Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP30712999A
Other languages
Japanese (ja)
Other versions
JP3404339B2 (en
Inventor
Yoshimasa Hayashi
林義正
Koji Kato
加藤浩嗣
Ryoichi Kaneko
金子亮一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Telegraph and Telephone Corp
Iwabuchi Corp
Original Assignee
Nippon Telegraph and Telephone Corp
Iwabuchi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Telegraph and Telephone Corp, Iwabuchi Corp filed Critical Nippon Telegraph and Telephone Corp
Priority to JP30712999A priority Critical patent/JP3404339B2/en
Publication of JP2001128324A publication Critical patent/JP2001128324A/en
Application granted granted Critical
Publication of JP3404339B2 publication Critical patent/JP3404339B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Light Guides In General And Applications Therefor (AREA)
  • Electric Cable Installation (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a lead tool which can be applied to both a messenger wire and a self-supporting cable which have different diameters. SOLUTION: The lead tool of a cable pulling string is placed in a spiral cable hanger, which is supported by a messenger wire or a self-supporting cable, suspended between poles and a cable pulling string, is connected to its tail end. A pair of hanging elements 18 and 18' of the lead tool are hung on the messenger wire or the self-supporting cable. A pair of front and rear partition bars, which partition the recessed parts of the hanging elements, are turnably attached to the support part of the lead tool by a pair of support bars 17, while the standing postures are maintained. The respective base parts 18a and 18a' of the pair of hanging elements, a flat spring 19 and a tightening element 20 are successively piled and attached to the support part by the pair of support bars. Tapered edges inclined in the longitudinal direction of a long hole are formed on the surface of the tightening element, and the head parts of the support bars are engaged in the tapered edges.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、電柱間に架設した吊り
線又は自己支持型ケーブル(SSD)に螺旋状吊り具を
巻回して前記電柱間に架設し、該螺旋状ケーブル吊り具
に受支させるようにしてケーブルを電柱間に新たに架設
する際に、ケーブルを前記吊り線又は前記自己支持型ケ
ーブル(乃至螺旋状ケーブル吊り具)に沿って移動させ
るために用いるケーブル用引き紐の先導具に関するもの
である。すなわち、一方の電柱から他の一方の電柱位置
までわたしたケーブル用引き紐を牽引することにより該
ケーブル用引き紐の末端側に接続したケーブルを螺旋状
ケーブル吊り具に受支案内させて移動させることによ
り、ケーブルは電柱間に架設されるのであるが、本発明
は、ケーブル用引き紐の先端を一方の電柱側から他の一
方の電柱位置に移動させるために用いるケーブル用引き
紐の先導具に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method of winding a helical hanger around a hanging wire or a self-supporting cable (SSD) erected between electric poles, extending the helical hanger between the electric poles, and receiving the helical cable. When a cable is newly erected between utility poles so as to be supported, a lead of a cable pull cord used for moving the cable along the suspension line or the self-supporting cable (or spiral cable suspension). It is about tools. That is, by pulling the pulled cord for cable from one telephone pole to the position of the other telephone pole, the cable connected to the end side of the cable pull cord is guided and moved by the spiral cable suspender and moved. Accordingly, the cable is installed between the utility poles. However, the present invention provides a leading device of the cable drawstring used for moving the tip of the cable drawstring from one utility pole side to the other utility pole position. It is about.

【0002】[0002]

【従来の技術】電柱間に架設した吊り線又は自己支持型
ケーブルを利用してケーブルを架設するには、前記自己
支持型ケーブル又は吊り線(メッセンジャーワイヤー)
に螺旋状吊り具を架設し、該吊り具に前記ケーブルを受
支させて電柱間に架設する手段が採られているが、ケー
ブルを吊り線又は自己支持型ケーブルに沿って配置する
には、ケーブルを牽引するためのケーブル用引き紐を螺
旋状吊り具に貫通させなければならない。この貫通させ
る手段として、従来は、支持線にぶら下がって行う作
業、若しくは高所作業車を利用して行うかの方法しかな
く、いずれにしても手先で螺旋状ケーブル吊り具に沿わ
せてケーブル用引き紐の先端を一方の電柱から他の一方
の電柱側へと移動させるようにしている。
2. Description of the Related Art In order to lay a cable using a hanging wire or a self-supporting cable installed between telephone poles, the self-supporting cable or the hanging wire (messenger wire) is used.
A helical hanger is erected, and means for erection between the utility poles by supporting the cable with the hanger is adopted.However, in order to arrange the cable along a hanger or a self-supporting cable, A cable drawstring for pulling the cable must penetrate the spiral hanger. Conventionally, as a means for this penetration, there is only a method of hanging from a support wire or using an aerial work vehicle. The leading end of the drawstring is moved from one telephone pole to the other telephone pole.

【0003】従来例は、いずれも作業者が自己支持型ケ
ーブルに沿って移動しつつ螺旋状ケーブル吊り具に沿う
ケーブル用引き紐の移動作業を行うため、作業性に欠け
る。
In any of the conventional examples, the workability is lacking because the worker moves the pulling cord for the cable along the spiral cable hanger while moving along the self-supporting type cable.

【0004】このため、本発明者等は、電柱間に作業者
を配する必要がなく作業性の優れたものとして、支持型
ケーブルに支持させた螺旋状ケーブル吊り具内側に配置
し、しかも、後端に前記電柱間の距離に見合う長さの可
撓性素材より成る押圧線体を介してケーブル用引き紐を
接続する、前後に長い主体片に、対向面を凹入させて湾
曲状とした掛止部片を備え、かつ、この掛止部片間に前
記吊り線又は自己支持型ケーブルを介在させて該吊り線
又は自己支持型ケーブルに掛止する一対の掛止片を相対
して立設したケーブル用引き紐の先導具を先に提案した
(特願平10−366151号)。
[0004] For this reason, the present inventors have determined that the workability is excellent without having to arrange an operator between utility poles, and the work is arranged inside a helical cable hanger supported by a support type cable. At the rear end, a pull cord for a cable is connected via a pressing wire made of a flexible material having a length corresponding to the distance between the telephone poles. And a pair of hooking pieces that interpose the hanging wire or the self-supporting cable between the hooking pieces and hook on the hanging wire or the self-supporting cable. A leading device for an erect cable drawstring was proposed first (Japanese Patent Application No. 10-366151).

【0005】[0005]

【発明が解決しようとする課題】本発明者等が提案した
前記構造のものは、発明者等が意図した通りに作業性上
優れたものではあるが、主体片に相対して立設した一対
の掛止片が固定的であるため、外径を異にする吊り線と
自己支持型ケーブルに選択的に掛止して兼用することが
できず、仮に、できたとしても掛止作業が煩雑となり、
吊り線と自己支持型ケーブルそれぞれに対応する先導具
を用意しなければならない不都合があることを見出し
た。
The structure proposed by the present inventors is excellent in workability as intended by the present inventors, but a pair of standing members which are opposed to the main body piece. Is fixed, so that it cannot be selectively used as a hanging wire with a different outer diameter and a self-supporting cable, and the locking work is complicated even if it can be done. Becomes
It has been found that there is a disadvantage that it is necessary to prepare a leading tool corresponding to each of the suspension line and the self-supporting cable.

【0006】本発明は、斯様な不都合さに着目し、外径
の異なる吊り線および自己支持型ケーブルいずれにも適
用できる先導具を提供することを目的として創案したも
のである。
The present invention has been made in view of such inconveniences and has been devised for the purpose of providing a leading tool which can be applied to both a suspension line having a different outer diameter and a self-supporting type cable.

【0007】[0007]

【課題を解決するための手段】電柱間に架設した吊り線
又は自己支持型ケーブルに支持させた螺旋状ケーブル吊
り具の内側に配置し、しかも、後端に前記電柱間の距離
に見合う長さの可撓性素材よりなる押圧線体を介してケ
ーブル用引き紐を接続する、前後に長い主体片に、掛止
部片の対向面に設けた凹入部に前記吊り線又は自己支持
型ケーブルを介在させて、該吊り線又は自己支持型ケー
ブルに前記掛止部片の上端を掛止する、一対の掛止片を
相対して立設したケーブル用引き紐の先導具において、
前記主体片に該主体片の長手方向に沿う支持部を設け、
該支持部に起立状態を維持して前記一対の掛止片の凹入
部間を仕切る前後一対の仕切り杆を支持杆によって起伏
可能に取付け、前記支持部に前記一対の掛止片のそれぞ
れの基部片と板ばねおよび締付け片を順次重合して、前
記基部片と前記板ばねは一対の透孔において、また、締
付け片は前後方向に長い一対の長孔においてそれぞれ一
対の前記支持杆によって取付けると共に、前記締付け片
の表面に、前記長孔の前後方向に傾斜するテーパ縁を設
け、このテーパ縁に前記支持杆の頭部を係止させた構成
とするのである。
Means for Solving the Problems A cable is disposed inside a suspension cable erected between utility poles or a helical cable suspension supported on a self-supporting cable, and has a rear end corresponding to the distance between the utility poles. The cable pull cord is connected through a pressing wire body made of a flexible material, and the hanging wire or the self-supporting cable is inserted into the concave portion provided on the facing surface of the hooking piece on the long main body piece. Interposed, to hook the upper end of the hanging piece to the hanging wire or the self-supporting cable, in a leading device of a cable drawstring in which a pair of hanging pieces are opposed to each other,
Providing a support portion along the longitudinal direction of the main body piece on the main body piece,
A pair of front and rear partitioning rods that partition the recessed portions of the pair of latching pieces while maintaining the upright state on the supporter are mounted on the supporter so that the partitioning rods can be raised and lowered, and the respective bases of the pair of latching pieces are mounted on the supporter. The base piece and the leaf spring are sequentially mounted on the pair of through holes, and the tightening piece is mounted on the pair of long holes long in the front-rear direction by the pair of support rods. A tapered edge is provided on the surface of the fastening piece, which is inclined in the front-rear direction of the elongated hole, and the head of the support rod is locked to the tapered edge.

【0008】[0008]

【実施例】図面は本発明に係るケーブル用引き紐の先導
具の一実施例を示し、図1は正面図、図2は図1のA1
−A1線断面図、図3は平面図、図4は一部欠截拡大平
面図、図5は底面図、図6は図5のA5−A5線断面
図、図7は締付け片を解放した状態の底面図、図8は自
己支持型ケーブルに組付けた状態の正面図、図9は図7
のA7−A7線断面図、図10は吊り線に組付けた状態
の断面図、図11は仕切り杆と一方の掛止片の関係を示
す斜視図である。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a front view of an embodiment of a lead cord for a cable according to the present invention, FIG.
3 is a plan view, FIG. 4 is a partially enlarged plan view, FIG. 5 is a bottom view, FIG. 6 is a sectional view taken along line A5-A5 of FIG. 5, and FIG. FIG. 8 is a front view of a state in which the cable is assembled to a self-supporting cable, and FIG.
10 is a cross-sectional view taken along the line A7-A7, FIG. 10 is a cross-sectional view showing a state where the hanging rod is assembled, and FIG. 11 is a perspective view showing a relationship between the partitioning rod and one hooking piece.

【0009】図中、1は先導具Aの主体片で、主体片1
は前端部側と後端部側を漸次幅狭くした断面やや角形樋
状の、前後方向に長い金属片で成り、中央部に厚肉状に
して主体片1の長手方向に沿って長い(前後に長い)支
持部2を備え、該支持部2の長手方向に沿う両側に窓口
3A,3Bを備えたものである。
In the drawing, reference numeral 1 denotes a main piece of the leading tool A,
Is made of a metal piece long in the front-rear direction having a cross section in which the front end side and the rear end side are gradually narrowed in width and having a slightly square trough shape, and is made thick at the center and long along the longitudinal direction of the main body piece 1 (front and rear). The support portion 2 is provided with windows 3A and 3B on both sides along the longitudinal direction of the support portion 2.

【0010】窓口3Aは後記する一対の掛止片18,1
8´の基部片18a,18´aを該窓口3Aを通じて前
記支持部2に支持杆17,17によって取付け、前記掛
止片18,18´を前記主体片1に相対して立設するた
めのもので、この掛止片18,18´、板ばね19或い
は締付け片20を前記支持杆17によって前記支持部2
に取付けることによって生じる左右の重量のバランスを
保つために前記窓口3Bを主体片1に設けてある。
The window 3A is provided with a pair of hanging pieces 18, 1 described later.
8 'base pieces 18a, 18'a are attached to the support section 2 by the support rods 17, 17 through the window 3A, and the hook pieces 18, 18' are erected relative to the main body piece 1. The holding pieces 18, 18 ', the leaf spring 19, or the fastening piece 20 are held by the support rod 17 by the support rod 17.
The window 3B is provided in the main piece 1 in order to maintain the balance between the right and left weights caused by the mounting on the main piece 1.

【0011】前記主体片1の先端側には、蝶着手段5に
よって、平面視三角形状の先導片4を俯仰自在に取付
け、先導片4は先導具Aが前進中に螺旋状吊り具6に接
触したとき、蝶着手段5に備えたコイルスプリング5a
の付勢に抗して俯仰して前記接触による衝撃を緩和す
る。
A triangular leading piece 4 in a plan view is attached to the leading end of the main piece 1 by a hinge means 5 so as to be capable of raising and lowering, and the leading piece 4 is attached to the spiral hanger 6 while the leading tool A is moving forward. When it comes into contact, the coil spring 5a provided in the hinge means 5
To reduce the impact due to the contact.

【0012】なお、先導片4の鋭角状の先端4aを前記
主体片1の長手方向に沿う中心位置よりずらせてあるの
は、螺旋状ケーブル吊り具6の内周縁側から外周縁側に
該先導片4(引いては主体片1の先端)が抜け出ようと
するのを防ぎ、先導片4乃至主体片1を螺旋状吊り具6
の内周縁内(内側)に常に位置させるためで、従って、
該先導片4の形状と前記コイルスプリング5aの作用に
より、先導片4が螺旋状ケーブル吊り具6に当ると、先
導片4は前進方向をわずかに変えて、螺旋状ケーブル吊
り具6の軸線方向に主体片1を先導する。
The reason why the acute end 4a of the leading piece 4 is displaced from the center position along the longitudinal direction of the main piece 1 is that the leading piece 4 extends from the inner peripheral side to the outer peripheral side of the helical cable suspender 6. 4 (and thus the tip of the main piece 1) is prevented from slipping out, and the leading piece 4 to the main piece 1 are spirally hung 6.
To always be located within (inside) the inner periphery of
Due to the shape of the leading piece 4 and the action of the coil spring 5a, when the leading piece 4 hits the helical cable suspender 6, the leading piece 4 slightly changes the forward direction, and the axial direction of the helical cable suspender 6 To the main body piece 1.

【0013】主体片1の後端には、可撓性の押圧線体7
の先端にコネクタ8、後端に接続フック9を設けて構成
したよび線工具10の前記コネクタ8を接続する接続材
11を設け、前記よび線工具10(押圧線体7)を介し
てケーブル用引き紐12を(前記接続フック9を利用し
て)接続するようにしてある(図8)。
At the rear end of the main body piece 1, a flexible pressing wire 7
A connecting member 11 for connecting the connector 8 of a wire tool 10 provided with a connector 8 at the front end and a connection hook 9 at the rear end is provided, and a connecting material 11 for the cable is provided via the wire tool 10 (pressing wire 7). The drawstring 12 is connected (using the connection hook 9) (FIG. 8).

【0014】なお、押圧線体7の可撓性とは、螺旋状ケ
ーブル吊り具6が成す曲路に応じてたわみ変形し、か
つ、先導具Aに押圧力を伝達できる性質をいう。
Note that the flexibility of the pressing wire 7 means a property that the pressing wire 7 bends and deforms in accordance with the curved path formed by the spiral cable hanging device 6 and that the pressing force can be transmitted to the leading device A.

【0015】前記支持部2の一方の前記窓口3A側の片
面の長手方向に沿う中央部には切欠13を設け、該切欠
13の中間部の下端側に前記窓口3A側に仕切り杆14
の板厚とほぼ同量突出するようにして仕切り杆14,1
4の受止部15,15を設けてある(図5,図6)。
A notch 13 is provided at a central portion of one side of the support portion 2 on the side of the window 3A along the longitudinal direction, and a partition rod 14 is provided at a lower end of an intermediate portion of the notch 13 on the side of the window 3A.
The partition rods 14 and 1 are projected so as to be approximately the same
4 are provided (FIGS. 5 and 6).

【0016】なお、受止部15,15間にして前記支持
部2の下縁に設けた半円状の切欠13Aは、指先を係合
して前記仕切り杆14,14を起立し易くするためであ
る。
The semicircular notch 13A provided between the receiving portions 15 and 15 at the lower edge of the support portion 2 engages with a fingertip to facilitate the standing of the partitioning bars 14 and 14. It is.

【0017】前記切欠13の前後両端側には螺子孔1
6,16を設け、該螺子孔16,16に螺合して前記支
持部2に突設した前記一対の支持杆17,17によって
前記一対の仕切り杆14,14と、該仕切り杆14,1
4と互いに同面上に位置する前記支持部2に順次重合し
た前記一対の掛止片18,18の基部片18a,18a
のそれぞれと板ばね19および前記締付け片20のそれ
ぞれを支持させてある。
Screw holes 1 are provided at both front and rear ends of the notch 13.
6 and 16, the pair of support rods 17 and 17 screwed into the screw holes 16 and 16 and protruding from the support portion 2, the pair of partition rods 14 and 14, and the partition rods 14 and 1.
4 and a pair of base pieces 18a, 18a of the pair of hook pieces 18, 18 sequentially superimposed on the support part 2 located on the same plane as each other.
And the leaf spring 19 and the fastening piece 20 are supported.

【0018】前記仕切り杆14は、その板厚を前記切欠
13の奥行幅と同じくして前記窓口3A側の表面が前記
の通り支持部2と同面上に位置するもので、先端側に、
倒伏時に前記受止部15に係合してこれに係止する切欠
14aを備え、前記支持杆17を枢軸として回動した起
立時には一方の掛止片18の掛止部片18bの基部片1
8a側に形成した窓口18cを通じて起立し、窓口18
cの両側の係合部18c´,18cに´係合して該立設
状態が保持され、前記掛止部片18bが成す凹入部21
を閉塞して該凹入部21内への吊り線22の係合を規制
する(図9)。
The partitioning rod 14 has the same thickness as the depth of the notch 13 and the surface on the window 3A side is located on the same plane as the support portion 2 as described above.
A notch 14a that engages with and engages with the receiving portion 15 when lying down, and the base piece 1 of the hooking piece 18b of one of the hooking pieces 18 when standing upright with the support rod 17 pivoted about a pivot.
8a, and stands up through a window 18c formed on the side of the window 18a.
c is engaged with the engaging portions 18c ', 18c on both sides of the retaining portion 18c, and the standing state is maintained, and the recessed portion 21 formed by the engaging portion piece 18b is formed.
To restrict the engagement of the hanging wire 22 into the recess 21 (FIG. 9).

【0019】前記一対の掛止片18,18´は、それぞ
れ前記基部片18a,18´aと該基部片18a,18
´aに連設した掛止部片18b,18´bとで成り、掛
止部片18b,18´bを、両掛止片18,18´間の
対向面側を凹入させて凹入部21,21´を備えた断面
湾曲状とし、互いに重ね合わせた前記基部片18a,1
8´aに一対の透孔(支持杆17,17と対応させて設
けてあるので符号省略)を設け、該透孔に前記支持杆1
7,17を貫通させて前記支持部2すなわち主体片1に
取付けたものである。
The pair of engaging pieces 18 and 18 'are respectively composed of the base pieces 18a and 18'a and the base pieces 18a and 18'.
'A, and the hooking pieces 18b, 18'b are formed by recessing the facing faces between the hooking pieces 18, 18'. The base pieces 18a, 1 each having a curved cross-section including
8'a is provided with a pair of through-holes (the symbols are omitted because they are provided in correspondence with the support rods 17 and 17), and the support rod 1 is provided in the through-hole.
7 and 17 are attached to the support portion 2, that is, the main piece 1, through the through holes 7 and 17.

【0020】この掛止片18,18´の掛止部片18
b,18´bの凹入部21,21´内に自己支持型ケー
ブル23(ケーブル部23aと吊り線部23bとで構成
される)のケーブル部(本体部)23aを係合するよう
にして掛止部片18b,18´bの上端をケーブル部2
3aに係止させ(図2)、また、吊り線22の場合(図
9)は、前記の通り、仕切り杆14,14において一方
へ掛止片18側の凹入部21を閉塞し、他の一方の掛止
片18´側の凹入部21´に吊り線22を係合するよう
にして掛止部片18´bの上端を吊り線22に係止させ
るようにしてある。
The hook pieces 18 of the hook pieces 18, 18 '
b, 18'b are hooked in such a manner that the cable portion (main body portion) 23a of the self-supporting cable 23 (comprised of the cable portion 23a and the suspension wire portion 23b) is engaged in the recessed portions 21, 21 'of the cable 18b. The upper ends of the stopper pieces 18b and 18'b are connected to the cable 2
3a (FIG. 2), and in the case of the suspension line 22 (FIG. 9), as described above, one of the partitioning rods 14, 14 closes the recessed portion 21 on the hooking piece 18 side, and the other is closed. The upper end of the hooking piece 18 ′ b is locked to the hanging wire 22 by engaging the hanging wire 22 with the recess 21 ′ on the one hooking piece 18 ′ side.

【0021】掛止片18,18´の基部片18a,18
´aを介して前記支持部2に重合させて取付けた前記板
ばね19は、前記締付け片20側面を膨出して屈曲状
(図7で示すように円弧状)とした板片で成り、一対の
透孔(支持杆17,17と対応させて設けてあるので図
示省略)に前記支持杆17,17を貫通させて前記の通
り該支持杆17に支持させ、支持部2に組付けたもの
で、この板ばね19の弾性に基づく押圧付勢により掛止
片18の基部片18aは支持部2に常時圧接して、仕切
り杆14の起立時における窓口係合部18c´に体する
係合状態を維持させると共に、締付け片20を、支持杆
17の頭部17aに常時圧接させる。
The base pieces 18a, 18 of the hook pieces 18, 18 '
The leaf spring 19, which is attached to the support portion 2 by superimposing via 'a, is made of a plate piece which is formed by bending the side surface of the tightening piece 20 and forming a bent shape (an arc shape as shown in FIG. 7). The supporting rods 17, 17 are passed through through holes (not shown because they are provided corresponding to the supporting rods 17, 17), and are supported by the supporting rods 17 as described above, and assembled to the support portion 2. Then, the base piece 18a of the hook piece 18 is always pressed against the support portion 2 by the urging force based on the elasticity of the leaf spring 19, and is engaged with the window engaging portion 18c 'when the partitioning rod 14 stands up. While maintaining the state, the fastening piece 20 is constantly pressed against the head 17a of the support rod 17.

【0022】前記締付け片20は、前記一対の支持杆1
7,17に対応するように一対の長孔26,26を備
え、各長孔26の長手方向の一端から他の一端方向に漸
次板厚を厚くするようにしてテーパ縁27,27を設
け、このテーパ縁27,27部に存する前記長孔26の
長手方向に沿う側縁に、支持杆17の頭部17aを摺接
し(前記板ばね19の付勢によって)、支持杆17は、
締付け片20の長孔26、板ばね19の透孔、掛止片1
8の基部片18aに設けた透孔および仕切り杆14に設
けた透孔(図示省略)を順次通じて前記螺子孔16に螺
合し、螺子孔16に対する螺合寸法を調節することによ
り、締付け片20と掛止片基部片18aとの間に介在さ
せた板ばね19の弾性力(付勢力)を調節する。
The fastening piece 20 is provided with the pair of support rods 1.
A pair of long holes 26, 26 are provided to correspond to 7, 17, respectively, and tapered edges 27, 27 are provided so that the plate thickness is gradually increased from one end in the longitudinal direction of each long hole 26 to the other end. The head 17a of the support rod 17 is slid on the side edge along the longitudinal direction of the long hole 26 existing in the tapered edges 27, 27 (by the urging of the leaf spring 19).
Long hole 26 of fastening piece 20, through hole of leaf spring 19, hook piece 1
8 through the through-hole provided in the base piece 18a and the through-hole (not shown) provided in the partitioning rod 14 and screwed into the screw hole 16, and by adjusting the screwing dimension to the screw hole 16, tightening is performed. The elastic force (biasing force) of the leaf spring 19 interposed between the piece 20 and the hook piece base piece 18a is adjusted.

【0023】しかして、主体片1の接続材11に後端に
ケーブル用引き紐12を接続した押圧線体7の先端に設
けたコネクタ8を接続して、よび線工具10と先導具A
を互いに接続し、先導具Aの締付け片20を、主体片1
の前方方向に摺動させて支持杆17部に位置していたテ
ーパ縁27を構成する締付け片20の厚肉部に代えて薄
肉部を該支持杆17部に位置させると、支持杆17の頭
部17aと支持部2乃至仕切り杆14に介在され、密接
していた締付け片20、板ばね19、掛止片18,18
´の基部片18a,18´aの密接状態は開放され、板
ばね19の作用により各部材20,19,18a,18
a間に適宜隙間が形成されることになる。
The connecting member 11 of the main piece 1 is connected to the connector 8 provided at the distal end of the pressing wire 7 having the cable pull cord 12 connected to the rear end thereof.
Are connected to each other, and the fastening piece 20 of the leading tool A is
When the thin part is positioned on the support rod 17 instead of the thick part of the fastening piece 20 that forms the tapered edge 27 that has been positioned on the support rod 17 by sliding in the forward direction of the support rod 17, The fastening piece 20, the leaf spring 19, and the hook pieces 18, 18 which are interposed between the head 17 a and the support 2 to the partitioning rod 14 and are in close contact with each other.
The base pieces 18a, 18'a of the ′ ′ are released from close contact, and the respective members 20, 19, 18a, 18
A gap is appropriately formed between a.

【0024】この隙間を利用して互いに相対して主体片
1に立設させて組付けている一対の掛止片18,18´
(の基部片18a,18´a)を、支持杆17,17の
軸線に沿わせて移動させるようにして互いに離開させる
と、掛止片18,18´の、互いに近接していた掛止部
片18b,18´bの先端は互いに離開し、該先端間
に、既設の自己支持型ケーブル23のケーブル部23a
を相対的に出入し得る程度の間隙が形成され(図9)、
この間隙を利用して前記掛止部片18b,18´bで構
成する凹入部21,21´内に前記ケーブル部23aが
存するように、先導具Aを自己支持型ケーブル23に組
合わせ、板ばね19の付勢の中断によって切欠13から
の仕切り杆14が離脱しているときは、切欠13に仕切
り杆14を係合させた後、前記締付け片20を原位置
に、すなわち、テーパ縁27部の厚肉部が支持杆17
(の頭部17a)部に位置するように移動復帰させる
と、先導具Aは自己支持型ケーブル23のケーブル部2
3aに掛止片18,18´において掛止され組付けられ
る。
Using this gap, a pair of hooking pieces 18, 18 ′ which are installed on the main body piece 1 so as to be opposed to each other.
When the base pieces 18a and 18'a are moved apart along the axis of the support rods 17 and 17 and separated from each other, the hooking portions of the hooking pieces 18 and 18 'which are close to each other are formed. The tips of the pieces 18b and 18'b are separated from each other, and a cable portion 23a of the existing self-supporting cable 23 is provided between the tips.
Gaps are formed to allow relative entry and exit (FIG. 9),
Using this gap, the leading tool A is combined with the self-supporting cable 23 so that the cable portion 23a exists in the recessed portions 21, 21 'formed by the hooking pieces 18b, 18'b. When the partitioning rod 14 is detached from the notch 13 due to the interruption of the bias of the spring 19, after the partitioning rod 14 is engaged with the notch 13, the tightening piece 20 is returned to the original position, that is, the tapered edge 27. The thick part of the support rod 17
When it is moved and returned to be located at the (head 17a) portion, the leading tool A becomes the cable portion 2 of the self-supporting cable 23.
The hook 3a is hooked on the hook pieces 18, 18 'and assembled.

【0025】そして、先導具3を、よび線工具10すな
わち押圧線体7を前記一方の電柱側から他の一方の電柱
側方向に押圧すると、先導具Aは、主体片1が螺旋状ケ
ーブル吊り具6に内接しつつ、他方において掛止片1
8,18´が自己支持型ケーブル23のケーブル部23
aに案内されて他の一方の電柱側へと移動し、該他の一
方の電柱側においてよび線工具10すなわち押圧線体7
を牽引すると、押圧線体7に引っ張られて、前記螺旋状
ケーブル吊り具6の内側において引き紐12の先端が前
記一方の電柱側から他の一方の電柱側へと移動し、次い
で、引き紐12の末尾に追加する(自己支持型ケーブル
23に対して)ケーブルを組付け、引き紐12の先端を
引っ張ることによって容易にケーブルが追加され、電柱
間に架設されるのである。
When the leading tool 3 is pushed from the one utility pole side to the other utility pole side, the leading tool 3 presses the call tool 10, that is, the pressing wire 7, so that the main body piece 1 suspends the spiral cable. While inscribing the tool 6,
8, 18 'are cable portions 23 of the self-supporting type cable 23.
a to move to the other one of the utility poles, and at the other one of the utility poles, the yoke tool 10, ie, the pressing wire 7
Is pulled by the pressing wire 7, the tip of the drawstring 12 moves from the one power pole side to the other power pole side inside the spiral cable hanging device 6, and then the pullstring By attaching a cable to the end of the cable 12 (with respect to the self-supporting cable 23) and pulling the tip of the drawstring 12, the cable is easily added and laid between telephone poles.

【0026】また、電柱間に架設した吊り線22を利用
してケーブルを新規に架設する場合は、自己支持型ケー
ブル23の場合と同様に吊り線22に螺旋状ケーブル吊
り具6を順次接続巻回吊設しておいて、主体片1の後端
によび線工具10等を接続した先導具Aの締付け片20
を、主体片1の前方方向に移動(摺動)させて支持杆1
7部に位置していたテーパ縁27の厚肉部に代えて薄肉
部を該支持杆17部に位置させて締付け片20等の密接
状態を開放し、前記と同様に、掛止部片18b,18´
bの先端間に生じる間隙を利用して掛止部片18b,1
8´bで構成する凹入部21,21内に前記吊り線22
が存するように、先導具Aを吊り線22に組合わせ、そ
して、吊り線22が一方の掛止片18´側の凹入部21
´内に偏するようにして、仕切り杆14,14を支持杆
17中心に回動させると、仕切り杆14,14は、他の
一方の掛止片18に形成した窓口18cを通じて起立し
て該窓口18の係合部18c´,18c´位置に配せら
れ、この状態で締付け片20を前記と同様に原位置に復
帰させると、一方の掛止片18側の凹入部21への吊り
線22の相対的な移動係合は仕切り杆14によって吊り
線22は仕切り杆14と他の一方の掛止片18´間に常
に存する状態になり、先導具Aは吊り線22に組付けら
れ、以下前記と同様にケーブルの架設作業を行うのであ
る。
When a new cable is erected using the hanging wire 22 laid between the utility poles, the spiral cable hanger 6 is sequentially connected to the hanging wire 22 in the same manner as the self-supporting cable 23. The main body piece 1 is fastened and the fastening piece 20 of the leading tool A is connected to the rear end of the main piece 1 and the wire tool 10 or the like.
Is moved (slid) in the forward direction of the main body piece 1 to support the support rod 1.
Instead of the thick portion of the tapered edge 27 located at the 7th portion, a thin portion is located at the support rod 17 to release the tight state of the fastening piece 20 and the like, and the hooking portion piece 18b , 18 '
b using the gap formed between the tips of the hooks 18b, 1b.
The suspension line 22 is provided in the recesses 21 and 21 formed by 8′b.
The leading tool A is combined with the hanging wire 22 so that the hanging wire 22 is provided, and the hanging wire 22 is inserted into the recess 21 on the one hooking piece 18 'side.
When the partitioning rods 14, 14 are pivoted about the support rod 17 so as to be deviated inward, the partitioning rods 14, 14 stand upright through the window 18 c formed in the other one of the latching pieces 18, and rise. When the fastening piece 20 is returned to the original position in the same manner as described above in this state, the hanging wire is connected to the recess 21 on the one hooking piece 18 side. The relative movement engagement of 22 is such that the suspension line 22 is always present between the partition rod 14 and the other hooking piece 18 ′ by the partition rod 14, and the leading tool A is assembled to the suspension line 22, Thereafter, the cable laying work is performed in the same manner as described above.

【0027】[0027]

【発明の効果】本発明は前記の通りの構成であるから、
径の異なる吊り線と支持型ケーブルのいずれにも選択的
に適用できる先導具を提供できる。
The present invention has the configuration described above,
A leading tool can be provided which can be selectively applied to both suspension wires and support cables having different diameters.

【図面の簡単な説明】[Brief description of the drawings]

【図1】正面図。FIG. 1 is a front view.

【図2】図1のA1−A1線断面図。FIG. 2 is a sectional view taken along line A1-A1 of FIG.

【図3】平面図。FIG. 3 is a plan view.

【図4】一部欠截拡大平面図。FIG. 4 is a partially cut-away enlarged plan view.

【図5】底面図。FIG. 5 is a bottom view.

【図6】図5のA5−A5線断面図。FIG. 6 is a sectional view taken along line A5-A5 of FIG. 5;

【図7】締付け片を解放した状態の底面図。FIG. 7 is a bottom view in a state where a fastening piece is released.

【図8】自己支持型ケーブルに組付けた状態の正面図。FIG. 8 is a front view showing a state where the self-supporting cable is assembled.

【図9】図7のA7−A7線断面図。FIG. 9 is a sectional view taken along line A7-A7 of FIG. 7;

【図10】吊り線に組付けた状態の断面図。FIG. 10 is a cross-sectional view of a state where it is assembled to a suspension line.

【図11】仕切り杆と一方の掛止片の関係を示す斜視
図。
FIG. 11 is a perspective view showing the relationship between a partitioning rod and one of the hook pieces.

【符号の説明】[Explanation of symbols]

1 主体片 2 支持部 14 仕切り杆 17 支持杆 17a 支持杆の頭部 18,18´ 掛止片 18a,18´a 基部片 19 板ばね 20 締付け片 26 長孔 27 テーパ縁 DESCRIPTION OF SYMBOLS 1 Main piece 2 Support part 14 Partition rod 17 Support rod 17a Head of support rod 18, 18 'Hook piece 18a, 18'a Base piece 19 Leaf spring 20 Tightening piece 26 Elongated hole 27 Tapered edge

───────────────────────────────────────────────────── フロントページの続き (72)発明者 加藤浩嗣 東京都千代田区大手町2丁目3番1号 日 本電信電話株式会社内 (72)発明者 金子亮一 東京都千代田区大手町2丁目3番1号 日 本電信電話株式会社内 Fターム(参考) 2H038 CA73  ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Hiroshi Kato 2-3-1, Otemachi, Chiyoda-ku, Tokyo Nippon Telegraph and Telephone Corporation (72) Ryoichi Kaneko 2-3-3, Otemachi, Chiyoda-ku, Tokyo No. 1 Nippon Telegraph and Telephone Corporation F-term (reference) 2H038 CA73

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 電柱間に架設した吊り線又は自己支持型
ケーブルに支持させた螺旋状ケーブル吊り具の内側に配
置し、しかも、後端に前記電柱間の距離に見合う長さの
可撓性素材よりなる押圧線体を介してケーブル用引き紐
を接続する、前後に長い主体片に、掛止部片の対向面に
設けた凹入部に前記吊り線又は自己支持型ケーブルを介
在させて、該吊り線又は自己支持型ケーブルに前記掛止
部片の上端を掛止する、一対の掛止片を相対して立設し
たケーブル用引き紐の先導具において、前記主体片に該
主体片の長手方向に沿う支持部を設け、該支持部に起立
状態を維持して前記一対の掛止片の凹入部間を仕切る前
後一対の仕切り杆を支持杆によって起伏可能に取付け、
前記支持部に前記一対の掛止片のそれぞれの基部片と板
ばねおよび締付け片を順次重合して、前記基部片と前記
板ばねは一対の透孔において、また、締付け片は前後方
向に長い一対の長孔においてそれぞれ一対の前記支持杆
によって取付けると共に、前記締付け片の表面に、前記
長孔の前後方向に傾斜するテーパ縁を設け、このテーパ
縁に前記支持杆の頭部を係止させた、ケーブル用引き紐
の先導具。
1. A flexible wire having a length corresponding to the distance between the power poles, which is disposed inside a suspension wire suspended between power poles or a helical cable hanger supported by a self-supporting cable. Connecting the pull cord for cable through a pressing wire made of a material, the main body piece long in the front and back, with the hanging wire or the self-supporting cable interposed in the recess provided on the opposing surface of the hanging piece, In a leading device of a cable pull cord in which a pair of hooking pieces are erected relative to each other, the upper end of the hooking piece is hung on the hanging wire or the self-supporting cable. A support portion is provided along the longitudinal direction, and a pair of front and rear partitioning bars that partition between the recessed portions of the pair of engaging pieces while maintaining the upright state on the supporting portion are attached to the supporting portion so as to be able to be raised and lowered by the supporting rod,
The base piece and the leaf spring of the pair of latch pieces are sequentially superimposed on the support portion and the leaf spring and the fastening piece, and the base piece and the leaf spring have a pair of through holes, and the fastening piece is long in the front-rear direction. Attach by a pair of the support rods in a pair of the long holes, and provide a tapered edge inclined in the front-rear direction of the long hole on the surface of the fastening piece, and lock the head of the support rod to the tapered edge. In addition, the leader of the cable drawstring.
【請求項2】 支持杆の先端に設けた雄螺子部を支持部
に設けた螺子孔に螺合した、請求項2記載のケーブル用
引き紐の先導具。
2. The lead device for a cable pulling cord according to claim 2, wherein a male screw portion provided at a tip of the support rod is screwed into a screw hole provided in the support portion.
JP30712999A 1999-10-28 1999-10-28 Leader for cable drawstring Expired - Lifetime JP3404339B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP30712999A JP3404339B2 (en) 1999-10-28 1999-10-28 Leader for cable drawstring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP30712999A JP3404339B2 (en) 1999-10-28 1999-10-28 Leader for cable drawstring

Publications (2)

Publication Number Publication Date
JP2001128324A true JP2001128324A (en) 2001-05-11
JP3404339B2 JP3404339B2 (en) 2003-05-06

Family

ID=17965388

Family Applications (1)

Application Number Title Priority Date Filing Date
JP30712999A Expired - Lifetime JP3404339B2 (en) 1999-10-28 1999-10-28 Leader for cable drawstring

Country Status (1)

Country Link
JP (1) JP3404339B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115367112A (en) * 2022-07-11 2022-11-22 国网河北省电力有限公司衡水供电分公司 Auxiliary maintenance unmanned aerial vehicle and auxiliary maintenance method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115367112A (en) * 2022-07-11 2022-11-22 国网河北省电力有限公司衡水供电分公司 Auxiliary maintenance unmanned aerial vehicle and auxiliary maintenance method

Also Published As

Publication number Publication date
JP3404339B2 (en) 2003-05-06

Similar Documents

Publication Publication Date Title
US20220010893A1 (en) Hanger for mounting multiple cables
US9853434B2 (en) Hanger for mounting multiple cables
US6355887B1 (en) Cable support
KR200362772Y1 (en) The wedge-shaped extensible-clamp
US6222128B1 (en) Cable support
KR101492041B1 (en) Hangger for installing cables
JP2001128324A (en) Lead tool for cable pulling string
US3470578A (en) Drapery rod and bracket
JP3404343B2 (en) Leader for cable drawstring
JP3404344B2 (en) Leader for cable drawstring
JP3381067B2 (en) Hanging bracket for messenger wire
KR101421942B1 (en) Hanger for arranging optical cable
JP2012120333A (en) Lead-in cable support
JPS587794Y2 (en) Cable horizontal overhead line support structure
JP3766740B2 (en) End fittings for architectural channels
KR200361584Y1 (en) A cable clamp
KR102484839B1 (en) Double locking band cable
JP3138434B2 (en) Leader for cable drawstring
JP3781627B2 (en) Wind regulator cable support device
JP2979406B1 (en) Wiring tool
JP7366970B2 (en) Hanging hardware for cables
CN214171033U (en) Waterline hanging piece
KR200375125Y1 (en) A cable clamp
EP0390834B1 (en) Quick-acting clamp, whose clamping force is a direct function of the load, for wires suspending weights, especially chandeliers
US7251886B1 (en) System for installing a cord in a cavity

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090228

Year of fee payment: 6

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100228

Year of fee payment: 7

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110228

Year of fee payment: 8

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120229

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120229

Year of fee payment: 9

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130228

Year of fee payment: 10