JP2000155781A - Estimation sheet generation system for construction cost - Google Patents

Estimation sheet generation system for construction cost

Info

Publication number
JP2000155781A
JP2000155781A JP32997298A JP32997298A JP2000155781A JP 2000155781 A JP2000155781 A JP 2000155781A JP 32997298 A JP32997298 A JP 32997298A JP 32997298 A JP32997298 A JP 32997298A JP 2000155781 A JP2000155781 A JP 2000155781A
Authority
JP
Japan
Prior art keywords
file
construction
data
building
room
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP32997298A
Other languages
Japanese (ja)
Inventor
Yuhei Maruyama
雄平 丸山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YUMETATSUJIN KK
Original Assignee
YUMETATSUJIN KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YUMETATSUJIN KK filed Critical YUMETATSUJIN KK
Priority to JP32997298A priority Critical patent/JP2000155781A/en
Publication of JP2000155781A publication Critical patent/JP2000155781A/en
Pending legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To speedily and accurately generate an estimation sheet for construction cost without generating a design drawing and to easily generates an estimation sheet again at the time of specification changes or the like of a building. SOLUTION: This estimation sheet generation system has a specification setting file to which data determining the specifications of a building are inputted, a material and parts data file containing the names of materials and parts fitted to respective rooms and construction quantities of construction for fitting the materials and parts, a construction unit-price file, and a special construction estimation sheet file. The data inputted to the specification setting file are stored as data determining the specifications of the building. According to the data determining the specifications, construction quantities by the special construction by the rooms are calculated. The calculated construction quantities are integrated by the special construction and the construction cost is calculated from the integrated construction quantities and the construction unit-price file and recorded in the special construction estimation sheet file.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、建築工事費用見積
書作成システムに関し、特にたとえば、建築物の建屋構
造や建築物内に設けられる和室,洋室,廊下等の各部屋
の仕様を決定していくことにより、建築工事費用の見積
書を作成することができる建築工事費用見積書作成シス
テムに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a system for preparing a construction cost estimate, and more particularly to, for example, determining the specifications of each room such as a Japanese-style room, a Western-style room, and a corridor provided in a building structure and a building. The present invention relates to a construction cost estimate creation system capable of creating an estimate of a construction cost by going there.

【0002】[0002]

【従来の技術】従来、建築工事費用の見積書を作成する
には、顧客よりヒアリングした内容に基づいて建築物の
設計図面を作成した後、設計図面より使用する資材・部
品の数量等を読取り、使用資材・部品費用と附帯工事費
用を手計算により積算して見積書を作成していた。また
は、CADシステムにより、設計図面を作成した後、C
ADシステムに組込まれた見積書作成機能を用いて、建
築工事費用の見積書を作成していた。
2. Description of the Related Art Conventionally, in order to create a building construction cost estimate, a building design drawing is created based on the contents interviewed by a customer, and then the quantities of materials and parts to be used are read from the design drawing. In addition, estimates were made by manually calculating the costs of materials and parts used and the costs of incidental works. Or, after creating a design drawing by CAD system, C
Using the estimate creation function incorporated in the AD system, an estimate of the construction cost was created.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、設計図
面より使用資材・部品の数量を読み取り、手計算により
見積書を作成する場合には、設計図面を作成する作業,
設計図面から使用する資材・部品の数量を読取る作業,
多数の単価表から該当単価表を探し出し単価を拾う作
業,資材・部品費用及び附帯工事費用を積算する作業等
の多くの作業を行わなければならなかった。そのため、
非常に効率が悪く、見積書を迅速に作成することができ
なかった。また、この方法で見積書を作成するには、建
築設計,建築設備工事に関するかなりの知識と見積り作
業に関する慣れとが必要とされるため、建築設計等に習
熟していない者や見積り作業に不慣れな者には、見積書
を作成することができなかった。さらに、全ての作業を
人が行うため、見積書を作成する者により見積り額が異
なったり、計算ミス等から見積り額を間違う等の問題が
生じていた。
However, when the quantity of materials and parts to be used is read from a design drawing and an estimate is created by manual calculation, the work of creating the design drawing,
Work to read the quantity of materials and parts to be used from design drawings,
A lot of work had to be performed, such as searching for the unit price table from a large number of unit price tables and picking up the unit price, and estimating the cost of materials and parts and the cost of incidental work. for that reason,
It was very inefficient and was unable to generate a quote quickly. In addition, creating an estimate using this method requires considerable knowledge of architectural design and building equipment work and experience in estimating work. Was unable to prepare a quote. Furthermore, since all the work is performed by a person, there have been problems such as a difference in the estimated amount depending on a person who creates the estimate, and a mistake in the estimated amount due to a calculation error or the like.

【0004】また、CADシステムに組込まれた見積書
作成機能を用いて見積書を作成する場合には、最初に建
築物の設計図面を作成しなければならないため、迅速に
見積書を作成することができなかった。当然のことなが
ら、建築物の設計図面を作成するには、建築設計を習得
していなければならないため、建築設計を習得していな
い者は見積書を作成することができなかった。
[0004] In addition, when creating an estimate using the estimate creation function incorporated in the CAD system, it is necessary to first create a design drawing of the building. Could not. Naturally, in order to create a design drawing of a building, it was necessary to master the architectural design, so that a person who did not master the architectural design could not create a quote.

【0005】上述した問題は、建築物の仕様変更等によ
り、再度見積書を作成する場合にも発生する。そのた
め、ケーススタディを重ねる場合には、その分、見積書
を作成する時間が必要となり、最悪の場合には、それが
原因で工事の着工が遅れる等の問題を併発する結果とな
っていた。
[0005] The above-described problem also occurs when a quote is created again due to a change in the specification of a building or the like. Therefore, when the case studies are repeated, it takes time to prepare an estimate, and in the worst case, problems such as delay of the construction start are caused.

【0006】よって、本発明の目的は、設計図面を作成
することなく、建築設計等に習熟していない者や見積り
作業に不慣れな者でも、迅速且つ正確な建築工事費用の
見積書を作成することができ、建築物の仕様変更等によ
り再度見積書を作成する場合にも、容易に作成すること
ができる建築工事費用見積書作成システムを提供するこ
とである。
Accordingly, it is an object of the present invention to quickly and accurately create an estimate of a building construction cost without preparing a design drawing, even for a person who is not familiar with architectural design and the like or who is unfamiliar with estimation work. It is an object of the present invention to provide a construction cost estimate creating system which can easily create an estimate even when a quote is created again due to a change in the specification of a building.

【0007】[0007]

【課題を解決するための手段】請求項1に記載の発明
は、中央処理装置と記憶装置と入力装置とから構成され
る建築工事費用見積書作成システムであって、記憶装置
は、建築物の建屋構造や各部屋の仕様を決定するデータ
を入力するための仕様設定ファイルと、各部屋に取付け
られる資材・部品の名称と、少なくとも資材・部品を取
付けるために発生する各種工事の工事量とを関連付けて
記憶した資材・部品データファイルと、単位工事量当た
りの各工事の単価を記憶した工事単価ファイルと、専門
工事区分毎に帳票データを有する専門工事見積書ファイ
ル群とを有し、中央処理装置は、表示装置に仕様設定フ
ァイルの内容を表示し、入力装置により入力された建築
物の建屋構造や各部屋の仕様を決定するデータを仕様設
定ファイルに収納する第1の手段と、建築物の建屋構造
や各部屋の仕様を決定するデータに基づいて、部屋毎の
専門工事毎の工事量を算出する第2の手段と、第2の手
段により算出された部屋毎の専門工事毎の工事量を専門
工事毎に集計して、集計した工事量と、工事単価ファイ
ルとの単価に基づいて、工事費用を算出し、専門工事見
積書ファイルに算出した工事費用を記憶する第3の手段
を有することを特徴とする、建築工事費用見積書作成シ
ステムである。請求項1の発明によれば、各部屋毎の工
事量が算出され、その値に基づいて、専門工事毎の工事
費用が正確に算出される。
According to a first aspect of the present invention, there is provided a building construction cost estimate creating system including a central processing unit, a storage device, and an input device, wherein the storage device includes a The specification setting file for inputting data that determines the specifications of the building structure and each room, the names of the materials and parts to be installed in each room, and at least the amount of various types of construction work required to install the materials and parts It has a material / parts data file stored in association with it, a construction unit price file that stores the unit price of each construction per unit construction volume, and a specialized construction estimate file group that has form data for each specialized construction category. The device displays the contents of the specification setting file on the display device, and stores in the specification setting file the data for determining the building structure of the building and the specifications of each room input by the input device. The first means, the second means for calculating the amount of work for each specialized work for each room based on the data for determining the building structure of the building and the specifications for each room, and the second means The construction cost calculated by summing up the work volume for each specialty work in each room for each specialty work, calculating the construction cost based on the totaled work volume and the unit price of the construction unit price file, and calculating the cost in the specialty work estimate file Is a building construction cost estimate creation system characterized by having a third means for storing According to the first aspect of the present invention, the amount of construction for each room is calculated, and the construction cost for each specialized construction is accurately calculated based on the calculated value.

【0008】請求項2に記載の発明は、第3の手段は、
階毎の部屋総壁面積を算出する第4の手段と、階毎の外
壁面積を算出する第5の手段と、第4の手段により算出
された階毎の部屋総壁面積と第5の手段により算出され
た階毎に外壁面積とを加算した値を整数2により除算し
て、除算した値から第5の手段により算出された階毎に
外壁面積を減算することにより階毎の間仕切量を算出す
る第6の手段とを有する、請求項1に記載の建築工事費
用見積書作成システムである。請求項2の発明によれ
ば、部屋を区切る間仕切量を、階毎の部屋の総壁面積と
階毎に外壁面積を算出を算出することにより、正確に算
出することができる。
According to a second aspect of the present invention, the third means includes:
Fourth means for calculating the total wall area of the room for each floor, fifth means for calculating the outer wall area for each floor, and total room area for each floor calculated by the fourth means and the fifth means By dividing the value obtained by adding the outer wall area and the outer wall area for each floor calculated by the integer 2 and subtracting the outer wall area for each floor calculated by the fifth means from the divided value, the partition amount for each floor is obtained. The building construction cost estimate creation system according to claim 1, comprising: a sixth means for calculating. According to the second aspect of the present invention, the partitioning amount for dividing the room can be accurately calculated by calculating the total wall area of the room for each floor and the outer wall area for each floor.

【0009】本発明の上述の目的、その他の目的、特徴
および利点は、図面を参照して行う以下の発明の実施の
形態の詳細な説明から一層明らかとなろう。
The above and other objects, features and advantages of the present invention will become more apparent from the following detailed description of embodiments of the present invention with reference to the accompanying drawings.

【0010】[0010]

【発明の実施の形態】図1は、本発明にかかる建築工事
費用見積書作成システムの一実施形態の構成を示すブロ
ック図であり、図2は、記憶装置に記憶されているファ
イルを示す図解図である。建築工事費用見積書作成シス
テム10は、中央処理装置であるCPU12を含む。C
PU12には、ROM14が接続されている。ROM1
4には、建築工事費用見積書作成システム10のデータ
の入出力の制御する制御プログラムが記憶されている。
FIG. 1 is a block diagram showing the configuration of an embodiment of a construction cost estimate creating system according to the present invention, and FIG. 2 is a diagram showing files stored in a storage device. FIG. The construction cost estimate creation system 10 includes a CPU 12 which is a central processing unit. C
A ROM 14 is connected to the PU 12. ROM1
Reference numeral 4 stores a control program for controlling the input and output of data of the construction work cost estimate creation system 10.

【0011】また、CPU12には、RAM16が接続
されている。RAM16は、CPU12が各種の処理を
実行するために必要とするプログラムやデータを一時的
に記憶するためのものである。さらに、CPU12に
は、I/Oインターフェイス18が接続されている。I
/Oインターフェイス18は、CPU12と外部の装置
とがデータの入出力を行うためのインターフェイスであ
り、複数の端子(図示せず)を有している。
A RAM 16 is connected to the CPU 12. The RAM 16 is for temporarily storing programs and data required for the CPU 12 to execute various processes. Further, an I / O interface 18 is connected to the CPU 12. I
The / O interface 18 is an interface for inputting and outputting data between the CPU 12 and an external device, and has a plurality of terminals (not shown).

【0012】I/Oインターフェイス18には、CRT
やLCD等から構成される表示装置20と、各種のデー
タを入力するためのキーボードやマウス等から成る入力
装置22と、プリンタ等の出力装置24と、ハードディ
スク等の記憶装置26とが端子において接続されてい
る。
The I / O interface 18 has a CRT
A display device 20 such as an LCD or an LCD, an input device 22 such as a keyboard and a mouse for inputting various data, an output device 24 such as a printer, and a storage device 26 such as a hard disk are connected at terminals. Have been.

【0013】記憶装置26には、図2に示すように、顧
客データファイル28、平面プランファイル30,建築
データファイル32,建屋仕様ファイル34、内部仕上
仕様ファイル36,部屋仕様ファイル群38、資材・部
品データファイル群40、工事単価ファイル42,専門
工事見積書ファイル群44が記憶されている。
As shown in FIG. 2, a customer data file 28, a plane plan file 30, a building data file 32, a building specification file 34, an internal finishing specification file 36, a room specification file group 38, A part data file group 40, a construction unit price file 42, and a specialized construction estimate file group 44 are stored.

【0014】これらのファイルは、機能的に大別する
と、表示装置20や出力装置24において、表示・印刷
される帳票や図形の設定がされている帳票データだけを
有するファイルと、帳票データと共に部品名称,部品単
価等の種々のデータをデータベースとして記憶している
ファイルと、CPU12により実行されることで処理手
段として機能する、処理関数と帳票データを記憶してい
るファイルとに分類することができる。なお、各ファイ
ルの内容・機能については、後述する本実施形態の動作
の説明において説明する。
These files can be roughly classified into two types of files: a file having only form data in which a form and a figure to be displayed and printed are set on the display device 20 and the output device 24; It can be classified into a file storing various data such as a name and a unit price as a database, and a file storing processing functions and form data which function as processing means when executed by the CPU 12. . The contents and functions of each file will be described later in the description of the operation of the present embodiment.

【0015】ここで、処理関数について説明すると、処
理関数とは、表計算アプリケーションでワークシート内
で演算処理等に使用される演算式や関数,表計算アプリ
ケーションに付属しているマクロプログラム、表計算ア
プリケーションに外部プログラムによって組み込まれる
アドインアプリケーションのことを意味する。処理関数
は、演算式,関数やプログラムの内容を変更することに
より、色々な処理手段として処理を実行することが可能
であり、この実施形態においては、主として、各ファイ
ルに入力されたデータから、所望するデータを作成した
り、任意のファイルにデータが入力され場合に、そのデ
ータを他のファイルに自動的に入力する処理を行うため
に使用している。なお、本実施形態においては、処理関
数や帳票データの作成の容易性から、表計算アプリケー
ションのワークシートに帳票データを作成し、処理関数
としては、ワークシート内で使用される演算式や関数を
使用した。
Here, the processing function will be described. The processing function is an arithmetic expression or a function used in a spreadsheet application for an arithmetic operation in a worksheet, a macro program attached to the spreadsheet application, or a spreadsheet application. An add-in application that is incorporated into an application by an external program. The processing function can execute processing as various processing means by changing the content of an arithmetic expression, a function, and a program. In this embodiment, the processing function mainly performs processing based on data input to each file. This is used to create desired data or to automatically input data to another file when data is input to an arbitrary file. In the present embodiment, form data is created on a worksheet of a spreadsheet application for ease of creation of processing functions and form data, and as a processing function, an arithmetic expression or function used in the worksheet is used. used.

【0016】以下、図3などを参照しながら、本実施形
態の動作について説明する。なお。図3は、本発明にか
かる建築工事費用見積書作成システムの動作フローを示
すフローチャート図である。
The operation of this embodiment will be described below with reference to FIG. In addition. FIG. 3 is a flowchart showing an operation flow of the construction cost estimate creation system according to the present invention.

【0017】まず、建築工事費用見積書作成システム1
0は、起動直後、ステップS1において、ROM14に
記憶されている制御プログラムがCPU12により実行
され、データの入出力に関する設定が行われる。
First, a construction work cost estimate creation system 1
0 indicates that immediately after startup, in step S1, the control program stored in the ROM 14 is executed by the CPU 12, and settings relating to data input / output are performed.

【0018】そして、ステップS2において、記憶装置
26から、顧客データファイル28、平面プランファイ
ル30,建築データファイル32,建屋仕様ファイル3
4、内部仕上仕様ファイル36,部屋仕様ファイル群3
8、資材・部品データファイル群40、工事単価ファイ
ル42,専門工事見積書ファイル群44がRAM16内
にロードされる。
In step S2, the customer data file 28, the plane plan file 30, the building data file 32, and the building specification file 3 are stored in the storage device 26.
4. Internal finish specification file 36, room specification file group 3
8. The material / part data file group 40, the construction unit price file 42, and the special construction estimate file group 44 are loaded into the RAM 16.

【0019】ステップS3においては、建築物の建屋の
構造に関する設定が行われる。ステップS3における設
定は、図4に示すように、建屋の大きさ等の設定,建屋
の構造等の設定に関して細分化されて行われる。なお、
図4は、建屋の構造に関する設定のフローを示すフロー
チャート図である。
In step S3, settings relating to the structure of the building are made. As shown in FIG. 4, the setting in step S <b> 3 is performed by subdividing the setting of the size of the building and the setting of the structure of the building. In addition,
FIG. 4 is a flowchart illustrating a flow of setting related to the structure of the building.

【0020】まず、ステップS31において、顧客デー
タファイル28が表示され、データの入力が行われる。
顧客データファイル28は、図5に示すように、建築物
を建設する場合に制限事項となる建蔽率や容積率,敷地
面積のデータの他、適宜に割り当てた顧客コード,顧客
の氏名,住所,建築物の用途,電話番号,家族構成等の
データを入力をするためのファイルである。顧客データ
ファイル28は、帳票データのみを有するファイルであ
るが、図5に示すように、各データが入力された後は、
入力されたデータと共に、RAM16に記憶される。な
お、図5は、顧客データファイルを示す図解図である。
First, in step S31, the customer data file 28 is displayed, and data is input.
As shown in FIG. 5, the customer data file 28 includes data on the building coverage, floor area ratio, and site area, which are restrictions when constructing a building, as well as appropriately assigned customer code, customer name, address, and building. This file is used to input data such as the purpose of use, telephone number, and family structure. Although the customer data file 28 is a file having only the form data, as shown in FIG. 5, after each data is input,
The data is stored in the RAM 16 together with the input data. FIG. 5 is an illustrative view showing a customer data file.

【0021】ステップS32において、平面プランファ
イル30が表示され、データの入力が行われる。平面プ
ランファイル30は、図6に示すように、住宅の各階の
平面形状を設定するデータを入力するためのファイルで
ある。平面プランファイル30も、顧客データファイル
28と同様に、帳票データのみを有するファイルである
が、図6に示すように、各データが入力された後は、入
力されたデータと共に、RAM16に記憶される。な
お、図6は、平面プランファイルを示す図解図である。
In step S32, the plane plan file 30 is displayed, and data is input. As shown in FIG. 6, the plane plan file 30 is a file for inputting data for setting the plane shape of each floor of the house. Like the customer data file 28, the plane plan file 30 is a file having only the form data. However, as shown in FIG. 6, after each data is input, the data is stored in the RAM 16 together with the input data. You. FIG. 6 is an illustrative view showing a plane plan file.

【0022】ステップS33において、建築データファ
イル32が表示され、データの入力が行われる。建築デ
ータファイル32は、図7に示すように、建築物に設け
られるペントハウスの間口と奥行、各階の吹き抜けの面
積,2階以上に設けられるベランダの間口と奥行、1階
に設けられる駐車場の面積のデータを入力するためのフ
ァイルである。建築データファイル32は、上述したよ
うに、ペントハウスの間口と奥行,各階の吹き抜けの面
積,2階以上に設けられるベランダの間口と奥行、1階
駐車場の面積のデータの他に、敷地面積,法床面積,施
工延床面積,内部利用可能面積,敷地面積等が入力され
るように帳票データに項目が設けられているが、上述し
た項目以外に、データの入力は行われない。入力が指定
されていない項目のデータは、建築データファイル32
の帳票データ内に搭載された処理関数によって、建築デ
ータファイル32に入力されたデータより、算出して入
力されるか、若しくは、顧客データファイル28,平面
プランファイル30等の他のファイルに入力されたデー
タを参照して入力される。
In step S33, the building data file 32 is displayed, and data is input. As shown in FIG. 7, the construction data file 32 includes the frontage and depth of a penthouse provided in a building, the area of a stairwell on each floor, the frontage and depth of a veranda provided on two or more floors, and the parking lot provided on the first floor. This is a file for inputting area data. As described above, the construction data file 32 includes, in addition to the data on the frontage and depth of the penthouse, the area of the stairwell on each floor, the frontage and depth of the veranda provided on the second floor or more, and the area of the parking space on the first floor, the site area, Items are provided in the form data so that the floor area, construction total floor area, internal available area, site area, and the like are input. However, other than the above-described items, no data is input. Data for items for which no input has been specified is stored in the building data file 32
Of the building data file 32, or input to another file such as the customer data file 28 or the plane plan file 30 by the processing function mounted in the form data. Entered by referring to the data.

【0023】例をあげて説明すると、法床面積のデータ
に関しては、処理関数が平面プランファイル30と建築
データファイル32とに入力されたデータを参照して、
“1階の間口*1階の奥行+2階の間口*2階の奥行+
3階の間口*3階の奥行+ペントハウスの間口*ペント
ハウスの奥行−各階の吹き抜けの面積−1階駐車場の面
積”で表される演算式をCPU12により実行して、法
床面積のデータとして入力するように処理されている。
For example, with respect to the data of the floor area, the processing function refers to the data input to the plane plan file 30 and the building data file 32, and
"Front of the first floor * Depth of the first floor + Frontage of the second floor * Depth of the second floor +
The CPU 12 executes an arithmetic expression expressed by "the frontage of the third floor * the depth of the third floor + the frontage of the penthouse * the depth of the penthouse-the area of the stairwell of each floor-the area of the first floor parking lot" by the CPU 12 to obtain the data of the floor area. It has been processed to be entered.

【0024】また、敷地面積のデータについては、既に
顧客データファイル28において入力されているので、
そのデータを建築データファイル32の敷地面積のデー
タとして入力するように処理関数により処理されてい
る。
Also, since the data of the site area has already been entered in the customer data file 28,
The data is processed by a processing function so as to be input as the data of the site area of the building data file 32.

【0025】そして、顧客データファイル28は、図7
に示すように、コード入力や処理関数によりデータが入
力された後、RAM16に記憶される。なお、図7は、
建築データファイルを示す図解図である。
The customer data file 28 is shown in FIG.
As shown in (1), after data is input by a code input or a processing function, the data is stored in the RAM 16. In addition, FIG.
It is an illustrative view showing a building data file.

【0026】ステップS34においては、建屋仕様ファ
イル34が表示され、データの入力が行われる。建屋仕
様ファイル34は、図8に示すように、建屋の構造や使
用する資材に関するデータを入力するために用いられる
ファイルである。建屋仕様ファイル34へのデータの入
力は、各階の柱の本数,屋根の高さについては、直接、
数値を入力することにより行われる。その他の項目につ
いては、建屋仕様ファイル34内に記憶されているデー
タベース34aのデータが、各項目のデータとして入力
されるように処理関数により処理される。なお、図8
は、建屋仕様ファイルの帳票データを示す図解図であ
る。
In step S34, the building specification file 34 is displayed, and data is input. As shown in FIG. 8, the building specification file 34 is a file used to input data on the structure of the building and the materials to be used. The input of data to the building specification file 34 is based on the number of columns on each floor and the height of the roof.
This is done by entering a numerical value. The other items are processed by the processing function so that the data of the database 34a stored in the building specification file 34 is input as the data of each item. FIG.
FIG. 3 is an illustrative view showing a form data of a building specification file;

【0027】上述したように、建屋仕様ファイル34に
は、図8に示した帳票データ以外に、図9に示すよう
な、建屋の構造を決定するためのデータがデータベース
34aとして記憶されている。そして、表示された帳票
データの「入力」の欄に予め定義しておいたコードを入
力することにより、「形状」の欄に入力されるべきデー
タが、データベース34aを参照して入力される。詳し
く説明すると、図8に示す帳票データの行と同じ行位置
に配置されているデータのいずれかか入力されるように
定義されおり、「入力」の欄に図9に示すデータベース
34aの列番号を入力することにより、「形状」の欄に
選択した列のデータが入力され、建屋の構造や使用する
資材データが決定される。そして、入力されたデータ
は、建屋仕様ファイル34の帳票データと共に、RAM
16に記憶される。なお、図9は、建屋仕様ファイルに
記録されているデータベースを示す図解図である。
As described above, in addition to the form data shown in FIG. 8, data for determining the structure of the building as shown in FIG. 9 is stored in the building specification file 34 as the database 34a. Then, by inputting a predefined code in the “input” field of the displayed form data, data to be input in the “shape” field is input with reference to the database 34a. More specifically, it is defined so that any one of the data arranged at the same line position as the form data line shown in FIG. 8 is input, and the column of the database 34a shown in FIG. Is input, the data of the selected column is input in the column of “shape”, and the structure of the building and the material data to be used are determined. The input data is stored in the RAM together with the form data of the building specification file 34.
16 is stored. FIG. 9 is an illustrative view showing a database recorded in the building specification file.

【0028】引き続いて、ステップS4においては、建
物内の設けられる玄関,洋室,和室,廊下等の部屋毎の
仕様の設定が行われ、各部屋の専門工事項目毎の工事量
の算出が行われる。以下、図10などを用いて説明す
る。なお、図10は、工事量の算出の動作フローを示す
フロー図である。
Subsequently, in step S4, specifications for each room such as an entrance, a Western-style room, a Japanese-style room, and a corridor in the building are set, and the amount of work for each specialized work item in each room is calculated. . Hereinafter, description will be made with reference to FIG. FIG. 10 is a flowchart showing an operation flow for calculating the amount of work.

【0029】まず、ステップS41においては、内部仕
上仕様ファイル26が表示され、データの入力が行われ
る。内部仕上仕様ファイル26は、図11に示すよう
に、建物の内部に設けられる各部屋における床,壁,天
井等の仕様を決定するためのファイルである。内部仕上
仕様ファイル26へのデータの入力は、建屋仕様ファイ
ル34と同様に、帳票内に設けられた入力欄27にコー
ドを用いて行われる。各コードは各列の上部に設けられ
たデータベースか、若しくは入力欄27内に不可視化し
て記憶されたデータベース(図示せず)とに対応付けら
れており、コードが入力されると各項目に決定したデー
タが入力されるように処理関数により処理されている。
また、内部仕上仕様ファイル26には、各部屋の床,
壁,天井等の決定した資材データが入力される他に、各
部屋の配置階数や使用スペースのデータが入力されるよ
うに帳票データには項目が設けられているが、これらの
項目には、コード入力によるデータ入力は行われない。
これらの項目には、後述する部屋仕様ファイル群38に
データが入力されたときに、処理関数により入力が行わ
れる。そして、入力された各項目のデータは、内部仕上
仕様ファイル26の帳票データと共に、RAM16に記
憶される。なお、図11は、内部仕上仕様ファイルを示
す図解図である。
First, in step S41, the internal finish specification file 26 is displayed, and data is input. As shown in FIG. 11, the internal finish specification file 26 is a file for determining specifications of floors, walls, ceilings, and the like in each room provided inside the building. Data is input to the internal finish specification file 26 using a code in an input field 27 provided in the form, as in the building specification file 34. Each code is associated with a database provided at the top of each column, or a database (not shown) stored in an invisible manner in the input field 27. Processing is performed by the processing function so that the determined data is input.
In addition, the interior finish specification file 26 includes the floor of each room,
In addition to the input of the material data determined for the walls and ceiling, etc., the form data is provided with items so that the data of the number of floors and the used space of each room is input. Data input by code input is not performed.
These items are input by a processing function when data is input to a room specification file group 38 described later. Then, the input data of each item is stored in the RAM 16 together with the form data of the internal finish specification file 26. FIG. 11 is an illustrative view showing an internal finish specification file.

【0030】次ぎに、ステップS42においては、部屋
仕様ファイル群38を適宜表示させ、各項目にデータを
入力後、各部屋の専門工事毎の工事量の算出が行われ
る。部屋仕様ファイル群38は、部屋毎に仕様を決定し
ていくために、図12に示すように、納戸仕様ファイル
38a,階段仕様ファイル38b,ユニットバス仕様フ
ァイル38c,洗面化粧室仕様ファイル38d,トイレ
仕様ファイル38e,キッチン仕様ファイル38f,和
室仕様ファイル38g,洋室仕様ファイル38h,玄関
・ポーチ仕様ファイル38i,リビング仕様ファイル3
8j,廊下・ホール仕様ファイル38kの構成ファイル
から構成されている。各構成ファイル38a〜38kに
おいて入力されるデータは異なるが、各部屋を設けるの
に必要な工事量を算出するために、算出条件を拘束して
いくプロセスは同一であるので、以下、納戸仕様ファイ
ル38aを例にとって説明する。なお、図12は、部屋
仕様ファイル群の構成を示す図解図である。
Next, in step S42, the group of room specification files 38 is appropriately displayed, and after inputting data for each item, the amount of construction for each specialized construction in each room is calculated. As shown in FIG. 12, the room specification file group 38 includes a storage room specification file 38a, a staircase specification file 38b, a unit bath specification file 38c, a bathroom toilet specification file 38d, and a toilet, as shown in FIG. Specification file 38e, kitchen specification file 38f, Japanese-style specification file 38g, Western-style specification file 38h, entrance / porch specification file 38i, living specification file 3
8j, a corridor / hall specification file 38k. Although the data input in each of the configuration files 38a to 38k is different, the process of restricting the calculation conditions in order to calculate the amount of work required for providing each room is the same. This will be described by taking 38a as an example. FIG. 12 is an illustrative view showing a configuration of a room specification file group.

【0031】図13は、納戸仕様ファイルの一部を示す
図解図である。納戸仕様ファイル38aは、建屋内に設
けられる納戸の設置階数と、納戸の広さと、戸開仕様,
すなわち納戸に設ける戸の仕様と、外部開口仕様,すな
わち窓の仕様とを決定するデータを入力するためのファ
イルである。納戸仕様ファイル38aへのデータの入力
は、建屋仕様ファイル34等と同様に、帳票内に設けら
れた入力欄39にコードを用いて行われる。各コードは
入力項目内に不可視された状態で設けられたデータベー
ス(図示せず)か、若しくは、資材・部品データファイ
ル群40の一構成ファイルである木製建具データファイ
ル40hと金属製建具データファイル40fとに対応付
けされており、適宜なコードが入力されることにより、
入力項目内にデータが入力される。なお、その他の項目
については、納戸ファイル仕様ファイル38aに入力さ
れたデータ若しくはその他のファイルに入力されたデー
タが適宜用いられて入力される。
FIG. 13 is an illustrative view showing a part of a storage room specification file. The storage room specification file 38a includes the number of floors of the storage room provided in the building, the size of the storage room, the door opening specification,
That is, it is a file for inputting data for determining the specification of the door provided in the storage room and the specification of the external opening, that is, the specification of the window. The input of data to the storage room specification file 38a is performed using a code in an input column 39 provided in the form, similarly to the building specification file 34 and the like. Each code is stored in a database (not shown) provided in an invisible state in the input item, or a wooden fitting data file 40h and a metal fitting data file 40f which are constituent files of the material / part data file group 40. , And by inputting an appropriate code,
Data is entered in the input item. Note that, for other items, data input to the storage room file specification file 38a or data input to other files is appropriately used and input.

【0032】ここで、資材・部品データファイル群40
について説明すると、資材・部品データファイル群40
は、建築工事に使用する資材・部品の名称と,その資材
・部品の単価やサイズに関するデータ,その資材・部品
を取付けるのに発生する工事量とが関連付けられてデー
タベースとして記憶しているファイルであり、前述した
木製建具データファイル40hや金属製建具データファ
イル40fの他に、図14に示すように、照明器具デー
タファイル40a,ユニットバスデータファイル40
b,洗面化粧室データファイル40c,トイレデータフ
ァイル40d,キッチンデータファイル40e,玄関ド
アデータファイル40g,下駄箱データファイル40
i,収納スペースデータファイル40j,床の間データ
ファイル40k,生コンクリートデータファイル40l
とから構成されている。なお、図14は、資材・部品デ
ータファイル群の構成を示す図解図である。
Here, the material / part data file group 40
The material / part data file group 40
Is a file that stores the names of materials and parts used in building construction, data on the unit price and size of the materials and parts, and the amount of work required to install the materials and parts, as a database. Yes, in addition to the wooden fitting data file 40h and the metal fitting data file 40f described above, as shown in FIG. 14, a lighting fixture data file 40a and a unit bus data file 40
b, vanity room data file 40c, toilet data file 40d, kitchen data file 40e, entrance door data file 40g, clog box data file 40
i, storage space data file 40j, floor space data file 40k, ready-mixed concrete data file 40l
It is composed of FIG. 14 is an illustrative view showing the configuration of a material / part data file group.

【0033】引き続いて、納戸を設置するために必要な
工事量の算出過程について説明するが、まず、納戸仕様
ファイル38aに入力された納戸の設置階数と納戸の広
さのデータに基づいて、図15に示すように、建屋仕様
ファイル34で入力された階の高さと、納戸仕様ファイ
ル38aに入力された広さを有する、窓,戸が設置され
ていない閉じた箱状のユニットとして定義され、処理関
数により納戸を設置するのに必要な工事量が専門工事の
項目毎に算出される。なお、処理関数は、図13に示し
た帳票データの他に、図16に示すように、納戸ファイ
ル仕様ファイル38aに演算式(図示せず)として搭載
されている。なお、図16は、納戸仕様ファイルの他の
部分を示す図解図である。
Next, the process of calculating the amount of work required to install a storage room will be described. First, based on the data of the number of floors of the storage room and the size of the storage room inputted to the storage room specification file 38a, FIG. As shown in FIG. 15, it is defined as a closed box-shaped unit having no windows and doors, having the floor height entered in the building specification file 34 and the size entered in the door specification file 38a, The amount of construction required to install a storage room is calculated for each specialized construction item by the processing function. In addition, as shown in FIG. 16, the processing functions are mounted as arithmetic expressions (not shown) in the storage unit file specification file 38a as shown in FIG. FIG. 16 is an illustrative view showing another portion of the storage room specification file.

【0034】そして、納戸に設ける戸や窓について、デ
ータが入力された場合には、図17に示すように、納戸
の戸や窓が設置されたユニットとして、納戸を設置する
のに必要な工事量が算出される。この場合の工事量の算
出は、窓や戸が設置されていないユニットとして算出し
た工事量より、戸や窓を設置することにより、工事量が
減少する工事,例えば、内装工事のビニルクロスや金属
工事のプラスターボード貼等の項目の工事は、設置され
る戸や窓のサイズを木製建具ファイル40hや金属製建
具データファイル40fから取得して、そのサイズ分だ
け工事量を減算する。なお、戸や窓を設置することによ
り減少する工事の工事量については、戸や窓のサイズか
ら、処理関数により、適宜工事量を算出するようにして
もよいし、または、木製建具ファイル40hや金属製建
具データファイル40f内に予め算出しておいた工事量
をデータベースとして記憶しておき、その値を用いても
よい。
When data is input for the doors and windows provided in the storage room, as shown in FIG. 17, the work required to install the storage room as a unit having the storage room doors and windows is performed. The amount is calculated. In this case, the amount of work is calculated by reducing the amount of work by installing doors and windows from the amount of work calculated as a unit without windows and doors, such as vinyl cloth or metal for interior work. For the construction of items such as plaster board pasting, the size of the door or window to be installed is acquired from the wooden fitting file 40h or the metal fitting data file 40f, and the construction amount is subtracted by the size. In addition, about the construction amount of the construction which decreases by installing a door or a window, you may make it calculate a construction amount suitably by a processing function from the size of a door or a window, or may use the wooden fitting file 40h or The construction amount calculated in advance in the metal fittings data file 40f may be stored as a database, and the value may be used.

【0035】また、戸や窓を設置することにより発生す
る工事,例えば、窓を設置するにあたり必要となる金属
工事の開口補強やコーキング,モルタル充填工事等の工
事については、木製建具ファイル40hや金属製建具デ
ータファイル40fより、発生する工事量が取得され加
算される。なお、図17は、戸及び窓が設けられたユニ
ットを示す図解図である。
In addition, for the work that occurs due to the installation of doors and windows, for example, the work such as metal opening reinforcement, caulking, and mortar filling work required for installing the window, the wooden fitting file 40h and the metal The amount of construction that occurs is acquired from the fittings data file 40f and added. FIG. 17 is an illustrative view showing a unit provided with a door and a window.

【0036】以上、納戸仕様ファイル38aを例に説明
を行ったが、部屋仕様ファイル群38を構成する他の構
成ファイルについても、同様の処理が処理関数により行
われる。すなわち、各部屋の工事量は、まず最初に、戸
や窓等の機能部を有しない閉じた箱状のユニットとし
て、部屋仕様ファイル群38の各処理関数により専門工
事の項目毎に工事量が算出される。そして、戸,窓,物
入れ,クローゼット,床の間等のように部屋に各種の機
能を設けた場合には、それらを設けたことにより、減少
する工事は工事量が減算され、それらを設けたことによ
り発生する工事は、資材・部品データファイル群40よ
り工事量が取得され加算されるように、各ファイルの処
理関数により処理が行われ、部屋毎の工事量が算出され
る。そして、部屋仕様ファイル群38に入力されたデー
タや、処理関数により算出された各工事量の値は各構成
ファイルの帳票データと共に、RAM16に記憶され
る。
The above description has been given with reference to the storage room specification file 38a as an example. However, the same processing is performed by the processing function for other configuration files constituting the room specification file group 38. That is, the amount of work in each room is firstly calculated as a closed box-shaped unit having no functional units such as doors and windows by the processing functions of the room specification file group 38 for each item of specialized work. Is calculated. When various functions are provided in a room such as a door, a window, a storage, a closet, a floor, etc., by providing them, the amount of work to be reduced is reduced and the amount of work is reduced. The generated work is processed by the processing function of each file so that the work amount is acquired from the material / part data file group 40 and added, and the work amount for each room is calculated. The data input to the room specification file group 38 and the value of each construction amount calculated by the processing function are stored in the RAM 16 together with the form data of each configuration file.

【0037】ステップS5においては、工事費用の算出
が行われ、専門工事毎の見積書が作成される。専門工事
毎の工事費用の算出は、専門工事見積書ファイル群44
の図示しない構成ファイルである、仮設工事ファイル,
基礎工事ファイル,鉄骨工事ファイル,屋根工事ファイ
ル,外装工事ファイル,防水工事ファイル,タイル工事
ファイル,木工事ファイル,収納工事ファイル,金属工
事ファイル,左官工事ファイル,塗装工事ファイル,耐
火被覆工事ファイル,内装工事ファイル,雑・備品工事
ファイルにより行われる。各ファイルは、部屋仕様ファ
イル群38により算出された専門工事の項目毎に工事量
を積算し、工事単価ファイル42より得た工事単価に基
づいて、専門工事の項目毎に工事費用を算出するように
処理関数に処理が行われている。なお、工事単価ファイ
ル42は、各工事の単位数量当たりの工事単価をデータ
ベースとして有しているファイルである。
In step S5, the construction cost is calculated, and an estimate for each specialized construction is created. For the calculation of the construction cost for each specialized construction, refer to the specialized construction estimate file group 44
Temporary construction file, which is a configuration file not shown
Foundation work file, Steel work file, Roof work file, Exterior work file, Waterproof work file, Tile work file, Wood work file, Storage work file, Metal work file, Plastering work file, Painting work file, Fireproof covering work file, Interior Performed by construction files and miscellaneous and equipment construction files. In each file, the amount of construction is integrated for each item of specialized construction calculated by the room specification file group 38, and the construction cost is calculated for each item of specialized construction based on the construction unit price obtained from the construction unit price file 42. Is being processed by the processing function. The construction unit price file 42 is a file having a construction unit price per unit quantity of each construction as a database.

【0038】工事量を積算するにあたり、部屋を仕切る
ために設けられる間仕切の量で工事量が決定される工事
については、単に各部屋の壁の面積を積算したのでは、
正確な間仕切量の算出が不可能であるため、正確な工事
量の算出ができない。そのため、本実施形態において
は、以下に示す手法により正確な間仕切量を算出し工事
量を求めた。
In the case of integrating the amount of construction, for the construction in which the amount of construction is determined by the amount of the partition provided for partitioning the room, if the area of the wall of each room is simply integrated,
Since it is impossible to calculate an accurate partition amount, it is not possible to calculate an accurate construction amount. Therefore, in the present embodiment, an accurate partition amount is calculated by the following method to obtain a construction amount.

【0039】まず、建屋仕様ファイル34に入力された
各階の高さと、部屋仕様ファイル群38に入力された各
部屋の広さのデータとを用いて、処理関数により各階の
各部屋総壁面積を算出する。
First, using the height of each floor input to the building specification file 34 and the data of the size of each room input to the room specification file group 38, the total wall area of each room on each floor is calculated by a processing function. calculate.

【0040】そして、平面プランファイル30に入力さ
れた各階の平面形状に関するデータと、建屋仕様ファイ
ル34に入力された各階の高さと用いて。処理関数によ
り各階の外壁面積を算出する。
Then, the data relating to the plane shape of each floor input to the plane plan file 30 and the height of each floor input to the building specification file 34 are used. The outer wall area of each floor is calculated by the processing function.

【0041】さらに、処理関数により求めた各階の各部
屋総壁面積と各階の外壁面積との値を用いて、”間仕切
量=(各階の各部屋総壁面積+該当階の外壁面積)/2
―該当階の外壁面積”という演算式で表される処理関数
により間仕切量を算出して工事量を算出している。これ
により、各部屋をユニットとして扱い、部屋毎に工事量
を算出した場合においても、各専門工事毎の工事量を正
確に算出することができる。なお、これらの処理関数
は、専門工事見積書ファイル群44の中で、工事量の算
出するのに間仕切量の算出が必要な工事が含まれている
構成ファイルに適宜搭載されている。
Further, using the values of the total wall area of each room on each floor and the outer wall area of each floor obtained by the processing function, "partition amount = (total wall area of each room on each floor + outer wall area of the corresponding floor) / 2"
-The amount of work is calculated by calculating the partition amount using the processing function expressed by the operation formula "the outer wall area of the corresponding floor." This means that each room is treated as a unit and the amount of work is calculated for each room. It is also possible to accurately calculate the amount of work for each specialty work.These processing functions are used in the specialty estimate file group 44 to calculate the partition amount for calculating the work amount. It is installed as appropriate in the configuration file that contains the necessary work.

【0042】そして、ステップS6においては、専門工
事見積書ファイル群44が出力装置24により出力され
建築工事費用の見積書が印刷される。
Then, in step S6, the specialized construction estimate file group 44 is output by the output device 24, and the estimate of the construction cost is printed.

【0043】なお、この実施形態の建築工事費用見積書
作成システム10は、入力されたデータに修正が加わっ
た場合には、その都度、処理関数により全体について再
計算を行うように設定を行っている。これにより、仕様
変更等により、データの一部の値に修正を加えた場合に
も、正確な建築工事費用の見積り額を算出することがで
きる。
Note that the construction work cost estimate creation system 10 of this embodiment is set so that every time the input data is modified, the entire function is recalculated by the processing function. I have. As a result, even when a partial value of the data is modified due to a specification change or the like, an accurate estimate of the construction work cost can be calculated.

【0044】また、この実施形態においては、建築物の
建屋構造や各部屋の仕様を決定するために、顧客データ
ファイル28、平面プランファイル30,建築データフ
ァイル32,建屋仕様ファイル34、内部仕上仕様ファ
イル36,部屋仕様ファイル群38と決定項目毎に細分
化したファイルを用いてデータ入力を行ったが、建築物
の建屋構造や各部屋の仕様に関して見積書を作成するの
に必要なデータの入力が行われればよく、これに限られ
ず、更にファイルを細分化した構成としてもよいし、ま
た反対に、ファイルを結合して、単数若しくは本実施形
態よりファイル数が少ないファイル構成としてもよい。
In this embodiment, in order to determine the structure of the building and the specifications of each room, the customer data file 28, the plan plan file 30, the building data file 32, the building specification file 34, the internal finishing specification The data was input using the file 36, the room specification file group 38, and the file subdivided for each decision item. However, the data input required to create an estimate regarding the building structure of the building and the specifications of each room was performed. However, the present invention is not limited to this, and a configuration in which the files are further subdivided may be adopted, and conversely, the files may be combined into a single configuration or a file configuration having a smaller number of files than in the present embodiment.

【0045】さらに、本実施形態においては、資材・部
品データファイル群40を、照明器具データファイル4
0a,ユニットバスデータファイル40b,洗面化粧室
データファイル40c,トイレデータファイル40d,
キッチンデータファイル40e,金属製建具データファ
イル40f,玄関ドアデータファイル40g,木製建具
データファイル40h,下駄箱データファイル40i,
収納スペースデータファイル40j,床の間データファ
イル40k,生コンクリートデータファイル40lと資
材区分毎に細分化してファイルを設けたが、これに限ら
れず、更にファイルを細分化した構成としてもよいし、
また反対に、ファイルを結合して、単数若しくは本実施
形態よりファイル数が少ないファイル構成としてもよ
い。
Further, in this embodiment, the material / part data file group 40 is stored in the lighting fixture data file 4.
0a, unit bath data file 40b, washroom data file 40c, toilet data file 40d,
Kitchen data file 40e, metal fittings data file 40f, entrance door data file 40g, wooden fittings data file 40h, clog box data file 40i,
The storage space data file 40j, the floor space data file 40k, and the ready-mixed concrete data file 40l are divided into files for each material category, but the files are not limited to this, and the file may be further divided.
Conversely, files may be combined into a single file or a file configuration with fewer files than in the present embodiment.

【0046】[0046]

【発明の効果】上述したように、本発明にかかる建築工
事費用見積書作成システムによれば、建築物の設計図面
を作成したり、使用する資材や必要な作業の量を手計算
で積算することなく、建築物の建屋構造や建築物内に設
けられる部屋の大きさ・仕様を決定していくだけで、建
築工事費用の見積書が、迅速且つ正確に作成することが
できる。また、仕様変更を行う場合においても、入力し
たデータの値を変更するだけで、正確な見積書が容易に
作成することができる。
As described above, according to the building construction cost estimate creating system according to the present invention, a design drawing of a building is created, and materials used and the amount of required work are manually calculated. By simply determining the building structure of the building and the size and specification of the room provided in the building, an estimate of the building construction cost can be created quickly and accurately. Further, even when the specification is changed, an accurate quote can be easily created only by changing the value of the input data.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明にかかる建築工事費用見積書作成システ
ムの一実施形態の構成を示すブロック図である。
FIG. 1 is a block diagram illustrating a configuration of an embodiment of a building construction cost estimate creation system according to the present invention.

【図2】記憶装置に記憶されているファイルを示す図解
図である。
FIG. 2 is an illustrative view showing a file stored in a storage device;

【図3】本発明にかかる建築工事費用見積書作成システ
ムの動作フローを示すフローチャート図である。
FIG. 3 is a flowchart showing an operation flow of the building work cost estimate creation system according to the present invention.

【図4】建屋の構造に関する設定のフローを示すフロー
チャート図である。
FIG. 4 is a flowchart illustrating a setting flow regarding a structure of a building.

【図5】顧客データファイルを示す図解図である。FIG. 5 is an illustrative view showing a customer data file;

【図6】平面プランファイルを示す図解図である。FIG. 6 is an illustrative view showing a plane plan file;

【図7】建築データファイルを示す図解図である。FIG. 7 is an illustrative view showing a building data file;

【図8】建屋仕様ファイルの帳票データを示す図解図で
ある。
FIG. 8 is an illustrative view showing a form data of a building specification file;

【図9】建屋仕様ファイルに記録されているデータベー
スを示す図解図である。
FIG. 9 is an illustrative view showing a database recorded in a building specification file;

【図10】工事量の算出の動作フローを示すフロー図で
ある。
FIG. 10 is a flowchart showing an operation flow of calculating a construction amount.

【図11】内部仕上仕様ファイルを示す図解図である。FIG. 11 is an illustrative view showing an internal finish specification file;

【図12】部屋仕様ファイル群の構成を示す図解図であ
る。
FIG. 12 is an illustrative view showing a configuration of a room specification file group;

【図13】納戸仕様ファイルの一部を示す図解図であ
る。
FIG. 13 is an illustrative view showing one portion of a storage room specification file;

【図14】資材・部品データファイル群の構成を示す図
解図である。
FIG. 14 is an illustrative view showing a structure of a material / part data file group;

【図15】ユニットを示す図解図である。FIG. 15 is an illustrative view showing a unit;

【図16】納戸仕様ファイルの他の部分を示す図解図で
ある。
FIG. 16 is an illustrative view showing another portion of the storage room specification file;

【図17】戸及び窓が設けられたユニットを示す図解図
である。
FIG. 17 is an illustrative view showing a unit provided with a door and a window.

【符号の説明】[Explanation of symbols]

10 建築工事費用見積書作成システム 12 CPU 14 ROM 16 RAM 18 I/Oインターフェイス 20 表示装置 22 入力装置 24 出力装置 26 記憶装置 28 顧客データファイル 30 平面プランファイル 32 建築データファイル 34 建屋仕様ファイル 36 内部仕上仕様ファイル 38 部屋仕様ファイル群 40 資材・部品データファイル群 42 工事単価ファイル 44 専門工事見積書ファイル群 DESCRIPTION OF SYMBOLS 10 Building construction cost estimate creation system 12 CPU 14 ROM 16 RAM 18 I / O interface 20 Display device 22 Input device 24 Output device 26 Storage device 28 Customer data file 30 Plan plan file 32 Building data file 34 Building specification file 36 Internal finishing Specification file 38 Room specification file group 40 Material / part data file group 42 Construction unit price file 44 Specialized construction estimate file group

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 中央処理装置と記憶装置と入力装置とか
ら構成される建築工事費用見積書作成システムであっ
て、 前記記憶装置は、 建築物の建屋構造や各部屋の仕様を決定するデータを入
力するための仕様設定ファイルと、 各部屋に取付けられる資材・部品の名称と、少なくとも
前記資材・部品を取付けるために発生する各種工事の工
事量とを関連付けて記憶した資材・部品データファイル
と、 単位工事量当たりの各工事の単価を記憶した工事単価フ
ァイルと、 専門工事区分毎に帳票データを有する専門工事見積書フ
ァイル群とを有し、 前記中央処理装置は、 前記表示装置に前記仕様設定ファイルの内容を表示し、
前記入力装置により入力された前記建築物の建屋構造や
各部屋の仕様を決定するデータを前記仕様設定ファイル
に収納する第1の手段と、 前記建築物の建屋構造や各部屋の仕様を決定するデータ
に基づいて、部屋毎の専門工事毎の工事量を算出する第
2の手段と、 前記第2の手段により算出された部屋毎の専門工事毎の
工事量を専門工事毎に集計して、前記集計した工事量
と、前記工事単価ファイルとの単価に基づいて、工事費
用を算出し、前記専門工事見積書ファイルに前記算出し
た工事費用を記憶する第3の手段を有することを特徴と
する、建築工事費用見積書作成システム。
1. A building construction cost estimate creation system comprising a central processing unit, a storage device, and an input device, wherein the storage device stores data for determining a building structure of a building and specifications of each room. A specification setting file for input, a material / part data file stored in association with a name of the material / part to be attached to each room, and at least a construction amount of various constructions required to attach the material / part, The central processing unit has a construction unit price file storing unit prices of each construction per unit construction amount and a specialized construction estimate file group having form data for each specialized construction classification, and the central processing unit sets the specification on the display unit. Displays the contents of the file,
First means for storing, in the specification setting file, data for determining the building structure of the building and the specifications of each room input by the input device; and determining the building structure of the building and the specifications of each room. Based on the data, a second means for calculating the amount of work for each specialty work for each room, and the amount of work for each specialty work for each room calculated by the second means, tabulated for each specialty work, It has a third means for calculating a construction cost based on the totaled construction amount and a unit price of the construction unit price file, and storing the calculated construction cost in the specialized construction estimate file. , Construction cost estimate creation system.
【請求項2】 前記第3の手段は、 階毎の部屋総壁面積を算出する第4の手段と、 階毎の外壁面積を算出する第5の手段と、 前記第4の手段により算出された階毎の部屋総壁面積と
前記第5の手段により算出された階毎に外壁面積とを加
算した値を整数2により除算して、前記除算した値から
前記第5の手段により算出された階毎に外壁面積を減算
することにより階毎の間仕切量を算出する第6の手段と
を有する、請求項1に記載の建築工事費用見積書作成シ
ステム。
2. The third means comprises: a fourth means for calculating a total wall area of a room for each floor; a fifth means for calculating an outer wall area for each floor; and a calculation by the fourth means. The value obtained by adding the total wall area of the room for each floor and the outer wall area for each floor calculated by the fifth means is divided by an integer 2 and calculated from the divided value by the fifth means. 6. A construction cost estimate creation system according to claim 1, further comprising: sixth means for calculating a partition amount for each floor by subtracting an outer wall area for each floor.
JP32997298A 1998-11-19 1998-11-19 Estimation sheet generation system for construction cost Pending JP2000155781A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP32997298A JP2000155781A (en) 1998-11-19 1998-11-19 Estimation sheet generation system for construction cost

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP32997298A JP2000155781A (en) 1998-11-19 1998-11-19 Estimation sheet generation system for construction cost

Publications (1)

Publication Number Publication Date
JP2000155781A true JP2000155781A (en) 2000-06-06

Family

ID=18227339

Family Applications (1)

Application Number Title Priority Date Filing Date
JP32997298A Pending JP2000155781A (en) 1998-11-19 1998-11-19 Estimation sheet generation system for construction cost

Country Status (1)

Country Link
JP (1) JP2000155781A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002269174A (en) * 2001-03-09 2002-09-20 Zaus Communications:Kk Construction system
JP2003064873A (en) * 2001-08-30 2003-03-05 Sumitomo Forestry Co Ltd Construction automatic analysis system
KR100400511B1 (en) * 2000-08-22 2003-10-08 주식회사 모아바 Method of analysis and control of construction drawing using computer
JP2007065806A (en) * 2005-08-29 2007-03-15 Wood One:Kk System for creating and processing building estimate
US9600801B2 (en) 2011-05-03 2017-03-21 Architectural Computer Services, Inc. Systems and methods for integrating research and incorporation of information into documents
CN111984909A (en) * 2020-08-11 2020-11-24 合肥电力规划设计院 Method for rapidly calculating civil engineering quantity in power distribution network cable engineering

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100400511B1 (en) * 2000-08-22 2003-10-08 주식회사 모아바 Method of analysis and control of construction drawing using computer
JP2002269174A (en) * 2001-03-09 2002-09-20 Zaus Communications:Kk Construction system
JP2003064873A (en) * 2001-08-30 2003-03-05 Sumitomo Forestry Co Ltd Construction automatic analysis system
JP2007065806A (en) * 2005-08-29 2007-03-15 Wood One:Kk System for creating and processing building estimate
JP4676282B2 (en) * 2005-08-29 2011-04-27 株式会社ウッドワン Building quotation creation processing system
US9600801B2 (en) 2011-05-03 2017-03-21 Architectural Computer Services, Inc. Systems and methods for integrating research and incorporation of information into documents
CN111984909A (en) * 2020-08-11 2020-11-24 合肥电力规划设计院 Method for rapidly calculating civil engineering quantity in power distribution network cable engineering

Similar Documents

Publication Publication Date Title
US20210383033A1 (en) Structural construction system employing architectural modeling
US20090100769A1 (en) Prefabricated bathroom assembly and methods of its manufacture and installation
US20070294954A1 (en) Prefabricated bathroom assembly and methods of its manufacture and installation
JPH10334135A (en) Construction cost estimation method
CN110930178A (en) Decoration expense budget system based on household model
JP2000155781A (en) Estimation sheet generation system for construction cost
US20020066256A1 (en) Construction system for building housing and other shelters
WO2015069405A1 (en) Pre-assembly of casework components in shipping container
Biolek et al. Proposed interconnecting database for BIM models and construction-economic systems in the Czech Republic
Shamaeva et al. Architecture of medium-And multistoried residential buildings with steel framework
KR20230111044A (en) Automated Design Methods and Programs
JP2754119B2 (en) Automatic setting device of outlet position in house
KR102086459B1 (en) Integrating collaboration type architecture project management system, and method thereof
JP5778508B2 (en) Air volume calculation program
JPH0877233A (en) Building reform support system
JP2002123707A (en) Information processor and storage medium
JP7219490B2 (en) Quotation Support Method, Quotation Support Program, and Quotation Support System
Khosakitchalert et al. Conversion Challenges: A Case Study of Converting a Post and Lintel Structure to a Precast Concrete Structure Using Building Information Modeling (BIM)
Varela et al. Construction Costs in North America and Australia
Öncül Cost estimation of housing projects by functional areas
Toth A bottoms-up approach to cost estimation using parametric inputs
Jo A Study on Information Systematization of Detail Drawings for Connectivity between BIM Libraries and Technical Contents based on Information Framework
KR20210063805A (en) A Method of Partitioning Location and Joint Processing for the Floor Plan of Wall-Type Apartment Housing
JPH09259159A (en) Cad system for unit type building
EFFICIENCY the PLANS