JP2001254367A - Junction structure between pile and foundation beam - Google Patents

Junction structure between pile and foundation beam

Info

Publication number
JP2001254367A
JP2001254367A JP2000064015A JP2000064015A JP2001254367A JP 2001254367 A JP2001254367 A JP 2001254367A JP 2000064015 A JP2000064015 A JP 2000064015A JP 2000064015 A JP2000064015 A JP 2000064015A JP 2001254367 A JP2001254367 A JP 2001254367A
Authority
JP
Japan
Prior art keywords
pile
joint
foundation beam
reinforcement
annular
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2000064015A
Other languages
Japanese (ja)
Inventor
Nobuhiro Chikuma
信博 竹間
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Construction Co Ltd
Shimizu Corp
Original Assignee
Shimizu Construction Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Construction Co Ltd, Shimizu Corp filed Critical Shimizu Construction Co Ltd
Priority to JP2000064015A priority Critical patent/JP2001254367A/en
Publication of JP2001254367A publication Critical patent/JP2001254367A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

PROBLEM TO BE SOLVED: To simplify the structure of a junction between a pile and a foundation beam, and to improve the workability thereof. SOLUTION: In the structure of the junction A between a pile head portion of the pile 1 and a foundation beam 2 of a steel reinforced structure, a steel annular jointing board 4 is arranged at a location of a lower main reinforcement 6 of the foundation beam 2 at the junction A, and the lower main reinforcement 6 of the foundation beam 2 is connected to the annular jointing board 4. Further, an upper end of a pile main reinforcement 7 is anchored to the junction A through a central hole 5 of the annular jointing board 4. Then, a lower end of a column main reinforcement 8 of a steel reinforced column 3 to be connected to the junction A is anchored to the interior of the upper end of the pile main reinforcement 7 anchored to the junction A.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は建物における基礎の
構造に係わり、特にコンクリート杭の杭頭部と鉄筋コン
クリート造の基礎梁とを合理的に接合するための構造に
関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a foundation for a building, and more particularly to a structure for rationally joining a pile head of a concrete pile and a reinforced concrete foundation beam.

【0002】[0002]

【従来の技術】建物における基礎は、杭の杭頭部と基礎
梁と柱の柱脚部とを強固に接合することで構成され、そ
の接合部には多数の大径の鉄筋が密に配筋されて複雑に
錯綜する状態となるので、それら配筋を納めるための大
掛かりなフーチングが接合部に設けられることが通常で
ある。
2. Description of the Related Art A foundation in a building is constructed by firmly joining a pile head of a pile, a foundation beam, and a column base of a column, and a large number of large-diameter reinforcing bars are densely arranged at the joint. Since they are streaked and become intricately complicated, a large footing for accommodating the streaks is usually provided at the joint.

【0003】[0003]

【発明が解決しようとする課題】従来の基礎の設計およ
びその施工に際しては、上記のようなフーチングにおけ
る配筋の納まりやその施工を如何に合理的、効率的に行
うかが重要な課題であり、有効な改善策が未だ模索され
ているのが実状である。
In the conventional design and construction of a foundation, it is an important issue how to fit the reinforcing bars in the footing and how to perform the construction in a rational and efficient manner. In fact, effective improvement measures are still being sought.

【0004】上記事情に鑑み、本発明は、杭と基礎梁と
の接合部の構造を大幅に簡略化しかつその施工性を改善
し得る有効な構造を提供することを目的とする。
[0004] In view of the above circumstances, an object of the present invention is to provide an effective structure capable of greatly simplifying the structure of a joint between a pile and a foundation beam and improving its workability.

【0005】[0005]

【課題を解決するための手段】請求項1の発明は、コン
クリート杭の杭頭部と鉄筋コンクリート造の基礎梁との
接合部の構造において、鋼製の環状接合板を接合部にお
ける基礎梁の下主筋の位置に配して、該環状接合板に対
して基礎梁の下主筋を接合せしめるとともに、杭主筋の
上端部を前記環状接合板の中心孔を通して接合部に定着
せしめるようにしたものである。
According to the first aspect of the present invention, in a joint structure between a pile head of a concrete pile and a reinforced concrete foundation beam, a steel annular joint plate is provided below the foundation beam at the joint. At the position of the main reinforcement, the lower main reinforcement of the foundation beam is joined to the annular joint plate, and the upper end of the pile main reinforcement is fixed to the joint through the center hole of the annular joint plate. .

【0006】請求項2の発明は、請求項1の発明におい
て、前記接合部に定着せしめた杭主筋の内側に、該接合
部に接合される鉄筋コンクリート造の柱の柱主筋を定着
せしめるようにしたものである。
According to a second aspect of the present invention, in the first aspect of the present invention, a column main reinforcement of a reinforced concrete column to be joined to the joint is fixed inside the pile main reinforcement fixed to the joint. Things.

【0007】[0007]

【発明の実施の形態】図1および図2は本発明の実施形
態を示すもので、図中符号1は杭(本実施形態では場所
打ちコンクリート杭)、2は鉄筋コンクリート造の基礎
梁、3は同じく鉄筋コンクリート造の柱であり、符号4
はそれらの接合部Aに設けられた鋼製の環状接合板であ
る。
1 and 2 show an embodiment of the present invention. In the drawings, reference numeral 1 denotes a pile (a cast-in-place concrete pile in this embodiment), 2 denotes a reinforced concrete foundation beam, and 3 denotes a foundation beam. It is also a reinforced concrete pillar, and the symbol 4
Are steel annular joint plates provided at the joints A.

【0008】本実施形態における環状接合板4は、図2
に示すように中心孔5を有する略八角形(角部が切除さ
れた正方形)の平板状のものであり、その素材としては
鋼板や鋳鋼板が好適に採用可能である。この環状接合板
4は基礎梁2の下主筋6の位置に配置され、その周縁部
に下主筋6が直接的に接合されることにより、この接合
部Aの周囲の各基礎梁2の各下主筋6がこの環状接合板
4を介して相互に連結されて構造的に一体化するものと
なる。環状接合板4に対する下主筋6の接合は溶接によ
るか、あるいは下主筋6としてネジ鉄筋を用いてそれを
環状接合板4に固定した袋ナットにねじ込む等、適宜の
接合手段が採用可能である。
[0008] The annular joining plate 4 in the present embodiment is shown in FIG.
As shown in FIG. 5, the plate is a substantially octagonal (square with a cut corner) having a center hole 5, and a steel plate or a cast steel plate can be suitably used as the material. The annular joint plate 4 is arranged at the position of the lower main reinforcement 6 of the foundation beam 2, and the lower main reinforcement 6 is directly joined to the periphery of the lower end of each foundation beam 2 around the joint A. The main bars 6 are connected to each other via the annular joint plate 4 to be structurally integrated. The lower main bar 6 is joined to the annular joint plate 4 by welding, or an appropriate joining means such as screwing a threaded rebar as the lower main bar 6 and screwing it into a cap nut fixed to the annular joint plate 4 can be adopted.

【0009】そして、円形をなすように配列されている
多数の杭主筋7は、それらの上端部が環状接合板4の中
心孔5を通されて接合部Aに至り、そこでやや外側に曲
げられて接合部Aに対して定着されており、さらに柱3
の柱主筋8の下端部はそれら杭主筋7の上端部の内側に
配置されてそこに定着されている。
The plurality of pile main reinforcements 7 arranged in a circular shape have their upper ends passed through the center hole 5 of the annular joint plate 4 to reach the joint A, where they are slightly bent outward. And is fixed to the joint A.
The lower ends of the column main bars 8 are arranged inside and fixed to the upper ends of the pile main bars 7.

【0010】上記構造によれば、環状接合板4を用いる
ことによって杭主筋7と基礎梁2の下主筋6との干渉が
回避され、したがって接合部Aにおける配筋納まりが格
段に容易となる。すなわち、従来一般には基礎梁2の下
主筋6を杭主筋7の隙間を通して接合部Aを横断させる
ような配筋とすることが通常であるが、図2に示される
ように杭主筋7は密に配筋されているためにそれらの間
に下主筋6を通すことは実際上は容易ではないのである
が、上記のような環状接合板4を用いてそれに下主筋6
を接合することでそのような不具合を一気に解決するこ
とができる。
According to the above structure, the use of the annular joint plate 4 avoids the interference between the pile main reinforcing bar 7 and the lower main reinforcing bar 6 of the foundation beam 2, so that the arrangement of the reinforcing bars at the joint A becomes much easier. That is, conventionally, the lower reinforcement 6 of the foundation beam 2 is usually arranged so as to cross the joint A through the gap of the reinforcement 7, but as shown in FIG. 2, the reinforcement 7 is denser. Although it is not practically easy to pass the lower main bar 6 between them because of the arrangement of the lower main bar 6,
By joining them, such a problem can be solved at once.

【0011】そのため、接合部Aの配筋が極めて単純に
して明快となって実質的にフーチングを省略することが
でき、大掛かりなフーチングが不可欠である従来一般の
基礎に比べて配筋設計が容易となるし、当然に配筋作業
の施工性を大きく改善することができる。また、環状接
合板4自体は中心孔5を有する単なる鋼製の平板状のも
のに過ぎないからこれ自体は安価に製作できるし、環状
接合板4に対する下主筋6の接合も何等面倒な作業では
なく、これを用いることにより鉄筋量を削減することも
できるから、施工性改善効果と相俟って基礎工事費削減
を図ることができる。
[0011] Therefore, the reinforcement at the joint A is very simple and clear, and footing can be substantially omitted. Reinforcement design can be made easier as compared with a conventional general foundation in which large-scale footing is indispensable. Naturally, the workability of the arrangement work can be greatly improved. Further, since the annular joining plate 4 itself is merely a mere steel plate having a center hole 5, it can be manufactured at a low cost, and the joining of the lower main reinforcement 6 to the annular joining plate 4 can be performed by any troublesome work. In addition, the use of this can reduce the amount of rebar, so that it is possible to reduce the cost of foundation work together with the effect of improving workability.

【0012】なお、上記実施形態では、基礎梁2の上主
筋9は従来と同様に接合部Aをそのまま横断するように
配筋しており、したがってこの上主筋9と柱主筋8との
交差はあるが、柱主筋8は杭主筋7のようには密に配筋
されるものではないのでそこでの干渉はさして問題とな
らず、通常は本実施形態のように下主筋6に対してのみ
環状接合板4を設けることで十分である。しかし、上主
筋9と柱主筋8とが干渉してしまうような場合等におい
て、必要であれば、同様の環状接合板4を接合部Aの上
部にも配してそれに上主筋9を溶接等により接合するよ
うにしても良い。
In the above-described embodiment, the upper main reinforcement 9 of the foundation beam 2 is arranged so as to cross the joint A as it is in the conventional manner, and therefore, the intersection between the upper main reinforcement 9 and the column main reinforcement 8 is limited. However, since the column main bar 8 is not densely arranged like the pile main bar 7, interference there is not a problem. Usually, only the lower main bar 6 is annular as in the present embodiment. It is sufficient to provide the joining plate 4. However, in a case where the upper main bar 9 and the column main bar 8 interfere with each other, if necessary, the same annular joint plate 4 is also arranged above the joint A, and the upper main bar 9 is welded thereto. May be joined together.

【0013】また、上記実施形態は柱3が鉄筋コンクリ
ート造の場合の例であるので、柱主筋8を杭主筋7の内
側に定着するようにしたが、柱が鉄骨造の場合には鉄骨
柱の柱脚部をそのまま杭主筋7の内側に差し込んで定着
するか、あるいは柱脚に設けたベースプレートを接合部
Aの上面に対してアンカーにより締結することで接合す
れば良い。また、杭1としては場所打ちコンクリート杭
に限らず、杭主筋7を接合部Aに定着せしめるものであ
ればPHC杭等の既製コンクリート杭であっても同様に
適用可能である。
The above embodiment is an example in which the column 3 is made of reinforced concrete. Therefore, the column main bar 8 is fixed inside the pile main bar 7, but when the column is made of steel frame, the column main bar 8 is fixed. The column base may be inserted into the inside of the main pile 7 as it is and fixed, or may be joined by fastening the base plate provided on the column base to the upper surface of the joint A with an anchor. Further, the pile 1 is not limited to the cast-in-place concrete pile, but may be applied to a precast concrete pile such as a PHC pile as long as the main pile 7 is fixed to the joint A.

【0014】さらに、環状接合板4はその周縁部に基礎
梁2の下主筋6あるいは上主筋9を溶接等により接合で
きかつ杭主筋7を挿通させることのできる中心孔5を有
しているものであれば良く、その限りにおいて上記実施
形態のような八角形ないし正方形とすることに限らず、
たとえば円形や十字形とする等の変更が可能であること
はいうまでもない。
Further, the annular joint plate 4 has a central hole 5 at the periphery thereof, to which the lower main bar 6 or the upper main bar 9 of the foundation beam 2 can be joined by welding or the like and the main bar 7 of the pile can be inserted. As long as it is not limited to the octagon or square as in the above embodiment,
For example, it is needless to say that a change such as a circular shape or a cross shape is possible.

【0015】[0015]

【発明の効果】請求項1の発明は、環状接合板に対して
基礎梁の下主筋を接合せしめるとともに、杭主筋の上端
部を環状接合板の中心孔を通して接合部に定着せしめる
ので、基礎梁の下主筋と杭の杭主筋との干渉を回避で
き、したがって接合部の配筋納まりが格段に容易となっ
て実質的にフーチングを省略可能であり、配筋設計およ
び配筋作業の合理化を実現でき、基礎工事費削減を図る
ことができる。
According to the first aspect of the present invention, the lower main reinforcement of the foundation beam is joined to the annular joint plate and the upper end of the pile main reinforcement is fixed to the joint through the center hole of the annular joint plate. Interference between the lower main reinforcement of the pile and the main reinforcement of the pile can be avoided, so that the reinforcement at the joint is much easier to fit and the footing can be substantially omitted, realizing the reinforcement arrangement design and the reinforcement arrangement work. It is possible to reduce foundation work costs.

【0016】請求項2の発明は、接合部に定着せしめた
杭主筋の上端部の内側に、この接合部に接合される柱の
柱主筋の下端部を定着せしめるので、柱主筋と杭主筋と
の干渉をも有効に回避できる。
According to the second aspect of the present invention, the lower end of the column main bar of the column to be joined to the joint is fixed inside the upper end of the pile main bar fixed to the joint. Can also be effectively avoided.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本発明の構造の実施形態を示す側断面図であ
る。
FIG. 1 is a side sectional view showing an embodiment of the structure of the present invention.

【図2】 同、平断面図である。FIG. 2 is a plan sectional view of the same.

【符号の説明】[Explanation of symbols]

A 接合部 1 杭(コンクリート杭) 2 基礎梁 3 柱 4 環状接合板 5 中心孔 6 基礎梁の下主筋 7 杭主筋 8 柱主筋 9 基礎梁の上主筋 A Joint 1 Pile (concrete pile) 2 Foundation beam 3 Column 4 Ring connection plate 5 Center hole 6 Lower main bar of foundation beam 7 Pile main bar 8 Column main bar 9 Upper main bar of foundation beam

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 コンクリート杭の杭頭部と鉄筋コンクリ
ート造の基礎梁との接合部の構造において、鋼製の環状
接合板を接合部における基礎梁の下主筋の位置に配し
て、該環状接合板に対して基礎梁の下主筋を接合せしめ
るとともに、杭主筋の上端部を前記環状接合板の中心孔
を通して接合部に定着せしめてなることを特徴とする杭
と基礎梁の接合構造。
In a structure of a joint portion between a pile head of a concrete pile and a reinforced concrete foundation beam, a steel annular joining plate is disposed at a position of a lower main bar of the foundation beam at the joining portion, and the annular joint is provided. A joint structure between a pile and a foundation beam, wherein the lower reinforcement of the foundation beam is joined to the plate, and the upper end of the pile reinforcement is fixed to the joint through the center hole of the annular joint plate.
【請求項2】 請求項1記載の杭と基礎梁の接合構造に
おいて、前記接合部に定着せしめた杭主筋の上端部の内
側に、該接合部に接合される鉄筋コンクリート造の柱の
柱主筋の下端部を定着せしめてなることを特徴とする杭
と基礎梁の接合構造。
2. A joint structure between a pile and a foundation beam according to claim 1, wherein a main reinforcement of a reinforced concrete column joined to the joint is provided inside an upper end portion of the main reinforcement of the pile fixed to the joint. A joint structure between a pile and a foundation beam, wherein the lower end is fixed.
JP2000064015A 2000-03-08 2000-03-08 Junction structure between pile and foundation beam Withdrawn JP2001254367A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000064015A JP2001254367A (en) 2000-03-08 2000-03-08 Junction structure between pile and foundation beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000064015A JP2001254367A (en) 2000-03-08 2000-03-08 Junction structure between pile and foundation beam

Publications (1)

Publication Number Publication Date
JP2001254367A true JP2001254367A (en) 2001-09-21

Family

ID=18583785

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000064015A Withdrawn JP2001254367A (en) 2000-03-08 2000-03-08 Junction structure between pile and foundation beam

Country Status (1)

Country Link
JP (1) JP2001254367A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006144535A (en) * 2004-10-21 2006-06-08 Shimizu Corp Joint structure of column and beam
JP2006291575A (en) * 2005-04-11 2006-10-26 Kanuka Design:Kk Retaining wall and method of constructing the same
JP2013040485A (en) * 2011-08-15 2013-02-28 Jfe Steel Corp Load support and support body joint structure
CN105839775A (en) * 2016-05-24 2016-08-10 东南大学 Beam end crossed arc-shaped post-tensioned pre-stressed reinforcing steel dry-type assembling beam-column node

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006144535A (en) * 2004-10-21 2006-06-08 Shimizu Corp Joint structure of column and beam
JP2006291575A (en) * 2005-04-11 2006-10-26 Kanuka Design:Kk Retaining wall and method of constructing the same
JP2013040485A (en) * 2011-08-15 2013-02-28 Jfe Steel Corp Load support and support body joint structure
CN105839775A (en) * 2016-05-24 2016-08-10 东南大学 Beam end crossed arc-shaped post-tensioned pre-stressed reinforcing steel dry-type assembling beam-column node

Similar Documents

Publication Publication Date Title
JP3891085B2 (en) Steel pipe column or steel pipe pile and beam joint structure and joining method
JPH0393923A (en) Connection method of steel pillar of cast-in-place pile and connection structure
JP4868358B2 (en) Column and beam joint structure
JP2001254367A (en) Junction structure between pile and foundation beam
JPH08170309A (en) Constructing method of structure
JPH0586630A (en) Construction for jointing steel pipe pile filled with concrete and steel pipe column filled up with concrete
JP2001254365A (en) Junction structure between column and pile
JP2000320057A (en) Flat slab using steel pipe concrete column and construction for the slab
JP5143526B2 (en) Building column base structure
JP3067541U (en) Reinforcement pillars such as signposts and lighting poles
JP2000273880A (en) Pile head connecting method
JP2001248167A (en) Structure of building foundation
JP2004052389A (en) Panel zone constructing method and precast beam
JP3639368B2 (en) Foundation structure of steel column base
JP4298628B2 (en) Construction method of viaduct beam using steel pipe column joint element
JP2004143878A (en) Construction method for joining foundation pile and column together and metal joint for joining
JP2635872B2 (en) How to build a composite structure
JP7356825B2 (en) Joint structure between reinforced concrete columns and steel beams
JP2000120170A (en) Concrete charged steel pipe pillar
JPH07252882A (en) Connecting method for building frame
JPH079921Y2 (en) Joint structure between reinforced concrete column and steel beam
JP2007170124A (en) Construction method of pile head joint part, and pile head joint part form
JP2005232822A (en) Aseismatic reinforcing method of reinforced concrete column
JP2021101077A (en) Structure, and construction method of the same
JP2984882B2 (en) Precast reinforced concrete column-beam joint structure

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20070605