JP2001201391A - Calibration system of flowmeter - Google Patents
Calibration system of flowmeterInfo
- Publication number
- JP2001201391A JP2001201391A JP2000011028A JP2000011028A JP2001201391A JP 2001201391 A JP2001201391 A JP 2001201391A JP 2000011028 A JP2000011028 A JP 2000011028A JP 2000011028 A JP2000011028 A JP 2000011028A JP 2001201391 A JP2001201391 A JP 2001201391A
- Authority
- JP
- Japan
- Prior art keywords
- chamber
- oil liquid
- storage tank
- oil
- flow meter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Measuring Volume Flow (AREA)
Abstract
Description
【0001】[0001]
【発明の属する技術分野】本発明は流量計校正システム
に係り、特に流量計の校正精度を向上させるよう構成さ
れた流量計校正システムに関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a flowmeter calibration system, and more particularly to a flowmeter calibration system configured to improve the calibration accuracy of a flowmeter.
【0002】[0002]
【従来の技術】組立が完了した流量計の校正を行うた
め、流量計を流量計校正システムの配管途中に設置し、
ポンプから送液された水量を実際に計測して流量計固有
の計測精度を調べている。従来の流量計校正システムで
は、軽油や灯油等の油液を計測する流量計の校正を行う
場合、流量計測値と目盛り付けされた計量タンク(基準
器)に供給された油液の体積の差から計測誤差を求めて
いた。2. Description of the Related Art In order to calibrate a flow meter that has been assembled, a flow meter is installed in the piping of a flow meter calibration system,
The amount of water sent from the pump is actually measured to check the measurement accuracy inherent to the flow meter. In a conventional flow meter calibration system, when calibrating a flow meter that measures oil liquid such as light oil or kerosene, the difference between the measured flow rate and the volume of oil liquid supplied to a graduated measuring tank (reference unit) is measured. From the measurement error.
【0003】[0003]
【発明が解決しようとする課題】ところで、従来の流量
計校正システムにおいては、貯蔵タンクに貯溜された被
測流体をポンプにより送液して流量計に供給した後、被
測流体が貯蔵タンクに還流されるシステム構成を採って
いる。つまり、被測流体を一旦、基準タンクに貯溜する
際、貯蔵タンク内の液位(水頭)が漸減し、計測が終了
すると漸増することを繰り返しており、液位(水頭)が
変動する。このことで、供給圧力が変動し、校正システ
ム系に接続された流量計の正確な校正が為し得ないとい
った問題がある。By the way, in the conventional flow meter calibration system, after the measured fluid stored in the storage tank is fed by the pump and supplied to the flow meter, the measured fluid is stored in the storage tank. The system has a recirculated system. In other words, when the measured fluid is once stored in the reference tank, the liquid level (water head) in the storage tank gradually decreases, and when the measurement is completed, the liquid level (water head) repeatedly increases, and the liquid level (water head) fluctuates. As a result, there is a problem that the supply pressure fluctuates, and accurate calibration of the flow meter connected to the calibration system cannot be performed.
【0004】従来の流量計校正システムにおいて、流量
計により計測された油液を基準タンクで計量した後、貯
蔵タンクへ還流させているため、貯蔵タンクに還流され
た油液中には、気泡が混入されており、この気泡が混入
された油液をそのまま次回の流量計の校正を行うために
供給してしまうと、その分流量計の計測値に誤差が生じ
てしまうといった問題がある。In the conventional flow meter calibration system, since the oil liquid measured by the flow meter is measured in the reference tank and then returned to the storage tank, bubbles are contained in the oil liquid returned to the storage tank. If the oil liquid mixed with the air bubbles is supplied as it is for the next calibration of the flowmeter, there is a problem that an error occurs in the measured value of the flowmeter.
【0005】そこで、本発明は、上記課題を解決した流
量計校正システムを提供することを目的とする。Therefore, an object of the present invention is to provide a flowmeter calibration system which has solved the above-mentioned problems.
【0006】[0006]
【課題を解決するための手段】上記課題を解決するた
め、本発明は以下のような特徴を有する。In order to solve the above problems, the present invention has the following features.
【0007】上記請求項1記載の発明は、校正用の油液
が貯蔵された貯蔵タンクと、該貯蔵タンクの油液を供給
する油液供給経路と、該油液供給経路を介して油液を送
液するポンプと、該ポンプにより送液された油液を計測
する流量計と、油液を貯溜して液量を計量する基準器
と、該計量器の油液を前記貯蔵タンクに還流させる還流
経路とを備えてなり、前記流量計の計測値と前記基準メ
ータの計測値とを比較して前記流量計を校正するよう構
成された流量計校正システムにおいて、前記貯蔵タンク
は、互いに独立した第1、第2の室を有し前記油液供給
経路を前記第1の室の底部近傍に接続し、前記還流経路
を前記第1の室の上部に接続し、少なくとも、基準器へ
油液を供給中は、前記第1の室の油液を前記第2の室に
常時溢出させるよう構成したことを特徴とするものであ
る。According to the first aspect of the present invention, there is provided a storage tank in which an oil liquid for calibration is stored, an oil liquid supply path for supplying the oil liquid in the storage tank, and an oil liquid supply path via the oil liquid supply path. Pump, a flow meter for measuring the oil liquid sent by the pump, a reference device for storing the oil liquid and measuring the amount of the liquid, and returning the oil liquid of the measuring device to the storage tank. A flow path calibration system configured to compare the measurement value of the flow meter with the measurement value of the reference meter to calibrate the flow meter, wherein the storage tanks are independent of each other. The first and second chambers, the oil liquid supply path is connected near the bottom of the first chamber, and the return path is connected to the upper part of the first chamber. During the supply of the liquid, the oil liquid in the first chamber always overflows into the second chamber. It is characterized in that the form.
【0008】従って、請求項1記載の発明によれば、少
なくとも、基準器へ油液を供給中は、前記第1の室の油
液を前記第2の室に常時溢出させるよう構成したため、
流量計により計測された油液を基準器へ供給している間
は貯蔵タンク内の液位(水頭)が一定となり、流量計に
供給される油液の供給圧力が変動することを防止でき、
校正精度を向上させることができる。Therefore, according to the first aspect of the present invention, at least while the oil liquid is being supplied to the reference device, the oil liquid in the first chamber is always overflowed into the second chamber.
While the oil liquid measured by the flow meter is being supplied to the reference device, the liquid level (head) in the storage tank is constant, and the supply pressure of the oil liquid supplied to the flow meter can be prevented from fluctuating.
Calibration accuracy can be improved.
【0009】また、第1の室から溢れた油液を第2の室
に流出させると共に、還流経路を貯蔵タンク内に形成さ
れた第2の室の上部に接続することにより、第2の室の
油液を第1の室の上部に還流させるため、油液中に混入
された気泡を分離させて第2の室に排出し、気泡が除去
された第1の室の底部近傍から油液を流量計に送液でき
るので、気泡混入による計測誤差を防止できる。Further, the oil liquid overflowing from the first chamber is caused to flow out to the second chamber, and the return path is connected to the upper portion of the second chamber formed in the storage tank, whereby the second chamber is formed. In order to recirculate the oil liquid to the upper part of the first chamber, the air bubbles mixed in the oil liquid are separated and discharged to the second chamber, and the oil liquid is removed from near the bottom of the first chamber from which the air bubbles have been removed. Can be sent to the flow meter, so that measurement errors due to air bubbles can be prevented.
【0010】また、請求項2記載の発明は、前記貯蔵タ
ンクを所定角度傾斜させたことを特徴とするものであ
る。Further, the invention according to claim 2 is characterized in that the storage tank is inclined at a predetermined angle.
【0011】従って、請求項2記載の発明によれば、貯
蔵タンクを所定角度傾斜させたため、第1の室から溢れ
た油液を第2の室に容易に流出させることができると共
に、第1の室の油液に混入された気泡を第1の室の上部
空間へ浮上させて分離させることができる。According to the second aspect of the present invention, since the storage tank is inclined at a predetermined angle, the oil liquid overflowing from the first chamber can be easily discharged to the second chamber, and the first tank can be easily discharged to the second chamber. Bubbles mixed in the oil liquid in the first chamber can be separated by floating in the upper space of the first chamber.
【0012】また、請求項3記載の発明は、前記貯蔵タ
ンクの内部に2つの室に画成する仕切りを設け、該仕切
りの上部に前記第1の室と前記第2の室とを連通する連
通手段を設けたことを特徴とするものである。According to a third aspect of the present invention, a partition that defines two chambers is provided inside the storage tank, and the first chamber and the second chamber communicate with each other above the partition. A communication means is provided.
【0013】従って、請求項3記載の発明によれば、貯
蔵タンクの内部に2つの室に画成する仕切りを設け、仕
切りの上部に第1の室と第2の室とを連通する連通手段
を設けたため、第1の室に還流された油液の液位が仕切
りより高くなると、第1の室から溢れた油液が第2の室
に溢流して液位を一定に保つことにより供給圧力の変動
を防止でき、且つ第1の室の上部に溜まった気泡を第2
の室に排出して流量計に供給される油液から気泡を分離
させることができる。Therefore, according to the third aspect of the present invention, a partition that defines two chambers is provided inside the storage tank, and a communication means that connects the first chamber and the second chamber above the partition. When the liquid level of the oil liquid refluxed to the first chamber becomes higher than the partition, the oil liquid overflowing from the first chamber overflows to the second chamber and is supplied by keeping the liquid level constant. Pressure fluctuation can be prevented, and bubbles accumulated at the upper part of the first chamber are removed from the second chamber.
Air bubbles can be separated from the oil liquid discharged to the chamber and supplied to the flow meter.
【0014】また、請求項4記載の発明は、前記貯蔵タ
ンク内に気泡除去手段を設けたことを特徴とするもので
ある。The invention according to claim 4 is characterized in that a bubble removing means is provided in the storage tank.
【0015】従って、請求項4記載の発明によれば、貯
蔵タンク内に気泡除去手段を設たため、貯蔵タンク内に
還流された油液中に含まれる気泡を気泡除去手段により
除去することができる。Therefore, according to the fourth aspect of the present invention, since the bubble removing means is provided in the storage tank, bubbles contained in the oil liquid refluxed in the storage tank can be removed by the bubble removing means. .
【0016】また、請求項5記載の発明は、校正用の油
液が貯蔵された貯蔵タンクと、該貯蔵タンクの油液を供
給する油液供給経路と、該油液供給経路を介して油液を
送液するポンプと、該ポンプにより送液された油液を計
測する流量計と、油液を貯溜して液量を計量する基準器
と、該計量器の油液を前記貯蔵タンクに還流させる還流
経路とを備えてなり、前記流量計の計測値と前記基準メ
ータの計測値とを比較して前記流量計を校正するよう構
成された流量計校正システムにおいて、前記貯蔵タンク
を所定角度傾斜させ、且つ前記貯蔵タンクの内部を第
1、第2の室に画成する仕切りを設け、該仕切りの上部
に前記第1の室と前記第2の室とを連通する空間を設
け、前記油液供給経路を前記第1の室の底部近傍に接続
し、前記還流経路を前記第1の室の上部に接続し、少な
くとも、基準器へ油液を供給中は、前記第1の室の油液
を前記第2の室に常時溢出させるよう構成したことを特
徴とするものである。According to a fifth aspect of the present invention, there is provided a storage tank for storing an oil liquid for calibration, an oil liquid supply path for supplying the oil liquid in the storage tank, and an oil liquid supply path via the oil liquid supply path. A pump that sends the liquid, a flow meter that measures the oil liquid sent by the pump, a reference device that stores the oil liquid and measures the amount of the liquid, and the oil liquid of the measuring device into the storage tank. A reflux path for refluxing, wherein the flowmeter calibrating system configured to calibrate the flowmeter by comparing the measured value of the flowmeter with the measured value of the reference meter, wherein the storage tank has a predetermined angle. A partition that inclines and defines the inside of the storage tank in first and second chambers, and a space that communicates the first chamber and the second chamber is provided above the partition; An oil liquid supply path is connected near the bottom of the first chamber, and the return path is It is connected to the upper part of the first chamber, and at least during the supply of the oil liquid to the reference device, the oil liquid in the first chamber always overflows to the second chamber. is there.
【0017】従って、請求項5記載の発明によれば、少
なくとも、基準器へ油液を供給中は、前記第1の室の油
液を前記第2の室に常時溢出させるよう構成したため、
流量計により計測された油液を基準器へ供給している間
は、貯蔵タンク内の液位(水頭)が一定となり、流量計
に供給される油液の供給圧力が変動することを防止で
き、校正精度を向上させることができる。また、貯蔵タ
ンクを所定角度傾斜させたため、第1の室から溢れた油
液を第2の室に容易に流出させることができると共に、
第1の室の油液に混入された気泡を第1の室の上部空間
へ浮上させて分離させることができる。また、貯蔵タン
ク内に気泡除去手段を設たため、貯蔵タンク内に還流さ
れた油液中に含まれる気泡を気泡除去手段により除去す
ることができる。Therefore, according to the fifth aspect of the present invention, at least while the oil liquid is being supplied to the reference device, the oil liquid in the first chamber always overflows into the second chamber.
While the oil liquid measured by the flow meter is being supplied to the reference device, the liquid level (head) in the storage tank is constant, and the supply pressure of the oil liquid supplied to the flow meter can be prevented from fluctuating. In addition, the calibration accuracy can be improved. In addition, since the storage tank is inclined by a predetermined angle, the oil liquid overflowing from the first chamber can easily flow out to the second chamber,
Bubbles mixed into the oil liquid in the first chamber can be separated by floating in the upper space of the first chamber. Further, since the bubble removing means is provided in the storage tank, the bubbles contained in the oil liquid refluxed in the storage tank can be removed by the bubble removing means.
【0018】[0018]
【発明の実施の形態】以下、添付図面を参照して本発明
の実施の形態について説明する。Embodiments of the present invention will be described below with reference to the accompanying drawings.
【0019】図1は本発明になる流量計校正システムの
一実施の形態を示す構成図である。FIG. 1 is a block diagram showing one embodiment of a flow meter calibration system according to the present invention.
【0020】図1に示されるように、流量計校正システ
ム10では、校正用の油液が貯蔵された貯蔵タンク12
と、貯蔵タンク12の油液を供給する油液供給経路14
と、油液供給経路14を介して油液を送液する送液用ポ
ンプ16と、送液用ポンプ16により送液された油液を
計測する流量計(テストメータ)18と、基準器として
の計量タンク20と、計量タンク20の油液を貯蔵タン
ク12に還流させる還流経路22とを備えてなる。As shown in FIG. 1, in a flow meter calibration system 10, a storage tank 12 storing an oil solution for calibration is provided.
And an oil supply path 14 for supplying the oil in the storage tank 12.
A pump 16 for feeding the oil through the oil supply path 14, a flow meter (test meter) 18 for measuring the oil fed by the pump 16, and a reference device. And a reflux path 22 for returning the oil liquid in the measurement tank 20 to the storage tank 12.
【0021】また、計量タンク20の隣には、循環用回
収タンク24が設けられており、計量タンク20及び循
環用回収タンク24の上部には、流量計18を通過して
油液供給経路14を流れる油液が供給される転流器26
が設けられている。この転流器26は、計量タンク20
と回収タンク24との連通系路を切り替えるものであ
る。すなわち、転流器26は、計量タンク20と回収タ
ンク24との分岐路に設けられており、内部に設けられ
た転流板(図示せず)を揺動させて流量計測前は油液を
回収タンク24に導き、流量計測中は油液を計量タンク
20に導くように動作する。尚、計量タンク20は、流
量計18で計測された流量の体積を測定できるように構
成されていれば良いので、例えばメスシリンダを大型化
したような体積基準器を用いても良い。A circulation recovery tank 24 is provided adjacent to the measuring tank 20. Above the measuring tank 20 and the circulation collecting tank 24, an oil liquid supply path 14 passing through a flow meter 18 is provided. Commutator 26 supplied with oil flowing through
Is provided. The commutator 26 is connected to the measuring tank 20.
The communication path between the tank and the collection tank 24 is switched. That is, the commutator 26 is provided in a branch path between the measuring tank 20 and the collection tank 24, and oscillates a commutation plate (not shown) provided therein to remove the oil liquid before the flow rate measurement. It operates to guide the oil liquid to the collection tank 24 and to guide the oil liquid to the measuring tank 20 during the flow rate measurement. It is sufficient that the measuring tank 20 is configured to be able to measure the volume of the flow rate measured by the flow meter 18, and therefore, for example, a volume standard device in which a measuring cylinder is enlarged may be used.
【0022】そして、流量計18による流量計測が終了
した時点で油液を回収タンク24に導くように転流器2
6の転流板(図示せず)が復帰する。また、計量タンク
20の底部には、計量タンク20の供給された油液の質
量を測定するための基準秤28が設置されている。尚、
流量計18と転流器26との間を連通する油液供給経路
14には、開閉弁30が設けられ、回収タンク24と貯
蔵タンク12との間を連通する還流経路22には、還流
用ポンプ32が配設されている。この還流用ポンプ32
は、少なくとも、流量計18により計測された油液が計
量タンク20に供給されている間は、常時起動される。When the flow rate measurement by the flow meter 18 is completed, the commutator 2 guides the oil liquid to the recovery tank 24.
The commutation plate 6 (not shown) returns. At the bottom of the measuring tank 20, a reference balance 28 for measuring the mass of the supplied oil liquid in the measuring tank 20 is installed. still,
An on-off valve 30 is provided in the oil liquid supply path 14 that communicates between the flow meter 18 and the commutator 26, and a return path 22 that communicates between the collection tank 24 and the storage tank 12 A pump 32 is provided. This reflux pump 32
Is always started at least while the oil liquid measured by the flow meter 18 is being supplied to the measuring tank 20.
【0023】貯蔵タンク12は、内部が中仕切板34に
より第1の室36と第2の室38とに画成されている。
また、中仕切板34は、第1の室36に還流された油液
の液位を所定高さに保つように形成されている。従っ
て、中仕切板34の上方は、第1の室36と第2の室3
8とを連通するための上部空間(連通手段)40となっ
ている。The inside of the storage tank 12 is defined by a partitioning plate 34 into a first chamber 36 and a second chamber 38.
The middle partition plate 34 is formed so as to maintain the level of the oil liquid returned to the first chamber 36 at a predetermined level. Therefore, the first chamber 36 and the second chamber 3 are located above the partition 34.
8 is an upper space (communication means) 40 for communicating with the control unit 8.
【0024】そして、少なくとも、流量計18により計
測された油液が計量タンク20に供給されている間は、
第1の室36に十分な油液が供給されており、第1の室
36に還流された油液の液位が中仕切板34の高さを越
えて第1の室36の液面付近の油液が上部空間40を介
して第2の室38へ溢流する。これにより、第1の室3
6における水頭(ヘッド)が一定に保たれる。従って、
油液供給経路14を介して流量計18に送液される油液
の供給圧力が貯蔵タンク12の液位によって変動するこ
とが防止される。At least while the oil liquid measured by the flow meter 18 is being supplied to the measuring tank 20,
Sufficient oil liquid is supplied to the first chamber 36, and the level of the oil liquid refluxed to the first chamber 36 exceeds the height of the partition 34 and is near the liquid level of the first chamber 36. Flows into the second chamber 38 via the upper space 40. Thereby, the first room 3
The head at 6 is kept constant. Therefore,
The supply pressure of the oil liquid sent to the flow meter 18 via the oil liquid supply path 14 is prevented from fluctuating due to the liquid level in the storage tank 12.
【0025】尚、第1の室36に油液を還流させるため
の循環用回収タンク24及び第2の室38は、第1の室
36の容量(容積)よりも十分に大きな容量(容積)を
持っており、計量タンク20で計量中に第1の室36の
液位が中仕切板34の高さより低くなることが無いよう
ようになっている。また、第2の室38は、第1の室3
6と別体に設けるようにしても良いし、あるいは、循環
用回収タンク24を第2の室38として用いた構成とす
ることもできる。その場合、第1の室36と第2の室3
8との間を連通する管路が連通手段となる。The circulation recovery tank 24 for recirculating the oil liquid into the first chamber 36 and the second chamber 38 have a capacity (volume) sufficiently larger than the capacity (volume) of the first chamber 36. So that the liquid level in the first chamber 36 does not become lower than the height of the partition 34 during the measurement in the measuring tank 20. The second chamber 38 is the first chamber 3
6 may be provided separately, or the circulation recovery tank 24 may be used as the second chamber 38. In that case, the first chamber 36 and the second chamber 3
A conduit communicating with the line 8 is a communication means.
【0026】さらに、還流経路22を介して第1の室3
6に還流された油液中に気泡が混入していても浮力によ
り気泡が第1の室36の液面付近に溜まりやすいので、
第2の室38へ溢流する油液と共に気泡を第2の室38
へ排出して第1の室36の油液から分離することができ
る。また、貯蔵タンク12において、油液供給経路14
が第1の室36の底部に接続され、還流経路22が第1
の室36の上部に接続されている。このため、油液供給
経路14へ送液される油液には、気泡が混入されてな
く、気泡混入による流量計18の計測誤差を防止でき
る。Further, the first chamber 3
Even if air bubbles are mixed in the oil liquid refluxed to 6, the air bubbles tend to collect near the liquid surface of the first chamber 36 due to buoyancy.
Bubbles are formed together with the oil liquid overflowing into the second chamber 38.
To separate from the oil liquid in the first chamber 36. In the storage tank 12, the oil supply path 14
Is connected to the bottom of the first chamber 36, and the return path 22 is
Is connected to the upper part of the chamber 36. For this reason, no bubbles are mixed in the oil liquid sent to the oil liquid supply path 14, and a measurement error of the flowmeter 18 due to the mixing of the bubbles can be prevented.
【0027】また、第2の室38の底部には、循環経路
42の一端が接続され、第2の室38の上部には、循環
経路42の一端が接続されている。そして、循環経路4
2には、循環用ポンプ44が配設されている。尚、第2
の室38においては、第1の室36から中仕切板34を
越えて溢流した油液中に含まれた気泡が浮力により液面
付近に溜まり、油液から分離される。The bottom of the second chamber 38 is connected to one end of a circulation path 42, and the top of the second chamber 38 is connected to one end of the circulation path 42. And circulation route 4
2 is provided with a circulation pump 44. The second
In the chamber 38, bubbles contained in the oil liquid overflowing from the first chamber 36 over the intermediate partition plate 34 accumulate near the liquid surface due to buoyancy and are separated from the oil liquid.
【0028】循環用ポンプ44は、第1の室36の液位
が所定以下に低下したことが検出されたとき起動され、
第2の室38の底部付近から気泡が混入していない油液
を吸引して、循環経路42を介して第1の室36の上部
に供給する。このように、貯蔵タンク12の内部に形成
された第1の室36と第2の室38との間では、循環経
路42を介して油液の循環が行われる。また、循環用ポ
ンプ44は、少なくとも、流量計18により計測された
油液が計量タンク20に供給されている間は、常時起動
させるようにしても良い。The circulation pump 44 is activated when it is detected that the liquid level in the first chamber 36 has dropped below a predetermined level.
The oil liquid containing no air bubbles is sucked from near the bottom of the second chamber 38 and supplied to the upper part of the first chamber 36 through the circulation path 42. As described above, the circulation of the oil liquid is performed via the circulation path 42 between the first chamber 36 and the second chamber 38 formed inside the storage tank 12. The circulation pump 44 may be always started at least while the oil liquid measured by the flow meter 18 is being supplied to the measuring tank 20.
【0029】尚、上記第1の室36と第2の室38及び
回収タンク24には、液位を検出する液位計(液面計)
45,46,47が挿入されている。さらに、貯蔵タン
ク12の上面には、上部空間に連通する通気管50が設
けられている。The first chamber 36, the second chamber 38, and the collection tank 24 are provided with a liquid level meter (liquid level meter) for detecting a liquid level.
45, 46 and 47 are inserted. Further, a vent pipe 50 communicating with the upper space is provided on the upper surface of the storage tank 12.
【0030】また、送液用ポンプ16により送液される
流量F1は、還流用ポンプ32により送液される流量F
2とほぼ同一流量であり、循環用ポンプ44により送液
される流量F3は、第1の室36から第2の室38へ溢
流する流量とほぼ同一流量である。The flow rate F1 fed by the pump 16 is the flow rate F1 fed by the reflux pump 32.
2, the flow rate F3 sent by the circulation pump 44 is substantially the same as the flow rate overflowing from the first chamber 36 to the second chamber 38.
【0031】ここで、上記のように構成された貯蔵タン
ク12に貯溜された油液を送液して流量計18の検定を
行う場合の動作について説明する。ポンプ16の起動に
より貯蔵タンク12の第1の室36に貯蔵された油液が
送液されると、流量計18は、油液供給経路14を流れ
る油液の流量を計測する。そして、流量計18を通過し
た油液は、油液供給経路14を介して転流器26に供給
される。Here, the operation in the case where the oil liquid stored in the storage tank 12 configured as described above is sent and the flow meter 18 is verified will be described. When the oil liquid stored in the first chamber 36 of the storage tank 12 is sent by the activation of the pump 16, the flow meter 18 measures the flow rate of the oil liquid flowing through the oil liquid supply path 14. The oil liquid that has passed through the flow meter 18 is supplied to the commutator 26 via the oil liquid supply path 14.
【0032】転流器26では、前述したように流量計測
前は内部に設けられた転流板(図示せず)を揺動させて
油液を回収タンク24に導き、流量計測中は転流板(図
示せず)を逆方向に揺動させて油液を計量タンク20に
導くように動作する。これにより、流量計18で流量計
測を行っている間のみ油液が計量タンク20に供給され
る。In the commutator 26, before measuring the flow rate, the commutation plate (not shown) provided therein is swung before the flow rate measurement as described above to guide the oil liquid to the recovery tank 24. The plate (not shown) is operated to swing in the opposite direction to guide the oil liquid to the measuring tank 20. Thus, the oil liquid is supplied to the measuring tank 20 only while the flow rate is measured by the flow meter 18.
【0033】そして、流量計18による流量計測が終了
した時点で油液を回収タンク24に導くように転流器2
6の転流板(図示せず)が復帰する。これにより、計量
タンク20には、流量計18で計測された流量と同一容
量の油液が供給される。When the flow rate measurement by the flow meter 18 is completed, the commutator 2 guides the oil liquid to the recovery tank 24.
The commutation plate 6 (not shown) returns. As a result, the same volume of oil liquid as the flow rate measured by the flow meter 18 is supplied to the measuring tank 20.
【0034】その後、計量タンク20に供給された油液
の質量が基準秤28により測定される。この基準秤28
により測定された油液の質量は、基準値として流量計1
8により計測された流量値と比較される。そして、比較
結果に基づいて、流量計測値の校正が行われる。After that, the mass of the oil liquid supplied to the measuring tank 20 is measured by the reference balance 28. This reference scale 28
The mass of the oil liquid measured by the
8 is compared with the measured flow value. Then, based on the comparison result, the calibration of the flow measurement value is performed.
【0035】尚、循環用ポンプ44は、常時起動させて
も良いが、これに限らず、液位計45により計測された
第1の室3の液位が所定値以下に下がった時に起動させ
るようにしても良い。The circulation pump 44 may be started at all times, but is not limited to this, and is started when the liquid level in the first chamber 3 measured by the liquid level meter 45 falls below a predetermined value. You may do it.
【0036】図2は本発明の変形例の貯蔵タンク51を
示す正面図である。図3は変形例の貯蔵タンク51の左
側面図である。図4は変形例の貯蔵タンク51のC−C
線に沿う断面図である。図5は貯蔵タンク51の平面図
である。図6は貯蔵タンク51の長手方向に沿う断面図
である。FIG. 2 is a front view showing a storage tank 51 according to a modification of the present invention. FIG. 3 is a left side view of the storage tank 51 of the modified example. FIG. 4 is a cross-sectional view of the storage tank 51 according to the modification.
It is sectional drawing which follows a line. FIG. 5 is a plan view of the storage tank 51. FIG. 6 is a cross-sectional view of the storage tank 51 along the longitudinal direction.
【0037】図2乃至図6に示されるように、変形例の
貯蔵タンク51は、円筒形状に形成されており、水平面
に対し所定角度θ(例えば、θ=約10度〜20度)傾
斜した状態で取り付けられている。また、貯蔵タンク5
1は、底部に油液供給経路14が接続される取出口52
が設けられ、上部に還流経路22が接続される流入口5
4が設けられている。この流入口54は、貯蔵タンク5
1の第1の室64に挿入されたドロップパイプ56に連
通されている。As shown in FIGS. 2 to 6, the storage tank 51 of the modified example is formed in a cylindrical shape and is inclined at a predetermined angle θ (for example, θ = about 10 to 20 degrees) with respect to a horizontal plane. Installed in state. In addition, storage tank 5
1 is an outlet 52 to which the oil liquid supply path 14 is connected at the bottom.
Is provided, and an inflow port 5 to which a reflux path 22 is connected
4 are provided. This inflow port 54 is connected to the storage tank 5
The first chamber 64 communicates with a drop pipe 56 inserted into the first chamber 64.
【0038】さらに、貯蔵タンク51の上部には、内部
の上部空間58に連通する通気口60が設けられてい
る。そして、貯蔵タンク51の断面中央には、第1の室
62と第2の室64とに画成する中仕切板66が起立し
た状態で長手方向に延在している。上記ドロップパイプ
56は、第1の室62の上部空間に連通する位置に挿入
されており、取出口52は第1の室62の下部空間に連
通するように設けられている。Further, a vent 60 communicating with the internal upper space 58 is provided above the storage tank 51. At the center of the cross section of the storage tank 51, an intermediate partition plate 66 that defines a first chamber 62 and a second chamber 64 extends in the longitudinal direction in an upright state. The drop pipe 56 is inserted at a position communicating with the upper space of the first chamber 62, and the outlet 52 is provided so as to communicate with the lower space of the first chamber 62.
【0039】中仕切板66は、第1の室62と第2の室
64との間を連通する上部空間58を残すように上端縁
部66aが水平方向にカットされている。そのため、第
1の室62に還流された油液の液面が上端縁部66aを
越えると、中仕切板66の上端縁部66aを乗り越えて
第2の室64に溢流する。The upper end edge 66a of the middle partition plate 66 is horizontally cut so as to leave an upper space 58 communicating between the first chamber 62 and the second chamber 64. Therefore, when the liquid level of the oil recirculated to the first chamber 62 exceeds the upper edge 66 a, it flows over the upper edge 66 a of the partition 66 and overflows into the second chamber 64.
【0040】従って、中仕切板66の上端縁部66aの
高さ位置により第1の室62における水頭(ヘッド)が
一定に保たれ、油液供給経路14を介して流量計18に
送液される油液の供給圧力が貯蔵タンク51の液位によ
って変動することが防止される。Therefore, the head in the first chamber 62 is kept constant by the height position of the upper end edge 66 a of the middle partition plate 66, and the liquid is sent to the flow meter 18 via the oil supply path 14. Oil supply pressure is prevented from fluctuating due to the liquid level in the storage tank 51.
【0041】さらに、還流経路22を介して第1の室6
2に還流された油液中に気泡が混入していても浮力によ
り気泡が第1の室62の液面付近に溜まりやすいので、
第2の室64へ溢流する油液と共に気泡を第2の室64
へ排出して第1の室62の油液から分離することができ
る。また、貯蔵タンク51において、油液供給経路14
が第1の室62の底部に接続され、還流経路22が第1
の室62の上部から挿入されたドロップパイプ56に接
続されている。このため、油液供給経路14へ送液され
る油液には、気泡が混入されてなく、気泡混入による流
量計18の計測誤差を防止できる。Further, the first chamber 6 is returned to the first chamber 6 via the reflux path 22.
Even if air bubbles are mixed in the oil liquid refluxed to 2, the air bubbles tend to collect near the liquid surface of the first chamber 62 due to buoyancy.
Bubbles are formed together with the oil liquid overflowing into the second chamber 64.
And separated from the oil liquid in the first chamber 62. In the storage tank 51, the oil supply path 14
Is connected to the bottom of the first chamber 62, and the reflux path 22 is connected to the first
Is connected to a drop pipe 56 inserted from above the chamber 62. For this reason, no bubbles are mixed in the oil liquid sent to the oil liquid supply path 14, and a measurement error of the flowmeter 18 due to the mixing of the bubbles can be prevented.
【0042】また、第1の室62には、気泡を除去する
ための3枚の金網(気泡除去手段)68が設けられてい
る。この金網68は、油液中に混入した気泡が第1の室
62の底部側へ移動することを防止するためのものであ
り、還流経路22を介して還流された油液中に含まれて
いる気泡が油液供給経路14へ流出することを防止する
ことができる。尚、上記金網68の代わりに多数の孔を
有するパンチングプレートや格子状の邪魔板等を設ける
構成としても良い。The first chamber 62 is provided with three wire nets (bubble removing means) 68 for removing bubbles. The wire mesh 68 is for preventing bubbles mixed in the oil liquid from moving to the bottom side of the first chamber 62, and is included in the oil liquid refluxed through the reflux path 22. It is possible to prevent the flowing bubbles from flowing out to the oil liquid supply path 14. It should be noted that a configuration may be adopted in which a punching plate having a large number of holes, a lattice-shaped baffle plate, or the like is provided instead of the wire mesh 68.
【0043】また、貯蔵タンク51の下部より上方に延
在する一対の液位検出管路70,71が垂立しており、
液位検出管路70,71の内部には第1、第2の液位計
72,73が挿入されている。そして、液位検出管路7
0,71には、上部空間58に連通された連通管路7
4、75が接続されている。そのため、液位検出管路7
0、71の内部の液位は、第1の室62に供給された油
液の液面と同一の液面高さの液位となる。したがって、
第1の液位計72は、第1の室62の液位(水頭)を検
出し、第2の液位計73は、第2の室64の液位(水
頭)を検出することができる。Further, a pair of liquid level detecting pipes 70 and 71 extending upward from the lower part of the storage tank 51 are erected,
First and second liquid level gauges 72, 73 are inserted into the liquid level detection pipes 70, 71, respectively. And the liquid level detection line 7
The communication pipes 7 connected to the upper space 58 are provided at 0 and 71.
4, 75 are connected. Therefore, the liquid level detection line 7
The liquid level inside 0 and 71 has the same liquid level as the liquid level of the oil liquid supplied to the first chamber 62. Therefore,
The first liquid level meter 72 can detect the liquid level (water head) of the first chamber 62, and the second liquid level meter 73 can detect the liquid level (water head) of the second chamber 64. .
【0044】尚、上記実施例では、貯蔵タンクの内部を
中仕切板により第1の室と第2の室に分離させる構成と
したが、これに限らず、例えば別個に形成された室間を
通路等で連通させる構成としても良い。In the above embodiment, the inside of the storage tank is separated into the first chamber and the second chamber by the partition plate. However, the present invention is not limited to this. For example, the space between the separately formed chambers may be separated. It may be configured to communicate with a passage or the like.
【0045】[0045]
【発明の効果】以上説明したように、請求項1記載の発
明によれば、少なくとも、基準器へ油液を供給中は、前
記第1の室の油液を前記第2の室に常時溢出させるよう
構成したため、流量計により計測された油液を基準器へ
供給している間は貯蔵タンク内の液位(水頭)が一定と
なり、流量計に供給される油液の供給圧力が変動するこ
とを防止でき、校正精度を向上させることができる。As described above, according to the first aspect of the present invention, at least while the oil liquid is being supplied to the reference device, the oil liquid in the first chamber constantly overflows into the second chamber. As the oil liquid measured by the flow meter is supplied to the reference device, the liquid level (water head) in the storage tank becomes constant, and the supply pressure of the oil liquid supplied to the flow meter fluctuates. Can be prevented, and the calibration accuracy can be improved.
【0046】また、第1の室から溢れた油液を第2の室
に流出させると共に、還流経路を貯蔵タンク内に形成さ
れた第2の室の上部に接続することにより、第2の室の
油液を第1の室の上部に還流させるため、油液中に混入
された気泡を分離させて第2の室に排出し、気泡が除去
された第1の室の底部近傍から油液を流量計に送液でき
るので、気泡混入による計測誤差を防止できる。Further, the oil liquid overflowing from the first chamber is caused to flow out to the second chamber, and the return path is connected to the upper part of the second chamber formed in the storage tank, whereby the second chamber is formed. In order to recirculate the oil liquid to the upper part of the first chamber, the air bubbles mixed in the oil liquid are separated and discharged to the second chamber, and the oil liquid is removed from near the bottom of the first chamber from which the air bubbles have been removed. Can be sent to the flow meter, so that measurement errors due to air bubbles can be prevented.
【0047】また、請求項2記載の発明によれば、貯蔵
タンクを所定角度傾斜させたため、第1の室から溢れた
油液を第2の室に容易に流出させることができると共
に、第1の室の油液に混入された気泡を第1の室の上部
空間へ浮上させて分離させることができる。According to the second aspect of the present invention, since the storage tank is inclined at a predetermined angle, the oil liquid overflowing from the first chamber can easily flow out to the second chamber, and the first tank can be easily discharged to the second chamber. Bubbles mixed in the oil liquid in the first chamber can be separated by floating in the upper space of the first chamber.
【0048】また、請求項3記載の発明によれば、貯蔵
タンクの内部に2つの室に画成する仕切りを設け、仕切
りの上部に第1の室と第2の室とを連通する連通手段を
設けたため、第1の室に還流された油液の液位が仕切り
より高くなると、第1の室から溢れた油液が第2の室に
溢流して液位を一定に保つことにより供給圧力の変動を
防止でき、且つ第1の室の上部に溜まった気泡を第2の
室に排出して流量計に供給される油液から気泡を分離さ
せることができる。また、請求項4記載の発明によれ
ば、貯蔵タンク内に気泡除去手段を設たため、貯蔵タン
ク内に還流された油液中に含まれる気泡を気泡除去手段
により除去することができる。According to the third aspect of the present invention, a partition is provided inside the storage tank to define two chambers, and a communication means for communicating the first chamber and the second chamber above the partition. When the liquid level of the oil liquid refluxed to the first chamber becomes higher than the partition, the oil liquid overflowing from the first chamber overflows to the second chamber and is supplied by keeping the liquid level constant. Fluctuations in pressure can be prevented, and bubbles accumulated in the upper portion of the first chamber can be discharged to the second chamber to separate bubbles from the oil liquid supplied to the flow meter. According to the fourth aspect of the present invention, since the bubble removing means is provided in the storage tank, bubbles contained in the oil liquid refluxed in the storage tank can be removed by the bubble removing means.
【0049】また、請求項5記載の発明によれば、少な
くとも、基準器へ油液を供給中は、前記第1の室の油液
を前記第2の室に常時溢出させるよう構成したため、流
量計により計測された油液を基準器へ供給している間
は、貯蔵タンク内の液位(水頭)が一定となり、流量計
に供給される油液の供給圧力が変動することを防止で
き、校正精度を向上させることができる。また、貯蔵タ
ンクを所定角度傾斜させたため、第1の室から溢れた油
液を第2の室に容易に流出させることができると共に、
第1の室の油液に混入された気泡を第1の室の上部空間
へ浮上させて分離させることができる。また、貯蔵タン
ク内に気泡除去手段を設たため、貯蔵タンク内に還流さ
れた油液中に含まれる気泡を気泡除去手段により除去す
ることができる。According to the fifth aspect of the present invention, at least while the oil liquid is being supplied to the reference device, the oil liquid in the first chamber is always allowed to overflow into the second chamber. While the oil liquid measured by the meter is being supplied to the reference device, the liquid level (head) in the storage tank becomes constant, and the supply pressure of the oil liquid supplied to the flow meter can be prevented from fluctuating. Calibration accuracy can be improved. In addition, since the storage tank is inclined by a predetermined angle, the oil liquid overflowing from the first chamber can easily flow out to the second chamber,
Bubbles mixed into the oil liquid in the first chamber can be separated by floating in the upper space of the first chamber. Further, since the bubble removing means is provided in the storage tank, the bubbles contained in the oil liquid refluxed in the storage tank can be removed by the bubble removing means.
【図1】本発明になる流量計校正システムの一実施の形
態を示す構成図である。FIG. 1 is a configuration diagram showing one embodiment of a flow meter calibration system according to the present invention.
【図2】本発明の変形例の貯蔵タンク51を示す正面図
である。FIG. 2 is a front view showing a storage tank 51 according to a modified example of the present invention.
【図3】変形例の貯蔵タンク51の左側面図である。FIG. 3 is a left side view of a storage tank 51 of a modified example.
【図4】変形例の貯蔵タンク51のC−C線に沿う断面
図である。FIG. 4 is a cross-sectional view of a storage tank 51 of a modified example taken along line CC.
【図5】貯蔵タンク51の平面図である。FIG. 5 is a plan view of the storage tank 51.
【図6】貯蔵タンク51の長手方向に沿う断面図であ
る。FIG. 6 is a sectional view taken along a longitudinal direction of the storage tank 51.
10 流量計校正システム 12,51 貯蔵タンク 14 油液供給経路 16 送液用ポンプ 18 流量計 20 計量タンク 22 還流経路 24 循環用回収タンク 26 転流器 28 基準秤 32 還流用ポンプ 34,66 中仕切板 36,62 第1の室 38,64 第2の室 40 上部空間 42 循環経路 44 循環用ポンプ 45,46,47,72,74 液位計 52 取出口 54 流入口 56 ドロップパイプ 70,71 液位検出管路 74,75 連通管路 DESCRIPTION OF SYMBOLS 10 Flow meter calibration system 12, 51 Storage tank 14 Oil liquid supply path 16 Pump for feeding liquid 18 Flow meter 20 Metering tank 22 Reflux path 24 Recovery tank for circulation 26 Commutator 28 Reference scale 32 Reflux pump 34, 66 Middle partition Plates 36, 62 First chamber 38, 64 Second chamber 40 Upper space 42 Circulation path 44 Circulation pump 45, 46, 47, 72, 74 Level gauge 52 Outlet 54 Inlet 56 Drop pipe 70, 71 Liquid Position detection pipeline 74, 75 Communication pipeline
Claims (5)
と、該貯蔵タンクの油液を供給する油液供給経路と、該
油液供給経路を介して油液を送液するポンプと、該ポン
プにより送液された油液を計測する流量計と、油液を貯
溜して液量を計量する基準器と、該計量器の油液を前記
貯蔵タンクに還流させる還流経路とを備えてなり、前記
流量計の計測値と前記基準メータの計測値とを比較して
前記流量計を校正するよう構成された流量計校正システ
ムにおいて、 前記貯蔵タンクは、互いに独立した第1、第2の室を有
し 前記油液供給経路を前記第1の室の底部近傍に接続し、 前記還流経路を前記第1の室の上部に接続し、 少なくとも、基準器へ油液を供給中は、前記第1の室の
油液を前記第2の室に常時溢出させるよう構成したこと
を特徴とする流量計校正システム。A storage tank storing an oil solution for calibration, an oil solution supply path for supplying the oil solution in the storage tank, a pump for sending the oil solution through the oil solution supply path, A flow meter that measures the oil liquid sent by the pump, a reference device that stores the oil liquid and measures the amount of the liquid, and a reflux path that returns the oil liquid of the measuring device to the storage tank. In a flowmeter calibration system configured to calibrate the flowmeter by comparing the measurement value of the flowmeter and the measurement value of the reference meter, the storage tanks are independent of each other, Connecting the oil liquid supply path near the bottom of the first chamber, connecting the return path to the top of the first chamber, and supplying the oil liquid to at least a reference device. The oil liquid in the first chamber is always overflowed into the second chamber. Flowmeter calibration system.
とを特徴とする請求項1記載の流量計校正システム。2. The flow meter calibration system according to claim 1, wherein the storage tank is inclined at a predetermined angle.
する仕切りを設け、該仕切りの上部に前記第1の室と前
記第2の室とを連通する連通手段を設けたことを特徴と
する請求項2記載の流量計校正システム。3. The storage tank is provided with a partition defining two chambers inside, and a communication means for communicating the first chamber and the second chamber is provided above the partition. The flowmeter calibration system according to claim 2, wherein
たことを特徴とする請求項2記載の流量計校正システ
ム。4. The flowmeter calibration system according to claim 2, wherein air bubble removing means is provided in said storage tank.
と、該貯蔵タンクの油液を供給する油液供給経路と、該
油液供給経路を介して油液を送液するポンプと、該ポン
プにより送液された油液を計測する流量計と、油液を貯
溜して液量を計量する基準器と、該計量器の油液を前記
貯蔵タンクに還流させる還流経路とを備えてなり、前記
流量計の計測値と前記基準メータの計測値とを比較して
前記流量計を校正するよう構成された流量計校正システ
ムにおいて、 前記貯蔵タンクを所定角度傾斜させ、且つ前記貯蔵タン
クの内部を第1、第2の室に画成する仕切りを設け、該
仕切りの上部に前記第1の室と前記第2の室とを連通す
る空間を設け、 前記油液供給経路を前記第1の室の底部近傍に接続し、 前記還流経路を前記第1の室の上部に接続し、 少なくとも、基準器へ油液を供給中は、前記第1の室の
油液を前記第2の室に常時溢出させるよう構成したこと
を特徴とする流量計校正システム。5. A storage tank in which an oil liquid for calibration is stored, an oil liquid supply path for supplying the oil liquid in the storage tank, a pump for sending the oil liquid through the oil liquid supply path, A flow meter that measures the oil liquid sent by the pump, a reference device that stores the oil liquid and measures the amount of the liquid, and a reflux path that returns the oil liquid of the measuring device to the storage tank. In a flow meter calibration system configured to calibrate the flow meter by comparing the measurement value of the flow meter with the measurement value of the reference meter, the storage tank is inclined at a predetermined angle, and the storage tank is A partition that defines the interior into first and second chambers is provided, and a space that communicates the first chamber and the second chamber is provided above the partition, and the oil liquid supply path is connected to the first chamber. Connecting the vicinity of the bottom of the first chamber, connecting the reflux path to the top of the first chamber, At least while the oil liquid is being supplied to the reference device, the oil liquid in the first chamber always overflows into the second chamber.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2000011028A JP2001201391A (en) | 2000-01-19 | 2000-01-19 | Calibration system of flowmeter |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2000011028A JP2001201391A (en) | 2000-01-19 | 2000-01-19 | Calibration system of flowmeter |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2001201391A true JP2001201391A (en) | 2001-07-27 |
Family
ID=18538960
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2000011028A Pending JP2001201391A (en) | 2000-01-19 | 2000-01-19 | Calibration system of flowmeter |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2001201391A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101154275B1 (en) * | 2011-11-18 | 2012-06-14 | 한국기계연구원 | Verification system for flowmeter and test system for pump using the same |
CN103088872A (en) * | 2013-02-01 | 2013-05-08 | 天津大学 | Water supplying system for flow device |
CN108775949A (en) * | 2018-07-12 | 2018-11-09 | 丹东意邦计量仪器仪表有限公司 | A kind of voltage stabilizing fluid perseverance liquid level buffer system |
KR20220008089A (en) * | 2020-07-13 | 2022-01-20 | 주식회사 청호정밀 | testing apparatus for water meter |
-
2000
- 2000-01-19 JP JP2000011028A patent/JP2001201391A/en active Pending
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101154275B1 (en) * | 2011-11-18 | 2012-06-14 | 한국기계연구원 | Verification system for flowmeter and test system for pump using the same |
CN103088872A (en) * | 2013-02-01 | 2013-05-08 | 天津大学 | Water supplying system for flow device |
CN108775949A (en) * | 2018-07-12 | 2018-11-09 | 丹东意邦计量仪器仪表有限公司 | A kind of voltage stabilizing fluid perseverance liquid level buffer system |
KR20220008089A (en) * | 2020-07-13 | 2022-01-20 | 주식회사 청호정밀 | testing apparatus for water meter |
KR102420068B1 (en) * | 2020-07-13 | 2022-07-13 | 주식회사 청호정밀 | testing apparatus for water meter |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100817329B1 (en) | Cistern for testing the quality of water | |
RU2299322C1 (en) | Method for oil and gas-condensate well production measurement in air-tight oil collection systems | |
US6741942B2 (en) | Free-flow fluid measurement meter | |
CN100526811C (en) | Device and method for measuring amounts of milk in particular during the milking process | |
CN105556301A (en) | Vehicle urea tank associated with a sensing chamber for acoustic quality inspection and level sensing | |
CN107121177A (en) | Open channel and conduit wastewater flow integral standard device | |
JP6223041B2 (en) | Liquid metering device and water quality analyzer | |
JP2001201391A (en) | Calibration system of flowmeter | |
US6871540B2 (en) | Method and device for determining quantities of fluid | |
FI127472B (en) | Device to measure dewatering at various objects in a paper machine wet end, and method for carrying out this | |
WO2006061186A3 (en) | Level meter | |
JP2011180055A (en) | Ultrasonic-wave gas meter | |
JP3987454B2 (en) | Device for measuring gas content in flowing liquid and control device for pump for injecting antifoaming agent | |
KR101356764B1 (en) | Apparatus and method for measuring inner volume of tested sturcture using fluid | |
US20130342223A1 (en) | Fuel property measuring device | |
JPS5826370Y2 (en) | Defoaming flow divider | |
CN219161412U (en) | Water meter calibration device | |
CN214150670U (en) | Chemical liquid detection device and adding device | |
CN216697594U (en) | Hydrodynamics comprehensive experiment device | |
KR100902342B1 (en) | Water tank for flowmeter tester | |
JP4341185B2 (en) | Chemical manufacturing equipment | |
CN221579784U (en) | Bubble separation mechanism, grinding material circulating system and grinding machine | |
CN221006445U (en) | Jet-propelled refrigerated water yield inspection device | |
FI98093C (en) | Apparatus for measuring fluid flow | |
KR102622194B1 (en) | fluid mixing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20060920 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20060920 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20080318 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20080708 |