JP2000240024A - Concrete protective wall - Google Patents

Concrete protective wall

Info

Publication number
JP2000240024A
JP2000240024A JP11044995A JP4499599A JP2000240024A JP 2000240024 A JP2000240024 A JP 2000240024A JP 11044995 A JP11044995 A JP 11044995A JP 4499599 A JP4499599 A JP 4499599A JP 2000240024 A JP2000240024 A JP 2000240024A
Authority
JP
Japan
Prior art keywords
block
steel
steel material
concrete
insertion hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP11044995A
Other languages
Japanese (ja)
Other versions
JP3165127B2 (en
Inventor
Yutaka Hiruma
豊 比留間
Tsuyoshi Yamamoto
強 山本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
KOWA CONCRETE KK
Original Assignee
KOWA CONCRETE KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by KOWA CONCRETE KK filed Critical KOWA CONCRETE KK
Priority to JP04499599A priority Critical patent/JP3165127B2/en
Publication of JP2000240024A publication Critical patent/JP2000240024A/en
Application granted granted Critical
Publication of JP3165127B2 publication Critical patent/JP3165127B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

PROBLEM TO BE SOLVED: To save labor for construction to make it economically advantageous by dispensing with a coupler for connecting together steel bars and its connecting work, and facilitating the installation work of a stranded steel wire. SOLUTION: This is a concrete protective wall in which a plurality of concrete blocks respectively formed with steel material insert holes 4 are connected together by tension steel inserted into the steel insert holes while giving tension. In this case, a stranded steel wire 5 is used as tension steel, the one end of the steel material insert hole of the block 2 for fixing steel within a plurality of the concrete blocks is opened toward the crown part 2a of the block, and the end part of the stranded steel wire is fixed to the block for fixing steel material on this opening position.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、高速道路・一般道
路の分離帯、路側壁又は橋梁高欄等として用いられるコ
ンクリート防護壁に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a concrete protection wall used as a separation strip, a road side wall, a bridge railing, or the like of an expressway or a general road.

【0002】[0002]

【従来の技術】上記のようなコンクリート防護壁として
は、例えば特公平6−29492号公報にて開示されて
いるように、緊張用鋼材挿通用の貫通孔をそれぞれ設け
た複数のコンクリートブロックを緊張用鋼材により緊張
力を与えて連結してなるものがある。
2. Description of the Related Art As a concrete protective wall as described above, for example, as disclosed in Japanese Patent Publication No. 29492/1994, a plurality of concrete blocks each having a through hole for inserting a steel material for tension are used. Some steel materials are connected by applying tension.

【0003】ここで、従来のコンクリート防護壁では、
図7および図8に示すように、緊張用鋼材としてPC鋼
棒105が用いられるのが一般的であり、この場合、防
護壁の施工は以下のようにして行われる。
Here, in a conventional concrete protection wall,
As shown in FIGS. 7 and 8, a PC steel bar 105 is generally used as a tension steel material. In this case, the construction of the protective wall is performed as follows.

【0004】まず、50〜60m区間のコンクリートブ
ロック101,102を上層路盤基礎107上に設置す
る。次に、コンクリートブロックの設置作業を一時中断
して、各ブロックの貫通孔104にPC鋼棒105を挿
入する。そして、PC鋼棒105の端部同士を各ブロッ
クの側端部に形成された切り欠き103内に配置したカ
プラー110で接続し、ブロック間の目地部108にセ
メントモルタルを充填する。
First, concrete blocks 101 and 102 in a section of 50 to 60 m are set on an upper subgrade foundation 107. Next, the installation work of the concrete blocks is temporarily interrupted, and the PC steel bars 105 are inserted into the through holes 104 of each block. Then, the ends of the PC steel bars 105 are connected to each other by a coupler 110 arranged in a notch 103 formed at a side end of each block, and a joint mortar 108 between the blocks is filled with cement mortar.

【0005】次に、モルタルの硬化後(例えば、翌日)
に接続したPC鋼棒105に、コンクリートブロック1
02の端部に配置した定着用支板111を介して緊張用
惹起を取り付けてからPC鋼棒を緊張した後、ナット1
12を締め付けることによって緊張力を保持し、これら
のブロック101,102を緊結して連続体とする。そ
して、このように1つの連結体の緊結作業が終了してか
ら、次の区間のブロック設置を行い、以後同様の作業を
繰り返し行う。
Next, after the mortar is cured (for example, the next day)
Concrete block 1 to PC steel rod 105 connected to
After the tension bar is attached via the fixing support plate 111 disposed at the end of the PC steel bar 02 and the PC steel bar is tensioned, the nut 1
Tightening of the block 12 maintains the tension, and the blocks 101 and 102 are tightened to form a continuous body. Then, after the binding work of one connected body is completed, a block is installed in the next section, and thereafter, the same work is repeated.

【0006】[0006]

【発明が解決しようとする課題】しかしながら、上記の
ような施工方法では、1日に施工できる区間が50〜6
0m程度の短いに限られる。これは、カプラー110を
使用してPC鋼棒を接続する必要があるため、緊結作業
においてカプラー110が切り欠き103内でブロック
101に干渉することなく移動できる実際上の長さによ
り制限されるためである。
However, in the above-described construction method, 50 to 6 sections can be constructed in one day.
It is limited to a short length of about 0 m. This is limited by the actual length that the coupler 110 can move within the notch 103 without interfering with the block 101 due to the need to connect the PC steel bars using the coupler 110. It is.

【0007】そして、このように1日に施工できる区間
が短区間に制限されることにより、防護壁全体の施工に
要する日数が多くなり、施工費も割高となってしまうと
いう問題がある。
[0007] In this way, since the section that can be constructed in one day is limited to a short section, there is a problem that the number of days required for constructing the entire protective wall is increased and the construction cost is increased.

【0008】また、上記の施工方法では、全てのブロッ
クに切り欠き103を形成し、また全ての切り欠き10
3をカバーで覆ったりセメントで埋めたりする作業も必
要となるため、ブロック製作時および現場作業時の作業
量が増加してしまうという問題もある。
In the above construction method, the notches 103 are formed in all the blocks, and all the notches 10 are formed.
Since it is also necessary to cover 3 with a cover or to bury it with cement, there is a problem that the amount of work at the time of block production and on-site work increases.

【0009】さらに、このような防護壁では、例えば1
区間のブロックを1つのブロック連続体として見た場
合、ブロック連続体同士が隣接する部分に伸縮目地部を
設け、温度変化によるブロック連続体の伸縮を吸収する
ことができるようにするのが望ましい。しかし、PC鋼
棒を用いる上記工法では、たとえ伸縮目地部を設けたと
しても、その性能を十分に発揮させることが難しいとい
う問題もある。
Further, in such a protective wall, for example, 1
When the blocks in the section are viewed as one block continuum, it is desirable to provide an expansion joint at a portion where the block continuations are adjacent to each other so that the expansion and contraction of the block continuity due to a temperature change can be absorbed. However, the above-described method using a PC steel rod has a problem that it is difficult to sufficiently exhibit its performance even if an expansion joint is provided.

【0010】[0010]

【課題を解決するための手段】上記の課題を解決するた
めに、本願発明では、鋼材挿通孔がそれぞれ形成された
複数のコンクリートブロックを、鋼材挿通孔に挿入した
緊張用鋼材により緊張力を与えて連結してなるコンクリ
ート防護壁であって、緊張用鋼材としてPC鋼より線
等、可撓性を有する撚り線鋼材を用い、複数のコンクリ
ートブロックのうち鋼材定着用ブロックの鋼材挿通孔の
一端をブロック天端部に向けて開口させ、この開口位置
にて撚り線鋼材の端部を鋼材定着用ブロックに定着させ
ている。
In order to solve the above-mentioned problems, in the present invention, a plurality of concrete blocks each having a steel material insertion hole are provided with a tension by a tension steel material inserted into the steel material insertion hole. A concrete protective wall which is connected by connecting a flexible stranded wire steel material such as a PC steel stranded wire as a tension steel material, and connecting one end of a steel material insertion hole of a steel material fixing block among a plurality of concrete blocks. An opening is made toward the top end of the block, and the end of the stranded steel material is fixed to the steel fixing block at this opening position.

【0011】これにより、まず、鋼棒を接続するための
カプラーおよびその接続作業が不要になり、また、撚り
線鋼材の設置作業自体は容易であるので、施工の省力化
が図れ、経済的にも有利となる。
As a result, first, the coupler for connecting the steel rods and the connecting operation thereof are not required, and the installation operation of the stranded wire steel material itself is easy. Is also advantageous.

【0012】また、撚り線鋼材の緊張定着作業を鋼材定
着用ブロックの天端部のみにて行うことができるので、
目地部等へのセメントモルタルの充填作業や撚り線鋼材
の緊張定着作業に関わらず、長い区間(例えば、150
m程度)のブロックの設置作業を連続して最高の施工速
度で進めることが可能になる。
Further, since the tension fixing operation of the stranded wire steel material can be performed only at the top end of the steel material fixing block,
Regardless of the work of filling cement mortar into joints and the like and the work of fixing and twisting the stranded wire steel material, long sections (for example, 150
m) blocks can be installed continuously at the highest construction speed.

【0013】また、鋼材定着用ブロック以外のブロック
には、撚り線鋼材の緊張定着用の切り欠き部を設ける必
要がないので、ブロック製作および現場作業を容易にす
ることが可能となる。
Further, since it is not necessary to provide a cutout portion for tension fixing of the stranded steel material in the blocks other than the steel material fixing block, it is possible to easily manufacture the block and work on site.

【0014】なお、1つの鋼材定着用ブロックに、この
鋼材定着用ブロックの両側にそれぞれ配置されたコンク
リートブロックを連結するための複数の撚り線鋼材の端
部を定着させるようにしてもよい。
The ends of a plurality of stranded steel materials for connecting concrete blocks arranged on both sides of the steel material fixing block may be fixed to one steel material fixing block.

【0015】これにより、少ない数の鋼材定着用ブロッ
クの使用で長区間の防護壁を施工することが可能とな
る。
This makes it possible to construct a long-section protective wall by using a small number of steel fixing blocks.

【0016】また、緊張用鋼材により複数のコンクリー
トブロックが連結されてなるブロック連続体を連設し、
これら連続体同士を連続体連結用撚り線鋼材により連結
する場合にも、上記同様な撚り線鋼材の緊張定着手法を
用いればよい。これにより、連続体の連結作業の容易化
・高速化を図ることが可能となる。
[0016] Further, a block continuum in which a plurality of concrete blocks are connected by a tension steel material is continuously provided,
Even when these continuous bodies are connected to each other by a continuous body connecting stranded wire steel material, a tension fixing method of the stranded wire steel material similar to the above may be used. This makes it possible to facilitate and speed up the connection of the continuum.

【0017】この場合において、連続体連結用撚り線鋼
材により与えられる緊張力を、ブロック連続体の各コン
クリートブロックを連結させる撚り線鋼材により与えら
れる緊張力よりもある程度小さくして、防護壁の性能を
損なうことなく、連続体の隣接部に設けられる伸縮目地
部の機能を確保できるようにするのが望ましい。
In this case, the tension given by the stranded wire material for connecting the continuous body is made somewhat smaller than the tension given by the stranded wire material connecting the concrete blocks of the block continuum, and the performance of the protective wall is improved. It is desirable that the function of the expansion joint portion provided in the adjacent portion of the continuum can be ensured without impairing the structure.

【0018】[0018]

【発明の実施の形態】図1〜図4には、本発明の実施形
態であるコンクリート防護壁を示している。このコンク
リート防護壁は、略台形の断面形状を有する複数のプレ
キャストコンクリートブロック1,2を防食処理が施さ
れたPC鋼撚り線(撚り線鋼材)5により緊張力を与え
て連結して構成されている。
1 to 4 show a concrete protective wall according to an embodiment of the present invention. This concrete protection wall is formed by connecting a plurality of precast concrete blocks 1 and 2 having a substantially trapezoidal cross-sectional shape by applying a tension to a PC steel stranded wire (twisted steel material) 5 subjected to anticorrosion treatment. I have.

【0019】このコンクリート防護壁の施工に用いられ
るプレキャストコンクリートブロックには、PC鋼撚り
線5を挿通させるための挿通孔4のみがブロック上部に
形成された一般用ブロック1と、挿通孔4が形成されて
いるとともにPC鋼撚り線5の端部を定着させるための
切り欠き部3がブロック天端部2aに形成された定着用
ブロック2とがある。
In the precast concrete block used for the construction of the concrete protective wall, a general block 1 in which only an insertion hole 4 for inserting a stranded PC steel wire 5 is formed in the upper part of the block, and an insertion hole 4 are formed. There is a fixing block 2 in which a notch 3 for fixing the end of the stranded PC steel wire 5 is formed at the block top end 2a.

【0020】まず、一般用ブロック1には、図2に示す
ように、ブロック長さ方向にのみ延びる挿通孔4がブロ
ック上部に1本形成されている。
First, as shown in FIG. 2, one insertion hole 4 extending only in the block length direction is formed in the general block 1 in the upper part of the block.

【0021】また、定着用ブロック2には、図1に示す
ように、このブロック2の右側端部から若干図中手前側
に偏りながらブロック左側内部までブロック長さ方向に
延び、さらに斜め上方に延びて、天端部2aにて向けて
開口する挿通孔4′と、このブロック2の左側端部から
若干図中奥側に偏りながらブロック右側内部まで延び、
さらに斜め上方に曲がって延びて天端部2aに向けて開
口する挿通孔4′の2本が形成されている。
As shown in FIG. 1, the fixing block 2 extends in the block length direction from the right end of the block 2 to the inside of the left side of the block while slightly biased toward the front side in the figure, and further extends obliquely upward. An insertion hole 4 ′ extending toward the top end 2 a and extending from the left end of the block 2 to the inside of the right side of the block while slightly biased toward the back in the figure;
Further, two insertion holes 4 ′ that bend obliquely upward and extend toward the top end 2 a are formed.

【0022】なお、これら2本の挿通孔4′は、図3に
示すように、ブロック中央部においてはブロック厚さ方
向(図1中、手前側と奥側)に並んで形成されている。
As shown in FIG. 3, these two insertion holes 4 'are formed side by side in the block thickness direction (the front side and the back side in FIG. 1) at the center of the block.

【0023】また、これら挿通孔4′の天端部2側の端
部はそれぞれ、天端部2aの左右に、図1に示すよう
に、正面視において略直角三角形状となるように形成さ
れた切り欠き部3の短辺側底面にて開口している。
The ends of the insertion holes 4 'on the top end 2 side are formed on the left and right sides of the top end 2a, respectively, so as to form a substantially right triangle in front view as shown in FIG. The notch 3 is open at the bottom surface on the short side.

【0024】さらに、図1には示していないが、防護壁
の端部を構成する定着用ブロックには、天端部に向けて
開口する1本の挿通孔のみを形成すればよい。
Further, although not shown in FIG. 1, the fixing block constituting the end of the protective wall may be formed with only one insertion hole opening toward the top end.

【0025】図4には、上記切り欠き部3を詳しく示し
ている。切り欠き部3の短辺側底面3aには、この底面
3aから一段下がった矩形の支持面部3a′が形成され
ている。上記挿通孔4の天端部2側の開口は、この支持
面部3a′の中央に設けられている。また、長辺側底面
3cにおける天端部2a近傍部分3c′には、底面3c
に対して若干角度が付けられている。
FIG. 4 shows the notch 3 in detail. On the short side bottom surface 3a of the cutout portion 3, a rectangular support surface portion 3a 'is formed, which is one step lower than the bottom surface 3a. The opening on the top end 2 side of the insertion hole 4 is provided at the center of the support surface 3a '. A portion 3c 'near the top end 2a on the long side bottom surface 3c is provided with a bottom surface 3c.
Slightly angled with respect to

【0026】これらブロック1,2により構成されるコ
ンクリート防護壁を道路等に施工する場合、まず、舗装
面から一段下がって形成された上層路盤基礎7上の1施
工区間(例えば、各ブロック1,2の長さが5m程度と
すると、150m程度以上の区間)に、複数の一般用ブ
ロック1と1つの定着用ブロック2とを交互に並べてい
く。各ブロックの隣接空間には、PC鋼撚り線5を通す
ためのシース(図示せず)が配置される。
When constructing a concrete protective wall composed of these blocks 1 and 2 on a road or the like, first, one construction section (for example, each block 1 and 2) on the upper subgrade foundation 7 formed one step below the pavement surface is formed. Assuming that the length 2 is about 5 m, a plurality of general blocks 1 and one fixing block 2 are alternately arranged in a section of about 150 m or more. A sheath (not shown) for passing the PC steel stranded wire 5 is arranged in a space adjacent to each block.

【0027】次に、複数の一般用ブロック1を挟む2つ
の定着用ブロック2のうち一方の定着用ブロック2の挿
通孔4′の切り欠き部3内の開口からPC鋼撚り線5を
挿入していき、他方の定着用ブロック2の挿通孔4′の
切り欠き部3内の開口から延出させる。
Next, the PC steel stranded wire 5 is inserted from the opening in the cutout 3 of the insertion hole 4 ′ of one of the two fixing blocks 2 sandwiching the plurality of general blocks 1. The other fixing block 2 is extended from the opening in the cutout 3 of the insertion hole 4 ′ of the other fixing block 2.

【0028】なお、各ブロックと上層路盤基礎7との間
にドライモルタル6が充填される。また、各ブロックの
隣接空間には、セメントモルタルが充填され、目地部8
が形成される。
Dry mortar 6 is filled between each block and the upper subgrade foundation 7. In addition, the space adjacent to each block is filled with cement mortar,
Is formed.

【0029】次に、目地部8のセメントモルタルの硬化
を待ってPC鋼撚り線5の緊張定着作業を行う。具体的
には、図4に示すように、両側の定着用ブロック2,2
の各切り欠き部3内の開口から延出したPC鋼撚り線5
の端部(実際には余長部分があって長く延出するが、図
では省略)に、中央に貫通孔が形成された定着用支圧板
11および円筒形の定着用スリーブ12を通して緊張用
ジャッキにて緊張し、定着用ウエッジ13を押し込んで
PC鋼撚り線5に緊張力を与える。定着用支圧板11
は、切り欠き部3の支持面部3a′に圧接してPC鋼撚
り線5の緊張力を支える。これにより、両側の定着用ブ
ロック2,2とこれらに挟まれた複数の一般用ブロック
1は緊張力が与えられた状態で連結される。
Next, after the cement mortar of the joint portion 8 has hardened, the tension fixing operation of the PC steel stranded wire 5 is performed. More specifically, as shown in FIG.
PC steel stranded wire 5 extending from the opening in each cutout 3
At the end (actually, it has a surplus portion and extends long, but is omitted in the figure), through a fixing support plate 11 having a through hole formed in the center and a cylindrical fixing sleeve 12, a tension jack is provided. And the fixing wedge 13 is pushed in to apply tension to the PC steel stranded wire 5. Fixing support plate 11
Presses against the support surface 3 a ′ of the notch 3 to support the tension of the stranded PC steel wire 5. Thus, the fixing blocks 2 and 2 on both sides and the plurality of general blocks 1 sandwiched therebetween are connected in a state where a tension is applied.

【0030】この後、PC鋼撚り線5の端部のうち余分
な部分(切り欠き部3内に収まらない部分)がカットさ
れ、切り欠き部3がセメントモルタルで埋められる。
After that, an extra portion (a portion that does not fit in the notch portion 3) of the end portion of the PC steel stranded wire 5 is cut, and the notch portion 3 is filled with cement mortar.

【0031】本実施形態によれば、PC鋼棒を緊張用鋼
材として用いる従来の防護壁に対して、ブロック間でP
C鋼棒を接続するためのカプラーおよびその接続作業が
が不要になる。このため、施工が容易になる。
According to the present embodiment, the conventional protective wall using a PC steel rod as a tension steel material has a P
The coupler for connecting the C steel bar and the connecting operation thereof are not required. For this reason, construction becomes easy.

【0032】また、PC鋼撚り線5の緊張定着作業を定
着用ブロック2の天端部2aのみにて行うことができる
ので、目地部8へのセメントモルタルの充填作業やPC
鋼撚り線5の緊張定着作業に関わらず、長い区間(例え
ば、150m程度)のブロックの設置作業を連続して最
高の施工速度で進めることができる。
Further, since the tension fixing operation of the PC steel stranded wire 5 can be performed only at the top end 2a of the fixing block 2, the cement mortar filling operation into the joint portion 8 or the PC fixing operation can be performed.
Regardless of the tension fixing work of the steel stranded wire 5, the installation work of the block in a long section (for example, about 150 m) can be continuously performed at the highest construction speed.

【0033】さらに、切り欠き部3は少ない数の定着用
ブロック2にのみ設ければよいので、多数使用される一
般用ブロック1の製作を容易にすることができる。ま
た、切り欠き部3のセメントモルタル埋め作業も少ない
数の切り欠き部3に対してのみ行えばよいので、現場作
業を容易にすることができる。
Further, since the notch portion 3 needs to be provided only in a small number of fixing blocks 2, it is possible to easily manufacture a large number of general blocks 1. Further, since the work of filling the cutouts 3 with cement mortar only needs to be performed for a small number of cutouts 3, the on-site work can be facilitated.

【0034】また、1つの定着用ブロック2に、この定
着用ブロック2の両側にそれぞれ配置されたブロックを
連結するための2本のPC鋼撚り線5の端部を定着させ
るようにしているので、少ない数の定着用ブロック2の
使用で長区間の防護壁を施工することができる。
Also, the ends of the two twisted PC steel wires 5 for connecting the blocks arranged on both sides of the fixing block 2 to one fixing block 2 are fixed. By using a small number of fixing blocks 2, a long-distance protection wall can be constructed.

【0035】次に、上記実施形態のようにして連結され
たコンクリートブロック1,2により構成されるブロッ
ク連続体(例えば、コンクリート防護壁の1区間を構成
する連続体)同士を連結する場合について、図5および
図6を用いて説明する。
Next, a case where block continuities (for example, a continuum forming one section of a concrete protection wall) composed of concrete blocks 1 and 2 connected as in the above embodiment are connected to each other will be described. This will be described with reference to FIGS.

【0036】図5において隣接配置された2つの定着用
ブロック2は、連結される2つの連続体A,Bの端部を
構成するものである。
In FIG. 5, two fixing blocks 2 arranged adjacent to each other form ends of two continuous bodies A and B to be connected.

【0037】これら定着用ブロック2には、図6にも示
すように、各連続体A,B内のブロックの連結に用いら
れるPC鋼撚り線5を挿通させ、その端部を天面部2a
にて定着させるための1本の挿通孔4′が形成されてい
るとともに、この挿通孔4′の下側には、後述する連続
体連結用のPC鋼撚り線45を挿通させるための、ブロ
ック長さ方向にのみ延びる挿通孔44が形成されてい
る。
As shown in FIG. 6, a stranded PC steel wire 5 used to connect the blocks in each of the continuous bodies A and B is inserted into these fixing blocks 2, and the ends of the strands are connected to the top surface 2a.
A single insertion hole 4 'for fixing is formed, and a block for inserting a PC steel stranded wire 45 for connecting a continuous body to be described later is inserted below the insertion hole 4'. An insertion hole 44 extending only in the length direction is formed.

【0038】また、各連続体A,B内において、上記2
つの定着用ブロック2に隣接配置された定着用ブロック
42には、一般用ブロック1と同様のPC鋼撚り線5を
挿通させるための挿通孔4が形成されているとともに、
連続体連結用のPC鋼撚り線45を挿通させ、その端部
を天端部42aにて定着させるための挿通孔44′が形
成されている。挿通孔44′のうちブロック長さ方向に
のみ延びる部分は、挿通孔4の下側に形成されている。
In each of the continuum bodies A and B,
The fixing block 42 disposed adjacent to the two fixing blocks 2 is formed with an insertion hole 4 for inserting the same PC steel stranded wire 5 as the general block 1, and
An insertion hole 44 'is formed for inserting the stranded PC steel wire 45 for connecting the continuous body and fixing the end at the top end 42a. A portion of the insertion hole 44 ′ extending only in the block length direction is formed below the insertion hole 4.

【0039】なお、挿通孔44′の天端部42a側の端
部は、図4にて説明したのと同様の切り欠き部3の短辺
側底面にて開口している。
The end of the insertion hole 44 'on the side of the top end 42a is open at the bottom surface on the short side of the notch 3 similar to that described with reference to FIG.

【0040】このように構成されたブロック連続体A,
Bを連結する場合、まず、隣接する2つの定着用ブロッ
ク2のうち一方の定着用ブロック2の挿通孔44′の切
り欠き部3内の開口から連続体連結用のPC鋼撚り線4
5を挿入していき、他方の定着用ブロック2の挿通孔4
4′の切り欠き部3内の開口から延出させる。
The block continuum A constructed as described above,
B, first, a PC steel stranded wire 4 for connecting a continuum from the opening in the cutout 3 of the insertion hole 44 ′ of one of the two adjacent fixing blocks 2.
5 is inserted into the other fixing block 2 through the insertion hole 4.
It extends from the opening in the notch 3 of 4 '.

【0041】次に、連続体A,B(定着用ブロック2,
2)の隣接空間に伸縮可能な目地材を充填して伸縮目地
部9を形成する。この伸縮目地部9は、各連続体の温度
変化等による伸縮を吸収するためのものである。
Next, the continuum A, B (fixing block 2,
The expandable joint part 9 is formed by filling the expandable joint material in the adjacent space of 2). The expansion joint 9 absorbs expansion and contraction of each continuum due to a temperature change or the like.

【0042】次に、連続体連結用のPC鋼撚り線45の
緊張定着作業および切り欠き部3のセメントモルタル埋
め作業を行う。緊張定着作業は、図4を用いて先に説明
したものと同様に行う。
Next, a tension fixing operation of the PC steel stranded wire 45 for connecting the continuous body and a cement mortar filling operation of the notch 3 are performed. The tension fixing operation is performed in the same manner as described above with reference to FIG.

【0043】ここで、連続体連結用のPC鋼撚り線45
に与えられる緊張力は、各連続体A,B内のブロック連
結に用いられるPC鋼撚り線5に与えられる緊張力に比
べて若干小さく設定される。これにより、上述した伸縮
目地部9の機能を十分に発揮させることができるととも
に、車両等の衝突時における防護壁としての性能をも十
分に確保することができる。
Here, a stranded PC steel wire 45 for connecting a continuous body is used.
Is set to be slightly smaller than the tension applied to the stranded PC steel wire 5 used for connecting the blocks in each of the continuous bodies A and B. Thereby, while the function of the above-mentioned expansion joint part 9 can be fully exhibited, the performance as a protective wall at the time of a collision of vehicles etc. can also be fully ensured.

【0044】なお、連続体連結用のPC鋼撚り線45を
定着させる定着用ブロック42の連続体内での位置は、
図5に示すものに限られない。また、連続体の端部を構
成する定着用ブロック2にPC鋼撚り線45を定着させ
るようにしてもよい。
The position of the fixing block 42 for fixing the PC steel stranded wire 45 for connecting the continuous body in the continuous body is as follows.
It is not limited to the one shown in FIG. Moreover, you may make it fix the PC steel stranded wire 45 to the fixing block 2 which comprises the edge part of a continuous body.

【0045】[0045]

【発明の効果】以上説明したように、本発明によれば、
まず、緊張用鋼材として撚り線鋼材を用いているので、
鋼棒を用いる従来の防護壁に対して、鋼棒を接続するた
めのカプラーおよびその接続作業が不要になり、また、
撚り線鋼材の設置作業自体は容易であるので、施工の省
力化が図れ、経済的にも有利なコンクリート防護壁を実
現することができる。
As described above, according to the present invention,
First, since stranded wire steel is used as the tension steel,
The conventional protective wall using steel bars eliminates the need for couplers for connecting steel bars and their connection work,
Since the installation work of the stranded wire steel material itself is easy, labor saving of construction can be achieved, and an economically advantageous concrete protective wall can be realized.

【0046】しかも、本発明によれば、連結する複数の
コンクリートブロックのうち鋼材定着用ブロックの鋼材
挿通孔の一端をブロック天端部に向けて開口させ、この
開口位置にて撚り線鋼材の端部を鋼材定着用ブロックに
定着させるようにしているので、撚り線鋼材の緊張定着
作業を鋼材定着用ブロックの天端部のみにて行うことが
できる。したがって、目地部等へのセメントモルタルの
充填作業や撚り線鋼材の緊張定着作業に関わらず、長い
1区間(例えば、150m程度)のブロックの設置作業
を連続して最高の施工速度で進めることができる。
Further, according to the present invention, one end of the steel material insertion hole of the steel material fixing block among the plurality of concrete blocks to be connected is opened toward the top end of the block, and the end of the stranded steel material is opened at this opening position. Since the portion is fixed to the steel fixing block, the tension fixing operation of the stranded steel material can be performed only at the top end of the steel fixing block. Therefore, regardless of the work of filling cement mortar into joints and the like and the work of fixing tension of stranded wire steel, it is possible to continuously perform the installation work of a block of one long section (for example, about 150 m) at the highest construction speed. it can.

【0047】さらに、鋼材定着用ブロック以外のブロッ
クには、撚り線鋼材の定着用の切り欠き部を設ける必要
がないので、ブロック製作および現場作業を容易にする
ことができる。
Further, it is not necessary to provide a cutout for fixing the stranded steel material in the blocks other than the steel material fixing block, so that block production and on-site work can be facilitated.

【0048】また、1つの鋼材定着用ブロックに、この
鋼材定着用ブロックの両側にそれぞれ配置されたコンク
リートブロックを連結するための複数の撚り線鋼材の端
部を定着させるようにすれば、少ない数の鋼材定着用ブ
ロックの使用で長区間の防護壁を施工することができ
る。
In addition, if one steel fixing block is fixed to the ends of a plurality of stranded wire steels for connecting concrete blocks arranged on both sides of the steel fixing block, a small number can be obtained. By using the steel fixing block, a long section protective wall can be constructed.

【0049】また、緊張用鋼材により複数のコンクリー
トブロックを連結してなるブロック連続体を連設して防
護壁を構成し、これら連続体同士を連続体連結用撚り線
鋼材により連結する場合にも、上記同様な撚り線鋼材の
緊張定着手法を用いることにより、連続体の連結作業の
容易化・高速化を図ることができる。
Further, in a case where a block continuous body formed by connecting a plurality of concrete blocks with a tension steel material is connected to form a protective wall, and these continuous bodies are connected to each other by a stranded wire steel material for connecting a continuous body. By using the same technique of tensioning and fixing a stranded wire steel material as described above, the connection operation of the continuum can be facilitated and speeded up.

【0050】そして、この場合、連続体連結用撚り線鋼
材により与えられる緊張力を、ブロック連続体の各コン
クリートブロックを連結させる撚り線鋼材により与えら
れる緊張力よりもある程度小さくすれば、防護壁として
の性能を損なうことなく、連続体の隣接部に設けられる
伸縮目地部の機能を確保することができる。
In this case, if the tension given by the stranded wire steel for connecting the continuous body is made somewhat smaller than the tension given by the stranded wire steel connecting the concrete blocks of the block continuum, the protection wall can be used. The function of the expansion joint provided in the adjacent part of the continuum can be secured without impairing the performance of the above.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の実施形態であるコンクリート防護壁の
正面図。
FIG. 1 is a front view of a concrete protection wall according to an embodiment of the present invention.

【図2】図1のコンクリート防護壁のa−a線断面図。FIG. 2 is a sectional view taken along line aa of the concrete protection wall of FIG.

【図3】図1のコンクリート防護壁のb−b線断面図。FIG. 3 is a sectional view taken along line bb of the concrete protection wall of FIG. 1;

【図4】上記コンクリート防護壁を構成する定着用ブロ
ックの天端部に形成された切り欠き部の斜視図。
FIG. 4 is a perspective view of a notch formed at a top end of a fixing block constituting the concrete protection wall.

【図5】本発明の実施形態であるブロック連続体を連結
してなるコンクリート防護壁の正面図。
FIG. 5 is a front view of a concrete protection wall formed by connecting a continuous block of blocks according to the embodiment of the present invention.

【図6】図5のコンクリート防護壁のc−c線断面図。FIG. 6 is a cross-sectional view taken along the line cc of the concrete protection wall of FIG. 5;

【図7】従来のコンクリート防護壁の正面図。FIG. 7 is a front view of a conventional concrete protection wall.

【図8】図7のコンクリート防護壁のd−d線断面図。FIG. 8 is a sectional view taken along line dd of the concrete protection wall of FIG. 7;

【符号の説明】[Explanation of symbols]

1 一般用ブロック 2,42 定着用ブロック 3 切り欠き部 4,4′,44,44′ 挿通孔 5,45 PC鋼撚り線 6 ドライモルタル 7 上層路盤基礎 8 目地部 9 伸縮目地部 11 定着用支圧板 12 定着用スリーブ 13 定着用ウエッジ 105 PC鋼棒 110 カプラー DESCRIPTION OF SYMBOLS 1 General-purpose block 2,42 Fixing block 3 Notch 4,4 ', 44,44' Inserting hole 5,45 PC steel stranded wire 6 Dry mortar 7 Upper roadbed foundation 8 Joint 9 Extension joint 11 Fixing support Press plate 12 Fixing sleeve 13 Fixing wedge 105 PC steel bar 110 Coupler

─────────────────────────────────────────────────────
────────────────────────────────────────────────── ───

【手続補正書】[Procedure amendment]

【提出日】平成11年3月1日(1999.3.1)[Submission date] March 1, 1999 (1999.3.1)

【手続補正1】[Procedure amendment 1]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0005[Correction target item name] 0005

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0005】次に、モルタルの硬化後(例えば、翌日)
に接続したPC鋼棒105に、コンクリートブロック1
02の端部に配置した定着用支板111を介して緊張用
ジャッキを取り付けてからPC鋼棒を緊張した後、ナッ
ト112を締め付けることによって緊張力を保持し、こ
れらのブロック101,102を緊結して連続体とす
る。そして、このように1つの連結体の緊結作業が終了
してから、次の区間のブロック設置を行い、以後同様の
作業を繰り返し行う。
Next, after the mortar is cured (for example, the next day)
Concrete block 1 to PC steel rod 105 connected to
02 for tension through fixing support plate 111 arranged at the end of
After the PC steel rod is tensioned after the jack is attached, the tension is maintained by tightening the nut 112, and the blocks 101 and 102 are tightly connected to form a continuous body. Then, after the binding work of one connected body is completed, a block is installed in the next section, and thereafter, the same work is repeated.

【手続補正2】[Procedure amendment 2]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0021[Correction target item name] 0021

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0021】また、定着用ブロック2には、図1に示す
ように、このブロック2の右側端部から若干図中手前側
に偏りながらブロック左側内部までブロック長さ方向に
延び、さらに斜め上方に延びて、天端部2a向けて開
口する挿通孔4′と、このブロック2の左側端部から若
干図中奥側に偏りながらブロック右側内部まで延び、さ
らに斜め上方に曲がって延びて天端部2aに向けて開口
する挿通孔4′の2本が形成されている。 ─────────────────────────────────────────────────────
As shown in FIG. 1, the fixing block 2 extends in the block length direction from the right end of the block 2 to the inside of the left side of the block while slightly biased toward the front side in the figure, and further extends obliquely upward. extends, the insertion hole 4 'which opens towards the Tentan portion 2a, extends from the left end of the block 2 to the internal block right while biased slightly Figure Nakaoku side crest extends further bent obliquely upward Two insertion holes 4 'opening toward the portion 2a are formed. ────────────────────────────────────────────────── ───

【手続補正書】[Procedure amendment]

【提出日】平成11年12月22日(1999.12.
22)
[Submission date] December 22, 1999 (1999.12.
22)

【手続補正1】[Procedure amendment 1]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】特許請求の範囲[Correction target item name] Claims

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【特許請求の範囲】[Claims]

【手続補正2】[Procedure amendment 2]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0006[Correction target item name] 0006

【補正方法】削除[Correction method] Deleted

【手続補正3】[Procedure amendment 3]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0007[Correction target item name] 0007

【補正方法】削除[Correction method] Deleted

【手続補正4】[Procedure amendment 4]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0008[Correction target item name] 0008

【補正方法】削除[Correction method] Deleted

【手続補正5】[Procedure amendment 5]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0009[Correction target item name] 0009

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0009】 [0009]

【発明が解決しようとする課題】 このような防護壁で
は、例えば1区間のブロックを1つのブロック連続体と
して見た場合、ブロック連続体同士が隣接する部分に伸
縮目地部を設け、温度変化によるブロック連続体の伸縮
を吸収することができるようにするのが望ましい。しか
し、PC鋼棒を用いる上記工法では、たとえ伸縮目地部
を設けたとしても、その性能を十分に発揮させることが
難しいという問題ある。
In such a protective wall, for example, when a block in one section is viewed as one continuous block, an expansion joint portion is provided at a portion where the continuous block is adjacent to each other, and a change in temperature is caused. It is desirable to be able to absorb the expansion and contraction of the block continuum. However, in the above method of using a PC steel rod, even if provided with the expansion joint portion, there is a problem that it is difficult to sufficiently exhibit its performance.

【手続補正6】[Procedure amendment 6]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0010[Correction target item name] 0010

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0010】[0010]

【課題を解決するための手段】上記の課題を解決するた
めに、本願発明では、複数のコンクリートブロックを緊
張用撚り線鋼材により緊張力を与えて連結してなるブロ
ック連続体を連設して構成したコンクリート防護壁にお
いて、上記各ブロック連続体のうちいずれかのコンクリ
ートブロックにブロック連続体同士を緊張力を与えて連
結する連続体連結用撚り線鋼材を挿通するための挿通孔
を形成し、この挿通孔の一端をブロック天端部に向けて
開口させ、この開口位置にて連続体連結用撚り線鋼材の
端部をコンクリートブロックに定着させるとともに、ブ
ロック連続体の隣接部分に、伸縮可能な目地部を設け、
連続体連結用撚り線鋼材により与えられる緊張力を、ブ
ロック連続体の各コンクリートブロックを連結させる緊
張用撚り線鋼材により与えられる緊張力よりも小さくし
ている。 これにより、ブロック連結体の連結作業の容易
化・高速化を図ることが可能となるとともに、防護壁の
性能を損なうことなく、連続体の隣接部に設けられる伸
縮目地部の機能を確保することが可能となる。
In order to solve the above-mentioned problems, according to the present invention, a plurality of concrete blocks are tightened.
Blows connected by applying tension to stranded wire steel
On a concrete protective wall constructed by connecting
Of any of the above block continuum
The block blocks are connected to each other by applying tension to the block blocks.
Insertion hole for inserting stranded wire steel material for connecting continuous body to be connected
With one end of this insertion hole facing the top end of the block.
Open the stranded wire steel material for continuous body connection at this opening position.
Fix the end to the concrete block and
A stretchable joint is provided in the adjacent part of the lock continuum,
The tension given by the stranded wire steel
The tension that connects each concrete block of the lock continuum
Less than the tension given by the stranded wire steel
ing. This facilitates the connection work of the block connection body
It is possible to increase the speed and speed, and
The extension provided adjacent to the continuum without impairing the performance
It becomes possible to secure the function of the shrinkage joint.

【手続補正7】[Procedure amendment 7]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0011[Correction target item name] 0011

【補正方法】削除[Correction method] Deleted

【手続補正8】[Procedure amendment 8]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0012[Correction target item name] 0012

【補正方法】削除[Correction method] Deleted

【手続補正9】[Procedure amendment 9]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0013[Correction target item name] 0013

【補正方法】削除[Correction method] Deleted

【手続補正10】[Procedure amendment 10]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0014[Correction target item name] 0014

【補正方法】削除[Correction method] Deleted

【手続補正11】[Procedure amendment 11]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0015[Correction target item name] 0015

【補正方法】削除[Correction method] Deleted

【手続補正12】[Procedure amendment 12]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0016[Correction target item name] 0016

【補正方法】削除[Correction method] Deleted

【手続補正13】[Procedure amendment 13]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0017[Correction target item name] 0017

【補正方法】削除[Correction method] Deleted

【手続補正14】[Procedure amendment 14]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0023[Correction target item name] 0023

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0023】また、これら挿通孔4′の天端部2側の
端部はそれぞれ、天端部2aの左右に、図1に示すよう
に、正面視において略直角三角形状となるように形成さ
れた切り欠き部3の短辺側底面にて開口している。
Further, each end of the top end portion 2 a side of the insertion hole 4 ', the left and right Tentan portion 2a, as shown in FIG. 1, formed in a substantially right-angled triangular shape in a front view The cutout 3 is open at the bottom surface on the short side.

【手続補正15】[Procedure amendment 15]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0025[Correction target item name] 0025

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0025】図4には、上記切り欠き部3を詳しく示し
ている。切り欠き部3の短辺側底面3aには、この底面
3aから一段下がった矩形の支持面部3a′が形成され
ている。上記挿通孔4の天端部2側の開口は、この支
持面部3a′の中央に設けられている。また、長辺側底
面3cにおける天端部2a近傍部分3c′には、底面3
cに対して若干角度が付けられている。
FIG. 4 shows the notch 3 in detail. On the short side bottom surface 3a of the cutout portion 3, a rectangular support surface portion 3a 'is formed, which is one step lower than the bottom surface 3a. The opening at the top end 2a side of the insertion hole 4 is provided at the center of the support surface 3a '. In addition, a portion 3c 'near the top end 2a on the long side bottom surface 3c is provided with a bottom surface 3c.
It is slightly angled with respect to c.

【手続補正16】[Procedure amendment 16]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0031[Correction target item name] 0031

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0031】本実施形態によれば、PC鋼棒を緊張用鋼
材として用いる従来の防護壁に対して、ブロック間でP
C鋼棒を接続するためのカプラーおよびその接続作業
不要になる。このため、施工が容易になる。
According to the present embodiment, the conventional protective wall using a PC steel rod as a tension steel material has a P
Couplers and the connection work for connecting the C steel bar is not required <br/>. For this reason, construction becomes easy.

【手続補正17】[Procedure amendment 17]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0037[Correction target item name] 0037

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0037】これら定着用ブロック2には、図6にも示
すように、各連続体A,B内のブロックの連結に用いら
れるPC鋼撚り線5を挿通させ、その端部を天部2a
にて定着させるための1本の挿通孔4′が形成されてい
るとともに、この挿通孔4′の下側には、後述する連続
体連結用のPC鋼撚り線45を挿通させるための、ブロ
ック長さ方向にのみ延びる挿通孔44が形成されてい
る。
[0037] These fixing block 2, as shown in FIG. 6, the continuous body A, it is inserted the PC steel strand 5 to be used in connection of the blocks in the B, top end 2a of the end portion
A single insertion hole 4 'for fixing is formed, and a block for inserting a PC steel stranded wire 45 for connecting a continuous body to be described later is inserted below the insertion hole 4'. An insertion hole 44 extending only in the length direction is formed.

【手続補正18】[Procedure amendment 18]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0045[Correction target item name] 0045

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【0045】[0045]

【発明の効果】以上説明したように、本発明によれば、
ブロック連続体のうちいずれかのコンクリートブロック
にブロック連続体同士を緊張力を与えて連結する連続体
連結用撚り線鋼材を挿通するための挿通孔を形成し、こ
の挿通孔の一端をブロック天端部に向けて開口させ、こ
の開口位置にて連続体連結用撚り線鋼材の端部をコンク
リートブロックに定着させるとともに、ブロック連続体
の隣接部分に、伸縮可能な目地部を設け、連続体連結用
撚り線鋼材により与えられる緊張力を、ブロック連続体
の各コンクリートブロックを連結させる緊張用撚り線鋼
材により与えられる緊張力よりも小さくしているので、
ブロック連結体の連結作業の容易化・高速化を図ること
ができるとともに、防護壁の性能を損なうことなく、連
続体の隣接部に設けられる伸縮目地部の機能を確保する
ことができる。
As described above, according to the present invention,
Any concrete block in the block continuum
Continuum that connects block continuum to each other by applying tension
An insertion hole for inserting the stranded wire steel for connection is formed,
Open one end of the insertion hole toward the top of the block.
At the opening position of the strand
Affixes to the REIT block and the block continuum
A stretchable joint is provided in the adjacent area of
The tension given by the stranded wire material is
Strand wire steel for connecting each concrete block
Since it is smaller than the tension given by the material,
To facilitate and speed up the connection work of block connected bodies
Can be connected and without losing the performance of the protective wall.
Ensuring the function of expansion joints provided adjacent to the continuum
be able to.

【手続補正19】[Procedure amendment 19]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0046[Correction target item name] 0046

【補正方法】削除[Correction method] Deleted

【手続補正20】[Procedure amendment 20]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0047[Correction target item name] 0047

【補正方法】削除[Correction method] Deleted

【手続補正21】[Procedure amendment 21]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0048[Correction target item name] 0048

【補正方法】削除[Correction method] Deleted

【手続補正22】[Procedure amendment 22]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0049[Correction target item name] 0049

【補正方法】削除[Correction method] Deleted

【手続補正23】[Procedure amendment 23]

【補正対象書類名】明細書[Document name to be amended] Statement

【補正対象項目名】0050[Correction target item name] 0050

【補正方法】削除[Correction method] Deleted

【手続補正24】[Procedure amendment 24]

【補正対象書類名】図面[Document name to be amended] Drawing

【補正対象項目名】図6[Correction target item name] Fig. 6

【補正方法】変更[Correction method] Change

【補正内容】[Correction contents]

【図6】 FIG. 6

Claims (8)

【特許請求の範囲】[Claims] 【請求項1】 鋼材挿通孔がそれぞれ形成された複数の
コンクリートブロックを、前記鋼材挿通孔に挿入した緊
張用鋼材により緊張力を与えて連結してなるコンクリー
ト防護壁であって、 前記緊張用鋼材として撚り線鋼材を用い、 前記複数のコンクリートブロックのうち鋼材定着用ブロ
ックの鋼材挿通孔の一端をブロック天端部に向けて開口
させ、この開口位置にて撚り線鋼材の端部を前記鋼材定
着用ブロックに定着させたことを特徴とするコンクリー
ト防護壁。
1. A concrete protection wall comprising a plurality of concrete blocks each having a steel material insertion hole formed therein and connected by applying tension to the steel material for insertion inserted in the steel material insertion hole by applying tension. One of the plurality of concrete blocks is opened at one end of the steel material insertion hole of the steel fixing block toward the top end of the concrete block, and at the opening position, the end of the stranded wire steel is fixed to the steel material. A concrete protective wall that has been anchored to a building block.
【請求項2】 前記鋼材定着用ブロックの前記天端部に
切り欠き部を形成し、この切り欠き部内に前記鋼材挿通
孔の一端を開口させたことを特徴とする請求項1に記載
のコンクリート防護壁。
2. The concrete according to claim 1, wherein a notch is formed at the top end of the steel material fixing block, and one end of the steel material insertion hole is opened in the notch. Protective wall.
【請求項3】 前記鋼材定着用ブロックに、この鋼材定
着用ブロックの両側にそれぞれ配置されたコンクリート
ブロックを連結するための複数の撚り線鋼材の端部を定
着させたことを特徴とする請求項1又は2に記載のコン
クリート防護壁。
3. An end of a plurality of stranded steel materials for connecting concrete blocks disposed on both sides of the steel fixing block to the steel fixing block, respectively, is fixed to the steel fixing block. 3. The concrete protective wall according to 1 or 2.
【請求項4】 複数のコンクリートブロックを緊張用鋼
材により緊張力を与えて連結してなるブロック連続体を
連設して構成したコンクリート防護壁において、 前記各ブロック連続体のうちいずれかのコンクリートブ
ロックにブロック連続体同士を緊張力を与えて連結する
連続体連結用撚り線鋼材を挿通するための挿通孔を形成
し、 前記挿通孔の一端をブロック天端部に向けて開口させ、
この開口位置にて前記連続体連結用撚り線鋼材の端部を
前記コンクリートブロックに定着させたことを特徴とす
る請求項1から3のいずれかに記載のコンクリート防護
壁。
4. A concrete protection wall comprising a plurality of concrete blocks connected to each other by applying tension to a plurality of concrete blocks by using a tension steel material, wherein the concrete block includes any one of the concrete blocks in each of the block continuous bodies. Forming an insertion hole for inserting a continuous body connecting stranded wire steel material that connects the block continuous bodies to each other by applying tension, and opening one end of the insertion hole toward the block top end,
The concrete protection wall according to any one of claims 1 to 3, wherein an end portion of the continuous body connecting stranded wire steel material is fixed to the concrete block at the opening position.
【請求項5】 前記天端部に切り欠き部を形成し、この
切り欠き部内に前記挿通孔の一端を開口させたことを特
徴とする請求項4に記載のコンクリート防護壁。
5. The concrete protection wall according to claim 4, wherein a notch is formed in the top end, and one end of the insertion hole is opened in the notch.
【請求項6】 前記ブロック連続体の隣接部分に、伸縮
可能な目地部を設け、 前記連続体連結用撚り線鋼材に
より与えられる緊張力を、前記ブロック連続体の各コン
クリートブロックを連結させる撚り線鋼材により与えら
れる緊張力よりも小さくしたことを特徴とする請求項4
又は5に記載のコンクリート防護壁。
6. A stretchable joint portion is provided adjacent to the block continuum, and the tension given by the continuum connection stranded wire steel material is used to connect each concrete block of the block continuum to a stranded wire. 5. The structure according to claim 4, wherein the tension is smaller than a tension given by the steel material.
Or the concrete protective wall according to 5.
【請求項7】 前記ブロック連続体が、鋼材挿通孔がそ
れぞれ形成された複数のコンクリートブロックを前記鋼
材挿通孔に挿入した撚り線鋼材により緊張力を与えて連
結したものであり、 前記複数のコンクリートブロックのうち鋼材定着用ブロ
ックの鋼材挿通孔の一端をブロック天端部に向けて開口
させ、この開口位置にて撚り線鋼材の端部を前記鋼材定
着用ブロックに定着させたことを特徴とする請求項4か
ら6のいずれかに記載のコンクリート防護壁。
7. The block continuum comprises a plurality of concrete blocks, each having a steel material insertion hole formed therein, connected by applying tension to the stranded wire steel material inserted into the steel material insertion hole, and One end of the steel material insertion hole of the steel material fixing block among the blocks is opened toward the block top end, and at this opening position, the end of the stranded steel material is fixed to the steel material fixing block. A concrete protective wall according to any of claims 4 to 6.
【請求項8】 前記各ブロック連続体の長さが、150
m程度であることを特徴とする請求項7に記載のコンク
リート防護壁。
8. The length of each block continuum is 150
The concrete protective wall according to claim 7, wherein the diameter is about m.
JP04499599A 1999-02-23 1999-02-23 Concrete protective wall Expired - Lifetime JP3165127B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP04499599A JP3165127B2 (en) 1999-02-23 1999-02-23 Concrete protective wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP04499599A JP3165127B2 (en) 1999-02-23 1999-02-23 Concrete protective wall

Publications (2)

Publication Number Publication Date
JP2000240024A true JP2000240024A (en) 2000-09-05
JP3165127B2 JP3165127B2 (en) 2001-05-14

Family

ID=12707023

Family Applications (1)

Application Number Title Priority Date Filing Date
JP04499599A Expired - Lifetime JP3165127B2 (en) 1999-02-23 1999-02-23 Concrete protective wall

Country Status (1)

Country Link
JP (1) JP3165127B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2801913A1 (en) * 1999-12-07 2001-06-08 Bernard Abram DEVICE FOR CONTINUOUS CONSTRUCTION OF ROAD SAFETY BARRIER ELEMENTS
KR100977197B1 (en) 2010-05-18 2010-08-20 금호이엔씨 주식회사 A precast concrete barrier
KR20150102569A (en) * 2014-02-28 2015-09-07 고려개발 주식회사 The noise barrier foundation and its construction method

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2801913A1 (en) * 1999-12-07 2001-06-08 Bernard Abram DEVICE FOR CONTINUOUS CONSTRUCTION OF ROAD SAFETY BARRIER ELEMENTS
EP1106738A2 (en) * 1999-12-07 2001-06-13 Bernard Nakul Means for assuring the continuity of safety barriers for motorway guard-rails
EP1106738A3 (en) * 1999-12-07 2002-09-18 Bernard Nakul Means for assuring the continuity of safety barriers for motorway guard-rails
KR100977197B1 (en) 2010-05-18 2010-08-20 금호이엔씨 주식회사 A precast concrete barrier
KR20150102569A (en) * 2014-02-28 2015-09-07 고려개발 주식회사 The noise barrier foundation and its construction method
KR101581938B1 (en) 2014-02-28 2015-12-31 고려개발 주식회사 The noise barrier foundation and its construction method

Also Published As

Publication number Publication date
JP3165127B2 (en) 2001-05-14

Similar Documents

Publication Publication Date Title
JPS5869907A (en) Free tension material, especially, obliquely tensioned cable for obliquely tensioned bridge
JP2759217B2 (en) Introduction method of tensile force of carbon fiber reinforced plastic material
JP3165127B2 (en) Concrete protective wall
KR100707136B1 (en) Construction method of arch-shaped slab bridge using arch-shaped precast panel for building arch-type slab
JP3442319B2 (en) Precast PC web for concrete bridge and prestressed concrete bridge having the PC web
JPH0642039A (en) Joining method of end of precast concrete beam to precast concrete girder, and joining construction thereof
JP2824043B2 (en) Construction method of L-shaped retaining wall
JP2941172B2 (en) Manufacturing method of PC segment
JP3020474B2 (en) Precast concrete sound barrier
KR100382300B1 (en) A fireproof reinforcement method by burying steel strand
JP2815129B2 (en) Pretensioned precast concrete columns
JPS605968A (en) Prestress introduction of pc slab in existing structure
JPS6250617B2 (en)
JP2538528B2 (en) Slope stabilization method
JP2528081B2 (en) Reinforcement structure of existing bridge and its construction method
JPS626005A (en) Introduction of prestress into bridge girdle
JP2741649B2 (en) Prestressed concrete beam
JPS632486Y2 (en)
JP2596532B2 (en) Slope stable structure
JP3505662B2 (en) Precast concrete beam and method of using the beam
JPS59220560A (en) Construction of flat slab
JP2994271B2 (en) Bonding method and bonding material for thin PC board
JP2918427B2 (en) Building foundation and its construction method
JPS61211408A (en) Construction of protective shelter
JPH0657968B2 (en) Box culvert

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090302

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090302

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100302

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100302

Year of fee payment: 9

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100302

Year of fee payment: 9

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100302

Year of fee payment: 9

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100302

Year of fee payment: 9

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100302

Year of fee payment: 9

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100302

Year of fee payment: 9

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110302

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110302

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110302

Year of fee payment: 10

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

Free format text: JAPANESE INTERMEDIATE CODE: R313532

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110302

Year of fee payment: 10

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115

Free format text: JAPANESE INTERMEDIATE CODE: R313117

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110302

Year of fee payment: 10

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110302

Year of fee payment: 10

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110302

Year of fee payment: 10

R370 Written measure of declining of transfer procedure

Free format text: JAPANESE INTERMEDIATE CODE: R370

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110302

Year of fee payment: 10

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

Free format text: JAPANESE INTERMEDIATE CODE: R313115

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110302

Year of fee payment: 10

R371 Transfer withdrawn

Free format text: JAPANESE INTERMEDIATE CODE: R371

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120302

Year of fee payment: 11

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313117

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120302

Year of fee payment: 11

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130302

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140302

Year of fee payment: 13

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term