JP2000185886A - Method of installing horizontal sliding door on elevator - Google Patents

Method of installing horizontal sliding door on elevator

Info

Publication number
JP2000185886A
JP2000185886A JP10362824A JP36282498A JP2000185886A JP 2000185886 A JP2000185886 A JP 2000185886A JP 10362824 A JP10362824 A JP 10362824A JP 36282498 A JP36282498 A JP 36282498A JP 2000185886 A JP2000185886 A JP 2000185886A
Authority
JP
Japan
Prior art keywords
sliding door
jig
sill
elevator
view
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP10362824A
Other languages
Japanese (ja)
Inventor
Hideji Fujitsugu
秀治 藤次
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Building Solutions Corp
Original Assignee
Mitsubishi Electric Building Techno Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Building Techno Service Co Ltd filed Critical Mitsubishi Electric Building Techno Service Co Ltd
Priority to JP10362824A priority Critical patent/JP2000185886A/en
Publication of JP2000185886A publication Critical patent/JP2000185886A/en
Pending legal-status Critical Current

Links

Landscapes

  • Elevator Door Apparatuses (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a method of installing a horizontal sliding door on an elevator in which horizontal sliding door an easily be installed in a normal position by a simple work. SOLUTION: This method of installing a horizontal sliding door on an elevator comprises a first step of temporarily installing, into a guide groove 8, a jig 17 having an upper surface groove part to which the lower end of a horizontal sliding door 10 is fitted and a protruded part fitted to the guide groove 8 of a rail 7, a second step of temporarily erectedly installing the horizontal sliding door 10 by fitting the lower end of it into the upper surface groove part of the jig 17, and a third step of disposing the upper end of the horizontal sliding door 10 at a specified position relative to a guide rail 9 by connecting a hanger 11 through a liner to hook it to the guide rail 9. By this, the lower end of the horizontal siding door 10 is disposed at a specified position by the jig 17, and an installation operation for the upper end of the horizontal sliding door 10, i.e., a tightening operation for the hanger 11 can be performed. The number of adjustments is reduced and the horizontal sliding door 10 can easily be installed in a specified position, thus increasing a work efficiency.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、下端が敷居に上
端は案内レールに案内されて出入口を開閉するエレベー
ター引き戸の取付方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for mounting an elevator sliding door that opens and closes an entrance with a lower end guided by a sill and an upper end guided by a guide rail.

【0002】[0002]

【従来の技術】図24は、従来のエレベーター引き戸の
取付方法を示すエレベーター昇降路の要部縦断面図であ
る。図において、1は昇降路、2は昇降路1に設けられ
た乗場、3は乗場2の出入口4を形成する三方枠、5は
三方枠3の上枠、6は乗場2の天井、7は出入口4の下
縁部を構成する敷居で、案内溝8が設けられている。
2. Description of the Related Art FIG. 24 is a longitudinal sectional view of a main part of an elevator hoistway showing a method of mounting a conventional elevator sliding door. In the figure, 1 is a hoistway, 2 is a landing provided on the hoistway 1, 3 is a three-way frame forming an entrance 4 of the landing 2, 5 is an upper frame of the three-way frame 3, 6 is a ceiling of the landing 2, and 7 is A guide groove 8 is provided at a threshold constituting a lower edge of the entrance 4.

【0003】9は出入口4の上縁部に沿って設けられた
案内レール、10は出入口4を開閉する引き戸、11は
吊り手で、引き戸10の上端にライナー(図示しない)
を介して締結され、また案内レール9に掛合されて転動
する転子12が設けられている。13は昇降路1を昇降
するかご、14はかご13を吊持した主索である。
[0003] 9 is a guide rail provided along the upper edge of the entrance 4, 10 is a sliding door for opening and closing the entrance 4, 11 is a hanging hand, a liner (not shown) at the upper end of the sliding door 10
And a rotator 12 which is engaged with the guide rail 9 and rolls. Reference numeral 13 denotes a car that moves up and down the hoistway 1, and 14 denotes a main rope that suspends the car 13.

【0004】従来のエレベーター引き戸の取付方法は、
上記のように構成された出入口4、引き戸10等に対し
て次に述べるような作業が行われる。すなわち、引き戸
10を敷居7の上に置き、案内溝8と平行に配置する。
次に、引き戸10の幅方向の両側寄りにそれぞれ吊り手
11を取付ボルト(図示しない)によって仮締結して、
転子12を案内レール9に掛合し引き戸10を案内レー
ル9に仮吊りする。
[0004] A conventional method of mounting an elevator sliding door is as follows.
The following operations are performed on the entrance 4, the sliding door 10, and the like configured as described above. That is, the sliding door 10 is placed on the threshold 7 and is arranged in parallel with the guide groove 8.
Next, the hanging hands 11 are temporarily fastened to the sliding door 10 near both sides in the width direction by mounting bolts (not shown), respectively.
The trochanter 12 is hung on the guide rail 9 and the sliding door 10 is temporarily suspended on the guide rail 9.

【0005】次いで、引き戸10上端と吊り手11の間
にライナーを挿入し、取付ボルトを締めて引き戸10の
高さ方向位置を確認し、要すれば高さ方向位置をライナ
ーによって修正する。なお、ライナーは0.25mm、
0.5mm、1.0mm、1.2mm等の厚さのものが適宜に
組み合わされて引き戸10の高さ方向位置が調整され
る。そして、引き戸10を開閉動作させて動きが確認さ
れる。
[0005] Next, a liner is inserted between the upper end of the sliding door 10 and the suspender 11, and the mounting bolt is tightened to confirm the height position of the sliding door 10, and if necessary, the height direction position is corrected by the liner. The liner is 0.25mm,
Thicknesses such as 0.5 mm, 1.0 mm, and 1.2 mm are appropriately combined to adjust the position of the sliding door 10 in the height direction. Then, the sliding door 10 is opened and closed to confirm the movement.

【0006】次に、引き戸10面と三方枠3縁部との隙
間、引き戸10面の鉛直度、三方枠3縁部に対する引き
戸10縁部の建て付けにつき、引き戸10の全開時及び
全閉時のそれぞれにおいて、取付規定値内に取付られて
いるかどうかを測定する。そして、三方枠3に対する引
き戸10位置が正常であれば、引き戸10に吊り手11
が取付ボルトによって本締結される。なお、三方枠3に
対する引き戸10位置が取付規定値外であれば再調整が
行われる。なお、この再調整時には引き戸10面の鉛直
度等の微調整に0.1mm程度の薄い銅板が使用される。
Next, the clearance between the sliding door 10 and the edge of the three-way frame 3, the verticality of the sliding door 10, and the installation of the edge of the sliding door 10 with respect to the edge of the three-way frame 3 will be described when the sliding door 10 is fully opened and fully closed. In each of the above, it is measured whether or not it is installed within the specified installation value. If the position of the sliding door 10 with respect to the three-way frame 3 is normal, the hanging
Are fully fastened by the mounting bolts. If the position of the sliding door 10 with respect to the three-way frame 3 is outside the specified mounting value, readjustment is performed. During this readjustment, a thin copper plate of about 0.1 mm is used for fine adjustment of the verticality of the sliding door 10 surface.

【0007】そして、前述の引き戸10の取付作業が全
部の引き戸10について行われる。また、引き戸10面
の鉛直度等の調整に加えて、全閉時の左右の引き戸10
面の段差、引き戸10の開閉動作状況が検定されて吊り
手11の本締結が行われる。さらに、引き戸10面の下
端の倒れ、三方枠3縁部に対する引き戸10縁部の建て
付け寸法を検定しながら、案内溝8に嵌合された戸の脚
(図示しない)が引き戸10に装着される。そして、最
終的に引き戸10の全体的な開閉動作状況が検定されて
引き戸10の取付作業が終了する。
[0007] The above-mentioned operation of mounting the sliding doors 10 is performed for all the sliding doors 10. Further, in addition to the adjustment of the verticality of the sliding door 10, the left and right sliding doors 10 when fully closed.
The step on the surface and the opening / closing operation status of the sliding door 10 are verified, and the final fastening of the hanging hand 11 is performed. Further, the leg (not shown) of the door fitted in the guide groove 8 is attached to the sliding door 10 while verifying the falling of the lower end of the sliding door 10 surface and the dimension of the edge of the sliding door 10 with respect to the three edges of the three-way frame 3. You. Finally, the overall opening / closing operation state of the sliding door 10 is verified, and the mounting operation of the sliding door 10 is completed.

【0008】[0008]

【発明が解決しようとする課題】上記のような従来のエ
レベーター引き戸の取付方法では、引き戸10の取付時
に引き戸10の上端を介して仮吊りした後、引き戸10
上端位置を基準として引き戸10下端の位置が規定位置
に配置されるように調整し、引き戸10が正常位置に装
着される。このような取付方法では、かご13上と乗場
2との二箇所による作業を要するので、二名の作業員に
よって行うことになり作業能率が低く取付費が嵩むとい
う問題点があった。
In the above-described conventional method of mounting the elevator sliding door, the sliding door 10 is temporarily suspended via the upper end of the sliding door 10 when the sliding door 10 is mounted.
Adjustment is made so that the position of the lower end of the sliding door 10 is arranged at the specified position based on the upper end position, and the sliding door 10 is mounted at the normal position. In such a mounting method, since work is required at two places on the car 13 and the landing 2, there is a problem that the work efficiency is low and the mounting cost is increased due to two workers.

【0009】この発明は、かかる問題点を解消するため
になされたものであり、簡易な作業によって容易に正常
位置に引き戸を取付けできるエレベーター引き戸の取付
方法を得ることを目的とする。
The present invention has been made to solve such a problem, and an object of the present invention is to provide an elevator sliding door mounting method which can easily mount a sliding door at a normal position by a simple operation.

【0010】[0010]

【課題を解決するための手段】この発明に係るエレベー
ター引き戸の取付方法においては、下縁部を形成する敷
居及び上縁部に沿って設けられた案内レールを有する出
入口に対して、下端部が敷居に案内され、上端はライナ
ーを介して締結された吊り手が転子により案内レールに
掛合されて動作し出入口を開閉するエレベーター引き戸
の取付方法において、引き戸の下端が嵌合される上面溝
部及び下面に設けられて敷居の案内溝に嵌合される凸部
が形成されて、引き戸の下端を敷居に対する所定位置に
配置する治具を案内溝に仮設する第一工程と、治具の上
面溝部に引き戸の下端を嵌合して仮立設する第二工程
と、仮立設された引き戸の上端にライナーを介して吊り
手を締結して案内レールに掛合し、引き戸の上端を案内
レールに対する所定位置に配置する第三工程とが実施さ
れる。
In the method of mounting an elevator sliding door according to the present invention, a lower end portion is provided at an entrance having a sill forming a lower edge portion and a guide rail provided along the upper edge portion. Guided to the sill, the upper end of the elevator sliding door that opens and closes the entrance by operating the hanging hand fastened via a liner to the guide rail by the trochanter, the upper end groove part where the lower end of the sliding door is fitted, A first step in which a projection provided on the lower surface and fitted into the guide groove of the sill is formed, and a jig for temporarily arranging the lower end of the sliding door at a predetermined position with respect to the sill in the guide groove; A second step of fitting the lower end of the sliding door to the temporary installation, and fastening the hanging hand via the liner to the upper end of the temporarily installed sliding door to engage with the guide rail, and connecting the upper end of the sliding door to the guide rail. Predetermined A third step of placing the location is performed.

【0011】また、この発明に係るエレベーター引き戸
の取付方法においては、凸部よりも幅広に形成されて敷
居の案内溝に嵌合される補助嵌合子が要時に治具に連結
され、補助嵌合子を介して敷居の案内溝に嵌合された治
具により引き戸の下端が敷居に対する所定位置に配置さ
れる。
In the method of mounting an elevator sliding door according to the present invention, the auxiliary fitting which is formed wider than the convex portion and which is fitted into the guide groove of the sill is connected to the jig when necessary. The lower end of the sliding door is arranged at a predetermined position with respect to the sill by a jig fitted into the guide groove of the sill via.

【0012】[0012]

【発明の実施の形態】実施の形態1.図1〜図11は、
この発明の実施の形態の一例を示す図で、図1はエレベ
ーター昇降路の要部縦断面図、図2は図1の乗場を昇降
路側から見た正面図、図3は図2のA−A線断面図、図
4は図3のB部拡大図、図5は全開時における引き戸の
配置状況を示す図で前述の図2相当図、図6は図5の右
側面図、図7は図5の横断平面相当図、図8は全閉時に
おける引き戸の配置状況を示す図で前述の図2相当図、
図9は図8の右側面図、図10は図8の引き戸の横断平
面図、図11は図8の横断平面相当図である。
DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiment 1 1 to 11
FIG. 1 is a view showing an example of an embodiment of the present invention. FIG. 1 is a longitudinal sectional view of a main part of an elevator shaft, FIG. 2 is a front view of the landing of FIG. 1 viewed from the shaft side, and FIG. 4 is an enlarged view of a portion B in FIG. 3, FIG. 5 is a view showing an arrangement state of the sliding door at the time of full opening, and is a view corresponding to FIG. 2 described above, FIG. 6 is a right side view of FIG. 5, and FIG. FIG. 5 is a view corresponding to the cross-sectional plane of FIG. 5, and FIG.
9 is a right side view of FIG. 8, FIG. 10 is a cross-sectional plan view of the sliding door of FIG. 8, and FIG. 11 is a cross-sectional plane equivalent view of FIG.

【0013】図において、1は昇降路、2は昇降路1に
設けられた乗場、3は乗場2の出入口4を形成する三方
枠、5は三方枠3の上枠、6は乗場2の天井、7は出入
口4の下縁部を構成する敷居で、案内溝8が設けられて
いる。9は出入口4の上縁部に沿って設けられた案内レ
ール、10は出入口4を開閉する引き戸、11は吊り手
で、引き戸10の上端にライナー15を介して取付ボル
ト16により締結され、また案内レール9に掛合されて
転動する転子12が設けられている。
In the drawing, 1 is a hoistway, 2 is a landing provided on the hoistway 1, 3 is a three-way frame forming an entrance 4 of the landing 2, 5 is an upper frame of the three-way frame 3, and 6 is a ceiling of the landing 2 , 7 are thresholds forming the lower edge of the entrance 4 and provided with guide grooves 8. 9 is a guide rail provided along the upper edge of the entrance 4, 10 is a sliding door for opening and closing the entrance 4, 11 is a suspender, and is fastened to the upper end of the sliding door 10 by a mounting bolt 16 via a liner 15. A trochanter 12 is provided which is hung on the guide rail 9 and rolls.

【0014】13は昇降路1を昇降するかご、14はか
ご13を吊持した主索である。17は治具で、基準面1
8、基準面18の上側に設けられて引き戸10の下端が
嵌合される上面溝部19及び下面に設けられて敷居7の
案内溝8に嵌合される凸条からなる凸部20が形成され
て、上面溝部19に嵌合された引き戸10の下端を敷居
7に対する所定位置に配置する。
Reference numeral 13 denotes a car that moves up and down the hoistway 1, and 14 denotes a main rope that suspends the car 13. 17 is a jig, reference surface 1
8, an upper surface groove 19 provided above the reference surface 18 to which the lower end of the sliding door 10 is fitted, and a convex portion 20 provided on the lower surface and formed by a ridge fitted into the guide groove 8 of the threshold 7. Then, the lower end of the sliding door 10 fitted to the upper surface groove 19 is arranged at a predetermined position with respect to the threshold 7.

【0015】そして、上記のように構成された出入口
4、引き戸10等に対して次に述べるように引き戸10
の取付が行われる。すなわち、治具17の凸部20を敷
居7の案内溝8に嵌合させて基準面18が敷居7上面に
密着させ、出入口4幅の中間部及び戸袋箇所に治具17
が配置される第一工程の作業が行われる。
The door 10 and the sliding door 10 constructed as described above are used as described below.
Is performed. That is, the projection 20 of the jig 17 is fitted into the guide groove 8 of the sill 7 so that the reference surface 18 is in close contact with the upper surface of the sill 7, and the jig 17 is placed in the middle part of the width of the entrance 4 and the door pocket.
The operation of the first step in which is arranged is performed.

【0016】そして、三方枠3の出入方向の端面と上面
溝部19の内壁との間隔、すなわち図4に示す寸法XX
を確認して、そのときの引き戸10の下端位置が記録さ
れる。次に、戸袋箇所の治具17の上面溝部19に引き
戸10の下端を嵌合して仮立設する第二工程の作業が行
われる。
The distance between the end face of the three-way frame 3 in the entry / exit direction and the inner wall of the upper groove 19, ie, the dimension XX shown in FIG.
Is confirmed, and the lower end position of the sliding door 10 at that time is recorded. Next, the work of the second step of fitting the lower end of the sliding door 10 to the upper surface groove 19 of the jig 17 at the door pocket and temporarily erected is performed.

【0017】これにより、引き戸10の下端の幅方向が
案内溝8と平行に配置され、また引き戸10の高さ方向
位置が治具17の基準面18と上面溝部19底面の厚さ
4mmによって所定位置に配置される。これと共に、三方
枠3の出入方向の端面と引き戸10面との隙間、すなわ
ち図6に示す寸法Xは前述の寸法XXによって調整を要
せずに所定寸法に設定される。
Thus, the width direction of the lower end of the sliding door 10 is arranged in parallel with the guide groove 8, and the height direction position of the sliding door 10 is determined by the reference surface 18 of the jig 17 and the thickness 4 mm of the bottom surface of the upper groove 19. Placed in the position. At the same time, the gap between the end face of the three-way frame 3 in the entry / exit direction and the sliding door 10, that is, the dimension X shown in FIG. 6, is set to a predetermined dimension by the dimension XX without any adjustment.

【0018】また、三方枠3の出入方向の端面に対する
引き戸10面の倒れに関する下部寸法、すなわち図6に
示す下部の寸法Wは前述の寸法XXによって調整を要せ
ずに所定寸法に設定される。さらに、左右の引き戸10
面の全閉時における段差、すなわち図10に示す寸法Y
も、左右の引き戸10が治具17によって配置されるの
で調整を要せずに所定の段差値内に設定される。
The lower dimension of the sliding door 10 falling with respect to the end face of the three-way frame 3 in the entry / exit direction, ie, the lower dimension W shown in FIG. 6, is set to a predetermined dimension by the above-described dimension XX without adjustment. . In addition, left and right sliding doors 10
Step when the surface is fully closed, ie, dimension Y shown in FIG.
Also, since the left and right sliding doors 10 are arranged by the jig 17, they are set within a predetermined step value without adjustment.

【0019】次いで、次に述べる第三工程の作業が行わ
れる。すなわち、案内レール9に吊り手11の転子12
が掛合されて、仮立設された引き戸10の上端に、引き
戸10が持ち上がらない程度に取付ボルト16がねじ込
まれる。これによって、引き戸10が仮吊りされて引き
戸10上端と吊り手11の間に、厚さが適宜に組み合わ
された複数のライナー15が隙間なく挿入される。この
状態において、挿入されたライナー15から厚さ1mmの
ライナー15が撤去される。
Next, the operation of the third step described below is performed. That is, the trochanter 12 of the suspender 11 is
And the mounting bolt 16 is screwed into the upper end of the temporarily erected sliding door 10 so that the sliding door 10 cannot be lifted. As a result, the sliding door 10 is temporarily suspended, and a plurality of liners 15 having appropriately combined thicknesses are inserted between the upper end of the sliding door 10 and the suspender 11 without any gap. In this state, the liner 15 having a thickness of 1 mm is removed from the inserted liner 15.

【0020】次に、三方枠3の出入方向の端面に対する
引き戸10面の倒れに関する上部寸法、すなわち図6に
示す上部の寸法Wを、先に記録した図4に示す寸法XX
に対応した寸法に設定する。そして、この状態において
左右の引き戸10の全開及び全閉時の引き戸10の配置
状況、すなわち図5、図7、図8及び図11における寸
法Zを確認しながら取付ボルト16が、引き戸10上端
にねじ込まれて吊り手11が引き戸10に締結される。
Next, the upper dimension relating to the falling of the sliding door 10 with respect to the end face of the three-way frame 3 in the entry / exit direction, that is, the upper dimension W shown in FIG.
Set the dimensions corresponding to. Then, in this state, the mounting bolt 16 is attached to the upper end of the sliding door 10 while checking the arrangement state of the sliding door 10 when the left and right sliding doors 10 are fully opened and fully closed, that is, the dimension Z in FIGS. 5, 7, 8 and 11. The hanging hand 11 is screwed and fastened to the sliding door 10.

【0021】これにより、引き戸10の吊り高さ、すな
わち図9に示す敷居7上面と引き戸10下端の隙間の寸
法Vは、治具17の前述の厚さ4mmと前述の厚さ1mmの
ライナー15撤去分とに、取付ボルト16のねじ込みに
よる吊り上がりを加えて引き戸10の吊り高さ寸法Vは
5mm強となり所定範囲内に設定される。
Accordingly, the hanging height of the sliding door 10, that is, the dimension V of the gap between the upper surface of the sill 7 and the lower end of the sliding door 10 shown in FIG. The lifting height V of the sliding door 10 is set to a little over 5 mm, which is set within a predetermined range, by adding the lifting due to the screwing of the mounting bolt 16 with the removal.

【0022】また、治具17の上面溝部19とこの上面
溝部19に嵌合した引き戸10の下端との間の隙間は1
mm強であって、引き戸10面は敷居7の案内溝8に対し
て平行に取付られている。また、引き戸10の下端は敷
居7上面に対して平行に配置されて5mm強の隙間が形成
されている。
The gap between the upper surface groove 19 of the jig 17 and the lower end of the sliding door 10 fitted in the upper surface groove 19 is one.
mm, and the sliding door 10 face is attached in parallel to the guide groove 8 of the threshold 7. The lower end of the sliding door 10 is arranged in parallel with the upper surface of the sill 7 to form a gap of slightly more than 5 mm.

【0023】この状態で、引き戸10を開閉してその動
きが確認されるが、開閉動作が重い場合は引き戸10面
の倒れ寸法Wの調整不良であって、引き戸10面が出入
口4の出入方向に向かって前後方向の何れかに倒れてい
る。このため、引き戸10の下端が治具17の上面溝部
19側面に接触して摺動している。したがって、引き戸
10面の倒れ寸法Wを調整すると共に、三方枠3の出入
幅端面に対する引き戸10の全開及び全閉時における配
置状況、すなわち寸法Zが引き戸10の上下端部につい
て、所定値内にあるかどうかを検定し所定値外であれば
再調整する。
In this state, the sliding door 10 is opened and closed to confirm its movement. If the opening / closing operation is heavy, the tilting dimension W of the sliding door 10 is poorly adjusted, and the sliding door 10 faces the entrance / exit direction of the entrance 4. Toward the front or back. Therefore, the lower end of the sliding door 10 slides in contact with the side surface of the upper groove 19 of the jig 17. Therefore, while adjusting the falling dimension W of the sliding door 10 surface, the arrangement state of the sliding door 10 when fully opened and fully closed with respect to the end face of the three-way frame 3 when the sliding door 10 is fully opened and closed, that is, the dimension Z is within a predetermined value for the upper and lower ends of the sliding door 10. It is checked whether it is present, and if it is outside the specified value, it is readjusted.

【0024】そして、引き戸10面の倒れ寸法W及び三
方枠3の出入幅端面に対する引き戸10の配置寸法Zを
所定値内に設定して、吊り手11を引き戸10に本締結
する。そして、このような取付方法によって全ての引き
戸10を取付けて、左右の引き戸10面の全閉時におけ
る段差、すなわち図10に示す寸法Yを確認する。次い
で、治具17を敷居7の案内溝8から撤去し、引き戸1
0面の下端の倒れ寸法W、三方枠3の出入方向端面と引
き戸10面との隙間寸法Xを確認しつつ、戸の脚(図示
しない)を引き戸10に装着する。
Then, the falling dimension W of the sliding door 10 and the arrangement dimension Z of the sliding door 10 with respect to the end surface of the three-way frame 3 are set within predetermined values, and the hanging hand 11 is fully fastened to the sliding door 10. Then, all the sliding doors 10 are attached by such an attaching method, and a step when the surfaces of the left and right sliding doors 10 are fully closed, that is, a dimension Y shown in FIG. 10 is confirmed. Next, the jig 17 is removed from the guide groove 8 of the threshold 7, and the sliding door 1 is removed.
The leg (not shown) of the door is attached to the sliding door 10 while checking the falling dimension W of the lower end of the zero plane and the gap dimension X between the end face in the entry / exit direction of the three-way frame 3 and the sliding door 10.

【0025】以上の工程の作業後、最終的に引き戸10
の全体的な開閉動作状況を検定して引き戸10の取付が
終了する。なお、引き戸10面の下端の倒れ寸法Wを調
整せずに、引き戸10の下端位置を装着された戸の脚に
よって、引き戸10を弾性変形させて強制的に所定位置
に配置すると、敷居7の案内溝8の損耗が促進されるこ
とになる。
After the above steps, the sliding door 10
The overall opening / closing operation status is verified, and the installation of the sliding door 10 is completed. In addition, if the sliding door 10 is elastically deformed by the legs of the attached door without force to adjust the falling dimension W of the lower end of the surface of the sliding door 10 and the sliding door 10 is forcibly arranged at a predetermined position, The wear of the guide groove 8 is promoted.

【0026】以上説明したように、敷居7に治具17を
仮設して引き戸10の下端を所定位置に配置し、引き戸
10の上端の取付作業、すなわち吊り手11の締結作業
が行われる。このため、作業員の移動が少なくなり一名
の作業員による引き戸10の取付が可能になる。また、
治具17を使用することによって調整箇所が減少し、簡
易であって短時間の作業によって、引き戸10を容易に
所定位置に取付けることができ、作業能率を向上するこ
とができる。
As described above, the jig 17 is temporarily installed on the sill 7 and the lower end of the sliding door 10 is arranged at a predetermined position, and the work of attaching the upper end of the sliding door 10, that is, the work of fastening the hanging hand 11 is performed. Therefore, the movement of the worker is reduced, and the sliding door 10 can be mounted by one worker. Also,
The use of the jig 17 reduces the number of adjustment points, and the sliding door 10 can be easily attached to a predetermined position by simple and short-time work, thereby improving work efficiency.

【0027】実施の形態2.図12〜図14は、この発
明の他の実施の形態の一例を示す図で、図12は治具の
正面図、図13は図12の側面図、図14は図12の平
面図である。なお、図12〜図14の他は前述の図1〜
図11と同様にエレベーターの引き戸装置が構成されて
いる。図において、図1〜図11と同符号は相当部分を
示し、21は治具17の下面に設けられて敷居7の案内
溝8に嵌合される凸部で、治具17の長手の両方の端部
のみに形成され、下面に逆V字状の切欠部22が設けら
れている。
Embodiment 2 FIG. 12 to 14 are views showing an example of another embodiment of the present invention. FIG. 12 is a front view of a jig, FIG. 13 is a side view of FIG. 12, and FIG. 14 is a plan view of FIG. . In addition, other than FIG.
An elevator sliding door device is configured as in FIG. In the drawings, the same reference numerals as those in FIGS. 1 to 11 denote corresponding parts, and 21 denotes a projection provided on the lower surface of the jig 17 and fitted into the guide groove 8 of the sill 7. And an inverted V-shaped notch 22 is provided on the lower surface.

【0028】上記のように構成された治具17によっ
て、前述の図1〜図11の実施の形態と同様に引き戸1
0の取付作業が行われる。したがって、詳細な説明を省
略するが図12〜図14の実施の形態においても図1〜
図11の実施の形態と同様な作用が得られる。
With the jig 17 configured as described above, the sliding door 1 is provided in the same manner as in the embodiment shown in FIGS.
0 is performed. Therefore, detailed description is omitted, but in the embodiment of FIGS.
The same operation as the embodiment of FIG. 11 can be obtained.

【0029】また、図12〜図14の実施の形態におい
て、凸部21が治具17の長手の両方の端部のみに形成
され、下面に逆V字状の切欠部22が設けられている。
このため、凸部21を敷居7の案内溝8幅方向に容易に
圧縮することができるので、案内溝8に嵌合するときに
便利である。
In the embodiments shown in FIGS. 12 to 14, the protrusions 21 are formed only at both longitudinal ends of the jig 17, and the inverted V-shaped notch 22 is provided on the lower surface. .
For this reason, the convex portion 21 can be easily compressed in the width direction of the guide groove 8 of the sill 7, which is convenient when fitting into the guide groove 8.

【0030】なお、凸部21の材料は弾性材料で製作す
ることが望ましい。また、治具17の上面溝部19の内
面は、引き戸10が摺動するときに滑りがよく、摺動に
よる引き戸10の塗装が剥げにくく、クッション性が良
く、しかも軟質の粘弾性材料である適宜な合成樹脂材料
によって被覆することが望ましい。
The material of the projection 21 is desirably made of an elastic material. Also, the inner surface of the upper surface groove 19 of the jig 17 slides well when the sliding door 10 slides, and the coating of the sliding door 10 due to the sliding is difficult to peel off, has good cushioning properties, and is a soft viscoelastic material. It is desirable to coat with a synthetic resin material.

【0031】実施の形態3.図15〜図17も、この発
明の他の実施の形態の一例を示す図で、図15は治具の
正面図、図16は図15の側面図、図17は図15の平
面図である。なお、図15〜図17の他は前述の図1〜
図11と同様にエレベーターの引き戸装置が構成されて
いる。図において、図1〜図11と同符号は相当部分を
示し、23は治具17の下面に設けられた凸条からなり
敷居7の案内溝8に嵌合される凸部で、下面に横断面に
おいて突出した円弧状をなす円弧部24が設けられてい
る。
Embodiment 3 15 to 17 also show an example of another embodiment of the present invention. FIG. 15 is a front view of a jig, FIG. 16 is a side view of FIG. 15, and FIG. 17 is a plan view of FIG. . In addition, other than FIG. 15 to FIG.
An elevator sliding door device is configured as in FIG. In the figures, the same reference numerals as those in FIGS. 1 to 11 denote corresponding parts, and 23 is a convex portion provided on the lower surface of the jig 17 and fitted into the guide groove 8 of the sill 7 and crosses the lower surface. An arc portion 24 having an arc shape protruding from the surface is provided.

【0032】上記のように構成された治具17によっ
て、前述の図1〜図11の実施の形態と同様に引き戸1
0の取付作業が行われる。したがって、詳細な説明を省
略するが図15〜図17の実施の形態においても図1〜
図11の実施の形態と同様な作用が得られる。また、図
15〜図17の実施の形態において、治具17の凸部2
3に円弧部24が形成されているので、敷居7の案内溝
8に凸部23を容易に嵌合できて便利である。
With the jig 17 configured as described above, the sliding door 1 is provided in the same manner as in the embodiment shown in FIGS.
0 is performed. Therefore, although detailed description is omitted, FIGS.
The same operation as the embodiment of FIG. 11 can be obtained. Further, in the embodiment shown in FIGS.
Since the circular arc portion 24 is formed in 3, the convex portion 23 can be easily fitted into the guide groove 8 of the threshold 7, which is convenient.

【0033】実施の形態4.図18〜図20も、この発
明の他の実施の形態の一例を示す図で、図18は治具の
正面図、図19は図18の側面図、図20は図18の平
面図である。なお、図18〜図20の他は前述の図1〜
図11と同様にエレベーターの引き戸装置が構成されて
いる。図において、図1〜図11と同符号は相当部分を
示し、26は治具17の下面に設けられて敷居7の案内
溝8に嵌合される凸部で、治具17の長手の両方の端部
のみに形成され、治具17の長手端面側に嵌合溝が設け
られている。
Embodiment 4 FIG. FIGS. 18 to 20 also show another embodiment of the present invention. FIG. 18 is a front view of a jig, FIG. 19 is a side view of FIG. 18, and FIG. 20 is a plan view of FIG. . In addition, other than FIG.
An elevator sliding door device is configured as in FIG. In the drawings, the same reference numerals as those in FIGS. 1 to 11 denote corresponding parts, and reference numeral 26 denotes a projection provided on the lower surface of the jig 17 and fitted into the guide groove 8 of the sill 7. And a fitting groove is provided on the longitudinal end face side of the jig 17.

【0034】27は凸部26の嵌合溝に嵌合される嵌合
突部が突設された補助嵌合子で、敷居7の案内溝8が損
耗して広がっている場合に、凸部26に嵌合突部を介し
て連結されて使用される。28は基準面18の上側に設
けられて引き戸10の下端が嵌合される上面溝部で、横
断面において上側が幅広に形成されている。
Reference numeral 27 denotes an auxiliary fitting having a protruding fitting projection fitted into the fitting groove of the projection 26. When the guide groove 8 of the sill 7 is worn out and widens, the projection 26 is used. Are connected to each other via a fitting projection. Reference numeral 28 denotes an upper surface groove portion provided above the reference surface 18 and fitted with the lower end of the sliding door 10, and has a wide upper portion in a cross section.

【0035】上記のように構成された治具17によっ
て、前述の図1〜図11の実施の形態と同様に引き戸1
0の取付作業が行われる。したがって、詳細な説明を省
略するが図18〜図20の実施の形態においても図1〜
図11の実施の形態と同様な作用が得られる。
With the jig 17 configured as described above, the sliding door 1 is provided in the same manner as in the embodiment shown in FIGS.
0 is performed. Therefore, although detailed description is omitted, FIGS.
The same operation as the embodiment of FIG. 11 can be obtained.

【0036】また、図18〜図20の実施の形態におい
て、凸部26に補助嵌合子27を連結することにより、
敷居7の案内溝8が損耗して広がっている場合に容易に
対応でき、前述の図1〜図11の実施の形態と同様に引
き戸10の取付作業を行うことができる。また、横断面
において上側が幅広に形成された上面溝部28が設けら
れるので、引き戸10を容易に嵌合することができて便
利である。
In the embodiment shown in FIGS. 18 to 20, by connecting the auxiliary fitting 27 to the projection 26,
It is possible to easily cope with the case where the guide groove 8 of the sill 7 is worn out and spread, and it is possible to mount the sliding door 10 similarly to the embodiment of FIGS. In addition, since the upper surface groove 28 having a wide upper side in the cross section is provided, the sliding door 10 can be easily fitted, which is convenient.

【0037】実施の形態5.図21〜図23も、この発
明の他の実施の形態の一例を示す図で、図21は治具の
正面図、図22は図21の側面図、図23は図21の平
面図である。なお、図21〜図23の他は前述の図1〜
図11と同様にエレベーターの引き戸装置が構成されて
いる。図において、図1〜図11と同符号は相当部分を
示す。
Embodiment 5 21 to 23 also show another embodiment of the present invention. FIG. 21 is a front view of a jig, FIG. 22 is a side view of FIG. 21, and FIG. 23 is a plan view of FIG. . In addition, other than FIG. 21 to FIG.
An elevator sliding door device is configured as in FIG. In the figure, the same reference numerals as those in FIGS.

【0038】29は上面溝部19の開口端部に外側に湾
曲して形成された曲面、30は治具17とは別体をなす
凸部で、治具17の下面に凸条状態に設けられて敷居7
の案内溝8に嵌合される。31は治具17の上面溝部2
8から凸部30にねじ込まれた取付ねじからなる装着手
段で、治具17に凸部30を装着する。
Reference numeral 29 denotes a curved surface formed by curving outward at the opening end of the upper surface groove 19, and reference numeral 30 denotes a projection which is separate from the jig 17, and is provided on the lower surface of the jig 17 in a protruding state. Threshold 7
In the guide groove 8. 31 is the upper surface groove 2 of the jig 17
The protrusion 30 is mounted on the jig 17 by mounting means consisting of mounting screws screwed into the protrusion 30 from 8.

【0039】上記のように構成された治具17によっ
て、前述の図1〜図11の実施の形態と同様に引き戸1
0の取付作業が行われる。したがって、詳細な説明を省
略するが図21〜図23の実施の形態においても図1〜
図11の実施の形態と同様な作用が得られる。
With the jig 17 configured as described above, the sliding door 1 is provided in the same manner as in the embodiment shown in FIGS.
0 is performed. Therefore, although detailed description is omitted, FIGS.
The same operation as the embodiment of FIG. 11 can be obtained.

【0040】また、図21〜図23の実施の形態におい
て、上面溝部19の開口端部に曲面29が形成されてい
るので引き戸10を容易に嵌合することができて便利で
ある。また、治具17すなわち、上面溝部19とは別体
の凸部30が装着手段31を介して組立てられるので、
上面溝部19と凸部30の材料を適宜に容易に選択する
ことができて便利である。
Further, in the embodiments shown in FIGS. 21 to 23, since the curved surface 29 is formed at the opening end of the upper surface groove 19, the sliding door 10 can be easily fitted, which is convenient. Also, since the jig 17, that is, the protrusion 30 separate from the upper surface groove 19 is assembled via the mounting means 31,
The material of the upper surface groove 19 and the protrusion 30 can be conveniently selected easily and conveniently.

【0041】[0041]

【発明の効果】この発明は以上説明したように、下縁部
を形成する敷居及び上縁部に沿って設けられた案内レー
ルを有する出入口に対して、下端部が敷居に案内され、
上端はライナーを介して締結された吊り手が転子により
案内レールに掛合されて動作し出入口を開閉するエレベ
ーター引き戸の取付方法において、引き戸の下端が嵌合
される上面溝部及び下面に設けられて敷居の案内溝に嵌
合される凸部が形成されて、引き戸の下端を敷居に対す
る所定位置に配置する治具を案内溝に仮設する第一工程
と、治具の上面溝部に引き戸の下端を嵌合して仮立設す
る第二工程と、仮立設された引き戸の上端にライナーを
介して吊り手を締結して案内レールに掛合し、引き戸の
上端を案内レールに対する所定位置に配置する第三工程
との作業を行うものである。
As described above, according to the present invention, the lower end is guided by the sill with respect to the entrance and exit having the sill forming the lower edge and the guide rail provided along the upper edge.
The upper end is provided on the upper surface groove portion and the lower surface where the lower end of the sliding door is fitted in a method of mounting an elevator sliding door in which a hanging hand fastened via a liner is engaged with a guide rail by a trochanter to operate and open and close an entrance. A convex portion to be fitted into the guide groove of the sill is formed, a first step of temporarily installing a jig for arranging the lower end of the sliding door at a predetermined position with respect to the sill in the guide groove, and attaching the lower end of the sliding door to the upper groove portion of the jig. The second step of fitting and provisionally erected, and the hanging hand is fastened to the upper end of the provisionally erected sliding door via a liner to engage with the guide rail, and the upper end of the sliding door is arranged at a predetermined position with respect to the guide rail. The third step is performed.

【0042】これによって、敷居に治具を仮設して引き
戸の下端を所定位置に配置し、引き戸の上端の取付作
業、すなわち吊り手の締結作業が行われる。このため、
作業員の移動が少なくなり一名の作業員による引き戸の
取付が可能になる。また、治具を使用することによって
調整箇所が減少し、簡易であって短時間の作業により引
き戸を容易に所定位置に取付けることができ、生産性を
向上する効果がある。
Thus, the jig is temporarily installed on the sill, the lower end of the sliding door is arranged at a predetermined position, and the work of attaching the upper end of the sliding door, that is, the work of fastening the suspender is performed. For this reason,
The movement of the worker is reduced, and the installation of the sliding door by one worker becomes possible. In addition, the use of the jig reduces the number of adjustment locations, allows the sliding door to be easily attached to a predetermined position by a simple and short-time operation, and has the effect of improving productivity.

【0043】また、この発明は以上説明したように、凸
部よりも幅広に形成されて敷居の案内溝に嵌合される補
助嵌合子が要時に治具に連結され、補助嵌合子を介して
敷居の案内溝に嵌合された治具により引き戸の下端を敷
居に対する所定位置に配置するものである。
As described above, according to the present invention, the auxiliary fitting which is formed wider than the convex portion and is fitted into the guide groove of the sill is connected to the jig when necessary, and the auxiliary fitting is provided via the auxiliary fitting. The lower end of the sliding door is arranged at a predetermined position with respect to the sill by a jig fitted into the guide groove of the sill.

【0044】これによって、敷居に治具を仮設して引き
戸の下端を所定位置に配置し、引き戸の上端の取付作
業、すなわち吊り手の締結作業が行われる。このため、
作業員の移動が少なくなり一名の作業員による引き戸の
取付が可能になる。また、治具を使用することによって
調整箇所が減少し、簡易であって短時間の作業により引
き戸を容易に所定位置に取付けることができ、生産性を
向上する効果がある。また、補助嵌合子を連結すること
により、敷居の案内溝が損耗して広がっている場合に
も、引き戸の下端を敷居に対する所定位置に配置する効
果がある。
As a result, the jig is temporarily installed on the sill, the lower end of the sliding door is arranged at a predetermined position, and the upper end of the sliding door is attached, that is, a hanging operation is performed. For this reason,
The movement of the worker is reduced, and the installation of the sliding door by one worker becomes possible. In addition, the use of the jig reduces the number of adjustment locations, allows the sliding door to be easily attached to a predetermined position by a simple and short-time operation, and has the effect of improving productivity. In addition, by connecting the auxiliary fittings, even when the guide groove of the sill is worn out and spreads, there is an effect that the lower end of the sliding door is arranged at a predetermined position with respect to the sill.

【図面の簡単な説明】[Brief description of the drawings]

【図1】 この発明の実施の形態1を示す図で、エレベ
ーター昇降路の要部縦断面図。
FIG. 1 is a view showing a first embodiment of the present invention, and is a longitudinal sectional view of a main part of an elevator hoistway.

【図2】 図1の乗場を昇降路側から見た正面図。FIG. 2 is a front view of the landing of FIG. 1 as viewed from a hoistway side.

【図3】 図2のA−A線断面図。FIG. 3 is a sectional view taken along line AA of FIG. 2;

【図4】 図3のB部拡大図。FIG. 4 is an enlarged view of a portion B in FIG.

【図5】 全開時における引き戸の配置状況を示す図で
あり前述の図2相当図。
FIG. 5 is a view showing an arrangement state of a sliding door when fully opened, and is a view corresponding to FIG. 2 described above.

【図6】 図5の右側面図。6 is a right side view of FIG.

【図7】 図5の横断平面相当図。FIG. 7 is a sectional plane equivalent view of FIG. 5;

【図8】 全閉時における引き戸の配置状況を示す図で
あり前述の図2相当図。
FIG. 8 is a diagram showing an arrangement state of a sliding door when fully closed, and is a diagram corresponding to FIG. 2 described above.

【図9】 図8の右側面図。FIG. 9 is a right side view of FIG. 8;

【図10】 図8の引き戸の横断平面図。FIG. 10 is a cross-sectional plan view of the sliding door of FIG. 8;

【図11】 図8の横断平面相当図。FIG. 11 is a sectional plane equivalent view of FIG. 8;

【図12】 この発明の実施の形態2を示す図で、治具
の正面図。
FIG. 12 shows the second embodiment of the present invention, and is a front view of a jig.

【図13】 図12の側面図。FIG. 13 is a side view of FIG. 12;

【図14】 図12の平面図。FIG. 14 is a plan view of FIG.

【図15】 この発明の実施の形態3を示す図で、治具
の正面図。
FIG. 15 shows the third embodiment of the present invention, and is a front view of a jig.

【図16】 図15の側面図。FIG. 16 is a side view of FIG.

【図17】 図15の平面図。FIG. 17 is a plan view of FIG. 15;

【図18】 この発明の実施の形態4を示す図で、治具
の正面図。
FIG. 18 shows the fourth embodiment of the present invention, and is a front view of a jig.

【図19】 図18の側面図。FIG. 19 is a side view of FIG. 18;

【図20】 図18の平面図。FIG. 20 is a plan view of FIG. 18;

【図21】 この発明の実施の形態5を示す図で、治具
の正面図。
FIG. 21 shows the fifth embodiment of the present invention, and is a front view of a jig.

【図22】 図21の側面図。FIG. 22 is a side view of FIG. 21;

【図23】 図21の平面図。FIG. 23 is a plan view of FIG. 21;

【図24】 従来のエレベーター引き戸の取付方法を示
すエレベーター昇降路の要部縦断面図。
FIG. 24 is a longitudinal sectional view of a main part of an elevator hoistway showing a conventional method of mounting an elevator sliding door.

【符号の説明】[Explanation of symbols]

4 出入口、7 敷居、8 案内溝、9 案内レール、
10 引き戸、11吊り手、15 ライナー、17 治
具、19 上面溝部、20 凸部、27 補助嵌合子。
4 doorways, 7 thresholds, 8 guide grooves, 9 guide rails,
DESCRIPTION OF SYMBOLS 10 Sliding door, 11 hanging hand, 15 liner, 17 jig, 19 upper surface groove part, 20 convex part, 27 auxiliary fitting.

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 下縁部を形成する敷居及び上縁部に沿っ
て設けられた案内レールを有する出入口に対して、下端
部が上記敷居に案内され、上端はライナーを介して締結
された吊り手が転子により上記案内レールに掛合されて
動作し上記出入口を開閉するエレベーター引き戸の取付
方法において、上記引き戸の下端が嵌合される上面溝部
及び下面に設けられて上記敷居の案内溝に嵌合される凸
部が形成されて、上記引き戸の下端を上記敷居に対する
所定位置に配置する治具を上記案内溝に仮設する第一工
程と、上記治具の上面溝部に上記引き戸の下端を嵌合し
て仮立設する第二工程と、仮立設された上記引き戸の上
端に上記ライナーを介して上記吊り手を締結して上記案
内レールに掛合し、上記引き戸の上端を上記案内レール
に対する所定位置に配置する第三工程とからなるエレベ
ーター引き戸の取付方法。
1. A suspension having a lower end guided by a sill and an upper end fastened via a liner to an entrance having a sill forming a lower edge and a guide rail provided along the upper edge. In a method for mounting an elevator sliding door, wherein a hand is hung on the guide rail by a trochanter to operate and open and close the entrance, the sliding door is provided on an upper surface groove portion and a lower surface in which a lower end of the sliding door is fitted, and is fitted into the guide groove of the threshold. A first step of temporarily setting a jig for arranging a lower end of the sliding door at a predetermined position with respect to the sill in the guide groove, and fitting a lower end of the sliding door into an upper groove of the jig; A second step of temporarily erecting and joining, the hanging hand is fastened to the upper end of the temporarily erecting sliding door via the liner and hooked on the guide rail, and the upper end of the sliding door with respect to the guide rail. In place An elevator sliding door mounting method including a third step of disposing.
【請求項2】 凸部よりも幅広に形成され要時に治具に
連結されて敷居の案内溝に嵌合される補助嵌合子を備え
たことを特徴とする請求項1記載のエレベーター引き戸
の取付方法。
2. An elevator sliding door mounting according to claim 1, further comprising an auxiliary fitting which is formed wider than the convex portion and which is connected to a jig when necessary and fitted into a guide groove of a sill. Method.
JP10362824A 1998-12-21 1998-12-21 Method of installing horizontal sliding door on elevator Pending JP2000185886A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP10362824A JP2000185886A (en) 1998-12-21 1998-12-21 Method of installing horizontal sliding door on elevator

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP10362824A JP2000185886A (en) 1998-12-21 1998-12-21 Method of installing horizontal sliding door on elevator

Publications (1)

Publication Number Publication Date
JP2000185886A true JP2000185886A (en) 2000-07-04

Family

ID=18477825

Family Applications (1)

Application Number Title Priority Date Filing Date
JP10362824A Pending JP2000185886A (en) 1998-12-21 1998-12-21 Method of installing horizontal sliding door on elevator

Country Status (1)

Country Link
JP (1) JP2000185886A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2401399A (en) * 2003-05-08 2004-11-10 Automotive Motion Tech Ltd Casing wall recesses reduce shear loss in screw pumps
JP2010208740A (en) * 2009-03-09 2010-09-24 Toshiba Elevator Co Ltd Adjusting tool and adjusting method of elevator door switch
JP2015093760A (en) * 2013-11-12 2015-05-18 東芝エレベータ株式会社 Fitting method of elevator protection member
US20150354258A1 (en) * 2013-02-05 2015-12-10 Reynaers Aluminium, Naamloze Vennootscha Method for installing a leaf of a sliding door and set used thereby
JP5832676B2 (en) * 2013-02-07 2015-12-16 三菱電機株式会社 Elevator door apparatus and elevator door installation method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2401399A (en) * 2003-05-08 2004-11-10 Automotive Motion Tech Ltd Casing wall recesses reduce shear loss in screw pumps
JP2010208740A (en) * 2009-03-09 2010-09-24 Toshiba Elevator Co Ltd Adjusting tool and adjusting method of elevator door switch
CN101863408A (en) * 2009-03-09 2010-10-20 东芝电梯株式会社 Adjustment jig of elevator door switch and adjustment method thereof
US20150354258A1 (en) * 2013-02-05 2015-12-10 Reynaers Aluminium, Naamloze Vennootscha Method for installing a leaf of a sliding door and set used thereby
US9708843B2 (en) * 2013-02-05 2017-07-18 Reynaers Aluminium, Naamloze Vennootschap Method for installing a leaf of a sliding door and set used thereby
JP5832676B2 (en) * 2013-02-07 2015-12-16 三菱電機株式会社 Elevator door apparatus and elevator door installation method
JP2015093760A (en) * 2013-11-12 2015-05-18 東芝エレベータ株式会社 Fitting method of elevator protection member

Similar Documents

Publication Publication Date Title
JP2000185886A (en) Method of installing horizontal sliding door on elevator
JP5214180B2 (en) Sliding door device
JPH10167639A (en) Manufacture of elevator door
JP2008265902A (en) Entrance/exit device for elevator
JP4111327B2 (en) Elevator door equipment
JP4689242B2 (en) Elevator door equipment
JPH06298477A (en) Elevator door device
JP2002104754A (en) Guide rail device for elevator
JP2007153518A (en) Landing hall device of elevator
CN117377634B (en) Mounting auxiliary tool
JP6769585B1 (en) Elevator doors and elevator door maintenance parts
WO2022107300A1 (en) Guide rail support structure and elevator
JP6697663B1 (en) Elevator door panel positioning device
JPH11255454A (en) Landing doorway frame for elevator
CN210288978U (en) A mounting structure for indoor dado
JPH0318591A (en) Doorsill at elevator getting-on field
US20210403290A1 (en) Narrow groove elevator doorsill
JPH08245142A (en) Doorway device of elevator
JP4315730B2 (en) Elevator sliding door
KR200300631Y1 (en) Checking door for ceiling
JP2023149856A (en) Door device and method for mounting upper frame portion in door device
JP2002206366A (en) Airtight device for door
JP4912901B2 (en) Sliding door device
JPH0867482A (en) Leg of door for elevator
JPH07228439A (en) Elevator landing entrance device