JP2001182330A - Construction and curing tent on construction field - Google Patents

Construction and curing tent on construction field

Info

Publication number
JP2001182330A
JP2001182330A JP37265999A JP37265999A JP2001182330A JP 2001182330 A JP2001182330 A JP 2001182330A JP 37265999 A JP37265999 A JP 37265999A JP 37265999 A JP37265999 A JP 37265999A JP 2001182330 A JP2001182330 A JP 2001182330A
Authority
JP
Japan
Prior art keywords
rope
construction
tent
awning
scaffold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP37265999A
Other languages
Japanese (ja)
Inventor
Toshiyuki Fukushima
敏之 福島
Yohei Watanabe
洋平 渡辺
Kazuo Okamoto
和男 岡本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui House Ltd
Original Assignee
Sekisui House Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui House Ltd filed Critical Sekisui House Ltd
Priority to JP37265999A priority Critical patent/JP2001182330A/en
Publication of JP2001182330A publication Critical patent/JP2001182330A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To provide a construction and curing tent on a construction field, which can be stretched and removed easily and rapidly and can be stretched at a position higher than a scaffold, in the tent for construction and curing on the construction field. SOLUTION: In the construction and curing tent on the construction field, the tent has a rope 5 stretched between poles 4 extended from the mutually opposed supports 3 of a scaffold 2, the tent 9 having fastening means 8 with the scaffold 2 or the building frame 7 of a building in outer edge sections 6, and a hanging means 10 slidably hanging the tent 9 to the rope 5 along the rope 5, and the tent 9 is stretched so that the outer edge sections 6 are fastened to the scaffold 2 or the building frame 7 of the building and a projecting shape is formed.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、建築施工現場等に
おいて、先に設置された足場を利用して設置する施工及
び養生用テントに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a construction and curing tent which is installed at a construction site by using a scaffold previously installed.

【0002】[0002]

【従来の技術】従来、建築施工現場等において、降雨か
ら資材等を守る対策として、ブルーシート等を資材等に
覆いかぶせる等の処置が施されていたが、人の背丈より
遥かに高い建築施工中の建物や資材全体を覆うことは難
しいため、これらは雨ざらしにせざるを得なかった。ま
た、現場作業者においては、雨に濡れながら作業を行う
か、或いは、降雨がひどい場合は、作業を中断せざるを
得なかった。
2. Description of the Related Art Conventionally, at a construction site or the like, measures such as covering a blue sheet or the like with a material or the like have been taken as a measure to protect the material or the like from rainfall. Since it was difficult to cover the entire building and the materials inside, they had to be exposed to rain. In addition, the on-site workers have to work while getting wet in the rain, or have to stop the work when the rainfall is severe.

【0003】雨天時の作業の中断を回避するため、足場
等を利用してテントを張設することも検討された。とこ
ろが、テントは、雨天時以外では、不要であり、それど
ころか、却って作業の邪魔になる場合がある。例えば、
施工においてクレーンを使用する場合、前記テントは、
建築物の上からの資材搬入等の妨げとなる。また、晴天
時にテントが張られたままであると、作業現場の湿度、
温度が上昇して、資材に悪影響を及ぼしたり、作業者の
作業能率低下の原因ともなり得る。しかし、テントを張
ったり撤収したりする作業は、時間と労力を要するた
め、雨が降ったり止んだりする毎にテントを張ったり片
づけたりすることは困難であった。
[0003] In order to avoid interruption of work in rainy weather, it has been considered to install a tent using a scaffold or the like. However, the tent is unnecessary except during rainy weather, and may rather hinder the work. For example,
When using a crane in the construction, the tent,
It hinders the import of materials from above the building. Also, if the tent is kept stretched in fine weather, the humidity at the work site,
The rise in temperature may have an adverse effect on materials and cause a decrease in work efficiency of workers. However, the work of setting and removing the tent requires time and labor, and it has been difficult to set and clear the tent every time it rains or stops.

【0004】一方、建築物の高さが高くなった場合に
は、更に高くテントを張り直す必要が生じる。しかし、
テントの端部を固定する足場の高さも限られており、わ
ざわざテントの位置を上げるだけのために足場を数段高
く設けることは、費用対効果の面からも得策とは言え
ず、結局のところ、足場より高い位置のテントは張られ
ていなかった。
[0004] On the other hand, when the height of the building is increased, it is necessary to extend the tent higher. But,
The height of the scaffold for fixing the end of the tent is also limited, and it is not cost effective to provide a scaffold several steps higher only to raise the tent position. However, there was no tent above the scaffold.

【0005】[0005]

【発明が解決しようとする課題】本発明は、上記の課題
に鑑みてなされたものであり、本発明の目的は、建築施
工現場の施工用・養生用テントにおいて、天幕の張設、
撤収、及び張設高さの変更が容易に且つ迅速にでき、ま
た、天幕を足場より高い位置に張設することができる建
築現場の施工・養生テントを提供することである。
SUMMARY OF THE INVENTION The present invention has been made in view of the above-mentioned problems, and an object of the present invention is to provide a tent for construction and curing at a building construction site.
An object of the present invention is to provide a construction and curing tent at a construction site where a tent can be easily and quickly removed and a height of the tent can be changed, and a tent can be erected at a position higher than a scaffold.

【0006】[0006]

【課題を解決するための手段】上記目的を達成するため
に、請求項1に記載の建築現場の施工・養生テントは、
建築物の周囲に設けられる建築現場の足場に取付ける施
工・養生テントであって、前記足場の相対向している側
の部材の間に架設されたロープと、外縁部に前記足場又
は建築物の躯体との留め付け手段を有する天幕と、前記
ロープに前記天幕を該ロープに沿ってスライド自在に吊
着する吊着手段とを備えることにより、前記天幕が、前
記外縁部が前記足場又は前記建築物の躯体に留め付けら
れて凸型を形成するように張設されることを特徴として
いる。
In order to achieve the above object, a construction and curing tent for a construction site according to claim 1 is provided.
A construction / healing tent attached to a scaffold at a construction site provided around a building, and a rope erected between members on opposite sides of the scaffold, and an outer edge portion of the scaffold or the building. An awning having fastening means to a frame, and hanging means for hanging the awning slidably along the rope along the rope, so that the awning has an outer edge portion of the scaffold or the building. It is characterized in that it is fastened to the body of the product and stretched to form a convex shape.

【0007】請求項2に記載の建築現場の施工・養生テ
ントは、請求項1に記載の建築現場の施工・養生テント
において、前記吊着手段が、前記ロープにスライド自在
に挿入されて吊るされた複数のリングと、一端が前記リ
ングに取付けられ、他端が前記天幕に取付けられて前記
天幕を懸架する複数の懸架紐体とからなることを特徴と
している。
According to a second aspect of the present invention, there is provided a construction and curing tent for a construction site according to the first aspect, wherein the hanging means is slidably inserted into the rope and suspended. And a plurality of suspension strings attached at one end to the ring and the other end to the awning to suspend the awning.

【0008】請求項3に記載の建築現場の施工・養生テ
ントは、請求項1又は2に記載の建築現場の施工・養生
テントにおいて、前記ロープが前記相対向している側の
部材の間に架設される代わりに、これらの部材の上方に
延設したポールの間に架設されたことを特徴としてい
る。
According to a third aspect of the present invention, there is provided the construction and curing tent of the construction site according to the first or second aspect, wherein the rope is provided between the members on the side facing each other. Instead of being erected, it is erected between poles extending above these members.

【0009】請求項4に記載の建築現場の施工・養生テ
ントは、請求項1又は2に記載の建築現場の施工・養生
テントにおいて、前記ロープが前記相対向している側の
部材の上方に延設した滑車付きポールの間に架設される
とともに、該ロープの両端又は一端がウインチで巻き取
られたことを特徴としている。
According to a fourth aspect of the present invention, there is provided the construction and curing tent of the construction site according to the first or second aspect, wherein the rope is provided above the member on the side where the rope faces each other. It is characterized by being installed between extended pulley-equipped poles, and having both ends or one end of the rope wound by a winch.

【0010】請求項5に記載の建築現場の施工・養生テ
ントは、請求項1乃至4のいずれかに記載の建築現場の
施工・養生テントにおいて、前記天幕の側部に開閉用ロ
ープの一端が取付けられたことを特徴としている。
According to a fifth aspect of the present invention, there is provided the construction and curing tent for a construction site according to any one of the first to fourth aspects, wherein one end of an opening / closing rope is provided on a side portion of the tent. It is characterized by being attached.

【0011】請求項6に記載の建築現場の施工・養生テ
ントは、請求項1乃至4のいずれかに記載の建築現場の
施工・養生テントにおいて、前記天幕の上部を通る開閉
用ロープが、前記相対向している側の部材又は該部材の
上方に延設したポールに設けられた開閉用滑車の間に架
設されるとともに、前記天幕の一端が該開閉用ロープに
固定されたことを特徴としている。
According to a sixth aspect of the present invention, there is provided the construction / curing tent for a construction site according to any one of the first to fourth aspects, wherein the opening / closing rope passing through an upper part of the tent is provided with the opening / closing rope. It is provided between the member on the opposite side or the opening / closing pulley provided on the pole extending above the member, and one end of the awning is fixed to the opening / closing rope. I have.

【0012】[0012]

【発明の実施の形態】以下、本発明の実施の形態に係る
建築現場の施工・養生テントについて図面に基づいて説
明する。図1に示すように、本発明の第1の実施形態に
係る建築現場の施工・養生テント1は、建築物の周囲に
設けられる建築現場の足場2に取付ける施工・養生テン
トであって、前記足場2の相対向している側の支柱(部
材)3の上方に延設されたポール4の間に架設されたロ
ープ5と、外縁部6に前記足場2又は建築物の躯体7と
の留め付け手段8を有する天幕9と、前記ロープ5に前
記天幕9の直線上複数箇所を該ロープ5に沿ってスライ
ド自在に吊着する吊着手段10とを備え、前記天幕9
が、前記外縁部6が前記足場2又は前記建築物の躯体7
に留め付けられて凸型を形成するように張設されるもの
である。以下、詳細に説明する。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS A construction and curing tent for a construction site according to an embodiment of the present invention will be described below with reference to the drawings. As shown in FIG. 1, a construction / curing tent 1 for a construction site according to a first embodiment of the present invention is a construction / curing tent attached to a scaffold 2 at a construction site provided around a building, A rope 5 erected between poles 4 extending above columns (members) 3 on opposite sides of the scaffold 2, and fastening of the scaffold 2 or a building body 7 of the building to an outer edge 6. An awning 9 having attachment means 8; and hanging means 10 for slidably hanging a plurality of portions of the awning 9 on the rope 5 in a straight line along the rope 5.
However, the outer edge 6 is the scaffold 2 or the building frame 7 of the building.
And is stretched so as to form a convex shape. The details will be described below.

【0013】前記ロープ5は、ワイヤー等の可撓性紐体
であり、前記施工現場の足場2の相対向している側の支
柱3から延設されたポール4の先端に架設されて、足場
2に囲まれた敷地を2分しながら横断している。
The rope 5 is a flexible cord made of a wire or the like, and is erected at the tip of a pole 4 extending from the column 3 on the opposite side of the scaffold 2 at the construction site. Crossing the site surrounded by 2 for 2 minutes.

【0014】前記ロープ5と前記ポール4との接続部
は、例えば、図2に示すように、前記ロープ5の両端に
フック5aを設け、前記ポール4の先端側部に掛合輪4
bを設けて、前記フック5aを該掛合輪4bに掛止する
ことで前記ロープ5を前記足場2において相対向する側
にある2本の前記ポール4の間に架設する構造である。
接続部は、これに限定されず、前記ロープ5の端部を前
記ポール4に固定するものであればよく、例えば、前記
支柱3の先端に前記ロープ5の両端を該支柱3からずれ
ないように繋着することにより固定した構造等でもよ
い。
As shown in FIG. 2, for example, hooks 5a are provided at both ends of the rope 5 and a hook 4a is connected to the tip of the pole 4 at the connecting portion between the rope 5 and the pole 4.
b, the hook 5a is hooked on the hooking wheel 4b, whereby the rope 5 is bridged between the two poles 4 on opposite sides of the scaffold 2.
The connecting portion is not limited to this, and may be any as long as the end of the rope 5 is fixed to the pole 4. For example, both ends of the rope 5 are not displaced from the support 3 at the tip of the support 3. Alternatively, a structure or the like fixed by being connected to the device may be used.

【0015】なお、前記ロープ5の長さは、当然に、前
記した2本のポール4の間の距離より長いものを使用す
るが、生じる撓みを少なくするために、できる限り前記
ポール4の間の距離に近い長さとする。前記ロープ5と
後述するリングの間とのスライド抵抗を低下させるため
である。また、この撓みをなくすために、非可撓性部材
の梁などを該ロープ5の代わりに使用することも考えら
れる。この場合は、前記梁は前記ロープ5と比較して殆
ど撓みを生じないので、この梁と後述するリングの間の
スライドする抵抗が少なくなるという利点を有する。
The length of the rope 5 is naturally longer than the distance between the two poles 4 described above. Length close to the distance of This is to reduce the sliding resistance between the rope 5 and a ring to be described later. Further, in order to eliminate the bending, a beam of a non-flexible member or the like may be used instead of the rope 5. In this case, since the beam hardly bends as compared with the rope 5, there is an advantage that a sliding resistance between the beam and a ring described later is reduced.

【0016】上記天幕9は、例えば、図1に示すよう
に、前記足場2に囲まれた敷地が矩形であるのでこれに
対応させて、矩形の天幕9が採用されている。そして、
該天幕9には、四隅(外縁部)9aに紐8(留め付け手
段)が設けられ、前記四隅9aを前記足場2の部材、或
いは、建築物の躯体7に結び付けることができるように
なっている。そして、前記ロープ5の下に前記天幕9の
複数箇所が後述する吊着手段10によって吊着されて山
型の折り目9bが形成されている。さらに、前記折り目
9bの端部(天幕9の側部)には該天幕9を前記ロープ
5に沿って開閉させるための開閉用ロープ9dの一端が
取付けられている。
As shown in FIG. 1, for example, as shown in FIG. 1, the site surrounded by the scaffold 2 is rectangular, and accordingly, a rectangular awning 9 is employed. And
The tent 9 is provided with a string 8 (fastening means) at four corners (outer edges) 9a so that the four corners 9a can be connected to the member of the scaffold 2 or the building frame 7 of the building. I have. A plurality of portions of the awning 9 are hung below the rope 5 by hanging means 10 to be described later to form a mountain-shaped fold 9b. Further, one end of an opening / closing rope 9d for opening and closing the awning 9 along the rope 5 is attached to an end of the fold 9b (side of the awning 9).

【0017】上記吊着手段10は、前記天幕9の複数箇
所を前記ロープ5に吊着しながら、人間の腕力程度の力
で前記ロープ5に沿ってスライドさせることができるも
のであればよい。例えば、図3に示すように、前記ロー
プ5に取付けられた動滑車12から前記天幕9を懸架紐
9cを介して懸架したもの等が考えられるが、本実施の
形態に係る建築現場の施工・養生テント1においては、
以下に示す懸架紐9c、前記リング13を備えた吊着手
段10を採用している。
The hanging means 10 may be of any type as long as it can slide along the rope 5 with the force of a human arm while hanging a plurality of points of the awning 9 on the rope 5. For example, as shown in FIG. 3, the awning 9 may be suspended from a moving pulley 12 attached to the rope 5 via a suspension string 9c. In the curing tent 1,
A suspending means 10 including a suspension string 9c and the ring 13 described below is employed.

【0018】本実施の形態に係る建築現場の施工・養生
テント1においては、上記吊着手段10が、一端が前記
天幕9に取付けられ、他端がリング13に取付けられて
いる前記懸架紐9cと、前記ロープ5に沿って(矢印に
示す方向に)スライド自在に挿着されている前記リング
13とからなるものである。
In the construction / curing tent 1 of the construction site according to the present embodiment, the hanging means 10 has the suspension string 9c having one end attached to the tent 9 and the other end attached to the ring 13. And the ring 13 which is slidably inserted along the rope 5 (in the direction indicated by the arrow).

【0019】以上、説明した本実施の形態に係る建築現
場の施工・養生テント1を足場2に取付け施工する場合
について、以下に説明する。
A case where the construction and curing tent 1 of the construction site according to the present embodiment described above is attached to the scaffold 2 and constructed will be described below.

【0020】まず、現状の建築物の高さと最高部の水平
方向の位置より、前記ポール4を延設する支柱3及び前
記天幕9の外縁部9aを留め付ける位置を決定し、前記
ポール4を決められた前記支柱3に延設する。
First, from the current height of the building and the horizontal position of the highest part, the position where the pole 3 extending the pole 4 and the outer edge 9a of the tent 9 are fixed is determined. It is extended to the determined column 3.

【0021】前記ポール4は、図1及び図2に示すよう
に、前記支柱3に延設されているが、天幕9をより低い
位置に張設する場合は、前記ポール4を延設せずに、前
記支柱3に前記ロープ5を取付けて施工する。一方、図
5に示すように、住宅の2階の屋根部7aの施工を行う
場合は、建築物の高さが前記足場2より遥かに高くなる
ことが多く、この場合、前記ロープ5が架設される位置
は、更に高くする必要があるので、前記ポール4を更に
長いポール4Aと入れ替える。
As shown in FIGS. 1 and 2, the pole 4 is extended from the support 3, but when the tent 9 is extended at a lower position, the pole 4 is not extended. Then, the rope 5 is attached to the support column 3 for construction. On the other hand, as shown in FIG. 5, when constructing the roof 7a on the second floor of the house, the height of the building is often much higher than the scaffold 2, and in this case, the rope 5 is erected. Since the position of the pole 4 needs to be higher, the pole 4 is replaced with a longer pole 4A.

【0022】次に、足場2の相対向している側の2本の
前記ポール4の先端に設けられた掛合輪4bに前記ロー
プ5の両端部に設けられたフック5aを掛止する。この
とき、前記ロープ5には予め前記天幕9に懸架紐9cを
介して取付けられた複数のリング13を挿着しておく。
最後に、前記四隅9aに設けられた紐8を前記天幕9の
前記折り目9bより低い位置に前記足場2の部材等に結
び付けて前記天幕9の四隅9aを足場2の部材等に固定
する。この結果、前記天幕9は凸型を形成して張設さ
れ、雨水、砂、塵等は天幕9の上に溜まることなく地面
に流れ落ちる。
Next, hooks 5a provided at both ends of the rope 5 are hooked to hooking wheels 4b provided at the tips of the two pawls 4 on opposite sides of the scaffold 2. At this time, a plurality of rings 13 previously attached to the tent 9 via a suspension cord 9c are inserted into the rope 5.
Finally, the strings 8 provided at the four corners 9a are connected to the members of the scaffold 2 at positions lower than the folds 9b of the awning 9, and the four corners 9a of the tent 9 are fixed to the members of the scaffold 2. As a result, the awning 9 is stretched to form a convex shape, and rainwater, sand, dust, and the like flow down to the ground without collecting on the awning 9.

【0023】次に前記天幕9の張設、撤収及び張設高さ
の移動について説明する。まず、天幕9の張設、撤収に
ついてであるが、これは、前記開閉用ロープ9dを引張
って、前記天幕9を牽引することによって行う。前記天
幕9が張設された状態から撤収する場合は、まず、前記
四隅9aの紐8を前記足場2等から解き、次に、図6に
示すように、前記天幕9を撤収する方向と反対側に設け
られた前記開閉用ロープ9dを手で前記天幕9を撤収す
る方向に牽引する。或いは、前記天幕9の端部を手で持
って撤収する方向へ移動させてもよい。このとき前記天
幕9の一端は牽引されて撤収されていくとともに、該天
幕9を懸架する前記懸架紐9cと前記リング13は、前
記ロープ5に沿ってスライドしていく。尚、通常、天幕
9を開く側は一方に定めることができるので、他方にお
いて、前記天幕9の側部と前記ポール4、又は、前記支
柱3とを固定して、片方のみに前記天幕9を収納するよ
うにしておく。前記天幕9が完全に撤収された状態は、
図7に示すように、建築物15の上には、前記ロープ5
以外に何も残らず、上からのクレーンによる資材の搬
入、移動等の作業にも支障がなくなり、実質上何も張設
していない状態と同じ条件で建築施工作業ができる。
Next, the extension, withdrawal, and movement of the extension of the awning 9 will be described. First, the extension and withdrawal of the awning 9 is performed by pulling the opening / closing rope 9 d and pulling the awning 9. When withdrawing the awning 9 from the stretched state, first untie the string 8 at the four corners 9a from the scaffold 2 or the like, and then, as shown in FIG. The opening / closing rope 9d provided on the side is pulled by hand in the direction in which the tent 9 is withdrawn. Alternatively, the end of the awning 9 may be held in a hand and moved in the retreating direction. At this time, one end of the awning 9 is pulled and withdrawn, and the suspension string 9c and the ring 13 for suspending the awning 9 slide along the rope 5. Normally, the side on which the awning 9 is opened can be determined to be one side. On the other hand, the side of the awning 9 and the pole 4 or the support 3 are fixed, and the awning 9 is mounted on only one side. Keep it in storage. The state where the tent 9 has been completely withdrawn is
As shown in FIG.
Nothing remains except for the work of loading and moving the material by the crane from above, and the construction work can be performed under the same conditions as when there is virtually no extension.

【0024】一方、天幕9が撤収された状態から張設す
る場合には、図8に示すように、前記天幕9を拡張する
側の前記開閉用ロープ9dを手で持って、前記天幕9の
一部を牽引する。或いは、前記天幕9の端部等を手で持
って拡張する方向へ移動させる。これに伴って前記天幕
9の一端は牽引されて前記天幕9全体が拡張されていく
とともに、前記天幕9を懸架する前記懸架紐9cと前記
リング13が前記ロープ5に沿ってスライドする。前記
天幕9が足場2に囲まれた敷地を覆うまでに拡張される
と、前記四隅9aに設けられた紐8を前記足場2、又は
前記躯体7に結び付け(留め付け)て、天幕9の張設完
了となる。
On the other hand, when the awning 9 is extended from the retracted state, as shown in FIG. 8, the opening / closing rope 9d on the side where the awning 9 is extended is held by hand, and Tow a part. Alternatively, the end of the awning 9 is moved in the direction in which the awning 9 is extended by hand. Along with this, one end of the awning 9 is pulled and the entire awning 9 is expanded, and the suspension string 9c for suspending the awning 9 and the ring 13 slide along the rope 5. When the tent 9 is extended to cover the site surrounded by the scaffold 2, the strings 8 provided at the four corners 9a are tied (fastened) to the scaffold 2 or the frame 7, and the tent 9 is stretched. The installation is completed.

【0025】上記開閉用ロープ9dは、前記したように
牽引する以外に前記ポール4又は前記支柱3に固定滑車
14等を設けて牽引操作の負担を減らすことも考えられ
る。例えば、図9に示すように、前記開閉用ロープ9d
を前記ポール4に回動自在に設けられた固定滑車14を
介して建物の1階まで設けることで、該開閉用ロープ9
dを作業者が下方に引張る等の操作をすれば、作業者が
その場に立ったままで前記天幕9の開閉をすることがで
きる。
The opening / closing rope 9d may be provided with a fixed pulley 14 or the like on the pole 4 or the column 3 in addition to towing as described above to reduce the burden of the towing operation. For example, as shown in FIG.
Is provided up to the first floor of the building via a fixed pulley 14 rotatably provided on the pole 4 so that the opening / closing rope 9
If the operator performs an operation such as pulling d downward, the tent 9 can be opened and closed while the operator is standing on the spot.

【0026】施工が進行して、図5に示すように、建築
物15の高さが高くなる場合は、前記天幕9を上方へ移
動させる。まず、天幕9の四隅9aに設けられた紐8を
前記足場2又は前記躯体7から解き、建築物の高さが上
昇する分だけ上方の前記足場2又は前記躯体7に結び付
ける。そして、前記ロープ5の両端を前記ポール4から
外して、該ポール4を前記上昇分だけ長いポール4Aに
取り替え、再び前記ロープ5の両端を長くなったポール
4Aの先端部に取付ける。以上の簡単な作業で、天幕9
の張設する高さを変更することができる。
When the construction proceeds and the height of the building 15 is increased as shown in FIG. 5, the tent 9 is moved upward. First, the strings 8 provided at the four corners 9a of the tent 9 are unraveled from the scaffold 2 or the skeleton 7, and tied to the scaffold 2 or the skeleton 7 which is higher by the height of the building. Then, both ends of the rope 5 are detached from the pole 4, the pole 4 is replaced with a pole 4A that is longer by the rising amount, and both ends of the rope 5 are attached to the tip of the longer pole 4A again. With the above simple work, the tent 9
Can be changed in height.

【0027】次に、本発明の第2の実施形態に係る建築
現場の施工・養生テントについて説明する。図10に示
すように、本発明の第2の実施形態に係る建築現場の施
工・養生テント1は、前記第1の実施形態における前記
ポール4に代えて滑車19が付いた滑車付きポール16
を用い、前記ロープ5が前記足場2の相対向している側
の支柱(部材)3の上方に延設した滑車付きポール16
の間に架設されるとともに、該ロープ5の両端がウイン
チ17で巻き取られている。また、前記天幕9の上部を
通る開閉用ロープ9dが、前記滑車付きポール16に設
けられた開閉用滑車18の間に架設されるとともに、前
記天幕9の一端9eが該開閉用ロープ9dに固定されて
いる。その他の構成については、前記第1の実施形態に
係る建築現場の施工・養生テント1と同様である。
Next, a construction and curing tent at a construction site according to a second embodiment of the present invention will be described. As shown in FIG. 10, a construction / curing tent 1 at a building site according to a second embodiment of the present invention includes a pulley pole 16 having a pulley 19 instead of the pole 4 in the first embodiment.
And the pulley-equipped pole 16 in which the rope 5 extends above the support (member) 3 on the side of the scaffold 2 facing the opposite side.
And both ends of the rope 5 are wound by winches 17. An opening / closing rope 9d passing through the upper part of the awning 9 is installed between opening / closing pulleys 18 provided on the pulley-equipped pole 16, and one end 9e of the awning 9 is fixed to the opening / closing rope 9d. Have been. Other configurations are the same as those of the construction and curing tent 1 at the building site according to the first embodiment.

【0028】前記滑車付きポール16は、その上端に固
定式の前記滑車19が設けられて構成されたものであ
る。そして、前記ロープ5は、前記滑車19に掛けられ
て前記滑車付きポール16の間に架設され、その両端部
において前記ウインチ17により巻き取られる。前記ウ
インチ17は、両側の前記滑車付きポール16に設けら
れており、該ウインチ17によって前記ロープ5を巻き
取ることにより、前記ロープ5をきつく張った状態で架
設することができる。また、本実施形態においては、前
記ロープ5の両端を前記ウインチ17により巻き取るこ
ととしているが、前記ロープ5の一端のみを前記ウイン
チ17により巻き取ることも可能である。そのような場
合には、左右の前記滑車付きポール16の内のいずれか
一方のみに設け、他方には前記ロープ5の端部を固定す
るためのフック等を設けた構成とする。なお、ここで
は、前記ウインチ17として、ハンドルを手動で回転さ
せるものとしているが、これに限定されるものではな
く、既存の様々なウインチを使用することができる。
The pulley-equipped pole 16 is configured such that the fixed type pulley 19 is provided at the upper end thereof. Then, the rope 5 is hung on the pulley 19 and is installed between the pulley-equipped poles 16, and is wound by the winch 17 at both ends. The winch 17 is provided on the pulley-equipped poles 16 on both sides. By winding the rope 5 with the winch 17, the rope 5 can be installed in a tight state. In the present embodiment, both ends of the rope 5 are wound by the winch 17, but it is also possible to wind only one end of the rope 5 by the winch 17. In such a case, one of the left and right pulley-equipped pawls 16 is provided on one of the right and left, and the other is provided with a hook or the like for fixing the end of the rope 5. Here, as the winch 17, the handle is manually rotated, but the present invention is not limited to this, and various existing winches can be used.

【0029】このように、前記ロープ5の両端又は一端
を前記ウインチ17で巻き取る構造としたことにより、
前記ロープ5を少ない力で容易にきつく張った状態で架
設することができるので、前記ロープ5を架設する作業
を容易化することができる。また、更に、前記ウインチ
17で巻き取った前記ロープ5を緩めることにより、前
記天幕9を下方へ下げることができるので、施工作業を
行わない時には前記天幕9を下げて建物の上に覆い被せ
ることにより、養生シートの代わりとすることができ
る。すなわち、前記ウインチ17により前記ロープ5を
巻き取ったり緩めたりするのみで、施工作業時には、降
雨から建築資材や作業者を守る天幕として、施工作業を
行わないときには、建物に被せて養生シートとして、容
易に変更して使用することができる。
As described above, both ends or one end of the rope 5 are wound around the winch 17 so that
Since the rope 5 can be erected easily and tightly with a small force, the work of erection of the rope 5 can be facilitated. Further, the awning 9 can be lowered by loosening the rope 5 wound by the winch 17, so that the awning 9 can be lowered and covered on a building when construction work is not performed. Thereby, it can be used as a substitute for the curing sheet. That is, the rope 5 is only wound up or loosened by the winch 17, and is used as an awning for protecting building materials and workers from rain during construction work, and as a curing sheet over a building when construction work is not performed. It can be easily changed and used.

【0030】本実施形態においては、前記開閉用ロープ
9dは、前記天幕9の上部において、前記吊着手段10
の前記リング13の内部を通るように配置され、前記滑
車付きポール16に設けられた固定式の前記開閉用滑車
18の間に架設される。そして、前記開閉用滑車18に
掛けられた先の前記開閉用ロープ9dの両端部は、前記
開閉用滑車18から下方へ垂れ下がっている。前記開閉
用ロープ9dには、前記天幕9の一端9eが固定されて
いる。より具体的には、本実施形態においては、前記天
幕9の端部における前記吊着手段10の前記リング13
を前記開閉用ロープ9dに固定することにより、前記天
幕9の一端9eを固定している。また、前記天幕の他端
側は、前記紐8(留め付け手段)により前記足場2の部
材又は前記建物の躯体7に結び付けられている。したが
って、前記開閉用ロープ9dのいずれか一方の端部を作
業者が下方へ引張ることにより、容易に前記天幕の開閉
を行うことができる。なお、前記開閉用滑車18は前記
支柱(部材)3に設けることもできる。
In this embodiment, the opening / closing rope 9 d is attached to the upper part of the tent 9 by the hanging means 10.
Is arranged so as to pass through the inside of the ring 13 and is installed between the fixed pulleys 18 for opening and closing provided on the pole 16 with pulleys. Then, both ends of the opening / closing rope 9 d which is hung on the opening / closing pulley 18 hang downward from the opening / closing pulley 18. One end 9e of the awning 9 is fixed to the opening / closing rope 9d. More specifically, in the present embodiment, the ring 13 of the hanging means 10 at the end of the awning 9
Is fixed to the opening / closing rope 9d, thereby fixing one end 9e of the awning 9. The other end of the awning is connected to the member of the scaffold 2 or the building frame 7 of the building by the string 8 (fastening means). Therefore, the operator can easily open and close the awning by pulling one end of the opening and closing rope 9d downward. The opening / closing pulley 18 may be provided on the column (member) 3.

【0031】[0031]

【発明の効果】請求項1に記載の建築現場の施工・養生
テントは、建築物の周囲に設けられる建築現場の足場に
取付ける施工・養生テントであって、前記足場の相対向
している側の部材の間に架設されたロープと、外縁部に
前記足場又は建築物の躯体との留め付け手段を有する天
幕と、前記ロープに前記天幕を該ロープに沿ってスライ
ド自在に吊着する吊着手段とを備え、前記天幕が、前記
外縁部が前記足場又は前記建築物の躯体に留め付けられ
て凸型を形成するように張設されるものであるので、容
易に天幕の開閉、張設高さの変更ができると共に、容易
に足場に取付けることができる利点を有する。また、天
幕は凸型に張設されるため、雨水等が天幕に溜まる心配
がない。
According to the first aspect of the present invention, there is provided a construction / healing tent for a construction site, which is mounted on a scaffold of a construction site provided around a building, and which is opposite to the scaffold. A tent having fastening means for fastening the scaffold or the building body to the outer edge of the tent, and a hanger for slidably hanging the tent on the rope along the rope. Means, the awning is stretched so that the outer edge is fixed to the scaffold or the frame of the building to form a convex shape, so that the awning can be easily opened, closed and stretched. It has the advantage that the height can be changed and that it can be easily attached to a scaffold. Also, since the awning is stretched in a convex shape, there is no fear that rainwater or the like will collect on the awning.

【0032】請求項2に記載の建築現場の施工・養生テ
ントは、請求項1に記載の建築現場の施工・養生テント
において、前記吊着手段が、前記ロープにスライド自在
に挿入されて吊るされた複数のリングと、一端が前記リ
ングに取付けられ、他端が前記天幕に取付けられて前記
天幕を懸架する複数の懸架紐体とからなるものであるの
で、請求項1に記載の建築現場の施工・養生テントと同
様の効果を有するとともに、人間の腕力程度で確実に天
幕を開閉させることができる利点を有する。また、リン
グがロープに挿入された構造であるので、不具合の発生
が少なく、不具合が発生しても直ちに目視で不具合箇所
の発見ができる。
According to a second aspect of the present invention, there is provided the construction and curing tent of the construction site according to the first aspect, wherein the hanging means is slidably inserted into the rope and suspended. The construction site according to claim 1, comprising a plurality of rings, and a plurality of suspension strings each having one end attached to the ring and the other end attached to the awning and suspending the awning. It has the same effect as the construction and curing tent, and has the advantage that the tent can be opened and closed reliably with the strength of a human. In addition, since the ring is structured to be inserted into the rope, the occurrence of defects is small, and even if a defect occurs, the defective portion can be immediately found visually.

【0033】請求項3に記載の建築現場の施工・養生テ
ントは、請求項1又は2に記載の建築現場の施工・養生
テントにおいて、前記ロープが前記相対向している側の
部材の間に架設される代わりに、これらの部材の上方に
延設したポールの間に架設されたものであるので、請求
項1又は2と同様の効果を有すると共に、足場より高い
位置に天幕を張設する場合に、足場を上方へ増設するこ
となく前記天幕を足場より高い位置に張設することが可
能である。
[0033] The construction and curing tent of the construction site according to the third aspect is the construction and curing tent of the construction site according to the first or second aspect, wherein the rope is provided between the members on the opposite side. Instead of being erected, it is erected between the poles extending above these members, so it has the same effect as in claim 1 or 2, and the awning is extended at a position higher than the scaffold. In this case, it is possible to extend the tent at a position higher than the scaffold without increasing the scaffold upward.

【0034】請求項4に記載の建築現場の施工・養生テ
ントは、請求項1又は2に記載の建築現場の施工・養生
テントにおいて、前記ロープが前記相対向している側の
部材の上方に延設した滑車付きポールの間に架設され、
前記ロープの両端又は一端がウインチで巻き取られたも
のであるので、請求項1又は2と同様の効果を有すると
共に、前記ロープを少ない力で容易にきつく張った状態
で架設することができるので、前記ロープを架設する作
業を容易化することができる。また、更に、前記ウイン
チで巻き取った前記ロープを緩めることにより、前記天
幕を下方へ下げることができるので、施工作業を行わな
い時には前記天幕を下げて建物の上に覆い被せることに
より、養生シートの代わりとすることができる。すなわ
ち、前記ウインチにより前記ロープを巻き取ったり緩め
たりするのみで、施工作業時には、降雨から建築資材や
作業者を守る天幕として、施工作業を行わないときに
は、建物に被せて養生シートとして、容易に変更して使
用することができる。
According to a fourth aspect of the present invention, there is provided the construction and curing tent of the construction site according to the first or second aspect, wherein the rope is provided above the member on the side on which the rope faces each other. It is erected between the extended poles with pulleys,
Since both ends or one end of the rope are wound by a winch, the same effect as in claim 1 or 2 can be obtained, and the rope can be erected easily and tightly with a small force. The work of erection of the rope can be facilitated. Further, by loosening the rope wound by the winch, the awning can be lowered, so that when the construction work is not performed, the awning is lowered and covered on the building, so that the curing sheet is provided. Can be used instead of In other words, only by winding or loosening the rope by the winch, during construction work, as an awning to protect building materials and workers from rainfall, when not performing construction work, easily cover the building as a curing sheet, Can be changed and used.

【0035】請求項5に記載の建築現場の施工・養生テ
ントは、請求項1乃至4のいずれかに記載の建築現場の
施工・養生テントにおいて、前記天幕の側部に開閉用ロ
ープの一端が取付けられたものであるので、請求項1乃
至4と同様の効果を有すると共に、前記天幕に手が届か
なくても、該開閉用ロープを所定の方向に引張ることで
前記天幕の開閉が可能である。
According to a fifth aspect of the present invention, there is provided the construction / curing tent for a construction site according to any one of the first to fourth aspects, wherein one end of an opening / closing rope is provided on a side of the tent. Since the awning is attached, the awning can be opened and closed by pulling the rope for opening and closing in a predetermined direction even if the awning cannot be reached, while having the same effect as in claims 1 to 4. is there.

【0036】請求項6に記載の建築現場の施工・養生テ
ントは、請求項1乃至4のいずれかに記載の建築現場の
施工・養生テントにおいて、前記天幕の上部を通る開閉
用ロープが、前記相対向している側の部材、又は該部材
の上方に延設したポールに設けられた開閉用滑車の間に
架設されるとともに、前記天幕の一端が前記開閉用ロー
プに固定されたものであるので、請求項1乃至4と同様
の効果を有すると共に、前記開閉用ロープのいずれか一
方の端部を作業者が下方へ引張ることにより、容易に前
記天幕の開閉を行うことができる。
According to a sixth aspect of the present invention, there is provided the construction and curing tent of the construction site according to any one of the first to fourth aspects, wherein the opening and closing rope passing through the upper part of the tent is provided with the opening and closing rope. The awning is installed between the members on the side facing each other or the opening / closing pulley provided on the pole extending above the member, and one end of the awning is fixed to the opening / closing rope. Therefore, while having the same effect as the first to fourth aspects, the operator can easily open and close the awning by pulling one end of the opening and closing rope downward.

【図面の簡単な説明】[Brief description of the drawings]

【図1】足場に設置された本発明の実施の形態に係る建
築現場の施工・養生テントの使用状態を示した斜視図で
ある。
FIG. 1 is a perspective view showing a use state of a construction and curing tent at a building site according to an embodiment of the present invention installed on a scaffold.

【図2】ロープとポールの接合例を示した説明図であ
る。
FIG. 2 is an explanatory diagram showing an example of joining a rope and a pole.

【図3】吊着手段の例を示した説明図である。FIG. 3 is an explanatory view showing an example of a hanging means.

【図4】本発明の実施の形態に係る建築現場の施工・養
生テントの吊着手段を示した説明図である。
FIG. 4 is an explanatory diagram showing a means for hanging a construction / curing tent at a construction site according to an embodiment of the present invention.

【図5】天幕の張設位置を上方へ移動させた場合を示す
斜視図である。
FIG. 5 is a perspective view showing a case where a stretched position of an awning is moved upward.

【図6】天幕を撤収する場合を示した正面図である。FIG. 6 is a front view showing a case where the awning is withdrawn.

【図7】本発明の実施の形態に係る建築現場の施工・養
生テントの使用状態における天幕を撤収した状態を示す
斜視図である。
FIG. 7 is a perspective view showing a state in which a tent is withdrawn in a state of use of a construction and curing tent at a building site according to an embodiment of the present invention.

【図8】天幕を張設する場合を示した正面図である。FIG. 8 is a front view showing a case where an awning is extended.

【図9】開閉用ロープに固定滑車を介して使用する場合
を示した説明図である。
FIG. 9 is an explanatory view showing a case where the opening / closing rope is used via a fixed pulley.

【図10】本発明の第2の実施形態を示した正面図であ
る。
FIG. 10 is a front view showing a second embodiment of the present invention.

【符号の説明】[Explanation of symbols]

1 建築現場の施工・養生テント 2 足場 3 支柱 4 ポール 5 ロープ 6 外縁部 7 躯体 8 留め付け手段 9 天幕 10 吊着手段 16 滑車付きポール 17 ウインチ 18 開閉用滑車 9d 開閉用ロープ DESCRIPTION OF SYMBOLS 1 Construction / healing tent of a construction site 2 Scaffold 3 Post 4 Pole 5 Rope 6 Outer edge 7 Body 8 Fastening means 9 Tent 10 Hanging means 16 Pulley pole 17 Winch 18 Opening pulley 9d Opening / closing rope

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】 建築物の周囲に設けられる建築現場の足
場に取付ける施工・養生テントであって、前記足場の相
対向している側の部材の間に架設されたロープと、外縁
部に前記足場又は建築物の躯体との留め付け手段を有す
る天幕と、前記ロープに前記天幕を該ロープに沿ってス
ライド自在に吊着する吊着手段とを備えることにより、
前記天幕が、前記外縁部が前記足場又は前記建築物の躯
体に留め付けられて凸型を形成するように張設されるこ
とを特徴とする建築現場の施工・養生テント。
1. A construction / healing tent to be attached to a scaffold at a building site provided around a building, wherein the rope is laid between members on opposite sides of the scaffold, By providing an awning having fastening means to a scaffold or a building body, and hanging means for slidably hanging the awning on the rope along the rope,
The construction and curing tent of a construction site, wherein the awning is stretched so that the outer edge portion is fixed to the scaffold or the frame of the building to form a convex shape.
【請求項2】 前記吊着手段が、前記ロープにスライド
自在に挿入されて吊るされた複数のリングと、一端が前
記リングに取付けられ、他端が前記天幕に取付けられて
前記天幕を懸架する複数の懸架紐体とからなることを特
徴とする請求項1に記載の建築現場の施工・養生テン
ト。
2. The hanging means includes a plurality of rings slidably inserted into and suspended from the rope, one end attached to the ring, and the other end attached to the awning to suspend the awning. The construction / healing tent according to claim 1, comprising a plurality of suspension strings.
【請求項3】 前記ロープが前記相対向している側の部
材の間に架設される代わりに、これらの部材の上方に延
設したポールの間に架設されたことを特徴とする請求項
1又は2に記載の建築現場の施工・養生テント。
3. The cable according to claim 1, wherein the rope is not installed between the members on the side facing each other, but is installed between poles extending above these members. Or the construction and curing tent of the construction site according to 2.
【請求項4】 前記ロープが前記相対向している側の部
材の上方に延設した滑車付きポールの間に架設されると
ともに、該ロープの両端又は一端がウインチで巻き取ら
れたことを特徴とする請求項1又は2に記載の建築現場
の施工・養生テント。
4. The rope is installed between pulley-equipped poles extending above the members on the opposite side, and both ends or one end of the rope are wound by a winch. The construction / curing tent for a construction site according to claim 1 or 2, wherein:
【請求項5】 前記天幕の側部に開閉用ロープの一端が
取付けられたことを特徴とする請求項1乃至4のいずれ
かに記載の建築現場の施工・養生テント。
5. The construction and curing tent according to claim 1, wherein one end of an opening / closing rope is attached to a side portion of the awning.
【請求項6】 前記天幕の上部を通る開閉用ロープが、
前記相対向している側の部材又は該部材の上方に延設し
たポールに設けられた開閉用滑車の間に架設されるとと
もに、前記天幕の一端が該開閉用ロープに固定されたこ
とを特徴とする請求項1乃至4のいずれかに記載の建築
現場の施工・養生テント。
6. An opening / closing rope passing through an upper part of the awning,
It is installed between an opening / closing pulley provided on the member on the opposite side or a pole extending above the member, and one end of the awning is fixed to the opening / closing rope. The construction and curing tent for a construction site according to any one of claims 1 to 4, wherein:
JP37265999A 1999-12-28 1999-12-28 Construction and curing tent on construction field Pending JP2001182330A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP37265999A JP2001182330A (en) 1999-12-28 1999-12-28 Construction and curing tent on construction field

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP37265999A JP2001182330A (en) 1999-12-28 1999-12-28 Construction and curing tent on construction field

Publications (1)

Publication Number Publication Date
JP2001182330A true JP2001182330A (en) 2001-07-06

Family

ID=18500832

Family Applications (1)

Application Number Title Priority Date Filing Date
JP37265999A Pending JP2001182330A (en) 1999-12-28 1999-12-28 Construction and curing tent on construction field

Country Status (1)

Country Link
JP (1) JP2001182330A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006118121A (en) * 2004-10-19 2006-05-11 Asahi Kasei Homes Kk Structure for stretching curing sheet
JP2009068288A (en) * 2007-09-14 2009-04-02 Sekisui House Ltd Curing system for use in wet weather
KR20150112264A (en) 2014-03-27 2015-10-07 삼성중공업 주식회사 Apparatus for reducing methane

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006118121A (en) * 2004-10-19 2006-05-11 Asahi Kasei Homes Kk Structure for stretching curing sheet
JP4504780B2 (en) * 2004-10-19 2010-07-14 旭化成ホームズ株式会社 Curing sheet tension structure
JP2009068288A (en) * 2007-09-14 2009-04-02 Sekisui House Ltd Curing system for use in wet weather
KR20150112264A (en) 2014-03-27 2015-10-07 삼성중공업 주식회사 Apparatus for reducing methane

Similar Documents

Publication Publication Date Title
JPH10510018A (en) Temporary protective cover system
KR20110006018A (en) Opening and shutting apparatus of manhole cover
JP2001182330A (en) Construction and curing tent on construction field
JP2581413B2 (en) Renewal method of electrode plate for electric precipitator and its device
JP3967643B2 (en) Building site tent
US2187436A (en) Portable structure
KR101180367B1 (en) A Gantry Crane with folding-typed Dome
JPH08260709A (en) All weather temporary constructed roof
EP1186696A2 (en) Washing line unit
JP4167377B2 (en) Rainfall installation method for unit housing, tent
JP3694666B2 (en) Temporary tent
JP7443279B2 (en) A roof frame for curing external framework scaffolding and a rain protection device for external framework scaffolding using a roof frame for curing external framework scaffolding.
JP3381090B2 (en) Temporary roof of building site
RU2225346C2 (en) Tower crane and method of its mounting
JPH06101366A (en) Hanging cover device
JPH0329489Y2 (en)
JPH0746135Y2 (en) Protective net device
JP2006161336A (en) Constructing and curing tent
JPH10266578A (en) Tent sheet for executing building nd usage of the tent sheet
JP2003120075A (en) Temporary cantilever type opening-closing roof structure
JP2764366B2 (en) Temporary tent with opening and closing mechanism
JPH11180679A (en) Rain protecting opening and closing tent for tower crane setting opening part
EP1062398A1 (en) Screening assembly for the screening of work on an outside wall
JP2546777B2 (en) Awning device for construction site
JPS63219761A (en) Tent for spot work