JP2000257063A - Pile driving method and device - Google Patents

Pile driving method and device

Info

Publication number
JP2000257063A
JP2000257063A JP11062274A JP6227499A JP2000257063A JP 2000257063 A JP2000257063 A JP 2000257063A JP 11062274 A JP11062274 A JP 11062274A JP 6227499 A JP6227499 A JP 6227499A JP 2000257063 A JP2000257063 A JP 2000257063A
Authority
JP
Japan
Prior art keywords
casing
pile
drilling machine
ground
holding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP11062274A
Other languages
Japanese (ja)
Other versions
JP4105322B2 (en
Inventor
Katsuhiko Itagaki
勝彦 板垣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Oak Co Ltd
Original Assignee
Oak Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Oak Co Ltd filed Critical Oak Co Ltd
Priority to JP06227499A priority Critical patent/JP4105322B2/en
Publication of JP2000257063A publication Critical patent/JP2000257063A/en
Application granted granted Critical
Publication of JP4105322B2 publication Critical patent/JP4105322B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Earth Drilling (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a piling method capable of certainly and easily driving a pile by avoiding collapse of a drilling wall and improving its working performance. SOLUTION: A drilling machine 12 is equipped in the inside of a casing 9, a casing 9 devised to be capable of inserting a pile in the inside of the casing 9 in parallel with the drilling machine 12 is used, and the pile 13 is inserted and held in the inside of this casing 9. Thereafter, holding of the pile 13 in the inside of the casing 9 is released after intruding the casing 9 to specified depth under the ground while driving the drilling machine 12 in this state, and the casing 9 is pulled up by leaving this pile 13 underground.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、基礎工事において
地盤中に既製杭を打ち込む杭打ち工法、及び杭打ち装置
に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a pile driving method and a pile driving method for driving a ready-made pile into the ground during foundation work.

【0002】[0002]

【従来の技術】従来の杭打ち工法にあっては、例えばア
ースオーガで地盤を掘孔し、あるいはケーシング内にエ
アハンマーを装備して、ケーシングを回転させつつエア
ハンマーを駆動させて地盤を掘孔し、そしてアースオー
ガ又はケーシングを引き上げた後、その掘削孔に杭をク
レーン等で立て込むようにしている。
2. Description of the Related Art In a conventional pile driving method, a ground is excavated with, for example, an earth auger, or an air hammer is provided in a casing, and the air hammer is driven while rotating the casing to excavate the ground. After drilling and lifting the earth auger or casing, the pile is erected in the borehole with a crane or the like.

【0003】[0003]

【発明が解決しようとする課題】上記のような従来工法
では、地盤の掘孔と杭の打ち込みとが別工程となるた
め、作業能率が悪い上に、玉石混じりの地盤土壌の場合
には、アースオーガやケーシングを引き上げるときに孔
壁が崩壊して、掘削孔が蟻地獄のような状態に埋まって
しまい、杭の挿入が困難になると云う問題があった。
In the conventional method as described above, the excavation of the ground and the driving of the piles are separate processes, so that the work efficiency is poor, and in the case of the ground soil mixed with cobblestones, When the earth auger or casing is lifted, the hole wall collapses, and the excavation hole is buried in a state like an ant hell, which makes it difficult to insert a pile.

【0004】本発明は、上記に鑑み、地盤の掘孔と同時
に杭を打ち込むようにすることで、孔壁の崩壊を回避で
きて杭の打ち込みを確実容易に行えると共に、その作業
能率の向上を図ることのできる杭打ち工法及び杭打ち装
置を提供することを目的とする。
[0004] In view of the above, the present invention is intended to avoid the collapse of the hole wall by driving the pile simultaneously with the excavation of the ground, to facilitate the driving of the pile, and to improve the work efficiency. An object of the present invention is to provide a pile driving method and a pile driving device that can be achieved.

【0005】[0005]

【課題を解決するための手段】請求項1に係る発明の杭
打ち工法は、ケーシング9A内部に穿孔機12を装備す
ると共に、ケーシング9A内部に前記穿孔機12に並列
して杭13を挿入できるようにしたケーシング9Aを使
用し、このケーシング9Aの内部に杭13を挿入して保
持し、この状態で穿孔機12を駆動させながらケーシン
グ9Aを地盤中所定深さまで貫入した後、ケーシング9
A内部での杭の保持を解除し、この杭13を地盤中に残
してケーシング9Aを引き上げるようにしたことを特徴
とする。
According to the pile driving method of the present invention, a drilling machine 12 is provided inside the casing 9A, and a pile 13 can be inserted into the casing 9A in parallel with the drilling machine 12. The pile 9 is inserted into and held in the casing 9A, and the casing 9A is penetrated to a predetermined depth in the ground while driving the drilling machine 12 in this state.
The holding of the pile inside A is released, and the casing 9A is pulled up while leaving the pile 13 in the ground.

【0006】請求項2に係る発明の杭打ち工法は、ケー
シング9内部に穿孔機12を装備すると共に、ケーシン
グ9内部に前記穿孔機12に並列して杭を挿入できるよ
うケーシング9が縦割に分割して開閉可能に構成された
ケーシング9を使用し、このケーシング9の内部に杭1
3を挿入して保持し、この状態で穿孔機12を駆動させ
ながらケーシング9を地盤中所定深さまで貫入した後、
ケーシング9内部での杭13の保持を解除し、この杭1
3を地盤中に残してケーシング9を引き上げるようにし
たことを特徴とする。
In the pile driving method according to the second aspect of the present invention, the drilling machine 12 is provided inside the casing 9 and the casing 9 is divided vertically so that the pile can be inserted in the casing 9 in parallel with the drilling machine 12. A casing 9 which is divided and opened and closed is used.
After inserting and holding the casing 9 and driving the drilling machine 12 in this state and penetrating the casing 9 to a predetermined depth in the ground,
The holding of the pile 13 inside the casing 9 is released, and the pile 1
3 is characterized in that the casing 9 is pulled up while leaving it in the ground.

【0007】請求項3に係る発明の杭打ち装置は、吊持
手段3によってケーシング9が昇降可能に垂下連結さ
れ、このケーシング9Aは、ケーシング9A内部に穿孔
機12を装備すると共に、ケーシング9A内部に前記穿
孔機12に並列して杭13を挿入できるようようになっ
ていると共に、ケーシング9A内部に挿入した杭13を
保持する杭保持手段52〜54を備えてなることを特徴
とするものである。
According to a third aspect of the present invention, in the pile driving apparatus, the casing 9 is vertically connected by the suspending means 3 so as to be able to move up and down. The casing 9A is provided with the drilling machine 12 inside the casing 9A and the casing 9A. And a pile holding means 52 to 54 for holding the pile 13 inserted inside the casing 9A while being capable of inserting the pile 13 in parallel with the drilling machine 12. is there.

【0008】請求項4に係る発明の杭打ち装置は、リー
ダ1に沿って昇降可能な昇降機枠4の下部にケーシング
9が垂下連結され、このケーシング9は、ケーシング9
内部に穿孔機12を装備すると共に、ケーシング9内部
に前記穿孔機12に並列して杭を挿入できるようケーシ
ング9が縦割に分割して開閉可能に構成されていて、杭
13をケーシング9の内部に吊り込んで挿入する吊込挿
入手段33と、ケーシング9内部に挿入した杭13を保
持する杭保持手段34とを備えてなることを特徴とす
る。
According to the fourth aspect of the present invention, a casing 9 is vertically connected to a lower portion of an elevator frame 4 which can move up and down along the leader 1.
The casing 9 is equipped with a drilling machine 12 inside, and the casing 9 is divided vertically so that the pile can be opened and closed so that the pile can be inserted in parallel with the drilling machine 12 inside the casing 9. It is characterized by comprising a hanging insertion means 33 for hanging and inserting the inside and a pile holding means 34 for holding the pile 13 inserted inside the casing 9.

【0009】[0009]

【発明の実施の形態】図1は本発明に係る杭打ち装置を
示す側面図である。この図において、1はリーダで、走
行台車2から延設されたバックステー3によって鉛直姿
勢に保持されている。4は昇降機枠で、リーダ1に沿っ
て昇降可能に支持されていると共に、ウインチの昇降操
作ワイヤー5によって吊支されている。昇降機枠4には
回転駆動装置6が設けてあり、この回転駆動装置6の出
力軸7(図2参照)に回転軸体8を介してケーシング9
が連動連結されている。
FIG. 1 is a side view showing a pile driving device according to the present invention. In this figure, reference numeral 1 denotes a leader, which is held in a vertical posture by a back stay 3 extended from the traveling vehicle 2. Reference numeral 4 denotes an elevator frame which is supported so as to be able to move up and down along the reader 1 and is suspended by a winch elevating operation wire 5. The elevator frame 4 is provided with a rotary driving device 6. An output shaft 7 (see FIG. 2) of the rotary driving device 6 is connected to a casing 9 via a rotary shaft 8.
Are linked together.

【0010】図2はケーシング9の上端部側を示す縦断
面図、図3はケーシング9の下端部側を示す縦断面図、
図4は図2のV−V線断面図、図5は図2のW−W線断
面図、図6は図2のX−X線断面図である。図2に示す
ように、回転軸体8の上端部8aが回転駆動装置6の出
力軸7にピン結合され、回転軸体8の下端部8bがケー
シング9の上部固定板10上に一体突設された連結軸部
11にピン結合され、これによりケーシング9が回転駆
動装置6の出力軸7に連動連結される。ケーシング9
は、これの内部に、先行掘りするための穿孔機としての
ダウンザホールハンマー12を装備していると共に、ケ
ーシング9内部にダウンザホールハンマー12に並列し
て杭13を挿入できるよう縦割に分割されて開閉可能に
構成されている。
FIG. 2 is a longitudinal sectional view showing the upper end of the casing 9, FIG. 3 is a longitudinal sectional view showing the lower end of the casing 9,
4 is a sectional view taken along line VV of FIG. 2, FIG. 5 is a sectional view taken along line WW of FIG. 2, and FIG. 6 is a sectional view taken along line XX of FIG. As shown in FIG. 2, the upper end 8 a of the rotating shaft 8 is pin-coupled to the output shaft 7 of the rotary drive device 6, and the lower end 8 b of the rotating shaft 8 projects integrally on the upper fixed plate 10 of the casing 9. The coupling 9 is connected to the output shaft 7 of the rotary driving device 6 by a pin. Casing 9
Is equipped with a down-the-hole hammer 12 as a drilling machine for pre-drilling, and is vertically divided so that a pile 13 can be inserted in the casing 9 in parallel with the down-the-hole hammer 12 so as to be opened and closed. It is configured to be possible.

【0011】上記ケーシング9の構造について詳細に説
明すると、ケーシング9は、図4〜図6、図9〜図12
に示すように、縦長帯状で断面が円弧状の剛性基板14
と、夫々断面円弧状に形成されて、夫々の一側縁部が縦
長帯状基板14の両側縁部にヒンジ17によって蝶着さ
れた両側一対の開閉側板15,15とからなる。各開閉
側板15の内側には、ダウンザホールハンマー12及び
これにエアを供給するエア供給管16と、ケーシング9
の下端より掘削孔内に根固め用セメントミルク等のグラ
ウトを注入するためのグラウト供給管19とが夫々一体
的に装備されている。両開閉側板15,15の夫々他側
縁部(遊端側側縁部)には、両開閉側板15,15を閉
鎖位置にロックするロック手段18が設けられている。
[0011] The structure of the casing 9 will be described in detail.
As shown in FIG.
And a pair of open / close side plates 15, 15, each of which is formed in an arc shape in cross section, and has one side edge hinged to both side edges of the vertically long strip-shaped substrate 14 by hinges 17. Inside each opening / closing side plate 15, a down-the-hole hammer 12, an air supply pipe 16 for supplying air thereto, and a casing 9
And a grout supply pipe 19 for injecting grout such as cement milk for consolidation from the lower end of the drilling hole into the borehole. Locking means 18 for locking the open / close side plates 15, 15 to the closed position is provided at the other side edge (the free end side edge) of the open / close side plates 15, 15, respectively.

【0012】図2及び図3はケーシング9の両開閉側板
15,15が閉鎖した状態を示し、両開閉側板15,1
5が開放した状態を図7及び図8に示す。両開閉側板1
5,15を基板14の両側縁部に夫々蝶着するヒンジ1
7は、ケーシング9長手方向に所要間隔おきに設けてあ
る。また図9〜図12には、両開閉側板15,15が閉
鎖した状態を実線で示し、両開閉側板15,15が開放
した状態を仮想線で示す。両開閉側板15,15を閉鎖
位置にロックするロック手段18は、図10に概略示す
ように、一方の開閉側板15の遊端側側縁部に設けられ
た雄係合部18aと、これに対向する他方の開閉側板1
5の遊端側側縁部に設けられた雌係合部18bと、両開
閉側板15,15が閉じて雄雌両係合部18a,18b
が互いに係合した位置で雄雌両係合部18a,18bを
上下に貫通するロックピン18cとから構成される。両
開閉側板15,15の開閉操作、ならびにロックピン1
8cによるロック操作及びロック解除操作は夫々手動で
行うようになっている。
FIGS. 2 and 3 show a state in which both the open / close side plates 15, 15 of the casing 9 are closed.
FIG. 7 and FIG. 8 show a state where 5 is opened. Both open / close side plates 1
Hinge 1 hinges 5, 15 to both side edges of substrate 14
Reference numerals 7 are provided at required intervals in the longitudinal direction of the casing 9. 9 to 12, the state in which both open / close side plates 15, 15 are closed is indicated by a solid line, and the state in which both open / close side plates 15, 15 are open is indicated by a virtual line. As schematically shown in FIG. 10, a locking means 18 for locking the two open / close side plates 15 and 15 in the closed position includes a male engaging portion 18a provided at the free end side edge of one open / close side plate 15 and a male engaging portion 18a. Opposite open / close side plate 1
5, the female engaging portion 18b provided on the free end side edge portion, and the open / close side plates 15, 15 are closed to close the male and female engaging portions 18a, 18b.
And a lock pin 18c penetrating vertically through the male and female engaging portions 18a and 18b at positions where they are engaged with each other. Opening / closing operation of both open / close side plates 15, 15 and lock pin 1
The lock operation and the lock release operation by 8c are manually performed, respectively.

【0013】また図4〜図6、図9〜図12に示すよう
に、前記両開閉側板15,15の上端には半円形の取付
板20,20が夫々固着してあって、両取付板20,2
0の上面に円板状の上部固定板10が載置されると共
に、両取付板20,20の夫々一端部が上部固定板10
に枢軸21,21によって枢着されている。両枢軸2
1,21は、両開閉側板15,15を基板14の両側縁
部に蝶着するヒンジ17,17と夫々同軸線上に配設さ
れている。また、両取付板20,20の遊端部は、図9
及び図10から分かるように、ケーシング9の両開閉側
板15,15が閉じた位置でロックピン22,22を介
して上部固定板10にロックされるようになっている。
各ロックピン22は、上部固定板10から取付板20の
ロック孔aに突入して挿着する。
As shown in FIGS. 4 to 6 and FIGS. 9 to 12, semi-circular mounting plates 20, 20 are fixed to the upper ends of the open / close side plates 15, 15, respectively. 20,2
A disk-shaped upper fixing plate 10 is placed on the upper surface of the upper fixing plate 10, and one end of each of the mounting plates 20
Are pivotally connected to the shafts 21 and 21. Double Axis 2
Numerals 1 and 21 are arranged coaxially with hinges 17 and 17 that hinge both open / close side plates 15 and 15 to both side edges of the substrate 14. The free ends of both mounting plates 20, 20 are shown in FIG.
As can be seen from FIG. 10 and FIG. 10, the open / close side plates 15 of the casing 9 are locked to the upper fixed plate 10 via the lock pins 22 in the closed position.
Each lock pin 22 is inserted from the upper fixing plate 10 into the lock hole a of the mounting plate 20.

【0014】上記ケーシング9の各開閉側板15に装備
されたエア供給管16へのエアの供給は、図2に示すよ
うに回転軸体8の外周に装備されたエアスイベル機構2
3を通じて行われる。即ち、このエアスイベル機構23
は、回転軸体8に対し軸受及びオイルシールを介して相
対回転のみ可能に外嵌された筒状体24を有し、この筒
状体24の内周面に環状通路25が形成され、この環状
通路25にエアを導入するためのエア導入管26が筒状
体24に取り付けられ、このエア導入管26は、昇降機
枠4側から垂下されたワイヤー27によって回転しない
ように懸吊保持される。また、環状通路25は回転軸体
8の内部に設けられたエア供給路28の上端部に連通
し、このエア供給路28の下端部側はホース29を介し
て各開閉側板15側のエア供給管16に接続される。
尚、エア導入管26はエアホースを介してエアコンプレ
ッサに接続される。
As shown in FIG. 2, air is supplied to an air supply pipe 16 provided on each of the open / close side plates 15 of the casing 9 by an air swivel mechanism 2 provided on the outer periphery of the rotary shaft 8.
3 is performed. That is, the air swivel mechanism 23
Has a cylindrical body 24 that is fitted to the rotary shaft 8 via a bearing and an oil seal so that only relative rotation is possible. An annular passage 25 is formed in the inner peripheral surface of the cylindrical body 24. An air introduction pipe 26 for introducing air into the annular passage 25 is attached to the tubular body 24, and the air introduction pipe 26 is suspended and held by a wire 27 suspended from the elevator frame 4 so as not to rotate. . The annular passage 25 communicates with the upper end of an air supply passage 28 provided inside the rotary shaft 8, and the lower end of the air supply passage 28 is connected via a hose 29 to the air supply passage on each of the open / close side plates 15. Connected to tube 16.
The air introduction pipe 26 is connected to an air compressor via an air hose.

【0015】また、ケーシング9の各開閉側板15に装
備されたグラウト供給管19へのグラウトの供給は、図
1に概略示すようなグラウト導入ホース30により、グ
ラウトスイベル機構(図示は省略するが、このグラウト
スイベル機構内を回転駆動装置6の出力軸7が貫通して
いる)、出力軸7内部のグラウト供給路、回転軸体8内
部のグラウト供給路31、及びホース32を通じて行わ
れる(図2参照)。尚、グラウト導入ホース30はグラ
ウト圧送ポンプに接続される。
The grout is supplied to a grout supply pipe 19 provided on each of the open / close side plates 15 of the casing 9 by a grout introduction hose 30 as schematically shown in FIG. The output is carried out through the grout swivel mechanism through the output shaft 7 of the rotary drive device 6), the grout supply path inside the output shaft 7, the grout supply path 31 inside the rotary shaft body 8, and the hose 32 (FIG. 2). reference). The grout introduction hose 30 is connected to a grout pressure feed pump.

【0016】前記ダウンザホールハンマー12は、周知
のものであるため詳細な図示は省略するが、ハンマー本
体12aの内部にシリンダが設けてあって、このシリン
ダ内を摺動するハンマーピストンが圧縮エアの供給によ
って往復運動を起こし、この往復運動するハンマーピス
トンがハンマー本体12aの下部に突出するビット12
bを打撃し、この打撃作用によって地盤、特に岩盤を破
砕するようになっている。このダウンザホールハンマー
12は、ケーシング9を形成する各開閉側板15に一体
的に装備されているので、回転駆動装置6の駆動による
ケーシング9の回転に伴って旋回することになる。
Although the down-the-hole hammer 12 is a well-known one, its detailed illustration is omitted. A cylinder is provided inside the hammer body 12a, and a hammer piston sliding in the cylinder supplies compressed air. The hammer piston reciprocates, and the reciprocating hammer piston projects from the lower part of the hammer body 12a.
b, and the striking action crushes the ground, especially the rock. Since the down-the-hole hammer 12 is integrally provided on each of the open / close side plates 15 forming the casing 9, the down-the-hole hammer 12 turns with the rotation of the casing 9 driven by the rotation drive device 6.

【0017】図13の(A)〜(C)は、杭13をケー
シング9の内部に吊り込んで挿入する吊込挿入手段3
3、及びケーシング9内部に挿入した杭13を保持する
杭保持手段34を示す。杭13は、ここではH形鋼から
なるものとし、このH形鋼のフランジ部を13aで示
し、ウェブ部を13bで示す。
FIGS. 13A to 13C show hanging insertion means 3 for hanging and inserting the pile 13 inside the casing 9.
3 and a pile holding means 34 for holding the pile 13 inserted inside the casing 9. Here, the pile 13 is made of an H-shaped steel, and a flange portion of the H-shaped steel is denoted by 13a, and a web portion is denoted by 13b.

【0018】先ず、吊込挿入手段33は、リーダ1(図
1参照)の頂部より垂下される吊込用ワイヤー35と、
この吊込用ワイヤー35を開放されたケーシング9の内
部に案内するシーブ36,37と、吊込用ワイヤー35
の先端部に取り付けてあって、H形鋼からなる杭13の
ウェブ部13bの上端部に設けられた係入孔38に係入
されるフック39とからなる。シーブ36は、図13の
(A)から分かるように上部固定板10のケーシング開
放側端部に軸着され、シーブ37は、ケーシング9の内
部にあって、上部固定板10の下面中央部に垂下連結し
てある取付フレーム40に軸着されている。このシーブ
37は、取付フレーム40の上部側に設けてある取付板
部40aに片持ち状態で取り付けられた支軸41に軸支
されている。尚、吊込用ワイヤー35は走行台車2側で
操作されるようになっている。
First, the hanging insertion means 33 includes a hanging wire 35 hanging down from the top of the reader 1 (see FIG. 1),
Sheaves 36 and 37 for guiding the suspending wire 35 into the opened casing 9;
And a hook 39 which is engaged with an engagement hole 38 provided at the upper end of the web portion 13b of the pile 13 made of H-section steel. As shown in FIG. 13A, the sheave 36 is pivotally mounted on the casing open side end of the upper fixing plate 10, and the sheave 37 is located inside the casing 9 and at the center of the lower surface of the upper fixing plate 10. It is mounted on a mounting frame 40 which is connected in a hanging manner. The sheave 37 is supported by a support shaft 41 which is mounted in a cantilever manner on a mounting plate 40 a provided on the upper side of the mounting frame 40. Note that the suspension wire 35 is operated on the traveling carriage 2 side.

【0019】杭保持手段34は、図13の(A)及び
(C)に示すように、取付フレーム40の下端部に形成
されていて、H形鋼からなる杭13のウェブ部13bの
上端部を係入させる下向きコ字状の係入溝42と、この
係入溝42を横方向に貫通するピン挿通孔43と、この
係入溝42のピン挿通孔43から杭13のウェブ部13
b上端部に設けられたピン挿通孔44に亘って挿通され
るロックピン45とからなる。
The pile holding means 34 is formed at the lower end of the mounting frame 40 as shown in FIGS. 13A and 13C, and is formed at the upper end of the web 13b of the pile 13 made of H-section steel. , A pin insertion hole 43 penetrating the engagement groove 42 in the lateral direction, and a web portion 13 of the pile 13 from the pin insertion hole 43 of the engagement groove 42.
(b) a lock pin 45 inserted through the pin insertion hole 44 provided at the upper end.

【0020】図14は杭押し下げ手段46を示し、これ
は、前記杭保持手段34による杭13の保持を解除して
ケーシング9を引き上げる際に杭13を押し下げて引き
離すことによって、杭13の共上がりを防止するように
したものである。この杭押し下げ手段46は、図13の
(B)にも示すように、ケーシング9の上部固定板10
に下向きに取り付けられた油圧シリンダからなるもの
で、杭保持手段34による杭13の保持を解除した状態
でピストンロッド46aを伸張作動させることにより、
その先端の押え部材46bを介して杭13に下向きの押
力を付与するようになっている。
FIG. 14 shows a pile pushing-down means 46, which lifts the pile 13 by releasing the holding of the pile 13 by the pile holding means 34 and pulling the pile 13 down when the casing 9 is pulled up. Is to be prevented. As shown in FIG. 13 (B), this pile pushing-down means 46
The piston rod 46a is extended in a state where the holding of the pile 13 by the pile holding means 34 is released,
A downward pressing force is applied to the pile 13 via the pressing member 46b at the tip.

【0021】以上説明したような構成を有する杭打ち装
置の使用による杭打ち工法につき、図15の〜に示
す工程図を中心に他の図面を参照して以下に説明する。
A pile driving method using the pile driving device having the above-described configuration will be described below with reference to other drawings, mainly with reference to the process diagrams shown in FIGS.

【0022】先ず、図15のに示すように、ケーシン
グ9を地上に吊り上げた状態でその両開閉側板15,1
5開放し、この開放した両開閉側板15,15の間に杭
13を挿入する。この際には、作業者がリーダ1に登っ
て、ケーシング9の上部固定板10から各取付板20に
係入されているロックピン22(図10参照)を抜き、
更に両開閉側板15,15を閉鎖位置にロックするロッ
ク手段18をロック解除して、両開閉側板15,15を
開放させる。
First, as shown in FIG. 15, with the casing 9 suspended above the ground, the open / close side plates 15, 1
5 is opened, and the stake 13 is inserted between the open / closed side plates 15 and 15. At this time, the worker climbs up the reader 1 and removes the lock pins 22 (see FIG. 10) engaged with the respective mounting plates 20 from the upper fixing plate 10 of the casing 9, and
Further, the locking means 18 for locking the open / close side plates 15 and 15 in the closed position is unlocked, and the open / close side plates 15 and 15 are opened.

【0023】ケーシング9の両開閉側板15,15を開
放した後、吊込挿入手段33により杭13をケーシング
9の内部に吊り込んで挿入し、この挿入した杭13を杭
保持手段34によってケーシング9内部に保持する。こ
の際、吊込挿入手段33の吊込用ワイヤー35をシーブ
35,36に掛けて地上近くまで下ろして、先端のフッ
ク39を、地上に寝かせてある杭13の係入孔38に引
っ掛け、このワイヤー35を巻き取りながら、杭13を
開放されたケーシング9の内部に吊り込んでゆき、そし
て図13の(A)に示すように杭保持手段34の係入溝
42に杭13のウェブ部13bの上端部を係入させ、ロ
ックピン45を係入溝42のピン挿通孔43から杭13
のピン挿通孔44に挿通して、杭13を同図のようにケ
ーシング9内部に懸吊した状態で保持する。
After the open / close side plates 15, 15 of the casing 9 are opened, the pile 13 is suspended and inserted into the casing 9 by the suspending and inserting means 33, and the inserted pile 13 is secured to the casing 9 by the pile holding means 34. Keep inside. At this time, the hanging wire 35 of the hanging insertion means 33 is hung on the sheaves 35 and 36 and lowered near the ground, and the hook 39 at the tip is hooked into the engagement hole 38 of the pile 13 laid on the ground. While winding the wire 35, the pile 13 is hung inside the opened casing 9, and the web portion 13 b of the pile 13 is inserted into the engagement groove 42 of the pile holding means 34 as shown in FIG. Of the pile 13 from the pin insertion hole 43 of the engagement groove 42.
And the pile 13 is held in a state of being suspended inside the casing 9 as shown in FIG.

【0024】上記のように杭13を吊込挿入手段33に
よりケーシング9内部に吊り込んで挿入し、杭保持手段
34によって保持した後、吊込挿入手段33のフック3
9を杭13から外し、更に吊込用ワイヤー35をシーブ
35,36から外す。この際、ケーシング9内部にある
シーブ36が図13の(C)に示すように取付板部40
aに片持ち状態で取り付けられた支軸41に軸支されて
いるため、吊込用ワイヤー35の取外しが簡単容易とな
る。この後、ケーシング9の開閉側板15,15を閉鎖
して、その遊端側側縁部をロック手段18によりロック
し、更に上部固定板10から両取付板20,20に夫々
ロックピン22を挿着して固定し、図15のに示す状
態とする。
As described above, the pile 13 is suspended and inserted into the casing 9 by the suspending and inserting means 33, and is held by the pile holding means 34.
9 is removed from the pile 13, and the suspension wire 35 is further removed from the sheaves 35 and 36. At this time, the sheave 36 inside the casing 9 is attached to the mounting plate portion 40 as shown in FIG.
Since the support wire 41 is supported by the support shaft 41 mounted in a cantilever state, the removal of the hanging wire 35 is facilitated easily. Thereafter, the open / close side plates 15, 15 of the casing 9 are closed, the free end side edges are locked by the lock means 18, and the lock pins 22 are respectively inserted from the upper fixed plate 10 into the two mounting plates 20, 20, respectively. After being put on and fixed, the state shown in FIG. 15 is obtained.

【0025】次に、ケーシング9を地上に接地し、ケー
シング9内部に装備されているダウンザホールハンマー
12,12を駆動させて地盤を先行掘りしつつ、ケーシ
ング9自体を回転駆動装置6により回転させて両ハンマ
ー12,12を旋回させながら、図15のに示すよう
にケーシング9を地盤中に貫入してゆく。このとき、各
ダウンザホールハンマー12によって掘削された掘削土
砂や破砕屑等は、ビット12bの先端から噴出される圧
縮エアによってケーシング9と掘孔との隙間から地上へ
排出される。上記のようにダウンザホールハンマー12
の駆動中にケーシング9を回転させることによって、ハ
ンマー12による地盤の破砕・穿孔作用をより有効に発
揮させることができる。
Next, the casing 9 itself is rotated by the rotary drive unit 6 while the casing 9 is grounded and the down-the-hole hammer 12, 12 provided inside the casing 9 is driven to dig the ground in advance. While turning both hammers 12, 12, the casing 9 penetrates into the ground as shown in FIG. At this time, excavated earth and sand, crushed debris and the like excavated by each down-the-hole hammer 12 are discharged to the ground from a gap between the casing 9 and the excavation hole by compressed air jetted from the tip of the bit 12b. Down the hole hammer 12 as above
By rotating the casing 9 during the driving of, the crushing and piercing of the ground by the hammer 12 can be more effectively exerted.

【0026】ケーシング9が図15に示すように地盤
中所定深さまで貫入されたならば、各ダウンザホールハ
ンマー12の駆動を停止させた後、地上のグラウト圧送
ポンプを始動させて、グラウト導入ホース30から回転
駆動装置6内部のグラウト供給路、回転軸体8内部のグ
ラウト供給路31及びホース32を通じ、ケーシング9
の各開閉側板15に装備されたグラウト供給管19にセ
メントミルク等のグラウトを供給して、そのグラウトを
各グラウト供給管19の先端から掘削孔内に注入する。
When the casing 9 has penetrated to a predetermined depth in the ground as shown in FIG. 15, the driving of each down-the-hole hammer 12 is stopped, and then the grout pressure pump on the ground is started, and the grout introduction hose 30 is turned off. The casing 9 passes through the grout supply path inside the rotation drive device 6, the grout supply path 31 inside the rotary shaft 8 and the hose 32.
The grout such as cement milk is supplied to the grout supply pipes 19 provided on the respective opening / closing side plates 15, and the grout is injected into the excavation hole from the end of each grout supply pipe 19.

【0027】上記のように掘削孔内にグラウトを注入し
つつ、昇降操作ワイヤー5の巻取り操作により昇降機枠
4を上昇させてケーシング9を引き上げる。このケーシ
ング9の引き上げにあたっては、ケーシング9内部での
杭保持手段34による杭13の保持を解除し、この杭1
3を地盤中に残したままケーシング9を引き上げる。杭
保持手段34による杭13の保持を解除するには、地上
において作業者がロックピン45を抜き取ればよい。ま
た、この際、ケーシング9の引き上げに伴って杭13が
共上がりすることがあるため、杭押し下げ手段46を作
動させ、図14の仮想線図示のように杭13を押し下げ
て引き離すことによって、杭13の共上がりを防止し、
地盤中に確実に残存させることができる。
As described above, while the grout is being injected into the excavation hole, the elevator frame 4 is lifted by the winding operation of the lifting operation wire 5, and the casing 9 is pulled up. In raising the casing 9, the holding of the pile 13 by the pile holding means 34 inside the casing 9 is released, and the pile 1
The casing 9 is pulled up while leaving 3 in the ground. To release the holding of the stake 13 by the stake holding means 34, the worker may pull out the lock pin 45 on the ground. Further, at this time, the pile 13 may rise together with the raising of the casing 9, so that the pile pushing-down means 46 is operated, and the pile 13 is pushed down and separated as shown by the phantom line in FIG. 13 to prevent the rise
It can be reliably left in the ground.

【0028】図15のは、杭13を地盤中に残してケ
ーシング9を引き上げてゆく状態を示し、同図のは、
ケーシング9を地上に完全に引き上げた状態を示す。地
盤の掘削孔内に残置された杭13は、掘削孔内に注入さ
れたグラウトによって根固めされ、強固な支持杭を形成
する。尚、ケーシング9の引き上げ中に、ケーシング9
を回転駆動装置6によって回転させるようにしてもよ
い。
FIG. 15 shows a state in which the casing 9 is pulled up while the pile 13 is left in the ground.
This shows a state in which the casing 9 is completely pulled up to the ground. The pile 13 left in the excavation hole of the ground is solidified by the grout injected into the excavation hole to form a strong support pile. While the casing 9 is being lifted, the casing 9
May be rotated by the rotation driving device 6.

【0029】以上説明した杭打ち工法によれば、ケーシ
ング9内部に穿孔機としてのダウンザホールハンマー1
2を装備すると共に、ケーシング9内部にダウンザホー
ルハンマー12に並列して杭13を挿入できるようケー
シング9が縦割に分割して開閉可能に構成されたケーシ
ング9を使用し、このケーシング9を開放させた状態で
吊込挿入手段33により杭13をケーシング9内部に吊
り込んで挿入し、その杭13を杭保持手段34により保
持した状態で、ダウンザホールハンマー12で先行掘り
しながらケーシング9を地盤中所定深さまで貫入した
後、ケーシング9内部での杭13の保持を解除し、この
杭13を地盤中に残してケーシングを引き上げるように
するから、ケーシング9を引き上げるときに孔壁が崩壊
するようなことがなくて杭13を確実に埋入でき、しか
も地盤の掘孔と同時に杭13を打ち込むことができるか
ら、杭13の打ち込み作業を大幅に向上できる。
According to the pile driving method described above, the down-the-hole hammer 1 as a drilling machine is provided inside the casing 9.
2 is used, and the casing 9 is divided vertically so that the pile 13 can be inserted into the casing 9 in parallel with the down-the-hole hammer 12 so that the pile 9 can be opened and closed. In a state where the pile 13 is suspended and inserted into the casing 9 by the hanging insertion means 33 in a state where the pile 9 is held by the pile holding means 34, the casing 9 is digged in advance by the down-the-hole hammer 12, and After penetrating to the depth, the holding of the pile 13 in the casing 9 is released, and the pile 13 is left in the ground so that the casing is pulled up. Therefore, when the casing 9 is pulled up, the hole wall may collapse. The pile 13 can be reliably buried without any holes, and the pile 13 can be driven at the same time as the ground excavation. It can greatly improve the work.

【0030】この実施形態にあっては、穿孔機としてダ
ウンザホールハンマー12を使用しているから、地盤中
に岩盤が存在する場合も確実且つ有効に先行掘りを行う
ことができる。また、ケーシング9を、縦長帯状の基板
14と、夫々断面円弧状に形成されて、夫々の一側縁部
が縦長帯状基板14の両側縁部に蝶着された両側一対の
開閉側板15,15とによって構成すると共に、各開閉
側板15の内側にダウンザホールハンマー12とこれに
エアを供給するエア供給管16が一体的に装備している
から、ケーシング9内の両側に一対の穿孔機を配備し、
両穿孔機の間に杭13を挿入でき、それによりケーシン
グ9内に穿孔機と杭13とをバランス良く配置できると
共に、掘削能力を高めることができる。また、ロック手
段18によって、両開閉側板15,15を閉止位置にロ
ックすることができる。
In this embodiment, since the down-the-hole hammer 12 is used as a drilling machine, it is possible to reliably and effectively perform pre-digging even when rock is present in the ground. Further, the casing 9 has a pair of open / close side plates 15, 15, each of which has a vertically long band-shaped substrate 14, and is formed in an arc-shaped cross section, and one side edge of each of which is hinged to both side edges of the vertically long band-shaped substrate 14. Since the down-the-hole hammer 12 and the air supply pipe 16 for supplying air to the down-the-hole hammer 12 are integrally provided inside each opening / closing side plate 15, a pair of punches are provided on both sides in the casing 9. ,
The pile 13 can be inserted between the two drills, whereby the drill and the pile 13 can be arranged in the casing 9 in a well-balanced manner, and the excavating ability can be enhanced. Further, both the open / close side plates 15, 15 can be locked at the closed position by the lock means 18.

【0031】また、この実施形態では、先行掘りするた
めの穿孔機としてダウンザホールハンマー12を使用し
ているが、この穿孔機としてはアースオーガを使用して
もよい。また杭13は、H形鋼からなるものを例示した
が、その他L形鋼、I形鋼、T形鋼等、更には形鋼以外
の鋼管、更にまたコンクリートパイルも使用可能であ
る。
In this embodiment, the down-the-hole hammer 12 is used as a drilling machine for pre-digging, but an earth auger may be used as the drilling machine. In addition, the pile 13 is exemplified by an H-section steel, but L-section steel, I-section steel, T-section steel, and the like, a steel pipe other than a section steel, and a concrete pile can also be used.

【0032】図16は他の実施形態を示すもので、前記
実施形態にあってはケーシング9は縦割で観音開きの構
成になっているが、この実施形態にあっては通常の円筒
状のケーシング9Aからなるもので、このケーシング9
Aの内部にダウザホールハンマー等の穿孔機12が装備
され、その上端部に回転駆動装置6が取り付けられ、ケ
ーシング9Aの内部にH形鋼等からなる杭13を挿入す
ることができるようになっていることは前記実施形態と
同じである。
FIG. 16 shows another embodiment. In the above embodiment, the casing 9 is vertically split so as to have a double door opening. In this embodiment, a normal cylindrical casing is used. 9A, this casing 9
A is equipped with a drilling machine 12 such as a dozer hole hammer, and a rotary drive unit 6 is attached to the upper end thereof so that a pile 13 made of H-shaped steel or the like can be inserted into the casing 9A. This is the same as the above embodiment.

【0033】この実施形態にあっては、走行台車2に取
り付けてあるブームを吊持手段3として利用し、これに
前記回転駆動装置6を介してケーシング9Aを吊持する
ようになっている。
In this embodiment, a boom attached to the traveling vehicle 2 is used as the suspension means 3, and the casing 9 A is suspended on the boom via the rotary drive device 6.

【0034】一方、杭打ちする近傍の個所に、この種の
作業で一般に現場に敷設してある覆工板50を利用し、
これに箱状の杭起立ケース51を溶接やボルト止め等に
よって取り付け、この杭起立ケース51に杭13の下端
部をブーム3先端部からの吊りロープによって挿入し
て、図示のように杭13を杭起立ケース51に立てかけ
ておく。
On the other hand, a lining plate 50 generally laid on the site in this type of work is used at a location near the pile driving,
A box-shaped pile standing case 51 is attached thereto by welding, bolting, or the like, and the lower end of the pile 13 is inserted into the pile standing case 51 with a hanging rope from the end of the boom 3 so that the pile 13 is attached as shown. It stands against the pile standing case 51.

【0035】この状態で吊持手段3で吊持されたケーシ
ング9Aを走行台車2から操作して該ケーシング9A
を、その下部開放端から杭13に挿入して杭13にケー
シング9Aを外嵌し、両者に設けたピン挿入孔52,5
3が合致した位置でロックピン54を両ピン挿入孔5
2,53にわたって挿入し、該ロックピン54によって
ケーシング9Aに杭13を保持させる。ついで、同図の
(B)に示すように、吊持手段であるブーム3に吊持さ
れたケーシング9Aおよび杭13を所定の埋設個所にダ
ウザホールハンマー12の穿孔作業を伴いながら杭13
およびケーシング9Aを埋設し、杭13及びケーシング
9Aの上端部が地表面近くまで埋設されると両者を保持
しているロックピン54を取り外し、杭13のみを地中
に埋設した状態で、ケーシング9Aのみを吊持手段3に
よって引き上げることになる。これによってケーシング
9A、杭13および穿孔機12を同時に地中に挿入しな
がら杭13を地中に円滑に埋設することができる。
In this state, the casing 9A suspended by the suspension means 3 is operated from the traveling carriage 2 to
Is inserted into the stake 13 from its lower open end, the casing 9A is externally fitted to the stake 13, and the pin insertion holes 52, 5 provided in both are inserted.
At the position where 3 coincides, the lock pin 54 is inserted into both pin insertion holes 5.
2 and 53, and the pile 13 is held by the lock pin 54 in the casing 9A. Next, as shown in FIG. 1B, the casing 9A and the pile 13 suspended by the boom 3 as the suspending means are attached to the pile 13 at a predetermined embedding point while the douser hole hammer 12 is pierced.
And the casing 9A is buried. When the upper end of the pile 13 and the casing 9A are buried close to the ground surface, the lock pin 54 holding both is removed, and only the pile 13 is buried in the ground. Only the lifting means 3 will lift it. This allows the pile 13 to be smoothly embedded in the ground while simultaneously inserting the casing 9A, the pile 13 and the drilling machine 12 into the ground.

【0036】この埋設方法であれば、前記実施形態のよ
うにケーシング9を縦割りにして観音開き構造にする必
要がないから、それだけ構成が簡単で安価に施工するこ
とができる。
According to this embedding method, it is not necessary to vertically divide the casing 9 into a double-opened structure as in the above-described embodiment, so that the construction can be simplified and the construction can be performed at low cost.

【0037】また図17は、本発明の他の実施形態を示
すもので、図16の実施形態と相違する点は、図16に
示す実施形成にあっては、杭13を予め起立させておく
ために杭起立ケース51を設けるようにしているが、こ
の本実施形態にあっては、杭打ちする近傍の個所に土壁
崩壊防止用筒体55を有する杭起立用孔56を穿設して
おき、これに杭13を挿入しておき、ついで前記実施形
態と同じように、吊持手段3で吊持されたケーシング9
Aを走行台車2から操作して該ケーシング9Aを、その
下部開放端から杭13に挿入して杭13にケーシング9
Aを外嵌し、両者のピン挿入孔52,53が合致した位
置でロックピン54を両ピン挿入孔52,53にわたっ
て挿入し、該ロックピン54によってケーシング9Aに
杭13を保持させる。ついで、同図の(B)に示すよう
に、吊持手段であるブーム3に吊持されたケーシング9
Aおよび杭13を杭起立用孔孔56から引き上げ、所定
の埋設個所にダウザホールハンマー12の穿孔作業を伴
いながら杭13およびケーシング9Aを埋設し、杭13
及びケーシング9Aの上端部が地表面近くまで埋設され
ると両者を保持しているロックピン54を取り外し、杭
13のみを地中に埋設した状態で、ケーシング9Aのみ
を吊持手段3によって引き上げることになることは前記
実施形態と同じである。
FIG. 17 shows another embodiment of the present invention. The difference from the embodiment of FIG. 16 is that the pile 13 is set up in advance in the embodiment shown in FIG. For this purpose, the pile standing case 51 is provided, but in this embodiment, a pile standing hole 56 having a soil wall collapse prevention cylinder 55 is formed at a location near the pile driving. The stake 13 is inserted into this, and the casing 9 suspended by the suspending means 3 is then inserted in the same manner as in the previous embodiment.
A is operated from the traveling trolley 2 to insert the casing 9A into the pile 13 from the lower open end thereof.
A is externally fitted, and a lock pin 54 is inserted across the two pin insertion holes 52 and 53 at a position where both pin insertion holes 52 and 53 match, and the pile 13 is held by the lock pin 54 in the casing 9A. Next, as shown in FIG. 3B, the casing 9 suspended by the boom 3 as a suspending means.
A and the pile 13 are pulled up from the hole 56 for standing the pile, and the pile 13 and the casing 9 </ b> A are buried in a predetermined burial place while the drilling operation of the douser hole hammer 12 is performed.
When the upper end of the casing 9A is buried close to the ground surface, the lock pin 54 holding them is removed, and only the casing 9A is pulled up by the hanging means 3 with only the pile 13 buried underground. Is the same as in the above embodiment.

【0038】この実施形態によれば、前記実施形態と同
じように通常のケーシング9Aを用いることができると
共に、単に地中に通常の径大のケーシングからなる土壁
崩壊防止用筒体55による杭起立用孔56を穿設するだ
けでよいから、施工費用が非常に安くつくという利点が
ある。
According to this embodiment, the ordinary casing 9A can be used in the same manner as in the above-described embodiment, and the piles made of the earth wall collapse preventing cylinder 55 consisting of a normal large-diameter casing are simply placed underground. Since only the erecting hole 56 needs to be formed, there is an advantage that the construction cost is very low.

【0039】[0039]

【発明の効果】請求項1に係る発明の杭打ち工法によれ
ば、ケーシング内部に穿孔機を装備すると共に、ケーシ
ング内部に穿孔機に並列して杭を挿入できるようにした
ケーシングを使用し、このケーシングの内部に杭を挿入
保持した状態で穿孔機を駆動させてケーシングを地盤中
所定深さまで貫入した後、ケーシング内部での杭の保持
を解除し、この杭を地盤中に残してケーシングを引き上
げるようにするから、ケーシングを引き上げるときに孔
壁が崩壊するようなことがなく、杭を確実に埋入するこ
とができ、しかも地盤の掘孔と同時に杭を打ち込むこと
ができるため杭の打ち込み作業を大幅に向上できる。
According to the pile driving method according to the first aspect of the present invention, a casing is provided with a drilling machine inside the casing, and a casing is used inside the casing so that the pile can be inserted in parallel with the drilling machine. After driving the drilling machine while inserting and holding the pile inside the casing to penetrate the casing to a predetermined depth in the ground, the holding of the pile inside the casing is released, and the casing is left while the pile is kept in the ground. As the casing is pulled up, the hole walls do not collapse when the casing is pulled up, and the pile can be securely inserted, and the pile can be driven at the same time as the ground is drilled. Work can be greatly improved.

【0040】請求項2に係る発明の杭打ち工法によれ
ば、ケーシング内部に穿孔機を装備すると共に、ケーシ
ング内部に穿孔機に並列して杭を挿入できるようケーシ
ングが縦割に分割して開閉可能に構成されたケーシング
を使用し、このケーシングの内部に杭を挿入保持した状
態で穿孔機を駆動させてケーシングを地盤中所定深さま
で貫入した後、ケーシング内部での杭の保持を解除し、
この杭を地盤中に残してケーシングを引き上げるように
するから、ケーシングを引き上げるときに孔壁が崩壊す
るようなことがなく、杭を確実に埋入することができ、
しかも地盤の掘孔と同時に杭を打ち込むことができるた
め杭の打ち込み作業を大幅に向上できる。
According to the pile driving method according to the second aspect of the present invention, a drill is provided inside the casing, and the casing is divided vertically so that the pile can be inserted into the casing in parallel with the drill. Using a casing configured to be possible, after driving the drilling machine with the pile inserted and held inside the casing and penetrating the casing to a predetermined depth in the ground, release the holding of the pile inside the casing,
Since the casing is pulled up while leaving this pile in the ground, the hole wall does not collapse when the casing is pulled up, and the pile can be securely inserted,
Moreover, since the pile can be driven simultaneously with the excavation in the ground, the driving work of the pile can be greatly improved.

【0041】請求項3に係る発明の杭打ち装置によれ
ば、吊持手段によってケーシングが昇降可能に垂下連結
され、このケーシングは、ケーシング内部に穿孔機を装
備すると共に、ケーシング内部に前記穿孔機に並列して
杭を挿入できるようようになっていると共に、ケーシン
グ内部に挿入した杭を保持する杭保持手段(実施形態で
はピン挿入孔52,53、ロックピン54)を備えてな
るため、構成が極めて簡単で安価に施工することできる
という利点がある。
According to the third aspect of the present invention, the casing is vertically connected by the suspending means so as to be able to move up and down. The casing is provided with a drilling machine inside the casing and the drilling machine is installed inside the casing. And a pile holding means (in the embodiment, pin insertion holes 52 and 53 and a lock pin 54) for holding the pile inserted inside the casing. However, there is an advantage that the construction can be performed very easily and inexpensively.

【0042】請求項4に係る発明の杭打ち装置によれ
ば、リーダに沿って昇降可能な昇降機枠の下部にケーシ
ングが垂下連結され、このケーシングは、ケーシング内
部に先行掘りするための穿孔機を装備すると共に、ケー
シング内部に前記穿孔機に並列して杭を挿入できるよう
ケーシングが縦割に分割して開閉可能に構成されてい
て、杭をケーシングの内部に吊り込んで挿入する吊込挿
入手段と、ケーシング内部に挿入した杭を保持する杭保
持手段とを備えてなるものであるから、施工容易に杭打
ちを行うことができる。
According to the fourth aspect of the present invention, a casing is vertically connected to a lower portion of an elevator frame which can be moved up and down along a leader, and this casing is used for a drilling machine for pre-digging inside the casing. The casing is divided vertically so that the pile can be inserted into the casing in parallel with the drilling machine so that the pile can be inserted into the casing and can be opened and closed, and a hanging insertion means for suspending and inserting the pile inside the casing. And a pile holding means for holding the pile inserted inside the casing, so that the pile driving can be performed easily.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 本発明に係る杭打ち装置を示す側面図であ
る。
FIG. 1 is a side view showing a pile driving device according to the present invention.

【図2】 閉鎖されたケーシングの上端部側を示す縦断
面図である。
FIG. 2 is a longitudinal sectional view showing an upper end side of a closed casing.

【図3】 閉鎖されたケーシングの下端部側を示す縦断
面図である。
FIG. 3 is a longitudinal sectional view showing a lower end side of a closed casing.

【図4】 図2のV−V線断面図である。FIG. 4 is a sectional view taken along line VV of FIG. 2;

【図5】 図2のW−W線断面図である。FIG. 5 is a sectional view taken along line WW of FIG. 2;

【図6】 図2のX−X線断面図である。FIG. 6 is a sectional view taken along line XX of FIG. 2;

【図7】 開放されたケーシングの上端部側を示す縦断
面図である。
FIG. 7 is a longitudinal sectional view showing the upper end side of the opened casing.

【図8】 開放されたケーシングの上端部側を示す縦断
面図である。
FIG. 8 is a longitudinal sectional view showing the upper end side of the opened casing.

【図9】 ケーシングの両開閉側板の開閉状態を示すも
ので、図5とほぼ同様な断面図である。
FIG. 9 is a cross-sectional view, similar to FIG. 5, showing an open / close state of both open / close side plates of the casing.

【図10】 ケーシングの両開閉側板の開閉状態を示す
もので、ケーシングをその開放部側から見た正面図であ
る。
FIG. 10 is a front view showing the open / closed state of both open / close side plates of the casing, as viewed from the open side of the casing.

【図11】 ケーシングの両開閉側板の開閉状態を示す
もので、図6とほぼ同様な断面図である。
FIG. 11 is a cross-sectional view, similar to FIG. 6, showing an open / close state of both open / close side plates of the casing.

【図12】 ケーシングの両開閉側板の開閉状態を示す
もので、ケーシングをそのヒンジ側から見た正面図であ
る。
FIG. 12 is a front view showing the open / close state of both open / close side plates of the casing, as viewed from the hinge side of the casing.

【図13】 (A)はケーシング上端部の断面図で、吊
込挿入手段及び杭保持手段を示しており、(B)は
(A)の平面図であり、(C)は(A)のY−Y線断面
図である。
13A is a cross-sectional view of the upper end portion of the casing, showing the hanging insertion means and the pile holding means, FIG. 13B is a plan view of FIG. 13A, and FIG. 13C is a sectional view of FIG. It is YY line sectional drawing.

【図14】 ケーシング上端部の断面図で、杭押し下げ
手段を示す。
FIG. 14 is a cross-sectional view of the upper end portion of the casing, showing a pile pushing-down means.

【図15】 〜は本発明に係る杭打ち工法の一連の
工程を示す概略説明図である。
FIG. 15 is a schematic explanatory view showing a series of steps of the pile driving method according to the present invention.

【図16】 本発明の他の実施形態の施工状態を示す図
であり、(A)は正面図、(B)は要部の正面図であ
る。
FIG. 16 is a view showing a construction state of another embodiment of the present invention, wherein (A) is a front view and (B) is a front view of a main part.

【図17】 本発明の他の実施形態の施工状態を示す図
であり、(A)は正面図、(B)は要部の正面図であ
る。
FIG. 17 is a view showing a construction state of another embodiment of the present invention, wherein (A) is a front view and (B) is a front view of a main part.

【符号の説明】[Explanation of symbols]

1 リーダ 6 回転駆動装置 9 ケーシング 9A ケーシング 10 上部固定板 12 ダウンザホールハンマー(穿孔機) 13 杭(H形鋼) 14 基板 15 開閉側板 16 エア供給管 17 ヒンジ 18 ロック手段 19 グラウト供給管 20 取付板 21 枢軸 22 ロックピン 33 吊込挿入手段 34 杭保持手段 45 ロックピン 46 杭押し下げ手段 52 杭起立ケース 56 杭起立用孔 DESCRIPTION OF SYMBOLS 1 Leader 6 Rotation drive device 9 Casing 9A Casing 10 Upper fixed plate 12 Down the hole hammer (drilling machine) 13 Pile (H-shaped steel) 14 Substrate 15 Opening / closing side plate 16 Air supply pipe 17 Hinge 18 Locking means 19 Grout supply pipe 20 Mounting plate 21 Axis 22 Lock pin 33 Hanging insertion means 34 Pile holding means 45 Lock pin 46 Pile pushing down means 52 Pile standing case 56 Pile standing hole

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 ケーシング内部に穿孔機を装備すると共
に、ケーシング内部に前記穿孔機に並列して杭を挿入で
きるようにしたケーシングを使用し、このケーシングの
内部に杭を挿入して保持し、この状態で穿孔機を駆動さ
せながらケーシングを地盤中所定深さまで貫入した後、
ケーシング内部での杭の保持を解除し、この杭を地盤中
に残してケーシングを引き上げるようにした杭打ち工
法。
1. A casing provided with a drilling machine inside a casing, and a casing in which a pile can be inserted in parallel with the drilling machine is used inside the casing. The pile is inserted and held inside the casing, After piercing the casing to a predetermined depth in the ground while driving the drilling machine in this state,
A pile driving method in which the holding of the pile inside the casing is released, and this pile is left in the ground and the casing is lifted.
【請求項2】 ケーシング内部に穿孔機を装備すると共
に、ケーシング内部に前記穿孔機に並列して杭を挿入で
きるようケーシングが縦割に分割して開閉可能に構成さ
れたケーシングを使用し、このケーシングの内部に杭を
挿入して保持し、この状態で穿孔機を駆動させながらケ
ーシングを地盤中所定深さまで貫入した後、ケーシング
内部での杭の保持を解除し、この杭を地盤中に残してケ
ーシングを引き上げるようにした杭打ち工法。
2. A casing provided with a drilling machine inside the casing, and a casing which is divided vertically and opened and closed so that a pile can be inserted in parallel with the drilling machine inside the casing. After inserting the pile inside the casing and holding it, and driving the drilling machine in this state, penetrating the casing to a predetermined depth in the ground, release the holding of the pile inside the casing and leave this pile in the ground. Pile driving method that lifts the casing.
【請求項3】 吊持手段によってケーシングが昇降可能
に垂下連結され、このケーシングは、ケーシング内部に
穿孔機を装備すると共に、ケーシング内部に前記穿孔機
に並列して杭を挿入できるようようになっていると共
に、ケーシング内部に挿入した杭を保持する杭保持手段
を備えてなる杭打ち装置。
3. A casing is vertically connected by a suspending means so as to be able to move up and down. The casing is equipped with a drilling machine inside the casing, and a pile can be inserted inside the casing in parallel with the drilling machine. And a pile driving device comprising a pile holding means for holding a pile inserted inside the casing.
【請求項4】 リーダに沿って昇降可能な昇降機枠の下
部にケーシングが垂下連結され、このケーシングは、ケ
ーシング内部に穿孔機を装備すると共に、ケーシング内
部に前記穿孔機に並列して杭を挿入できるようケーシン
グが縦割に分割して開閉可能に構成されていて、杭をケ
ーシングの内部に吊り込んで挿入する吊込挿入手段と、
ケーシング内部に挿入した杭を保持する杭保持手段とを
備えてなる杭打ち装置。
4. A casing is vertically connected to a lower portion of an elevator frame which can be moved up and down along a leader. The casing is equipped with a drilling machine inside the casing and a pile is inserted inside the casing in parallel with the drilling machine. The casing is divided vertically so that it can be opened and closed so that it can be opened and closed, and a hanging insertion means for hanging and inserting the pile inside the casing,
A pile driving device comprising: a pile holding means for holding a pile inserted into a casing.
JP06227499A 1999-03-09 1999-03-09 Pile driving method and pile driving device Expired - Lifetime JP4105322B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP06227499A JP4105322B2 (en) 1999-03-09 1999-03-09 Pile driving method and pile driving device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP06227499A JP4105322B2 (en) 1999-03-09 1999-03-09 Pile driving method and pile driving device

Publications (2)

Publication Number Publication Date
JP2000257063A true JP2000257063A (en) 2000-09-19
JP4105322B2 JP4105322B2 (en) 2008-06-25

Family

ID=13195414

Family Applications (1)

Application Number Title Priority Date Filing Date
JP06227499A Expired - Lifetime JP4105322B2 (en) 1999-03-09 1999-03-09 Pile driving method and pile driving device

Country Status (1)

Country Link
JP (1) JP4105322B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020180509A (en) * 2019-04-26 2020-11-05 学校法人早稲田大学 Excavation device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020180509A (en) * 2019-04-26 2020-11-05 学校法人早稲田大学 Excavation device
JP7254608B2 (en) 2019-04-26 2023-04-10 学校法人早稲田大学 drilling equipment

Also Published As

Publication number Publication date
JP4105322B2 (en) 2008-06-25

Similar Documents

Publication Publication Date Title
US6540443B2 (en) Apparatus for and a method of boring the ground
CN106545007B (en) The method of pile in the stratum that lower part is hard rock stratum
JP2021165468A (en) Construction method of steel pipe pile
JPS6319328A (en) Method and apparatus for constructing turning-penetrating type large-diameter steel tube
JP3818519B2 (en) Drilling tool for earth drill
JP3410230B2 (en) Drilling method and device
JP4478348B2 (en) Steel pipe pile driving method and apparatus
JP3361776B2 (en) Crushing equipment for underground piles
CN115478543B (en) Artificial hole digging pile foundation pit supporting structure and construction method
KR100255423B1 (en) Method and apparatus of pipe for foundation construction
JP3031876B2 (en) Izutsu laying method and its device
JPH09144466A (en) Expanding head for excavation
JP7205838B1 (en) Pile driving device and pile driving method
JP3806318B2 (en) Foundation pile construction method and apparatus
JP2000257063A (en) Pile driving method and device
JP4400700B2 (en) Cutting and drawing method and equipment for existing piles
JP2001248375A (en) Suspension mobile type pile driving device and pile driving method using it
JP3037609B2 (en) Drilling rig
JPH0718665A (en) Screw rod for underground boring machine
JP2001323767A (en) Pit excavator
JP2000008763A (en) Caisson type pile excavator and caisson type pile excavating construction method
JPH0718664A (en) Rotary joint for underground boring machine
GB2270329A (en) Forming a hole in the ground
JP7337343B2 (en) Strut construction device and strut construction method for protective fence
JPH0657762A (en) Construction of deep foundation

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060127

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20071203

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20071214

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080111

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080305

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080327

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110404

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110404

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120404

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130404

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130404

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140404

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term