JP2002030310A JP2000216317A JP2000216317A JP2002030310A JP 2002030310 A JP2002030310 A JP 2002030310A JP 2000216317 A JP2000216317 A JP 2000216317A JP 2000216317 A JP2000216317 A JP 2000216317A JP 2002030310 A JP2002030310 A JP 2002030310A
Authority
JP
Japan
Prior art keywords
brick
furnace
stave
furnace wall
press
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2000216317A
Other languages
Japanese (ja)
Inventor
Kiyotaka Oe
清高 大江
Takaaki Okuda
隆昭 奥田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Nippon Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel Corp filed Critical Nippon Steel Corp
Priority to JP2000216317A priority Critical patent/JP2002030310A/en
Publication of JP2002030310A publication Critical patent/JP2002030310A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

PROBLEM TO BE SOLVED: To extend the service life of a furnace wall in a blast furnace by improving a furnace wall cooling performance, and also to shorten the period required for constructing the furnace wall. SOLUTION: This furnace wall is formed as integral structure of a stave cooler and bricks through a monolithic refractory layer having high heat- conductivity. Several steps of ribs are projectingly arranged at the brick side of the stave cooler and the ribs are inserted into grooves arranged in the brick, and press-in holes for pressing the monolithic refractory into this stave cooler are arranged. Further, the furnace lining is performed by which several steps of the ribs projectingly arranged in the stave cooler are inserted into the grooves in the brick and after fixing the block formed by pre-fixing with brick fixing bolts to a prescribed position, the brick fixing bolts are taken off, and the monolithic refractory is pressed in the bolt hole opened as the press-in hole, and successively, the stave cooler is fixed to an iron shell by inserting a fitting bolt for the iron shell into the bolt hole.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、高炉炉底部の冷却
効果高めることで高炉の寿命を延長すると共に、炉壁の
築造工期を短縮できる炉壁構造および築炉方法に関する
ものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a furnace wall structure and a furnace construction method capable of extending the life of a blast furnace by shortening the furnace wall construction time by increasing the cooling effect of the blast furnace bottom, and shortening the construction period of the furnace wall.

【0002】[0002]

【従来の技術】近年、高炉の炉壁冷却方法としてステー
ブ冷却方式が採用される例が多くなってきたが、例えば
炉底の場合、まずステーブを鉄皮の内面全体に取付けた
後に、カーボン煉瓦等の炉壁煉瓦を最下段から据え付
け、順次上段へ築造を進める方法が取られている。
2. Description of the Related Art In recent years, a stave cooling method has been frequently used as a method of cooling a furnace wall of a blast furnace. Is installed from the bottom of the furnace wall, etc., and the building is sequentially advanced to the upper stage.

【0003】その際、各段の炉壁煉瓦の築造に当たって
は、ステーブ内面と煉瓦との間に100mm程度の隙間を
設けており、炉壁煉瓦各段の据え付けを完了した後に、
不定形材であるスタンプ材をこの隙間にハンマーで打設
して煉瓦膨張代を確保すると共に1500℃もの高温に
さらされる炉壁煉瓦からの熱をステーブへ伝え、炉壁煉
瓦を冷却して損耗を防ぎ炉壁の寿命を確保している。
[0003] At that time, in the construction of the furnace wall brick of each step, a gap of about 100 mm is provided between the inner surface of the stave and the brick, and after the installation of each step of the furnace wall brick is completed,
A stamp material, which is an irregular shaped material, is poured into this gap with a hammer to secure the allowance for brick expansion and to transfer the heat from the furnace wall brick exposed to a high temperature of 1500 ° C to the stave to cool the furnace wall brick and wear it out. To prevent furnace wall life.

【0004】また、炉底の炉壁は直接溶銑に接触するた
め築造時における各煉瓦間の目地は厚さ0.5mm以下と
し、溶銑の目地浸入を防止する目的で高品質の据え付け
精度が要求されている。炉壁の築造工期短縮方法として
は、特開昭59−158983号公報に、鉄皮、冷却装
置および煉瓦を一体据付ブロックとして据え付ける方法
が提案されている。
In addition, since the furnace wall at the bottom of the furnace is in direct contact with the hot metal, the joint between the bricks at the time of construction should be 0.5 mm or less in thickness, and high quality installation accuracy is required for the purpose of preventing the hot metal from entering the joint. Have been. As a method of shortening the construction period of the furnace wall, Japanese Patent Application Laid-Open No. S59-158983 proposes a method of installing a steel shell, a cooling device, and a brick as an integrated installation block.

【0005】[0005]

【発明が解決しようとする課題】高炉では炉底の炉壁煉
瓦の損耗速度によって寿命が決定されるが、従来の炉壁
構造では、冷却性能を上げることができず、寿命は15
年程度が限度となっている。炉壁煉瓦は高温による割れ
の発生と剥離の繰り返しによって損耗が進行するため、
寿命を延長するには炉壁の冷却性能を向上させることが
必須となる。
In the blast furnace, the life is determined by the wear rate of the furnace wall brick at the bottom of the furnace. However, in the conventional furnace wall structure, the cooling performance cannot be improved, and the life is 15 years.
Years are the limit. Furnace wall bricks wear due to repeated cracking and peeling due to high temperature,
To extend the life, it is essential to improve the cooling performance of the furnace wall.

【0006】上記特開昭59−158983号公報にお
いて炉壁の築造工期短縮方法が提案されているが、据付
ブロックを鉄皮基準で据え付けているため、特に炉底で
は高精度の目地幅確保が困難であり、かつ煉瓦の熱膨張
を吸収する構造がないため煉瓦内部の熱応力により煉瓦
に割れが発生し損耗が容易に進行し、長寿命を維持する
ことが困難である。そこで本発明が解決しようとする課
題は、炉壁冷却性能を向上させることで高炉の寿命を延
長すると共に、炉壁の築造工期を短縮することである。
Japanese Patent Application Laid-Open No. 59-158983 proposes a method for shortening the construction period of a furnace wall. However, since the installation block is installed on the basis of a steel shell, it is possible to secure a joint width with high precision especially at the furnace bottom. Since it is difficult and there is no structure that absorbs the thermal expansion of the brick, cracks are generated in the brick due to thermal stress inside the brick, wear easily proceeds, and it is difficult to maintain a long life. The problem to be solved by the present invention is to extend the life of the blast furnace by improving the furnace wall cooling performance and shorten the construction period of the furnace wall.

【0007】[0007]

【課題を解決するための手段】上記課題を解決するため
の本発明構造は、ステーブと煉瓦とが熱伝導率の高い不
定形耐火材の層を介して一体構造となっており、ステー
ブの煉瓦側に数段のリブが突設され、該リブが煉瓦に設
けられた溝に挿入され、かつステーブには前記不定形耐
火材を圧入するための圧入孔が設けられていることを特
徴とする高炉の炉壁構造である。
According to the structure of the present invention for solving the above-mentioned problems, the stave and the brick are integrated with each other via a layer of irregularly shaped refractory material having a high thermal conductivity. A plurality of ribs are protruded on the side, the ribs are inserted into grooves provided in the brick, and a stave is provided with a press-fit hole for press-fitting the irregular-shaped refractory material. It is a furnace wall structure of a blast furnace.

【0008】また上記課題を解決するための本発明法
は、炉壁を運搬可能な据付ブロックに分割して最下段か
ら順次構築する方法において、ステーブに突設された数
段のリブを煉瓦の溝に挿入し、煉瓦固定ボルトで予め固
定して形成した据付ブロックを所定の位置に固定した
後、煉瓦固定ボルトを取り外し、開けられたステーブの
ボルト孔を圧入孔として不定形耐火材を圧入し、次いで
該ボルト孔に鉄皮取付ボルトを挿入してステーブを鉄皮
に固定することを特徴とする高炉の築炉方法である。
According to a method of the present invention for solving the above-mentioned problems, in a method of dividing a furnace wall into transportable installation blocks and sequentially constructing from the bottom, a plurality of ribs protruding from a stave are formed on a brick. After inserting into the groove and fixing the installation block formed in advance with the brick fixing bolts in place, the brick fixing bolts are removed, and the irregular refractory material is pressed in using the bolt holes of the opened staves as press-in holes. Then, an iron shell mounting bolt is inserted into the bolt hole to fix the stave to the iron shell.

【0009】[0009]

【発明の実施の形態】本発明の炉壁構造により高炉の炉
壁を築造した例を図1および図2に示す。図1は炉底の
平面を示す横断面図、図2は縦断面図である。図1のよ
うに炉底1の周りに鉄皮2を設け、その内側に本発明の
炉壁構造を使用した炉壁を築造する。炉底1は、図2の
ように底板10の上に敷煉瓦9を敷き、その上に縦煉瓦
8を敷き詰めて構成される。
1 and 2 show an example in which a furnace wall of a blast furnace is constructed by the furnace wall structure of the present invention. FIG. 1 is a horizontal sectional view showing a plane of a furnace bottom, and FIG. 2 is a vertical sectional view. As shown in FIG. 1, a steel shell 2 is provided around a furnace bottom 1 and a furnace wall using the furnace wall structure of the present invention is built inside the steel shell 2. The furnace bottom 1 is constructed by laying a brick 9 on a bottom plate 10 as shown in FIG. 2 and laying a vertical brick 8 on the brick.

【0010】本発明の炉壁構造は、ステーブ3と煉瓦5
と、その間に介在する不定形耐火材で構成される。図2
のようにステーブ3には数段(本例では3段)のリブ4
が突設され、リブ4は煉瓦5の溝に挿入され、熱伝導率
の高い不定形耐火材であるスタンプ材11の層を介し
て、ステーブ3と煉瓦5は一体構造になっている。
The furnace wall structure of the present invention comprises a stave 3 and a brick 5
And an irregular shaped refractory material interposed therebetween. FIG.
The stave 3 has several ribs (three in this example)
The rib 4 is inserted into the groove of the brick 5, and the stave 3 and the brick 5 have an integral structure via a layer of the stamp material 11 which is an irregular refractory material having high thermal conductivity.

【0011】そしてステーブ3には、図3〜図6の例の
ような圧入孔15が設けられている。圧入孔15はスタ
ンプ材11などの不定形耐火材を炉内側に圧入するもの
であり、本例では煉瓦固定ボルト16用および鉄皮固定
ボルト17用の孔と兼用になっている。
The stave 3 is provided with a press-in hole 15 as shown in FIGS. The press-in hole 15 is used for press-fitting an irregular-shaped refractory material such as the stamp material 11 into the inside of the furnace. In the present embodiment, the press-in hole 15 also serves as a hole for the brick fixing bolt 16 and the steel shell fixing bolt 17.

【0012】図1の例では炉壁が16個の据付ブロック
6で構成され、各据付ブロック6は1枚のステーブ3に
3個の煉瓦5を一体化している。7は据付ブロック6の
間隔を調整するための調整用煉瓦である。ステーブ3
は、炉容積により異なるが、円周方向に20〜30枚、
炉高方向では3段〜4段使用される。各据付ブロック6
は工場にて予め組立てを行い、築炉場所へ搬入して築炉
する。
In the example shown in FIG. 1, the furnace wall is composed of sixteen installation blocks 6, and each installation block 6 integrates three bricks 5 with one stave 3. Reference numeral 7 denotes an adjustment brick for adjusting the interval between the installation blocks 6. Stave 3
Varies depending on the furnace volume, but 20 to 30 in the circumferential direction,
Three to four stages are used in the furnace height direction. Each installation block 6
Assemble at the factory in advance and bring it to the furnace place to build the furnace.

【0013】ステーブ3に突設したリブ4により、冷却
フィン効果と煉瓦保持効果がもたらされる。リブ4は、
ステーブ3の大きさ、要求される冷却性能に応じて数段
設けることができる。ステーブ3のリブ4全面に可塑性
を有する高熱伝導性不定形材としてのスタンプ材11を
設け、リブ4が挿入される溝を設けた煉瓦5をステーブ
3に装着して、図3および図4に示すような煉瓦固定ボ
ルト16によりステーブ3に固定する。スタンプ材11
は、煉瓦5の熱膨張代が確保されるよう、煉瓦5の熱膨
張量に応じて数十mm程度の厚さにすることができる。
The ribs 4 projecting from the stave 3 provide a cooling fin effect and a brick holding effect. The rib 4
Several stages can be provided according to the size of the stave 3 and the required cooling performance. A stamp material 11 as a highly thermally conductive irregular-shaped material having plasticity is provided on the entire surface of the rib 4 of the stave 3, and a brick 5 provided with a groove into which the rib 4 is inserted is attached to the stave 3, and FIG. 3 and FIG. It is fixed to the stave 3 by a brick fixing bolt 16 as shown. Stamp material 11
The thickness can be set to about several tens mm depending on the amount of thermal expansion of the brick 5 so that the thermal expansion allowance of the brick 5 is secured.

【0014】次に本発明法は、図1および図2に示す例
のように、炉壁を運搬可能な据付ブロック6に分割して
最下段から順次構築する方法において、各据付ブロック
6を図3〜図6に示す例のようにして構築する。図2の
ように底板10の上に敷煉瓦9を構築したのち、まず1
段目の各据付ブロック6を敷煉瓦9上の所定位置に仮置
きし、縦煉瓦8を敷き詰めた後、ステーブ3を鉄皮2に
固定し、縦煉瓦8に対し各据付ブロック6を締め付けて
密着させる。ステーブ3と鉄皮2の間にはキャスタブル
12が介在する。
Next, according to the method of the present invention, as shown in FIGS. 1 and 2, in a method of dividing the furnace wall into transportable installation blocks 6 and sequentially constructing them from the bottom, It is constructed as in the example shown in FIGS. After constructing the laying brick 9 on the bottom plate 10 as shown in FIG.
After temporarily placing each of the mounting blocks 6 at the predetermined positions on the bricks 9 and laying down the vertical bricks 8, the stave 3 is fixed to the steel shell 2, and each of the mounting blocks 6 is fastened to the vertical bricks 8. Adhere. A castable 12 is interposed between the stave 3 and the steel shell 2.

【0015】密着手段としては、例えば煉瓦固定ボルト
16を外した後のボルト穴にジャッキボルトを装着して
締め付け、各煉瓦5を炉内側へ押して密着させるなどの
手段を採用することができる。次いで2段目の各据付ブ
ロック6を、1段目の各据付ブロック6の上面を基準に
した所定位置に載置して本発明法により炉壁を構築し、
同様にして3段目以上の構築を行う。
As the contacting means, for example, a means can be employed in which a jack bolt is attached to the bolt hole after removing the brick fixing bolts 16 and tightened, and the bricks 5 are pressed into the furnace and adhered. Next, each of the second-stage installation blocks 6 is placed at a predetermined position based on the upper surface of each of the first-stage installation blocks 6, and a furnace wall is constructed by the method of the present invention.
Similarly, construction of the third and higher stages is performed.

【0016】煉瓦5とステーブ3およびステーブ3と鉄
皮2の固定方法の詳細を図3〜図6に示す。築炉場所以
外の工場等にて、予め煉瓦5とステーブ3とで据付ブロ
ック6を組み立てる。煉瓦5にねじ穴を設け、図3のよ
うにステーブ3に開けたボルト孔の中最低2カ所に煉瓦
固定ボルト16を挿通し、煉瓦5をステーブ3に固定し
て据付ブロック6を組み立てる。このときステーブ3と
煉瓦5の間に、熱伝導率の高い不定形耐火材であるスタ
ンプ材11を介在させる。
The details of the method of fixing the brick 5 and the stave 3 and the method of fixing the stave 3 and the steel shell 2 are shown in FIGS. At a factory or the like other than the furnace construction site, the installation block 6 is assembled with the brick 5 and the stave 3 in advance. A screw hole is provided in the brick 5, and a brick fixing bolt 16 is inserted into at least two of the bolt holes formed in the stave 3 as shown in FIG. 3, and the brick 5 is fixed to the stave 3 to assemble the installation block 6. At this time, a stamp material 11 which is an irregular refractory material having a high thermal conductivity is interposed between the stave 3 and the brick 5.

【0017】組み立てた据付ブロック6を築炉場所に搬
入し、まず1段目の据付ブロック6を上記所定位置に仮
置きする。仮置きの位置決めは、図4のように鉄皮2に
予め設けた取付孔18に煉瓦固定ボルト16の頭部を挿
入することで行うことができる。
The assembled installation block 6 is carried into a furnace place, and the first-stage installation block 6 is first temporarily placed at the predetermined position. The positioning of the temporary placement can be performed by inserting the head of the brick fixing bolt 16 into a mounting hole 18 previously provided in the steel shell 2 as shown in FIG.

【0018】1段目の各据付ブロック6の配置が完了し
たら、それぞれの間隔を調整し、図3のように、ステー
ブ3の一部のボルト孔を鉄皮固定ボルト17用とし、図
6のように鉄皮2の外側から鉄皮取付孔18に鉄皮取付
ボルト17を挿通して据付ブロック6を鉄皮2に固定す
る。そして図4のように、ステーブ3と煉瓦5を固定し
た煉瓦固定ボルト16を、別の鉄皮取付孔18から取り
外す。その後、上記のように縦煉瓦8に対し据付ブロッ
ク6を締め付け密着させる。
When the arrangement of the first-stage installation blocks 6 is completed, the intervals between them are adjusted, and as shown in FIG. 3, some bolt holes of the stave 3 are used for the iron-bar fixing bolts 17, and FIG. Thus, the installation block 6 is fixed to the steel shell 2 by inserting the steel mounting bolt 17 from the outside of the steel shell 2 into the steel mounting hole 18. Then, as shown in FIG. 4, the brick fixing bolt 16 to which the stave 3 and the brick 5 are fixed is removed from another steel shell mounting hole 18. After that, the installation block 6 is tightened and adhered to the vertical brick 8 as described above.

【0019】次いで2段目の据付ブロック6を構築す
る。2段目については、図2の例のように縦煉瓦8の上
に位置する場合、上記締め付け密着工程は不要となる。
2段目の各据付ブロック6を、1段目の各据付ブロック
6上面の所定位置に位置決めするには、上記1段目の場
合と同様、図4のように鉄皮2に予め設けた取付孔18
に煉瓦固定ボルト16の頭部を挿入することで行うこと
ができる。その後も1段目の場合と同様、各据付ブロッ
ク6の間隔を調整して、図6のように鉄皮取付ボルト1
7により据付ブロック6を鉄皮2に固定した後、煉瓦固
定ボルト16を取り外す。3段目以上は、2段目と同様
にして行う。
Next, a second-stage installation block 6 is constructed. For the second stage, when it is located on the vertical brick 8 as in the example of FIG.
In order to position each of the second-stage installation blocks 6 at a predetermined position on the upper surface of each of the first-stage installation blocks 6, as in the case of the first-stage, as shown in FIG. Hole 18
By inserting the head of the brick fixing bolt 16 into the hole. Thereafter, similarly to the case of the first stage, the interval between the mounting blocks 6 is adjusted, and as shown in FIG.
After fixing the installation block 6 to the steel shell 2 by using 7, the brick fixing bolt 16 is removed. The third and subsequent steps are performed in the same manner as the second step.

【0020】その後、各段の据付ブロック6について、
煉瓦固定ボルト16を外した後のボルト孔を圧入孔15
として、図5のように、不定形耐火材であるスタンプ材
11を圧入し、ステーブ3と煉瓦5の間の隙間を埋めつ
くす。そして、図6のように鉄皮固定ボルト17を装着
し、鉄皮2とステーブ3を固定して各ブロックの築造を
完了する。高炉の火入れ後、煉瓦5が膨張した時点で、
鉄皮固定ボルト17を外し、炉外から高熱伝導性不定形
材を圧入することにより、スタンプ材11の層に隙間が
生じて煉瓦5からステーブ3への熱伝導が阻害されるの
を防止することができる。
After that, for each stage of the installation block 6,
The bolt hole after removing the brick fixing bolt 16 is inserted into the press-fit hole 15.
As shown in FIG. 5, a stamp material 11 which is an irregular-shaped refractory material is press-fitted to fill a gap between the stave 3 and the brick 5. Then, as shown in FIG. 6, the steel shell fixing bolts 17 are attached, and the steel shell 2 and the staves 3 are fixed to complete the construction of each block. After burning the blast furnace, when the brick 5 expands,
By removing the iron fixing bolts 17 and press-fitting the irregularly shaped material having high thermal conductivity from outside the furnace, it is possible to prevent a gap in the layer of the stamp material 11 from hindering the heat conduction from the brick 5 to the stave 3. be able to.

【0021】[0021]

【発明の効果】本発明によれば、高炉の寿命を左右する
炉底部の冷却性能を高め、かつ煉瓦の熱膨張による割れ
を防止することにより、高炉の寿命を延長することがで
きると共に、炉壁煉瓦とステーブを予め一体化した据付
ブロックを採用することで、炉壁の築造工期を短縮する
ことができる。
According to the present invention, the life of the blast furnace can be extended by improving the cooling performance of the furnace bottom which affects the life of the blast furnace and preventing cracks due to thermal expansion of the brick. By adopting the installation block in which the wall brick and the stave are integrated in advance, the construction period of the furnace wall can be shortened.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明による炉底の例を示す横断面図である。FIG. 1 is a cross-sectional view showing an example of a furnace bottom according to the present invention.

【図2】本発明による炉底の例を示す縦断面図である。FIG. 2 is a longitudinal sectional view showing an example of a furnace bottom according to the present invention.

【図3】本発明における据付ブロックの例を示す平面図
である。
FIG. 3 is a plan view showing an example of a mounting block according to the present invention.

【図4】本発明による築炉過程の例を示す炉壁の断面図
である。
FIG. 4 is a sectional view of a furnace wall showing an example of a furnace building process according to the present invention.

【図5】本発明による築炉過程の例を示す炉壁の別の断
面図である。
FIG. 5 is another sectional view of a furnace wall showing an example of a furnace building process according to the present invention.

【図6】本発明による築炉過程の例を示す炉壁の別の断
面図である。
FIG. 6 is another sectional view of a furnace wall showing an example of a furnace building process according to the present invention.

【符号の説明】[Explanation of symbols]

1…炉底 2…鉄皮 3…ステーブ 4…リブ 5…煉瓦 6…据付ブロック 7…調整用煉瓦 8…縦煉瓦 9…敷煉瓦 10…底板 11…スタンプ材 12…キャスタブル 13…給水管 14…配水管 15…圧入孔 16…煉瓦固定ボルト 17…鉄皮固定ボルト 18…鉄皮取付孔 19…ナット DESCRIPTION OF SYMBOLS 1 ... Furnace bottom 2 ... Iron shell 3 ... Stave 4 ... Rib 5 ... Brick 6 ... Installation block 7 ... Bricks for adjustment 8 ... Vertical brick 9 ... Brick brick 10 ... Bottom plate 11 ... Stamp material 12 ... Castable 13 ... Water pipe 14 ... Water pipe 15 ... Press-in hole 16 ... Brick fixing bolt 17 ... Steel fixing bolt 18 ... Steel mounting hole 19 ... Nut

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 ステーブと煉瓦とが熱伝導率の高い不定
形耐火材の層を介して一体構造となっており、ステーブ
の煉瓦側に数段のリブが突設され、該リブが煉瓦に設け
られた溝に挿入され、かつステーブには前記不定形耐火
材を圧入するための圧入孔が設けられていることを特徴
とする高炉の炉壁構造。
1. A stave and a brick have an integral structure with a layer of irregularly shaped refractory material having a high thermal conductivity, and a plurality of ribs are protrudingly provided on the brick side of the stave. A furnace wall structure for a blast furnace, wherein the furnace wall structure is inserted into the provided groove, and the stave is provided with a press-fitting hole for press-fitting the irregular-shaped refractory material.
【請求項2】 炉壁を運搬可能な据付ブロックに分割し
て最下段から順次構築する方法において、ステーブに突
設された数段のリブを煉瓦の溝に挿入し、煉瓦固定ボル
トで予め固定して形成した据付ブロックを所定の位置に
固定した後、煉瓦固定ボルトを取り外し、開けられたス
テーブのボルト孔を圧入孔として不定形耐火材を圧入
し、次いで該ボルト孔に鉄皮取付ボルトを挿入してステ
ーブを鉄皮に固定することを特徴とする高炉の築炉方
法。
2. A method in which a furnace wall is divided into transportable installation blocks and sequentially constructed from the bottom, a plurality of ribs protruding from a stave are inserted into a groove of a brick and fixed in advance with a brick fixing bolt. After fixing the installation block formed in a predetermined position, the brick fixing bolt is removed, a non-standard refractory material is press-fitted using the bolt hole of the opened stave as a press-fitting hole, and a steel mounting bolt is inserted into the bolt hole. A method for building a blast furnace, comprising inserting and fixing a stave to a steel shell.
JP2000216317A 2000-07-17 2000-07-17 Structure of furnace wall in blast furnace and method for constructing furnace Withdrawn JP2002030310A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000216317A JP2002030310A (en) 2000-07-17 2000-07-17 Structure of furnace wall in blast furnace and method for constructing furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000216317A JP2002030310A (en) 2000-07-17 2000-07-17 Structure of furnace wall in blast furnace and method for constructing furnace

Publications (1)

Publication Number Publication Date
JP2002030310A true JP2002030310A (en) 2002-01-31

Family

ID=18711599

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000216317A Withdrawn JP2002030310A (en) 2000-07-17 2000-07-17 Structure of furnace wall in blast furnace and method for constructing furnace

Country Status (1)

Country Link
JP (1) JP2002030310A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011075183A (en) * 2009-09-30 2011-04-14 Pan Pacific Copper Co Ltd Water-cooled jacket, and furnace body cooling structure and method using the same
CN104390463A (en) * 2014-11-12 2015-03-04 浙江森波特搪瓷有限公司 Method for preventing cracking and cooling of refractory bricks of furnace kiln
CN104726625A (en) * 2015-02-26 2015-06-24 河北二十冶建设有限公司 Method for quickly eliminating waste materials and remaining iron in a furnace during blast furnace overhaul
CN108424989A (en) * 2018-04-11 2018-08-21 邢台钢铁有限责任公司 A kind of blast furnace taphole region cooling structure
CN113260716A (en) * 2018-12-13 2021-08-13 保罗沃思公司 Method for protecting the inner wall of a shaft furnace

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011075183A (en) * 2009-09-30 2011-04-14 Pan Pacific Copper Co Ltd Water-cooled jacket, and furnace body cooling structure and method using the same
CN104390463A (en) * 2014-11-12 2015-03-04 浙江森波特搪瓷有限公司 Method for preventing cracking and cooling of refractory bricks of furnace kiln
CN104726625A (en) * 2015-02-26 2015-06-24 河北二十冶建设有限公司 Method for quickly eliminating waste materials and remaining iron in a furnace during blast furnace overhaul
CN108424989A (en) * 2018-04-11 2018-08-21 邢台钢铁有限责任公司 A kind of blast furnace taphole region cooling structure
CN113260716A (en) * 2018-12-13 2021-08-13 保罗沃思公司 Method for protecting the inner wall of a shaft furnace

Similar Documents

Publication Publication Date Title
US20190154338A1 (en) Stave with external manifold
US9102990B2 (en) Apparatus and method for frame and brick constructions
KR100601988B1 (en) Apparatus of heating wafer
US20180149429A1 (en) Stave with external manifold
JP2002030310A (en) Structure of furnace wall in blast furnace and method for constructing furnace
US6575738B1 (en) Composite refractory insulating tile
JPH0370989A (en) Cooling element through which liquid for vertical furnace flows
US20110200958A1 (en) Hot Blast Stove Dome and Hot Blast Stove
CN216977552U (en) Water jacket assembling structure
JP2008127529A (en) Chamber type coke oven structure and method for constructing chamber type coke oven
JP2725576B2 (en) Water-cooled refractory panels for blast furnace wall repair
KR20180134413A (en) Checker Bricks for Water Extra Pillar for Metal Water, Checker Bricks for Water
US7452497B2 (en) Furnace sidewall structure of rotary hearth furnace
JPH07279427A (en) Piping structure of cooling pipe
US11384985B2 (en) Furnace stave
WO2019147920A1 (en) Stave with external manifold
JP2008101233A (en) Furnace body cooling apparatus in blast furnace
JPS5854189Y2 (en) Rotating drum tire support device
JPS6217464Y2 (en)
KR102689888B1 (en) Casting blocks used as refractory materials for rotary kiln and their construction methods
JP2000045005A (en) Stave cooler and its production
RU2729800C1 (en) Device for water cooling of blast furnace bottom
JP2007205693A (en) Construction method of furnace-laid brick
CN114413635A (en) Water jacket assembling structure
JP2659501B2 (en) Hearth structure of vertical induction heating furnace

Legal Events

Date Code Title Description
A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20060804

RD03 Notification of appointment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7423

Effective date: 20060831

A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20071002