JP2000213070A - Joining method for pipe body with join hardware by bolt and pipe body bolt conveyance device and pipe body bolt pulling out jig - Google Patents

Joining method for pipe body with join hardware by bolt and pipe body bolt conveyance device and pipe body bolt pulling out jig

Info

Publication number
JP2000213070A
JP2000213070A JP11019050A JP1905099A JP2000213070A JP 2000213070 A JP2000213070 A JP 2000213070A JP 11019050 A JP11019050 A JP 11019050A JP 1905099 A JP1905099 A JP 1905099A JP 2000213070 A JP2000213070 A JP 2000213070A
Authority
JP
Japan
Prior art keywords
bolt
pipe
jig
tube
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP11019050A
Other languages
Japanese (ja)
Other versions
JP3656942B2 (en
Inventor
Hiroshi Tanaka
浩史 田中
Tadayoshi Okada
忠義 岡田
Nobuyoshi Uno
暢芳 宇野
Masahiro Nagata
匡宏 永田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Nippon Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel Corp filed Critical Nippon Steel Corp
Priority to JP01905099A priority Critical patent/JP3656942B2/en
Publication of JP2000213070A publication Critical patent/JP2000213070A/en
Application granted granted Critical
Publication of JP3656942B2 publication Critical patent/JP3656942B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a joining method for a pipe body such as a square steel pipe and a circular steel pipe capable of being tightened easily from outside with join hardware by a bolt using an inexpensive through bolt instead of an expansive on side bolt, a bolt conveyance device, and a bolt pulling out jig. SOLUTION: When a pipe body and join hardware are mutually joined by a bolt, a bolt conveyance device 15 provided with a bolt holder 14 nipping a plurality of bolts in a condition in which they stand straight is inserted into the pipe body and is stopped at a predetermined position, and a bolt pulling out jig 18 inserted with a washer 17 and a nut 12 is inserted into bolt holes of overlapped pipe elements and a bolt hole of the join hardware 5 from the outside. A tip part of the bolt nipped by the bolt holder is gripped and pulled out by a bolt grip cylinder 19 of this pulling out jig, the tip part of the bolt protrudes to the outside of the join hardware, and the washer and the nut are moved from the pulling out jig to the tip part of the bolt to screw-fit the nut and tighten them.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、例えば、鋼構造建
築物を構築する際に閉鎖断面を有する角形鋼管、円形鋼
管などの管体を柱材とし、この柱材に接合金物を介して
梁を取り付ける場合に、管体に接合金物を通しボルトに
より接合するために適用されるボルト接合方法と、この
接合方法に用いられる管体内ボルト搬送装置および管体
内ボルト引出治具に関するものであり、特に管体端部か
ら手が届かない位置にあるボルト孔にボルトを挿し込む
ボルト接合において適用されるものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a steel structure building, for example, using a tubular body such as a square steel pipe or a circular steel pipe having a closed cross section as a column member, and connecting the column member to a beam through a metal joint. The present invention relates to a bolt joining method applied for passing a joint metal to a pipe and joining with a bolt when attaching the pipe, a bolt conveying device in a pipe used in the joining method, and a bolt extracting jig in a pipe. The present invention is applied to a bolt joint in which a bolt is inserted into a bolt hole that is not accessible from the end of the tube.

【0002】[0002]

【従来の技術】近年、耐震性を向上させるために、柱材
として閉鎖断面を有する角形鋼管や円形鋼管などの管体
を用い、梁材としてH形鋼を用いた両方向ラーメン構造
が多用されており、例えば、両方向ラーメン構造を得る
ための閉鎖断面を有する角形鋼管柱と梁材との接合に
は、図15に示すような通しダイヤフラム形式が一般的
であり、柱材としての角形鋼管柱1とダイヤフラム2の
接合、ダイヤフラム2と梁材としてのH形鋼梁3の取付
部4との接合は、溶接によって行われている。この構築
方法においては、溶接箇所が多く、高い溶接技術と厳密
な品質が不可欠で、施工に長時間を要し、施工コストも
高くなるという問題点がある。
2. Description of the Related Art In recent years, in order to improve seismic resistance, a bidirectional rigid frame structure using a tubular member such as a square steel tube or a circular steel tube having a closed cross section as a column member and an H-shaped steel member as a beam member has been frequently used. For example, in order to join a rectangular steel pipe column having a closed cross section and a beam material to obtain a bidirectional rigid frame structure, a through-diaphragm type as shown in FIG. 15 is generally used. The connection between the diaphragm 2 and the diaphragm 2 and the mounting portion 4 of the H-shaped steel beam 3 as a beam material are performed by welding. In this construction method, there are many welding points, high welding technology and strict quality are indispensable, there is a problem that a long time is required for the construction, and the construction cost is high.

【0003】このような問題点を解消する接合方法とし
て、ダイヤフラム形式ではなく、例えば図16に示すよ
うに、角形鋼管柱1とH形鋼梁3を接合金物(スプリッ
トティー)5と、外部側から挿入・締結でき、工場でも
施工現場でも容易に締め付け可能なワンサイドボルト6
を用いて接合する方法が提案されている。しかし、この
接合方法においては、 (1)高価なワンサイドボルトを多量に使用するため、
接合コストが増大する。 (2)ボルト締結が失敗した場合にはボルトを切断除去
したり、やり直しの作業が必要になる等の問題がある。
[0003] As a joining method for solving such a problem, a rectangular steel pipe column 1 and an H-shaped steel beam 3 are joined to a joining metal (split tee) 5 and an outer side, as shown in FIG. One-side bolt 6 that can be inserted and fastened from the front and can be easily tightened at the factory or construction site
There has been proposed a method of joining using the method. However, in this joining method, (1) since a large amount of expensive one-side bolts are used,
The joining cost increases. (2) If the bolt fastening fails, there are problems such as cutting and removing the bolt and the need for rework.

【0004】このような問題を解消する接合方法とし
て、角形鋼管柱1とH型鋼梁3を接合金物(スプリット
ティー)5と安価な通しボルトを用いて接合する方法が
ある。この接合方法では、角形鋼管柱の厚みが大きく、
外部側からナットを用いないタップボルトを螺合して十
分な強度を確保できる場合に有効であるが、十分な強度
を確保できない場合には、通しボルトを角形鋼管柱の内
部から挿入して外部で通しボルトにナットを螺合して外
部側で締め付けることにより、または、外部から通しボ
ルトを挿入して内部側でナットを螺合して外部側で締め
付けることにより接合金具(スプリットティー)5を強
固に固定する方法を採用することが考えられる。
[0004] As a joining method for solving such a problem, there is a method of joining the rectangular steel tube column 1 and the H-shaped steel beam 3 to a joining metal (split tee) 5 using an inexpensive through bolt. In this joining method, the thickness of the square tubular column is large,
It is effective when sufficient strength can be secured by screwing a tap bolt that does not use a nut from the outside, but if sufficient strength cannot be secured, insert a through bolt from the inside of the square steel pipe column and By screwing the nut to the through bolt and tightening it on the outside, or by inserting the through bolt from the outside and screwing the nut on the inside and tightening it on the outside, the joining bracket (split tee) 5 It is conceivable to adopt a method of firmly fixing.

【0005】このような接合方法として、例えば特許第
2693139号公報に記載された発明がある。この発
明は、図17(a)に示すように、長尺の棒状柄部39
が連結され、複数のボルト体を倒立させた状態で保持す
る支持穴40を有する複数の保持体41を設けた挿入治
具42を用い、挿入治具42の保持体41でボルト体4
3の頭部を支持してボルト体43を倒立させた状態で中
空柱44内部に挿入し、次に中空柱44の外面に沿って
取り付けられる外側金具45と中空柱44の重なったボ
ルト孔46、47より中空柱44内に吊り具48を差し
込み、図17(b)、(c)に示すように、吊り具48
でボルト体43を吊り上げて、ボルト体の軸部43sを
ボルト孔47より外部に突出させた状態で板状ストッパ
ー49で仮止めし、次に外部に突出したボルト体43の
軸部43sにナットを螺合して外側金具45と中空柱4
4とを相互に接合するようにしたものである。
As such a joining method, there is, for example, an invention described in Japanese Patent No. 2693139. According to the present invention, as shown in FIG.
Are connected, and a plurality of holding bodies 41 having support holes 40 for holding the plurality of bolt bodies in an inverted state are provided.
3 is inserted into the hollow column 44 in a state where the bolt body 43 is inverted while supporting the head of the third column, and then an outer fitting 45 attached along the outer surface of the hollow column 44 and a bolt hole 46 where the hollow column 44 overlaps , 47 into the hollow column 44, as shown in FIGS. 17 (b) and (c).
The bolt body 43 is lifted up with a bolt, and the shaft portion 43s of the bolt body is temporarily fixed with a plate-shaped stopper 49 in a state of protruding from the bolt hole 47 to the outside. Into the outer fitting 45 and the hollow pillar 4
4 are joined to each other.

【0006】しかし、この発明では、ボルト挿入治具4
2を中空柱44内に挿入して、長尺で重い挿入治具で支
持したボルト体43と中空柱44のボルト孔46と47
の位置合わせのための効果的な構造を有しないため、位
置合わせに手間がかかることと、挿入治具42と中空柱
44の内面との摩擦抵抗が大きいため、ボルト挿入治具
42の移動労力が大きく操作性に乏しい。
However, in the present invention, the bolt insertion jig 4
2 is inserted into the hollow pillar 44, and the bolt body 43 supported by the long and heavy insertion jig and the bolt holes 46 and 47 of the hollow pillar 44 are provided.
Does not have an effective structure for the positioning of the bolt insertion jig 42 because the positioning is troublesome and the frictional resistance between the insertion jig 42 and the inner surface of the hollow column 44 is large. Is large and poor in operability.

【0007】また、ボルト体43をボルト孔47より外
部に突出させた状態で仮止めするために、ボルト体43
の軸部43sに切り欠きを有する板状ストッパー49を
嵌め込む必要があり煩わしく、仮止めした状態でボルト
体から吊り具を外してからナットを螺合するため、仮止
めから螺合までの所要時間が長いといった問題がある。
さらに、ボルト体の吊り上げに失敗してボルト体を落下
させた場合、ボルト体が倒れたり位置ずれを起こし、再
吊り上げができず、やり直しに時間がかかるという問題
もある。
Further, in order to temporarily fix the bolt body 43 in a state of protruding outside from the bolt hole 47, the bolt body 43 is provided.
It is necessary to fit a plate-shaped stopper 49 having a notch into the shaft portion 43s, and it is troublesome. Since the hanging tool is removed from the bolt body in a temporarily fixed state and the nut is screwed, the time required from the temporary fixing to the screwing is required. There is a problem that time is long.
Furthermore, when the lifting of the bolt body is unsuccessful and the bolt body is dropped, there is a problem that the bolt body falls down or shifts in position, cannot be lifted again, and it takes time to start over.

【0008】[0008]

【発明が解決しようとする課題】本発明は、高価なワン
サイドボルトの使用量を極力少なくするため、基本的に
は、前記特許第2693139号公報に記載された発明
の問題を有利に解決し、安価な通しボルトを用いて外部
側から容易に締め付け可能な角形鋼管や円形鋼管、これ
らの柱材などの管体(以下「管体」という。)と接合金
物とのボルト接合方法と、ボルト搬送装置とボルト引出
治具を提供するものである。
The present invention basically solves the problem of the invention described in Japanese Patent No. 2693139 in order to minimize the amount of expensive one-side bolts used. A method of joining a steel pipe (hereinafter referred to as a "pipe body") such as a square steel pipe, a circular steel pipe, or a column material thereof, which can be easily tightened from the outside using an inexpensive through bolt, and a bolt, and a bolt. An object of the present invention is to provide a transfer device and a bolt drawing jig.

【0009】[0009]

【課題を解決するための手段】本発明は、下記(1)〜
(9)の発明から構成されるものである。 (1) 管体に接合金物をボルト接合する際に、複数の
ボルトを直立状態で挟持したボルトホルダーを備えたボ
ルト搬送装置を、管体内に挿入して所定の位置で停止さ
せ、重ね合わせた管体のボルト孔と接合金物のボルト孔
にその外部側から、座金とナットを挿通したボルト引出
治具を挿し込み、この引出治具の先端のボルト把持筒
を、ボルトホルダーに挟持されたボルトの先端部に嵌合
して押し込み、ボルトの先端部をボルト把持筒で把持し
た状態でボルト引出治具を引出すことにより接合金物の
外部に突出させ、座金とナットを引出治具からボルト先
端部に移行させてナットを螺合し締め付けることを特徴
とする管体と接合金物とのボルト接合方法。 (2) (1)において、管体内にボルト搬送装置を挿
入する際に、重ね合わせた管体のボルト孔と接合金物の
ボルト孔の一部を選択して位置検知治具を挿入してお
き、管体内にボルト搬送装置を挿入してボルト搬送装置
に配設した位置検知器で前記位置検知治具を検知させ、
ボルト搬送装置を所定位置に停止させることを特徴とす
る管体と接合金物とのボルト接合方法。 (3) 管体内に挿入するボルト搬送装置であって、下
部に走行ローラーを有し、両側部にガイドローラーを備
え操作棒を連結した搬送台に、ボルトを接合面に対し直
立状態で弾性的に挟持し、ボルト頭部が引出された時、
閉動作してボルト頭部の後退を阻止する支持面を形成可
能な複数のボルトホルダーを備えるとともに、管体のボ
ルト孔を検知するための位置検知器を備えたことを特徴
とする管体内ボルト搬送装置。 (4) (3)において、ボルトを接合面に対して直立
状態で弾性的に挟持するボルトホルダーが、交換可能な
バネ体により弾性的に開閉可能な相対するボルト挟持体
からなり、このボルト挟持体のボルトの挟持面の奥側に
傾斜面が形成され、先端面まで引き出されたボルト頭部
の後退を阻止する支持面が形成されていることを特徴と
する管体内ボルト搬送装置。 (5) (3)において、管体のボルト孔の位置を検知
するための位置検知器が、管体のボルト孔と接合金物の
ボルト孔に挿入された位置検知治具としてのダミーボル
トの先端部に係止してボルト搬送装置を所定位置に停止
させるストッパーであることを特徴とする管体内ボルト
搬送装置。 (6) (5)において、管体のボルト孔と接合金物の
ボルト孔に挿入し、ボルト搬送装置のストッパーを係止
させるダミーボルトであって、管体のボルト孔と接合金
物のボルト孔に挿入されたとき、少なくとも管体のボル
ト孔に位置する部分の軸径を管体のボルト孔径より小さ
く、ボルトの軸径より大きくしたものであり、先端部が
管体内に突出するものであることを特徴とするストッパ
ー係止用のダミーボルト。 (7) 管体内に挿入したボルト搬送装置のボルトホル
ダーに直立状態で弾性的に挟持したボルトを、管体とこ
の管体に接合される接合金物の重ねられたボルト孔を通
して引き出すボルト引出治具であって、一方の先端部に
ボルト先端部を弾性的に把持する局部スリット付き把持
筒を交換可能に装着し、他方の先端部に把手を形成した
棒体からなり、把持筒と棒体の少なくとも先端部領域の
外径が、ボルト孔径およびナットの内径、座金の孔径よ
り小径に形成され、管体と接合金物の重ねられたボルト
孔に挿入する際に座金とナットを挿通できるものである
ことを特徴とする管体内ボルト引出治具。 (8) (7)において、把持筒の先端部に、ボルト先
端部に係止する爪が形成されていることを特徴とする管
体内ボルト引出治具。 (9) (7)において、棒体の先端部または把持筒が
永久磁石による磁着機能を有するものであることを特徴
とする管体内ボルト引出治具。
Means for Solving the Problems The present invention provides the following (1) to
It comprises the invention of (9). (1) When bolting a metal joint to a pipe, a bolt transfer device provided with a bolt holder holding a plurality of bolts in an upright state is inserted into the pipe, stopped at a predetermined position, and overlapped. A bolt pull-out jig through which a washer and a nut are inserted is inserted from the outside into the bolt hole of the tubular body and the bolt hole of the joint hardware, and the bolt holding cylinder at the tip of the pull-out jig is clamped by the bolt holder. The bolt is pulled out of the joint by pulling out the bolt extraction jig while holding the tip of the bolt with the bolt gripping tube, and then the washer and nut are pulled out from the extraction jig. A method for joining bolts to a tube and a joint metal, wherein the method is shifted to the above, and the nut is screwed and tightened. (2) In (1), when inserting the bolt conveying device into the pipe, a part of the bolt hole of the overlapped pipe and the bolt hole of the joint metal are selected, and the position detection jig is inserted. , Insert the bolt conveying device into the pipe and let the position detecting jig be detected by the position detector arranged on the bolt conveying device,
A method for joining bolts between a tube and a joint metal, wherein the bolt conveying device is stopped at a predetermined position. (3) A bolt conveying device to be inserted into a pipe, which has a traveling roller at a lower portion, a guide roller on both sides, and an operation bar connected to a conveying table, wherein the bolt is elastically mounted in an upright state with respect to a joint surface. When the bolt head is pulled out,
A bolt in a pipe, comprising a plurality of bolt holders capable of forming a support surface for closing the bolt head to prevent retreat, and a position detector for detecting a bolt hole in the pipe. Transport device. (4) In (3), the bolt holder for elastically holding the bolt in an upright state with respect to the joining surface is composed of an opposing bolt holder that can be elastically opened and closed by a replaceable spring body. An in-tube bolt conveying device, characterized in that an inclined surface is formed on the back side of a body bolt holding surface, and a supporting surface is formed to prevent the bolt head pulled out to the tip end surface from retreating. (5) In (3), the position detector for detecting the position of the bolt hole of the tube is a tip of a dummy bolt as a position detection jig inserted into the bolt hole of the tube and the bolt hole of the joint hardware. And a stopper for stopping the bolt conveying device at a predetermined position by locking the bolt conveying device at a predetermined position. (6) In (5), a dummy bolt which is inserted into the bolt hole of the tube and the bolt hole of the joint hardware and locks the stopper of the bolt conveying device, and is inserted into the bolt hole of the tube and the bolt hole of the joint hardware. When inserted, at least the shaft diameter of the portion located in the bolt hole of the tube is smaller than the bolt hole diameter of the tube and larger than the shaft diameter of the bolt, and the tip end projects into the tube. A dummy bolt for locking the stopper. (7) A bolt pull-out jig for pulling out a bolt elastically held upright in a bolt holder of a bolt transfer device inserted into a pipe through a bolt hole in which a pipe and a metal fitting joined to the pipe are overlapped. A gripping cylinder with a local slit for elastically gripping the bolt tip at one tip is replaceably mounted, and the other tip comprises a rod formed with a handle. At least the outer diameter of the tip region is formed to be smaller than the bolt hole diameter, the inner diameter of the nut, and the hole diameter of the washer, so that the washer and the nut can be inserted when the tube is inserted into the bolt hole in which the joint metal is overlapped. A jig for pulling out a bolt in a pipe, characterized by being characterized in that: (8) The jig for pulling out a bolt in a tube according to (7), wherein a claw that is engaged with the tip of the bolt is formed at the tip of the gripping cylinder. (9) The jig for withdrawing a bolt in a tube according to (7), wherein the distal end portion of the rod body or the holding cylinder has a magnetic attachment function using a permanent magnet.

【0010】[0010]

【発明の実施の形態】本発明においては、管体と接合金
物とを安価な通しボルト(含むトルシア形高力ボルト)
とナットを用いて接合する場合に適用されるものであ
り、管体に接合金物をボルト接合する際に、複数のボル
トを直立状態で挟持したボルトホルダーを備えたボルト
搬送装置を、管体内に挿入して所定の位置で停止させ、
重ね合わせた管体のボルト孔と接合金物のボルト孔にそ
の外部側から、座金とナットを挿通したボルト引出治具
を挿し込み、ボルトホルダーに挟持されたボルトの先端
部(トルシア形高力ボルトの場合はピンテール部)を把
持してボルト孔を通して引き出し、このボルトの先端部
を接合金物の外部側に突出させて、このボルト先端部に
座金とナットを移行させ、ナットを螺合し締め付けるよ
うにしたものである。
DESCRIPTION OF THE PREFERRED EMBODIMENTS In the present invention, an inexpensive through bolt (including a torcia-type high-strength bolt) is used to connect a tube and a joint metal.
It is applied when joining with a nut using a nut, and when bolting the joining hardware to the tube, a bolt transfer device equipped with a bolt holder that holds a plurality of bolts in an upright state is inserted into the tube. Insert and stop in place,
From the outside, insert a bolt extraction jig through which a washer and a nut are inserted into the bolt hole of the superposed pipe and the bolt hole of the joint hardware, and insert the tip of the bolt (Torcia-type high-strength bolt) In the case of, grip the pin tail), pull it out through the bolt hole, project the tip of this bolt to the outside of the joining hardware, transfer the washer and nut to the tip of this bolt, and screw and tighten the nut It was made.

【0011】本発明では、 (1)ボルトを接合面に対して直立状態で弾性的に挟持
したボルトホルダーを備えたボルト搬送装置に、走行ロ
ーラーを装着して移動抵抗を小さくして移動のための労
力を軽減するとともに、両側部にバネ付きのガイドロー
ラーを管体内面に対して位置調整可能に配設し、管体サ
イズ変更に対応して位置精度を安定確保する。
In the present invention, (1) a traveling roller is mounted on a bolt conveying device having a bolt holder elastically holding a bolt in an upright state with respect to a joining surface to reduce movement resistance and move the bolt. In addition, the guide rollers with springs are provided on both sides of the tube so as to be position-adjustable with respect to the inner surface of the tube, and the position accuracy is stably secured in response to a change in the tube size.

【0012】ボルト搬送装置は、自動走行させてもよい
し、連結した操作棒を手動で操作して移動させるように
してもよい。手動操作の場合には、操作棒に距離目盛り
を付け、ボルト搬送装置の効率移動、位置合わせを可能
とすることも有効である。この操作棒は、ボルト搬送装
置を移動をさせる距離によって好ましい長さのものを選
択して用いることができるように、複数の長さのものを
用意したり、管体の端部に近い接合箇所から遠い接合箇
所にも対応できるように、継ぎ足したり、伸縮可能なも
のを用いてもよく、特に管体を斜めまたは垂直にした状
態でボルト接合作業を行う場合などでは、ボルト搬送装
置を所定位置で懸吊支持するための管体との係止部を設
けててもよい。また、このボルト搬送装置には、照明装
置を取り付けて管体内でのボルト先端位置がボルト孔を
通して外部から十分に判別できるようにすることが有効
である。
The bolt conveying device may be moved automatically or may be moved by manually operating a connected operation rod. In the case of manual operation, it is also effective to provide a distance scale on the operation rod to enable efficient movement and alignment of the bolt transfer device. This operation rod is prepared in a plurality of lengths so as to be able to select and use a preferable length depending on the distance by which the bolt transfer device is moved, or a joint portion close to the end of the pipe body. It is also possible to use an extendable or expandable one so that it can be used for joints far from the distance.Especially, when performing the bolt joining work with the pipe body slanted or vertical, move the bolt transfer device to the predetermined position. An engaging portion with a tube for suspending and supporting the tube may be provided. It is effective to attach an illuminating device to the bolt conveying device so that the position of the bolt tip in the tube can be sufficiently determined from the outside through the bolt hole.

【0013】(2)管体のボルト孔とボルト搬送装置の
ボルトホルダーに挟持されたボルト先端との位置合わせ
を確実に行うために、ボルト搬送装置を所定の位置に停
止させる必要があるが、そのための手段としては、例え
ば重ね合わせた管体のボルト孔と接合金物のボルト孔に
位置検知治具としてダミーボルトを挿入し、管体内を移
動するボルト搬送装置に位置検知器としてストッパーを
配設して、前記ダミーボルトにストッパーを機械的に係
止させることにより、ボルト搬送装置を所定位置に容易
にかつ確実に停止させることができる。
(2) It is necessary to stop the bolt transfer device at a predetermined position in order to surely align the bolt hole of the tube with the tip of the bolt held by the bolt holder of the bolt transfer device. For this purpose, for example, a dummy bolt is inserted as a position detection jig into the bolt hole of the overlapped pipe and the bolt hole of the joint hardware, and a stopper is provided as a position detector on the bolt transport device that moves in the pipe. Then, by mechanically locking the stopper to the dummy bolt, the bolt transfer device can be easily and reliably stopped at a predetermined position.

【0014】このダミーボルトは、管体のボルト孔と接
合金物のボルト孔を重ね合わせる場合に位置合わせ治具
として活用することもできるものであり、管体のボルト
孔と接合金物のボルト孔に挿入されたとき、管体のボル
ト孔との間の遊びを少なくして位置合わせの精度を確保
するために、少なくとも管体のボルト孔に位置する部分
の軸径が管体のボルト孔径より小さく、ボルトの軸径よ
り大きくしたものであり、先端部が管体内に突出するも
のであることが重要である。
This dummy bolt can also be used as a positioning jig when the bolt hole of the tube and the bolt hole of the metal joint are overlapped. When inserted, the shaft diameter of at least the portion located in the bolt hole of the tube is smaller than the bolt hole diameter of the tube in order to reduce the play between the bolt hole of the tube and secure the accuracy of alignment. It is important that the diameter is larger than the shaft diameter of the bolt, and that the tip portion protrudes into the tube.

【0015】また、このダミーボルトの管内への落下を
防止するとともに、ストッパー位置に対応して管内に所
定の長さ突出させるために、ダミーボルトに頭部や係止
部あるいはテーパーなどの係止構造を形成することが好
ましい。係止部を形成する場合には、その係止位置を調
節できるようにすることも有効である。
Further, in order to prevent the dummy bolt from falling into the tube and to project the dummy bolt into the tube by a predetermined length corresponding to the stopper position, the dummy bolt is locked with a head, a locking portion or a taper. Preferably, a structure is formed. When forming the locking portion, it is also effective to be able to adjust the locking position.

【0016】ボルト搬送装置を所定位置に停止させるた
めの他の手段としては、管体、接合金物とボルト搬送装
置に、電気的、光学的、機械的手段を利用した位置検知
器、(位置検知治具)などの位置検知手段を配設して、
この位置検知手段からの位置検知情報でボルト搬送装置
の走行・停止を行う位置検知システムを用いることもで
き、この場合に自動操作、または自動操作と手動操作を
併用することもできる。ボルト搬送装置が所定の位置か
らずれないように、例えばボルト搬送装置の走行ローラ
ーの回転止め機構(例えばブレーキ)を設けることが有
効である。この場合、操作棒、位置検知器の動作を活用
したものにすることもできる。
Other means for stopping the bolt transfer device at a predetermined position include a tube, a joint hardware, and a position detector using electrical, optical, and mechanical means for the bolt transfer device; Jig) and other position detection means
A position detection system for running / stopping the bolt transport device based on the position detection information from the position detection means can be used. In this case, automatic operation or automatic operation and manual operation can be used together. It is effective to provide, for example, a rotation stopping mechanism (for example, a brake) for the traveling roller of the bolt transfer device so that the bolt transfer device does not deviate from a predetermined position. In this case, the operation of the operation rod and the position detector can be utilized.

【0017】(3)ボルトホルダーは、筒状体でもよい
が、ボルト頭部径が多少異なる場合でも、その支持位置
を安定確保する観点、または上端部にボルト頭部の支持
面を形成しボルト引出過程でのボルトの後退を防止する
観点から、交換可能なバネ体により弾性的に開閉可能な
相対するボルト挟持体により接合面に対して直立状態で
弾性的に挟持して直立状態を安定確保できるようにし、
このボルト挟持体のボルトの挟持面の奥側に傾斜面を形
成して、ボルトの引出抵抗を小さくすることが、より有
利である。
(3) Although the bolt holder may be a cylindrical body, even if the bolt head diameter is slightly different, the bolt holder may be formed by forming a bolt head support surface at the upper end to secure a stable supporting position. From the viewpoint of preventing the bolt from retreating during the pulling process, the opposing bolt holding body that can be elastically opened and closed by a replaceable spring body elastically clamps the joint surface upright and secures the upright state stably. To be able to
It is more advantageous to form an inclined surface on the back side of the bolt holding surface of the bolt holding body to reduce the bolt pull-out resistance.

【0018】ボルト頭部がボルトホルダーの外に引出さ
れたとき、相対するボルト挟持体がバネ体の作用により
閉動作して先端面に引き出されたボルト頭部の後退を阻
止する支持面を形成し、ボルトが挟持体内に後退するの
を防止することができる。ここで用いるバネ体として
は、小径のコイルバネやゴム製バネ(例えば輪ゴムや紐
状ゴム等)が安価で着脱容易である。特に輪ゴムの場
合、挟持力を容易に調整可能であり便利である。
When the bolt head is pulled out of the bolt holder, the opposing bolt holding member is closed by the action of the spring body to form a support surface for preventing the bolt head pulled out from being retracted at the tip end surface. However, it is possible to prevent the bolt from retreating into the holding body. As the spring body used here, a small-diameter coil spring or rubber spring (for example, rubber band or string rubber) is inexpensive and easy to attach and detach. In particular, in the case of rubber bands, the clamping force can be easily adjusted, which is convenient.

【0019】ボルトの形状、サイズ、ボルトの孔径、配
置は管体のサイズ、接合金物の種類、サイズによって異
なる場合が多いので、この各種別毎に専用のボルト搬送
装置を用意してもよいが、より少ない台数のボルト搬送
装置で対応するためには、各ボルトホルダーの位置調整
可能にすることが有効である。
Since the shape and size of the bolt, the hole diameter and the arrangement of the bolt often differ depending on the size of the tube, the type and size of the metal fittings, a dedicated bolt conveying device may be prepared for each type. In order to cope with a smaller number of bolt transfer devices, it is effective to adjust the position of each bolt holder.

【0020】位置調整方法としては、ボルトホルダーを
ネジ止めにより固定するようにして、予め複数種に対応
できるようにネジ孔配置パターンを選択する方法や、ボ
ルトホルダーを管体の径方向および長さ方向にスライド
させ、ピン止めして固定する方法など一般的な方法を用
いることができる。また、予め各種サイズに対応してボ
ルトホルダーを配設した一括交換型の支持盤を用意し
て、この支持盤を兼用型のボルト搬送装置に装着する方
法を用いることもできる。また、高さ位置を調整するこ
とも有効であり、例えばボルトホルダーの支持板を、搬
送台に高さ位置調整機構を介して支持したり、ボルトホ
ルダーのボルト載置台の高さを変えられるようにするこ
とが有効である。
As the position adjustment method, the bolt holder is fixed by screwing, and a screw hole arrangement pattern is selected in advance so as to be able to cope with a plurality of types. A general method such as sliding in the direction, pinning and fixing can be used. It is also possible to use a method in which a support plate of a batch exchange type in which bolt holders are arranged in advance corresponding to various sizes is prepared, and the support plate is mounted on a dual-purpose bolt transfer device. It is also effective to adjust the height position.For example, the support plate of the bolt holder can be supported on the transfer table via a height position adjustment mechanism, or the height of the bolt mounting table of the bolt holder can be changed. It is effective to

【0021】(4)管体内の所定位置にあるボルト搬送
装置のボルトホルダーに弾性的に挟持したボルトを、ボ
ルト孔を通して引き出すためにボルト引出治具を用いる
が、このボルト引出治具は、ボルト先端部を弾性的に把
持する局部スリット付き把持筒を先端部に螺合等で交換
可能に装着することが簡易であり、ボルトを引き出し後
にボルト先端部から取り外すことも容易である。また、
把持筒の内面先端に内面径が外側に拡径するテーパーを
形成して、ボルト先端に嵌合容易とすることが有効であ
る。
(4) A bolt pull-out jig is used to pull out a bolt elastically held by a bolt holder of a bolt transfer device at a predetermined position in a pipe through a bolt hole. It is easy to replaceably attach a gripping cylinder with a local slit that elastically grips the distal end portion to the distal end portion by screwing or the like, and it is also easy to remove the bolt from the distal end portion after pulling out the bolt. Also,
It is effective to form a taper at the inner end of the inner surface of the gripping tube so that the inner surface diameter increases outward, so that the inner end of the gripping tube can be easily fitted to the end of the bolt.

【0022】把持筒は、ボルトの先端部の形状や外径に
応じた把持筒を用いる必要があることから、複数種のも
のを複数用意しておき、容易に交換できるようにするこ
とが有利である。他方の先端部にはハンドルを装着する
ことは、ボルト先端部へ把持筒の押し込み、ボルトの引
出し操作を容易にする上で有利である。
Since it is necessary to use a gripping cylinder corresponding to the shape and the outer diameter of the tip end of the bolt, it is advantageous to prepare a plurality of types of gripping cylinders so that they can be easily replaced. It is. Attaching the handle to the other end is advantageous in that the gripping cylinder is pushed into the end of the bolt and the bolt is easily pulled out.

【0023】このボルト引出治具の少なくとも把持筒を
含む先端部領域には、座金とナットを挿通するので、こ
の先端部領域の外径は、ボルト孔径、ナットの内径、座
金の孔径より小径である必要がある。この引出治具は、
把持筒とともに中空体で形成し、引出治具をボルト孔か
ら挿入した際に、ボルト搬送装置上のボルトの先端部の
位置を、中空部を通して把手部で確認できるように、把
手部で覗孔となるようにすることが有効である。なお、
この引出治具の把持筒によるボルト把持力を補強するた
めに、把持筒の先端部にボルト先端部を係止する爪を形
成したり、把持筒に磁石による磁着機能を持たせること
も有効である。
A washer and a nut are inserted through at least a tip region of the bolt extracting jig including the gripping cylinder. Therefore, the outer diameter of the tip region is smaller than the bolt hole diameter, the nut inner diameter, and the washer hole diameter. Need to be. This drawer jig
It is formed of a hollow body together with the gripping cylinder, and when the draw-out jig is inserted from the bolt hole, the position of the tip of the bolt on the bolt conveying device can be checked with the handle through the hollow so that the position can be confirmed with the handle. It is effective to make In addition,
In order to reinforce the bolt gripping force of the pulling jig by the gripping cylinder, it is effective to form a claw that locks the bolt tip at the tip of the gripping cylinder, or to make the gripping cylinder have a magnetic attachment function with a magnet. It is.

【0024】本発明を適用するボルト接合は、工場また
は施工現場で行うことができ、例えば工場で行う場合に
は、管体を作業台に水平に載置した状態で管体内にボル
ト搬送装置を挿入し、操作棒を手動操作して移動させて
所定の位置に停止させて接合を行うものである。一般に
は、管体が角形鋼管の場合では、4面がボルト接合面で
あり、接合箇所が長さ方向に複数箇所である場合が多
く、ボルト搬送装置をそれぞれの接合面に対して、長さ
方向の複数の接合箇所で停止させてボルト接合を行う必
要がある。
The bolt joining to which the present invention is applied can be performed at a factory or a construction site. For example, when the bolt is bonded at a factory, a bolt transfer device is installed in a pipe with the pipe placed horizontally on a work table. Insertion, manual operation of the operating rod, and movement to stop at a predetermined position for joining. In general, when the pipe is a square steel pipe, four surfaces are bolted joint surfaces, and there are many cases where there are a plurality of joints in the longitudinal direction. It is necessary to stop at a plurality of joints in the direction and perform bolt joining.

【0025】ボルト搬送装置の1回の挿入で、1面(上
面)の接合しかできない場合には、管体を4度転回さ
せ、ボルト搬送装置の管体内への入・出操作を4回行う
必要があり、作業負担が大きく所要時間も長くなること
から、管体の転回数とボルト搬送装置の管体内への入・
出操作回数を極力減らすことが好ましい。その意味で、
ボルト搬送装置の位置を変えないで角型鋼管の同じ辺
(面)内で例えば2箇所の接合箇所をボルト接合できる
ように、ボルト搬送装置にボルトホルダーを2箇所の接
合箇所分(例えば4個×2箇所)配設することも有効で
ある。
If only one surface (upper surface) can be joined by a single insertion of the bolt transfer device, the pipe is turned four times, and the operation of entering and exiting the bolt transfer device is performed four times. Need to be performed, the work load is large and the required time is long.
It is preferable to reduce the number of outgoing operations as much as possible. In that sense,
In order to be able to bolt-join, for example, two joints within the same side (plane) of the rectangular steel pipe without changing the position of the bolt carrier, the bolt holder is connected to the bolt carrier for two joints (for example, four joints). × 2 places) is also effective.

【0026】管体を転回する方法としては、例えば管体
にワイヤーを玉掛けし、クレーンによる周方向の吊上点
を選択することにより任意の角度に転回する方法が簡易
である。他の方法としては、駆動装置を備えた転回装置
などを用いることもできる。例えば、管体の上面での接
合と両側面での接合を、ボルト搬送装置の一回の入・出
操作の範囲内で行うようにすれば、管体の転回数とボル
ト搬送装置の入・出操作回数を減少(上面と両側面が1
回でできれば転回数は1回、入・出操作は2回)させる
ことができる。
As a method of turning the tube, for example, a method in which a wire is slung on the tube and a lifting point in a circumferential direction is selected by a crane to turn the tube at an arbitrary angle is simple. As another method, a turning device provided with a driving device can be used. For example, if the joining on the upper surface and the joining on both sides of the tube are performed within the range of one entry / exit operation of the bolt transfer device, the number of turns of the tube and the input / output of the bolt transfer device are determined. Reduce the number of outgoing operations (1
If it can be performed once, the number of turns can be one, and the input / output operation can be performed twice).

【0027】この場合、管体の上面での接合と側面での
接合を同じ位置で同時に行うことは、上面側と側面側に
配設のボルトホルダー群が干渉するためできないが、上
面接合用のボルトホルダー群と側面接合用のボルトホル
ダーが干渉しないように、例えば、側面接合用のボルト
ホルダー群を、上面接合用のボルトホルダー群の位置か
ら長さ方向にずらして配置し、例えば、まず、側面での
接合を行い、その後に位置をずらした分だけボルト搬送
装置を移動して上面での接合を行えば、1回の入出操作
の範囲内で管体を転回させないで上面での接合と側面で
の接合を行うことが可能である。
In this case, it is not possible to simultaneously perform the joining on the upper surface and the joining on the side surface of the tubular body at the same position because the bolt holder groups provided on the upper surface side and the side surface interfere with each other. In order not to interfere with the bolt holder group and the bolt holder for side joining, for example, a bolt holder group for side joining is displaced in the length direction from the position of the bolt holder group for top joining, for example, first, If joining is performed on the side surface and then the bolt transfer device is moved by the amount shifted and joining on the upper surface is performed, the joining on the upper surface can be performed without turning the pipe within the range of one entry and exit operation It is possible to perform the joining on the side.

【0028】ボルトの長さと管体の寸法の関係で、両側
面の同じ位置にボルトホルダー群を配設できない場合に
は、前記の場合と同様の考え方で、両側面間でボルトホ
ルダー群が干渉しないように、側面側のボルトホルダー
群を長さ方向で前後に位置をずらして配設し、まず、前
部側のボルトホルダー群のボルトによるボルト接合を行
い、その後に位置をずらした分だけボルト搬送装置を移
動して、後部側のボルトホルダー群のボルトによるボル
ト接合を行うようにすることによって、1回の入出操作
の範囲内で管体を転回させないで両側面でのボルト接合
を行うことが可能である。
If the bolt holders cannot be arranged at the same position on both sides due to the relationship between the length of the bolts and the dimensions of the tube, the bolt holders may interfere with each other in the same way as described above. In order not to dispose, the bolt holder group on the side is shifted at the front and back in the length direction, firstly bolted with the bolt of the front bolt holder group, and then only the amount shifted By moving the bolt conveying device so as to perform the bolt joining by the bolts of the bolt holder group on the rear side, the bolt joining is performed on both sides without turning the pipe within the range of one entry / exit operation. It is possible.

【0029】なお、ボルト搬送装置は、1台を用いて管
体の一端側からのみ挿入して接合するようにしてもよい
し、両端から挿入して接合するようにしてもよい。ま
た、管体が長尺で、ボルト接合箇所が多い場合には、ボ
ルト搬送装置を2台用意して管体の両側から挿入して同
時的にボルト接合を行うようにしてもよい。
It is to be noted that the bolt transfer device may be inserted and joined only from one end side of the tube using one unit, or may be inserted and joined from both ends. When the pipe is long and has many bolted joints, two bolt transfer devices may be prepared and inserted from both sides of the pipe to perform simultaneous bolt joining.

【0030】なお、上記は角形の管体と接合金物とのボ
ルト接合を工場で行う場合を例にして説明したが、本発
明における管体と接合金物とのボルト接合は、基本的に
は、円形の管体と接合金物とのボルト接合も行うことが
できる。円形の管体と接合金物とのボルト接合の際に
は、回転止め手段を用いてボルト接合作業が円滑にでき
るようにする必要がある。
Although the above description has been made by taking as an example the case where bolt connection between a rectangular tube and a metal joint is performed in a factory, the bolt joint between the tube and the metal joint in the present invention is basically performed as follows. Bolt joining between the circular tube and the joining hardware can also be performed. At the time of bolt connection between the circular tube and the metal joint, it is necessary to use a rotation stopping means so that the bolt connection operation can be performed smoothly.

【0031】ボルト接合作業は、工場のみではなく、施
工現場においても行うことができる。工場で行う場合に
は、管体を水平状態にして、その上面側、側面側のボル
ト接合を行うことが主体になるが、施工現場で行うこの
場合には、管体を水平状態の他、斜めの状態または垂直
状態にして行う場合もあり、本発明は基本的には、いず
れの状態にしても適用可能である。
The bolt joining operation can be performed not only at a factory but also at a construction site. When performed at a factory, the pipe is kept horizontal, and the upper surface side and the side surface are mainly bolted.In this case, at the construction site, in addition to the pipe being horizontal, The present invention may be performed in an oblique state or a vertical state, and the present invention is basically applicable to any state.

【0032】[0032]

【実施例】以下に本発明の実施例について、図面を参照
しながら説明する。この実施例は、柱材として用いる管
体すなわち角形鋼管柱にスプリットティー(接合金物)
を介してH形鋼梁を取り付けて、図16に示すような構
築部材を構築する際に、予め、工場において、角形鋼管
柱にスプリットティー(接合金物)を通しボルト(例え
ばトルシア型高力ボルト)を用いて接合する場合に適用
した場合のものである。
Embodiments of the present invention will be described below with reference to the drawings. In this embodiment, a split tee (joint metal) is used for a pipe used as a column material, ie, a square steel pipe column.
At the time of constructing a construction member as shown in FIG. 16 by attaching an H-shaped steel beam through a steel pipe, a split tee (joining hardware) is previously passed through a square steel pipe column at a factory, and a bolt (for example, a torcia-type high-strength bolt) is inserted. ) Is applied to the case of joining using).

【0033】図1(a)において、1は角形鋼管柱で、
軸方向の2箇所(ここではA箇所とB箇所)において、
各辺(4面)にそれぞれ図1(b)に示すようなスプリ
ットティー5を取り付けるためのボルト孔7が複数(4
個)配設され、スプリットティー5には、角形鋼管柱1
にボルト接合するための4個のボルト孔8と、図1
(c)に示すような複数のボルト孔10を配設した梁3
のフランジ3fをボルト接合するためのボルト孔9が複
数配設されており、角形鋼管柱1の各辺(4面)のA、
B、A′、B′か所において、それぞれ角型鋼管柱1に
スプリットティー5を、ボルト孔7とボルト孔8が重な
るように当接し、ボルト孔7とボルト孔8に通しボルト
11を挿し込み、ナット12を螺合し締め付けて、図1
(d)に示すような、構築部材を構築する。
In FIG. 1 (a), 1 is a square steel tubular column,
At two locations in the axial direction (here, location A and location B)
Each side (four sides) has a plurality of bolt holes 7 (4) for attaching split tees 5 as shown in FIG.
The split tee 5 has a square steel pipe column 1
Bolt holes 8 for bolting to
A beam 3 having a plurality of bolt holes 10 as shown in FIG.
Are provided with a plurality of bolt holes 9 for bolting the flanges 3f of the rectangular steel pipe column 1 to A,
At points B, A 'and B', the split tee 5 is brought into contact with the square steel pipe column 1 so that the bolt holes 7 and 8 overlap each other, and the bolt 11 is inserted through the bolt holes 7 and 8. And tighten the nut 12 by screwing.
A construction member as shown in (d) is constructed.

【0034】この実施例では、このような構築部材を予
め工場において構築するものであり、例えば図2〜図3
に示すように、上方にクレーン(図示省略)を備えた工
場の作業台wtに角型鋼管柱1を横にして載置した状態
で、この角型鋼管柱1内に、通しボルトを挟持した複数
のボルトホルダー14a〜14dを配設したボルト搬送
装置15を挿入し、ボルト引出治具18を用いて、角形
鋼管柱1の上面側で角形鋼管柱1とスプリットティー5
のボルト接合を行うようにした例を示している。
In this embodiment, such a construction member is constructed in a factory in advance.
As shown in the figure, the square steel pipe column 1 was placed sideways on a work table wt of a factory equipped with a crane (not shown) above, and through bolts were clamped in the square steel pipe column 1. A bolt conveying device 15 provided with a plurality of bolt holders 14a to 14d is inserted, and a rectangular steel pipe column 1 and a split tee 5 are formed on the upper surface side of the rectangular steel pipe column 1 using a bolt extracting jig 18.
2 shows an example in which bolt joining is performed.

【0035】図2、図3は、ボルト搬送装置15を、角
形鋼管柱1とスプリットティー5のボルト孔7、8に挿
入した位置検知治具としてのダミーボルト13と位置検
知器としてのストッパー16により所定位置に停止させ
て、このボルト搬送装置15のボルトホルダー14a〜
14dに弾性的に挟持した4本の通しボルト11を、そ
れぞれ角形鋼管柱1とスプリットティー5のボルト孔
7、8に位置合わせし、ボルトホルダーに把持した通し
ボルト11の先端を、ナット12と座金17を挿通した
ボルト引出治具18の先端の把持筒19で把持した状態
を示している。
FIGS. 2 and 3 show a dummy bolt 13 as a position detecting jig and a stopper 16 as a position detector, in which the bolt conveying device 15 is inserted into the rectangular steel pipe column 1 and the bolt holes 7 and 8 of the split tee 5. To stop at a predetermined position, and the bolt holders 14a to 14a
The four through bolts 11 elastically clamped by 14d are aligned with the rectangular steel pipe column 1 and the bolt holes 7 and 8 of the split tee 5, respectively. This shows a state in which the washer 17 is gripped by the gripping cylinder 19 at the tip of the bolt extraction jig 18 inserted.

【0036】ここでは、このボルト接合を角型鋼管柱1
の各辺(面)毎に、接合される梁の一方のフランジを接
合する例えばB箇所単位(ここではA箇所のボルト接合
は現場でワンサイドボルトにより接合する。)で行うも
のであり、角形鋼管柱1にスプリットティー5を、ボル
ト孔7と8が一致するように当接し、このボルト孔7、
8にダミーボルト13を挿入した状態の角形鋼管柱1内
に、複数(4個)の通しボルト11を弾性的に挟持した
ボルトホルダー14a〜14dを備えたボルト搬送装置
15を挿入して、ダミーボルト13にボルト搬送装置1
5の手前側(ここではボルトホルダー14a、14b近
傍)に配設したストッパー16を接触させることによ
り、各通しボルト11の先端部と各ボルト孔7、8との
位置合わせを行う。
In this case, this bolt connection is performed by connecting the square steel tube column 1
For example, for each side (face), one flange of a beam to be joined is joined in units of B (here, bolt joining at A is joined by one-side bolts at the site), and is square. The split tee 5 is brought into contact with the steel pipe column 1 so that the bolt holes 7 and 8 coincide with each other.
8, a bolt conveying device 15 having bolt holders 14a to 14d elastically holding a plurality of (four) through bolts 11 is inserted into the rectangular steel tube column 1 in which the dummy bolts 13 are inserted. Bolt transport device 1 for bolt 13
By contacting a stopper 16 disposed on the near side of the 5 (here, near the bolt holders 14a, 14b), the tip of each through-bolt 11 and each of the bolt holes 7, 8 are aligned.

【0037】位置合わせ後、ナット12と座金17とを
挿通したボルト引出治具18(把持筒19)で各通しボ
ルト11の先端部(トルシア形高力ボルトの場合はピン
テール部)を把持してボルト孔7、8を通して引出し、
通しボルト11のネジ形成部の先端を外部に突出させ、
ボルト引出治具18(把持筒19)から座金17とナッ
ト12を移行(ここでは落し込み)させてナット12を
螺合して締め付け、角型鋼管柱1とスプリットティー5
をボルト接合する(ダミーボルト13と、ボルト引出治
具18の取り外しは適時行う)。
After the positioning, the tip of each through-bolt 11 (pin tail in the case of a torcia-type high-strength bolt) is gripped by a bolt extracting jig 18 (holding cylinder 19) in which the nut 12 and the washer 17 are inserted. Pull out through bolt holes 7 and 8,
The tip of the thread forming portion of the through bolt 11 is projected outside,
The washer 17 and the nut 12 are moved (in this case, dropped) from the bolt extracting jig 18 (the gripping cylinder 19), and the nut 12 is screwed and tightened.
(The dummy bolt 13 and the bolt extraction jig 18 are removed at appropriate times).

【0038】角形鋼管柱1には、図1(d)に示したよ
うに、各辺(4面)のB箇所にスプリットティー5をボ
ルト接合するものであるが、この例では、ボルト搬送装
置15を同じ位置に停止させた状態で、各辺(4面)で
のボルト接合を行うことはできない。
As shown in FIG. 1D, a split tee 5 is bolted to the square steel pipe column 1 at a position B on each side (four sides). In this example, a bolt conveying device is used. With 15 stopped at the same position, bolt joining on each side (4 surfaces) cannot be performed.

【0039】そのため、角形鋼管柱1を周方向に、例え
ばクレーン(図示省略)を用いて90度ずつ転回させて
から、ボルト搬送装置15を辺(1面)毎に、角形鋼管
柱1内に入・出させようにしており、この辺(1面)毎
にボルト搬送装置をB箇所に停止させ、ボルト接合を行
うようにしており、前方側にさらにA′箇所とB′箇所
(図示省略)がある場合には、まず、B′箇所にボルト
搬送装置15を移動してB′箇所のボルト接合を行った
後、ボルト搬送装置15を一旦、角形鋼管柱1の外に移
動して、ボルトホルダーにボルトを装填してボルト搬送
装置15を角形鋼管柱1内の手前側のB箇所に移動して
B箇所のボルト接合を行う。
For this reason, the rectangular steel pipe column 1 is turned in the circumferential direction, for example, by 90 ° using a crane (not shown), and then the bolt conveying device 15 is inserted into the rectangular steel pipe column 1 for each side (one surface). For each side (one surface), the bolt conveying device is stopped at the B position, and the bolts are joined, and the A 'position and the B' position (not shown) are further provided on the front side. In the case where there is, first, the bolt transfer device 15 is moved to the position B ′ to perform the bolt joining at the position B ′, and then the bolt transfer device 15 is once moved out of the square steel tubular column 1 to The bolt is loaded into the holder, and the bolt conveying device 15 is moved to the front B position in the square steel tubular column 1 to perform the bolt connection at the B position.

【0040】このようにして、この辺(1面)の2箇所
(B、B′箇所)のボルト接合を終わったら、ボルト搬
送装置15を一旦、角形鋼管柱1内から外に移動して退
避させ、角形鋼管柱1をクレーンで90度回転させて、
前記と同様にして次の辺(面)のボルト接合を行う。
After the bolt connection at two places (B and B ') on this side (one surface) is completed in this way, the bolt transfer device 15 is once moved out of the square steel tube column 1 and retracted. , Rotate the square steel tube column 1 90 degrees with a crane,
The bolt joining of the next side (surface) is performed in the same manner as described above.

【0041】本発明で用いるボルト搬送装置15と、ダ
ミーボルト13と、ボルト引出治具18の基本的構成例
と、これらの操作によるボルト接合手順例について、以
下に説明する。
A basic configuration example of the bolt transport device 15, the dummy bolt 13, and the bolt extracting jig 18 used in the present invention, and an example of a bolt joining procedure by these operations will be described below.

【0042】ボルト搬送装置15は、図2、図3に示す
ように、下部に走行ローラー20を有し、両側部に相対
位置を取付けボルト21による取付位置で調整可能なガ
イドローラー22a、22bを備え、操作棒23を上
下、左右に回動自在で交換可能に連結した搬送台24
に、通しボルト11を接合面に対し直立状態で弾性的に
挟持するボルトホルダー14a〜14dを、位置調整装
置25で上下に位置調整可能で、取付けボルト26によ
る取付位置を調整することによって位置調整可能に配設
している。そして、最手前のボルトホルダー14a、1
4bの近くに、角形鋼管柱1とスプリットティー5のボ
ルト孔7、8に挿入のダミーボルト13を検知する切欠
部を有するストッパー16を配設したものである。
As shown in FIGS. 2 and 3, the bolt conveying device 15 has a traveling roller 20 at a lower portion, and guide rollers 22a and 22b whose relative positions can be adjusted at the mounting position by the mounting bolt 21 on both sides. A carriage 24 having an operating rod 23 rotatably movable up and down, left and right and exchangeable.
The position of the bolt holders 14a to 14d, which elastically clamp the through bolt 11 in an upright state with respect to the joining surface, can be adjusted vertically by the position adjusting device 25, and the position of the bolt holders 14a to 14d can be adjusted by adjusting the mounting position by the mounting bolt 26. It is arranged as possible. Then, the frontmost bolt holders 14a, 1
A stopper 16 having a cutout for detecting the dummy bolt 13 inserted in the bolt holes 7 and 8 of the rectangular steel pipe column 1 and the split tee 5 is provided near 4b.

【0043】図中の27はブレーキで、所定位置で停止
させたボルト搬送装置15の位置ずれを防止するための
ものである。また、28は照明灯で、ボルト搬送装置1
5を所定位置に停止させたとき、ボルトホルダー14a
〜14dに把持された通しボルト11の先端位置が、ボ
ルト孔7、8の外部側から目視で、確認しやすく照らす
ためのものである。
In the figure, reference numeral 27 denotes a brake for preventing a displacement of the bolt transfer device 15 stopped at a predetermined position. Reference numeral 28 denotes an illuminating lamp, and the bolt conveying device 1
5 is stopped at a predetermined position, the bolt holder 14a
The position of the tip of the through-bolt 11 gripped by 14d is for illuminating the bolt holes 7 and 8 from outside the bolt holes 7 and 8 for easy visual confirmation.

【0044】ボルト搬送装置15に配設されるボルトホ
ルダー14a〜14dは、ここでは、図4に示すような
構造を有している。(ここでは、ボルトホルダー14a
で代表説明する。) すなわち、ボルトホルダー14aは、挟持する通しボル
ト11の頭部11hの径Dより大きい距離Lをおいて対
設した支持体29a、29b(29a、29bは一体に
形成してもよい。)に、それぞれ挟持体30a、30b
を回動可能に取り付け、この相対する挟持体30a、3
0b間にバネ31により挟持力を付与する構造を有して
おり、相対する支持体29a、29b間の下部には、通
しボルト11の頭部11hを載置する載置台32を設
け、(29a、29b、32は一体に形成してもよ
い。)また、挟持体30a、30b間の上部にはバネ3
1により、通しボルト11の軸部11s部を挟持する開
閉自在な挟持孔33を形成するとともに、この挟持孔の
上端に通しボルト11の頭部11hを支持可能な支持面
30fを形成している。
The bolt holders 14a to 14d provided in the bolt transfer device 15 have a structure as shown in FIG. (Here, the bolt holder 14a
A representative explanation is given below. That is, the bolt holder 14a is formed on the support members 29a and 29b (29a and 29b may be integrally formed) opposed to each other at a distance L larger than the diameter D of the head 11h of the through bolt 11 to be clamped. , The holding bodies 30a, 30b respectively
Are rotatably mounted, and the opposed holding bodies 30a, 3a
0b has a structure for applying a clamping force by a spring 31. A mounting table 32 for mounting the head 11h of the through bolt 11 is provided below the opposing supports 29a and 29b. , 29b, and 32 may be formed integrally.) In addition, a spring 3 is provided above the sandwiching bodies 30a and 30b.
1 forms an openable / closable holding hole 33 for holding the shaft portion 11s of the through bolt 11, and a support surface 30f capable of supporting the head 11h of the through bolt 11 at an upper end of the holding hole. .

【0045】挟持孔33の挟持径aは、通しボルト11
を挟持したときの位置精度を安定させるため、軸部11
s部の径dよりやや小さく設定されている。また、挟持
孔33の下端から支持体29a、29bの内側の上端と
の間に傾斜面30tが形成されている。
The holding diameter a of the holding hole 33 is equal to the through bolt 11.
In order to stabilize the position accuracy when the
It is set slightly smaller than the diameter d of the s portion. Further, an inclined surface 30t is formed between the lower end of the holding hole 33 and the upper end inside the supports 29a and 29b.

【0046】このボルトホルダー14aに通しボルト1
1を挟持させる作業は、ボルト搬送装置15を角型鋼管
柱1内に挿入する前に行うものであり、図4の状態で通
しボルト11を手で持って、ボルトホルダー14aのバ
ネ31の弾性力に勝る押込力で下方に押し込み(容易に
押し込みができる弾性力、挟持力を設定する。)挟持孔
33をこじ開けて、通しボルト11を図5の状態を経て
図6のような状態でバネ31の弾性力でボルトホルダー
14aに弾性的に挟持させることができる。この状態で
は挟持孔33の径aは通しボルト11の軸11sの径d
とほぼ一致する。
The bolt 1 is inserted through the bolt holder 14a.
The operation of holding the bolts 1 is performed before the bolt conveying device 15 is inserted into the square steel tubular column 1, and by holding the through bolts 11 by hand in the state of FIG. 4, the elasticity of the spring 31 of the bolt holder 14a is adjusted. Pressing down with a pushing force exceeding the force (sets the elastic force and the holding force that can be easily pushed in.) The holding hole 33 is pryed open, and the through bolt 11 is moved in the state shown in FIG. With the elastic force of 31, the bolt holder 14a can be elastically held. In this state, the diameter a of the holding hole 33 is equal to the diameter d of the shaft 11s of the through bolt 11.
And almost match.

【0047】次に、このようにしてホルダー14aに挟
持された通しボルト11を、座金とナットを挿通したボ
ルト引出治具18で引き出すと、図7(a)に示すよう
に、通しボルト11の頭部11hが挟持体30a、30
bの傾斜面30tの効果で、バネ31の弾性力に容易に
勝って挟持孔33を次第に開き、通しボルト11の頭部
11hが挟持体30a、30bによる挟持から解放され
ると、図7(b)に示すように、挟持体30a、30b
はバネ31の弾性力で通しボルト11を挟持する前の状
態に復帰する。
Next, when the through bolt 11 clamped by the holder 14a in this manner is pulled out by a bolt pulling jig 18 through which a washer and a nut are inserted, as shown in FIG. The head 11h is the holding body 30a, 30
By the effect of the inclined surface 30t of b, the holding hole 33 is gradually opened by easily overcoming the elastic force of the spring 31, and the head 11h of the through bolt 11 is released from being held by the holding bodies 30a and 30b. As shown in b), the holding bodies 30a, 30b
Returns to the state before the through bolt 11 is clamped by the elastic force of the spring 31.

【0048】この状態では、通しボルト11の頭部11
hは、挟持体の上面の支持面30fで支持され自重で落
下(後退)する心配はない。そして、この状態では通し
ボルト11のネジ形成部の先端は、図7(c)に示すよ
うに、外部に突出しているので、座金、ナットの落し込
み、ナットの螺合・締め付け、引出治具18の取り外し
作業などを安定して行うことができる。
In this state, the head 11 of the through bolt 11
h is supported by the support surface 30f on the upper surface of the holding body, and there is no risk of dropping (retreating) by its own weight. In this state, since the tip of the thread forming portion of the through bolt 11 projects outside as shown in FIG. 7C, the washer, the nut is dropped, the nut is screwed and tightened, and the drawing jig is used. 18 can be stably removed.

【0049】本発明で用いるボルト引出治具18は、図
8(a)に示すように、一方の先端部に通しボルト11
の先端部を弾性的に把持する、数条の弾性付与用の縦ス
リット34を形成した把持筒19を交換可能に装着し、
他方の先端部に把手35を形成した棒体36からなり、
孔19oを有する把持筒19と棒体36の少なくとも先
端部領域の外径が、角型鋼管柱1のボルト孔7の孔径、
スプリットティー5のボルト孔8の孔径、ナット12の
内径、座金17の孔径より小径に形成して、ボルト孔7
とボルト孔8に容易に挿入でき、通しボルト11を、把
持した状態でボルト孔7とボルト孔8から容易に引出せ
るようにしている。
As shown in FIG. 8 (a), the bolt pull-out jig 18 used in the present invention
The gripping cylinder 19 formed with several longitudinal slits 34 for elasticity elastically gripping the distal end of the cylinder is replaceably mounted,
It consists of a rod 36 having a handle 35 formed at the other end,
The outer diameter of at least the distal end region of the holding cylinder 19 having the hole 19o and the rod 36 is the hole diameter of the bolt hole 7 of the square steel tubular column 1,
The diameter of the bolt hole 8 of the split tee 5, the inner diameter of the nut 12, and the diameter of the washer 17 are smaller than the diameter of the bolt hole 7.
And the bolt hole 8 so that the through bolt 11 can be easily pulled out from the bolt hole 7 and the bolt hole 8 in a gripped state.

【0050】棒体36の先端に装着される把持筒19
は、把持対象の通しボルト11の先端の形状および径に
応じて、また、損耗、破損した場合には交換する必要が
あることから、複数用意するものであり、交換を容易に
するため引出治具18の棒体36の先端内面に雌ねじ3
6aを切り、把持筒19の上部の小径部外面に雄ネジ1
9aを切って、棒体36と把持筒19を容易に螺合でき
るようにしている。図8中の37は覗孔であり、棒体3
6の先端に装着した把持筒19の孔19oに連通し、ボ
ルト孔7、8に挿し込んだ状態で、ボルト搬送装置上の
通しボルト11の先端位置を確認するためのものであ
る。
The gripping cylinder 19 attached to the tip of the rod 36
Are prepared in accordance with the shape and diameter of the end of the through bolt 11 to be gripped, and when worn or damaged, need to be replaced. Female screw 3 on the inner surface of the tip of the rod 36 of the tool 18
6a, and cut a male screw 1
9a is cut so that the rod 36 and the holding cylinder 19 can be easily screwed together. Reference numeral 37 in FIG.
This is for confirming the position of the leading end of the through bolt 11 on the bolt transfer device while communicating with the hole 19o of the gripping cylinder 19 attached to the leading end of the bolt 6 and being inserted into the bolt holes 7 and 8.

【0051】次に、上記のボルト搬送装置15とボルト
引出治具18を用いた角型鋼管柱1とスプリットティー
5のボルト接合手順例について、図2および図9〜図1
4に基づき説明する。
Next, FIGS. 2 and 9 to 1 show an example of a bolt joining procedure of the square steel tubular column 1 and the split tee 5 using the above-described bolt conveying device 15 and the bolt extracting jig 18.
4 will be described.

【0052】(1)角型鋼管柱1とスプリットティー5
のサイズ、ボルト孔7、8の径、配置に応じたボルト搬
送装置15を準備し、このボルト搬送装置のボルトホル
ダー14a〜14dに、それぞれ通しボルト11をその
頭部側から押し込んで、このボルトホルダーにより直立
状態にして弾性的に保持させる。
(1) Square steel pipe column 1 and split tee 5
A bolt conveying device 15 is prepared in accordance with the size of the bolt holes 7, 8 and the arrangement thereof, and the through bolts 11 are pushed into the bolt holders 14a to 14d of the bolt conveying device from the head side. The holder is placed upright and held elastically.

【0053】(2)角型鋼管柱1は、図2および図3に
示すように、作業台wt上に載置し、この角型鋼管柱1
とスプリットティー5の接合箇所において、手前側(ボ
ルト搬送装置15の挿入側)のボルト孔7と8に、ダミ
ーボルト13を挿し込んでボルト孔7と8を一致させ
て、角型鋼管柱1にスプリットティー5を当接し、ダミ
ーボルト13の先端部を角型鋼管柱1内に突出させる。
(2) As shown in FIGS. 2 and 3, the square steel pipe column 1 is mounted on a worktable wt.
At the joint of the square steel pipe 5 and the split tee 5, the dummy bolts 13 are inserted into the bolt holes 7 and 8 on the near side (the insertion side of the bolt conveying device 15) so that the bolt holes 7 and 8 coincide with each other. The split tee 5 is brought into contact with the rectangular steel pipe column 1 so that the tip of the dummy bolt 13 protrudes into the square steel pipe column 1.

【0054】(3)角形鋼管柱1内にボルト搬送装置1
5を挿入して操作棒23で押し、ストッパー16をダミ
ーボルト13に接触させることにより、このボルト搬送
装置15のボルトホルダー14a〜14d(ここではボ
ルトホルダー14bと14dで代表説明する。)に弾性
的に挟持した各通しボルト11の先端を、それぞれ角形
鋼管柱1とスプリットティー5のボルト孔7、8に位置
合わせすることができる。この状態で操作棒23を下げ
てブレーキ27を作用させ、位置がずれないように固定
する。
(3) Bolt transfer device 1 in rectangular steel tube column 1
5 is pushed by the operating rod 23, and the stopper 16 is brought into contact with the dummy bolt 13, so that the bolt holders 14a to 14d of the bolt transport device 15 (here, representatively described by the bolt holders 14b and 14d) are resilient. The ends of the through bolts 11 that have been properly held can be aligned with the bolt holes 7 and 8 of the square steel tubular column 1 and the split tee 5, respectively. In this state, the operating rod 23 is lowered to actuate the brake 27 and fix the position so that the position does not shift.

【0055】(4)ダミーボルト13を挿入していない
ボルト孔7、8に、ナット12と座金17を挿通したボ
ルト引出治具18を挿入し、その先端の把持筒19をボ
ルト搬送装置15のボルトホルダー14dに弾性的に挟
持した通しボルト11の先端部に押し込むことにより、
スリット34の作用により把持筒19で通しボルト11
の先端部を弾性的に把持する。
(4) A bolt extraction jig 18 in which a nut 12 and a washer 17 are inserted is inserted into the bolt holes 7 and 8 into which the dummy bolt 13 is not inserted. By pushing into the tip of the through bolt 11 elastically held by the bolt holder 14d,
By the action of the slit 34, the bolt 11
Elastically grips the tip of the.

【0056】(5)図2および図3の状態から、ボルト
引出治具18を引上げると、図9の状態を経て図10の
状態、すなわち、ボルトホルダー14dによる挟持が解
除されて、通しボルト11の頭部11hは、ボルトホル
ダー14dの上端部の支持面30fで支持された状態に
なり、自重ではボルトホルダー14d内に落下(後退)
する心配はない。このとき、通しボルト11のネジ形成
部の先端部は、スプリットティー5の上面から突出した
状態になるので、ボルト引出治具18に挿通した座金1
7とナット12は通しボルト11のネジ形成部の先端部
に自動的に落とし込まれているので、容易にナット17
を螺合し締め付けることができる。
(5) When the bolt extracting jig 18 is pulled up from the state shown in FIGS. 2 and 3, the state shown in FIG. 10 is passed through the state shown in FIG. 9, that is, the holding by the bolt holder 14d is released, and the through bolt 11 is supported by the support surface 30f at the upper end of the bolt holder 14d, and falls (retreats) into the bolt holder 14d under its own weight.
Don't worry. At this time, the tip of the thread forming portion of the through bolt 11 projects from the upper surface of the split tee 5, so that the washer 1 inserted through the bolt pull-out jig 18.
7 and the nut 12 are automatically dropped into the end of the thread forming portion of the through bolt 11, so that the nut 17 can be easily removed.
Can be screwed and tightened.

【0057】締め付け後に通しボルト11の先端部から
引出治具18の把持筒19を外して図11に示すよう
に、ボルトホルダー14d側での接合を終了する。そし
て、手前側のボルト孔7、8からダミーボルト13を引
き抜いた後、このボルト孔7、8から、ボルトホルダー
14bに、ナット12と座金17を挿通したボルト引出
治具18を挿入し、その先端の把持筒19をボルトホル
ダー14bに弾性的に挟持した通しボルト11の先端部
に押し込むことにより、スリット36の作用により把持
筒19で通しボルト11の先端部を弾性的に把持する。
After the tightening, the gripping tube 19 of the draw-out jig 18 is removed from the tip of the through bolt 11, and the joining on the bolt holder 14d side is completed as shown in FIG. Then, after the dummy bolt 13 is pulled out from the bolt holes 7 and 8 on the front side, the bolt pulling jig 18 into which the nut 12 and the washer 17 are inserted is inserted from the bolt holes 7 and 8 into the bolt holder 14b. The distal end of the through bolt 11 is elastically gripped by the gripping cylinder 19 by the action of the slit 36 by pushing the gripping cylinder 19 at the distal end into the distal end of the through bolt 11 elastically held by the bolt holder 14b.

【0058】(6)図11の状態からボルト引出治具1
8を引き出し、図12の状態を経て図13の状態、すな
わち、ボルトホルダー14bによる挟持が解除されて、
通しボルト11の頭部11hは、ボルトホルダー14b
の上端部の支持面30fで支持された状態になり、自重
ではボルトホルダー14b内に落下(後退)する心配は
ない。
(6) Jig 1 for pulling out bolt from the state of FIG.
8 is pulled out, the state of FIG. 13 is passed through the state of FIG. 12, that is, the holding by the bolt holder 14b is released,
The head 11h of the through bolt 11 is attached to the bolt holder 14b.
Is supported by the support surface 30f at the upper end of the bolt holder 14b, and there is no fear of falling (retreating) into the bolt holder 14b by its own weight.

【0059】このとき、通しボルト11のネジ形成部の
先端部は、スプリットティー5の上面から突出した状態
になるので、ボルト引出治具18に挿通した座金17と
ナット12は通しボルト11のネジ形成部の先端部に自
動的に移行しているので、ナット12を螺合し仮締め付
けした後、図14に示すように、ボルト11の先端部か
ら引出治具18の把持筒19を外し、ボルト搬送装置1
5を外方へ移動(ストッパー16と通しボルトの頭部と
の干渉を避ける)し、仮締めしたナット12を締め付け
ることにより、ボルトホルダー14b側での接合も終了
する。
At this time, since the tip of the thread forming portion of the through bolt 11 projects from the upper surface of the split tee 5, the washer 17 and the nut 12 inserted into the bolt extracting jig 18 are screwed into the thread of the through bolt 11. Since the nut automatically shifts to the tip of the forming portion, the nut 12 is screwed and temporarily tightened. Then, as shown in FIG. Bolt transfer device 1
5 is moved outward (to avoid interference between the stopper 16 and the head of the through-bolt) and the temporarily tightened nut 12 is tightened, thereby completing the joining on the bolt holder 14b side.

【0060】(7)角形鋼管柱1の辺(1面)内の接合
箇所が、図1で示したように、手前側のB箇所と前方側
のB′箇所の2箇所ある場合には、B′箇所でのボルト
接合が終了したらボルト搬送装置15を一旦外へ出し、
前記(1)〜(6)の作業を行い、B箇所でのボルト接
合を行う。
(7) As shown in FIG. 1, when there are two joints on the side (one surface) of the rectangular steel tube column 1, a position B on the near side and a position B ′ on the front side, When the bolting at the point B ′ is completed, the bolt transport device 15 is once taken out, and
The above operations (1) to (6) are performed, and bolt joining is performed at the point B.

【0061】(8)角形鋼管柱1の辺(1面)内でのボ
ルト接合が終了したら、ボルト搬送装置15を一旦外へ
出した状態で、角形鋼管柱1にワイヤーを玉掛けして吊
り上げ位置を90度ずらし、クレーン(図示省略)で吊
って90度転回して、次の辺(他面)について上記
(1)〜(7)とほぼ同様の作業を行う。このようにし
て、角形鋼管柱1の各辺について各箇所単位でボルト接
合を行っていき、全体の接合を完了することができる。
(8) When the bolt connection within the side (one surface) of the square steel tubular column 1 is completed, the wire is slung on the square steel tubular column 1 in the state where the bolt conveying device 15 is once taken out, and the lifting position is set. Is shifted by 90 degrees, suspended by a crane (not shown), turned around by 90 degrees, and the same operation as the above (1) to (7) is performed on the next side (the other surface). In this manner, the bolt joining is performed for each side of each side of the rectangular steel tubular column 1, and the entire joining can be completed.

【0062】なお、本発明は上記の実施例に限定される
ものではない。例えば、上記の実施例は、角形鋼管柱と
スプリットティーとのボルト接合に適用したものである
が、施工現場での角形鋼管と他の接合金物とのボルト接
合にも適用することもできるし、円形鋼管と接合金物を
ボルト接合する場合にも適用可能である。また、このボ
ルト接合は、工場だけではなく、施工現場でも行うこと
ができる。
The present invention is not limited to the above embodiment. For example, the above embodiment is applied to bolt joint between a square steel pipe column and a split tee, but can also be applied to bolt joint between a square steel pipe and other joint hardware at a construction site, The present invention is also applicable to the case where a circular steel pipe and a metal joint are bolted. This bolt connection can be performed not only at a factory but also at a construction site.

【0063】ボルト搬送装置(含ボルトホルダー、ガイ
ドローラー、位置検知器等)の構造、配置、引出治具
(把持筒)の構造、位置検知治具の構造、配置、ボルト
接合手順等については、接合対象の角形鋼管柱、接合金
物、梁等のサイズ、ボルトの形状とサイズ、ボルトの孔
径、配置等に応じて各請求項を満足する範囲内で変更の
あるものである。
The structure and arrangement of the bolt transfer device (including bolt holders, guide rollers, position detectors, etc.), the structure of the drawing jig (holding cylinder), the structure and arrangement of the position detection jig, the bolt joining procedure, etc. There is a change within a range that satisfies the claims according to the size of the rectangular steel pipe column, the joint hardware, the beam, and the like to be joined, the shape and size of the bolt, the hole diameter of the bolt, the arrangement, and the like.

【0064】また、上記の実施例では、ボルト搬送装置
には、1接合箇所分(4個)のボルトホルダーを配設
し、接合箇所単位で角形鋼管柱内で出し入れするように
したが、ボルト搬送装置に2箇所の接合箇所分(例えば
8個)のボルトホルダーを配設し、2接合箇所単位で角
形鋼管柱内で出し入れするようにしたり、ボルト搬送装
置に、上面用と側面用のボルトホルダーを配設して、ボ
ルト搬送装置の角形鋼管柱内での出し入れ回数を少なく
するようにしてもよい。
In the above-described embodiment, the bolt transfer device is provided with one (four) bolt holders for one joint, and the bolt holder is inserted into and removed from the rectangular steel pipe column in joint units. Bolt holders for two joints (for example, eight) are provided in the transfer device, and they can be inserted into and removed from the rectangular steel pipe column in units of two joints. A holder may be provided to reduce the number of times the bolt transfer device is inserted into and removed from the rectangular steel tube column.

【0065】また、上記の実施例では、ダミーボルト1
3を挿入していたボルト孔7、8から引出治具18を挿
し込みボルトホルダーから通しボルト11を引き上げる
際に、ストッパー16に通しボルト11の頭部11hが
干渉して引上げができないので、ボルト搬送台車を移動
してストッパーを退避させるようにしたが、例えば、ボ
ルト孔7、8から引出治具18を挿し込みによって、あ
るいは引上げによって、通しボルト11などを介してス
トッパーを退避させる機構を用いることにより、ボルト
搬送台車の退避移動を回避できるようにしてもよい。
In the above embodiment, the dummy bolt 1
When the pull-out jig 18 is inserted from the bolt holes 7 and 8 into which the bolt 3 has been inserted, and the bolt 11 is pulled up from the bolt holder, the head 11h of the bolt 11 interferes with the stopper 16 and cannot be pulled up. The stopper is retracted by moving the transport trolley. For example, a mechanism for retracting the stopper via the through bolt 11 or the like by inserting the pull-out jig 18 from the bolt holes 7 and 8 or by pulling up is used. Thereby, the retreating movement of the bolt transport trolley may be avoided.

【0066】[0066]

【発明の効果】本発明では、角形鋼管や円形鋼管などの
管体と接合金物を、工場や施工現場において、安価な通
しボルトを用いたボルト接合により容易に行うことがで
き、ワンサイドボルト使用量を大幅に減らすことがで
き、ワンサイドボルトのみを使用した場合に比べてボル
トコストを大幅に削減することができ、また、労力負担
も小さくしながら施工工期を短縮し、トータルの施工コ
ストを大幅に節減することが可能である。
According to the present invention, pipes such as square steel pipes and circular steel pipes and metal fittings can be easily formed at a factory or a construction site by bolting using inexpensive through bolts. The amount can be greatly reduced, the bolt cost can be greatly reduced compared to the case where only one side bolt is used, and the construction period is shortened while reducing the labor burden, and the total construction cost is reduced. Significant savings can be made.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明を適用する角形鋼管柱と梁の接合構造例
を示す説明図で、(a)図は、角形鋼管柱を示す立体説
明図、(b)図は、角形鋼管柱に梁を取り付けるために
用いる接合金物(スプリットティー)を示す立体説明
図、(c)は、角形鋼管柱に接合金物を介して取り付け
る梁を示す立体説明図、(d)図は、角形鋼管柱に接合
金物をボルト接合した構築部材例を示す立体説明図。
BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is an explanatory view showing an example of a joint structure of a rectangular steel pipe column and a beam to which the present invention is applied. FIG. 1 (a) is a three-dimensional explanatory view showing a rectangular steel pipe column, and FIG. Three-dimensional explanatory view showing a joint metal (split tee) used to attach the steel, (c) is a three-dimensional explanatory view showing a beam to be attached to the square steel pipe column via the joint metal, and (d) is a figure joined to the square steel pipe column The three-dimensional explanatory drawing which shows the example of the construction member which joined the metal by bolt.

【図2】本発明の実施例を示す一部断面側面説明図。FIG. 2 is a partial cross-sectional side view illustrating an embodiment of the present invention.

【図3】図3のAa−Ab矢視での平面説明図。FIG. 3 is an explanatory plan view as seen from arrows Aa-Ab in FIG. 3;

【図4】(a)図は、本発明の実施例におけるボルトホ
ルダーの構造例を示す側面説明図、(b)図は、(a)
図のBa−Bb矢視で示す平面説明図、(c)図は、
(b)図のCa−Cb矢視で示す側断面説明図。
4A is an explanatory side view showing a structural example of a bolt holder according to an embodiment of the present invention, and FIG.
FIG. 3C is an explanatory plan view taken along the line Ba-Bb in FIG.
(B) Side sectional explanatory drawing shown by Ca-Cb arrow of a figure.

【図5】(a)図は、図4のボルトホルダーへの通しボ
ルト装着状態例を示す側面説明図、(b)図は、(a)
図のDa−Db矢視で示す平面説明図。
5A is an explanatory side view showing an example of a state in which a through-bolt is attached to the bolt holder of FIG. 4; FIG.
FIG. 2 is an explanatory plan view as viewed in the direction of arrows Da-Db in FIG.

【図6】(a)図は、図4のボルトホルダーへの通しボ
ルトの挟持状態例を示す側面説明図、(b)図は、
(a)図のEa−Eb矢視で示す平面説明図。
6A is an explanatory side view showing an example of a state in which a through-bolt is held by a bolt holder in FIG. 4; FIG.
(A) Plan view explanatory drawing shown by Ea-Eb arrow of a figure.

【図7】(a)図は、図4のボルトホルダーからの通し
ボルト引上げ状態例を示す側面説明図、(b)図は、ボ
ルトホルダー上端部で通しボルトの頭部を支持している
状態を示す側面説明図、(c)図は、(b)図の状態で
の通しボルトの先位置を示す側断面説明図。
7A is an explanatory side view showing an example of a state in which a through-bolt is pulled up from the bolt holder in FIG. 4; FIG. 7B is a state in which the head of the through-bolt is supported at the upper end of the bolt holder; (C) is a side sectional view showing the leading position of the through bolt in the state shown in (b).

【図8】(a)図は、本発明の実施例における引出治具
の構造例を示す側面説明図、(b)図は、(a)図の把
持筒の構造例を示す立体説明図。
FIG. 8A is a side view showing an example of the structure of a drawer jig according to an embodiment of the present invention, and FIG. 8B is a three-dimensional view showing an example of the structure of the gripping cylinder shown in FIG.

【図9】本発明の実施例におけるボルト接合作業手順例
(ボルトの引上げ状態例)を示す一部切り欠き断面側断
面説明図。
FIG. 9 is a partially cutaway side sectional explanatory view showing an example of a bolt joining work procedure (an example of a bolt pulled up state) in the embodiment of the present invention.

【図10】本発明の実施例におけるボルト接合作業手順
例(ボルトへのナット螺合開始状態例)を示す一部切り
欠き断面側断面説明図。
FIG. 10 is a partially cutaway side sectional explanatory view showing an example of a bolt joining operation procedure (an example of a state in which a nut is screwed into a bolt) in the embodiment of the present invention.

【図11】本発明の実施例におけるボルト接合作業手順
例(ボルトへのナット螺合終了状態例と、他のボルトを
引出治具で把持状態例)を示す一部切り欠き断面側断面
説明図。
FIG. 11 is a partially cut-away cross-sectional side sectional view showing an example of a bolt joining operation procedure in the embodiment of the present invention (an example of a state in which a nut is screwed to a bolt and an example of a state in which another bolt is gripped by a drawing jig); .

【図12】本発明の実施例におけるボルト接合作業手順
例(他のボルトの引上げ状態例)を示す一部切り欠き断
面側断面説明図。
FIG. 12 is a partially cutaway side sectional explanatory view showing an example of a bolt joining operation procedure (an example of a pulled-up state of another bolt) in the embodiment of the present invention.

【図13】本発明の実施例におけるボルト接合作業手順
例(他のボルトへのナット螺合開始状態例)を示す一部
切り欠き断面側断面説明図。
FIG. 13 is a partially cutaway side sectional explanatory view showing an example of a bolt joining operation procedure (an example of a nut screwing start state to another bolt) in the embodiment of the present invention.

【図14】本発明の実施例におけるボルト接合作業手順
例(他のボルトへのナット螺合終了状態例と、ボルト搬
送装置の次接合箇所への移動例)を示す一部切り欠き側
断面説明図。
FIG. 14 is a partially cut-away side cross-sectional view showing an example of a bolt joining operation procedure (an example of a state in which a nut is screwed into another bolt and an example of movement of a bolt conveying device to a next joining point) in the embodiment of the present invention. FIG.

【図15】従来の通しダイヤフラムを用いた角形鋼管柱
と梁の接合構造例を示す立体説明図。
FIG. 15 is a three-dimensional explanatory view showing an example of a joint structure between a square steel tubular column and a beam using a conventional through diaphragm.

【図16】従来の接合金物とワンサイドボルトを用いた
角形鋼管柱と梁の接合構造例を示す立体説明図。
FIG. 16 is a three-dimensional explanatory view showing an example of a conventional joint structure between a square steel pipe column and a beam using a metal joint and a one-side bolt.

【図17】(a)図は、従来の接合金物と通しボルトを
用いた中空柱と梁の接合方法例で用いるボルト挿入治具
の構造例を示す立体説明図、(b)図は、中空柱内にボ
ルト体を保持した(a)図のボルト挿入治具を挿入した
状態を示す断面説明図、(c)図は、ボルト挿入治具の
保持体から吊具によりボルト体を吊り上げ、外部側で仮
止めした状態を示す断面説明図。
FIG. 17 (a) is a three-dimensional explanatory view showing a structural example of a bolt insertion jig used in an example of a method of joining a hollow column and a beam using a conventional joining hardware and through bolts, and FIG. Sectional explanatory view showing a state in which a bolt insertion jig of FIG. (A) holding a bolt body in a pillar is inserted, and FIG. (C) shows a state in which the bolt body is lifted up from a holder of the bolt insertion jig by a hanging tool, and is externally mounted. Sectional explanatory drawing which shows the state temporarily fixed by the side.

【符号の説明】[Explanation of symbols]

1 角形鋼管(柱) 2 ダイヤフラ
ム 3 H形鋼 4 梁取付部 5 スプリットティー(接合金物) 6 ワンサイドボルト 7 ボルト孔
(角形鋼管柱) 8 ボルト孔(スプリットティー)・・角形鋼管柱接
合用 9 ボルト孔(スプリットティー)・・梁接合用 10 ボルト孔(梁)・・スプリットティー接合用 11 通しボルト 11h ボルト頭
部 11s ボルト軸部 12 ナット 13 ダミーボルト 14a〜14d
ボルトホルダー 15 ボルト搬送装置 16 ストッパ
ー 17 座金 18 ボルト引
出治具 19 把持筒 19a 雄ネジ 19o 孔 20 走行ロー
ラー 21 取付けボルト(ガイドローラー) 22a、22b ガイドローラー 23 操作棒 24 搬送台 25 位置調整
機構 26 取付けボルト(ボルトホルダー) 27 ブレーキ 28 照明灯 29a、29b 支持体 30a、30b挟
持体 30t 傾斜面 30f 支持面 31 バネ 32 載置台 33 挟持孔 34 縦スリッ
ト 35 把手 36 棒体 36a 雌ネジ 37 覗孔 39 挿入治具 40 支持穴 41 保持体 42 挿入治具 43 ボルト体 43s ボルト体
軸部 44 中空柱 45 外側金具 46 ボルト孔(中空柱) 47 ボルト孔
(外側金具) 48 吊り具 49 板状スト
ッパー wt 作業台
DESCRIPTION OF SYMBOLS 1 Square steel pipe (column) 2 Diaphragm 3 H-section steel 4 Beam attachment part 5 Split tee (joining hardware) 6 One side bolt 7 Bolt hole (square steel pipe column) 8 Bolt hole (split tee) ... for joining square steel pipe column 9 Bolt hole (split tee) ... for beam joining 10 Bolt hole (beam) ... for split tee joining 11 Through bolt 11h Bolt head 11s Bolt shaft 12 Nut 13 Dummy bolt 14a to 14d
Bolt holder 15 Bolt transport device 16 Stopper 17 Washer 18 Bolt pull-out jig 19 Gripping cylinder 19a Male screw 19o Hole 20 Running roller 21 Mounting bolt (guide roller) 22a, 22b Guide roller 23 Operation rod 24 Carrier 25 Position adjustment mechanism 26 Mounting Bolt (bolt holder) 27 Brake 28 Illumination lamp 29a, 29b Support 30a, 30b Holder 30t Inclined surface 30f Support surface 31 Spring 32 Mounting table 33 Holding hole 34 Vertical slit 35 Handle 36 Rod 36a Female screw 37 Viewing hole 39 Insert Jig 40 Support hole 41 Holder 42 Insert jig 43 Bolt 43s Bolt shaft 44 Hollow column 45 Outer bracket 46 Bolt hole (hollow column) 47 Bolt hole (outer bracket) 48 Suspension tool 49 Plate stopper wt Work bench

───────────────────────────────────────────────────── フロントページの続き (72)発明者 宇野 暢芳 千葉県富津市新富20−1 新日本製鐵株式 会社技術開発本部内 (72)発明者 永田 匡宏 東京都千代田区大手町2−6−3 新日本 製鐵株式会社内 Fターム(参考) 2E125 AA03 AA13 AB01 AB16 AB17 AC15 AC16 AG04 AG12 AG43 AG49 BB12 BB22 BB37 BD01 BE02 BE06 BF01 CA01 CA05 CA14 EA01 EA33  ──────────────────────────────────────────────────続 き Continued on the front page (72) Inventor Nobuyoshi Uno 20-1 Shintomi, Futtsu-shi, Chiba Nippon Steel Corporation Technology Development Division (72) Inventor Masahiro Nagata 2-6-3 Otemachi, Chiyoda-ku, Tokyo F-term in Nippon Steel Corporation (reference) 2E125 AA03 AA13 AB01 AB16 AB17 AC15 AC16 AG04 AG12 AG43 AG49 BB12 BB22 BB37 BD01 BE02 BE06 BF01 CA01 CA05 CA14 EA01 EA33

Claims (9)

【特許請求の範囲】[Claims] 【請求項1】 管体に接合金物をボルト接合する際に、
複数のボルトを直立状態で挟持したボルトホルダーを備
えたボルト搬送装置を、管体内に挿入して所定の位置で
停止させ、重ね合わせた管体のボルト孔と接合金物のボ
ルト孔にその外部側から、座金とナットを挿通したボル
ト引出治具を挿し込み、この引出治具の先端のボルト把
持筒を、ボルトホルダーに挟持されたボルトの先端部に
嵌合して押し込み、ボルトの先端部をボルト把持筒で把
持した状態でボルト引出治具を引出すことにより接合金
物の外部に突出させ、座金とナットを引出治具からボル
ト先端部に移行させてナットを螺合し締め付けることを
特徴とする管体と接合金物とのボルト接合方法。
1. When a metal joint is bolted to a tube,
A bolt transfer device equipped with a bolt holder that holds a plurality of bolts in an upright state is inserted into the pipe and stopped at a predetermined position, and the bolt holes of the overlapped pipe and the bolt holes of the joint hardware are externally connected to the bolt holes. Then, insert the bolt extraction jig through which the washer and nut are inserted, fit the bolt holding cylinder at the tip of this extraction jig into the tip of the bolt held by the bolt holder, and push it in. By pulling out the bolt extraction jig while holding it with the bolt gripping cylinder, it is projected to the outside of the joint hardware, the washer and nut are transferred from the extraction jig to the bolt tip, and the nut is screwed and tightened. Bolt joining method between pipe and joining hardware.
【請求項2】 請求項1において、管体内にボルト搬送
装置を挿入する際に、重ね合わせた管体のボルト孔と接
合金物のボルト孔の一部を選択して位置検知治具を挿入
しておき、管体内にボルト搬送装置を挿入してボルト搬
送装置に配設した位置検知器で前記位置検知治具を検知
させ、ボルト搬送装置を所定位置に停止させることを特
徴とする請求項1に記載の管体と接合金物とのボルト接
合方法。
2. The method according to claim 1, wherein when the bolt conveying device is inserted into the tube, a part of the bolt hole of the overlapped tube and a part of the bolt hole of the joint metal are selected and a position detecting jig is inserted. 2. The method according to claim 1, further comprising: inserting the bolt conveying device into the pipe, detecting the position detecting jig with a position detector disposed on the bolt conveying device, and stopping the bolt conveying device at a predetermined position. The method for joining bolts between a pipe and a joint hardware according to the above.
【請求項3】 管体内に挿入するボルト搬送装置であっ
て、下部に走行ローラーを有し、両側部にガイドローラ
ーを備え操作棒を連結した搬送台に、ボルトを接合面に
対し直立状態で挟持し、ボルト頭部が引出された時、閉
動作してボルト頭部の後退を阻止する支持面を形成可能
な複数のボルトホルダーを備えるとともに、管体のボル
ト孔を検知するための位置検知器を備えたことを特徴と
する管体内ボルト搬送装置。
3. A bolt conveying device to be inserted into a pipe, having a traveling roller at a lower portion, a guide roller on both sides, and a conveying table connected to an operation rod, wherein the bolt is mounted upright on a joint surface. A plurality of bolt holders capable of forming a support surface for holding and holding the bolt head when the bolt head is pulled out when the bolt head is pulled out, and a position detection for detecting a bolt hole in the pipe body. A bolt conveying device in a pipe, comprising a vessel.
【請求項4】 ボルトを接合面に対して直立状態で弾性
的に挟持するボルトホルダーが、交換可能なバネ体によ
り弾性的に開閉可能な相対するボルト挟持体からなり、
このボルト挟持体のボルトの挟持面の奥側に傾斜面が形
成され、先端面まで引き出されたボルト頭部の後退を阻
止する支持面が形成されていることを特徴とする請求項
3に記載の管体内ボルト搬送装置。
4. A bolt holder for elastically holding a bolt in an upright state with respect to a joint surface, comprising a pair of opposing bolt clamps which can be elastically opened and closed by a replaceable spring body.
4. The bolt holding body according to claim 3, wherein an inclined surface is formed on the back side of the bolt holding surface of the bolt, and a support surface for preventing the bolt head pulled out to the tip end surface from retreating is formed. In-tube bolt transfer device.
【請求項5】 管体のボルト孔の位置を検知するための
位置検知器が、管体のボルト孔と接合金物のボルト孔に
挿入された位置検知治具としてのダミーボルトの下部に
係止してボルト搬送装置を所定位置に停止させるストッ
パーであることを特徴とする請求項3に記載の管体内ボ
ルト搬送装置。
5. A position detector for detecting a position of a bolt hole of a tube is engaged with a lower portion of a dummy bolt as a position detecting jig inserted into the bolt hole of the tube and a bolt hole of a metal joint. The bolt conveying device according to claim 3, wherein the stopper is a stopper for stopping the bolt conveying device at a predetermined position.
【請求項6】 請求項5において、管体のボルト孔と接
合金物のボルト孔に挿入し、ボルト搬送装置のストッパ
ーを係止させるダミーボルトであって、管体のボルト孔
と接合金物のボルト孔に挿入されたとき、少なくとも管
体のボルト孔に位置する部分の軸径を管体のボルト孔径
より小さく、ボルトの軸径より大きくしたものであり、
先端部が管体内に突出するものであることを特徴とする
ストッパー係止用のダミーボルト。
6. The dummy bolt according to claim 5, wherein the dummy bolt is inserted into the bolt hole of the pipe and the bolt hole of the metal fitting to lock a stopper of the bolt conveying device. When inserted into the hole, at least the shaft diameter of the portion located in the bolt hole of the tube is smaller than the bolt hole diameter of the tube, and larger than the shaft diameter of the bolt,
A dummy bolt for locking a stopper, the tip of which protrudes into a tube.
【請求項7】 管体内に挿入したボルト搬送装置のボル
トホルダーに直立状態で弾性的に挟持したボルトを、管
体とこの管体に接合される接合金物の重ねられたボルト
孔を通して引き出すボルト引出治具であって、一方の先
端部にボルト先端部を弾性的に把持する局部スリット付
き把持筒を交換可能に装着し、他方の先端部に把手を形
成した棒体からなり、把持筒と棒体の少なくとも先端部
領域の外径が、ボルト孔径およびナットの内径、座金の
孔径より小径に形成され、管体と接合金物の重ねられた
ボルト孔に挿入する際に座金とナットを挿通できるもの
であることを特徴とする管体内ボルト引出治具。
7. A bolt drawer for pulling out a bolt elastically held in an upright state by a bolt holder of a bolt conveying device inserted into a pipe through a bolt hole in which a pipe and a metal fitting joined to the pipe are overlapped. A jig, a bar having a local slit with a local slit for elastically gripping a bolt tip at one end, and a bar formed with a handle at the other end, comprising a gripping tube and a rod; At least the outer diameter of the distal end region of the body is formed to be smaller than the bolt hole diameter, the inner diameter of the nut, and the hole diameter of the washer, so that the washer and the nut can be inserted when inserted into the bolt hole where the pipe and the joint metal are overlapped. A bolt extracting jig for a tubular body, characterized in that:
【請求項8】 把持筒の先端部に、ボルト先端部に係止
する爪が形成されていることを特徴とする請求項7に記
載の管体内ボルト引出治具。
8. The jig for pulling out a bolt in a pipe according to claim 7, wherein a claw for locking the tip of the bolt is formed at a tip of the gripping cylinder.
【請求項9】 棒体の先端部または把持筒が永久磁石に
よる磁着機能を有するものであることを特徴とする請求
項7または請求項8に記載の管体内ボルト引出治具。
9. A jig for withdrawing a bolt in a tube according to claim 7, wherein the tip portion or the holding cylinder of the rod has a magnetic attaching function by a permanent magnet.
JP01905099A 1999-01-27 1999-01-27 Bolt joining method for tubular body and joint metal, tubular bolt conveying device and tubular bolt drawing jig Expired - Fee Related JP3656942B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP01905099A JP3656942B2 (en) 1999-01-27 1999-01-27 Bolt joining method for tubular body and joint metal, tubular bolt conveying device and tubular bolt drawing jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP01905099A JP3656942B2 (en) 1999-01-27 1999-01-27 Bolt joining method for tubular body and joint metal, tubular bolt conveying device and tubular bolt drawing jig

Publications (2)

Publication Number Publication Date
JP2000213070A true JP2000213070A (en) 2000-08-02
JP3656942B2 JP3656942B2 (en) 2005-06-08

Family

ID=11988611

Family Applications (1)

Application Number Title Priority Date Filing Date
JP01905099A Expired - Fee Related JP3656942B2 (en) 1999-01-27 1999-01-27 Bolt joining method for tubular body and joint metal, tubular bolt conveying device and tubular bolt drawing jig

Country Status (1)

Country Link
JP (1) JP3656942B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7204667B2 (en) 2000-12-18 2007-04-17 Nippon Steel Corporation High strength bolted structure and method of securing nut and torque-shear type high strength bolt and joining method using same
WO2023160851A1 (en) * 2022-02-28 2023-08-31 Iceye Oy Assembly jig

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7204667B2 (en) 2000-12-18 2007-04-17 Nippon Steel Corporation High strength bolted structure and method of securing nut and torque-shear type high strength bolt and joining method using same
WO2023160851A1 (en) * 2022-02-28 2023-08-31 Iceye Oy Assembly jig

Also Published As

Publication number Publication date
JP3656942B2 (en) 2005-06-08

Similar Documents

Publication Publication Date Title
US4440536A (en) Method and device for positioning and guiding pipe in a drilling derrick
US7036202B2 (en) Apparatus and method for handling of tubulars
EP0950443B1 (en) Tube bending apparatus
JP2002045994A (en) Manufacturing apparatus for large cylindrical vessel
JP2000213070A (en) Joining method for pipe body with join hardware by bolt and pipe body bolt conveyance device and pipe body bolt pulling out jig
US3803953A (en) Orienting apparatus for threaded well pipe
US11287073B2 (en) Method and apparatus for frame assembly for RTR scanner assembly
JPS62130140A (en) Device for assembling and disassembling cylinder
JP2002522800A (en) Clamp mounting device in pipes that are difficult to enter
JPH06235216A (en) Anchor drill supplying device, connecting and fixing device, and storing device
JPH08118077A (en) Welding jig for joining tube
JPH0742578Y2 (en) Tube bundle extraction / insertion device for horizontal multitubular heat exchanger
CN219992036U (en) Opposite clamping type tool frame for auxiliary cutting of cotton rolls
JP2002046033A (en) Bolt and nut supplying device
JPH0539272Y2 (en)
JPH10137889A (en) Device for changing upsetter die of tube end
JP2586348Y2 (en) Pipe gripper
KR200186864Y1 (en) An apparatus for jointing a tong crane
JP2982983B2 (en) Roll chock and its rearrangement device
CN117464125A (en) Positioning welding assisting device and application method thereof
SU1680554A1 (en) Device for welding plastic pipes
SU1496978A1 (en) Arrangement for assembling and welding sectioned branch pipes
DE2214587C3 (en) Device for centering pipes
KR20020046330A (en) Apparatus for inserting coil packer
JP2679672B2 (en) Cable drum carrier

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20050107

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20050302

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20050304

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080318

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090318

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090318

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100318

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110318

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120318

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130318

Year of fee payment: 8

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130318

Year of fee payment: 8

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130318

Year of fee payment: 8

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130318

Year of fee payment: 8

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130318

Year of fee payment: 8

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140318

Year of fee payment: 9

LAPS Cancellation because of no payment of annual fees