JP2001350637A - Automatic operation control system and method in power recovery of information processing device, and recording medium with automatic operation control program recorded thereon - Google Patents

Automatic operation control system and method in power recovery of information processing device, and recording medium with automatic operation control program recorded thereon

Info

Publication number
JP2001350637A
JP2001350637A JP2000173565A JP2000173565A JP2001350637A JP 2001350637 A JP2001350637 A JP 2001350637A JP 2000173565 A JP2000173565 A JP 2000173565A JP 2000173565 A JP2000173565 A JP 2000173565A JP 2001350637 A JP2001350637 A JP 2001350637A
Authority
JP
Japan
Prior art keywords
job
time
schedule
execution
executed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000173565A
Other languages
Japanese (ja)
Inventor
Hiroshi Osada
浩志 長田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NEC Corp
Original Assignee
NEC Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NEC Corp filed Critical NEC Corp
Priority to JP2000173565A priority Critical patent/JP2001350637A/en
Publication of JP2001350637A publication Critical patent/JP2001350637A/en
Pending legal-status Critical Current

Links

Landscapes

  • Multi Processors (AREA)
  • Power Sources (AREA)

Abstract

PROBLEM TO BE SOLVED: To reconfigure an optimum job schedule corresponding to power recovery time in power recovery. SOLUTION: This system has a job priority memory part 41 for preliminarily registering information such as degree of importance, time to start or the like every job, an executed job memory part 42 for registering the information for executed job every execution end, a schedule memory part 43 for registering a reconfigured schedule, a job schedule reconfiguration part 21 for extracting a job in order of priority from the job priority memory part 41, judging whether the extracted job is executed or not in reference to the executed job memory part 42, calculating the processing end scheduled time of the job when it is not executed, integrating this time into the schedule when it is before the time to end each job imparting an execution order to the extracted job in order of execution, and registering the reconfigured execution schedule in the schedule memory part 43, and a job execution management part 22 for executing the job according to the reconfigured schedule.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、情報処理装置の復
電時自動運転制御方式,方法および自動運転制御プログ
ラムを記録した記録媒体に関し、特に復電時刻に応じた
ジョブ実行を行う情報処理装置の復電時自動運転制御方
式,方法および自動運転制御プログラムを記録した記録
媒体に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a power recovery automatic operation control method and method for an information processing apparatus, and a recording medium on which an automatic operation control program is recorded. The present invention relates to a power recovery automatic operation control method and method and a recording medium on which an automatic operation control program is recorded.

【0002】[0002]

【従来の技術】近年、オンライン業務など重要な業務の
中心となる情報処理装置が増えてきているが、突然の停
電などによりシステムが停止してしまう事態が発生し得
る。そして、復電時には、再度情報処理装置を起動して
ジョブの実行を行わせる必要があるが、復電した時間帯
により復旧手順が異なり必然的に人の手作業による復旧
が行われるため、復旧までに時間がかかっていた。
2. Description of the Related Art In recent years, the number of information processing apparatuses, which are important for important tasks such as online tasks, has been increasing. However, a situation in which the system is stopped due to a sudden power failure or the like may occur. When the power is restored, the information processing device must be restarted to execute the job. However, the restoration procedure differs depending on the time of the power restoration, and the restoration is inevitably performed manually. It was taking a long time.

【0003】こうした人の手作業による復旧の代わり
に、復電時に情報処理装置を自動運転させる方式として
は、例えば特開昭63−231608号公報で開示され
ている情報処理システムの停電復電時の情報処理方式が
ある。この公報には、停電が発生したときに情報処理装
置でジョブ実行を再開始するのに必要なジョブ状態情報
を記憶部に格納しておき、復電時に記憶部に格納してお
いたジョブ状態情報に基いてジョブの実行を再開始する
ことが記載されている。
As a method of automatically operating the information processing apparatus at the time of power recovery instead of such manual recovery by a person, for example, a method of recovering the power failure of the information processing system disclosed in Japanese Patent Application Laid-Open No. 63-231608 is disclosed. Information processing system. In this publication, job status information necessary for restarting job execution in an information processing apparatus when a power failure occurs is stored in a storage unit, and the job status information stored in the storage unit when power is restored is stored. It is described that the execution of the job is restarted based on the information.

【0004】[0004]

【発明が解決しようとする課題】上述した公報による従
来の技術においては、停電時に格納しておいた情報処理
装置のジョブ状態情報により復電時にジョブの実行を再
開始するため、復電時に実行開始されるジョブが復電時
刻に関係なく固定で決まってしまうことになる。複数の
ジョブが連携した高度なシステムでは、復電時刻によっ
てその時点で実行すべき最適なジョブが変化するが、上
述した従来の技術においてはこうした要求に応えること
ができないという問題がある。
In the prior art disclosed in the above publication, the job execution is restarted at the time of power recovery based on the job state information of the information processing apparatus stored at the time of power failure. The job to be started is fixedly determined regardless of the power recovery time. In an advanced system in which a plurality of jobs cooperate, the optimum job to be executed at that time varies depending on the power recovery time. However, the above-described conventional technology has a problem that such a request cannot be satisfied.

【0005】本発明は、復電時に、復電時刻に応じたジ
ョブ実行を行うことのできる情報処理装置の復電時自動
運転制御方式,方法および自動運転制御プログラムを記
録した記録媒体を提供することを目的としている。
The present invention provides a power recovery automatic operation control method and method of an information processing apparatus capable of executing a job in accordance with the power recovery time at the time of power recovery, and a recording medium recording an automatic operation control program. It is intended to be.

【0006】[0006]

【課題を解決するための手段】本発明の第1の情報処理
装置の復電時自動運転制御方式は、情報処理装置の復電
時に、予め登録された各ジョブの優先度に応じてジョブ
毎の優先順位を判断し、この中から停電前に実行終了済
みのものを排除するとともに、残りのジョブに対し、前
記優先順位順に各ジョブの実行終了予定時刻を算出し、
この実行終了予定時刻がジョブ毎に予め登録された終了
すべき時刻を超えるジョブを排除してジョブ実行スケジ
ュールを再構成するジョブスケジュール再構成手段と、
前記再構成されたジョブ実行スケジュールによって復電
時のジョブ実行を行うジョブ実行管理手段とを有するこ
とを特徴とする。
According to a first aspect of the present invention, there is provided an automatic operation control system at the time of power recovery of an information processing apparatus. The priority order of the jobs is determined, and those whose execution has been completed before the power failure are excluded from the priority order, and the scheduled execution end time of each job is calculated for the remaining jobs in the order of the priority order,
A job schedule reconfiguring means for reconfiguring a job execution schedule by excluding a job whose scheduled execution end time exceeds a preregistered end time for each job;
A job execution management unit for executing a job at the time of power recovery according to the reconfigured job execution schedule.

【0007】本発明の第2の情報処理装置の復電時自動
運転制御方式は、本発明の第1の情報処理装置の復電時
自動運転制御方式において、前記各ジョブの優先度は、
ジョブ毎に予め登録された重要度および開始すべき時刻
により決定されることを特徴とする。
A second automatic operation control system at the time of power recovery of the information processing apparatus according to the present invention is the automatic operation control system at the time of power recovery of the first information processing apparatus according to the first embodiment of the present invention.
It is characterized in that it is determined based on the importance registered in advance and the time to start for each job.

【0008】本発明の第3の情報処理装置の復電時自動
運転制御方式は、本発明の第1の情報処理装置の復電時
自動運転制御方式において、前記ジョブスケジュール再
構成手段は、復電時刻とジョブ毎に予め登録された予定
処理時間とを基に各ジョブの実行終了予定時刻を算出す
ることを特徴とする。
[0008] In a third aspect of the present invention, there is provided an automatic operation control system at the time of power recovery of the first information processing apparatus according to the present invention. The present invention is characterized in that a scheduled execution end time of each job is calculated based on the electric time and a scheduled processing time registered in advance for each job.

【0009】本発明の第4の情報処理装置の復電時自動
運転制御方式は、復電時に情報処理装置が起動されたこ
とを判定してジョブスケジュール再構成手段を起動する
復電時起動判定手段と、現在時刻を管理している現在時
刻管理手段と、ジョブ単位に「重要度」、「開始すべき
時刻」、「終了すべき時刻」、「予定処理時間」、「ジ
ョブ名」の情報を予め登録され保持しているジョブ優先
度記憶手段と、前記ジョブ優先度記憶手段に登録された
各ジョブの当日の実行が終了する度に、実行済みのジョ
ブ情報を登録され保持している実行済ジョブ記憶手段
と、復電時に再構成された各ジョブの実行スケジュール
が登録されるスケジュール記憶手段と、前記現在時刻管
理手段から現在の時刻を取得して復電起動時刻を判断す
るとともに、前記ジョブ優先度記憶手段を参照し、「重
要度」の高い順、かつ同じ重要度のジョブが複数登録さ
れている場合は「開始すべき時刻」の早い順に各ジョブ
を抽出し、抽出されたジョブが停電前に実行終了したジ
ョブであるかを前記実行済ジョブ記憶手段を参照して判
断し、実行終了していた場合はスケジュールから排除
し、実行していなかった場合は、抽出された各ジョブの
処理の終了時刻を前記復電起動時刻と各ジョブの「予定
処理時間」とから算出し、算出した終了時刻が各ジョブ
の「終了すべき時刻」より前であればスケジュールに組
み込み、「終了すべき時刻」より後であった場合はスケ
ジュールから排除して、前記抽出された順に実行順序を
付与したスケジュールを再構成し、この再構成した実行
スケジュールを前記スケジュール記憶手段に登録するジ
ョブスケジュール再構成手段と、前記ジョブスケジュー
ル再構成手段から起動されて前記スケジュール記憶手段
から再構成されたジョブの実行スケジュールを取得し、
そのスケジュールに従ってジョブを実行するとともに、
各ジョブの実行が終了する毎に実行済みのジョブ情報を
前記実行済ジョブ記憶手段に登録するジョブ実行管理手
段とを有することを特徴とする。
A fourth power recovery automatic operation control method of the present invention is a power recovery start determination for activating the job schedule restructuring means upon determining that the information processing apparatus has been started upon power recovery. Means, current time management means for managing the current time, and information on "importance", "time to start", "time to end", "scheduled processing time", and "job name" for each job A job priority storage unit that has been registered and held in advance, and an execution unit that has registered and held executed job information every time the execution of each job registered in the job priority storage unit ends on the current day. Completed job storage means, a schedule storage means in which the execution schedule of each job reconfigured at the time of power recovery is registered, and obtaining a current time from the current time management means to determine a power recovery start time, The The job priority is stored in the storage unit, and the jobs are extracted in descending order of “importance”, and in the case of a plurality of registered jobs of the same importance, in descending order of “time to start”. Is determined by referring to the executed job storage unit, and if the job has been completed, it is excluded from the schedule. If the job has not been executed, each extracted job is Is calculated from the power recovery start time and the "scheduled processing time" of each job, and if the calculated end time is earlier than the "time to end" of each job, it is included in the schedule, and the "end" If the time is later than the "time to be performed", the schedule is excluded from the schedule, the schedule to which the execution order is assigned in the extracted order is reconfigured, and the reconfigured execution schedule is stored in the schedule storage unit. A job scheduling reconstruction means for registering the execution schedule of the job that is reconstructed from the schedule storage means is started from said job schedule reconstruction means acquired,
Execute the job according to the schedule,
Job execution management means for registering executed job information in the executed job storage means each time the execution of each job is completed.

【0010】本発明の第5の情報処理装置の復電時自動
運転制御方式は、複数の情報処理装置が連携して復電時
の処理を行う情報処理装置の復電時自動運転制御方式で
あって、第1の情報処理装置に、復電時起動判定手段
と、現在時刻管理手段と、ジョブ優先度記憶手段と、実
行済ジョブ記憶手段と、スケジュール記憶手段と、ジョ
ブスケジュール再構成手段と、ジョブ実行管理手段と
を、他の情報処理装置にジョブ実行管理手段をそれぞれ
有し、前記復電時起動判定手段は、復電時に情報処理装
置が起動されたことを判定して前記ジョブスケジュール
再構成手段を起動し、前記現在時刻管理手段は、現在時
刻を管理し、前記ジョブ優先度記憶手段は、ジョブ単位
に「重要度」、「開始すべき時刻」、「終了すべき時
刻」、「予定処理時間」、「ジョブ名」および「どの情
報処理装置のジョブかを示す情報」を予め登録されて保
持し、前記実行済ジョブ記憶手段は、前記ジョブ優先度
記憶手段に登録された各ジョブの当日の実行が終了する
度に、実行済みのジョブ情報を登録されて保持し、前記
スケジュール記憶手段は、復電時に再構成された各ジョ
ブの実行スケジュールを登録され、前記ジョブスケジュ
ール再構成手段は、前記現在時刻管理手段から現在の時
刻を取得して復電起動時刻を判断するとともに、前記ジ
ョブ優先度記憶手段を参照し、「重要度」の高い順、か
つ同じ重要度のジョブが複数登録されている場合は「開
始すべき時刻」の早い順に各ジョブを抽出し、抽出され
たジョブが停電前に実行終了したジョブであるかを前記
実行済ジョブ記憶手段を参照して判断し、実行終了して
いた場合はスケジュールから排除し、実行していなかっ
た場合は、抽出された各ジョブの処理の終了時刻を前記
復電起動時刻と各ジョブの「予定処理時間」とから各情
報処理装置毎に算出し、算出した終了時刻が各ジョブの
「終了すべき時刻」より前であればスケジュールに組み
込み、「終了すべき時刻」より後であった場合はスケジ
ュールから排除して、前記抽出された順に実行順序を付
与したスケジュールを再構成し、この再構成した実行ス
ケジュールを前記スケジュール記憶手段に登録し、前記
第1の情報処理装置のジョブ実行管理手段は、前記ジョ
ブスケジュール再構成手段から起動されて前記スケジュ
ール記憶手段から再構成されたジョブの実行スケジュー
ルを取得し、取得したジョブが自装置のジョブであった
場合はそのジョブを実行するとともに、各ジョブの実行
が終了する毎に実行済みのジョブ情報を前記実行済ジョ
ブ記憶手段に登録し、取得したジョブが他の情報処理装
置のジョブであった場合は、他の情報処理装置のジョブ
実行管理手段にこのジョブを渡し、前記他の情報処理装
置のジョブ実行管理手段は、前記第1の情報処理装置の
ジョブ実行管理手段から受け取ったジョブを実行すると
ともに、各ジョブの実行が終了する毎に実行済みのジョ
ブ情報を前記実行済ジョブ記憶手段に登録することを特
徴とする。
A fifth power recovery automatic operation control method according to the present invention is a power recovery automatic operation control method for an information processing apparatus in which a plurality of information processing apparatuses cooperate to perform power recovery processing. The first information processing apparatus further includes a power recovery start determination unit, a current time management unit, a job priority storage unit, an executed job storage unit, a schedule storage unit, and a job schedule reconfiguration unit. , A job execution management means, and a job execution management means in each of the other information processing apparatuses, wherein the power recovery start determination means determines that the information processing apparatus has been started at the time of power recovery, and Activating the reconfiguration means, the current time management means manages the current time, the job priority storage means, the job unit "importance", "start time", "end time", "Scheduled processing time" “Job name” and “information indicating which information processing device the job belongs to” are registered and held in advance, and the executed job storage unit stores the execution of each job registered in the job priority storage unit on the current day. Each time the job is completed, the executed job information is registered and held, the schedule storage unit is registered with the execution schedule of each job reconfigured at the time of power recovery, and the job schedule reconfiguration unit is configured to store the current time. When the current time is obtained from the management unit to determine the power recovery start time, and when referring to the job priority storage unit, a plurality of jobs having the same importance are registered in descending order of “importance”. Extracts each job in the order of `` time to start '', and determines whether the extracted job is a job that has been completed before the power failure by referring to the executed job storage unit, If the line has ended, it is excluded from the schedule. If it has not been executed, the end time of the processing of each extracted job is calculated based on the power recovery start time and the "scheduled processing time" of each job. If the calculated end time is before the “time to end” of each job, it is included in the schedule. If the calculated end time is after the “time to end”, the job is excluded from the schedule and extracted. Reconfigures the schedule to which the execution order is assigned in the order in which the schedules have been assigned, registers the reconfigured execution schedule in the schedule storage unit, and executes the job execution management unit of the first information processing apparatus from the job schedule reconfiguration unit. When the execution schedule of the reconfigured job is activated from the schedule storage unit and acquired, and the acquired job is a job of the own apparatus, Each time the job is executed, the executed job information is registered in the executed job storage unit each time the execution of each job is completed. If the acquired job is a job of another information processing apparatus, another This job is passed to the job execution management unit of the information processing device, and the job execution management unit of the other information processing device executes the job received from the job execution management unit of the first information processing device, Each time the execution of a job is completed, information on the executed job is registered in the executed job storage unit.

【0011】本発明の第1の情報処理装置の復電時自動
運転制御方法は、情報処理装置の復電時に、予め登録さ
れた各ジョブの優先度に応じてジョブ毎の優先順位を決
定し、この中から停電前に実行終了済みのものを排除す
るとともに、残りのジョブに対し、前記優先順位順に各
ジョブの実行終了予定時刻を算出し、この実行終了予定
時刻がジョブ毎に予め登録された終了すべき時刻を超え
るジョブを排除してジョブ実行スケジュールを再構成
し、この再構成されたジョブ実行スケジュールによって
復電時のジョブ実行を行うことを特徴とする。
According to the first automatic power recovery operation control method of the information processing apparatus of the present invention, when the information processing apparatus recovers power, the priority of each job is determined in accordance with the priority of each job registered in advance. Among them, the jobs whose execution has been completed before the power failure are excluded, and the scheduled execution end time of each job is calculated for the remaining jobs in the priority order, and the scheduled execution end time is registered in advance for each job. The job execution schedule is reconfigured by excluding the job that exceeds the time to be terminated, and the job execution at the time of power recovery is performed according to the reconfigured job execution schedule.

【0012】本発明の第2の情報処理装置の復電時自動
運転制御方法は、復電により情報処理装置が起動された
復電起動時刻を取得する第1の処理と、ジョブ優先度記
憶手段に予め登録された優先度が最も高いジョブAを選
択し、ジョブ情報(重要度、開始すべき時刻、終了すべ
き時刻、予定処理時間、ジョブ名)を読み取る第2の処
理と、停電前に実行終了したジョブが登録されている実
行済みジョブ記憶手段を検索し、前記第2の処理で読み
取ったジョブAが既に実行されているかどうかを判定す
る第3の処理と、読み取ったジョブAが既に実行されて
いた場合はスケジュールから排除し、優先度が次に高い
ジョブBを選択して情報を読み取る第4の処理と、前記
実行済みジョブ記憶手段を検索し、前記第4の処理で読
み取ったジョブBが既に実行されているかどうかを判定
する第5の処理と、前記ジョブBが実行されていなかっ
た場合は、前記第1の処理で取得した復電起動時刻と予
め登録されたジョブBの予定処理時間とから、ジョブB
の実行終了予定時刻を算出する第6の処理と、前記ジョ
ブBの実行終了予定時刻が予め登録されたジョブBの
「終了すべき時刻」を越えるかを判断する第7の処理
と、前記第7の処理における判断の結果、前記ジョブB
の実行終了予定時刻が「終了すべき時刻」を越える場合
はスケジュールから排除し、「終了すべき時刻」を越え
ない場合はジョブBを実行順序第1位としてスケジュー
ル記憶手段に登録する第8の処理と、前記第8の処理に
引き続き、優先度が高い順にジョブを選択して情報を読
み取り、読み取った各ジョブに対して前記第5〜第8の
処理を登録されているジョブがなくなるまで繰り返し、
前記第8の処理で各ジョブの実行終了予定時刻が「終了
すべき時刻」を越えない場合には、順次実行順序を付し
て前記スケジュール記憶手段に登録する第9の処理と、
前記スケジュール記憶手段に登録された各ジョブの実行
順序に従って各ジョブを実行し、各ジョブの実行終了の
都度実行済み情報を前記実行済ジョブ記憶手段に登録す
る第10の処理と、を有することを特徴とする情報処理
装置の復電時自動運転制御方法。
According to a second automatic power recovery operation control method for an information processing apparatus of the present invention, a first processing for acquiring a power recovery start time at which the information processing apparatus is activated by a power recovery, and a job priority storage means A second process for selecting the job A having the highest priority registered in advance and reading job information (importance, time to start, time to end, scheduled processing time, job name) A third process of searching the executed job storage unit in which the job whose execution has been registered is registered, and determining whether the job A read in the second process is already executed; If the job has been executed, the job is excluded from the schedule, a job B having the next highest priority is selected and information is read, and the executed job storage unit is searched and read in the fourth process. Job B Fifth processing for determining whether or not job B has already been executed, and when the job B has not been executed, the power recovery start time acquired in the first processing and the scheduled processing time for job B registered in advance From, Job B
A sixth process of calculating a scheduled execution end time of the job B; a seventh process of determining whether the scheduled execution end time of the job B exceeds a “time to be completed” of the job B registered in advance; 7, the job B
If the scheduled execution end time exceeds the “time to end”, the job B is excluded from the schedule. If the scheduled end time does not exceed the “time to end”, the job B is registered in the schedule storage unit as the first in the execution order. After the processing and the eighth processing, the jobs are selected in descending order of priority, the information is read, and the fifth to eighth processing is repeated for each read job until there is no registered job. ,
In the case where the scheduled execution end time of each job does not exceed the “time to end” in the eighth process, a ninth process of sequentially assigning an execution order and registering it in the schedule storage unit;
And a tenth process of executing each job in accordance with the execution order of each job registered in the schedule storage unit, and registering executed information in the executed job storage unit each time execution of each job is completed. An automatic operation control method at the time of power recovery of an information processing apparatus.

【0013】本発明の第1の記録媒体は、本発明の第4
または第5の情報処理装置の復電時自動運転制御方式と
してコンピュータを機能させる自動運転制御プログラム
を記録したことを特徴とする。
The first recording medium of the present invention is the fourth recording medium of the present invention.
Alternatively, an automatic operation control program for causing a computer to function as a power recovery automatic operation control method of the fifth information processing apparatus is recorded.

【0014】本発明の第2の記録媒体は、本発明の第1
または第2の情報処理装置の復電時自動運転制御方法を
コンピュータに実行させる自動運転制御プログラムを記
録したことを特徴とする。
The second recording medium of the present invention is the first recording medium of the present invention.
Alternatively, an automatic operation control program for causing a computer to execute the automatic operation control method at the time of power recovery of the second information processing apparatus is recorded.

【0015】[0015]

【発明の実施の形態】本発明の実施の形態について図面
を参照して説明する。
Embodiments of the present invention will be described with reference to the drawings.

【0016】図1は本発明の一実施の形態の構成を示す
ブロック図である。また、図2は図1のジョブ優先度記
憶部41に記憶される情報の一例を示す図であり、図3
は図1の実行済ジョブ記憶部42に記憶される情報の一
例を示す図であり、図4は図1のスケジュール記憶部4
3に記憶される情報の一例を示す図である。
FIG. 1 is a block diagram showing the configuration of an embodiment of the present invention. FIG. 2 is a diagram showing an example of information stored in the job priority storage unit 41 of FIG.
FIG. 4 is a diagram illustrating an example of information stored in the executed job storage unit 42 in FIG. 1, and FIG. 4 is a diagram illustrating the schedule storage unit 4 in FIG.
FIG. 3 is a diagram showing an example of information stored in No. 3;

【0017】図1を参照すると、本発明の情報処理装置
の復電時自動運転制御方式は、復電時に情報処理装置が
起動されたかを判定する復電時起動判定部1と、プログ
ラム制御により動作する制御部2と、現在時刻を管理し
ている現在時刻管理部3と、情報を記憶する記憶部4と
を含む。
Referring to FIG. 1, the power recovery automatic operation control method of the information processing apparatus according to the present invention includes a power recovery start determination unit 1 for determining whether the information processing apparatus has been started at the time of power recovery, and program control. It includes a control unit 2 that operates, a current time management unit 3 that manages the current time, and a storage unit 4 that stores information.

【0018】記憶部4は、ジョブ優先度記憶部41と実
行済ジョブ記憶部42とスケジュール記憶部43とを備
えている。
The storage unit 4 includes a job priority storage unit 41, an executed job storage unit 42, and a schedule storage unit 43.

【0019】ジョブ優先度記憶部41では、図2に示さ
れるように、ジョブ単位に「重要度」、「開始すべき時
刻」、「終了すべき時刻」、「予定処理時間」、「ジョ
ブ名」の情報を予め登録され保持している。なお、「重
要度」は高,低で分けているが、高,中,低でわけても
よいし、さらに細分化しても構わない。
As shown in FIG. 2, in the job priority storage section 41, "importance", "time to start", "time to end", "scheduled processing time", "job name" Is registered and held in advance. Note that the “importance” is classified into high and low, but may be divided into high, medium, and low, or may be further subdivided.

【0020】実行済ジョブ記憶部42では、図3に示さ
れるように、ジョブ優先度記憶部41に登録された各ジ
ョブの当日の実行が終了する度に、実行済みのジョブを
登録され保持している。なお、当日の定義としては例え
ば日が変わる0時以降とし、毎日0時に実行済ジョブ記
憶部42を初期化して登録されていた情報を削除するも
のとする。これにより、復電時に実行済ジョブ記憶部4
2を参照すると、停電時までに終了した当日のジョブが
判明することになる。
As shown in FIG. 3, each time the execution of each job registered in the job priority storage unit 41 is completed on the current day, the executed job storage unit 42 registers and stores the executed job. ing. The definition of the day is, for example, after 0:00 when the day changes, and the registered information is deleted by initializing the executed job storage unit 42 at 0:00 every day. As a result, when the power is restored, the executed job storage unit 4
Referring to FIG. 2, the job of the day completed by the time of the power failure will be identified.

【0021】スケジュール記憶部43は、図4に示され
るように、再構成された各ジョブの実行スケジュール
が、ジョブ名と実行順序の情報として登録される。
As shown in FIG. 4, the schedule storage section 43 registers the execution schedule of each reconstructed job as information on the job name and the execution order.

【0022】制御部2は、ジョブスケジュール再構成部
21とジョブ実行管理部22とを備えている。
The control unit 2 includes a job schedule reconfiguration unit 21 and a job execution management unit 22.

【0023】ジョブスケジュール再構成部21は、復電
時起動判定部1から復電時の情報処理装置の起動を受信
することにより動作を開始するとともに、現在時刻管理
部3から現在の時刻を取得し復電起動時刻を判断する。
また、ジョブ優先度記憶部41から、ジョブ毎の「重要
度」、「開始すべき時刻」等の情報を読み出し、実行済
ジョブ記憶部42から停電前に実行したジョブの情報を
取得して実行不要なジョブとみなしスケジュールから排
除して、復電時の優先度に応じたジョブスケジュールを
再構成する。そして、再構成したジョブスケジュールを
スケジュール記憶部43に登録する。なお、ジョブの優
先度は、ジョブ優先度記憶部41に登録されている「重
要度」が高,中,低の順に高く、同じ重要度のジョブが
複数ある場合は「開始すべき時刻」が0時を起点として
より早い方が高い優先度を有するものとする。
The job schedule reconfiguring unit 21 starts operation by receiving the activation of the information processing apparatus at the time of power recovery from the power recovery start determining unit 1 and acquires the current time from the current time management unit 3. Then, the power recovery start time is determined.
Further, information such as “importance” and “time to start” for each job is read from the job priority storage unit 41, and information on the job executed before the power failure is acquired from the executed job storage unit 42 and executed. The job is deemed unnecessary and excluded from the schedule, and the job schedule is reconfigured according to the priority at the time of power recovery. Then, the reconfigured job schedule is registered in the schedule storage unit 43. Note that the priority of a job is such that “importance” registered in the job priority storage unit 41 is higher in the order of high, middle, and low. If there are a plurality of jobs of the same importance, “time to start” is It is assumed that earlier ones starting from 0:00 have higher priority.

【0024】ジョブ実行管理部22は、スケジュール記
憶部43から再構成された実行ジョブのスケジュールを
取得し、そのスケジュールに従ってジョブを実行する。
ジョブの実行が完了する毎に完了したジョブ情報を実行
済ジョブ記憶部42に登録する。
The job execution management unit 22 obtains the reconfigured execution job schedule from the schedule storage unit 43 and executes the job according to the schedule.
Each time the execution of the job is completed, the completed job information is registered in the executed job storage unit 42.

【0025】次に、本発明の一実施の形態の動作につい
て図1〜図5を参照して説明する。図5は、本発明の一
実施の形態の動作を示すフローチャートである。
Next, the operation of the embodiment of the present invention will be described with reference to FIGS. FIG. 5 is a flowchart showing the operation of the embodiment of the present invention.

【0026】まず、復電したことにより復電時起動判定
部1から起動された制御部2のジョブスケジュール再構
成部21は、起動された時刻を現在時刻管理部3から取
得する(図5のステップA1)。
First, the job schedule reconfiguring unit 21 of the control unit 2 started by the power recovery start determination unit 1 due to the power recovery acquires the start time from the current time management unit 3 (FIG. 5). Step A1).

【0027】次に、ジョブスケジュール再構成部21
は、図2のジョブ優先度記憶部41に記憶されたジョブ
情報があることを確認し(ステップA2)、ジョブ優先
度記憶部41から優先度が最も高いジョブ(図2におい
て、「重要度」が高く、かつ「開始すべき時刻」が最も
早いジョブ)を選択して情報(重要度、開始すべき時
刻、終了すべき時刻、予定処理時間、ジョブ名)を読み
取る。図2のケースでは、「重要度」が高で「開始すべ
き時刻」が最も早い0:30であるジョブAが選択さ
れ、その情報が読み取られる(ステップA3)。
Next, the job schedule reconstruction unit 21
Confirms that there is job information stored in the job priority storage unit 41 of FIG. 2 (step A2), and stores the job with the highest priority (“importance” in FIG. 2) from the job priority storage unit 41. And the information (importance, time to start, time to end, scheduled processing time, job name) is read. In the case of FIG. 2, job A whose “importance” is high and “start time” is the earliest 0:30 is selected, and its information is read (step A3).

【0028】次に、ジョブスケジュール再構成部21は
実行済みジョブ記憶部42を検索して、読み取ったジョ
ブが既に実行されているかどうかを判定する(ステップ
A4→ステップA5)。
Next, the job schedule reconstruction unit 21 searches the executed job storage unit 42 to determine whether the read job has already been executed (step A4 → step A5).

【0029】ここで、図3を参照すると、実行済みジョ
ブ記憶部42にはジョブAが実行済みとして記憶されて
いるため、ステップA5からステップA2に戻る(ステ
ップA5→ステップA2)。
Referring to FIG. 3, since the job A has been stored in the completed job storage section 42, the process returns from step A5 to step A2 (step A5 → step A2).

【0030】ステップA2に戻り、ジョブスケジュール
再構成部21はジョブ優先度記憶部41に記憶されたジ
ョブ情報がまだあることを確認し、ジョブ優先度記憶部
41から優先度が次に高いジョブを選択して情報を読み
取る。図2のケースでは、「重要度」が高で「開始すべ
き時刻」が次に早い0:40であるジョブBが選択さ
れ、その情報が読み取られる(ステップA3)。
Returning to step A2, the job schedule restructuring unit 21 confirms that there is still job information stored in the job priority storage unit 41, and retrieves the next highest priority job from the job priority storage unit 41. Select and read information. In the case of FIG. 2, the job B whose “importance” is high and the “time to start” is 0:40, which is the next earliest, is selected and its information is read (step A3).

【0031】この後、ジョブスケジュール再構成部21
は実行済みジョブ記憶部42を検索し、ジョブAが実行
済みであることを読み取るが、ジョブBは実行済みでは
ないためステップA6に進む(ステップA4→ステップ
A5)。
Thereafter, the job schedule reconstruction unit 21
Searches the executed job storage unit 42 and reads that job A has been executed, but proceeds to step A6 because job B has not been executed (step A4 → step A5).

【0032】ステップA6においては、ジョブスケジュ
ール再構成部21は、ジョブBの予定処理時間が10分
という情報を合計ジョブ処理時間として認識し、これと
ステップA1で現在時刻管理部3から取得した起動され
た時刻とから実行終了時刻を計算する。例えば、復電し
起動された時刻が5時30分であったとすると、実行終
了時刻は5:30に合計ジョブ処理時間の10分を加え
た5:40となる(ステップA6)。
In step A6, the job schedule restructuring unit 21 recognizes the information that the scheduled processing time of the job B is 10 minutes as the total job processing time. Calculate the execution end time from the calculated time. For example, assuming that the time when the power is restored and started is 5:30, the execution end time is 5:40 obtained by adding 10 minutes of the total job processing time to 5:30 (step A6).

【0033】ジョブスケジュール再構成部21は、ステ
ップA6で計算した実行終了時刻がジョブBの「終了す
べき時刻」である6:00を越えるかを判断する。この
場合5:40はジョブBの「終了すべき時刻」である
6:00前であるため実行可能となり、ジョブスケジュ
ール再構成部21は、図4に示すようにジョブBを実行
順序1としてスケジュール記憶部43に登録する(ステ
ップA7→ステップA8)。
The job schedule restructuring unit 21 determines whether the execution end time calculated in step A6 exceeds 6:00, which is the “time to end” of job B. In this case, since 5:40 is before 6:00 which is the “time to end” of the job B, the job B can be executed, and the job schedule restructuring unit 21 sets the job B as the execution order 1 as shown in FIG. It is registered in the storage unit 43 (step A7 → step A8).

【0034】ステップA8からステップA2に戻り、ジ
ョブスケジュール再構成部21は再びステップA2〜ス
テップA8の動作を繰り返す。今度は、ジョブBの次に
優先度が高いジョブCを選択してその情報を読み取り、
実行終了時刻が5:45(復電起動時刻5:30+ジョ
ブB,Cの合計ジョブ処理時間15分)となることを計
算し、ジョブCの「終了すべき時刻」である22:00
前に実行終了可能であることを確認して、図4に示すよ
うにジョブCを実行順序2としてスケジュール記憶部4
3に登録する(ステップA2〜ステップA8)。
Returning from step A8 to step A2, the job schedule restructuring section 21 repeats the operations of steps A2 to A8 again. This time, the job C having the highest priority next to the job B is selected and its information is read.
It is calculated that the execution end time is 5:45 (power recovery start time 5: 30 + total job processing time of jobs B and C 15 minutes), and 22:00 which is “time to end” of job C
Before confirming that the execution can be ended, as shown in FIG.
3 (step A2 to step A8).

【0035】この後さらにステップA8からステップA
2に戻り、次の優先度であるジョブDを選択してその情
報を読み取る。ジョブDの実行終了時刻が6:15(復
電起動時刻5:30+ジョブB,C,Dの合計ジョブ処
理時間45分)となることを計算し、これがジョブDの
「終了すべき時刻」である6:00を越えるため、スケ
ジュール記憶部43に登録せず、ステップA7からステ
ップA2に戻る(ステップA2〜ステップA7)。
Thereafter, steps A8 to A
Returning to step 2, the next priority job D is selected and its information is read. It is calculated that the execution end time of job D is 6:15 (power recovery start time 5: 30 + total job processing time of jobs B, C, and 45 minutes), which is the “time to end” of job D. Since the time exceeds a certain 6:00, the process returns to step A2 from step A7 without registering in the schedule storage unit 43 (step A2 to step A7).

【0036】ステップA7からステップA2に戻り、ジ
ョブスケジュール再構成部21は、ジョブ優先度記憶部
41にもう残りのジョブ情報がないことを確認し、ジョ
ブ実行管理部22を起動する。ジョブ実行管理部22
は、スケジュール記憶部43に登録されたジョブの実行
順序に従って各ジョブを実行し、実行済ジョブ記憶部4
2に各ジョブの実行終了の都度実行済み情報を登録する
(ステップA2→ステップA9)。
Returning from step A7 to step A2, the job schedule reconstruction unit 21 confirms that there is no more remaining job information in the job priority storage unit 41, and activates the job execution management unit 22. Job execution management unit 22
Executes each job according to the execution order of the jobs registered in the schedule storage unit 43, and executes the executed job storage unit 4
In step A2, the executed information is registered each time the execution of each job is completed (step A2 → step A9).

【0037】なお、復電時に上述した本発明の復電時自
動運転制御方式の動作が終了すれば、通常の運転制御に
移る。すなわち、ジョブ実行管理部22は、今度はジョ
ブ優先度記憶部41に登録された「開始すべき時刻」に
基いて各ジョブの実行を行うとともに、実行済ジョブ記
憶部42に各ジョブの実行終了の都度実行済み情報を登
録する。
When the above-described operation of the automatic operation control system at the time of power recovery according to the present invention is completed at the time of power recovery, normal operation control is started. That is, the job execution management unit 22 executes each job based on the “time to start” registered in the job priority storage unit 41, and stores the execution end of each job in the executed job storage unit 42. Register the executed information each time.

【0038】以上の説明においては、情報処理装置が一
つの場合について説明したが、情報処理装置が複数存在
する場合にも本発明は適用可能である。情報処理装置が
複数存在する場合について、図6を参照して説明する。
図6は、本発明を複数の情報処理装置に適用した場合の
構成の一例を示すブロック図である。
In the above description, the case where there is one information processing device has been described. However, the present invention can be applied to a case where there are a plurality of information processing devices. A case where there are a plurality of information processing apparatuses will be described with reference to FIG.
FIG. 6 is a block diagram illustrating an example of a configuration when the present invention is applied to a plurality of information processing apparatuses.

【0039】図6を参照すると、情報処理装置5,6の
二つの情報処理装置が含まれている。情報処理装置5
は、図1の情報処理装置と同じ構成であり、制御部2,
記憶部4と、図示していない図1の復電時起動判定部
1,現在時刻管理部3とを備えている。情報処理装置5
の記憶部4において、図1による上記説明と異なる点
は、各ジョブがどの情報処理装置のジョブかを示す情報
とともに登録されている点である。もう一つの情報処理
装置6は、制御部2Aにジョブ実行管理部22Aを備え
ている。
Referring to FIG. 6, two information processing apparatuses, information processing apparatuses 5 and 6, are included. Information processing device 5
Has the same configuration as the information processing apparatus of FIG.
The storage unit 4 includes a power recovery start determination unit 1 and a current time management unit 3 (not shown) shown in FIG. Information processing device 5
Is different from the above description with reference to FIG. 1 in that each job is registered together with information indicating which information processing apparatus the job belongs to. Another information processing device 6 includes a job execution management unit 22A in the control unit 2A.

【0040】このような構成において、情報処理装置5
のジョブスケジュール再構成部21は、復電時のシステ
ムの起動を判定した図示していない復電時起動判定部1
から起動され、図2のステップA2〜ステップA8の動
作を行う。このとき、図1による上記説明と異なる点
は、各情報処理装置毎にジョブの実行終了時刻の計算を
行うことである。そして、再構成されたジョブの実行ス
ケジュールがスケジュール記憶部43に登録された後の
ジョブの実行の段階においては、情報処理装置5のジョ
ブ実行管理部22が、スケジュール記憶部43からジョ
ブを実行順序に従って読み取り、実行する。このとき、
図1による上記説明と異なる点は、情報処理装置5のジ
ョブ実行管理部22が読み取ったジョブが他の情報処理
装置のジョブであった場合、情報処理装置5のジョブ実
行管理部22から情報処理装置6の制御部2Aのジョブ
実行管理部22Aにこのジョブを渡し、情報処理装置6
のジョブ実行管理部22Aが実行を行う点である。そし
て、情報処理装置6のジョブ実行管理部22Aは、ジョ
ブの実行が終了すると、情報処理装置5の実行済ジョブ
記憶部42に実行終了を登録する。
In such a configuration, the information processing device 5
The job schedule reconfiguration unit 21 of the power recovery start determination unit 1 (not shown) that has determined the system startup at the time of power recovery.
And performs the operations of steps A2 to A8 in FIG. At this time, the difference from the above description with reference to FIG. 1 is that the execution end time of the job is calculated for each information processing apparatus. Then, in the stage of executing the job after the execution schedule of the reconfigured job is registered in the schedule storage unit 43, the job execution management unit 22 of the information processing apparatus 5 executes the job execution order from the schedule storage unit 43. Read and execute according to At this time,
1 is that if the job read by the job execution management unit 22 of the information processing device 5 is a job of another information processing device, the job execution management unit 22 of the information processing device 5 This job is passed to the job execution management unit 22A of the control unit 2A of the device 6, and the information processing device 6
Is that the job execution management unit 22A executes the job execution. Then, when the execution of the job ends, the job execution management unit 22A of the information processing device 6 registers the execution end in the executed job storage unit 42 of the information processing device 5.

【0041】このようにして、情報処理装置が二つある
場合にも本発明が適用できる。また、情報処理装置は一
つまたは二つに限定されず、三つ以上であってもよい。
As described above, the present invention can be applied to a case where there are two information processing apparatuses. Further, the number of information processing devices is not limited to one or two, and may be three or more.

【0042】次に、本発明の他の実施の形態について図
面を参照して詳細に説明する。
Next, another embodiment of the present invention will be described in detail with reference to the drawings.

【0043】図7は、本発明の他の実施の形態の構成を
示すブロック図であり、コンピュータ7と、記録媒体8
とから構成される。コンピュータ7の構成は、本発明の
一実施の形態で説明した図1または図6の制御部2と基
本的に同じである。記録媒体8は、自動運転制御プログ
ラムを記録している。この記録媒体8は、磁気ディス
ク,光記録ディスク,半導体メモリその他の記録媒体で
あってもよい。自動運転制御プログラムは、記録媒体8
からコンピュータ7に読み込まれ、本発明の一実施の形
態と同様の動作を制御する。
FIG. 7 is a block diagram showing a configuration of another embodiment of the present invention.
It is composed of The configuration of the computer 7 is basically the same as the control unit 2 of FIG. 1 or 6 described in the embodiment of the present invention. The recording medium 8 records an automatic operation control program. The recording medium 8 may be a magnetic disk, an optical recording disk, a semiconductor memory, or another recording medium. The automatic operation control program stores the recording medium 8
From the computer 7 to control the same operation as in the embodiment of the present invention.

【0044】[0044]

【発明の効果】本発明は、ジョブ優先度記憶部に各ジョ
ブの「重要度」と「開始すべき時刻」からなる優先度情
報等を登録しておき、復電時にその時点における各ジョ
ブの優先度を判定し、再構成したジョブスケジュールを
作成して実行するようにしたため、復電時点で実行すべ
き最適なジョブスケジュールによるジョブ実行が可能に
なるという効果がある。
According to the present invention, priority information and the like including "importance" and "time to start" of each job are registered in the job priority storage unit, and when the power is restored, each job at the time is restored. Since the priority is determined, and the reconfigured job schedule is created and executed, there is an effect that the job can be executed according to the optimum job schedule to be executed at the time of power recovery.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施の形態の構成を示すブロック図
である。
FIG. 1 is a block diagram showing a configuration of an embodiment of the present invention.

【図2】図1のジョブ優先度記憶部41に記憶される情
報の一例を示す図である。
FIG. 2 is a diagram showing an example of information stored in a job priority storage unit 41 of FIG.

【図3】図1の実行済ジョブ記憶部42に記憶される情
報の一例を示す図である。
FIG. 3 is a diagram illustrating an example of information stored in an executed job storage unit 42 of FIG. 1;

【図4】図1のスケジュール記憶部43に記憶される情
報の一例を示す図である。
FIG. 4 is a diagram showing an example of information stored in a schedule storage unit 43 of FIG.

【図5】本発明の一実施の形態の動作を示すフローチャ
ートである。
FIG. 5 is a flowchart showing the operation of the embodiment of the present invention.

【図6】本発明を複数の情報処理装置に適用した場合の
構成の一例を示すブロック図である。
FIG. 6 is a block diagram illustrating an example of a configuration when the present invention is applied to a plurality of information processing apparatuses.

【図7】本発明の他の実施の形態の構成を示すブロック
図である。
FIG. 7 is a block diagram showing a configuration of another embodiment of the present invention.

【符号の説明】[Explanation of symbols]

1 復電時起動判定部 2,2A 制御部 21 ジョブスケジュール再構成部 22,22A ジョブ実行管理部 3 現在時刻管理部 4 記憶部 41 ジョブ優先度記憶部 42 実行済ジョブ記憶部 43 スケジュール記憶部 5,6 情報処理装置 7 コンピュータ 8 記録媒体 DESCRIPTION OF REFERENCE NUMERALS 1 power recovery start determination unit 2, 2A control unit 21 job schedule reconfiguration unit 22, 22A job execution management unit 3 current time management unit 4 storage unit 41 job priority storage unit 42 executed job storage unit 43 schedule storage unit 5 , 6 Information processing device 7 Computer 8 Recording medium

Claims (9)

【特許請求の範囲】[Claims] 【請求項1】 情報処理装置の復電時に、予め登録され
た各ジョブの優先度に応じてジョブ毎の優先順位を判断
し、この中から停電前に実行終了済みのものを排除する
とともに、残りのジョブに対し、前記優先順位順に各ジ
ョブの実行終了予定時刻を算出し、この実行終了予定時
刻がジョブ毎に予め登録された終了すべき時刻を超える
ジョブを排除してジョブ実行スケジュールを再構成する
ジョブスケジュール再構成手段と、前記再構成されたジ
ョブ実行スケジュールによって復電時のジョブ実行を行
うジョブ実行管理手段とを有することを特徴とする情報
処理装置の復電時自動運転制御方式。
At the time of power recovery of an information processing apparatus, priority of each job is determined in accordance with the priority of each job registered in advance, and a job whose execution has been completed before a power failure is excluded from the priority order. For the remaining jobs, the scheduled execution end time of each job is calculated in the order of the priority, and the job execution schedule is re-executed by excluding the jobs whose scheduled execution end time exceeds the end time registered in advance for each job. A power recovery automatic operation control method for an information processing apparatus, comprising: a job schedule reconfiguration unit to be configured; and a job execution management unit that executes a job at the time of power recovery according to the reconfigured job execution schedule.
【請求項2】 前記各ジョブの優先度は、ジョブ毎に予
め登録された重要度および開始すべき時刻により決定さ
れることを特徴とする請求項1記載の情報処理装置の復
電時自動運転制御方式。
2. The automatic operation at the time of power recovery of the information processing apparatus according to claim 1, wherein the priority of each job is determined by the importance registered in advance for each job and the time to start. control method.
【請求項3】 前記ジョブスケジュール再構成手段は、
復電時刻とジョブ毎に予め登録された予定処理時間とを
基に各ジョブの実行終了予定時刻を算出することを特徴
とする請求項1記載の情報処理装置の復電時自動運転制
御方式。
3. The job schedule reconstructing means,
2. The power recovery automatic operation control method for an information processing apparatus according to claim 1, wherein a scheduled execution end time of each job is calculated based on the power recovery time and a scheduled processing time registered in advance for each job.
【請求項4】 復電時に情報処理装置が起動されたこと
を判定してジョブスケジュール再構成手段を起動する復
電時起動判定手段と、 現在時刻を管理している現在時刻管理手段と、 ジョブ単位に「重要度」、「開始すべき時刻」、「終了
すべき時刻」、「予定処理時間」、「ジョブ名」の情報
を予め登録され保持しているジョブ優先度記憶手段と、 前記ジョブ優先度記憶手段に登録された各ジョブの当日
の実行が終了する度に、実行済みのジョブ情報を登録さ
れ保持している実行済ジョブ記憶手段と、 復電時に再構成された各ジョブの実行スケジュールが登
録されるスケジュール記憶手段と、 前記現在時刻管理手段から現在の時刻を取得して復電起
動時刻を判断するとともに、前記ジョブ優先度記憶手段
を参照し、「重要度」の高い順、かつ同じ重要度のジョ
ブが複数登録されている場合は「開始すべき時刻」の早
い順に各ジョブを抽出し、抽出されたジョブが停電前に
実行終了したジョブであるかを前記実行済ジョブ記憶手
段を参照して判断し、実行終了していた場合はスケジュ
ールから排除し、実行していなかった場合は、抽出され
た各ジョブの処理の終了時刻を前記復電起動時刻と各ジ
ョブの「予定処理時間」とから算出し、算出した終了時
刻が各ジョブの「終了すべき時刻」より前であればスケ
ジュールに組み込み、「終了すべき時刻」より後であっ
た場合はスケジュールから排除して、前記抽出された順
に実行順序を付与したスケジュールを再構成し、この再
構成した実行スケジュールを前記スケジュール記憶手段
に登録するジョブスケジュール再構成手段と、 前記ジョブスケジュール再構成手段から起動されて前記
スケジュール記憶手段から再構成されたジョブの実行ス
ケジュールを取得し、そのスケジュールに従ってジョブ
を実行するとともに、各ジョブの実行が終了する毎に実
行済みのジョブ情報を前記実行済ジョブ記憶手段に登録
するジョブ実行管理手段とを有することを特徴とする情
報処理装置の復電時自動運転制御方式。
4. A power recovery start determining means for determining that the information processing apparatus has been started at the time of power recovery and activating a job schedule reconfiguring means; a current time managing means for managing a current time; A job priority storage unit in which information of “importance”, “time to start”, “time to end”, “scheduled processing time”, and “job name” is registered and held in advance; Each time the execution of each job registered in the priority storage unit on the current day ends, an executed job storage unit that registers and holds executed job information, and executes each job reconfigured when the power is restored A schedule storage unit in which a schedule is registered; a current time is obtained from the current time management unit to determine a power recovery start time; and by referring to the job priority storage unit, the order of “importance” is high, Or When a plurality of jobs having the same importance are registered, each job is extracted in ascending order of “time to start”, and the executed job storage unit determines whether the extracted job is a job that has been completed before the power failure. If the job has been completed, the job is excluded from the schedule. If the job has not been executed, the processing end time of each extracted job is set to the power recovery start time and the “scheduled process” of each job. If the calculated end time is before the “time to end” of each job, it is included in the schedule, and if it is after the “time to end”, it is excluded from the schedule. A job schedule reconfiguring means for reconfiguring a schedule with an execution order given in the extracted order, and registering the reconfigured execution schedule in the schedule storage means; A job execution schedule of the reconfigured job started from the schedule storage restructuring means and obtained from the schedule storage means, and the job is executed according to the schedule. A power recovery automatic operation control method for an information processing apparatus, comprising: a job execution management means for registering in the executed job storage means.
【請求項5】 複数の情報処理装置が連携して復電時の
処理を行う情報処理装置の復電時自動運転制御方式であ
って、 第1の情報処理装置に、復電時起動判定手段と、現在時
刻管理手段と、ジョブ優先度記憶手段と、実行済ジョブ
記憶手段と、スケジュール記憶手段と、ジョブスケジュ
ール再構成手段と、ジョブ実行管理手段とを、他の情報
処理装置にジョブ実行管理手段をそれぞれ有し、 前記復電時起動判定手段は、復電時に情報処理装置が起
動されたことを判定して前記ジョブスケジュール再構成
手段を起動し、 前記現在時刻管理手段は、現在時刻を管理し、 前記ジョブ優先度記憶手段は、ジョブ単位に「重要
度」、「開始すべき時刻」、「終了すべき時刻」、「予
定処理時間」、「ジョブ名」および「どの情報処理装置
のジョブかを示す情報」を予め登録されて保持し、 前記実行済ジョブ記憶手段は、前記ジョブ優先度記憶手
段に登録された各ジョブの当日の実行が終了する度に、
実行済みのジョブ情報を登録されて保持し、 前記スケジュール記憶手段は、復電時に再構成された各
ジョブの実行スケジュールを登録され、 前記ジョブスケジュール再構成手段は、前記現在時刻管
理手段から現在の時刻を取得して復電起動時刻を判断す
るとともに、前記ジョブ優先度記憶手段を参照し、「重
要度」の高い順、かつ同じ重要度のジョブが複数登録さ
れている場合は「開始すべき時刻」の早い順に各ジョブ
を抽出し、抽出されたジョブが停電前に実行終了したジ
ョブであるかを前記実行済ジョブ記憶手段を参照して判
断し、実行終了していた場合はスケジュールから排除
し、実行していなかった場合は、抽出された各ジョブの
処理の終了時刻を前記復電起動時刻と各ジョブの「予定
処理時間」とから各情報処理装置毎に算出し、算出した
終了時刻が各ジョブの「終了すべき時刻」より前であれ
ばスケジュールに組み込み、「終了すべき時刻」より後
であった場合はスケジュールから排除して、前記抽出さ
れた順に実行順序を付与したスケジュールを再構成し、
この再構成した実行スケジュールを前記スケジュール記
憶手段に登録し、 前記第1の情報処理装置のジョブ実行管理手段は、前記
ジョブスケジュール再構成手段から起動されて前記スケ
ジュール記憶手段から再構成されたジョブの実行スケジ
ュールを取得し、取得したジョブが自装置のジョブであ
った場合はそのジョブを実行するとともに、各ジョブの
実行が終了する毎に実行済みのジョブ情報を前記実行済
ジョブ記憶手段に登録し、取得したジョブが他の情報処
理装置のジョブであった場合は、他の情報処理装置のジ
ョブ実行管理手段にこのジョブを渡し、 前記他の情報処理装置のジョブ実行管理手段は、前記第
1の情報処理装置のジョブ実行管理手段から受け取った
ジョブを実行するとともに、各ジョブの実行が終了する
毎に実行済みのジョブ情報を前記実行済ジョブ記憶手段
に登録することを特徴とする情報処理装置の復電時自動
運転制御方式。
5. A power recovery automatic driving control method for an information processing apparatus in which a plurality of information processing apparatuses cooperate to perform a power recovery process, wherein the first information processing apparatus includes a power recovery start determination unit. A current time management unit, a job priority storage unit, an executed job storage unit, a schedule storage unit, a job schedule reconfiguration unit, and a job execution management unit. The power recovery start determination means determines that the information processing apparatus has been started at the time of power recovery, starts the job schedule reconfiguration means, and the current time management means The job priority storage unit manages the “importance”, “time to start”, “time to end”, “scheduled processing time”, “job name”, and “ Job or And held is registered in advance to information ", the execution completion job storing means, every time the job priority day of execution of each job registered in the storage means is completed,
Registered and held executed job information, The schedule storage unit is registered with an execution schedule of each job reconfigured at the time of power recovery, The job schedule reconfiguration unit is configured to store the current schedule from the current time management unit. The power recovery start time is determined by acquiring the time, and the job priority storage unit is referred to, and if a plurality of jobs having the same importance and having the same importance are registered in plurals, the job should be started. Each job is extracted in ascending order of “time”, and it is determined by referring to the executed job storage unit whether the extracted job has been completed before the power failure, and if the execution has been completed, it is excluded from the schedule. If the job has not been executed, the end time of the processing of each extracted job is calculated for each information processing apparatus from the power recovery start time and the “scheduled processing time” of each job. If the calculated end time is before the “time to end” for each job, it is included in the schedule, and if it is after the “time to end”, it is excluded from the schedule, and the execution order is changed in the extracted order. Reconfigure the assigned schedule,
The reconfigured execution schedule is registered in the schedule storage unit, and the job execution management unit of the first information processing apparatus is configured to execute the job executed by the job schedule reconfiguration unit and reconfigured from the schedule storage unit. An execution schedule is acquired, and when the acquired job is a job of the own apparatus, the job is executed, and the executed job information is registered in the executed job storage unit each time the execution of each job is completed. If the acquired job is a job of another information processing device, the job is passed to a job execution management unit of another information processing device, and the job execution management unit of the other information processing device Executes the jobs received from the job execution management unit of the information processing device of each of the above, and has executed each time the execution of each job is completed. Power recovery automatic operation control method of an information processing apparatus and registers the job information to the Executed job storage unit.
【請求項6】 情報処理装置の復電時に、予め登録され
た各ジョブの優先度に応じてジョブ毎の優先順位を決定
し、この中から停電前に実行終了済みのものを排除する
とともに、残りのジョブに対し、前記優先順位順に各ジ
ョブの実行終了予定時刻を算出し、この実行終了予定時
刻がジョブ毎に予め登録された終了すべき時刻を超える
ジョブを排除してジョブ実行スケジュールを再構成し、
この再構成されたジョブ実行スケジュールによって復電
時のジョブ実行を行うことを特徴とする情報処理装置の
復電時自動運転制御方法。
6. When the power of the information processing apparatus is restored, a priority order for each job is determined in accordance with the priority of each job registered in advance, and a job whose execution has been terminated before the power failure is excluded from the priority order. For the remaining jobs, the scheduled execution end time of each job is calculated in the order of the priority, and the job execution schedule is re-executed by excluding the jobs whose scheduled execution end time exceeds the end time registered in advance for each job. Make up,
A power recovery automatic operation control method for an information processing apparatus, wherein a job is executed at the time of power recovery according to the reconfigured job execution schedule.
【請求項7】 復電により情報処理装置が起動された復
電起動時刻を取得する第1の処理と、 ジョブ優先度記憶手段に予め登録された優先度が最も高
いジョブAを選択し、ジョブ情報(重要度、開始すべき
時刻、終了すべき時刻、予定処理時間、ジョブ名)を読
み取る第2の処理と、 停電前に実行終了したジョブが登録されている実行済み
ジョブ記憶手段を検索し、前記第2の処理で読み取った
ジョブAが既に実行されているかどうかを判定する第3
の処理と、 読み取ったジョブAが既に実行されていた場合はスケジ
ュールから排除し、優先度が次に高いジョブBを選択し
て情報を読み取る第4の処理と、 前記実行済みジョブ記憶手段を検索し、前記第4の処理
で読み取ったジョブBが既に実行されているかどうかを
判定する第5の処理と、 前記ジョブBが実行されていなかった場合は、前記第1
の処理で取得した復電起動時刻と予め登録されたジョブ
Bの予定処理時間とから、ジョブBの実行終了予定時刻
を算出する第6の処理と、 前記ジョブBの実行終了予定時刻が予め登録されたジョ
ブBの「終了すべき時刻」を越えるかを判断する第7の
処理と、 前記第7の処理における判断の結果、前記ジョブBの実
行終了予定時刻が「終了すべき時刻」を越える場合はス
ケジュールから排除し、「終了すべき時刻」を越えない
場合はジョブBを実行順序第1位としてスケジュール記
憶手段に登録する第8の処理と、 前記第8の処理に引き続き、優先度が高い順にジョブを
選択して情報を読み取り、読み取った各ジョブに対して
前記第5〜第8の処理を登録されているジョブがなくな
るまで繰り返し、前記第8の処理で各ジョブの実行終了
予定時刻が「終了すべき時刻」を越えない場合には、順
次実行順序を付して前記スケジュール記憶手段に登録す
る第9の処理と、 前記スケジュール記憶手段に登録された各ジョブの実行
順序に従って各ジョブを実行し、各ジョブの実行終了の
都度実行済み情報を前記実行済ジョブ記憶手段に登録す
る第10の処理と、 を有することを特徴とする情報処理装置の復電時自動運
転制御方法。
7. A first process for acquiring a power recovery start time at which an information processing apparatus is started by a power recovery, and selecting a job A having the highest priority registered in advance in a job priority storage unit, Second processing for reading information (importance, time to start, time to end, scheduled processing time, job name), and search for an executed job storage unit in which a job that has been completed before a power failure is registered A third process of determining whether the job A read in the second process has already been executed;
A fourth process of removing the read job A from the schedule if it has already been executed, selecting a job B having the next highest priority and reading the information, and searching the executed job storage unit A fifth process for determining whether the job B read in the fourth process has already been executed; and a fifth process for determining whether the job B has not been executed.
A sixth process of calculating a scheduled execution end time of the job B from the power recovery start time acquired in the process and the scheduled processing time of the previously registered job B; A seventh process of determining whether the completed time of the job B exceeds the “time to be completed”, and as a result of the determination in the seventh process, the scheduled execution completion time of the job B exceeds the “time to be completed” In the case, the job is excluded from the schedule, and when the time does not exceed “time to end”, the job B is registered in the schedule storage unit as the first in the execution order. Jobs are selected in descending order to read information, and the fifth to eighth processes are repeated for each read job until there are no more registered jobs. If the time does not exceed the “time to end”, a ninth process of sequentially assigning an execution order and registering it in the schedule storage means, and executing each job in accordance with the execution order of each job registered in the schedule storage means 10. A power recovery automatic operation control method for an information processing apparatus, comprising: a tenth process for executing a job and registering the executed information in the executed job storage means each time the execution of each job is completed.
【請求項8】 請求項4または5に記載された方式とし
てコンピュータを機能させる自動運転制御プログラムを
記録したことを特徴とする記録媒体。
8. A recording medium on which an automatic operation control program for causing a computer to function as the method according to claim 4 or 5 is recorded.
【請求項9】 請求項6または7に記載された方法をコ
ンピュータに実行させる自動運転制御プログラムを記録
したことを特徴とする記録媒体。
9. A recording medium on which an automatic operation control program for causing a computer to execute the method according to claim 6 or 7 is recorded.
JP2000173565A 2000-06-09 2000-06-09 Automatic operation control system and method in power recovery of information processing device, and recording medium with automatic operation control program recorded thereon Pending JP2001350637A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000173565A JP2001350637A (en) 2000-06-09 2000-06-09 Automatic operation control system and method in power recovery of information processing device, and recording medium with automatic operation control program recorded thereon

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000173565A JP2001350637A (en) 2000-06-09 2000-06-09 Automatic operation control system and method in power recovery of information processing device, and recording medium with automatic operation control program recorded thereon

Publications (1)

Publication Number Publication Date
JP2001350637A true JP2001350637A (en) 2001-12-21

Family

ID=18675771

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000173565A Pending JP2001350637A (en) 2000-06-09 2000-06-09 Automatic operation control system and method in power recovery of information processing device, and recording medium with automatic operation control program recorded thereon

Country Status (1)

Country Link
JP (1) JP2001350637A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7036041B2 (en) 2002-07-03 2006-04-25 Hitachi, Ltd. Method, program and system for managing operation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7036041B2 (en) 2002-07-03 2006-04-25 Hitachi, Ltd. Method, program and system for managing operation

Similar Documents

Publication Publication Date Title
JP4166056B2 (en) Database operation history management device, database operation history management method, and database operation history management program
JP4141875B2 (en) Recovery processing method, its execution system, and its processing program
JP6342070B2 (en) Job management apparatus, job management method, and job management program
CN110162563B (en) Data warehousing method and system, electronic equipment and storage medium
JP2001350637A (en) Automatic operation control system and method in power recovery of information processing device, and recording medium with automatic operation control program recorded thereon
JP2000194572A (en) Automatic job operational system by ups cooperation
JP2003280963A (en) Document management system, restoration method, program for performing restoration, and recording medium with program recorded thereon
JP4731960B2 (en) Pooling method, system and program
JP5035237B2 (en) Server management program, server management apparatus, and server management method
JP2010152707A (en) Backup method of database and database system
JP2002196939A (en) Start/finish control device of resident process and its control method and recording medium for recording method
JP2000076085A (en) Information processor, resource lack reporting method and recording medium
JP2005149106A (en) Backup system and control program for backup operation
JPH1040123A (en) System and method for job management
JP2002351719A (en) System and method for backup recovery of mail server
JPH09160845A (en) Process data logging device
JP3613077B2 (en) Database recovery method and program recording medium
JP2677162B2 (en) Scheduled job execution control method
KR100829289B1 (en) System and Method for Loading in the Switching System
CN118193372A (en) Test method, test device, electronic equipment and medium
CN117667887A (en) Database installation method and system for different operating systems in offline environment
TWI270058B (en) Backup method for wafer production apparatus
CN117493123A (en) Monitoring task scheduling method, device, equipment and storage medium
JPH11306032A (en) Fault occurrence state processing method and operating system
JP2004185165A (en) Method of shortening starting time of cellular phone application

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050111

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20050125

RD01 Notification of change of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7421

Effective date: 20050307

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20050524