Method of mounting building decorative material, its mounting device and its mounting structure

Info

Publication number
JP2001227132A
JP2001227132A JP2000036482A JP2000036482A JP2001227132A JP 2001227132 A JP2001227132 A JP 2001227132A JP 2000036482 A JP2000036482 A JP 2000036482A JP 2000036482 A JP2000036482 A JP 2000036482A JP 2001227132 A JP2001227132 A JP 2001227132A
Authority
JP
Japan
Prior art keywords
stone
building
building decoration
mounting
decoration material
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2000036482A
Other languages
Japanese (ja)
Other versions
JP4404430B2 (en
Inventor
Shigeru Anabuki
繁 穴吹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHINKUMATORITANI SEKIZAI KK
Original Assignee
SHINKUMATORITANI SEKIZAI KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHINKUMATORITANI SEKIZAI KK filed Critical SHINKUMATORITANI SEKIZAI KK
Priority to JP2000036482A priority Critical patent/JP4404430B2/en
Publication of JP2001227132A publication Critical patent/JP2001227132A/en
Application granted granted Critical
Publication of JP4404430B2 publication Critical patent/JP4404430B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a method of mounting a building decorative material, its mounting device and its mounting structure, by which a plurality of stones or the like are installed to the foundation of a building separately independently while construction works can be finished in a short period in mounting on the foundation of the building such as stone. SOLUTION: The method of mounting the building decorative material, by which a plurality of the building decorative materials are installed to the foundation of the building separately independently by a fixed fixture and the building decorative materials are arrayed in the fixed direction, is constituted. The fixed fixture contains a rod-shaped body set up to the building decorative material or the foundation and a case-shaped body, which is fitted to the foundation on the building decorative material into which the rod-shaped body is introduced. The case-shaped body and the rod-shaped body are fixed by introducing the rod-shaped body and a hardener to the case-shaped body, and the building decorative material is secured to the foundation of the building. Each building decorative material is mounted on the foundation of the building independently by conducting the above-mentioned process regarding each building decorative material.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、建築物装飾材の取
付装置、取付方法及び取付構造に関し、詳しくは、建築
物の壁、床、天井等に石材等を取り付けるための取付装
置、取付方法及び取付構造に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a mounting device, a mounting method, and a mounting structure for a building decorative material, and more particularly, to a mounting device and a mounting method for mounting a stone or the like on a wall, floor, ceiling, or the like of a building. And mounting structure.

【0002】[0002]

【従来の技術】従来、建築物の壁に石材を取り付ける場
合、下地となるコンクリート壁にかすがいの一端を埋設
し、かすがいの他端と石材に備えただぼとを引金物でつ
なぎ合わせて、石材を固定する。このとき、石材にだぼ
が入る穴を開け、石材と石材をだぼを用いて連結してお
く。そして、石材と下地との間にモルタルを充填する。
上記の工法を総とろ工法と呼ぶ。
2. Description of the Related Art Conventionally, when a stone is attached to a wall of a building, one end of a clasp is buried in a concrete wall serving as a foundation, and the other end of the clasp is connected to the stone by a trigger. , Fix the stone. At this time, a hole in which the dowel enters the stone is formed, and the stone and the stone are connected using the dowel. Then, mortar is filled between the stone and the base.
The above method is referred to as the total melting method.

【0003】この総とろ工法は、石材がモルタルの圧力
で動かないように数回に分けてモルタルを充填するの
で、工期が長くなる。そして、施工の後に雨などによっ
て、モルタル部に水が浸透して、エフロレセンス(風
解)が発生しやすくなる。更に、モルタルを数回に分け
て充填するので、モルタルを充填するときに、モルタル
を石材表面にこぼしてしまい、石材表面を汚してしまう
可能性が高くなる。
[0003] In this method, the mortar is filled several times so that the stone does not move under the pressure of the mortar. Then, after construction, water permeates the mortar portion due to rain or the like, and efflorescence (winding) is easily generated. Furthermore, since the mortar is filled in several times, when the mortar is filled, there is a high possibility that the mortar is spilled on the surface of the stone material and the surface of the stone material is soiled.

【0004】また、下地であるコンクリート壁に設置し
たかすがいと石材に設置しただぼを引き金物でつなぎ合
わせ、且つ、石材と石材とをだぼを用いて連結した後
に、石材と下地の間において水平方向の目地部分の上下
10cm程度にモルタルを充填し、他は空洞にする帯と
ろ工法がある。しかし、この帯とろ工法もモルタルが硬
化するまで上段の石材を積めず、工期が長くなる。ま
た、エフロレセンスが発生しやすい。更に、モルタルを
充填するので、モルタルを充填するときに、モルタルを
石材表面にこぼしてしまい、石材表面を汚してしまう可
能性が高くなる。
[0004] In addition, after a haze installed on a concrete wall as a base and a dowel set on a stone are connected with a trigger, and the stone and the stone are connected using the dowel, the stone and the base are interposed. There is a band and filter method in which mortar is filled into about 10 cm above and below the horizontal joint and the other part is hollow. However, this belt-striping method also does not load the upper stone until the mortar is hardened, and the construction period is long. Also, efflorescence tends to occur. Further, since the mortar is filled, the possibility of spilling the mortar on the stone surface when filling the mortar increases the possibility of soiling the stone surface.

【0005】一方、モルタルによって石材の表面を汚さ
ないために、モルタルを使わない乾式工法がある。この
乾式工法は、下地に金物(アングル,プレート)を設置
する。そして、垂直方向または水平方向の目地部分で、
下地に設置した金物によって石材の荷重を受け、且つ、
だぼで石材と石材を連結させる工法である。モルタルを
使用しないので、上述した石材表面の汚れ、及び、エフ
ロレセンスの発生を防ぐことが可能である。
[0005] On the other hand, there is a dry method that does not use mortar in order to prevent the surface of the stone material from being stained with mortar. In this dry method, hardware (angle, plate) is installed on a base. And in the vertical or horizontal joints,
Receive the load of the stone by the hardware installed on the base, and,
It is a method of connecting stones with a dowel. Since no mortar is used, it is possible to prevent the above-described soiling of the stone material and the occurrence of efflorescence.

【0006】[0006]

【発明が解決しようとする課題】しかし、上述した乾式
工法では、垂直方向または水平方向の目地部分で金物に
よって石材の荷重を受け、且つ、上下または左右の石材
をだぼで連結するので、目地の隙間から金物又はだぼが
見え、美観を損ねる。また、だぼによって石材と石材を
つなぎ合わせるので、石材の割付に際して矩形の石材を
用いなければならない制約を持っている。その上、何ら
かの事情で一部の石材を撤去し、且つ、撤去した石材に
換えて新しい石材を設置するとき、新設当初の乾式工法
で施工すると、だぼによって石材と石材をつなぎ合わせ
ているので、だぼでつながっている石材を全て撤去し、
新設しなくてはならない。また、下段に設置された石材
を撤去し、且つ、撤去した石材に換えて新しい石材を設
置する場合、上段の石材を全て撤去しなくてはならな
い。従って、一部の石材を撤去するのに多大の労力及び
時間が必要となる。
However, in the above-mentioned dry method, the load of the stone is received by the metal at the vertical or horizontal joint, and the upper and lower or left and right stones are connected by a dowel. Hardware or dowels can be seen through the gaps, which impairs aesthetics. In addition, since stones are joined together by a dowel, there is a restriction that a rectangular stone must be used when allocating stones. In addition, when some stones are removed for some reason, and new stones are installed in place of the removed stones, when the new dry construction method is used, the stones are joined together by dowels. , Remove all stones connected by dowels,
I have to build a new one. In addition, when removing the stones installed at the lower level and installing new stones in place of the removed stones, all the stones at the upper level must be removed. Therefore, a great deal of labor and time is required to remove some stones.

【0007】そこで、本発明者は上述した課題を解決す
るために、鋭意検討をした結果、本発明をするに至った
のである。
The inventor of the present invention has made intensive studies in order to solve the above-mentioned problems, and as a result, has come to the present invention.

【0008】[0008]

【課題を解決するための手段】本発明の建築物装飾材の
取付方法の要旨は、所定の固定具により複数の建築物装
飾材をそれぞれ独立して建築物の下地に取り付けて、該
建築物装飾材を所定方向に配列することを特徴とする。
なお、上記固定具は、上記建築物装飾材又は上記下地に
取り付けられた棒状体と、該下地又は該建築物装飾材に
取り付けられ、該棒状体が入るケース状体を含む。ま
た、上記棒状体はボルトを含む。上記固定具は、直接又
は間接的に上記建築物装飾材及び上記下地に取り付けら
れる。
The gist of the method for mounting a building decoration material according to the present invention is that a plurality of building decoration materials are independently attached to a base of a building by a predetermined fixing tool. The decorative materials are arranged in a predetermined direction.
In addition, the fixing tool includes a rod-shaped body attached to the building decoration material or the groundwork, and a case-shaped body attached to the groundwork or the building decoration material and into which the rod-shaped body enters. Further, the rod includes a bolt. The fixing device is directly or indirectly attached to the building decoration material and the base.

【0009】更に、上記ケース状体に上記棒状体及び固
化部材を入れる工程を含み、前記固化部材はコンクリー
ト又は樹脂性接着材を含む。なお、コンクリートはモル
タルを含む。また、上記ケース状体に上記棒状体及び上
記固化部材を入れる順番は、該棒状体を入れた後に該固
化部材を入れるが、該固化部材を該ケース状体に入れ、
該固化部材が固化する前に該棒状体を入れることも可能
である。
The method further includes the step of placing the rod and the solidifying member in the case-like member, wherein the solidifying member includes concrete or a resinous adhesive. The concrete includes mortar. In addition, the order in which the rod-shaped body and the solidified member are put in the case-shaped body is that the solidified member is put after the rod-shaped body is put, but the solidified member is put in the case-shaped body,
It is also possible to put the rod before the solidification member solidifies.

【0010】上記ケース状体の内底にナットを溶着し、
該ナットに上記ボルトを螺合した後に、該ケース状体の
中に上記固化部材を注入することもできる。また、該ケ
ース状体の代わりにナットを使用し、該ナットに上記ボ
ルトを螺合することによって、上記建築物装飾材を上記
建築物の下地に固定することも可能である。
A nut is welded to the inner bottom of the case-like body,
After the bolt is screwed into the nut, the solidifying member can be injected into the case. Further, it is also possible to use a nut instead of the case-like body and screw the bolt to the nut, thereby fixing the building decoration material to the base of the building.

【0011】上記建築物装飾材は、建築物に取り付ける
石材を含む。更に、上記建築物の下地は、建築物の壁、
床及び天井の下地となるコンクリートを含む。また、そ
の他の場所で下地にコンクリートを使用した場合、この
コンクリートも上記建築物の下地とする。
[0011] The building decoration material includes a stone material to be attached to the building. Furthermore, the foundation of the building is a building wall,
Includes concrete for floor and ceiling underlays. Further, when concrete is used for the foundation in other places, this concrete is also used as the foundation for the building.

【0012】本発明の建築物装飾材の取付装置の要旨
は、複数の建築物装飾材を建築物の下地に対して所定方
向に配列するための建築物装飾材の取付装置であって、
該建築物装飾材をそれぞれ独立して該下地に取り付ける
所定の固定具を備えたことを特徴とする。なお、上記所
定の固定具が、上記建築物装飾材又は上記下地に取り付
けられた棒状体と、該建築物装飾材又は該下地に取り付
けられ、該棒状体が入るケース状体とを含む。また、上
記棒状体はボルトを含む。
[0012] The gist of the building decoration material mounting device of the present invention is a building decoration material mounting device for arranging a plurality of building decoration materials in a predetermined direction with respect to a building base.
The present invention is characterized in that a predetermined fixture for independently attaching the building decoration material to the base is provided. In addition, the predetermined fixing tool includes a rod-shaped body attached to the building decoration material or the groundwork, and a case-shaped body attached to the building decoration material or the groundwork and into which the rod-shaped body enters. Further, the rod includes a bolt.

【0013】上記所定の固定具は、前記建築物装飾材に
開けられた複数の穴に入れられて該建築物装飾材の所定
部分を挾持する挿入部材を備えている。上記挿入部材は
ピン状の物を含む。また、上記挿入部材の数は任意であ
る。上記建築物装飾材に開けられた複数の穴は、該建築
物装飾材の表面に対して斜め方向に穴が開けられてい
る。
[0013] The predetermined fixing device includes an insertion member which is inserted into a plurality of holes formed in the building decoration material and holds a predetermined portion of the building decoration material. The insertion member includes a pin-shaped object. Further, the number of the insertion members is arbitrary. The plurality of holes formed in the building decoration material are formed in a diagonal direction with respect to the surface of the building decoration material.

【0014】1つの建築物装飾材において、使用する上
記所定の固定具の数は限定されず、1つ又は複数個の該
所定の固定具によって1つの建築物装飾材を建築物の下
地に固定する。
[0014] In one building decoration material, the number of the predetermined fixing tools to be used is not limited, and one building decoration material is fixed to the foundation of the building by one or more predetermined fixing tools. I do.

【0015】本発明の建築物装飾材の取付構造の要旨
は、建築物の下地及び建築物装飾材にそれぞれ設置した
所定の固定具によって、それぞれの該建築物装飾材が独
立し、且つ、複数の該建築物装飾材が所定方向に配列し
て該建築物の下地に取り付けられていることを特徴とす
る。上記建築物装飾材は独立して上記建築物の下地に取
り付けられるので、上記建築物装飾材の形状に制約はな
く、任意の形状が使用できる。
The gist of the structure for mounting a building decoration material according to the present invention is that each of the building decoration materials is independent by a predetermined fixing tool installed on the foundation of the building and the building decoration material, respectively. Wherein the building decoration materials are arranged in a predetermined direction and attached to the base of the building. Since the building decoration material is independently attached to the foundation of the building, the shape of the building decoration material is not limited, and any shape can be used.

【0016】[0016]

【発明の実施形態】次に、本発明に係る建築物装飾材の
取付方法、取付装置及び取付構造の実施形態を図面に基
づいて説明する。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a perspective view showing an embodiment of a method for mounting a building decorative material according to the present invention.

【0017】本発明の建築物装飾材の取付装置10を図
1及び図2に示す。棒状体である調節ボルト12及びケ
ース状体であるケース28が使用されている。また、建
築物装飾材である石材42の所定部分を挾持するため
に、挿入部材であるピン20,21が使用されている。
FIG. 1 and FIG. 2 show an installation device 10 for a building decoration material according to the present invention. The adjusting bolt 12 as a rod and the case 28 as a case are used. Further, pins 20 and 21 as insertion members are used to hold a predetermined portion of a stone material 42 as a building decoration material.

【0018】下地であるコンクリート躯体44にホール
インアンカー36を打ち込み、ホールインアンカー36
をコンクリート躯体44に固定する。その後、ホールイ
ンアンカー36に長ねじボルト38を螺合する。次に、
断面L字型の躯体側荷重受金物30に、ホールインアン
カー36に螺合された長ねじボルト38が通る穴及び角
根ボルト32が通る穴をそれぞれ所定位置に開ける。躯
体側荷重受金物30に開けられた長ねじボルト38が通
る穴に、ホールインアンカー36に螺合された長ねじボ
ルト38を通す。長ねじボルト38にナット40を螺合
して、躯体側荷重受金物30を図1のようにしてコンク
リート躯体44に固定する。そして、躯体側荷重受金物
30に開けられた角根ボルト32が通る穴とケース28
に備えられた穴に角根ボルト32を通し、角根ボルト3
2にナット34を螺合して、図1,図2に示すように、
躯体側荷重受金物30にケース28を取り付ける。な
お、躯体側荷重受金物30にケース28を取り付けた後
で、躯体側荷重受金物30をコンクリート躯体44に取
り付けてもよい。
The hole-in anchor 36 is driven into the concrete frame 44 serving as the foundation,
Is fixed to the concrete frame 44. Then, the long screw bolt 38 is screwed into the hole-in anchor 36. next,
Holes through which the long screw bolts 38 screwed to the hole-in anchors 36 and holes through which the square root bolts 32 pass are formed in predetermined positions on the frame-side load receiver 30 having an L-shaped cross section. The long screw bolt 38 screwed to the hole-in anchor 36 is passed through a hole through which the long screw bolt 38 opened in the frame-side load receiving object 30 passes. A nut 40 is screwed into the long screw bolt 38, and the frame-side load receiving object 30 is fixed to the concrete frame 44 as shown in FIG. The hole through which the square root bolt 32 opened in the frame-side load receiving object 30 passes and the case 28
Pass the square root bolt 32 through the hole provided in the
2 and a nut 34, and as shown in FIGS. 1 and 2,
The case 28 is attached to the frame-side load receiver 30. After attaching the case 28 to the skeleton-side load receiver 30, the skeleton-side load receiver 30 may be attached to the concrete skeleton 44.

【0019】第1ベース金物16及び第2ベース金物1
8にはそれぞれ挿入部材であるピン20,21を溶着
し、ピン20,21が入る穴17,19を石材42に開
ける。このとき、ピン20,21はそれぞれ第1ベース
金物16及び第2ベース金物18に対して鋭角、例えば
45°の角度を付けて溶着する。ピン20とピン21
は、両方が向き合う方向に傾斜している。なお、1つの
取付装置10において使用するピンの本数は、4本のピ
ンを使用しているが、石材42と第1ベース金物16及
び第2ベース金物18における取付強度が弱い場合は、
任意にピンの本数を増やし、石材42に開ける穴もピン
の本数にあわせて増やすことができる。また、ピン以外
に、爪状の物等を使用し、その形状にあわせて石材に穴
を開けることが可能である。
First base metal 16 and second base metal 1
8 are respectively welded with pins 20 and 21 as insertion members, and holes 17 and 19 in which the pins 20 and 21 are inserted are formed in the stone 42. At this time, the pins 20 and 21 are welded to the first base metal 16 and the second base metal 18 at an acute angle, for example, 45 °. Pin 20 and Pin 21
Are inclined in a direction in which both face each other. The number of pins used in one mounting device 10 is four, but when the mounting strength between the stone 42 and the first base metal 16 and the second base metal 18 is weak,
The number of pins can be arbitrarily increased, and the number of holes formed in the stone 42 can be increased in accordance with the number of pins. In addition, it is possible to use a claw-shaped object or the like in addition to the pin, and to make a hole in the stone according to the shape.

【0020】更に、第1ベース金物16にはボルト22
に合うナット24を溶着しておき、第2ベース金物18
には第1ベース金物16に溶着したナット24が貫通で
きる穴を上下方向にルーズに開けておく。これは、ピン
20,21が第1ベース金物16及び第2ベース金物1
8に対して鋭角に角度が付けられているので、ナット2
4が貫通できる穴を上下方向にルーズに開けておかない
と、ピン20,21が石材42の穴17,19に入らな
いからである。更に、石材側荷重受金物14にも第1ベ
ース金物16に溶着したナット24が貫通できる穴を開
けておく。また、第1ベース金物16に溶着されたナッ
ト24の下部に、ボルト22のネジ山に合うネジの谷を
設けることも可能である。ナット24の高さが高く、石
材側荷重受金物14を装着したときに、ナット24がは
みだすのならば、第1ベース金物16にナット24の対
角距離と同じ長さの直径を持った円形の穴を開け、該穴
にナット24を入れ、第1ベース金物16にナット24
を溶着することも可能である。
Further, a bolt 22 is attached to the first base hardware 16.
A nut 24 suitable for the second base metal 18 is welded.
First, a hole through which the nut 24 welded to the first base metal 16 can penetrate is loosely opened in the vertical direction. This is because the pins 20 and 21 are the first base metal 16 and the second base metal 1.
8 is acutely angled with respect to
This is because the pins 20 and 21 do not enter the holes 17 and 19 of the stone 42 unless the holes through which the holes 4 can penetrate are loosely opened in the vertical direction. Further, a hole through which the nut 24 welded to the first base metal 16 can penetrate is also formed on the stone-side load receiving metal 14. Further, it is also possible to provide a thread valley corresponding to the thread of the bolt 22 below the nut 24 welded to the first base hardware 16. If the height of the nut 24 is high and the nut 24 protrudes when the stone-side load receiving object 14 is mounted, the first base metal 16 has a circular shape having a diameter equal to the diagonal distance of the nut 24. , A nut 24 is inserted into the hole, and the nut 24 is
Can also be welded.

【0021】石材42に開けた穴17,19に第1ベー
ス金物16及び第2ベース金物18にそれぞれ溶着した
ピン20,21を入れて、図1に示すようにピン20,
21で石材42の所定部分を挾持する。上記の石材42
の所定部分は、石材42に開けられた穴17と穴19の
間の部分である。その後、第1ベース金物16に溶着さ
れたナット24にボルト22を螺合することによって、
第1ベース金物16及び第2ベース金物18及び石材側
荷重受金物14を石材42に固定する。
The pins 20, 21 welded to the first base metal 16 and the second base metal 18, respectively, are inserted into the holes 17, 19 formed in the stone 42, and the pins 20, 21 are inserted as shown in FIG.
At 21, a predetermined portion of the stone 42 is clamped. Stone 42 above
Is a portion between the hole 17 and the hole 19 formed in the stone 42. After that, the bolt 22 is screwed into the nut 24 welded to the first base metal part 16,
The first base metal 16, the second base metal 18, and the stone-side load receiving metal 14 are fixed to the stone 42.

【0022】石材側荷重受金物14に上下調節ボルト1
2が通る穴を所定位置に開け、穴の一端に上下調節ボル
ト12に合うナット26を溶着しておく。図1に示すよ
うに、上下調節ボルト12を石材側荷重受金物14に取
り付けた後、上下調節ボルト12の先端をケース28の
中に入れる。そして、上下調節ボルト12を回動及びケ
ース内部での位置を調節することにより、石材42を所
定の位置に調節する。
The vertical adjustment bolt 1 is attached to the stone-side load receiving member 14.
A hole through which 2 passes is made in a predetermined position, and a nut 26 that fits the up-and-down adjustment bolt 12 is welded to one end of the hole. As shown in FIG. 1, after attaching the vertical adjustment bolt 12 to the stone-side load receiving member 14, the tip of the vertical adjustment bolt 12 is put into the case 28. Then, the stone 42 is adjusted to a predetermined position by rotating the vertical adjustment bolt 12 and adjusting the position inside the case.

【0023】上記の工程だけでは、ケース28の内部に
上下調節ボルト12が入っているだけなので、石材42
に振動を与えると石材42の位置がずれたり、石材42
が外れたりする。従って、石材42を所定の位置に調節
後、ケース28の内部空間に無収縮モルタルを注入し
て、上下調節ボルト12とケース28を固定する。ま
た、無収縮モルタル以外に樹脂性接着剤等を使用して、
上下調節ボルト12とケース28を固定することも可能
である。
In the above steps only, since the vertical adjustment bolts 12 are just inside the case 28, the stone 42
When the vibration is given to the stone 42, the position of the stone 42
Comes off. Therefore, after adjusting the stone 42 to a predetermined position, the non-shrinkable mortar is poured into the internal space of the case 28 to fix the vertical adjustment bolt 12 and the case 28. Also, in addition to non-shrink mortar, using a resinous adhesive, etc.,
It is also possible to fix the vertical adjustment bolt 12 and the case 28.

【0024】上記の工程及び取付装置によって、石材4
2を下地であるコンクリート躯体44に取り付けること
が可能になった。なお、上記の取付装置10は、1石材
において複数の装置を取り付けることによって、取付強
度が増加する。一例として、図5に示すように、1石材
において3個の取付装置を取り付けているが、石材の大
きさ等によって、図6に示すように、取付装置の数を4
個に増やすなど、取付装置の数は任意に変更が可能であ
る。更に、取付装置を取り付ける位置72も任意に変更
が可能である。また、石材42の上段に取り付けた取付
装置10のケース28に無収縮モルタルを注入すること
によって、石材42が固定されるならば、下部に取り付
けた取付装置10のケース28に、無収縮モルタルを注
入しなくてもよい。更に、下段に取り付ける取付装置に
変更して、図7に示すような、コの字型板46をコンク
リート躯体44に取り付けて、石材42とコンクリート
躯体44の位置を平行にし易くすることも可能である。
The stone 4
2 can be attached to the concrete skeleton 44 which is the foundation. In addition, mounting strength of the mounting device 10 increases by mounting a plurality of devices on one stone. As an example, as shown in FIG. 5, three mounting devices are mounted on one stone, but depending on the size of the stone, etc., as shown in FIG.
The number of attachment devices can be arbitrarily changed, such as increasing the number of attachment devices. Further, the position 72 for attaching the attachment device can be arbitrarily changed. If the stone 42 is fixed by injecting the non-shrink mortar into the case 28 of the mounting device 10 attached to the upper stage of the stone 42, the non-shrink mortar is inserted into the case 28 of the mounting device 10 attached to the lower portion. It is not necessary to inject. Further, by changing to a mounting device to be attached to the lower stage, a U-shaped plate 46 as shown in FIG. 7 can be attached to the concrete skeleton 44 so that the position of the stone 42 and the concrete skeleton 44 can be easily made parallel. is there.

【0025】そして、上記の取付装置及び工程を複数の
石材において行なうこうとによって、図5,図6に示す
ように、壁を石材で装飾することができる。このとき、
各石材をだぼによってつなぎ合わせる必要は無く、各石
材が独立した状態で図5,図6に示したような設置がで
きる。
By performing the mounting device and the steps on a plurality of stones, the walls can be decorated with the stones as shown in FIGS. At this time,
There is no need to join the stones with a dowel, and the installation as shown in FIGS. 5 and 6 can be performed in a state where the stones are independent.

【0026】以上のように、各石材が独立しているの
で、何らかの理由で1つの石材を撤去し、更に撤去した
石材に換えて新しい石材を設置する場合、撤去したい石
材だけを工事することができる。また、一番外側に配置
された石材42等、一部の石材42においては、ボルト
22をはずすことによって、石材側荷重受金物14から
石材42がはずれる。そして、新しい石材に第1ベース
金物16及び第2ベース金物18を取り付けて、ボルト
22をナット24に螺合することによって、新しい石材
が取り付けられる。また、ナット40をはずすことによ
って、石材42をコンクリート躯体44から取り外すこ
とも可能である。そして、ボルト22をはずして石材4
2を石材側荷重受金物14から取り外したあと、新しい
石材に第1ベース金物16及び第2ベース金物18を取
り付けて、ボルト22をナット24に螺合し、更に、躯
体側荷重受金物30に長ねじボルト38を通し、ナット
40を螺合することによって、新しい石材が取り付けら
れる。
As described above, since each stone is independent, if one stone is removed for some reason and a new stone is installed in place of the removed stone, it is necessary to construct only the stone to be removed. it can. In addition, in some stone materials 42 such as the stone material 42 arranged on the outermost side, the stone material 42 is detached from the stone-side load receiving object 14 by removing the bolt 22. Then, the first base metal 16 and the second base metal 18 are attached to the new stone, and the new stone is attached by screwing the bolt 22 to the nut 24. Further, the stone 42 can be removed from the concrete skeleton 44 by removing the nut 40. Then, remove the bolt 22 and remove the stone 4
2 is removed from the stone-side load receiving member 14, the first base metal member 16 and the second base metal member 18 are attached to a new stone member, and the bolt 22 is screwed into the nut 24. A new stone is attached by threading the nut 40 through the long screw bolt 38.

【0027】また、図5,図6に示した矩形の石材以外
にも、任意の形状をした石材においても取り付けること
が可能である。一例として、図8に示すような菱形の石
材や、図9に示すような曲線形状を有する石材を取り付
けることが可能である。また、ケース28での調節ボル
ト12の位置を調節することのよって、それぞれの石材
が、コンクリート躯体44に対して前後方向に段差を持
たせることが可能である。
In addition to the rectangular stones shown in FIGS. 5 and 6, it is possible to attach stones of any shape. As an example, it is possible to attach a diamond-shaped stone material as shown in FIG. 8 or a curved stone material as shown in FIG. In addition, by adjusting the position of the adjustment bolt 12 in the case 28, each stone can have a step in the front-rear direction with respect to the concrete skeleton 44.

【0028】更に、だぼによって石材を連結することが
ないので、目地の隙間からだぼが見えて美観を損ねるこ
とはない。その上、各石材が独立しているので、数回に
分けて無収縮モルタルを注入することがなく、短期間に
工事が完了する。使用する無収縮モルタルは、ケース2
8に入れる量が必要になるだけなので、総とろ工法や帯
とろ工法に比べて、無収縮モルタルの使用量を減らすこ
とができる。
Further, since the stones are not connected to each other by the dowels, the dowels can be seen from the gaps of the joints and the aesthetic appearance is not spoiled. In addition, since each stone is independent, the construction is completed in a short time without injecting the non-shrink mortar in several steps. The non-shrink mortar used is Case 2.
Since only the amount to be added to 8 is required, the amount of non-shrink mortar used can be reduced as compared with the total mortaring method and the band-filtration method.

【0029】石材42と石材42の隙間である目地にシ
ーリングを行なわないのであるならば、図10に示す石
材の上面図のように、石材42の表面に雨等が降りかか
っても、石材42の裏面に雨等が入り込まないようにす
る。図10のようにすると、完全に建築物装飾材の取付
装置10が、目地から見えない。
If sealing is not performed on joints, which are gaps between the stones 42, even if rain or the like falls on the surface of the stones 42 as shown in the top view of the stones 42 as shown in FIG. Prevent rain etc. from entering the backside of. In the case of FIG. 10, the mounting device 10 for building decoration materials is completely invisible from the joint.

【0030】本発明に係る建築物装飾材の取付装置を、
天井等の吊り物に使用する場合の実施形態を図3に示
す。ホールインアンカー52を下地になるコンクリート
躯体44に打ち込み、ホールインアンカー52をコンク
リート躯体44に固定する。その後、ホールインアンカ
ー52に長ねじボルト54を螺合する。更に、長ねじボ
ルト54にロックナット56を螺合するが、この段階で
はロックナット56は緩めておく。
The mounting device for a building decoration material according to the present invention comprises:
FIG. 3 shows an embodiment in which the present invention is used for a suspended object such as a ceiling. The hole-in anchor 52 is driven into the concrete skeleton 44 serving as a base, and the hole-in anchor 52 is fixed to the concrete skeleton 44. Then, the long screw bolt 54 is screwed into the hole-in anchor 52. Further, a lock nut 56 is screwed into the long screw bolt 54, but at this stage, the lock nut 56 is loosened.

【0031】第1ベース金物16及び第2ベース金物1
8には、図3に示すように第1ベース金物16及び第2
ベース金物18に対して鋭角、例えば45°の角度でそ
れぞれピン20,21を溶着しておく。更に、第1ベー
ス金物16にボルト22にあうナット24を溶着し、第
2ベース金物18にはナット24及びボルト22が通る
穴を開けておく。なお、第1ベース金物16に溶着され
たナット24の下部に、ボルト22のネジ山にあうネジ
の谷を設けることも可能である。また、第1ベース金物
16にナット24の対角距離に等しい長さの直径を有す
る円形の穴を開け、該穴にナット24を入れ、ナット2
4を第1ベース金物16に溶着することも可能である。
First base metal 16 and second base metal 1
8, a first base metal 16 and a second base metal 16 as shown in FIG.
The pins 20 and 21 are welded to the base metal 18 at an acute angle, for example, at an angle of 45 °. Further, a nut 24 corresponding to the bolt 22 is welded to the first base metal 16, and a hole through which the nut 24 and the bolt 22 pass is formed in the second base metal 18. In addition, it is also possible to provide a thread valley corresponding to the thread of the bolt 22 below the nut 24 welded to the first base hardware 16. Further, a circular hole having a diameter equal to the diagonal distance of the nut 24 is formed in the first base metal 16, the nut 24 is inserted into the hole, and the nut 2 is formed.
4 can also be welded to the first base metal 16.

【0032】石材42には第1ベース金物16及び第2
ベース金物18にそれぞれ溶着されたピン20,21が
入る穴17,19を設けておく。そして、ピン20,2
1を石材42に開けられた穴17,19に入れて、図3
に示すようにピン20,21で石材42の所定部分を挾
持する。その後、ケース28に設置されたボルト22が
通る穴及び第2ベース金物18に開けられた穴にボルト
22を通し、第1ベース金物16に溶着したナット24
にボルト22を螺合することによって、ケース28を第
2ベース金物18に固定する。
The stone 42 has the first base metal 16 and the second metal
Holes 17 and 19 for receiving pins 20 and 21 respectively welded to base metal 18 are provided. And the pins 20, 2
3 is inserted into the holes 17 and 19 formed in the stone 42, and FIG.
As shown in (1), a predetermined portion of the stone 42 is held between the pins 20 and 21. Thereafter, the bolts 22 are passed through holes through which the bolts 22 installed in the case 28 pass and holes formed in the second base metal member 18, and the nuts 24 welded to the first base metal member 16.
The case 28 is fixed to the second base metal member 18 by screwing the bolt 22 to the second base member 18.

【0033】石材42を所定の位置に配置し、長ねじボ
ルト54が充分にケース28の中に入るように長ねじボ
ルト54を回動させて調整する。そして、緩めておいた
ロックナット56を図3に示す位置で固定する。ロック
ナット56を図3に示す位置で固定することによって、
長ねじボルト54がホールインアンカー52から弛ん
で、落下するのを防止する。最後に、ケース28の内部
空間に無収縮モルタル等を注入して、石材42を図3に
示す所定位置に置き、無収縮モルタル等の定着力でケー
ス28と長ねじボルト54を固定する。
The stone material 42 is arranged at a predetermined position, and the long screw bolt 54 is rotated and adjusted so that the long screw bolt 54 is sufficiently inserted into the case 28. Then, the loosened lock nut 56 is fixed at the position shown in FIG. By fixing the lock nut 56 at the position shown in FIG.
The long screw bolt 54 is prevented from loosening from the hole-in anchor 52 and falling. Finally, non-shrink mortar or the like is injected into the internal space of the case 28, the stone 42 is placed at a predetermined position shown in FIG. 3, and the case 28 and the long screw bolt 54 are fixed by the fixing force of the non-shrink mortar or the like.

【0034】また、1石材において上記の工程及び取付
装置だけでは、石材42が不安定であるならば、1石材
に複数の取付装置50を使用することによって、安定し
て天井に石材42を取り付けられる。更に、複数個の石
材を上記工程及び取付装置によって天井に取り付けるこ
とによって、天井を装飾することができる。
In addition, if the stone 42 is not stable with only the above-described process and mounting device for one stone, the stone 42 is stably mounted on the ceiling by using a plurality of mounting devices 50 for one stone. Can be Further, the ceiling can be decorated by attaching a plurality of stone materials to the ceiling by the above-described steps and the attachment device.

【0035】本発明に係る建築物装飾材の取付装置を、
床面に使用する場合の実施形態を図4に示す。床面の下
地となるコンクリート躯体44にホールインアンカー3
6を打ち込み、ホールインアンカー36をコンクリート
躯体44に固定する。その後、ホールインアンカー36
に長ねじボルト38を螺合する。そして、躯体側荷重受
金物62に長ねじボルト38が通る穴及び角根ボルト3
2が通る穴を開ける。長ねじボルト38を上記の躯体側
荷重受金物62に開けられた長ねじボルト38が通る穴
に通し、長ねじボルト38にナット40を螺合して躯体
側荷重受金物62をコンクリート躯体44に固定する。
更に、ケース28に設けられた角根ボルト32が通る穴
と躯体側荷重受金物62に設けられた角根ボルト32が
通る穴に、角根ボルト32を通して、角根ボルト32に
あうナット34を螺合する。上記の工程によって、躯体
側荷重受金物62にケース28が固定される。
An installation device for a building decoration material according to the present invention comprises:
FIG. 4 shows an embodiment when used on a floor surface. Hole-in anchor 3 on concrete skeleton 44 that is the foundation of the floor
6, the hole-in anchor 36 is fixed to the concrete skeleton 44. After that, the hole-in anchor 36
Is screwed with a long screw bolt 38. The hole through which the long screw bolt 38 passes and the square root bolt 3
Make a hole through which 2 passes. The long screw bolt 38 is passed through the hole through which the long screw bolt 38 formed in the frame-side load receiving member 62 passes, and the nut 40 is screwed into the long screw bolt 38 to transfer the frame-side load receiving member 62 to the concrete frame 44. Fix it.
Further, the nut 34 that fits the square root bolt 32 is passed through the square root bolt 32 through the hole through which the square root bolt 32 provided in the case 28 and the hole through which the square root bolt 32 provided in the frame-side load receiving member 62 passes. Screw together. Through the above steps, the case 28 is fixed to the frame-side load receiving object 62.

【0036】第1ベース金物16及び第2ベース金物1
8には、ピン20,21を第1ベース金物16及び第2
ベース金物18に対して鋭角、例えば45°の角度で溶
着する。石材42には、ピン20,21が入る穴17,
19を開ける。また、第1ベース金物16に長ねじボル
ト64が合うナット66の対角距離に等しい長さの直径
を有する円形の穴を開ける。そして、ナット66を該穴
に入れ、第1ベース金物16にナット66を溶着する。
第2ベース金物18には、ナット66が通る穴をルーズ
に開けておく。更に、使用するナット66の高さが低い
場合、第1ベース金物16上にナット66を溶着するこ
とが可能である。
First base metal 16 and second base metal 1
8, the pins 20, 21 are connected to the first base metal 16 and the second
It is welded to the base metal 18 at an acute angle, for example, at an angle of 45 °. In the stone material 42, the holes 17,
Open 19. In addition, a circular hole having a diameter equal to the diagonal distance of the nut 66 in which the long screw bolt 64 fits with the first base metal 16 is formed. Then, the nut 66 is inserted into the hole, and the nut 66 is welded to the first base metal member 16.
A hole through which the nut 66 passes is loosely formed in the second base metal member 18. Further, when the height of the nut 66 to be used is low, the nut 66 can be welded on the first base metal member 16.

【0037】石材42に開けられた穴17,19に、第
1ベース金物16及び第2ベース金物18に溶着された
ピン20,21を入れて、図4に示すように、ピン2
0,21で石材42の所定部分を挾持する。第1ベース
金物16に取り付けられたナット66に長ねじボルト6
4を螺合することによって、第1ベース金物16及び第
2ベース金物18を石材42に固定する。更に、長ねじ
ボルト64にロックナット68を螺合して、図4に示す
位置で固定することによって、長ねじボルト64が弛ま
ないようにする。また、第1ベース金物16及び第2ベ
ース金物18が固定されないのならば、長ねじボルト6
4が通る穴を持った板を用いて、その穴に長ねじボルト
64を通し、第2ベース金物18とロックナット68の
間にその板を入れることによって固定する。
The pins 20 and 21 welded to the first base metal 16 and the second base metal 18 are inserted into the holes 17 and 19 formed in the stone 42, and as shown in FIG.
A predetermined portion of the stone 42 is sandwiched between 0 and 21. The long screw bolt 6 is attached to the nut 66 attached to the first base hardware 16.
The first base metal 16 and the second base metal 18 are fixed to the stone 42 by screwing the 4. Further, the lock nut 68 is screwed into the long screw bolt 64 and fixed at the position shown in FIG. 4 so that the long screw bolt 64 is not loosened. If the first base metal 16 and the second base metal 18 are not fixed, the long screw bolt 6
Using a plate having a hole through which the screw 4 passes, a long screw bolt 64 is passed through the hole, and the plate is fixed between the second base metal member 18 and the lock nut 68 by being inserted.

【0038】そして、ケース28の中に無収縮モルタル
を注入後、無収縮モルタルが固化する前に長ねじボルト
64をケース28の中に入れる。その後、無収縮モルタ
ルが固化すれば、コンクリート躯体44に石材42が取
り付けられる。
After the non-shrink mortar is poured into the case 28, the long screw bolt 64 is put into the case 28 before the non-shrink mortar solidifies. Thereafter, when the non-shrink mortar solidifies, the stone 42 is attached to the concrete skeleton 44.

【0039】また、1石材において上記の取付装置60
を1つ取り付けただけでは、石材42が不安定であるの
で、石材42の大きさ等にあわせて複数個の取付装置6
0を取り付けるのが望ましい。また、複数の石材を上記
の工程及び取付装置60によって床面に取り付けること
によって、床面を石材で装飾することが可能である。
The mounting device 60 for one stone material
Since the stone 42 is unstable if only one is mounted, the plurality of mounting devices 6 are adjusted according to the size of the stone 42 and the like.
It is desirable to attach 0. Further, by attaching a plurality of stone materials to the floor surface by the above-described process and the attachment device 60, it is possible to decorate the floor surface with stone materials.

【0040】本発明に係る建築物装飾材の取付方法及び
取付装置について、上記に建築物の下地に石材を設置す
る実施形態を記したが、本発明は上記の実施形態に限定
されるものではない。
The embodiment of the method of mounting a building decoration material and the mounting apparatus according to the present invention in which a stone is installed on the foundation of a building has been described above, but the present invention is not limited to the above embodiment. Absent.

【0041】一例として、図11に躯体側荷重受金物や
石材側荷重受金物等を使用しない建築物装飾材の取付装
置90を示す。建築物の下地であるコンクリート躯体4
4にホールインアンカー36を打ち込み、コンクリート
躯体44に固定する。長ねじボルト38をホールインア
ンカー36に螺合する。ケース94に長ねじボルト38
が通る穴を開け、この長ねじボルト38が通る穴に長ね
じボルト38を通して、長ねじボルト38にナット40
を螺合する。以上の工程によって、ケース94がコンク
リート躯体44に固定される。
As an example, FIG. 11 shows an installation device 90 for a building decoration material that does not use a frame-side load receiver, a stone-side load receiver, or the like. Concrete frame 4 that is the foundation of the building
The hole-in anchor 36 is driven into 4 and fixed to the concrete frame 44. A long screw bolt 38 is screwed into the hole-in anchor 36. Long screw bolt 38 in case 94
The long screw bolt 38 is passed through the hole through which the long screw bolt 38 passes, and the nut 40 is inserted into the long screw bolt 38.
Screw. Through the above steps, the case 94 is fixed to the concrete body 44.

【0042】石材42にはL字型棒92が入る穴を開け
て、L字型棒92を図9のように石材42に差し込む。
L字型棒92が石材42に開けた穴からはずれてしまう
のならば、接着剤等で固定する。L字型棒92をケース
94の中に入れて、その後、無収縮モルタルをケース9
4の中に入れる。無収縮モルタルが固化すると、石材4
2がコンクリート躯体44に固定される。
A hole for the L-shaped bar 92 is formed in the stone 42, and the L-shaped bar 92 is inserted into the stone 42 as shown in FIG.
If the L-shaped bar 92 comes off the hole made in the stone 42, it is fixed with an adhesive or the like. The L-shaped rod 92 is placed in the case 94, and then the non-shrink mortar is placed in the case 9.
Put in 4. When the non-shrink mortar solidifies, the stone 4
2 is fixed to the concrete body 44.

【0043】図5,図6に示すように、上記の取付装置
90を1石材において複数個取り付けることによって、
石材の取付強度が増す。また、複数の石材を上記の工程
及び取付装置90によって下地に取り付けることによっ
て、建築物の壁を石材で装飾することが可能である。
As shown in FIGS. 5 and 6, by mounting a plurality of the mounting devices 90 on one stone,
Stone mounting strength is increased. In addition, by attaching a plurality of stone materials to the groundwork using the above-described process and attachment device 90, it is possible to decorate the walls of the building with stone materials.

【0044】上述した実施形態は、全て石材において実
施されているが、石材以外のタイル、セラミック、木材
等においても応用が可能である。
Although the above-described embodiments are all applied to stones, they can be applied to tiles, ceramics, woods, etc. other than stones.

【0045】以上、本発明に係る建築物装飾材の取付方
法及び取付装置について、図面に基づいて説明したが、
上記の実施形態に限定されるものではない。その他、本
発明の趣旨を逸脱しない範囲内で、当業者の知識に基づ
き種々なる改良、修正、変形を加えた態様で実施し得る
ものである。
As described above, the method and apparatus for mounting a building decoration material according to the present invention have been described with reference to the drawings.
It is not limited to the above embodiment. In addition, various improvements, modifications, and variations can be made based on the knowledge of those skilled in the art without departing from the spirit of the present invention.

【0046】[0046]

【発明の効果】本発明に係る建築物装飾材の取付方法
は、各石材を独立して下地であるコンクリート躯体に取
り付けることによって、石材の取付工期の短縮が可能に
なった。更に、建築物装飾材の取付構造は、各石材が独
立しているので、ある石材を取り外し、且つ、取り外し
た石材に替えて新しい石材を取り付ける場合に、他の石
材を取り外すことなく工事が可能である。
According to the method of mounting a building decoration material according to the present invention, the mounting period of the stone material can be shortened by independently mounting each stone material on the concrete skeleton as a base. In addition, the installation structure of the building decoration material is independent of each stone, so when removing a certain stone and installing a new stone in place of the removed stone, construction can be done without removing other stones It is.

【0047】本発明に係る建築物装飾材の取付装置はだ
ぼを使用せず、石材と石材をだぼで連結することがない
ので、目地からだぼが見えて美観を損ねることはない。
また、本発明の取付装置が、目地から見えないように石
材と建築物の下地に取り付ければ、美観を損ねることは
ない。
The mounting device for a building decoration material according to the present invention does not use a dowel and does not connect stones to each other with a dowel, so that the dowel is visible from the joint and does not impair the aesthetic appearance.
Further, if the mounting device of the present invention is mounted on a stone and a base of a building so as not to be seen from the joint, the appearance is not spoiled.

【0048】本発明に係る建築物装飾材の取付装置にお
いて、使用する固化部材であるコンクリート(無収縮モ
ルタル等)は、ケースに入れる量だけが必要であり、総
とろ工法及び帯とろ工法に比べて使用するコンクリート
の量が少なく、経済的である。
In the building decoration material mounting apparatus according to the present invention, the amount of concrete (non-shrink mortar, etc.) used as a solidifying member is required only in the case, which is smaller than the total filtration method and the band and filtration method. The amount of concrete used is small and economical.

【0049】本発明に係る建築物装飾材の取付装置は、
建築物の下地に取り付けられる部材と石材に取り付けら
れる部材とに分かれているので、石材に取り付けられた
部材又は建築物の下地に取り付けられた部材を取り外す
ことによって、建築物の下地から石材を取り外すことが
できる。また、取り外した石材に換えて、新しい石材を
取り付けるときに、新しい石材に上記の石材に取り付け
られた部材を取り付けることによって、ただちに新しい
石材を建築物の下地に取り付けることができる。
The building decoration material mounting apparatus according to the present invention comprises:
Since it is divided into a member attached to the foundation of the building and a member attached to the stone, the stone is removed from the foundation of the building by removing the member attached to the stone or the member attached to the foundation of the building. be able to. In addition, when a new stone is attached to a new stone instead of the removed stone, the new stone can be immediately attached to the foundation of the building by attaching the member attached to the stone to the new stone.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る建築物装飾材の取付装置の1実施
形態を示す図である。
FIG. 1 is a view showing one embodiment of a mounting device for a building decoration material according to the present invention.

【図2】図1における建築物装飾材の取付装置の上面図
である。
FIG. 2 is a top view of the installation device for building decoration materials in FIG. 1;

【図3】天井等の吊り物における本発明の建築物装飾材
の取付装置の図である。
FIG. 3 is a diagram of a device for mounting a building decoration material of the present invention on a suspended object such as a ceiling.

【図4】床における本発明の建築物装飾材の取付装置の
図である。
FIG. 4 is a diagram of a device for mounting a building decoration material of the present invention on a floor.

【図5】複数の石材を下地の上に配列させたときの一例
を示す図である。
FIG. 5 is a diagram showing an example when a plurality of stone materials are arranged on a base.

【図6】複数の石材を下地の上に配列させ、1石材にお
いて4個の取付け装置を使用した図である。
FIG. 6 is a diagram in which a plurality of stones are arranged on a base and four attachment devices are used for one stone.

【図7】本発明の建築物装飾材の取付装置とコの字型板
を使用したときの図である。
FIG. 7 is a view when a building decoration material mounting device of the present invention and a U-shaped plate are used.

【図8】菱形の石材を複数こ使用して、下地の上に配列
させたときの一例を示す図である。
FIG. 8 is a diagram showing an example when a plurality of diamond-shaped stone materials are used and arranged on a base.

【図9】曲線形状を持った石材を複数使用して、下地の
上に配列させたときの一例を示す図である。
FIG. 9 is a diagram showing an example when a plurality of curved stones are used and arranged on a base.

【図10】石材の上面図であり、(a)は目地が段差を
有し、(b)は目地がV字型であり、(c)は目地が斜
め形状である。
10A and 10B are top views of a stone material. FIG. 10A shows a joint having a step, FIG. 10B shows a joint having a V-shape, and FIG. 10C shows a joint having an oblique shape.

【図11】他の実施例であり、ケースを直接コンクリー
ト躯体に取り付けた場合の図である。
FIG. 11 shows another embodiment, in which a case is directly attached to a concrete body.

【符号の説明】[Explanation of symbols]

10,50,60,90:建築物装飾材の取付装置(所
定の固定具) 12:調節ボルト(棒状体) 14:石材側荷重受金物 16:第1ベース金物(板状体) 17,19:ピンが入る穴 18:第2ベース金物(板状体) 20,21:ピン(挿入部材) 22:ボルト 23,67:空間 24,26,34,40,66:ナット 25,35,41:座金 28,94:ケース 30,62:躯体側荷重受金物 32:角根ボルト 36,52:ホールインアンカー 38,54,64:長ねじボルト 42:石材(建築物装飾材) 44:コンクリート躯体(建築物の下地) 46:コの字型板 56,68:ロックナット 72:取付装置の取付位置 92:L字型棒
10, 50, 60, 90: Mounting device for building decoration material (predetermined fixing tool) 12: Adjustment bolt (rod) 14: Stone-side load receiver 16: First base metal (plate) 17, 19 : Hole for inserting a pin 18: Second base metal (plate-like body) 20, 21: Pin (insertion member) 22: Bolt 23, 67: Space 24, 26, 34, 40, 66: Nut 25, 35, 41: Washers 28, 94: Case 30, 62: Frame-side load receiver 32: Square root bolts 36, 52: Hole-in anchors 38, 54, 64: Long screw bolts 42: Stone (building decoration) 44: Concrete frame ( 46: U-shaped plate 56, 68: Lock nut 72: Mounting position of mounting device 92: L-shaped rod

Claims (8)

【特許請求の範囲】[Claims] 【請求項1】 所定の固定具により複数の建築物装飾材
をそれぞれ独立して建築物の下地に取り付けて、該建築
物装飾材を所定方向に配列することを特徴とした建築物
装飾材の取付方法。
1. A building decoration material comprising a plurality of building decoration materials independently attached to a base of a building by predetermined fixing tools, and the building decoration materials are arranged in a predetermined direction. Mounting method.
【請求項2】 前記所定の固定具が、前記建築物装飾材
又は前記下地に取り付けられた棒状体と、該下地又は該
建築物装飾材に取り付けられ、該棒状体が入るケース状
体とを含む請求項1記載の建築物装飾材の取付方法。
2. The method according to claim 1, wherein the predetermined fixing device includes a rod-shaped body attached to the building decoration material or the groundwork, and a case-shaped body attached to the groundwork or the building decoration material and into which the rod-shaped body enters. The mounting method for a building decoration material according to claim 1, comprising:
【請求項3】 前記ケース状体に前記棒状体及び固化部
材を入れる工程を含む請求項2記載の建築物装飾材の取
付方法。
3. The method for mounting a building decoration material according to claim 2, further comprising a step of putting the rod-shaped body and the solidifying member into the case-shaped body.
【請求項4】 前記固化部材がコンクリートである請求
項3記載の建築物装飾材の取付方法。
4. The method according to claim 3, wherein the solidifying member is concrete.
【請求項5】 複数の建築物装飾材を建築物の下地に対
して所定方向に配列するための建築物装飾材の取付装置
であって、 該建築物装飾材をそれぞれ独立して該下地に取り付ける
所定の固定具を備えたことを特徴とする建築物装飾材の
取付装置。
5. A mounting device for a building decoration material for arranging a plurality of building decoration materials in a predetermined direction with respect to a foundation of a building, wherein the building decoration materials are independently attached to the foundation. A mounting device for a building decoration material, comprising a predetermined fixing device to be mounted.
【請求項6】 前記所定の固定具が、前記建築物装飾材
又は前記下地に取り付けられる棒状体と、該建築物装飾
材又は該下地に取り付けられ、該棒状体が入るケース状
体とを含む請求項5記載の建築物装飾材の取付装置。
6. The predetermined fixing tool includes a rod-shaped body attached to the building decoration material or the groundwork, and a case-shaped body attached to the building decoration material or the groundwork and into which the rod-shaped body enters. An installation device for a building decoration material according to claim 5.
【請求項7】 前記所定の固定具が、前記建築物装飾材
に開けられた複数の穴に入れて、該建築物装飾材の所定
部分を挾持する挿入部材を備えた請求項5又は請求項6
記載の建築物装飾材の取付装置。
7. The building fixture according to claim 5, wherein said fixture comprises an insertion member which is inserted into a plurality of holes formed in said building decoration material and clamps a predetermined portion of said building decoration material. 6
A mounting device for a building decoration material as described in the above.
【請求項8】 建築物の下地及び建築物装飾材にそれぞ
れ設置した所定の固定具によって、それぞれの該建築物
装飾材が独立し、且つ、複数の該建築物装飾材が所定方
向に配列して該建築物の下地に取り付けられていること
を特徴とする建築物装飾材の取付構造。
8. A building fixture and a plurality of building decoration materials are arranged in a predetermined direction independently by a predetermined fixing tool installed on a building base and a building decoration material, respectively. A structure for mounting a building decoration material, wherein the mounting structure is mounted on a base of the building.
JP2000036482A 2000-02-15 2000-02-15 Method of attaching a building decoration material and the attachment device Expired - Fee Related JP4404430B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000036482A JP4404430B2 (en) 2000-02-15 2000-02-15 Method of attaching a building decoration material and the attachment device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000036482A JP4404430B2 (en) 2000-02-15 2000-02-15 Method of attaching a building decoration material and the attachment device

Publications (2)

Publication Number Publication Date
JP2001227132A true JP2001227132A (en) 2001-08-24
JP4404430B2 JP4404430B2 (en) 2010-01-27

Family

ID=18560527

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000036482A Expired - Fee Related JP4404430B2 (en) 2000-02-15 2000-02-15 Method of attaching a building decoration material and the attachment device

Country Status (1)

Country Link
JP (1) JP4404430B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7722938B2 (en) 2003-02-14 2010-05-25 The Procter & Gamble Company Dry paint transfer laminate
US7727607B2 (en) 2003-06-09 2010-06-01 The Procter & Gamble Company Multi-layer dry paint decorative laminate having discoloration prevention barrier
US7842364B2 (en) 2003-02-14 2010-11-30 The Procter & Gamble Company Differential release system for a self-wound multilayer dry paint decorative laminate having a pressure sensitive adhesive
US7897228B2 (en) 2001-12-20 2011-03-01 The Procter & Gamble Company Articles and methods for applying color on surfaces
CN107090929A (en) * 2017-05-16 2017-08-25 浙江亚厦幕墙有限公司 A kind of attachment structure of stone curtain wall mould board

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5931341A (en) * 1982-08-11 1984-02-20 鹿島建設株式会社 Pc panel outer wall
JPH02150338U (en) * 1989-05-23 1990-12-26
JPH0363342A (en) * 1989-07-29 1991-03-19 Kajima Corp Wall device and manufacture of wall
JPH0462733U (en) * 1990-10-03 1992-05-28
JPH0647468U (en) * 1992-12-10 1994-06-28 三菱マテリアル株式会社 Building board mounting structure
JPH0754464A (en) * 1993-08-13 1995-02-28 Matsushita Electric Works Ltd Fitting structure of stone
JPH07279361A (en) * 1994-04-06 1995-10-27 Toto Ltd Fitting structure by dry execution method for ceramic plate such as tile
JPH084285A (en) * 1994-06-17 1996-01-09 Toshiba Eng & Constr Co Ltd Anchor form, and anchor construction method using the same
JPH11107384A (en) * 1997-10-06 1999-04-20 Toyota Motor Corp Support structure for building

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5931341A (en) * 1982-08-11 1984-02-20 鹿島建設株式会社 Pc panel outer wall
JPH02150338U (en) * 1989-05-23 1990-12-26
JPH0363342A (en) * 1989-07-29 1991-03-19 Kajima Corp Wall device and manufacture of wall
JPH0462733U (en) * 1990-10-03 1992-05-28
JPH0647468U (en) * 1992-12-10 1994-06-28 三菱マテリアル株式会社 Building board mounting structure
JPH0754464A (en) * 1993-08-13 1995-02-28 Matsushita Electric Works Ltd Fitting structure of stone
JPH07279361A (en) * 1994-04-06 1995-10-27 Toto Ltd Fitting structure by dry execution method for ceramic plate such as tile
JPH084285A (en) * 1994-06-17 1996-01-09 Toshiba Eng & Constr Co Ltd Anchor form, and anchor construction method using the same
JPH11107384A (en) * 1997-10-06 1999-04-20 Toyota Motor Corp Support structure for building

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7897228B2 (en) 2001-12-20 2011-03-01 The Procter & Gamble Company Articles and methods for applying color on surfaces
US7722938B2 (en) 2003-02-14 2010-05-25 The Procter & Gamble Company Dry paint transfer laminate
US7807246B2 (en) 2003-02-14 2010-10-05 The Procter & Gamble Company Dry paint transfer laminate
US7842364B2 (en) 2003-02-14 2010-11-30 The Procter & Gamble Company Differential release system for a self-wound multilayer dry paint decorative laminate having a pressure sensitive adhesive
US7842363B2 (en) 2003-02-14 2010-11-30 The Procter & Gamble Company Differential release system for a self-wound multilayer dry paint decorative laminate having a pressure sensitive adhesive
US7905981B2 (en) 2003-02-14 2011-03-15 The Procter & Gamble Company Method of making a dry paint transfer laminate
US7727607B2 (en) 2003-06-09 2010-06-01 The Procter & Gamble Company Multi-layer dry paint decorative laminate having discoloration prevention barrier
CN107090929A (en) * 2017-05-16 2017-08-25 浙江亚厦幕墙有限公司 A kind of attachment structure of stone curtain wall mould board

Also Published As

Publication number Publication date
JP4404430B2 (en) 2010-01-27

Similar Documents

Publication Publication Date Title
KR20090090845A (en) A fixing process for a out side panel and the apparactus
JP2001227132A (en) Method of mounting building decorative material, its mounting device and its mounting structure
KR101052830B1 (en) Stone Panel Fixture
JP2004339890A (en) Alc wall panel, and structure and method of fixing alc wall panel to floor slab
JPH04213664A (en) Connecting device for structure made of stone material or the like
CN104831929B (en) Decorated construction method of the interior wall plaque without scaffold
JPH0726402B2 (en) Reinforcement method such as cut slope
JP4240288B2 (en) Prop body
JP2003213888A (en) Plate member fixture
JP3740232B2 (en) Anchor bolt mounting bracket
KR200306744Y1 (en) Concrete form fixing tool for underground breast wall
JPH05321440A (en) Natural stone panel provided with bracket
JP3225394B2 (en) Equipment for attaching decorative blocks to concrete products
JPS63184665A (en) Method for embedding anchor for mounting handrail support
JP4288257B2 (en) Surface decoration method for residual mold
KR20000074520A (en) connecting device for stone plate
JP2018165451A (en) Fence attaching member and wall structure
JP3560661B2 (en) Concrete structure, natural stone bonded panel formwork and connecting metal fittings for natural stone bonded panel formwork
JP3002657B2 (en) Retaining wall fixing device
JP2539950Y2 (en) Composite panel
JPH094215A (en) Wall connection structure for scaffolding on concrete wall
KR910006600Y1 (en) Anchoring mean for railing posts
JP3004453B2 (en) Hard wall mounting structure
JP3157919B2 (en) Wall plate block construction method
JPH04153465A (en) Constructing method with partition bearing-wall panel for extension

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070214

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20081030

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20081104

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20081219

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090421

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20090617

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20091002

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20091102

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121113

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20151113

Year of fee payment: 6

LAPS Cancellation because of no payment of annual fees