JP2000240105A - Second boom operation/motion controller for two-piece boom working machine - Google Patents

Second boom operation/motion controller for two-piece boom working machine

Info

Publication number
JP2000240105A
JP2000240105A JP4755999A JP4755999A JP2000240105A JP 2000240105 A JP2000240105 A JP 2000240105A JP 4755999 A JP4755999 A JP 4755999A JP 4755999 A JP4755999 A JP 4755999A JP 2000240105 A JP2000240105 A JP 2000240105A
Authority
JP
Japan
Prior art keywords
boom
speed
piece
ground
arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP4755999A
Other languages
Japanese (ja)
Other versions
JP4017279B2 (en
Inventor
Shinichi Nakamura
慎一 中村
Hiroshi Imai
寛 今井
Toshinaga Andou
豪修 安藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Komatsu Ltd
Original Assignee
Komatsu Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Komatsu Ltd filed Critical Komatsu Ltd
Priority to JP04755999A priority Critical patent/JP4017279B2/en
Publication of JP2000240105A publication Critical patent/JP2000240105A/en
Application granted granted Critical
Publication of JP4017279B2 publication Critical patent/JP4017279B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Operation Control Of Excavators (AREA)

Abstract

PROBLEM TO BE SOLVED: To improve the working efficiency of a two-piece boom working machine by constructing the machine such that the speed of vertical movement of a second boom is progressively increased or progressively decreased depending on the position of dynamic behavior of a two-piece boom structural mechanism when an ascending motion switch or a descending motion switch is activated. SOLUTION: First and second boom sensors 41, 42 and an arm angle sensor 43 output detection signals indicative of a first boom ground angle α, a second boom hoisting angle β, and an arm hoisting angle γ, respectively, to a controller 31. Then, the controller executes computation of a height position of the front end of an arm of a two-piece boom mechanism with respect to the ground, based on the angles α, β, and γ, and lengths of first and second booms and the arm, respectively. The controller 31 progressively accelerates the speed of the second boom in response to operation of a second boom ascending switch 23 when the front end of the arm is in a position of dynamic behavior in the vertical range between upper and lower set heights with respect to the ground. Further, the controller 31 progressively decelerates the speed of the second boom in response to operation of a second boom descending switch 24. Thus, the working efficiency of the machine can be enhanced.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、2ピースブーム
を含む多関節型フロント作業装置を備えた2ピースブー
ム作業機の第2ブーム操作動作制御装置に関するもので
ある。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a second boom operation control device of a two-piece boom working machine having an articulated front working device including a two-piece boom.

【0002】[0002]

【従来の技術】2ピースブームを含む多関節型フロント
作業装置を備えた2ピースブーム作業機の第2ブーム操
作動作制御装置の従来例としては、例えば特開平10−
37232号公報が挙げられる。この特開平10−37
232号公報に記載されている技術は、第1ブームと第
2ブームから成る2ピースブームのうち第2ブームを上
下方向に回動させるスイッチを操作レバーに配設し、こ
の操作レバーのスイッチのオン、オフにより第2ブーム
を一定に定めた速度により駆動するようにしたものであ
る。そしてこの第2ブーム操作動作制御装置は、上記回
動速度を調整する速度調整手段を有しているが、この速
度調整手段は、第2ブームの駆動アクチュエータ制御弁
を比例電磁弁とし、比例電磁弁を動作する電気回路に可
変抵抗器を設けることによって構成したり、あるいはア
クチュエータ制御弁のパイロット操作回路に電磁比例減
圧弁を設け、この減圧弁の電気動作を可変抵抗器によっ
て切換えるようにして構成されている。
2. Description of the Related Art As a conventional example of a second boom operating motion control device of a two-piece boom working machine having an articulated front working device including a two-piece boom, see, for example,
No. 37232. This Japanese Patent Application Laid-Open No. Hei 10-37
In the technique described in Japanese Patent Publication No. 232, a switch for vertically rotating the second boom out of a two-piece boom consisting of a first boom and a second boom is provided on an operation lever, and a switch of the operation lever is provided. The second boom is driven at a fixed speed by turning on and off. The second boom operation operation control device has speed adjusting means for adjusting the rotation speed. This speed adjusting means uses a proportional solenoid valve as a drive actuator control valve of the second boom and a proportional electromagnetic valve. A variable resistor is provided in the electric circuit that operates the valve, or an electromagnetic proportional pressure reducing valve is provided in the pilot operation circuit of the actuator control valve, and the electric operation of the pressure reducing valve is switched by the variable resistor. Have been.

【0003】[0003]

【発明が解決しようとする課題】ところで上記従来技術
のものは、第2ブームの動作開始から動作停止までの速
度が一定で、このために、早い動きまたは遅い動きが動
作開始から動作停止の間にわたって続き、迅速な動きか
ら慎重な動き、あるいは、その逆の動きが動作開始から
動作停止の間にわたって得られないものである。
In the above-mentioned prior art, the speed from the start of the operation of the second boom to the stop of the operation is constant, so that a fast or slow movement occurs between the start of the operation and the stop of the operation. And rapid movement to careful movement, or vice versa, cannot be obtained from the start of operation to the stop of operation.

【0004】すなわち図5に示すように管工事等による
掘削作業では、掘削した両側の面が崩れてこないよう
に、矢板、腹起し、切梁A等を用いて土留めを行う必要
があるが、このような工事において第2ブームの駆動速
度が早すぎると、バケット6、アーム5等が切梁Aに接
触し、切梁Aを壊したり、あるいはバケット6等の作業
機を破損する恐れが生じるのである。このようなことは
掘削作業時だけではなく、掘削後に砂をまいたり、資材
を搬入する場合にも同様に生じる。
That is, as shown in FIG. 5, in excavation work by pipe work or the like, it is necessary to perform earth retaining by using a sheet pile, a belly, a cutting beam A, etc. so that the excavated side surfaces do not collapse. However, if the driving speed of the second boom is too fast in such a construction, the bucket 6, the arm 5 and the like may come into contact with the cutting beam A and break the cutting beam A or damage the work equipment such as the bucket 6. Will occur. This occurs not only during excavation work, but also when sanding or carrying in materials after excavation.

【0005】この発明は上記従来の欠点を解決するため
になされたものであって、その目的は、第2ブームの動
作速度を2ピースブーム構成機構の動態位置に応じて制
御でき、そのため第2ブームの操作性を改善することが
可能であり、上記のような接触事故等の危険性を確実に
回避しながらも、作業効率を向上させることが可能な2
ピースブーム作業機の第2ブーム操作動作制御装置を提
供することにある。
SUMMARY OF THE INVENTION The present invention has been made to solve the above-mentioned conventional disadvantages, and has as its object to control the operation speed of the second boom in accordance with the dynamic position of the two-piece boom construction mechanism. It is possible to improve the operability of the boom, and it is possible to improve the work efficiency while reliably avoiding the danger of a contact accident as described above.
An object of the present invention is to provide a second boom operation motion control device for a piece boom working machine.

【0006】[0006]

【課題を解決するための手段及び効果】そこで請求項1
の2ピースブーム作業機の第2ブーム操作動作制御装置
は、上部旋回体1に対して、第1ブーム3と第2ブーム
4を関節結合し、さらに上記第2ブーム4の先端側に、
バケット等の作業機6を装備したアーム5を関節結合し
て成る多関節型フロント作業装置2を取り付け、多関節
型フロント作業装置及び上部旋回体1を操作する操作レ
バー16、18のいずれか一方側の操作レバーに第2ブ
ーム4の上げ動作と下げ動作を指令する上げ動作スイッ
チ23と下げ動作スイッチ24とを設けると共に、上記
上げ動作スイッチ23又は下げ動作スイッチ24が起動
されたときに、2ピースブーム構成機構の動態位置に応
じて、第2ブーム4の上下動作速度を漸増と漸減にする
動作速度を含む動作速度制御手段を介して操作されるよ
うにしたことを特徴としている。
Means and Effects for Solving the Problems Claim 1
The second boom operating motion control device of the two-piece boom working machine includes a first boom 3 and a second boom 4 that are articulated with respect to the upper revolving unit 1, and further, on a tip end side of the second boom 4,
An articulated front working device 2 formed by articulating an arm 5 equipped with a working machine 6 such as a bucket is attached, and one of operating levers 16 and 18 for operating the articulated front working device and the upper revolving unit 1 The operation lever on the side is provided with a raising operation switch 23 and a lowering operation switch 24 for instructing a raising operation and a lowering operation of the second boom 4, and when the raising operation switch 23 or the lowering operation switch 24 is activated, It is characterized in that it is operated via operation speed control means including an operation speed for gradually increasing and decreasing the vertical operation speed of the second boom 4 according to the dynamic position of the piece boom construction mechanism.

【0007】上記請求項1の2ピースブーム作業機の第
2ブーム操作動作制御装置によれば、第2ブーム4の動
作速度を2ピースブーム構成機構の動態位置に応じて制
御でき、そのため第2ブーム4の操作性を改善すること
が可能である。従って、管工事のような掘削作業におい
ても従来のような切梁Aとバケット等の作業機6との接
触事故等の危険性を確実に回避することが可能となる。
また、第2ブーム4を動作して作業機を地下掘削移動す
るときに狭隘な場所での作業の場合は慎重に移動でき
て、障害物との干渉を避けることができ、作業機を地上
移動するときには迅速な速度で移動できて作業効率を向
上させることができる。
According to the second boom operating motion control device of the two-piece boom working machine of the first aspect, the operation speed of the second boom 4 can be controlled according to the dynamic position of the two-piece boom constituting mechanism. The operability of the boom 4 can be improved. Therefore, even in the excavation work such as the pipe work, it is possible to reliably avoid the danger such as the conventional contact accident between the cutting beam A and the work machine 6 such as the bucket.
In addition, when the second boom 4 is operated to excavate and move the working machine underground, when working in a narrow place, the working machine can be carefully moved, interference with obstacles can be avoided, and the working machine can be moved on the ground. When doing so, it is possible to move at a rapid speed and improve work efficiency.

【0008】請求項2の2ピースブーム作業機の第2ブ
ーム操作動作制御装置は、上記第2ブーム4の動作速度
制御手段の漸増と漸減とは、上記2ピースブーム機構の
アーム5先端が対地GLを境にした上方向の設定高さと下
方向の設定深さとの上下範囲ΔH内に位置する動態のと
きに、第2ブーム上げ動作をすると漸増増速、第2ブー
ム下げ動作をすると漸減減速となるようにしていること
を特徴としている。
In the second boom operating operation control device for a two-piece boom working machine, the step of gradually increasing and decreasing the operation speed control means of the second boom 4 is such that the tip of the arm 5 of the two-piece boom mechanism is grounded. When the dynamic range is within the vertical range ΔH between the set height in the upward direction and the set depth in the downward direction from the GL, the second boom raising operation gradually increases the speed, and the second boom lowering operation gradually decreases the speed. It is characterized in that it becomes.

【0009】上記請求項2の2ピースブーム作業機の第
2ブーム操作動作制御装置によれば、アーム5先端の対
地GLを境にして上下方向の高さと深さの設定範囲ΔHに
わたって第2ブーム4の上げ/下げの動作速度を徐々に
速め又は遅くして動作できる。すなわち、第2ブーム下
げのときには第2ブーム4の下げ速度を次第に遅くなる
ようにして地下構築物との干渉を避けるための慎重なバ
ケット等の作業機6の移動操作が得られる。また第2ブ
ーム上げのときには第2ブーム4の上げ速度が次第に速
くなるようにして速い作業機6の移動操作が得られ、位
置に応じて連続的に速度変化する第2ブーム4の動作速
度調整ができて、安全作業と作業効率の向上を期するこ
とが可能となる。
According to the second boom operating operation control device of the two-piece boom working machine of the second aspect, the second boom extends over the vertical height and depth setting range ΔH with respect to the ground GL at the tip of the arm 5. 4 can be operated by gradually increasing or decreasing the operation speed. That is, at the time of lowering the second boom, the lowering speed of the second boom 4 is gradually reduced, and a careful operation of moving the work machine 6 such as a bucket for avoiding interference with the underground structure is obtained. In addition, when raising the second boom, the raising speed of the second boom 4 is gradually increased, so that a fast moving operation of the work implement 6 can be obtained, and the operating speed of the second boom 4 continuously changes according to the position. It is possible to improve safety work and work efficiency.

【0010】また、請求項3の2ピースブーム作業機の
第2ブーム操作動作制御装置は、上記第2ブーム4の動
作速度制御手段の漸増と漸減とは、対地GLを境にした下
方向の設定深さ範囲を超えて2ピースブーム機構のアー
ム5先端が位置する動態のときには、第2ブーム4の起
伏動作を上記漸減速度以下の一定の低速度で動く動作速
度とし、対地GLを境にした上方向の設定高さ範囲を超え
て2ピースブーム機構のアーム5先端が位置する動態の
ときには、第2ブーム4の起伏動作を上記漸増速度以上
の一定の高速度で動く動作速度とした速度範囲を含むこ
とを特徴としている。
According to a third aspect of the present invention, in the two-piece boom working machine, the second boom operation operation control device is configured such that the gradual increase and decrease of the operation speed control means of the second boom 4 are performed in a downward direction with respect to the ground GL. When the tip of the arm 5 of the two-piece boom mechanism is positioned beyond the set depth range, the up-and-down movement of the second boom 4 is set to an operation speed that moves at a constant low speed that is equal to or less than the above-described gradually decreasing speed, and the ground GL is a boundary. When the movement of the tip of the arm 5 of the two-piece boom mechanism exceeds the set height range in the upward direction, the up-and-down movement of the second boom 4 is set to an operation speed that moves at a constant high speed equal to or higher than the above-described gradually increasing speed. It is characterized by including a range.

【0011】上記請求項3の2ピースブーム作業機の第
2ブーム操作動作制御装置によれば、慎重な作業機移動
と速い作業機移動の連続的な可変移動を速度調整を加え
ることなく自動的に得られて、操作性を向上することが
可能となる。
According to the second boom operating motion control device of the two-piece boom working machine of the third aspect, the continuous variable movement of the cautious working machine movement and the fast working machine movement can be automatically performed without adding speed adjustment. And the operability can be improved.

【0012】請求項4の2ピースブーム作業機の第2ブ
ーム操作動作制御装置は、上記第2ブーム4の動作速度
制御手段は、2ピースブーム機構の第1ブーム3、第2
ブーム4、アーム5に備えた角度センサ41、41、4
3による角度検出信号からアーム5先端における上下方
向の高さ位置Hを検出する検出手段と、高さ位置Hに応
じた第2ブーム上げと第2ブーム下げの動作速度を定め
た速度テーブルと、速度テーブルのデータを電流値に変
えて出力する出力手段とから成るコントローラ31を有
し、第2ブーム動作アクチュエータ制御弁34の作動パ
イロット圧流体を制御し、第2ブーム動作アクチュエー
タ制御弁34のアクチュエータ作動流体通過の開口面積
を変える第2ブーム上げと第2ブーム下げの電磁比例減
圧弁35、36を、上記出力電流値に応答して作動する
ようにしたことを特徴としている。
According to a fourth aspect of the present invention, there is provided a two-piece boom operating machine, wherein the operating speed control means of the second boom 4 comprises a first boom 3 and a second boom of a two-piece boom mechanism.
Angle sensors 41, 41, 4 provided on boom 4 and arm 5
Detecting means for detecting a height position H in the vertical direction at the tip of the arm 5 from the angle detection signal obtained by 3; a speed table in which operating speeds for raising and lowering the second boom according to the height position H are determined; An output means for converting the data of the speed table into a current value and outputting the current value. The controller 31 controls an operation pilot pressure fluid of the second boom operation actuator control valve, and controls an actuator of the second boom operation actuator control valve. The electromagnetic proportional pressure reducing valves 35 and 36 for raising and lowering the second boom for changing the opening area of the passage of the working fluid are operated in response to the output current value.

【0013】上記請求項4の2ピースブーム作業機の第
2ブーム操作動作制御装置によれば、比較的簡素な構造
でもって、応答性に優れると共に、確実な速度制御を行
うことが可能である。
According to the second boom operating motion control device of the two-piece boom working machine of the fourth aspect, it is possible to perform the speed control with excellent responsiveness and with a relatively simple structure. .

【0014】また請求項5の2ピースブーム作業機の第
2ブーム操作動作制御装置は、上記第2ブーム4の動作
速度制御手段の漸増と漸減とは、2ピースブーム機構の
第1ブーム3の対地角度αが対地に接近した設定対地角
度範囲内に位置する動態のときに、第1ブーム3の対地
角度αが小さくなっていくときには第2ブーム4の動作
速度が漸減減速し、第1ブーム3の対地角度αが大きく
なっていくときには第2ブーム4の動作速度が漸増増速
するようにしていることを特徴としている。
According to a second aspect of the present invention, there is provided a two-piece boom operating machine, wherein the operation speed control means of the second boom 4 is gradually increased and decreased by the first boom 3 of the two-piece boom mechanism. When the ground angle α is within the set ground angle range close to the ground, and the ground angle α of the first boom 3 becomes smaller, the operation speed of the second boom 4 gradually decreases and decelerates, and 3, the operation speed of the second boom 4 is gradually increased when the ground angle α increases.

【0015】上記請求項5の2ピースブーム作業機の第
2ブーム操作動作制御装置によれば、第1ブーム3の対
地角度αに対応して第2ブーム4の上げ/下げの動作速
度を徐々に速め又は遅くして動作できる。例えば、第1
ブーム3の対地角度αを小さくして、作業機6を地表か
ら地下へ移行するときの第2ブーム4の下げ速度を遅く
なるようにして地下構築物との干渉を避けるための慎重
な作業機6の移動操作が得られる。また第1ブーム3の
対地角度αを大きくして、作業機6を地下から地表へ移
行するときの第2ブーム4の上げ速度が速くなるように
して速い作業機6の移動操作が得られ、位置に応じて連
続的に速度変化する第2ブーム4の動作速度調整ができ
て、安全作業と作業効率の向上を期することが可能とな
る。
According to the second boom operating motion control device of the two-piece boom working machine of the fifth aspect, the raising / lowering operation speed of the second boom 4 is gradually increased corresponding to the ground angle α of the first boom 3. It can operate faster or slower. For example, the first
A cautious work machine 6 for reducing the ground angle α of the boom 3 and slowing down the second boom 4 when moving the work machine 6 from the ground surface to the underground so as to avoid interference with the underground structure. Is obtained. In addition, by increasing the ground angle α of the first boom 3 to increase the speed of raising the second boom 4 when shifting the work machine 6 from the underground to the surface, a fast moving operation of the work machine 6 is obtained. The operation speed of the second boom 4 that continuously changes in speed according to the position can be adjusted, so that safe operation and improvement in operation efficiency can be expected.

【0016】請求項6の2ピースブーム作業機の第2ブ
ーム操作動作制御装置は、上記第2ブーム4の動作速度
制御手段の漸増と漸減とは、2ピースブーム機構の第1
ブーム3の対地角度αが設定対地角度範囲以下を超えた
対地角度範囲に位置する動態のときには、第2ブーム起
伏動作を上記漸減速度以下の一定の低速度で動く動作速
度とし、2ピースブーム機構の第1ブーム3の対地角度
αが設定対地角度範囲以上を超えた対地角度範囲に位置
する動態のときには、第2ブーム起伏動作を上記漸増速
度以上の一定の高速度で動く動作速度とした速度範囲を
含むことを特徴としている。
According to a second aspect of the present invention, there is provided a two-piece boom operating machine, wherein the operation speed control means of the second boom 4 is gradually increased and decreased.
When the ground angle α of the boom 3 is in the ground angle range exceeding the set ground angle range or less, the second boom up-and-down operation is set to an operation speed that moves at a constant low speed equal to or lower than the above-mentioned gradually decreasing speed. In the case of a dynamic state in which the ground angle α of the first boom 3 is located in the ground angle range exceeding the set ground angle range or more, the speed at which the second boom up / down operation is set to the operation speed that moves at a constant high speed that is equal to or higher than the above-described gradually increasing speed is set. It is characterized by including a range.

【0017】上記請求項6の2ピースブーム作業機の第
2ブーム操作動作制御装置によれば、慎重な作業機移動
と速い作業機移動の連続的な可変移動を速度調整を加え
ることなく自動的に得られて、操作性を向上することが
可能となる。
According to the second boom operating motion control device of the two-piece boom working machine of the sixth aspect, the continuous variable movement of the cautious working machine movement and the fast working machine movement can be automatically performed without adding speed adjustment. And the operability can be improved.

【0018】請求項7の2ピースブーム作業機の第2ブ
ーム操作動作制御装置は、上記第2ブーム4の動作速度
制御手段は、2ピースブーム機構の第1ブーム3に備え
た角度センサ41による角度検出信号から第1ブーム3
の対地角度αを検出する検出手段と、第1ブーム3の対
地角度αに応じた第2ブーム上げと第2ブーム下げの動
作速度を定めた速度テーブルと、速度テーブルのデータ
を電流値に変えて出力する出力手段とから成るコントロ
ーラ31を有し、第2ブーム動作アクチュエータ制御弁
34の作動パイロット圧流体を制御し、第2ブーム動作
アクチュエータ制御弁34のアクチュエータ作動流体通
過の開口面積を変える第2ブーム上げと第2ブーム下げ
の電磁比例減圧弁35、36を、上記出力電流値に応答
して作動するようにしたことを特徴としている。
According to a seventh aspect of the present invention, the operation speed control means of the second boom 4 is controlled by an angle sensor 41 provided on the first boom 3 of the two-piece boom mechanism. First boom 3 from angle detection signal
Detecting means for detecting the ground angle α of the first boom, a speed table in which the operation speeds of the second boom raising and the second boom lowering according to the ground angle α of the first boom 3 are determined, and the data in the speed table are converted into current values. And a controller 31 for controlling the pilot pressure fluid of the second boom operation actuator control valve 34 to change the opening area of the second boom operation actuator control valve 34 through which the actuator operation fluid passes. It is characterized in that the electromagnetic proportional pressure reducing valves 35, 36 for raising the second boom and lowering the second boom are operated in response to the output current value.

【0019】上記請求項7の2ピースブーム作業機の第
2ブーム操作動作制御装置によれば、比較的簡素な構造
でもって、応答性に優れると共に、確実な速度制御を行
うことが可能である。
According to the second boom operating motion control device of the two-piece boom working machine of the above-described claim, it is possible to perform excellent speed response and reliable speed control with a relatively simple structure. .

【0020】[0020]

【発明の実施の形態】(第1実施形態)以下、本発明の
実施の形態を図面を参照して説明する。図5は上部旋回
体1に対して多関節型フロント作業装置2を備えた建設
車両の構成図を示している。このフロント作業装置2
は、基部が上部旋回体1に回動可能に連結されている第
1ブーム3と、この第1ブーム3の先端に回動可能に連
結されている第2ブーム4と、この第2ブーム4の先端
に回動可能に連結されているアーム5と、このアーム5
の先端に回動可能に連結されているバケット6等で構成
されている。なおバケット6は作業機の一例を示すもの
であって、バケット6以外の作業機を用いる場合もあ
る。また、第1ブームシリンダ10により第1ブーム3
が起伏制御されるようになっており、第2ブーム4の基
部側と第1ブーム3との間に第2ブームシリンダ11が
設けられていて、この第2ブームシリンダ11により第
2ブーム4が上げ/下げの起伏制御がされる。また、ア
ームシリンダ12によりアーム5が回動制御され、バケ
ットシリンダ13によりバケット6が回動制御されるよ
うになっている。
DESCRIPTION OF THE PREFERRED EMBODIMENTS (First Embodiment) An embodiment of the present invention will be described below with reference to the drawings. FIG. 5 is a configuration diagram of a construction vehicle provided with the articulated front working device 2 for the upper swing body 1. This front work device 2
A first boom 3 whose base is rotatably connected to the upper swing body 1, a second boom 4 that is rotatably connected to the tip of the first boom 3, and a second boom 4 Arm 5 rotatably connected to the tip of the arm 5;
And a bucket 6 rotatably connected to the tip of the head. The bucket 6 is an example of a working machine, and a working machine other than the bucket 6 may be used. Also, the first boom cylinder 10 controls the first boom 3.
The second boom cylinder 11 is provided between the base side of the second boom 4 and the first boom 3, and the second boom cylinder 11 controls the second boom 4. Up / down undulation control is performed. The rotation of the arm 5 is controlled by the arm cylinder 12, and the rotation of the bucket 6 is controlled by the bucket cylinder 13.

【0021】図5に示すキャブ15内には図2に示すよ
うな2本の操作レバーが設けられている。この場合、右
側を第1操作レバー16とし、左側を第2操作レバー1
8とする。第1操作レバー16の握り部17を持って左
右方向、前後方向に操作することで、バケット6をクラ
ウドしたり、ダンプしたりでき、また第1ブーム3の上
げ/下げを行なうことができるようになっている。ま
た、第2操作レバー18を左右方向、前後方向に操作す
ることで、アーム5をクラウドしたり、ダンプしたりで
き、また上部旋回体1を左右に旋回できるようになって
いる。
The cab 15 shown in FIG. 5 is provided with two operation levers as shown in FIG. In this case, the right side is the first operation lever 16, and the left side is the second operation lever 1.
8 is assumed. The bucket 6 can be crowded or dumped by operating the grip portion 17 of the first operation lever 16 in the left-right direction and the front-back direction, and the first boom 3 can be raised / lowered. It has become. By operating the second operation lever 18 in the left-right direction and the front-back direction, the arm 5 can be crowded or dumped, and the upper swing body 1 can be turned left and right.

【0022】第1操作レバー16の握りブーム17の上
端面には、ホーンスイッチ22、第2ブーム上げスイッ
チ(上げ動作スイッチ)23及び第2ブーム下げスイッ
チ(下げ動作スイッチ)24が設けられている。この第
2ブーム上げスイッチ23を押操作することで第2ブー
ム4を上げる方向に駆動することができ、第2ブーム下
げスイッチ24を押操作することで第2ブーム4を下げ
る方向に駆動することができる。また、第2操作レバー
18の握り部19の上端面には、バケット6を振動させ
るためのバケット振動スイッチ26、ワンタッチデセル
スイッチ27が設けられている。
A horn switch 22, a second boom raising switch (raising operation switch) 23, and a second boom lowering switch (lowering operation switch) 24 are provided on the upper end surface of the gripping boom 17 of the first operating lever 16. . By operating the second boom raising switch 23, the second boom 4 can be driven in the upward direction, and by pressing the second boom lowering switch 24, the second boom 4 can be driven in the downward direction. Can be. A bucket vibration switch 26 for vibrating the bucket 6 and a one-touch decel switch 27 are provided on the upper end surface of the grip portion 19 of the second operation lever 18.

【0023】図1は本発明に関係したブロック図を示
し、全体の制御を行なうコントローラ31には、第2ブ
ーム4の上げ/下げの速度を予め記憶させておく速度テ
ーブル(A、B)が設けられている。また上記コントロ
ーラ31には、第2ブーム上げスイッチ23と第2ブー
ム下げスイッチ24からの第2ブーム上げ信号と第2ブ
ーム下げ信号とが入力される。さらに上記コントローラ
31には、第1ブーム角度センサ41、第2ブーム角度
センサ42、アーム角度センサ43からそれぞれ第1ブ
ーム対地角α検出信号、第2ブーム起伏角β検出信号、
アーム起伏角γ検出信号が入力されている。上記第1ブ
ーム対地角αは、第1ブーム3が対地となす角度(車体
水平面となす角度)、上記第2ブーム起伏角βは第2ブ
ーム4が第1ブーム3となす角度、上記アーム起伏角γ
はアーム5が第2ブーム4となす角度のことである(図
3(c)参照)。そしてコントローラ31において、上
記各角度α、β、γと第1ブーム3、第2ブーム4、ア
ーム5の各長さから、アーム5の先端と対地高さ位置H
を演算、把握し、上記速度テーブル(A、B)から上記
対地高さ位置Hに応じた速度電気信号を出力する。
FIG. 1 is a block diagram relating to the present invention. A controller 31 for performing overall control has a speed table (A, B) in which the speed of raising / lowering the second boom 4 is stored in advance. Is provided. Further, the controller 31 receives a second boom raising signal and a second boom lowering signal from the second boom raising switch 23 and the second boom lowering switch 24. Further, the controller 31 receives a first boom-to-ground angle α detection signal, a second boom undulation angle β detection signal from a first boom angle sensor 41, a second boom angle sensor 42, and an arm angle sensor 43, respectively.
An arm elevation angle γ detection signal is input. The first boom-to-ground angle α is the angle formed by the first boom 3 to the ground (the angle formed with the horizontal plane of the vehicle body), the second boom undulation angle β is the angle formed by the second boom 4 to the first boom 3, and the arm undulation Angle γ
Is the angle that the arm 5 makes with the second boom 4 (see FIG. 3C). Then, in the controller 31, based on the angles α, β, γ and the respective lengths of the first boom 3, the second boom 4, and the arm 5, the tip of the arm 5 and the ground height position H are set.
Is calculated and grasped, and a speed electric signal corresponding to the ground height position H is output from the speed tables (A, B).

【0024】さらに図1において、第2ブーム4の上げ
方向または下げ方向の回動速度は、第2ブームシリンダ
11を伸縮駆動する圧力流体流れの制御をする流量比例
切換弁(第2ブーム動作アクチュエータ制御弁)34の
開口面積によって決まり、流量比例切換弁34の開口面
積は、比例電磁減圧弁35、36を通じて流量比例切換
弁34に開口動作を加えるパイロット流体圧力の大きさ
にて制御され、パイロット流体圧力の大きさは、比例電
磁減圧弁35、36に加える前記速度テーブルからの速
度電気信号によって指令された電磁力に比例するパイロ
ット流体圧力制御によって決まる。速度テーブルは、第
2ブーム上げ操作スイッチ23からの操作指令によるA
電流出力と、第2ブーム下げ操作スイッチ24からの操
作指令によるB電流出力とからなり、第2ブームシリン
ダ11の伸縮速度を決める流量比例切換弁34の開口制
御をするパイロット流体圧力の大きさ信号として比例電
磁減圧弁35又は36の制御信号として加えられる。な
お、33は油圧ポンプである。
In FIG. 1, the rotation speed of the second boom 4 in the raising or lowering direction is controlled by a flow proportional switching valve (second boom operation actuator) for controlling the pressure fluid flow for driving the second boom cylinder 11 to expand and contract. The opening area of the flow rate proportional switching valve 34 is controlled by the magnitude of the pilot fluid pressure that applies an opening operation to the flow rate proportional switching valve 34 through the proportional electromagnetic pressure reducing valves 35 and 36, The magnitude of the fluid pressure is determined by pilot fluid pressure control proportional to the electromagnetic force commanded by the speed electrical signal from the speed table applied to the proportional electromagnetic pressure reducing valves 35,36. The speed table stores A according to an operation command from the second boom raising operation switch 23.
A pilot fluid pressure magnitude signal which comprises a current output and a B current output according to an operation command from the second boom lowering operation switch 24, and controls the opening of the flow proportional switching valve 34 which determines the expansion and contraction speed of the second boom cylinder 11. As a control signal for the proportional electromagnetic pressure reducing valve 35 or 36. 33 is a hydraulic pump.

【0025】ここで、第2ブーム4を上げ/下げする際
の速度は、安全性や作業効率を考慮してアーム5先端の
対地高さ位置Hに応じて変えるようにしている(図3
(a)(b)参照)。図3に示すように、上記2ピース
ブーム機構のアーム5先端が対地GLを境にした上方向の
設定高さと下方向の設定深さとの上下範囲ΔH内に位置
する動態のときに、第2ブーム上げ動作をすると漸増増
速、第2ブーム下げ動作をすると漸減減速となるように
している。すなわち、アーム5先端の対地GLを境にして
上下方向の高さと深さの設定範囲ΔHにわたって第2ブ
ーム4の上げ/下げの動作速度を徐々に速め又は遅くし
て動作できるようにしているのである。また、対地GLを
境にした下方向の設定深さ範囲を超えてアーム5先端が
位置する動態のときには、第2ブーム4の起伏動作を上
記漸減速度以下の一定の低速度で動く動作速度とし、対
地GLを境にした上方向の設定高さ範囲を超えてアーム5
先端が位置する動態のときには、第2ブーム4の起伏動
作を上記漸増速度以上の一定の高速度で動く動作速度と
なるようにしている。
Here, the speed at which the second boom 4 is raised / lowered is changed according to the height H of the tip of the arm 5 in consideration of safety and work efficiency (FIG. 3).
(See (a) and (b)). As shown in FIG. 3, when the tip of the arm 5 of the two-piece boom mechanism is in a dynamic state in which it is located within a vertical range ΔH between an upper set height and a lower set depth bordering the ground GL, the second When the boom raising operation is performed, the speed is gradually increased, and when the second boom lowering operation is performed, the speed is gradually reduced. That is, the operation speed of raising / lowering the second boom 4 is gradually increased or decreased over the set range ΔH of the height and the depth in the vertical direction from the ground GL at the tip of the arm 5 so that the operation can be performed. is there. When the tip of the arm 5 is located beyond the set depth range below the ground GL, the up-and-down movement of the second boom 4 is set to an operation speed that moves at a constant low speed equal to or lower than the above-described gradually decreasing speed. , Arm 5 beyond the set height range above the ground GL
When the tip is in a dynamic state, the undulating operation of the second boom 4 is set to an operation speed at which the second boom 4 moves at a constant high speed equal to or higher than the above-described gradually increasing speed.

【0026】上記第2ブーム操作動作制御装置によれ
ば、バケット6が対地GLに近接していく下げのとき、及
び対地GLからさらに下降していく下げのときには第2ブ
ーム4の下げ速度を次第に遅くなるようにして地下構築
物との干渉を避けるための慎重なバケット6の移動操作
が得られる。またバケット6を対地GLよりも深い位置か
ら上げるとき、及び対地GLからさらに上方に上げるとき
には第2ブーム4の上げ速度が次第に速くなるようにし
て速いバケット6の移動操作が得られ、位置に応じて連
続的に速度変化する第2ブーム4の動作速度調整ができ
て、安全作業と作業効率の向上を期することが可能とな
る。従って、管工事のような掘削作業においても従来の
ような切梁Aとバケット6との接触事故等の危険性を確
実に回避することが可能となる。また第2ブーム4の動
作速度を不必要に低下させることもないので、作業効率
を向上させることが可能である。しかも、慎重な作業機
移動と速い作業機移動の連続的な可変移動を速度調整を
加えることなく自動的に得られて、操作性を向上するこ
とが可能となる。
According to the second boom operation control device, the lowering speed of the second boom 4 is gradually increased when the bucket 6 is lowered closer to the ground GL and further lowered from the ground GL. Careful movement of the bucket 6 can be obtained so as to be slow and avoid interference with the underground structure. When raising the bucket 6 from a position deeper than the ground GL and further raising the ground 6 from the ground GL, the raising speed of the second boom 4 is gradually increased so that a quick operation of moving the bucket 6 is obtained. As a result, the operating speed of the second boom 4 that continuously changes in speed can be adjusted, and it is possible to improve safe work and work efficiency. Therefore, even in the excavation work such as the pipe work, it is possible to reliably avoid the danger such as the conventional contact accident between the cutting beam A and the bucket 6. In addition, since the operation speed of the second boom 4 is not unnecessarily reduced, the working efficiency can be improved. In addition, continuous variable movement of careful and quick movement of the working machine can be automatically obtained without any speed adjustment, so that operability can be improved.

【0027】(第2実施形態)上記実施形態において
は、第2ブーム4を上げ/下げする速度をアーム5先端
の対地高さ位置Hに応じて変えるようにしているが、上
記第2ブーム角度センサ42及びアーム角度センサ43
の付設を省略し、第2ブーム4を上げ/下げする際の速
度を、図4に示すように、第1ブーム3の対地角αに応
じて変えるようにしてもよい。すなわち図4に示すよう
に、対地角αが−10度〜10度と、10度〜40度、
40度〜112度の場合に分けて第2ブーム4の上げ/
下げの際の速度を変えるのである。具体的にいうと、図
4(a)(b)にも示しているように、対地角αが−1
0度〜10度の間はやや低速(一定)とし、また40度
〜112度の間は高速(一定)とし、さらに10度〜4
0度の間は操作速度を対地角αに比例させて徐々に増速
又は徐々に減速するように制御するのである。このよう
に第1ブーム3の対地角αの値が小さい時には第2ブー
ム4の上げ/下げの速度をゆっくりとし、対地角αが大
きい場合には上げ/下げの速度を早くすることによって
も、安全性を保ちつつ作業効率の向上を図ることができ
る。なおその他の制御構成は上記第1実施形態と全く同
様であるので、ここではその説明を省略する。
(Second Embodiment) In the above embodiment, the speed at which the second boom 4 is raised / lowered is changed in accordance with the ground height position H at the tip of the arm 5; Sensor 42 and arm angle sensor 43
May be omitted, and the speed when raising / lowering the second boom 4 may be changed according to the ground angle α of the first boom 3 as shown in FIG. That is, as shown in FIG. 4, the ground angle α is −10 degrees to 10 degrees, 10 degrees to 40 degrees,
Raise the second boom 4 in the case of 40 degrees to 112 degrees /
Change the speed of the lowering. Specifically, as shown in FIGS. 4A and 4B, the ground angle α is −1.
The speed is slightly low (constant) between 0 ° and 10 °, high speed (constant) between 40 ° and 112 °, and further 10 ° -4
During 0 degrees, the operation speed is controlled so as to increase or decrease gradually in proportion to the ground angle α. Thus, when the value of the ground angle α of the first boom 3 is small, the raising / lowering speed of the second boom 4 is made slow, and when the ground angle α is large, the raising / lowering speed is made faster. Work efficiency can be improved while maintaining safety. Note that the other control configuration is completely the same as that of the first embodiment, and the description thereof is omitted here.

【0028】上記のように第2ブーム上げスイッチ23
あるいは第2ブーム下げスイッチ24を操作すると、下
げの場合は、第2ブーム4は、第1ブーム3が地表側に
下がるほど除々に速度が遅くなって一定の低速速度に切
換わって動き、地下構築物と作業機が干渉する恐れのあ
るような狭隘な場所のときには作業安全に有効な速度と
なり、また、上げの場合には、第2ブーム4は、第1ブ
ーム3が地表側に上がるほど除々に速度が上がって一定
の高速速度に切り換わり、次の作業地点への作業機の移
動を速くし、作業効率を向上することができる。
As described above, the second boom raising switch 23
Alternatively, when the second boom lowering switch 24 is operated, in the case of lowering, the speed of the second boom 4 gradually decreases as the first boom 3 moves down to the surface of the ground, and the second boom 4 moves to a constant low speed to move. In a narrow place where there is a risk of interference between the building and the work machine, the speed becomes effective for work safety. In the case of raising, the second boom 4 gradually moves as the first boom 3 rises to the ground surface side. Then, the speed is increased and the speed is switched to a constant high speed, so that the movement of the work machine to the next work point can be speeded up, and work efficiency can be improved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の2ピースブーム作業機の第2ブーム操
作動作制御装置の第1実施形態の建設車両のブロック図
である。
FIG. 1 is a block diagram of a construction vehicle according to a first embodiment of a second boom operation motion control device of a two-piece boom working machine of the present invention.

【図2】上記実施形態の左右の操作レバーの斜視図であ
る。
FIG. 2 is a perspective view of left and right operation levers of the embodiment.

【図3】(a)〜(c)は上記第1実施形態において第
1ブームの対地高さ位置Hに対応して第2ブームの上げ
/下げ時の速度を変えている状態を示している説明図で
ある。
FIGS. 3 (a) to 3 (c) show a state in which the speed at the time of raising / lowering the second boom is changed according to the ground height position H of the first boom in the first embodiment. FIG.

【図4】(a)〜(c)はこの発明の第2実施形態にお
いて第1ブームの対地角度αに対応して第2ブームの上
げ/下げ時の速度を変えている状態を示している説明図
である。
FIGS. 4A to 4C show a state in which the speed of raising / lowering the second boom is changed according to the ground angle α of the first boom in the second embodiment of the present invention. FIG.

【図5】本発明の実施の形態の多関節型フロント作業装
置を備えた建設車両の構成図である。
FIG. 5 is a configuration diagram of a construction vehicle provided with the articulated front working device according to the embodiment of the present invention.

【符号の説明】[Explanation of symbols]

1 上部旋回体 2 多関節型フロント作業装置 3 第1ブーム 4 第2ブーム 5 アーム 6 バケット(作業機) 16 第1操作レバー 18 第2操作レバー 23 第2ブーム上げスイッチ 24 第2ブーム下げスイッチ 31 コントローラ 34 流量比例切換弁(第2ブーム動作アクチュエータ
制御弁) 35 比例電磁減圧弁 36 比例電磁減圧弁 41 第1ブーム角度センサ(角度センサ) 42 第2ブーム角度センサ(角度センサ) 43 アーム角度センサ(角度センサ)
REFERENCE SIGNS LIST 1 upper revolving unit 2 articulated front working device 3 first boom 4 second boom 5 arm 6 bucket (working machine) 16 first operation lever 18 second operation lever 23 second boom up switch 24 second boom down switch 31 Controller 34 Flow proportional switching valve (second boom operation actuator control valve) 35 Proportional electromagnetic pressure reducing valve 36 Proportional electromagnetic pressure reducing valve 41 First boom angle sensor (angle sensor) 42 Second boom angle sensor (angle sensor) 43 Arm angle sensor ( Angle sensor)

───────────────────────────────────────────────────── フロントページの続き (72)発明者 安藤 豪修 石川県小松市符津町ツ23番地 株式会社小 松製作所粟津工場内 Fターム(参考) 2D003 AA01 AB03 AB04 BA01 BA02 BB02 CA02 DA03 DA04 DB04 DB05 EA00  ──────────────────────────────────────────────────続 き Continuing on the front page (72) Inventor Goshu Ando 23, Tsutsucho-cho, Komatsu-shi, Ishikawa Pref.

Claims (7)

【特許請求の範囲】[Claims] 【請求項1】 上部旋回体(1)に対して、第1ブーム
(3)と第2ブーム(4)を関節結合し、さらに上記第
2ブーム(4)の先端側に、バケット等の作業機(6)
を装備したアーム(5)を関節結合して成る多関節型フ
ロント作業装置(2)を取り付け、多関節型フロント作
業装置(2)及び上部旋回体(1)を操作する操作レバ
ー(16)(18)のいずれか一方側の操作レバーに第
2ブーム(4)の上げ動作と下げ動作を指令する上げ動
作スイッチ(23)と下げ動作スイッチ(24)とを設
けると共に、上記上げ動作スイッチ(23)又は下げ動
作スイッチ(24)が起動されたときに、2ピースブー
ム構成機構の動態位置に応じて、第2ブーム(4)の上
下動作速度を漸増と漸減にする動作速度を含む動作速度
制御手段を介して操作されるようにしたことを特徴とす
る2ピースブーム作業機の第2ブーム操作動作制御装
置。
1. A first boom (3) and a second boom (4) are articulated to an upper revolving structure (1), and a work such as a bucket is provided on the tip end side of the second boom (4). Machine (6)
A multi-joint type front working device (2), which is formed by articulating an arm (5) equipped with an arm, is attached, and an operation lever (16) ( 18), an operation switch (23) and a lowering operation switch (24) for instructing the raising operation and the lowering operation of the second boom (4) are provided on one of the operation levers, and the raising operation switch (23) is provided. ) Or when the lowering operation switch (24) is actuated, the operation speed control including an operation speed for gradually increasing and decreasing the up-and-down operation speed of the second boom (4) according to the dynamic position of the two-piece boom construction mechanism. A second boom operation motion control device for a two-piece boom working machine, wherein the second boom operation motion control device is operated via a means.
【請求項2】 上記第2ブーム(4)の動作速度制御手
段の漸増と漸減とは、上記2ピースブーム機構のアーム
(5)先端が対地(GL)を境にした上方向の設定高さと
下方向の設定高さとの上下範囲(ΔH)内に位置する動
態のときに、第2ブーム上げ動作をすると漸増増速、第
2ブーム下げ動作をすると漸減減速となるようにしてい
ることを特徴とする請求項1の2ピースブーム作業機の
第2ブーム操作動作制御装置。
2. The gradual increase and decrease of the operation speed control means of the second boom (4) means that the tip of the arm (5) of the two-piece boom mechanism has an upward set height with respect to a ground (GL). When the dynamic range is within the vertical range (ΔH) with the set height in the downward direction, the second boom raising operation is gradually increased and the second boom lowered operation is gradually decreased and decelerated. The second boom operating motion control device for a two-piece boom working machine according to claim 1, wherein
【請求項3】 上記第2ブーム(4)の動作速度制御手
段の漸増と漸減とは、対地(GL)を境にした下方向の設
定深さ範囲を超えて2ピースブーム機構のアーム(5)
先端が位置する動態のときには、第2ブーム(4)の起
伏動作を上記漸減速度以下の一定の低速度で動く動作速
度とし、対地(GL)を境にした上方向の設定高さ範囲を
超えて2ピースブーム機構のアーム(5)先端が位置す
る動態のときには、第2ブーム(4)の起伏動作を上記
漸増速度以上の一定の高速度で動く動作速度とした速度
範囲を含むことを特徴とする請求項2の2ピースブーム
作業機の第2ブーム操作動作制御装置。
3. The gradual increase and decrease of the operating speed control means of the second boom (4) is performed by exceeding the set depth range below the ground (GL) with the arm (5) of the two-piece boom mechanism. )
When the tip is in a dynamic state, the undulating movement of the second boom (4) is set to a movement speed that moves at a constant low speed that is equal to or lower than the above-mentioned gradually decreasing speed, and exceeds a set height range above the ground (GL). In the case of a dynamic state in which the tip of the arm (5) of the two-piece boom mechanism is located, a speed range in which the undulating operation of the second boom (4) moves at a constant high speed equal to or higher than the above-mentioned gradually increasing speed is included. The second boom operating motion control device for a two-piece boom working machine according to claim 2, wherein
【請求項4】 上記第2ブーム(4)の動作速度制御手
段は、2ピースブーム機構の第1ブーム(3)、第2ブ
ーム(4)、アーム(5)に備えた角度センサ(41)
(42)(43)による角度検出信号からアーム(5)
先端における上下方向の高さ位置(H)を検出する検出
手段と、高さ位置(H)に応じた第2ブーム上げと第2
ブーム下げの動作速度を定めた速度テーブルと、速度テ
ーブルのデータを電流値に変えて出力する出力手段とか
ら成るコントローラ(31)を有し、第2ブーム動作ア
クチュエータ制御弁(34)の作動パイロット圧流体を
制御し、第2ブーム動作アクチュエータ制御弁(34)
のアクチュエータ作動流体通過の開口面積を変える第2
ブーム上げと第2ブーム下げの電磁比例減圧弁(35)
(36)を、上記出力電流値に応答して作動するように
したことを特徴とする請求項1〜請求項3のいずれかの
2ピースブーム作業機の第2ブーム操作動作制御装置。
4. The operation speed control means of the second boom (4) includes an angle sensor (41) provided on the first boom (3), the second boom (4), and the arm (5) of the two-piece boom mechanism.
(42) Arm (5) from the angle detection signal from (43)
Detecting means for detecting a vertical height position (H) at the tip, and raising and lowering a second boom according to the height position (H);
A controller (31) comprising a speed table that determines the operating speed of the boom lowering and output means for converting the data in the speed table into a current value and outputting the current value; and an operating pilot for the second boom operation actuator control valve (34). A second boom operation actuator control valve for controlling the pressurized fluid (34)
Second changing the opening area of the actuator working fluid passage
Electromagnetic proportional pressure reducing valve for boom raising and second boom lowering (35)
The second boom operation motion control device for a two-piece boom working machine according to any one of claims 1 to 3, wherein (36) operates in response to the output current value.
【請求項5】 上記第2ブーム(4)の動作速度制御手
段の漸増と漸減とは、2ピースブーム機構の第1ブーム
(3)の対地角度(α)が対地に接近した設定対地角度
範囲内に位置する動態のときに、第1ブーム(3)の対
地角度(α)が小さくなっていくときには第2ブーム
(4)の動作速度が漸減減速し、第1ブーム(3)の対
地角度(α)が大きくなっていくときには第2ブーム
(4)の動作速度が漸増増速するようにしていることを
特徴とする請求項1の2ピースブーム作業機の第2ブー
ム操作動作制御装置。
5. The gradual increase and decrease of the operating speed control means of the second boom (4) is based on a set ground angle range in which the ground angle (α) of the first boom (3) of the two-piece boom mechanism approaches the ground. When the ground angle (α) of the first boom (3) becomes smaller when the dynamics are located within, the operation speed of the second boom (4) gradually decreases and decelerates, and the ground angle of the first boom (3) decreases. The second boom operation control device for a two-piece boom working machine according to claim 1, wherein the operation speed of the second boom (4) gradually increases when (α) increases.
【請求項6】 上記第2ブーム(4)の動作速度制御手
段の漸増と漸減とは、2ピースブーム機構の第1ブーム
(3)の対地角度(α)が設定対地角度範囲以下を超え
た対地角度範囲に位置する動態のときには、第2ブーム
起伏動作を上記漸減速度以下の一定の低速度で動く動作
速度とし、2ピースブーム機構の第1ブーム(3)の対
地角度(α)が設定対地角度範囲以上を超えた対地角度
範囲に位置する動態のときには、第2ブーム起伏動作を
上記漸増速度以上の一定の高速度で動く動作速度とした
速度範囲を含むことを特徴とする請求項5の2ピースブ
ーム作業機の第2ブーム操作動作制御装置。
6. The gradual increase and decrease of the operating speed control means of the second boom (4) is such that the ground angle (α) of the first boom (3) of the two-piece boom mechanism exceeds a set ground angle range or less. In the case of a movement located in the ground angle range, the second boom up / down operation is set to an operation speed moving at a constant low speed equal to or lower than the above-described gradually decreasing speed, and the ground angle (α) of the first boom (3) of the two-piece boom mechanism is set. 6. A speed range in which the second boom undulating operation is an operation speed that moves at a constant high speed that is equal to or higher than the above-mentioned gradually increasing speed, when the dynamic state is located in a ground angle range exceeding the ground angle range or more. The second boom operating motion control device of the two-piece boom working machine of (1).
【請求項7】 上記第2ブーム(4)の動作速度制御手
段は、2ピースブーム機構の第1ブーム(3)に備えた
角度センサ(41)による角度検出信号から第1ブーム
(3)の対地角度(α)を検出する検出手段と、第1ブ
ーム(3)の対地角度(α)に応じた第2ブーム上げと
第2ブーム下げの動作速度を定めた速度テーブルと、速
度テーブルのデータを電流値に変えて出力する出力手段
とから成るコントローラ(31)を有し、第2ブーム動
作アクチュエータ制御弁(34)の作動パイロット圧流
体を制御し、第2ブーム動作アクチュエータ制御弁(3
4)のアクチュエータ作動流体通過の開口面積を変える
第2ブーム上げと第2ブーム下げの電磁比例減圧弁(3
5)(36)を、上記出力電流値に応答して作動するよ
うにしたことを特徴とする請求項5又は請求項6の2ピ
ースブーム作業機の第2ブーム操作動作制御装置。
7. The operating speed control means of the second boom (4) is configured to control the operation of the first boom (3) based on an angle detection signal from an angle sensor (41) provided on the first boom (3) of the two-piece boom mechanism. Detecting means for detecting the ground angle (α), a speed table defining operating speeds of the second boom raising and the second boom lowering according to the ground angle (α) of the first boom (3), and data of the speed table A controller for controlling the pilot pressure fluid of the second boom operation actuator control valve (34), and a second boom operation actuator control valve (3).
A second boom raising and a second boom lowering electromagnetic proportional pressure reducing valve (3) that changes the opening area of the actuator working fluid passage of (4).
The second boom operating motion control device for a two-piece boom working machine according to claim 5 or 6, wherein (36) is operated in response to the output current value.
JP04755999A 1999-02-25 1999-02-25 2nd boom operation machine second boom operation control device Expired - Fee Related JP4017279B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP04755999A JP4017279B2 (en) 1999-02-25 1999-02-25 2nd boom operation machine second boom operation control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP04755999A JP4017279B2 (en) 1999-02-25 1999-02-25 2nd boom operation machine second boom operation control device

Publications (2)

Publication Number Publication Date
JP2000240105A true JP2000240105A (en) 2000-09-05
JP4017279B2 JP4017279B2 (en) 2007-12-05

Family

ID=12778567

Family Applications (1)

Application Number Title Priority Date Filing Date
JP04755999A Expired - Fee Related JP4017279B2 (en) 1999-02-25 1999-02-25 2nd boom operation machine second boom operation control device

Country Status (1)

Country Link
JP (1) JP4017279B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010084375A (en) * 2008-09-30 2010-04-15 Caterpillar Japan Ltd Hydraulic control device for working machine
JP2013091935A (en) * 2011-10-24 2013-05-16 Kyokuto Kaihatsu Kogyo Co Ltd Concrete pump vehicle
JP2013091936A (en) * 2011-10-24 2013-05-16 Kyokuto Kaihatsu Kogyo Co Ltd Concrete pump vehicle
JP2015227609A (en) * 2015-07-27 2015-12-17 極東開発工業株式会社 Concrete pump vehicle

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2010084375A (en) * 2008-09-30 2010-04-15 Caterpillar Japan Ltd Hydraulic control device for working machine
JP2013091935A (en) * 2011-10-24 2013-05-16 Kyokuto Kaihatsu Kogyo Co Ltd Concrete pump vehicle
JP2013091936A (en) * 2011-10-24 2013-05-16 Kyokuto Kaihatsu Kogyo Co Ltd Concrete pump vehicle
JP2015227609A (en) * 2015-07-27 2015-12-17 極東開発工業株式会社 Concrete pump vehicle

Also Published As

Publication number Publication date
JP4017279B2 (en) 2007-12-05

Similar Documents

Publication Publication Date Title
KR100191391B1 (en) Area limiting excavation control system for construction machines
JP4223893B2 (en) Control method and control device for hydraulic pump for work machine of work vehicle
EP3409846A1 (en) Shovel
KR20150070095A (en) Hydraulic drive device for construction machinery
CN104968863A (en) Construction equipment
JP5615732B2 (en) Excavator
JP2003105795A (en) Drilling control device of hydraulic shovel
JP2000240105A (en) Second boom operation/motion controller for two-piece boom working machine
JPH08302753A (en) Hydraulic construction equipment
JPH09203087A (en) Construction machine
JP4017278B2 (en) Operating device for 2-piece boom type work machine
JP2002021804A (en) Drive control device for hydraulic cylinder and recording medium thereof
JP2001199676A (en) Hydraulic circuit for operation system of construction machine
JP2000355957A (en) Zone restrictive excavation controller for hydraulic shovel
JP3727423B2 (en) Control method of electronically controlled work vehicle
JP3147479B2 (en) Automatic control equipment for construction machinery
JPH06167036A (en) Automatic excavation controller for construction machinery
JP2697499B2 (en) Automatic excavation control device for construction machinery
JP3519215B2 (en) Operation drive of two-piece boom type working machine
JP2682926B2 (en) Backhoe hydraulic controller
JPH09151478A (en) Interference prevention device for construction machine
JP3895439B2 (en) Construction machine work attachment stop control device
JP2000336690A (en) Area restricted excavation control device for construction machine
JP2675231B2 (en) Backhoe
JP2635852B2 (en) Backhoe

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050228

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20061124

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070410

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070601

A131 Notification of reasons for refusal

Effective date: 20070703

Free format text: JAPANESE INTERMEDIATE CODE: A131

A521 Written amendment

Effective date: 20070802

Free format text: JAPANESE INTERMEDIATE CODE: A523

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070918

A61 First payment of annual fees (during grant procedure)

Effective date: 20070918

Free format text: JAPANESE INTERMEDIATE CODE: A61

R150 Certificate of patent (=grant) or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100928

Year of fee payment: 3

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 4

Free format text: PAYMENT UNTIL: 20110928

FPAY Renewal fee payment (prs date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110928

Year of fee payment: 4

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 5

Free format text: PAYMENT UNTIL: 20120928

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 5

Free format text: PAYMENT UNTIL: 20120928

FPAY Renewal fee payment (prs date is renewal date of database)

Year of fee payment: 6

Free format text: PAYMENT UNTIL: 20130928

LAPS Cancellation because of no payment of annual fees