計画立案装置20について説明したが、サ
ービスの提供を複数の提供拠点から供給するサービス供
給計画を立案するサービス供給計画立案装置に適用する
ものとしてもよい。サービスには、製品や部品の修理な
どの物品を介在するものや人的なサービスの提供などの
ように物品を介在しないものも含まれる。この場合、要
求生産台数Xi(t)をサービスiの計画対象月tの要
求サービス提供数に置き換えると共に生産台数計画値Y
ij(t)をサービスの各提供拠点における提供数計画
値に置き換えて考えればよい。
As one of the embodiments of the present invention, the product supply planning device 20 for preparing a product supply plan for producing and supplying products on a plurality of production lines has been described. The present invention may be applied to a service supply planning device that drafts a service supply plan to be supplied from a company. The services include those that intervene with goods such as repair of products and parts and those that do not intervene with goods such as provision of human services. In this case, the required production quantity Xi (t) is replaced with the required service provision quantity of the service i in the plan target month t, and the production quantity plan value Y
ij (t) may be replaced with the planned number of services provided at each service base.

【0047】また、本発明の実施の形態の一つとして商
品供給計画立案装置20を用いて説明したが、図3に例
示する商品供給計画立案処理ルーチンと同様な計画立案
手法を用いるものであれば如何なる手法を用いるものと
してもよく、また、コンピュータを実施例の商品供給計
画立案装置20やその変形例として機能させるコンピュ
ータ読み取り可能なプログラムとしてもよい。もとよ
り、こうしたプログラムを記憶したCD−ROMやDV
DーROMなどの記憶媒体としてもかまわない。
Although the embodiment of the present invention has been described using the product supply planning device 20, the present invention may be applied to any product using a planning method similar to the product supply planning process routine illustrated in FIG. 3. Any method may be used, or a computer-readable program that causes a computer to function as the product supply planning device 20 of the embodiment or a modification thereof. Needless to say, CD-ROMs and DVs storing these programs
It may be a storage medium such as a D-ROM.

【0048】以上、本発明の実施の形態について実施例
を用いて説明したが、本発明はこうした実施例に何等限
定されるものではなく、本発明の要旨を逸脱しない範囲
内において、種々なる形態で実施し得ることは勿論であ
る。
The embodiments of the present invention have been described with reference to the embodiments. However, the present invention is not limited to these embodiments, and various embodiments may be made without departing from the gist of the present invention. Of course, it can be carried out.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 機能ブロックとして示す構成図である。FIG. 1 is a configuration diagram shown as functional blocks.

【図2】 実施例の商品供給計画立案装置20のハード
構成を例示する構成図である。
FIG. 2 is a configuration diagram illustrating a hardware configuration of a product supply planning device 20 according to the embodiment;

【図3】 実施例の商品供給計画立案装置20により実
行される商品供給計画立案処理ルーチンの一例を示すフ
ローチャートである。
FIG. 3 is a flowchart illustrating an example of a product supply planning process routine executed by the product supply planning device 20 according to the embodiment;

【図4】 複数の商品iを複数の生産ラインjで生産し
て供給する際の供給計画の概念を例示する概念図であ
る。
FIG. 4 is a conceptual diagram illustrating the concept of a supply plan when a plurality of products i are produced and supplied on a plurality of production lines j.

【符号の説明】[Explanation of symbols]

20 商品供給計画立案装置、22 データ記憶部、2
4 データ入力部、26 供給個数分配部、28 要員
設定部、30 パラメータ変更部、32 費用演算部、
34 計画設定部、36 計画出力部、42 CPU、
44 バス、46 キャッシュメモリ、48 キャッシ
ュコントローラ、50 メインメモリ、52 グラフィ
ックスコントローラ、54 CRT、56 キーボード
インタフェース、58 キーボード、60 マウス、6
2 入出力インタフェース、64ハードディスク装置、
66 フロッピーディスク装置。
20 Commodity supply planning device, 22 Data storage unit, 2
4 data input section, 26 supply number distribution section, 28 personnel setting section, 30 parameter change section, 32 cost calculation section,
34 plan setting unit, 36 plan output unit, 42 CPU,
44 bus, 46 cache memory, 48 cache controller, 50 main memory, 52 graphics controller, 54 CRT, 56 keyboard interface, 58 keyboard, 60 mouse, 6
2 input / output interface, 64 hard disk drives,
66 Floppy disk drive.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 中村 敏弘 愛知県豊田市トヨタ町1番地 トヨタ自動 車株式会社内 (72)発明者 小島 英嗣 愛知県豊田市トヨタ町1番地 トヨタ自動 車株式会社内 Fターム(参考) 5B049 BB07 CC21  ──────────────────────────────────────────────────続 き Continued on the front page (72) Inventor Toshihiro Nakamura 1 Toyota Town, Toyota City, Aichi Prefecture Inside Toyota Motor Co., Ltd. (72) Eiji Kojima 1 Toyota Town, Toyota City, Aichi Prefecture Toyota Motor Corporation F Terms (Reference) 5B049 BB07 CC21

Claims (22)

【特許請求の範囲】[Claims] 【請求項1】 商品またはサービスの供給が可能な複数
の供給拠点における商品またはサービスの供給計画を立
案する供給計画立案装置であって、 単位当たりの商品またはサービスの供給に必要な要員数
と時間とに関する単位供給工数データと、要員タイプ別
の単位当たりの費用に関する単位要員タイプ別費用デー
タとを記憶するデータ記憶手段と、 全体の商品またはサービスの要求供給個数を入力する要
求供給個数入力手段と、 該入力された要求供給個数を分配パラメータに基づいて
各供給拠点からの供給個数である拠点供給個数に分配す
る供給個数分配手段と、 該分配された拠点供給個数の商品またはサービスを供給
するのに必要な拠点供給工数を前記データ記憶手段に記
憶された単位供給工数データに基づいて演算すると共に
該演算された拠点供給工数を処理する要員タイプ別の要
員数を要員パラメータに基づいて設定する要員設定手段
と、 前記要員設定手段により設定された要員タイプ別の要員
数と前記データ記憶手段に記憶された単位要員タイプ別
費用データとに基づいて前記複数の供給拠点からの拠点
供給個数の供給の際の全体の費用を演算する費用演算手
段と、 前記分配パラメータと前記要員パラメータとを逐次変更
するパラメータ変更手段と、 該パラメータ変更手段による分配パラメータおよび要員
パラメータの変更に伴って前記要員設定手段により設定
される要員タイプ別の要員数を用いて前記費用演算手段
により演算される全体の費用のうち該全体の費用が最小
となる分配パラメータと要員パラメータとを選択し、該
選択した分配パラメータと要員パラメータとを用いて前
記供給個数分配手段により分配される拠点供給個数と前
記要員設定手段により設定される各供給拠点の要員タイ
プ別の要員数とを供給計画として設定する計画設定手段
とを備える供給計画立案装置。
Claims 1. A supply planning device for planning supply of goods or services at a plurality of supply bases capable of supplying goods or services, comprising: a number of personnel and a time required to supply the goods or services per unit; Data storage means for storing unit supply man-hour data relating to the above, and unit personnel type cost data relating to the cost per unit for each personnel type, and a required supply quantity input means for inputting a required supply quantity of the whole goods or services. Supply number distribution means for distributing the input required supply number to the base supply number, which is the supply number from each supply base, based on the distribution parameter; and supplying the distributed base supply number of goods or services. And a calculation based on the unit supply man-hour data stored in the data storage means. The number of personnel for each type of personnel that processes the supplied base supply man-hours based on the personnel parameters; and the number of personnel for each type of personnel set by the personnel setting means and stored in the data storage means. Cost calculation means for calculating the total cost when supplying the number of supply bases from the plurality of supply bases based on the unit personnel type-based cost data, and a parameter change for sequentially changing the distribution parameters and the personnel parameters Means, and the total cost calculated by the cost calculating means using the number of personnel for each type of personnel set by the personnel setting means in accordance with the change of the distribution parameter and the personnel parameter by the parameter changing means. The distribution parameter and the personnel parameter that minimize the cost of the distribution are selected, and the selected distribution parameter and the personnel parameter are selected. And a plan setting means for setting, as a supply plan, the number of base supplies distributed by the supply number distribution means using the supply number and the number of personnel for each type of personnel at each supply base set by the personnel setting means. Planning equipment.
【請求項2】 前記パラメータ変更手段は、各供給拠点
の供給可能範囲内で前記分配パラメータを変更する手段
である請求項1記載の供給計画立案装置。
2. The supply planning device according to claim 1, wherein the parameter changing unit changes the distribution parameter within a supplyable range of each supply base.
【請求項3】 請求項2記載の供給計画立案装置であっ
て、 前記供給可能範囲は、定常業務により供給可能な定常供
給可能範囲と非定常業務により供給可能な非定常供給可
能範囲とを含む範囲であり、 前記単位要員タイプ別費用データは、定常業務における
要員タイプ別の単位当たりの費用に関する定常業務用単
位要員タイプ別費用データと、非定常業務における要員
タイプ別の単位当たりの費用に関する非定常業務用単位
要員タイプ別費用データとを含むデータである供給計画
立案装置。
3. The supply planning device according to claim 2, wherein the suppliable range includes a steadily suppliable range that can be supplied by a regular operation and an unsteady suppliable range that can be supplied by an irregular operation. The cost data by unit personnel type in the regular work, the cost data by unit personnel type for regular work related to the cost per unit by the personnel type in the regular work, and the non-work data related to the cost per unit by the personnel type in the irregular work. A supply planning device, which is data including regular business unit personnel type cost data.
【請求項4】 請求項3記載の供給計画立案装置であっ
て、 前記非定常供給可能範囲は、残業により供給可能な残業
供給可能範囲と休日出勤による供給可能な休出供給可能
範囲とを含む範囲であり、 前記非定常業務用単位要員タイプ別費用データは、残業
における要員タイプ別の単位当たりの費用に関する残業
用単位要員タイプ別費用データと、休日出勤における要
員タイプ別の単位当たりの費用に関する休出用単位要員
タイプ別費用データとを含むデータである供給計画立案
装置。
4. The supply planning device according to claim 3, wherein the unsteady supplyable range includes an overtime supplyable range that can be supplied by overtime and a restable supplyable range that can be supplied by working on holidays. The above-mentioned cost data by unit for the irregular work unit personnel type is the cost data by unit type for overtime work related to the cost per unit by the type of staff in overtime, and the cost data by unit type by the type of staff during work on holidays. A supply planning device, which is data including unit cost type data for unit personnel for rest.
【請求項5】 前記パラメータ変更手段は、各要員タイ
プの比率を前記要員パラメータの一つとして変更する手
段である請求項1ないし4いずれか記載の供給計画立案
装置。
5. The supply planning device according to claim 1, wherein the parameter changing unit changes a ratio of each type of personnel as one of the personnel parameters.
【請求項6】 請求項5記載の供給計画立案装置であっ
て、 前記要員タイプは、正規要員と複数種類の臨時要員とを
含み、 前記パラメータ変更手段は、前記複数種類の臨時要員の
構成比を変更することにより前記各要員タイプの比率を
変更する手段である供給計画立案装置。
6. The supply planning device according to claim 5, wherein the staff type includes a regular staff and a plurality of types of temporary staff, and the parameter changing unit includes a composition ratio of the plurality of temporary staffs. The supply planning device is a means for changing the ratio of each type of personnel by changing the number of persons.
【請求項7】 前記パラメータ変更手段は、各供給拠点
毎の総要員数を前記要員パラメータの一つとして変更す
る手段である請求項1ないし6いずれか記載の供給計画
立案装置。
7. The supply planning device according to claim 1, wherein the parameter changing unit changes a total number of personnel at each supply base as one of the personnel parameters.
【請求項8】 前記パラメータ変更手段は、前記供給拠
点の総要員数を各供給拠点の要員数変更範囲内で変更す
る手段である請求項7記載の供給計画立案装置。
8. The supply planning device according to claim 7, wherein said parameter changing means is means for changing the total number of personnel at the supply base within a range of changing the number of personnel at each supply base.
【請求項9】 前記パラメータ変更手段は、各パラメー
タ毎に設定された所定の刻み幅で逐次変更する手段であ
る請求項1ないし8いずれか記載の供給計画立案装置。
9. The supply planning device according to claim 1, wherein said parameter changing means is means for sequentially changing the parameter at a predetermined step size set for each parameter.
【請求項10】 請求項1ないし9いずれか記載の供給
計画立案装置であって、 前記複数の供給拠点は、商品を生産する生産ラインであ
り、 前記単位供給工数データは、一個の商品を生産するのに
必要な要員数と時間とに関するデータである供給計画立
案装置。
10. The supply planning device according to claim 1, wherein the plurality of supply bases are production lines for producing goods, and the unit supply man-hour data is for producing one commodity. A supply planning device that is data on the number of personnel and the time required to do so.
【請求項11】 請求項1ないし9いずれか記載の供給
計画立案装置であって、 前記複数の供給拠点は、所定のサービスを提供する拠点
であり、 前記単位供給工数データは、一回の所定のサービスの提
供に必要な要員数と時間とに関するデータである供給計
画立案装置。
11. The supply planning device according to claim 1, wherein the plurality of supply bases are bases that provide a predetermined service, and the unit supply man-hour data is a single predetermined supply man-hour. Supply planning device, which is data on the number of personnel and time required to provide the service of the present invention.
【請求項12】 コンピュータを、請求項1ないし11
いずれか記載の供給計画立案装置として機能させる供給
計画立案用のプログラム。
12. The computer according to claim 1, wherein
A supply planning program that functions as the supply planning device according to any of the above.
【請求項13】 商品またはサービスの供給が可能な複
数の供給拠点における商品またはサービスの供給計画を
立案する供給計画立案方法であって、(a)商品または
サービスの要求供給個数を分配パラメータを逐次変更し
て各供給拠点からの供給個数である拠点供給個数に分配
し、(b)該分配された拠点供給個数の商品またはサー
ビスを供給するのに必要な拠点供給工数を単位当たりの
商品またはサービスの供給に必要な要員数と時間とに関
する単位供給工数データに基づいて演算すると共に該演
算された拠点供給工数を処理する要員タイプ別の要員数
を要員パラメータを逐次変更して設定し、(c)該設定
された要員タイプ別の要員数と要員タイプ別の単位当た
りの費用に関する単位要員タイプ別費用データとに基づ
いて前記複数の供給拠点からの拠点供給個数の供給の際
の全体の費用を演算し、(d)前記分配パラメータおよ
び前記要員パラメータの変更に伴って演算される前記全
体の費用が最小となる分配パラメータと要員パラメータ
とを選択し、該選択した分配パラメータと要員パラメー
タとを用いて分配される拠点供給個数と設定される各供
給拠点の要員タイプ別の要員数とを供給計画として設定
する供給計画立案方法。
13. A supply planning method for preparing a supply plan of goods or services at a plurality of supply bases capable of supplying goods or services, comprising: (a) determining a required supply number of goods or services by sequentially assigning distribution parameters; (B) changing the base supply man-hours required to supply the distributed base supply quantity of goods or services to the base supply quantity, which is the supply quantity from each supply base; Calculating based on the unit supply man-hour data relating to the number of manpower and time required for supply, and setting the manpower for each manpower type for processing the calculated base supply manhour by sequentially changing the manpower parameters, (c The plurality of supplies based on the set number of personnel for each type of personnel and the cost data for each type of personnel relating to the cost per unit for each type of personnel. Calculating the total cost when supplying the number of base supplies from the base; and (d) the distribution parameter and the personnel parameter, which are calculated in accordance with the change of the distribution parameter and the personnel parameter, so that the total cost is minimized. And setting the number of base supplies distributed using the selected distribution parameters and personnel parameters and the number of personnel for each type of personnel at each supply base to be set as a supply plan.
【請求項14】 前記ステップ(a)は、各供給拠点の
供給可能範囲内で前記分配パラメータを変更するステッ
プである請求項13記載の供給計画立案方法。
14. The supply planning method according to claim 13, wherein said step (a) is a step of changing said distribution parameter within a supplyable range of each supply base.
【請求項15】 請求項14記載の供給計画立案方法で
あって、 前記供給可能範囲は、定常業務により供給可能な定常供
給可能範囲と非定常業務により供給可能な非定常供給可
能範囲とを含む範囲であり、 前記単位要員タイプ別費用データは、定常業務における
要員タイプ別の単位当たりの費用に関する定常業務用単
位要員タイプ別費用データと、非定常業務における要員
タイプ別の単位当たりの費用に関する非定常業務用単位
要員タイプ別費用データとを含むデータである供給計画
立案方法。
15. The supply planning method according to claim 14, wherein the suppliable range includes a steadily suppliable range that can be supplied by a regular operation and a non-stationary suppliable range that can be supplied by an irregular operation. The cost data by unit personnel type in the regular work, the cost data by unit personnel type for regular work related to the cost per unit by the personnel type in the regular work, and the non-work data related to the cost per unit by the personnel type in the irregular work. A supply planning method which is data including cost data for each unit type of personnel for regular business.
【請求項16】 請求項15記載の供給計画立案装置で
あって、 前記非定常供給可能範囲は、残業により供給可能な残業
供給可能範囲と休日出勤による供給可能な休出供給可能
範囲とを含む範囲であり、 前記非定常業務用単位要員タイプ別費用データは、残業
における要員タイプ別の単位当たりの費用に関する残業
用単位要員タイプ別費用データと、休日出勤における要
員タイプ別の単位当たりの費用に関する休出用単位要員
タイプ別費用データとを含むデータである供給計画立案
方法。
16. The supply planning device according to claim 15, wherein the unsteady supplyable range includes an overtime supplyable range that can be supplied by overtime and a restable supplyable range that can be supplied by working on a holiday. The above-mentioned cost data by unit for the irregular work unit personnel type is the cost data by unit type for overtime work related to the cost per unit by the type of staff in overtime, and the cost data by unit type by the type of staff during work on holidays. A supply planning method, which is data including cost data by unit personnel type for absence.
【請求項17】 前記ステップ(a)は、所定の刻み幅
で前記分配パラメータを逐次変更するステップである請
求項13ないし16いずれか記載の供給計画立案方法。
17. The supply planning method according to claim 13, wherein the step (a) is a step of sequentially changing the distribution parameter at a predetermined step size.
【請求項18】 前記ステップ(b)は、各要員タイプ
の比率を前記要員パラメータの一つとして変更するステ
ップである請求項13ないし17いずれか記載の供給計
画立案方法。
18. The supply planning method according to claim 13, wherein the step (b) is a step of changing a ratio of each personnel type as one of the personnel parameters.
【請求項19】 請求項18記載の供給計画立案方法で
あって、 前記要員タイプは、正規要員と複数種類の臨時要員とを
含み、 前記ステップ(b)は、前記複数種類の臨時要員の構成
比を変更することにより前記各要員タイプの比率を変更
するステップである供給計画立案方法。
19. The supply planning method according to claim 18, wherein the staff types include regular staff and a plurality of types of temporary staff, and the step (b) includes the configuration of the plurality of temporary staffs. A supply planning method in which the ratio of each of the personnel types is changed by changing the ratio.
【請求項20】 前記ステップ(b)は、各供給拠点毎
の総要員数を前記要員パラメータの一つとして変更する
ステップである請求項13ないし19いずれか記載の供
給計画立案方法。
20. The supply planning method according to claim 13, wherein the step (b) is a step of changing the total number of personnel at each supply base as one of the personnel parameters.
【請求項21】 前記ステップ(b)は、前記供給拠点
の総要員数を各供給拠点の要員数変更範囲内で変更する
ステップである請求項20記載の供給計画立案方法。
21. The supply planning method according to claim 20, wherein the step (b) is a step of changing the total number of personnel at the supply base within a range of changing the number of personnel at each supply base.
【請求項22】 前記ステップ(b)は、所定の刻み幅
で前記要員パラメータを逐次変更するステップである請
求項13ないし21いずれか記載の供給計画立案方法。
22. The supply planning method according to claim 13, wherein the step (b) is a step of sequentially changing the personnel parameters at a predetermined step size.
JP2000263794A 2000-08-31 2000-08-31 Device and method for planning supply plan, and program for planning supply plan Pending JP2002073751A (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
JP2000263794A JP2002073751A (en) 2000-08-31 2000-08-31 Device and method for planning supply plan, and program for planning supply plan
US09/935,692 US20020059089A1 (en) 2000-08-31 2001-08-24 Supply plan drafting device, method of drafting supply plan, program for drafting supply plan, and method of drafting production plan
EP01307349A EP1217563A3 (en) 2000-08-31 2001-08-30 Supply plan drafting device, method of drafting supply plan, program for drafting supply plan, and method of drafting production plan

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000263794A JP2002073751A (en) 2000-08-31 2000-08-31 Device and method for planning supply plan, and program for planning supply plan

Publications (1)

Publication Number Publication Date
JP2002073751A true JP2002073751A (en) 2002-03-12

Family

ID=18751290

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000263794A Pending JP2002073751A (en) 2000-08-31 2000-08-31 Device and method for planning supply plan, and program for planning supply plan

Country Status (1)

Country Link
JP (1) JP2002073751A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008090351A (en) * 2006-09-29 2008-04-17 Omron Corp Work record analyzer, work record analyzing method, program, and recording medium
CN117455181A (en) * 2023-11-09 2024-01-26 济南源天恒信息咨询有限公司 Intelligent enterprise management system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008090351A (en) * 2006-09-29 2008-04-17 Omron Corp Work record analyzer, work record analyzing method, program, and recording medium
CN117455181A (en) * 2023-11-09 2024-01-26 济南源天恒信息咨询有限公司 Intelligent enterprise management system

Similar Documents

Publication Publication Date Title
JP3481570B2 (en) Demand forecasting equipment in parts inventory management
Russell et al. A comparative analysis of the COVERT job sequencing rule using various shop performance measures
Hopp et al. Operations systems with discretionary task completion
US7921405B2 (en) Facilitation of multi-project management using throughput measurement
Chen A fuzzy back propagation network for output time prediction in a wafer fab
Pinker et al. Optimizing the use of contingent labor when demand is uncertain
US20040148209A1 (en) System and method for producing an infrastructure project estimate for information technology
Clark Optimization approximations for capacity constrained material requirements planning
Krishnamurthy et al. Re-examining the performance of MRP and Kanban material control strategies for multi-product flexible manufacturing systems
Hicks et al. Computer-aided production management issues in the engineer-to-order production of complex capital goods explored using a simulation approach
US20010020230A1 (en) Demand-production scheme planning apparatus, and storage medium
JP2000176799A (en) Production planning and manufacturing planning system
Jagdev et al. A QFD based performance measurement tool
US8401944B2 (en) Marketing investment optimizer with dynamic hierarchies
Kapalka et al. Retail inventory control with lost sales, service constraints, and fractional lead times
JPH09259178A (en) Process control system
US20100191562A1 (en) Internal material acquisition and reporting control system
Smith CONCRETE PLACING ANALYSIS USING DISCRETE-EVENT SIMULATION.
JP2002073751A (en) Device and method for planning supply plan, and program for planning supply plan
US20060026053A1 (en) Goal tender system and method
Gunduz A quantitative approach for evaluation of negative impact of overmanning on electrical and mechanical projects
US20050015294A1 (en) Method and system for modeling and simulating an automobile service facility
EP1217563A2 (en) Supply plan drafting device, method of drafting supply plan, program for drafting supply plan, and method of drafting production plan
US6847945B1 (en) Method for conducting a financial analysis
Agarwal et al. Assessing the organizational impacts of information technology

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040527

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20041102

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20041228

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20050104

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060228

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20060627