JP2000111370A - Centralized meter-reading system - Google Patents

Centralized meter-reading system

Info

Publication number
JP2000111370A
JP2000111370A JP10280988A JP28098898A JP2000111370A JP 2000111370 A JP2000111370 A JP 2000111370A JP 10280988 A JP10280988 A JP 10280988A JP 28098898 A JP28098898 A JP 28098898A JP 2000111370 A JP2000111370 A JP 2000111370A
Authority
JP
Japan
Prior art keywords
shut
valve
control panel
meter reading
centralized
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP10280988A
Other languages
Japanese (ja)
Other versions
JP4342010B2 (en
Inventor
Yukio Kodama
幸生 小玉
Mikio Nishizuka
実樹雄 西塚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ricoh Elemex Corp
Original Assignee
Ricoh Elemex Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ricoh Elemex Corp filed Critical Ricoh Elemex Corp
Priority to JP28098898A priority Critical patent/JP4342010B2/en
Priority to CNB991213041A priority patent/CN1187578C/en
Publication of JP2000111370A publication Critical patent/JP2000111370A/en
Priority to HK00106431A priority patent/HK1027392A1/en
Application granted granted Critical
Publication of JP4342010B2 publication Critical patent/JP4342010B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To detect an earthquake and to break the breaking valves of all flowmeters simultaneously by selecting an arbitrary flowmeter for reading a meter in a centralized control panel, occasionally reading the arbitrary flowmeter, occasionally breaking the breaking valve of the arbitrary flowmeter, simultaneously breaking the breaking valves of all flowmeters, and releasing and returning the breaking valve of the broken, arbitrary flowmeter. SOLUTION: A centralized control panel for centrally controlling a plurality of flowmeters is provided with a flowmeter selection part 5 for selecting each flow meter, a meter-reading operation part 16 for occasionally reading the flowmeter, an individual break operation part 17 for individually breaking the breaking valve of the flowmeter, a simultaneous break operation part 18 for simultaneously breaking the break valve of all flowmeters, a break valve return operation part 19 for releasing and returning the broken break valve, and an earthquake-sensing sensor 13.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】この発明は、複数の水道メー
タやガスメータ等を集中管理盤に接続し、集中管理盤に
て検針データを集中管理する集中検針システムに関す
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a centralized meter reading system in which a plurality of water meters, gas meters, and the like are connected to a centralized management panel, and meter reading data is centrally managed by the centralized management panel.

【0002】[0002]

【従来の技術】従来、水道メータやガスメータ等の計測
データを、遠隔的にかつ集中して検針する検針システム
として、メータの計測データを電話回線を利用して検針
センタに伝送し、検針センタで大規模に集中管理するシ
ステムがあり、またメータを集中管理盤に接続し、集中
管理盤にて比較的小規模に集中管理するシステムがあっ
た。
2. Description of the Related Art Conventionally, as a meter reading system for remotely and centrally reading meter data from a water meter, a gas meter, and the like, the meter measurement data is transmitted to a meter reading center using a telephone line, and the meter reading center transmits the data. There was a system for centralized management on a large scale, and a system for connecting meters to a centralized control panel and performing centralized control on a relatively small scale with the centralized control panel.

【0003】電話回線を利用するシステムの従来例とし
て、たとえば特開昭60−183525公報には、ガス
メータから電話回線を介して検針センタへ伝送した計測
データを自宅内のメータ指示部でもモニタできるように
したシステムが開示される。特開昭61−32648号
公報には、ガスメータの計測データを電話回線を介して
検針センターからの呼び出しにて読み出すことができる
とともに、ガスメータの電池電圧もチェックできるよう
にしたシステムが開示される。また、特開昭62−24
113号公報には、ガスメータ側に、電話回線を通じて
定時に検針センタに発呼する定時発呼機能を備え、ガス
メータから計測データを定時に検針センタに伝送できる
ようにしたシステムが開示されている。
[0003] As a conventional example of a system using a telephone line, for example, Japanese Patent Application Laid-Open No. 60-183525 discloses a system in which measurement data transmitted from a gas meter to a meter reading center via a telephone line can be monitored by a meter indicating unit in a home. A system is disclosed. Japanese Patent Application Laid-Open No. 61-32648 discloses a system in which measurement data of a gas meter can be read out by a call from a meter reading center via a telephone line, and a battery voltage of the gas meter can be checked. Also, JP-A-62-24
Japanese Patent Publication No. 113 discloses a system in which a gas meter side is provided with a regular calling function for making a regular call to a meter reading center through a telephone line so that the gas meter can transmit measurement data to the meter reading center at a regular time.

【0004】また、集中管理盤を用いたシステムの従来
例として、たとえば特開平8−326951号公報に
は、ある消費者の遮断弁が閉じた後、消費者が遮断弁を
開放できないでいる状態を集中監視装置(集中管理盤)
側で確認できるようにするため、遮断弁が閉じてから一
定時間以内にガスメータ側からの遮断弁開放データを集
中監視装置が受信しないときは、その旨を集中監視装置
の表示部に表示するようにしたシステムが開示されてい
る。
[0004] As a conventional example of a system using a centralized control panel, for example, Japanese Patent Application Laid-Open No. 8-326951 discloses a state in which after a certain consumer's shut-off valve is closed, the consumer cannot open the shut-off valve. The centralized monitoring device (centralized control panel)
If the centralized monitoring device does not receive the shut-off valve opening data from the gas meter within a certain period of time after the shut-off valve is closed, this fact is displayed on the display of the centralized monitoring device so that it can be confirmed on the side. A disclosed system is disclosed.

【0005】また、従来、地震時の対策としては、上記
いずれの形式のシステムの場合も、たとえば特開昭63
−208718号公報や特開平8−226832号公報
に開示されているように、流量計自体に感震器を備え、
個々の流量計の感震器で地震を感知して流量計毎にその
遮断弁を閉じるようにしていた。
Conventionally, as a countermeasure against an earthquake, in the case of any of the above-mentioned systems, for example, Japanese Patent Laid-Open
As disclosed in JP-A-208718 and JP-A-8-226832, the flowmeter itself is provided with a seismic sensor,
The seismic sensor of each flow meter senses the earthquake and closes its shut-off valve for each flow meter.

【0006】[0006]

【発明が解決しようとする課題】しかし、従来のシステ
ムでは、次のような問題点があった。 電話回線を利用したシステムでは、電話回線の使用
料やNCU(Network Control Unit:網制御装置)の設置
やセンタコンピュータの設置等により費用がかさみ、さ
らに対象流量計が接続されている電話回線が使用中であ
ると、データ管理が行えない。
However, the conventional system has the following problems. In a system using a telephone line, the telephone line usage fee, the installation of an NCU (Network Control Unit) and the installation of a center computer increase costs, and the telephone line to which the target flow meter is connected is used. If it is inside, data management cannot be performed.

【0007】 電話回線を使用せず、流量計からの定
時発呼を集中管理盤でデータ管理するシステムの場合
は、検針員が集中管理盤の設置場所まで出向いて各流量
計の計測データを収集しても、そのデータ収集した計測
データと流量計の現時点の計測データとは異なってい
る。さらに、集中管理盤に接続されている流量計の1台
が、何らかの異常で定時発呼の通信が正常に行われず、
その流量計だけのデータ管理が集中管理盤で行われてい
なかったら、たとえば、次の流量計の定時発呼時まで待
つか、または再度集中管理盤に接続されているすべての
流量計の計測データを集中管理盤が読み取らなければな
らず、データ収集効率が大変悪い。
[0007] In the case of a system that uses a centralized control panel to manage regular calls from a flow meter without using a telephone line, a meter reader goes to the installation location of the centralized control panel to collect measurement data from each flow meter. Even so, the measurement data collected and the current measurement data of the flow meter are different. Furthermore, one of the flowmeters connected to the centralized control panel does not normally communicate with regular calls due to some abnormalities.
If the data management of the flow meter alone is not performed by the central control panel, for example, wait until the next call of the flow meter on a regular basis, or measure the data of all the flow meters connected to the central control panel again. Must be read by the central control panel, and the data collection efficiency is very poor.

【0008】 集中管理盤を使用するシステムの場
合、集中管理盤に流量計を接続している消費者の料金支
払いが未納であるため、元栓を締めて供給を止めても、
消費者が元栓を開ければ、料金未納のままで再度使用さ
れてしまう。
[0008] In the case of a system using a centralized control panel, since a consumer who has connected the flow meter to the centralized control panel has not paid the fee, even if the main cock is closed and supply is stopped,
If the consumer opens the main cock, it will be used again without paying the fee.

【0009】 アパートやマンション等の集合住宅
で、地震や火災等の災害により、たとえば住宅が破壊
し、各戸で一斉にガス漏れや漏水が起こった場合、各戸
に供給体を供給し続けることは危険であるため、敏速に
供給停止したいが、電話回線を通して制御を行っている
と、いったんセンタコンピュータがある所に連絡して、
その後、電話回線を使用して制御を行わなければならな
いため、緊急時に間に合わない。
[0009] In a housing complex such as an apartment or a condominium, if a house is destroyed due to a disaster such as an earthquake or a fire and gas leaks or water leaks occur in all the houses at once, it is dangerous to continue to supply a supply body to each house. Therefore, we want to stop the supply promptly, but when controlling via telephone line, once contact the center computer,
After that, since control must be performed using a telephone line, it cannot be made in an emergency.

【0010】 集中管理盤に接続されている流量計に
対して、消費者への供給を止めるために集中管理盤から
遮断弁を閉じて供給路を遮断しても、各流量計に遮断弁
復帰スイッチがあると、消費者にて遮断弁を簡単に開放
復帰して供給体を消費してしまう。
[0010] Even if the shutoff valve is closed from the central control panel to shut off the supply path to the flowmeter connected to the central control panel in order to stop the supply to the consumer, the shutoff valve returns to each flowmeter. If there is a switch, the consumer easily opens and returns the shut-off valve and consumes the supply body.

【0011】 流量計毎に感震器を備えても、災害時
に一斉に供給停止したいアパートやマンション等の集合
住宅では、二次災害防止効果が少ない。
Even if a seismic sensor is provided for each flow meter, the secondary disaster prevention effect is small in an apartment house such as an apartment or a condominium where supply should be stopped at the same time in the event of a disaster.

【0012】従来のこのような問題点に鑑み、この発明
の第1の目的は、集中管理盤において任意の流量計を選
択して検針できるようにすること、これに加えて第2の
目的は、集中管理盤において任意の流量計を随時に検針
できるようにすること、第3の目的は、集中管理盤にお
いて任意の流量計の遮断弁を随時に遮断できるようにす
ること、第4の目的は、集中管理盤においてそれに接続
されているすべての流量計の遮断弁を一斉に遮断できる
ようにすること、第5の目的は、集中管理盤において遮
断した任意の流量計の遮断弁を開放復帰できるようにす
ること、第6の目的は、集中管理盤において地震を検知
して、それに接続されているすべての流量計の遮断弁を
一斉に遮断可能とすることにある。
In view of such a conventional problem, a first object of the present invention is to make it possible to select an arbitrary flow meter in a centralized control panel so that meter reading can be performed. The third object is to enable any flow meter to be read at any time in the centralized control panel, and to allow the shut-off valve of any flow meter to be shut off in the centralized control panel at any time. The purpose of the present invention is to make it possible to simultaneously shut off the shutoff valves of all flowmeters connected to it in the central control panel. The fifth object is to open and reset the shutoff valves of any flowmeters shut off in the central control panel. A sixth object is to make it possible to detect an earthquake in a centralized control panel and shut off all shut-off valves of all flow meters connected to it at the same time.

【0013】[0013]

【課題を解決するための手段】上記第1の目的を達成す
るため、この発明は、供給体の供給路を遮断する遮断
弁、この遮断弁を駆動する遮断弁駆動回路、外部との送
受信を行う通信回路、供給体の消費量を検出する流量セ
ンサ、その検出された消費量を計測するとともに、遮断
弁駆動回路および通信回路を制御する制御部を有する複
数の流量計と、これら流量計の通信回路と送受信する通
信回路、該通信回路を通じて流量計から収集した検針デ
ータ等を表示するための表示部、収集した検針データを
外部出力するための出力部、これら通信回路、表示部お
よび出力部を制御するコントローラを有する集中管理盤
とで構成される集中検針システムにおいて、集中管理盤
に、各流量計を選択する流量計選択部を設けたことを特
徴とする。
In order to achieve the first object, the present invention provides a shut-off valve for shutting off a supply path of a feeder, a shut-off valve driving circuit for driving the shut-off valve, and transmission and reception with the outside. A communication circuit to perform, a flow sensor for detecting the consumption of the supply body, a plurality of flow meters having a control unit for measuring the detected consumption and controlling the shut-off valve driving circuit and the communication circuit, and A communication circuit for transmitting and receiving to and from a communication circuit, a display unit for displaying meter reading data collected from the flow meter through the communication circuit, an output unit for externally outputting the collected meter reading data, these communication circuits, a display unit, and an output unit In a centralized meter reading system including a centralized control panel having a controller for controlling the flowmeter, the centralized control panel is provided with a flow meter selection unit for selecting each flow meter.

【0014】上記の構成を基本構成とし、第2の目的を
達成する構成は、基本構成に加え、集中管理盤に、流量
計を随時検針できる検針操作部を設けたことを特徴とす
る。
The above configuration is a basic configuration, and a configuration for achieving the second object is characterized in that, in addition to the basic configuration, a centralized control panel is provided with a meter reading operation unit capable of reading a flow meter at any time.

【0015】第3の目的を達成する構成は、基本構成に
加え、集中管理盤に、流量計の遮断弁を個別に遮断でき
る個別遮断操作部を設けたことを特徴とする。
[0015] The structure for achieving the third object is characterized in that, in addition to the basic structure, an individual shut-off operation unit capable of individually shutting off the shut-off valves of the flow meter is provided on the centralized control panel.

【0016】第4の目的を達成する構成は、供給体の供
給路を遮断する遮断弁、この遮断弁を駆動する遮断弁駆
動回路、外部との送受信を行う通信回路、供給体の消費
量を検出する流量センサ、その検出された消費量を計測
するとともに、遮断弁駆動回路および通信回路を制御す
る制御部を有する複数の流量計と、これら流量計の通信
回路と送受信する通信回路、該通信回路を通じて流量計
から収集した検針データ等を表示するための表示部、収
集した検針データを外部出力するための出力部、これら
通信回路、表示部および出力部を制御するコントローラ
を有する集中管理盤とで構成される集中検針システムに
おいて、集中管理盤に、それに接続されている全流量計
の遮断弁を一斉に遮断できる一斉遮断操作部を設けたこ
とを特徴とする。
A fourth object of the present invention is to provide a shut-off valve for shutting off a supply path of a feeder, a shut-off valve driving circuit for driving the shut-off valve, a communication circuit for transmitting and receiving to and from the outside, and a consumption of the feeder. A plurality of flowmeters having a control unit for controlling a shut-off valve driving circuit and a communication circuit while measuring the detected consumption amount, a communication circuit for transmitting and receiving to and from the communication circuit of the flowmeter, A central control panel having a display unit for displaying meter reading data collected from the flow meter through the circuit, an output unit for externally outputting the collected meter reading data, a communication circuit, a controller for controlling the display unit and the output unit, and In the centralized meter reading system configured as described above, the centralized control panel is provided with a simultaneous shutoff operation unit that can simultaneously shut off the shutoff valves of all the flow meters connected thereto.

【0017】第5の目的を達成する構成は、第3の目的
を達成する構成または第4の目的を達成する構成に加
え、集中管理盤に、遮断した遮断弁を開放復帰させるこ
とができる遮断弁復帰操作部を設けたことを特徴とす
る。
The structure for achieving the fifth object is, in addition to the structure for achieving the third object or the structure for achieving the fourth object, a shut-off which can open and return the shut-off valve to the central control panel. A valve return operation unit is provided.

【0018】第6の目的を達成する構成は、供給体の供
給路を遮断する遮断弁、この遮断弁を駆動する遮断弁駆
動回路、外部との送受信を行う通信回路、供給体の消費
量を検出する流量センサ、その検出された消費量を計測
するとともに、遮断弁駆動回路および通信回路を制御す
る制御部を有する複数の流量計と、これら流量計の通信
回路と送受信する通信回路、該通信回路を通じて流量計
から収集した検針データ等を表示するための表示部、収
集した検針データを外部出力するための出力部、これら
通信回路、表示部および出力部を制御するコントローラ
を有する集中管理盤とで構成される集中検針システムに
おいて、集中管理盤に、感震センサを設けたことを特徴
とする。
According to a sixth aspect of the present invention, there is provided a shut-off valve for shutting off a supply path of a feeder, a shut-off valve driving circuit for driving the shut-off valve, a communication circuit for transmitting / receiving data to / from the outside, and a consumption of the feeder. A plurality of flowmeters having a control unit for controlling a shut-off valve driving circuit and a communication circuit while measuring the detected consumption amount, a communication circuit for transmitting and receiving to and from the communication circuit of the flowmeter, A central control panel having a display unit for displaying meter reading data collected from the flow meter through the circuit, an output unit for externally outputting the collected meter reading data, a communication circuit, a controller for controlling the display unit and the output unit, and , A seismic sensor is provided on the centralized control panel.

【0019】[0019]

【発明の実施の形態】次に、この発明の実施の形態を図
面にしたがって説明する。
Next, an embodiment of the present invention will be described with reference to the drawings.

【0020】図1において、この発明による集中検針シ
ステムは、1台の集中管理盤1と、これに有線または無
線にて接続されるn個の流量計M1〜Mnとで構成され
る。
Referring to FIG. 1, the centralized meter reading system according to the present invention comprises one centralized control panel 1 and n flow meters M1 to Mn connected to the centralized control panel 1 by wire or wirelessly.

【0021】図2に、流量計M1〜Mn側の構成を示す。
各流量計は、供給路2を遮断する遮断弁3と、この遮断
弁3を駆動する遮断弁駆動回路4と、供給路2の供給体
の流れを検出するメータ本体5と、その流量を検知する
流量センサ6と、遮断弁復帰スイッチ7と、集中管理盤
1に接続されてそれとの間で信号を送受信する通信回路
8と、流量センサ6からの信号により消費量を計測した
り、集中管理盤1からの制御信号により、計測データを
通信回路8にて集中管理盤1へ応答したり、遮断弁駆動
回路4を制御して遮断弁3を遮断したり、遮断弁復帰ス
イッチ7の信号により遮断弁駆動回路4を制御して遮断
弁3を開放復帰させる等の機能を有する制御部9とを有
する。
FIG. 2 shows the configuration of the flow meters M1 to Mn.
Each flow meter includes a shut-off valve 3 for shutting off the supply path 2, a shut-off valve driving circuit 4 for driving the shut-off valve 3, a meter main body 5 for detecting a flow of a supply body in the supply path 2, and detecting the flow rate thereof. Flow sensor 6, a shut-off valve return switch 7, a communication circuit 8 connected to the central control panel 1 for transmitting and receiving signals to and from the central control panel 1. In response to a control signal from the panel 1, measurement data is responded to the central control panel 1 by the communication circuit 8, the shut-off valve drive circuit 4 is controlled to shut off the shut-off valve 3, and a signal from the shut-off valve return switch 7 is used. And a control unit 9 having a function of controlling the shut-off valve drive circuit 4 to open and return the shut-off valve 3.

【0022】図3に集中管理盤1の構成を示す。集中管
理盤1には、n個の流量計M1〜Mn側の通信回路8とそ
れぞれ接続するn個の通信回路C1〜Cnと、手動操作入
力するための操作入力パネル10と、各種の表示を行う
表示部11と、外部出力するための出力部12と、地震
を感知する感震センサ13とが備えられている。
FIG. 3 shows the configuration of the centralized control panel 1. The central control panel 1 displays n communication circuits C1 to Cn connected to the communication circuits 8 on the n flow meters M1 to Mn side, an operation input panel 10 for manual operation input, and various displays. A display unit 11 for performing the operation, an output unit 12 for outputting to the outside, and a seismic sensor 13 for detecting an earthquake are provided.

【0023】また、集中管理盤1には、操作入力パネル
10からの操作信号の内容により、その内容を表示部1
1に表示させたり、通信回路C1〜Cnを制御して、接続
されている流量計M1〜Mnと信号の送受信を行い、その
結果を表示部11に表示させたり、出力部12からたと
えばプリントアウトするためのデータを出力したり、感
震センサ13からの信号により地震を検知したときに、
接続されているすべての流量計M1〜Mnに対して遮断弁
3を遮断するために、通信回路C1〜Cnを制御する等の
機能を有するコントローラ14が備えられている。
The central control panel 1 displays the contents of the operation signal from the operation input panel 10 on the display unit 1.
1 and control the communication circuits C1 to Cn to transmit and receive signals to and from the connected flow meters M1 to Mn. The results are displayed on the display unit 11 or printed out from the output unit 12, for example. When data is output to perform an earthquake or when an earthquake is detected by a signal from the seismic sensor 13,
In order to shut off the shut-off valve 3 for all the connected flow meters M1 to Mn, a controller 14 having a function of controlling the communication circuits C1 to Cn is provided.

【0024】なお、集中管理盤1の通信回路を1つにし
て、各流量計とバス通信用の接続を行うようにしてもよ
い。
It should be noted that the centralized control panel 1 may be provided with a single communication circuit for connection with each flow meter for bus communication.

【0025】操作入力パネル10には、流量計選択部1
5と検針操作部16と個別遮断操作部17と一斉遮断操
作部18と遮断弁復帰操作部19とが設けられ、これら
はたとえばキー操作にてスイッチをオンにすることによ
り、次のようなそれぞれの機能が行われるようになって
いる。
The operation input panel 10 includes a flow meter selection unit 1
5, a meter reading operation unit 16, an individual shutoff operation unit 17, a simultaneous shutoff operation unit 18, and a shutoff valve return operation unit 19, which are turned on by a key operation, for example, so that Function is performed.

【0026】流量計選択部15を操作することにより、
集中管理盤1に接続されている流量計M1〜Mnのうちの
任意の1台を選択することができ、選択した1台の流量
計以外の余分なデータ管理やデータ収集を行わないよう
にし、データ収集効率が向上する。
By operating the flow meter selection unit 15,
Any one of the flow meters M1 to Mn connected to the centralized control panel 1 can be selected, and extra data management and data collection other than the selected one flow meter are not performed. Data collection efficiency is improved.

【0027】検針操作部16を操作することにより、た
とえば流量計選択部15にて選択した1台の流量計のみ
に対して検針制御信号の送受信を行うことが可能とな
り、その流量計が何らかの異常で集中管理盤1にてデー
タ管理を行えないときに、その異常を知ることができる
とともに、その流量計をデータ収集対象から外すことに
より、無駄なデータ収集を省ける。また、検針員がデー
タ収集する際に、任意の流量計の随時検針が可能とな
る。
By operating the meter reading operation section 16, it becomes possible to transmit and receive the meter reading control signal to only one of the flow meters selected by the flow meter selection section 15, for example. When the data cannot be managed by the centralized control panel 1, the abnormality can be known, and the flowmeter is excluded from the data collection targets, so that useless data collection can be omitted. Also, when a meter reader collects data, the meter reading of an arbitrary flow meter can be performed at any time.

【0028】個別遮断操作部17を操作することによ
り、たとえば料金未納な消費者が使用している流量計を
選択してその遮断弁3を遮断することが可能となる。そ
の場合、流量計側の遮断弁復帰スイッチ7が流量計側で
オンにされても、遮断弁3の開放復帰を禁止できるよう
な構成にすることは容易に可能である。また、アパート
やマンション等の集合住宅において、管理人が一括して
消費者からの料金を徴収している場合、集中管理盤1に
個別遮断操作部17があるため、料金未納な消費者のた
めにわざわざ供給事業主に連絡して遮断弁の遮断を依頼
する煩わしさが解消される。
By operating the individual shut-off operation section 17, for example, it is possible to select a flow meter used by a consumer who has not paid the charge and shut off the shut-off valve 3 thereof. In this case, even if the shutoff valve return switch 7 on the flowmeter side is turned on on the flowmeter side, it is easily possible to adopt a configuration in which opening and returning of the shutoff valve 3 can be prohibited. In addition, in a collective house such as an apartment or a condominium, when the manager collects a charge from the consumer collectively, since the centralized control panel 1 has the individual shut-off operation section 17, the consumer is not paid. The trouble of contacting the supply business owner and requesting the shutoff of the shutoff valve is eliminated.

【0029】一斉遮断操作部18を操作することによ
り、災害等の緊急時に、集中管理盤1に接続されている
すべての流量計M1〜Mnを、集中管理盤1を管理してい
る管理人等が素早くかつ容易に自動遮断できる。この場
合、各流量計への制御信号の送信は、コントローラ14
から一斉に各流量計に対して送信したり、順次送信した
り、バス通信にて同時に送信する等の方法が考えられ
る。また、災害を回避して、危険がなくなった後に、各
流量計の遮断弁3が遮断している状態から、一斉に開放
復帰させる一斉復帰操作部を、集中管理盤1に追加する
ことも可能である。
By operating the simultaneous shut-off operation unit 18, in the event of an emergency such as a disaster, all the flow meters M1 to Mn connected to the central control panel 1 can be controlled by an administrator or the like who controls the central control panel 1. Can be quickly and easily shut off automatically. In this case, the transmission of the control signal to each flow meter is performed by the controller 14.
From the above, methods such as simultaneous transmission to each flow meter, sequential transmission, simultaneous transmission by bus communication, and the like can be considered. It is also possible to add to the centralized control panel 1 a simultaneous return operation unit that allows all the flow meters to be simultaneously opened and returned after the disaster has been avoided and the danger has disappeared and the shutoff valve 3 of each flow meter has been shut off. It is.

【0030】遮断弁復帰操作部19を操作することによ
り、たとえば個別遮断操作部17を操作して遮断弁3が
遮断している流量計の消費者から料金の支払いがあった
場合、その流量計に対してのみ遮断弁3の開放復帰が可
能な状態にすることができる。このようにすると、当該
流量計において遮断弁復帰スイッチ7をオンにすれば、
遮断弁3の開放復帰が行われる。また、遮断弁復帰スイ
ッチ7をオンにしなくとも、集中管理盤1側からの制御
で遮断弁3を自動的に開放復帰させることも容易に考え
られる。
By operating the shut-off valve return operating section 19, for example, when the consumer of the flow meter whose shut-off valve 3 is shut off by operating the individual shut-off operating section 17 receives payment from the flow meter, Can be brought into a state in which the open / return of the shut-off valve 3 is possible. By doing so, if the shut-off valve return switch 7 is turned on in the flow meter,
The opening and returning of the shutoff valve 3 is performed. It is also conceivable that the shut-off valve 3 can be automatically opened and reset by control from the central control panel 1 without turning on the shut-off valve return switch 7.

【0031】図4はこの発明の変形例で、多数の流量計
M1〜M1n、M2〜M2n、MN〜MNnを、それぞれのため
の中継器R1〜R1n、R2〜R2n、RN〜RNnを介して1
台の集中管理盤1のバス通信回路に接続したものであ
る。この例では、各流量計毎に中継器を接続してある
が、1台の中継器に複数の流量計を接続して中継するこ
とも可能である。
FIG. 4 shows a modification of the present invention, in which a number of flow meters M1 to M1n, M2 to M2n, MN to MNn are connected via repeaters R1 to R1n, R2 to R2n, RN to RNn for the respective flow meters. 1
It is connected to the bus communication circuit of the centralized control panel 1. In this example, a repeater is connected to each flow meter. However, it is also possible to connect a plurality of flow meters to one repeater and perform relay.

【0032】[0032]

【発明の効果】この発明の効果を請求項毎に説明する
と、次のとおりである。 <請求項1>電話回線を使用せず、流量計からの定時発
呼を集中管理盤でデータ管理する従来のシステムでは、
集中管理盤に接続されている流量計の1台が、何らかの
異常で定時発呼の通信が正常に行われず、その流量計だ
けのデータ管理が集中管理盤で行われていなかったら、
次の流量計の定時発呼時まで待つか、または再度集中管
理盤に接続されているすべての流量計の計測データを集
中管理盤が読み取らなければならず、大変な時間がかか
り、データ収集効率が悪かったが、この発明によれば、
集中管理盤に設けられた流量計選択部を操作することに
より、集中管理盤に接続されている流量計のうちの任意
の1台を選択することができ、選択した1台の流量計以
外の余分なデータ管理やデータ収集を行わずに済むの
で、データ収集効率が向上する。
The effects of the present invention will be described below for each claim. <Claim 1> In a conventional system in which a regular call from a flow meter is data managed by a centralized control panel without using a telephone line,
If one of the flowmeters connected to the centralized control panel does not normally communicate with the regular call due to some abnormality and the data management of the flowmeter alone is not performed by the centralized control panel,
Either wait until the next call of the flow meter on a regular basis, or read the measurement data of all flow meters connected to the central control board again, which requires a great deal of time and data collection efficiency. Was bad, but according to the present invention,
By operating the flow meter selection unit provided on the centralized control panel, any one of the flowmeters connected to the centralized control panel can be selected. Since unnecessary data management and data collection are not required, data collection efficiency is improved.

【0033】<請求項2>集中管理盤に設けられた検針
操作部を操作することにより、流量計選択部にて選択し
た1台の流量計のみに対して検針制御信号の送受信を行
うことが可能となり、その流量計が何らかの異常で集中
管理盤にてデータ管理を行えないときに、その異常を知
ることができるとともに、その流量計をデータ収集対象
から外すことにより、無駄なデータ収集を省ける。ま
た、検針員がデータ収集する際に、任意の流量計の随時
検針を容易に行える。
<Claim 2> By operating the meter reading operation unit provided on the centralized control panel, transmission and reception of meter reading control signals can be performed only to one flow meter selected by the flow meter selection unit. It becomes possible, and when the flow meter cannot perform data management with the centralized control panel due to some abnormality, the abnormality can be known, and unnecessary data collection can be omitted by excluding the flow meter from the data collection target. . Also, when the meter reader collects data, the meter reading of an arbitrary flow meter can be easily performed at any time.

【0034】<請求項3>集中管理盤に設けられた個別
遮断操作部を操作することにより、たとえば料金未納な
消費者が使用している流量計を選択してその遮断弁を素
早く遮断することが可能となるため、不正使用を簡単に
防止できる。また、アパートやマンション等の集合住宅
において、管理人が一括して消費者からの料金を徴収し
ている場合、集中管理盤に個別遮断操作部があるため、
料金未納な消費者のためにわざわざ供給事業主に連絡し
て遮断弁の遮断を依頼する煩わしさが解消される。
[Claim 3] By operating an individual shut-off operation unit provided on a centralized control panel, for example, a flow meter used by a consumer who has not paid a fee is selected and its shut-off valve is quickly shut off. This makes it possible to easily prevent unauthorized use. In addition, in apartments, condominiums, and other apartments, if the manager collects fees from consumers in a lump, there is an individual shut-off operation unit on the centralized management panel,
The trouble of contacting the supplier and requesting the shutoff of the shutoff valve for the consumer who has not paid the fee is eliminated.

【0035】<請求項4>集中管理盤に設けられた一斉
遮断操作部を操作することにより、災害等の緊急時に、
各戸でガス漏れまたは漏水等があり、供給体を供給し続
けるのは危険なときに、集中管理盤に接続されているす
べての流量計の遮断弁を素早く一斉に遮断できるため、
二次災害を防止できる。また、遮断弁を個別に遮断する
手間が省ける。
<Claim 4> By operating the simultaneous shut-off operation section provided on the centralized control panel, an emergency such as a disaster can be performed.
If there is a gas leak or water leak in each house and it is dangerous to keep supplying the supply, it is possible to quickly and simultaneously shut off the shut-off valves of all flow meters connected to the central control panel.
Secondary disasters can be prevented. In addition, it is not necessary to individually shut off the shutoff valves.

【0036】<請求項5>集中管理盤に設けられた遮断
弁復帰操作部を操作することにより、たとえば個別遮断
操作部を操作して遮断弁が遮断している流量計の消費者
から料金の支払いがあった場合、その流量計に対しての
み遮断弁の開放復帰が可能な状態にすることができ、当
該流量計において遮断弁復帰スイッチをオンにすること
で、供給体の使用を再開できる。また、遮断弁復帰スイ
ッチをオンにしなくとも、集中管理盤側からの制御で遮
断弁を自動的に開放復帰させることも可能となる。
<Claim 5> By operating the shut-off valve returning operation unit provided on the centralized control panel, for example, the individual shut-off operation unit is operated to cut off the charge from the consumer of the flow meter whose shut-off valve is shut off. When payment is made, only the flow meter can be set to a state where the shut-off valve can be opened and returned, and by turning on the shut-off valve return switch in the flow meter, use of the supply body can be resumed. . Further, it is also possible to automatically open and return the shut-off valve under control from the central control panel without turning on the shut-off valve return switch.

【0037】<請求項6>集中管理盤に感震センサを設
けたので、流量計毎に感震センサを設ける必要が無くな
るため、地震対策を講じた集中検針システムを安価に構
築できる。また、集中管理盤に接続されている各流量計
に対して、地震時、自動的に供給を遮断する制御も可能
となるので、たとえばアパートやマンション等の集合住
宅の場合、管理人が集中管理盤を管理していれば、地震
時における集合住宅全体の安全に素早く対応できるとと
もに、全流量計の遮断弁を一斉に自動遮断して集合住宅
での二次災害を未然に防止できる。
<Claim 6> Since the seismic sensor is provided on the centralized control panel, it is not necessary to provide a seismic sensor for each flow meter, so that a centralized meter reading system taking measures against earthquakes can be constructed at low cost. In addition, since it is possible to control the flowmeters connected to the centralized control panel to automatically cut off the supply in the event of an earthquake, for example, in the case of an apartment house or apartment complex, the manager must perform centralized control. If the panels are managed, it will be possible to quickly respond to the safety of the entire apartment complex during an earthquake and to automatically shut off the shut-off valves of all flow meters simultaneously to prevent a secondary disaster in the apartment complex.

【図面の簡単な説明】[Brief description of the drawings]

【図1】この発明による集中検針システムの構成を示す
ブロック図である。
FIG. 1 is a block diagram showing a configuration of a centralized meter reading system according to the present invention.

【図2】流量計の構成例を示すブロック図である。FIG. 2 is a block diagram illustrating a configuration example of a flow meter.

【図3】集中管理盤の構成例を示すブロック図である。FIG. 3 is a block diagram illustrating a configuration example of a centralized management board.

【図4】この発明による集中検針システムの他の構成例
を示すブロック図である。
FIG. 4 is a block diagram showing another configuration example of the centralized meter reading system according to the present invention.

【符号の説明】[Explanation of symbols]

1 集中管理盤 2 供給路 3 遮断弁 4 遮断弁駆動回路 5 メータ本体 6 流量センサ 7 遮断部復帰スイッチ 8 通信回路 9 制御部 10 操作入力パネル 11 表示部 12 出力部 13 感震センサ 14 コントローラ 15 流量計選択部 16 検針操作部 17 個別遮断操作部 18 一斉遮断操作部 19 遮断弁復帰操作部 C1〜Cn 通信回路 M1〜M1n、M2〜M2n、MN〜MNn 流量計 R1〜R1n、R2〜R2n、RN〜RNn 中継器 DESCRIPTION OF SYMBOLS 1 Centralized control panel 2 Supply path 3 Shut-off valve 4 Shut-off valve drive circuit 5 Meter body 6 Flow sensor 7 Shut-off part return switch 8 Communication circuit 9 Control part 10 Operation input panel 11 Display part 12 Output part 13 Seismic sensor 14 Controller 15 Flow rate Meter selection unit 16 Meter reading operation unit 17 Individual shut-off operation unit 18 Simultaneous shut-off operation unit 19 Shut-off valve return operation unit C1-Cn Communication circuit M1-M1n, M2-M2n, MN-MNn Flow meters R1-R1n, R2-R2n, RN ~ RNn repeater

フロントページの続き Fターム(参考) 2F030 CC13 CE22 CF05 2F031 AB01 AE07 AE11 2F073 AA08 AB01 BB09 BC01 DD02 FG01 5K048 AA04 AA15 BA36 CA06 DA02 EB02 EB10 HA01 HA02 HA03Continued on front page F term (reference) 2F030 CC13 CE22 CF05 2F031 AB01 AE07 AE11 2F073 AA08 AB01 BB09 BC01 DD02 FG01 5K048 AA04 AA15 BA36 CA06 DA02 EB02 EB10 HA01 HA02 HA03

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】 供給体の供給路を遮断する遮断弁、この
遮断弁を駆動する遮断弁駆動回路、外部との送受信を行
う通信回路、供給体の消費量を検出する流量センサ、そ
の検出された消費量を計測するとともに、遮断弁駆動回
路および通信回路を制御する制御部を有する複数の流量
計と、 これら流量計の通信回路と送受信する通信回路、該通信
回路を通じて流量計から収集した検針データ等を表示す
るための表示部、収集した検針データを外部出力するた
めの出力部、これら通信回路、表示部および出力部を制
御するコントローラを有する集中管理盤とで構成される
集中検針システムにおいて、 前記集中管理盤に、各流量計を選択する流量計選択部を
設けたことを特徴とする、集中検針システム。
1. A shut-off valve for shutting off a supply path of a feeder, a shut-off valve drive circuit for driving the shut-off valve, a communication circuit for transmitting and receiving to and from the outside, a flow sensor for detecting a consumption of the feeder, Flow meters having a control unit for controlling the shut-off valve drive circuit and the communication circuit while measuring the consumed amount, a communication circuit for transmitting and receiving to and from the communication circuit of these flow meters, and meter reading collected from the flow meter through the communication circuit. In a centralized meter reading system composed of a display unit for displaying data and the like, an output unit for externally outputting collected meter reading data, a central control panel having a controller for controlling these communication circuits, a display unit and an output unit. A centralized meter reading system, wherein the centralized control panel is provided with a flow meter selecting unit for selecting each flow meter.
【請求項2】 前記集中管理盤に、流量計を随時検針で
きる検針操作部を設けたことを特徴とする、請求項1に
記載の集中検針システム。
2. The centralized meter reading system according to claim 1, wherein the centralized control panel is provided with a meter reading operation unit capable of reading a flow meter at any time.
【請求項3】 前記集中管理盤に、流量計の遮断弁を個
別に遮断できる個別遮断操作部を設けたことを特徴とす
る、請求項1、または2に記載の集中検針システム。
3. The centralized meter reading system according to claim 1, wherein the centralized control panel is provided with an individual shut-off operation unit capable of individually shutting off a shut-off valve of a flow meter.
【請求項4】 供給体の供給路を遮断する遮断弁、この
遮断弁を駆動する遮断弁駆動回路、外部との送受信を行
う通信回路、供給体の消費量を検出する流量センサ、そ
の検出された消費量を計測するとともに、遮断弁駆動回
路および通信回路を制御する制御部を有する複数の流量
計と、 これら流量計の通信回路と送受信する通信回路、該通信
回路を通じて流量計から収集した検針データ等を表示す
るための表示部、収集した検針データを外部出力するた
めの出力部、これら通信回路、表示部および出力部を制
御するコントローラを有する集中管理盤とで構成される
集中検針システムにおいて、 前記集中管理盤に、それに接続されている全流量計の遮
断弁を一斉に遮断できる一斉遮断操作部を設けたことを
特徴とする、集中検針システム。
4. A shut-off valve for shutting off a supply path of a feeder, a shut-off valve driving circuit for driving the shut-off valve, a communication circuit for transmitting and receiving to and from the outside, a flow sensor for detecting a consumption of the feeder, Flow meters having a control unit for controlling the shut-off valve drive circuit and the communication circuit while measuring the consumed amount, a communication circuit for transmitting and receiving to and from the communication circuit of these flow meters, and meter reading collected from the flow meter through the communication circuit. In a centralized meter reading system composed of a display unit for displaying data and the like, an output unit for externally outputting collected meter reading data, a central control panel having a controller for controlling these communication circuits, a display unit and an output unit. A centralized meter reading system, wherein the centralized control panel is provided with a simultaneous shutoff operation unit that can simultaneously shut off shutoff valves of all flow meters connected thereto.
【請求項5】 前記集中管理盤に、遮断した遮断弁を開
放復帰させることができる遮断弁復帰操作部を設けたこ
とを特徴とする、請求項3、または4に記載の集中検針
システム。
5. The centralized meter reading system according to claim 3, wherein the centralized control panel is provided with a shut-off valve returning operation unit that can open and return the shut-off shut-off valve.
【請求項6】 供給体の供給路を遮断する遮断弁、この
遮断弁を駆動する遮断弁駆動回路、外部との送受信を行
う通信回路、供給体の消費量を検出する流量センサ、そ
の検出された消費量を計測するとともに、遮断弁駆動回
路および通信回路を制御する制御部を有する複数の流量
計と、 これら流量計の通信回路と送受信する通信回路、該通信
回路を通じて流量計から収集した検針データ等を表示す
るための表示部、収集した検針データを外部出力するた
めの出力部、これら通信回路、表示部および出力部を制
御するコントローラを有する集中管理盤とで構成される
集中検針システムにおいて、 前記集中管理盤に、感震センサを設けたことを特徴とす
る、集中検針システム。
6. A shut-off valve for shutting off a supply path of a feeder, a shut-off valve driving circuit for driving the shut-off valve, a communication circuit for transmitting and receiving to and from the outside, a flow sensor for detecting a consumption of the feeder, Flow meters having a control unit for controlling the shut-off valve drive circuit and the communication circuit while measuring the consumed amount, a communication circuit for transmitting and receiving to and from the communication circuit of these flow meters, and meter reading collected from the flow meter through the communication circuit. In a centralized meter reading system composed of a display unit for displaying data and the like, an output unit for externally outputting collected meter reading data, a central control panel having a controller for controlling these communication circuits, a display unit and an output unit. A centralized meter reading system, wherein a seismic sensor is provided on the centralized control panel.
JP28098898A 1998-10-02 1998-10-02 Centralized meter reading system Expired - Fee Related JP4342010B2 (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
JP28098898A JP4342010B2 (en) 1998-10-02 1998-10-02 Centralized meter reading system
CNB991213041A CN1187578C (en) 1998-10-02 1999-09-30 Measuring system for centralized checkout
HK00106431A HK1027392A1 (en) 1998-10-02 2000-10-10 Collecting check-up system for use level.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP28098898A JP4342010B2 (en) 1998-10-02 1998-10-02 Centralized meter reading system

Publications (2)

Publication Number Publication Date
JP2000111370A true JP2000111370A (en) 2000-04-18
JP4342010B2 JP4342010B2 (en) 2009-10-14

Family

ID=17632701

Family Applications (1)

Application Number Title Priority Date Filing Date
JP28098898A Expired - Fee Related JP4342010B2 (en) 1998-10-02 1998-10-02 Centralized meter reading system

Country Status (3)

Country Link
JP (1) JP4342010B2 (en)
CN (1) CN1187578C (en)
HK (1) HK1027392A1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002267510A (en) * 2001-03-07 2002-09-18 Matsushita Electric Ind Co Ltd Telemeter
JP2008102811A (en) * 2006-10-20 2008-05-01 Matsushita Electric Ind Co Ltd Gas control system
KR102057439B1 (en) 2017-11-02 2019-12-19 (주)세화하이테크 Internet of things gas platform system performing remote-monitoring and remote-controlling and method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002267510A (en) * 2001-03-07 2002-09-18 Matsushita Electric Ind Co Ltd Telemeter
JP2008102811A (en) * 2006-10-20 2008-05-01 Matsushita Electric Ind Co Ltd Gas control system
KR102057439B1 (en) 2017-11-02 2019-12-19 (주)세화하이테크 Internet of things gas platform system performing remote-monitoring and remote-controlling and method thereof

Also Published As

Publication number Publication date
JP4342010B2 (en) 2009-10-14
CN1187578C (en) 2005-02-02
CN1250153A (en) 2000-04-12
HK1027392A1 (en) 2001-01-12

Similar Documents

Publication Publication Date Title
JP5213234B2 (en) Gas appliance monitoring device
US20110074601A1 (en) Utility meter with flow rate sensitivity shut off
KR20100075821A (en) Flow rate metering device, communication system, flow rate measuring method, flow rate measuring program, fluid supply system and gas tool monitoring device
JP2001243581A (en) Measuring device and measuring monitoring system
JP4342010B2 (en) Centralized meter reading system
JP3906551B2 (en) Facility information network system and reporting method
JP2002030702A (en) Cutoff-valve monitor control system
JP4867592B2 (en) Gas meter
JPH10255183A (en) System for reporting life abnormality
JPH10320675A (en) Radio alarm system
JP2504943B2 (en) Gas consumption control device
JP2003141660A (en) Earthquake safety system
JP4862631B2 (en) Gas meter
EP1221683A2 (en) Apparatus and method for detection and remote control of events through an Ethernet homenet
JPH03150698A (en) System for deciding abnormality of resident from using condition of water or electricity
JP2604981B2 (en) Gas leak monitoring device
JP2000088624A (en) Method, system and apparatus for controlling effective term in centralized control system of gas
JP3248665B2 (en) Remote monitoring device
JP4862632B2 (en) Gas meter
JP2002279574A (en) Water service management system
JP4830786B2 (en) Gas control device
JPS60183525A (en) Controller for gas meter
JP2008108167A (en) Automatic meter reading wireless system
JPH0829289A (en) Gas leak monitoring apparatus
JP3456034B2 (en) Piping leak detection device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050920

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20071219

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20071221

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080205

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080229

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080422

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090707

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090707

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120717

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120717

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130717

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130717

Year of fee payment: 4

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313113

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130717

Year of fee payment: 4

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

R371 Transfer withdrawn

Free format text: JAPANESE INTERMEDIATE CODE: R371

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313113

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130717

Year of fee payment: 4

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130717

Year of fee payment: 4

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: R3D02

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees