JP2000282777A - Reinforcing bar fixing tool and reinforcing bar arranging method - Google Patents

Reinforcing bar fixing tool and reinforcing bar arranging method

Info

Publication number
JP2000282777A
JP2000282777A JP11086699A JP8669999A JP2000282777A JP 2000282777 A JP2000282777 A JP 2000282777A JP 11086699 A JP11086699 A JP 11086699A JP 8669999 A JP8669999 A JP 8669999A JP 2000282777 A JP2000282777 A JP 2000282777A
Authority
JP
Japan
Prior art keywords
reinforcing bar
liner plate
fixing
bolt
setup
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP11086699A
Other languages
Japanese (ja)
Inventor
Katsuhiko Okumura
克彦 奥村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nishimatsu Construction Co Ltd
Original Assignee
Nishimatsu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nishimatsu Construction Co Ltd filed Critical Nishimatsu Construction Co Ltd
Priority to JP11086699A priority Critical patent/JP2000282777A/en
Publication of JP2000282777A publication Critical patent/JP2000282777A/en
Pending legal-status Critical Current

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a reinforcing bar fixing tool which is preferable for fixing an initial setup bar to a liner plate, saves fixing work of the initial setup bar, and positively ensures cover concrete, and to provide a reinforcing bar arranging method using the tool. SOLUTION: A reinforcing bar fixing tool 1 is produced by using a thick plate. A bolt inserting portion 3 formed at one end of the reinforcing bar fixing tool 1 and a bolt hole 11 formed in the upper surface of a liner plate 10 are superposed on each other, and they are fixed by using a bolt and a nut. Further, an initial setup bar 20 is filled into a recess formed in the other end of the reinforcing bar fixing tool 1, and they are bound, to thereby fix the initial setup bar 20 to the liner plate 10. The amount of cover concrete is adjusted by shifting the bolt in the bolt inserting portion 3.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、深礎工法において
ライナープレートに鉄筋を固定するのに好適であり、鉄
筋の固定作業を省力化するとともに、ライナープレート
と鉄筋との間隔すなわちかぶりを確実に確保する鉄筋固
定具およびこれを利用した鉄筋施工法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention is suitable for fixing a reinforcing bar to a liner plate in a deep foundation method, which can save labor for fixing the reinforcing bar and ensure that the distance between the liner plate and the reinforcing bar, that is, fogging. The present invention relates to a reinforcing steel fixture to be secured and a method for constructing a reinforcing steel using the same.

【0002】[0002]

【従来の技術】深礎工法は、地盤に掘削した穴を、円形
のライナープレート(山留め)で孔壁防護を行いながら
掘削し、さらに、掘削後に鉄筋を建て込んでコンクリー
トを打設することにより、地盤中に柱状杭すなわち深礎
杭を作製する工法である。深礎工法においては、地盤の
穴の内面に沿うように該穴に填め込まれたライナープレ
ートに鉄筋を固定することにより、コンクリートを打設
する際に鉄筋が移動、変形することを防いでいる。
2. Description of the Related Art In the deep foundation method, a hole excavated in the ground is excavated while protecting a hole wall with a circular liner plate (mountain retaining), and after excavation, a reinforcing bar is erected and concrete is poured into the hole. This is a method for producing columnar piles, that is, deep foundation piles in the ground. In the deep foundation method, a reinforcing bar is fixed to a liner plate inserted in the hole along the inner surface of the ground hole, thereby preventing the reinforcing bar from moving and deforming when casting concrete. .

【0003】ここで、ライナープレートに鉄筋を固定す
る従来工法について、図6の上面概略図および図7の鉛
直方向断面概略図を用いて説明する。まず、地盤に掘削
した穴100に、この穴の内周に沿う大きさのライナー
プレート10を填め込む。次に、ライナープレート10
の上面のボルト穴に、鉄線110の一端を、他端側が内
側に伸びるように、例えば等間隔に6箇所に固定し、さ
らに、円周状のフープ筋(帯鉄筋)30を、すべての鉄
線110の他端に固定する。この結果、フープ筋30…
は、一定間隔毎(例えば2m間隔毎)に、すなわち全数
ではなく一部のみ取り付けられたことになる(図6
(A))。次に、取り付け済みのフープ筋30…に段取
筋20を鉛直方向に取り付ける(図6(B))。
Here, a conventional method for fixing a reinforcing bar to a liner plate will be described with reference to a schematic top view of FIG. 6 and a schematic vertical sectional view of FIG. First, the liner plate 10 having a size along the inner periphery of the hole is inserted into the hole 100 excavated in the ground. Next, the liner plate 10
One end of the iron wire 110 is fixed to, for example, six places at equal intervals so that the other end extends inward in the bolt hole on the upper surface of the iron wire 110. Further, a circumferential hoop bar (band steel bar) 30 is connected to all the iron wires. 110 is fixed to the other end. As a result, hoop muscles 30 ...
Are attached at regular intervals (for example, every 2 m), that is, only a part is attached instead of the total number (FIG. 6).
(A)). Next, the setup stitches 20 are attached to the attached hoop staves 30 in the vertical direction (FIG. 6B).

【0004】次に、ライナープレート10の中に、残り
のフープ筋30…を上側から挿入して、段取筋20に、
最下部から順次取り付けた(図7)後に、フープ筋30
…の内側に、主筋40…を縦方向に取り付けることによ
り、鉄筋の建て込みを完了する(図6(C))。
Next, the remaining hoops 30 are inserted into the liner plate 10 from above, and
After sequentially attaching from the bottom (FIG. 7), the hoop streaks 30
By vertically attaching the main reinforcing bars 40 to the insides of the reinforcing bars, the installation of the reinforcing bars is completed (FIG. 6C).

【0005】[0005]

【発明が解決しようとする課題】しかし、上述した従来
工法においては、ライナープレート10と段取筋20と
を結合するために、フープ筋30のうち一部を先に取り
付けなければならなかった。この取り付け作業は、鉄線
110にフープ筋30を固定する作業であったため、段
取筋20にフープ筋30を固定する作業と比較して手間
がかかっていた。また、フープ筋30に段取筋20を固
定する際には、段取筋20を鉛直に保つために、その取
り付け位置を目視で確認しなければならなかった。従っ
て、ライナープレート10の中に鉄筋を建て込む作業に
は多大な労力を必要としていた。
However, in the above-mentioned conventional method, in order to connect the liner plate 10 and the setup line 20, a part of the hoop line 30 must be attached first. Since this attaching operation is an operation for fixing the hoop streak 30 to the iron wire 110, it takes much time compared to the operation for fixing the hoop streak 30 to the setup line 20. Further, when fixing the setup streaks 20 to the hoop streaks 30, it was necessary to visually confirm the attachment position in order to keep the setup streaks 20 vertical. Therefore, the work of laying the rebar in the liner plate 10 requires a great deal of labor.

【0006】さらには、ライナープレート10と段取筋
20とは、鉄線110によって結合しているため、その
間隔すなわちかぶりを設計値通りに保つことは難しかっ
た。
Furthermore, since the liner plate 10 and the setup line 20 are connected by the iron wire 110, it has been difficult to keep the interval, that is, the fogging, as designed.

【0007】上記事情に鑑み、本発明は、ライナープレ
ート10に段取筋20を固定するのに好適であり、段取
筋20の固定作業を省力化するとともにかぶりを確実に
確保する鉄筋固定具およびこれを利用した鉄筋施工法を
提供することを目的とする。
In view of the above circumstances, the present invention is suitable for fixing the setup streaks 20 to the liner plate 10, and saves labor for fixing the setup streaks 20 and reliably secures fogging. And a reinforcing bar construction method using the same.

【0008】[0008]

【課題を解決するための手段】上記問題点を解決するた
め、請求項1記載の発明は、孔壁を保護するためのライ
ナープレートの内側に鉄筋を固定する、鉄筋固定具
(1)であって、剛体(例えば厚板2)と、前記剛体の
一端側に設けられ、ライナープレートに設けられたボル
ト差込用の孔に被る、ボルト差込部(3)と、前記剛体
の他端側に設けられ、鉄筋を填め込むための凹部(4)
と、を備えることを特徴とする。
In order to solve the above problems, the invention according to claim 1 is a reinforcing bar fixing device (1) for fixing a reinforcing bar inside a liner plate for protecting a hole wall. A rigid body (for example, a thick plate 2), a bolt insertion portion (3) provided on one end side of the rigid body and covering a bolt insertion hole provided on a liner plate, and the other end side of the rigid body. Recessed part (4) for fitting reinforcing steel
And the following.

【0009】この請求項1に記載の発明によれば、例え
ば請求項3に記載するように、前記ボルト差込部を、ラ
イナープレート(10)に設けられたボルト差込用の孔
(例えばボルト穴11)に被せた後に、前記ボルト差込
部と前記孔とにボルトを差し込んでナットで固定し、ま
た、前記凹部に、鉄筋(例えば段取筋20)を填め込ん
だ後に、該凹部および前記鉄筋を結束することにより、
前記ライナープレートに前記鉄筋を固定することができ
る。従って、鉄筋をライナープレートに固定する際に必
要とする労力は従来例と比べて格段に減少する。
According to the first aspect of the present invention, for example, as described in the third aspect, the bolt insertion portion is provided with a bolt insertion hole (for example, a bolt) provided in the liner plate (10). After covering the hole 11), a bolt is inserted into the bolt insertion portion and the hole and fixed with a nut. Also, after a reinforcing bar (for example, a setup bar 20) is inserted into the recess, the recess and By binding the rebar,
The rebar can be fixed to the liner plate. Therefore, the labor required for fixing the reinforcing bar to the liner plate is significantly reduced as compared with the conventional example.

【0010】また、該鉄筋固定具は剛体によって構成さ
れるため、前記鉄筋と前記ライナープレートとを結合す
る部分は強固になる。従って、例えば深礎工法の段取筋
を固定する際に該鉄筋固定具を用いると、確実に段取筋
と穴との間すなわちかぶりを確保できるほか、段取筋を
従来工法より少なくしても、フープ筋を十分な強度で前
記ライナープレートに固定できる。
[0010] Further, since the reinforcing bar fixing member is formed of a rigid body, a portion connecting the reinforcing bar and the liner plate becomes strong. Therefore, for example, by using the rebar fixing tool when fixing the setup bar of the deep foundation method, it is possible to reliably secure the gap between the setup bar and the hole, that is, cover, and to reduce the setup bar compared to the conventional method. Also, the hoop can be fixed to the liner plate with sufficient strength.

【0011】また、この請求項1に記載の鉄筋固定具
は、請求項2に記載するように、前記ボルト差込部は、
他端側に向けて細長く形成されている構成としてもよ
い。この場合は、前記したボルトを前記ボルト差込部内
でずらすことにより、かぶりの量を、容易且つ確実に調
節できる。
Further, in the rebar fixing device according to the first aspect, as in the second aspect, the bolt insertion portion is
It may be configured to be elongated toward the other end. In this case, the amount of fogging can be easily and reliably adjusted by shifting the above-described bolt in the bolt insertion portion.

【0012】[0012]

【発明の実施の形態】以下、図を用いて本発明の一実施
例である鉄筋固定具1について詳細に説明する。図1
は、鉄筋固定具1の構造を説明する上面概略図である。
図2、図3、図5は、鉄筋固定具1を用いて段取筋20
をライナープレート10の内側に固定する方法を説明す
る上面概略図である。また、図4は、図3の鉛直方向断
面概略図である。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is an exploded perspective view of a rebar fixing device according to an embodiment of the present invention. FIG.
FIG. 3 is a schematic top view illustrating the structure of the reinforcing bar fixing device 1.
2, 3, and 5 show a setup bar 20 using a reinforcing bar fixture 1.
FIG. 4 is a schematic top view illustrating a method of fixing the inside of the liner plate 10. FIG. 4 is a schematic vertical sectional view of FIG.

【0013】まず、鉄筋固定具1の構造について説明す
る。鉄筋固定具1は、鋼製の厚板2(剛体)の一端に、
長方形のボルト差込部3を上面から下面に向かって打ち
抜き形成し、さらに、厚板2の側面の他端側に鉄筋を填
め込むための凹部4を設けたものである。
First, the structure of the reinforcing bar fixture 1 will be described. The reinforcing bar fixture 1 is attached to one end of a steel thick plate 2 (rigid body).
A rectangular bolt insertion portion 3 is formed by punching from the upper surface to the lower surface, and a concave portion 4 for inserting a reinforcing bar is provided on the other end of the side surface of the thick plate 2.

【0014】ここで、厚板2は、コンクリート打設時
に、該厚板2にかかる圧力に耐えたり鉄筋を支えたりす
るのに十分な強度を有するように、その厚さおよび幅を
設計する。
Here, the thickness and width of the thick plate 2 are designed so that the thick plate 2 has sufficient strength to withstand the pressure applied to the thick plate 2 and to support the reinforcing bar when the concrete is poured.

【0015】ここで、ボルト差込部3の長さは、後述す
る動作に従って段取筋20とライナープレート10との
間、すなわち、かぶりを調節するのに十分な程度とす
る。また、凹部4の幅及び深さは、填め込む鉄筋の径に
従って調節する。
Here, the length of the bolt insertion portion 3 is set to a sufficient length between the setup streaks 20 and the liner plate 10, ie, to adjust the fogging according to the operation described later. The width and depth of the recess 4 are adjusted according to the diameter of the reinforcing bar to be inserted.

【0016】次に、鉄筋固定具1を用いてライナープレ
ート10に段取筋20を固定する方法について説明す
る。
Next, a method of fixing the setup streaks 20 to the liner plate 10 using the reinforcing bar fixing device 1 will be described.

【0017】まず、図2に示すように、ライナープレー
ト10のボルト穴11に、鉄筋固定具1のボルト差込部
3に重ね、ボルトおよびナットを用いてライナープレー
ト10と鉄筋固定具1とを固定する。ここで、鉄筋固定
具1は、ライナープレート10に、円周方向に90゜お
きに設けることとする。
First, as shown in FIG. 2, the bolt hole 3 of the liner plate 10 is overlapped with the bolt insertion portion 3 of the reinforcing bar fixing device 1, and the liner plate 10 and the reinforcing bar fixing device 1 are connected by using bolts and nuts. Fix it. Here, the reinforcing bar fixing device 1 is provided on the liner plate 10 at every 90 ° in the circumferential direction.

【0018】次に、図3や図4に示すように、各々の鉄
筋固定具1の凹部4に段取筋20を填め込み、番線を用
いて結束する。すなわち、段取筋20はライナープレー
ト10の内側に円周方向に90゜おきに4本鉛直方向に
設けられたことになる。
Next, as shown in FIG. 3 and FIG. 4, the setup streaks 20 are inserted into the recesses 4 of the respective reinforcing bar fixtures 1 and tied using a number line. In other words, four setup streaks 20 are provided in the liner plate 10 at every 90 ° in the circumferential direction in the vertical direction.

【0019】ここで、段取筋20は、凹部4に填め込む
ことにより位置決めできるとともに仮固定されるため、
容易に設計通りの位置に固定できる。従って、従来工法
と比べて段取筋20をライナープレート10に固定する
際に必要な労力は格段に減少する。
Here, since the setup streaks 20 can be positioned and temporarily fixed by being fitted into the recesses 4,
It can be easily fixed at the position as designed. Therefore, the labor required for fixing the setup streaks 20 to the liner plate 10 is significantly reduced as compared with the conventional method.

【0020】また、段取筋20とライナープレート10
との結合は、従来工法と比べて強固になる。さらに、段
取筋20とライナープレート10のかぶりは確実に確保
されるとともに、その量は、前記したボルトをボルト差
込部3内でずらすことにより容易且つ確実に調節でき
る。
The setup line 20 and the liner plate 10
Bonding with the conventional method becomes stronger. Furthermore, the cover between the setup streaks 20 and the liner plate 10 is reliably ensured, and the amount thereof can be easily and reliably adjusted by shifting the bolts in the bolt insertion portion 3.

【0021】次に、図5に示すように、段取筋20の内
側にフープ筋30を一定間隔毎に積層するように、周知
の方法を用いて取り付け、さらに、フープ筋30…の内
側に、主筋40…を縦方向に取り付けることにより、鉄
筋の建て込みを完了する。
Next, as shown in FIG. 5, the hoop streaks 30 are attached to the inside of the setup streaks 20 by a well-known method so as to be laminated at regular intervals, and are further mounted inside the hoop streaks 30. , The main reinforcing bars 40 are attached in the vertical direction to complete the installation of the reinforcing bars.

【0022】以上より、本実施例によれば、厚板2を用
いて作製した鉄筋固定具1の一端をライナープレート1
0の上面に固定し、また、鉄筋固定具1の他端に設けた
凹部4に段取筋20を填め込んで結束することにより、
段取筋20をライナープレート10に固定するので、段
取筋20の固定にかかる労力は従来例と比べて格段に減
少する。
As described above, according to this embodiment, one end of the reinforcing bar fixture 1 manufactured using the thick plate 2 is connected to the liner plate 1.
0, and the stitches 20 are fitted into the recesses 4 provided at the other end of the reinforcing bar fixing device 1 and bound.
Since the setup streaks 20 are fixed to the liner plate 10, the labor required for fixing the setup streaks 20 is significantly reduced as compared with the conventional example.

【0023】また、フープ筋30…とライナープレート
10とを固定する鉄筋固定具1は十分な強度、剛性を備
えるため、フープ筋30…とライナープレート10とを
結合する部分は、従来工法と比較して強固になる。従っ
て、確実にフープ筋30…と段取筋20のかぶりを確保
できるほか、段取筋20を従来工法より2本少ない4本
としても、フープ筋30…を十分な強度でライナープレ
ート10に固定できる。さらに、かぶりの量は、前記し
たボルトをボルト差込部3内でずらすことにより容易且
つ確実に調節できる。
Further, since the reinforcing bar fixture 1 for fixing the hoop bars 30... And the liner plate 10 has sufficient strength and rigidity, the portion connecting the hoop bars 30. And become stronger. Therefore, it is possible to reliably secure the hoop between the hoop streaks 30 and the setup streaks 20, and to fix the hoop streaks 30 to the liner plate 10 with sufficient strength even if the setup streaks 20 are reduced by two from the conventional method. it can. Further, the amount of fogging can be easily and reliably adjusted by shifting the above-mentioned bolt in the bolt insertion portion 3.

【0024】なお、本発明は本実施例に限定されるもの
ではなく、本発明の趣旨を逸脱しない範囲で任意に変形
できる。例えば、固定する対象としての鉄筋は段取筋に
限定されるものではなく、当然任意の鉄筋をライナープ
レートに固定する場合に用いることができる。さらに、
鉄筋固定具1の形状は板状である必要はなく、当然他の
形状としてもよい。
The present invention is not limited to the present embodiment, but can be arbitrarily modified without departing from the spirit of the present invention. For example, the reinforcing bar to be fixed is not limited to the setup bar, but can be used to fix an arbitrary reinforcing bar to the liner plate. further,
The shape of the reinforcing bar fixing device 1 does not need to be plate-shaped, and may be other shapes.

【0025】[0025]

【発明の効果】請求項1記載の発明によれば、鉄筋をラ
イナープレートに固定する際に必要とする労力を従来例
と比べて格段に減少させることの可能な鉄筋固定具を作
製できる。また、本発明に係る鉄筋固定具は剛体によっ
て構成されるため、前記鉄筋と前記ライナープレートと
を結合する部分は強固になるため、例えば深礎工法の段
取筋を固定する際に用いる場合は、確実に段取筋と穴と
の間すなわちかぶりを確保できるほか、段取筋を従来工
法より少なくしても、フープ筋を十分な強度で前記ライ
ナープレートに固定できる。
According to the first aspect of the present invention, it is possible to produce a reinforcing bar fixing tool which can significantly reduce the labor required for fixing the reinforcing bar to the liner plate as compared with the conventional example. In addition, since the reinforcing bar fixing device according to the present invention is formed of a rigid body, a portion connecting the reinforcing bar and the liner plate becomes strong. In addition, the gap between the setup streaks and the hole, that is, the cover, can be ensured, and the hoop streak can be fixed to the liner plate with sufficient strength even if the setup streaks are reduced compared to the conventional method.

【0026】また、請求項2に記載の発明によれば、前
記したボルトを前記ボルト差込部内でずらすことによ
り、かぶりの量を、容易且つ確実に調節できる。
According to the second aspect of the present invention, the amount of fogging can be easily and reliably adjusted by shifting the bolt in the bolt insertion portion.

【0027】また、請求項3に記載の発明によれば、請
求項1や請求項2に記載の鉄筋固定具を容易に使用でき
る。
According to the third aspect of the present invention, the reinforcing bar fixing device according to the first or second aspect can be easily used.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の一実施例である鉄筋固定具1の構造を
説明する上面概略図である。
FIG. 1 is a schematic top view illustrating the structure of a reinforcing bar fixing device 1 according to an embodiment of the present invention.

【図2】鉄筋固定具1を用いて段取筋20をライナープ
レート10の内側に固定する方法を説明する上面概略図
である。
FIG. 2 is a schematic top view illustrating a method for fixing the setup streaks 20 inside the liner plate 10 using the reinforcing bar fixing tool 1. FIG.

【図3】鉄筋固定具1を用いて段取筋20をライナープ
レート10の内側に固定する方法を説明する上面概略図
である。
FIG. 3 is a schematic top view illustrating a method of fixing the setup streaks 20 inside the liner plate 10 using the reinforcing bar fixing tool 1.

【図4】図3の鉛直方向断面概略図である。4 is a schematic vertical sectional view of FIG. 3;

【図5】鉄筋固定具1を用いて段取筋20をライナープ
レート10の内側に固定する方法を説明する上面概略図
である。
FIG. 5 is a schematic top view illustrating a method of fixing the setup streaks 20 inside the liner plate 10 using the reinforcing bar fixing device 1.

【図6】ライナープレートに鉄筋を固定する従来工法に
ついて説明する上面概略図である。
FIG. 6 is a schematic top view illustrating a conventional method of fixing a reinforcing bar to a liner plate.

【図7】ライナープレートに鉄筋を固定する従来工法に
ついて説明する鉛直方向断面概略図である。
FIG. 7 is a schematic vertical sectional view illustrating a conventional method for fixing a reinforcing bar to a liner plate.

【符号の説明】[Explanation of symbols]

1 鉄筋固定具 2 厚板(剛体) 3 ボルト差込部 4 凹部 10 ライナープレート 11 ボルト穴(ボルト差込用
の穴) 20 段取筋(鉄筋) 30 フープ筋 40 主筋 100 穴
DESCRIPTION OF SYMBOLS 1 Reinforcement fixture 2 Thick plate (rigid body) 3 Bolt insertion part 4 Concave part 10 Liner plate 11 Bolt hole (hole for bolt insertion) 20 Setup bar (rebar) 30 Hoop bar 40 Main bar 100 hole

Claims (3)

【特許請求の範囲】[Claims] 【請求項1】孔壁を保護するためのライナープレートの
内側に鉄筋を固定する、鉄筋固定具であって、 剛体と、 前記剛体の一端側に設けられ、ライナープレートに設け
られたボルト差込用の孔に被る、ボルト差込部と、 前記剛体の他端側に設けられ、鉄筋を填め込むための凹
部と、 を備えることを特徴とする鉄筋固定具。
1. A reinforcing bar fixing device for fixing a reinforcing bar inside a liner plate for protecting a hole wall, comprising: a rigid body; and a bolt plug provided on one end side of the rigid body and provided on the liner plate. A bolt insertion portion covering a hole for use, and a concave portion provided on the other end side of the rigid body for inserting a reinforcing bar, The reinforcing bar fixing tool characterized by comprising:
【請求項2】請求項1に記載の鉄筋固定具において、 前記ボルト差込部は、他端側に向けて細長く形成されて
いることを特徴とする鉄筋固定具。
2. The reinforcing bar fixing device according to claim 1, wherein the bolt insertion portion is elongated toward the other end.
【請求項3】請求項1または請求項2に記載の鉄筋固定
具を使用した鉄筋施工法であって、 前記ボルト差込部を、ライナープレートに設けられたボ
ルト差込用の孔に被せた後に、前記ボルト差込部と前記
孔とにボルトを差し込んでナットで固定し、 また、 前記凹部に、鉄筋を填め込んだ後に、該凹部および前記
鉄筋を結束することにより、該鉄筋固定具を用いて前記
ライナープレートに前記鉄筋を固定すること、 を特徴とする鉄筋施工法。
3. A method of rebar using the reinforcing bar fixing device according to claim 1 or 2, wherein the bolt insertion portion is covered with a bolt insertion hole provided in a liner plate. After that, a bolt is inserted into the bolt insertion portion and the hole and fixed with a nut.After the reinforcing bar is inserted into the concave portion, the concave portion and the reinforcing bar are bound, so that the reinforcing bar fixing tool is attached. Fixing the rebar to the liner plate by using the method.
JP11086699A 1999-03-29 1999-03-29 Reinforcing bar fixing tool and reinforcing bar arranging method Pending JP2000282777A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11086699A JP2000282777A (en) 1999-03-29 1999-03-29 Reinforcing bar fixing tool and reinforcing bar arranging method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11086699A JP2000282777A (en) 1999-03-29 1999-03-29 Reinforcing bar fixing tool and reinforcing bar arranging method

Publications (1)

Publication Number Publication Date
JP2000282777A true JP2000282777A (en) 2000-10-10

Family

ID=13894206

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11086699A Pending JP2000282777A (en) 1999-03-29 1999-03-29 Reinforcing bar fixing tool and reinforcing bar arranging method

Country Status (1)

Country Link
JP (1) JP2000282777A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020204163A (en) * 2019-06-14 2020-12-24 日鉄建材株式会社 Reinforcing bar arrangement device and reinforcing bar construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020204163A (en) * 2019-06-14 2020-12-24 日鉄建材株式会社 Reinforcing bar arrangement device and reinforcing bar construction method
JP7326037B2 (en) 2019-06-14 2023-08-15 日鉄建材株式会社 Reinforcement arrangement device and reinforcement construction method

Similar Documents

Publication Publication Date Title
KR100720946B1 (en) Composit pile combined steel tubular pile and concrete pile reinforced with connecting structure
JP4835918B2 (en) Pile-column connection structure and method
JP5791777B1 (en) Joining structure and joining method
KR102268071B1 (en) Apparatus for reinforcing the pile head
JP6484209B2 (en) Connecting member, beam structure and construction method thereof
KR101619067B1 (en) Fabricated Column Structure with Jointing Structure of the Beam
JP2014070486A (en) Joint structure of steel-framed column and pile
JP3603130B2 (en) Root-wound reinforcement structure for column bases such as steel columns
KR100661301B1 (en) Support structure for concreting in a head of steel pile and construction method using it
JP2000282777A (en) Reinforcing bar fixing tool and reinforcing bar arranging method
JP2964924B2 (en) Piles and column base joints
JPH1121915A (en) Connecting method of pile head
JP2006083609A (en) Joint structure of pile head section and its construction method
JP2003082638A (en) Building material for civil engineered structure, method for manufacturing building material for civil engineered structure, and civil engineered structure
JPS6122088B2 (en)
JP4419456B2 (en) Method of joining reinforced concrete member and steel pipe concrete
JP6466554B2 (en) Pile head seismic isolation structure
JPH11315526A (en) Joint method of concrete block
JP2000297480A (en) Reinforcing method for steel-pipe structure column base section
JP2015190302A (en) Pile head base isolation joint structure
JP3058723U (en) Joint structure between cast-in-place concrete pile and foundation concrete slab
JPS602452B2 (en) Standard piles for continuous underground wall construction
JP2001311168A (en) Earth retaining wall
CN219498851U (en) Pre-buried line box with installation fixed knot constructs
KR101052650B1 (en) A pile head reinforcement structure of pile