peripheral surface
outer peripheral
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP10237610A
Other languages
Japanese (ja)
Other versions
JP3743169B2 (en
Inventor
Takuya Akasaki
琢也 赤崎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Steel Corp
Original Assignee
Kawasaki Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kawasaki Steel Corp filed Critical Kawasaki Steel Corp
Priority to JP23761098A priority Critical patent/JP3743169B2/en
Publication of JP2000063917A publication Critical patent/JP2000063917A/en
Application granted granted Critical
Publication of JP3743169B2 publication Critical patent/JP3743169B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Abstract

PROBLEM TO BE SOLVED: To provide an exchanging device of a stave in a blast furnace, with which the exchanging work of the stave in the blast furnace is completed in a short time because the works at the prestage and the poststage thereof are scarcely needed, and the reduction of working cost and the working safety can sufficiently be obtd. SOLUTION: A carry-in hole 26 and a carry-out hole 28A are arranged at the upper part of the furnace near the furnace top charging part 12. Then, two sets of chain blocks 34A, 34B are set so that the chains 34a, 34b hang down toward the conical outer peripheral surface 14a of a large bell 14 in the furnace top charging part from the upper part near the furnace center P in the furnace top charging part. Further, the chains 34a, 34b hung down on the conical outer peripheral surface of the large bell, are introduced to the lower side along the conical outer peripheral surface with chain swinging devices 38A, 38B and hung downward from the outer peripheral edge of the large bell and also, made swingable so that hooks 36a, 36b at the lower end can be freely shifted to the prescribed position in the inner wall of the furnace. Furthermore, in the carry-in hole and the carry-out hole, an auxiliary chain block 40 freely elevating/lowering an auxiliary chain 40a is disposed, too.

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】本発明は、高炉ステーブの交
換装置及びこの装置を使用した高炉ステーブの交換方法
に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a blast furnace stave replacement device and a blast furnace stave replacement method using this device.

【0002】[0002]

【従来の技術】ステーブ冷却方式の高炉は、長期操業に
よって炉内の耐火物壁が炉内の熱や装入物の影響によっ
て損傷すると、炉体鉄皮を保護している高炉ステーブも
損傷して冷却能力が低下すやすいので、高炉の寿命延長
を図るために高炉ステーブの取換える補修作業を定期的
に行っている。
2. Description of the Related Art In a stave-cooled blast furnace, when the refractory wall in the furnace is damaged due to the heat in the furnace or the influence of the charge in the furnace due to long-term operation, the blast furnace stave protecting the furnace shell is also damaged. Since the cooling capacity is likely to decrease, the repair work of replacing the blast furnace stave is regularly performed in order to extend the life of the blast furnace.

【0003】この高炉の補修作業の従来技術として、例
えば特開平9−118905号公報に記載の先行技術が
知られている。この先行技術は、高炉の休風後に、高炉
装入物を炉壁損傷部より下方位置まで下降させる工程
と、高炉装入物を炉壁損傷部より下方まで下降させた
後、高炉装入物上に鉱石バラスを所定高さまで充填する
と共に、炉壁の周面から冷却盤を取り外す工程と、前記
炉壁の鉱石バラス充填部分より若干上方に、前記炉壁耐
火物の破片の掻き出し装置が配置される上側開口部と、
前記掻き出し装置により掻き取られた破片を炉外へ排出
する下側開口部とを形成する工程と、前記炉壁の鉱石バ
ラス充填部分上に、前記炉壁の内周面に沿って、それぞ
れ炉心側の面が下方傾斜した複数個の炉壁プロテクタを
略環状に配置する工程と、前記炉壁プロテクタの炉内配
置後、前記炉壁耐火物を爆破して、その破片を前記鉱石
バラス上に落下させる工程と、前記掻き出し装置を用い
て、前記破片をぜんき下側開口部から炉外へ排出する工
程と、破片の掻き出し後、上側開口部から高炉ステーブ
を炉内へ運び込んで、炉壁の内周面に取り付ける工程
と、破片の掻き出し後、上側及び下側開口部を塞ぐ工程
とを備えた技術である。
As a conventional technique for repairing the blast furnace, a prior art disclosed in, for example, Japanese Patent Laid-Open No. 9-118905 is known. This prior art is a process of lowering the blast furnace charge to a position lower than the damaged portion of the furnace wall after the blast furnace is blown off, and a step of lowering the blast furnace charge to a position lower than the damaged portion of the furnace wall and then the blast furnace charge. While filling the ore ballast to a predetermined height above, removing the cooling plate from the peripheral surface of the furnace wall, and slightly above the ore ballast filling portion of the furnace wall, a device for scraping out fragments of the furnace wall refractory is arranged. The upper opening,
A step of forming a lower opening for discharging the fragments scraped off by the scraping device to the outside of the furnace, and on the ore ballast-filled portion of the furnace wall, along the inner peripheral surface of the furnace wall, respectively, A step of arranging a plurality of furnace wall protectors whose side surfaces are inclined downward in a substantially annular shape, and after arranging the furnace wall protectors in the furnace, blast the furnace wall refractory, and debris thereof on the ore ballast. A step of dropping, a step of discharging the fragments from the lower opening of the furnace using the scraping device, and a step of scraping the fragments, and then carrying the blast furnace stave into the furnace from the upper opening to remove the fragments from the furnace wall. This is a technique including a step of attaching to the inner peripheral surface of, and a step of closing the upper and lower openings after scraping out the fragments.

【0004】この先行技術によると、炉壁を爆破するこ
とで鉱石バラス上に落下した破片を、炉壁の鉱石バラス
充填部分より若干上方に形成した上側開口部付近の掻き
出し装置を用いて、下側開口部から炉外に掻き出し、上
側開口部から高炉ステーブを炉内に運び込んで炉壁に取
り付けるようにしたので、高炉を休止することなく熱間
である休風中に、炉壁に高炉ステーブを取り付けること
ができる。
According to this prior art, by using a scraping device in the vicinity of the upper opening formed slightly above the ore ballast filling portion of the furnace wall, the debris dropped on the ore ballast by blasting the furnace wall is used. The blast furnace stave was pushed out of the side opening to the outside of the furnace, and the blast furnace stave was carried into the furnace from the upper opening to be attached to the furnace wall.Therefore, the blast furnace stave was not attached to the blast furnace wall during a hot blast without stopping the blast furnace. Can be attached.

【0005】[0005]

【発明が解決しようとする課題】しかし、上記先行技術
は、炉壁に掻き出し装置を配置するための大口径となっ
てしまう上側開口部を形成する作業、炉壁の鉱石バラス
充填部分上の炉壁の内周面に沿って炉壁プロテクタを略
環状に配置する作業、爆破により発生した破片と鉱石バ
ラスを下側開口部から炉外へ排出する作業、さらには、
上側及び下側開口部を塞ぐ作業といった高炉ステーブの
交換作業の前段階や後段階の作業に多くの時間が費やさ
れてしまうので、短期間の間に高炉ステーブの交換作業
を終了することが難しく、作業コストの面でも問題があ
る。
However, in the above-mentioned prior art, the work of forming an upper opening portion having a large diameter for disposing the scraping device in the furnace wall, the furnace on the ore ballast filling portion of the furnace wall. A work of arranging the furnace wall protector in a substantially annular shape along the inner peripheral surface of the wall, a work of discharging debris and ore ballast generated by the blast from the lower opening to the outside of the furnace,
Since a lot of time is spent in the work before and after the blast furnace stave replacement work such as the work of closing the upper and lower openings, it is possible to finish the blast furnace stave replacement work in a short period of time. It is difficult and there is a problem in terms of work cost.

【0006】また、炉内にダイナマイトを配設して炉壁
耐火物を爆破するので、作業安全性の面でも問題があ
る。そこで、本発明は、上記従来例の未解決の課題に着
目してなされたものであり、高炉ステーブの交換作業の
前段階や後段階の作業が殆ど必要なく短時間の間に高炉
ステーブの交換作業が完了し、しかも、作業コストの低
減、作業安全性を充分に図ることができる高炉ステーブ
の交換装置及びこの装置を使用した高炉ステーブの交換
方法を提供することを目的としている。
Further, since the dynamite is arranged in the furnace to explode the furnace wall refractory, there is a problem in work safety. Therefore, the present invention has been made by paying attention to the unsolved problem of the above-mentioned conventional example, and there is almost no need for pre-stage or post-stage work of the blast furnace stave replacement work, and the blast furnace stave replacement is performed in a short time. An object of the present invention is to provide a blast furnace stave replacement device that can complete work, reduce the work cost, and achieve sufficient work safety, and a method of replacing the blast furnace stave using this device.

【0007】[0007]

【課題を解決するための手段】上記目的を達成するため
に、請求項1記載の高炉ステーブの交換装置は、炉頂装
入部近くの炉上部に、新高炉ステーブを炉内に搬入する
ための搬入口と、使用済みの旧高炉ステーブを炉外に搬
出するための搬出口とを設けた高炉において高炉ステー
ブの交換を行う装置であって、前記炉頂装入部の炉心近
くの上方から該炉頂装入部内の大ベルの円錐外周面に向
けて昇降吊り材が下がるように設置した吊り材昇降装置
と、前記大ベルの円錐外周面に下がってきた前記昇降吊
り材を、前記円錐外周面に沿って下側に導いた後に前記
大ベルの外周縁から下方に垂下させるとともに、前記円
錐外周面に沿っている前記前記昇降吊り材を水平旋回さ
せて前記昇降吊り材の下端のフックを炉内壁の所定位置
まで移動自在とした吊り材旋回装置と、前記搬入口及び
搬出口に向けて補助吊り材を昇降自在に配設し、前記昇
降吊り材への高炉ステーブの受渡しを補助する補助吊り
材昇降装置とを備えた装置である。
In order to achieve the above object, a blast furnace stave exchanging device according to claim 1 is for carrying a new blast furnace stave into the furnace near the top of the furnace. A device for exchanging blast furnace stave in a blast furnace provided with a carry-in inlet and a carry-out outlet for discharging a used old blast furnace stave out of the furnace, The lifting material lifting device installed such that the lifting lifting material is lowered toward the outer peripheral surface of the cone of the large bell in the furnace top charging section, and the lifting lifting material that has been lowered to the outer peripheral surface of the cone of the large bell After being guided downward along the outer peripheral surface, it is hung downward from the outer peripheral edge of the large bell, and the elevating suspension member along the conical outer peripheral surface is horizontally swung to hook the lower end of the elevating suspension material. Is movable to a predetermined position on the inner wall of the furnace A device provided with a suspending member swiveling device, and an auxiliary suspending member lifting device for arranging an auxiliary suspending member so that it can be raised and lowered toward the carry-in port and the carry-out port, and assisting the transfer of the blast furnace stave to the lift suspending member. is there.

【0008】また、請求項2記載の発明は、請求項1記
載の高炉ステーブの交換装置において、前記吊り材旋回
装置を、円筒形状の大ベルカップの内周面に前記炉心と
同軸に固定した円環レールから吊り下げ、且つ当該円環
レールに沿って旋回する構造とした。
According to a second aspect of the present invention, in the blast furnace stave exchanging device according to the first aspect, the suspending member swiveling device is fixed to an inner peripheral surface of a large cylindrical bell cup coaxially with the reactor core. The structure is such that it is suspended from the circular rail and turns along the circular rail.

【0009】また、請求項3記載の発明は、請求項2記
載の高炉ステーブの交換装置において、前記吊り材旋回
装置を、前記円環レール上を転動する支持滑車と、前記
大ベルの円錐外周面に向けて下がってきた前記昇降吊り
材を前記円錐外周面に沿って下方に導く第1の方向切換
滑車と、この第1の方向切換滑車に支持された前記昇降
吊り材を前記大ベルの外周縁から下方に導く第2の方向
切換滑車と、前記大ベルカップの内周面に当接して装置
全体の姿勢を保持する姿勢保持車とを備えたフレーム体
により構成した。
According to a third aspect of the present invention, in the blast furnace stave exchanging device according to the second aspect, the suspension swing device is a support pulley that rolls on the annular rail, and a cone of the large bell. A first direction switching pulley that guides the elevating suspension material that has descended toward the outer peripheral surface downward along the conical outer peripheral surface, and the elevating suspension material that is supported by the first direction switching sheave is the large bell. The frame body is provided with a second direction switching pulley guided downward from the outer peripheral edge of the device and an attitude holding wheel that abuts on the inner peripheral surface of the large bell cup and holds the attitude of the entire apparatus.

【0010】さらに、請求項4記載の発明は、請求項1
乃至請求項3の何れかに記載の高炉ステーブの交換装置
を使用した高炉ステーブの交換方法であって、前記炉頂
装入部近くの炉上部に、新高炉ステーブを炉内に搬入す
るための一箇所の搬入口を設け、前記炉心を対称位置と
した前記搬入口の反対側に、互いに離間した2か所の搬
出口を設け、前記炉頂装入部の炉心近くの上方から該炉
頂装入部内の大ベルの円錐外周面に向けて2本の昇降吊
り材が下げるように2台の吊り材旋回装置を配設すると
ともに、これら吊り材旋回装置を、互いに交錯しないよ
うに前記搬入口と前記搬出口との間を旋回させて、前記
吊り材昇降装置の作動により旧高炉ステーブ及び新高炉
ステーブの交換作業を行うようにした方法である。
Further, the invention according to claim 4 is the same as claim 1.
A method for replacing a blast furnace stave using the blast furnace stave replacement device according to claim 3, wherein the new blast furnace stave is loaded into the furnace at an upper part of the furnace near the furnace top charging part. A carry-in port is provided at one location, and two carry-out ports spaced apart from each other are provided on the opposite side of the carry-in port where the core is located symmetrically. The two suspension hanging devices are arranged so that the two lifting suspension members are lowered toward the outer peripheral surface of the cone of the large bell in the charging part, and the suspension carrying devices are carried in so that they do not cross each other. It is a method in which the old blast furnace stave and the new blast furnace stave are replaced by rotating the suspending member lifting device by rotating between the mouth and the carry-out port.

【0011】[0011]

【発明の実施の形態】以下に、本発明に係る高炉ステー
ブの交換装置の1実施形態について図面を参照して説明
する。
BEST MODE FOR CARRYING OUT THE INVENTION An embodiment of a blast furnace stave exchanging device according to the present invention will be described below with reference to the drawings.

【0012】図1は、ステーブ冷却方式の高炉10の内
部構造を示すものである。この高炉10の炉頂装入部1
2は、略円錐台形状の大ベル14と、この大ベル14の
上方に位置して大ベル14より小さな円錐台形状の小ベ
ル16を備えた2ベル形式の構造であり、小ベル16が
下方移動することにより円筒形状の小ベルカップ17の
下部が開口し、大ベル14が下方移動することにより円
筒形状の大ベルカップ15の下部が開口して炉内に装入
物が装入されるようになっている。
FIG. 1 shows the internal structure of a stave cooling type blast furnace 10. Top part charging part 1 of this blast furnace 10
Reference numeral 2 denotes a two-bell type structure that includes a large bell 14 having a substantially truncated cone shape and a small bell 16 that is located above the large bell 14 and that is smaller than the large bell 14 and has a truncated cone shape. By moving downward, the lower part of the cylindrical small bell cup 17 opens, and by moving the large bell 14 downward, the lower part of the large cylindrical bell cup 15 opens, and the charging material is charged into the furnace. It has become so.

【0013】そして、この高炉10は、高炉ステーブ1
8の交換作業を行うために炉下部に配設した羽口20か
らの熱風供給を停止することにより高炉休止状態として
いるとともに、高炉ステーブ18の交換位置より下方ま
で高炉装入物22を降下させ、高炉介装物22上に鉄鉱
石、コークスなどの鉱石バラス24を充填している。
The blast furnace 10 has a blast furnace stave 1
In order to perform the replacement work of No. 8, the blast furnace is stopped by stopping the hot air supply from the tuyere 20 arranged at the lower part of the furnace, and the blast furnace charge 22 is lowered below the replacement position of the blast furnace stave 18. The ore ballast 24 such as iron ore and coke is filled on the blast furnace interposer 22.

【0014】また、図2は、高炉10の炉頂装入部12
近くの詳細構造を示し、図3は、図2のIII −III 線矢
視図を示すものであり、炉頂装入部12近くの炉上部に
は、炉内と炉外とを連通する搬入口26及び搬出口が設
けられている。ここで、図3に示すように、搬入口26
は一箇所であり、搬出口は、炉心Pを対称位置とした搬
入口26の反対側に2箇所(搬出口28A、搬出口28
B)設けられている。
Further, FIG. 2 shows the furnace top charging section 12 of the blast furnace 10.
FIG. 3 shows a detailed structure in the vicinity, and FIG. 3 is a view taken along the line III-III in FIG. 2, in which the upper part of the furnace near the furnace top charging section 12 communicates with the inside and outside of the furnace. A mouth 26 and a carry-out port are provided. Here, as shown in FIG.
Is one place, and two carry-out ports are provided on the opposite side of the carry-in port 26 with the core P as a symmetrical position (carry-out port 28A and carry-out port 28).
B) It is provided.

【0015】そして、炉頂装入部12には、鉄皮19か
ら取り外した旧高炉ステーブ18を搬出口28A、28
Bから炉外に搬出するとともに、搬入口26から炉内に
搬入した新高炉ステーブ18を所定の取付け位置まで移
動するステーブ交換装置30が設置されている。
In the furnace top charging section 12, the old blast furnace stave 18 removed from the steel shell 19 is carried out to the outlets 28A, 28A.
A stave exchanging device 30 is installed to carry out the new blast furnace stave 18 carried into the furnace from the carry-in port 26 while being carried out from B to the outside of the furnace.

【0016】ステーブ交換装置30は、搬入口26、搬
出口28A、28Bから炉心内部に向けて水平移動する
ステーブ搬入・搬出ステージ32と、大ベル14の上方
に吊り下げられている2台の交換用チェーンブロック3
4A、34Bと、これら交換用チェーンブロック34
A、34Bの大ベル14の円錐外周面14aに下がった
チェーン34a、34bを円錐外周面14a下端から外
側まで導いた後に下方に垂下させてチェーン下端のフッ
ク36a、36bを炉内の所定高さに位置させるととも
に、チェーン34a、34bの錐面14aに沿っている
部分を水平旋回させてフック36a、36bを炉内の円
周方向の位置まで移動させる2台のチェーン旋回装置3
8A、38Bと、炉上部の周方向に所定間隔をあけて設
けたアーマ取替口39から搬入口26、搬出口28A及
び搬出口28Bに向けて補助チェーン40aを下げてい
る補助チェーンブロック40とを備えている。
The stave exchanging device 30 includes a stave loading / unloading stage 32 that horizontally moves from the carry-in port 26 and carry-out ports 28A and 28B toward the inside of the core, and two units that are suspended above the large bell 14. Chain block 3
4A, 34B and these replacement chain blocks 34
The chains 34a, 34b, which have fallen on the conical outer peripheral surface 14a of the large bell 14 of A, 34B, are guided from the lower end of the conical outer peripheral surface 14a to the outside and then hung downward to bring the hooks 36a, 36b at the lower end of the chain to a predetermined height in the furnace. The chain turning device 3 for moving the hooks 36a, 36b to positions in the furnace in the circumferential direction by horizontally turning the portions of the chains 34a, 34b along the conical surface 14a.
8A and 38B, and an auxiliary chain block 40 that lowers the auxiliary chain 40a from the armor exchange port 39 provided at a predetermined interval in the circumferential direction of the furnace upper part toward the carry-in port 26, the carry-out port 28A, and the carry-out port 28B. Is equipped with.

【0017】前記交換用チェーンブロック34A、34
Bは長尺なチェーン34a、34bを巻装しており、小
ベルカップ17の下端に互い離間して固定した2つの支
持部材42にそれぞれ吊り下げられている。
The replacement chain blocks 34A, 34
B has long chains 34a and 34b wound around it, and is hung from two support members 42 fixed to the lower end of the small bell cup 17 so as to be spaced apart from each other.

【0018】また、一方のチェーン旋回装置38Aは、
大ベルカップ15の内周面中央部に炉心Pと同軸に固定
した円環レール46に吊り下げ支持されているフレーム
体であり、図4に示すように、鉛直フレーム38aの上
部に固定した水平フレーム38bの先端に配設されて円
環レール46の上部を転動する支持滑車38cと、鉛直
フレーム38aの下端に大ベル14の円錐外周面14a
に沿って下り傾斜を付けて固定されているガイドフレー
ム38dと、このガイドフレーム38dの上端に配設さ
れて下がってきたチェーン34aを円錐外周面14aの
径方向外方に導く第1の方向切換滑車38eと、ガイド
フレーム38dの下端に配設されてチェーン34aを下
方に導く第2の方向切換滑車38fと、鉛直フレーム3
8aの中間に固定した中間水平フレーム38gに配設さ
れてガイドフレーム38dが円錐外周面14aに沿った
状態を維持するように大ベルカップ15の内周面に当接
する姿勢保持車38hとを備えている。また、他方のチ
ェーン旋回装置38Bも同様の構成となっている。
Further, one chain turning device 38A is
A frame body suspended and supported by an annular rail 46 fixed coaxially with the core P at the center of the inner peripheral surface of the large bell cup 15, and as shown in FIG. 4, a horizontal frame fixed above the vertical frame 38a. A supporting pulley 38c which is disposed at the tip of the frame 38b and rolls on the upper portion of the annular rail 46, and a conical outer peripheral surface 14a of the large bell 14 at the lower end of the vertical frame 38a.
A first direction switch that guides the guide frame 38d fixed along a downward slope along the guide frame 38a and the chain 34a arranged at the upper end of the guide frame 38d and lowered to the outside in the radial direction of the conical outer peripheral surface 14a. The pulley 38e, a second direction switching pulley 38f that is arranged at the lower end of the guide frame 38d and guides the chain 34a downward, and the vertical frame 3
8a, which is disposed in the middle horizontal frame 38g fixed to the middle, and is provided with a posture holding wheel 38h that abuts against the inner peripheral surface of the large bell cup 15 so that the guide frame 38d maintains a state along the conical outer peripheral surface 14a. ing. Further, the other chain turning device 38B has the same configuration.

【0019】なお、大ベル14の上部に設置した符号4
2で示す部材は、ステーブ交換装置30の操作を行うた
めに作業者が乗る作業足場である。次に、上記構成のス
テーブ交換装置30を使用した高炉ステーブ18の交換
作業の1実施例について説明する。
Reference numeral 4 installed on the upper part of the large bell 14
The member indicated by 2 is a work scaffold on which an operator rides to operate the stave changing device 30. Next, one embodiment of the replacement work of the blast furnace stave 18 using the stave replacement device 30 having the above configuration will be described.

【0020】先ず、旧高炉ステーブ18を回収する作業
は、以下の手順で行う。 回収すべき旧高炉ステーブ18を鉄皮19から取り
外し、炉内の鉱石バラス24上に落とす。
First, the work of recovering the old blast furnace stave 18 is performed in the following procedure. The old blast furnace stave 18 to be recovered is removed from the iron shell 19 and dropped on the ore ballast 24 in the furnace.

【0021】 鉱石バラス上の旧高炉ステーブ18に
向けて、例えばチェーンブロック34Aのチェーン34
aを下ろしていき、そのフック36aを旧高炉ステーブ
18に引っかける。
Towards the old blast furnace stave 18 on the ore ballast, for example, the chain 34 of the chain block 34A
a is lowered, and the hook 36a is hooked on the old blast furnace stave 18.

【0022】 チェーンブロック34により旧高炉ス
テーブ18を所定高さまで吊り上げた後、作業足場42
の作業者が、図3のS1 方向にチェーン旋回装置38A
を旋回していく。
After the old blast furnace stave 18 is lifted to a predetermined height by the chain block 34, the work scaffold 42 is
Worker of the chain swing device 38A in the direction S 1 of FIG.
Turn around.

【0023】 チェーン旋回装置38Aを搬出口28
Aに対向する位置まで移動させた後、チェーンブロック
34Aの上昇操作により旧高炉ステーブ18を搬出口2
8Aの直下まで吊り上げる。
The chain turning device 38A is attached to the carry-out port 28.
After moving to the position facing A, the old blast furnace stave 18 is carried out by the raising operation of the chain block 34A.
Lift to just below 8A.

【0024】 搬出口28A側のステーブ搬入・搬出
ステージ32を炉内側に進入させ、搬出口28A側の補
助チェーンブロック40の下降操作を行い、前記ステー
ブ搬入・搬出ステージ32上で補助チェーン40aを旧
高炉ステーブ18に引っかける。
The stave carry-in / carry-out stage 32 on the carry-out port 28A side is advanced to the inside of the furnace, and the auxiliary chain block 40 on the carry-out port 28A side is descended to remove the auxiliary chain 40a from the stave carry-in / carry-out stage 32. Hook on the blast furnace stave 18.

【0025】 補助チェーンブロック40の上昇操作
により旧高炉ステーブ18をステーブ搬入・搬出ステー
ジ32上に引き上げる。 ステーブ搬入・搬出ステージ32を炉内から後退さ
せ、旧高炉ステーブ18を炉外に搬出する。
The old blast furnace stave 18 is pulled up onto the stave loading / unloading stage 32 by the raising operation of the auxiliary chain block 40. The stave loading / unloading stage 32 is retracted from the inside of the furnace, and the old blast furnace stave 18 is carried out of the furnace.

【0026】また、新高炉ステーブ18を炉内に配置す
る作業は、以下の手順で行う。 (a) 搬入口26側のステーブ搬入・搬出ステージ32
上に、新高炉ステーブ18を載せる。
Further, the work of disposing the new blast furnace stave 18 in the furnace is performed in the following procedure. (a) Stave loading / unloading stage 32 on the loading port 26 side
The new blast furnace stave 18 is placed on top.

【0027】(b) 前記ステーブ搬入・搬出ステージ3
2を炉内に進入させる。 (c) 搬入口26側の補助チェーンブロック40の下降
操作を行い、前記ステーブ搬入・搬出ステージ32上で
補助チェーン40aを新高炉ステーブ18に引っかけ
る。
(B) The stave loading / unloading stage 3
2 is introduced into the furnace. (c) The auxiliary chain block 40 on the carry-in port 26 side is lowered, and the auxiliary chain 40a is hooked on the new blast furnace stave 18 on the stave carry-in / carry-out stage 32.

【0028】(d) 補助チェーンブロック40の上昇操
作を行い新高炉ステーブ18を僅かに吊り上げるととも
に、前記ステーブ搬入・搬出ステージ32を後退させ
る。 (e) 例えばチェーン旋回装置38Aを搬入口26側ま
で旋回させてくる。
(D) The auxiliary chain block 40 is raised to slightly lift the new blast furnace stave 18 and retract the stave loading / unloading stage 32. (e) For example, the chain turning device 38A is turned to the carry-in port 26 side.

【0029】補助チェーンブロック40の下降操作を行
い、吊り下げた新高炉ステーブ18の上部をチェーン旋
回装置38Aの近くに位置させる。 (f) 前記ステーブ搬入・搬出ステージ32を炉内に進
入し、ステーブ搬入・搬出ステージ32上の作業者がチ
ェーンブロック34Aのチェーン36aのフック36a
を新高炉ステーブ18の上部に引っかける。
The lowering operation of the auxiliary chain block 40 is performed to position the suspended upper part of the new blast furnace stave 18 near the chain turning device 38A. (f) The stave loading / unloading stage 32 enters the furnace, and the worker on the stave loading / unloading stage 32 makes the hook 36a of the chain 36a of the chain block 34A.
Is hooked on the upper part of the new blast furnace stave 18.

【0030】(g) 補助チェーン40aのフックを新高
炉ステーブ18から取り外した後、作業足場42の作業
者が、新高炉ステーブ18の取付け位置の上方となる位
置まで図3のS1 方向或いはS2 方向にチェーン旋回装
置38Aを旋回していく。
(G) After removing the hook of the auxiliary chain 40a from the new blast furnace stave 18, the operator of the work scaffold 42 moves to the position S 1 in FIG. The chain turning device 38A is turned in two directions.

【0031】(h) チェーンブロック34Aの下降操作
により取付け位置の高さまで新高炉ステーブ18を下降
していく。そして、炉内の作業者が、前記取付け位置に
おいて新高炉ステーブ18の取付け作業を行う。
(H) By lowering the chain block 34A, the new blast furnace stave 18 is lowered to the height of the mounting position. Then, the worker in the furnace performs the work of mounting the new blast furnace stave 18 at the mounting position.

【0032】このような高炉ステーブ18の交換作業
を、図3に示すように、一方のチェーン旋回装置38A
が搬入口26から搬出口28Aの範囲をS1 方向及びS
2 方向に旋回させて行い、他方のチェーン旋回装置38
Bが搬入口26から搬出口28Bの範囲をS3 方向及び
4 方向に旋回させて行うと、旧高炉ステーブ18の搬
出量、新高炉ステーブ18の搬入量を増大させて効率良
く高炉ステーブ18の交換作業を行うことができる。
As shown in FIG. 3, the chain slewing device 38A on one side is used to replace the blast furnace stave 18 as described above.
In the range from the carry-in port 26 to the carry-out port 28A in the S 1 direction and S
It is performed by turning in two directions, and the other chain turning device 38
When B rotates in the range from the carry-in port 26 to the carry-out port 28B in the S 3 direction and the S 4 direction, the carry-out amount of the old blast furnace stave 18 and the carry-in amount of the new blast furnace stave 18 are increased to efficiently and efficiently carry out the blast furnace stave 18 Can be replaced.

【0033】また、チェーン旋回装置38A、38B
は、大ベルカップ15の内周面中央部に固定した円環レ
ール46に吊り下げ支持され、支持滑車38cが円環レ
ール46上を転動して旋回動作を行う装置なので、炉内
への配置作業、或いは炉内からの撤去作業を簡単に行う
ことができる。
Further, the chain turning devices 38A, 38B
Is a device that is suspended and supported by an annular rail 46 fixed to the central portion of the inner peripheral surface of the large bell cup 15, and a supporting pulley 38c rolls on the annular rail 46 to perform a turning operation. Arrangement work or removal work from the furnace can be performed easily.

【0034】しかも、チェーン旋回装置38A、38B
は、円環レール46上を転動する支持滑車38cと、上
方から下がってきたチェーン34aと、34bを大ベル
14の円錐外周面14aの径方向外方に導く第1の方向
切換滑車38eと、チェーン34aを大ベル14の下方
に導く第2の方向切換滑車38fと、大ベルカップ15
の内周面に当接して姿勢を保持する姿勢保持車38hと
だけを備えた簡便な構造のフレーム体なので、装置コス
トの大幅な低減化を図ることができる。
Moreover, the chain turning devices 38A, 38B
Is a supporting pulley 38c that rolls on the annular rail 46, a chain 34a that descends from above, and a first direction switching pulley 38e that guides 34b radially outward of the conical outer peripheral surface 14a of the large bell 14. , A second direction switching pulley 38f that guides the chain 34a below the large bell 14 and the large bell cup 15
Since the frame body has a simple structure including only the attitude holding wheel 38h that holds the attitude by contacting the inner peripheral surface of the device, the cost of the device can be significantly reduced.

【0035】したがって、本実施形態は、従来の高炉ス
テーブの交換作業のように交換作業の前段階や後段階の
作業が殆ど必要なく、短時間の間に高炉ステーブの交換
作業を完了することができるとともに、作業コストや装
置コストの低減化を図ることができ、さらには、爆破作
業などのように危険な作業がないので作業安全性をも充
分に図ることができる。
Therefore, in this embodiment, unlike the conventional blast furnace stave replacement work, the work at the pre-stage and the post-stage of the replacement work is hardly required, and the blast furnace stave replacement work can be completed in a short time. In addition, it is possible to reduce the working cost and the device cost, and further, since there is no dangerous work such as blasting work, it is possible to sufficiently work safety.

【0036】なお、本実施形態では、旧高炉ステーブ1
8や新高炉ステーブ18を吊る装置としてチェーンブロ
ック34A、34B、補助チェーンブロック40を使用
したが、これらが本発明の要旨に限定されるものではな
く、例えばワイヤを使用したワイヤ巻き上げ装置を使用
しても、同様の作用効果を得ることができる。
In this embodiment, the old blast furnace stave 1 is used.
8 and the chain blocks 34A, 34B and the auxiliary chain block 40 were used as the device for suspending the new blast furnace stave 18, but these are not limited to the gist of the present invention. For example, a wire winding device using a wire may be used. However, the same effect can be obtained.

【0037】[0037]

【発明の効果】以上説明したように、請求項1に係る高
炉ステーブの交換装置によると、従来の高炉ステーブの
交換作業のように交換作業の前段階や後段階の作業が殆
ど必要なく、短時間の間に高炉ステーブの交換作業を完
了することができるとともに、爆破作業などのように危
険な作業がないので、作業安全性をも充分に図ることが
できる。
As described above, according to the blast furnace stave exchanging device according to the first aspect of the present invention, unlike the conventional blast furnace stave exchanging work, there is almost no need for the pre-stage or post-stage exchanging work, which is short. It is possible to complete the work of replacing the blast furnace stave in a time, and since there is no dangerous work such as the blast work, it is possible to achieve sufficient work safety.

【0038】また、請求項2に係る高炉ステーブの交換
装置によると、吊り材旋回装置は、大ベルカップの内周
面に固定した円環レールに吊り下げ支持されて旋回動作
を行う装置なので、炉内への配置作業、或いは炉内から
の撤去作業を簡単に行うことができ作業コストの低減化
を図ることができる。
Further, according to the blast furnace stave exchanging device of the second aspect, since the suspending member swiveling device is a device which is suspended and supported by an annular rail fixed to the inner peripheral surface of the large bell cup to perform a swiveling operation, The placement work in the furnace or the removal work from the furnace can be easily performed, and the work cost can be reduced.

【0039】また、請求項3に係る高炉ステーブの交換
装置によると、吊り材旋回装置は、支持滑車と、第1及
び第2の方向切換滑車と、姿勢保持車とを備えた簡便な
構造のフレーム体なので、装置コストの低減化を図るこ
とができる。
According to the blast furnace stave exchanging device of the third aspect, the suspension swinging device has a simple structure including a supporting pulley, first and second direction switching pulleys, and an attitude holding wheel. Since it is a frame body, the cost of the device can be reduced.

【0040】さらに、請求項4に係る高炉ステーブの交
換方法によると、一方の吊り材旋回装置が搬入口から一
方の搬出口の間を旋回しながら吊り材昇降装置により高
炉ステーブの交換作業を行い、他方の吊り材旋回装置が
搬入口から他の搬出口の間を旋回しながら吊り材昇降装
置により高炉ステーブの交換作業を行うと、旧高炉ステ
ーブの搬出量、新高炉ステーブの搬入量が増大して高能
率に高炉ステーブの交換作業を行うことができる。
Further, according to the method of exchanging a blast furnace stave according to a fourth aspect of the present invention, the suspending material lifting device moves the blast furnace stave while one suspending material swiveling device swivels between the carry-in port and the one carrying-out port. , If the other lifting material turning device turns the loading material from the loading port to the other loading port while the blast furnace stave is replaced by the lifting material lifting device, the loading amount of the old blast furnace stave and the loading amount of the new blast furnace stave increase. The blast furnace stave replacement work can be performed with high efficiency.

【図面の簡単な説明】[Brief description of drawings]

【図1】本発明に係るステーブ冷却方式の高炉を示す断
面図である。
FIG. 1 is a sectional view showing a stave cooling type blast furnace according to the present invention.

【図2】本発明に係る高炉の炉頂装入部の詳細を示す図
である。
FIG. 2 is a diagram showing details of a furnace top charging section of the blast furnace according to the present invention.

【図3】図2のIII −III 線矢視図である。FIG. 3 is a view taken along the line III-III in FIG.

【図4】本発明に係る吊り材旋回装置の具体的構成を示
す斜視図である。
FIG. 4 is a perspective view showing a specific configuration of a suspension swing device according to the present invention.

【符号の説明】[Explanation of symbols]

12 炉頂装入部 14 大ベル 14a 円錐外周面 15 大ベルカップ 18 高炉ステーブ 26 搬入口 28A、28B 搬出口 34a、34b チェーン(昇降吊り材) 34A、34B チェーンブロック(吊り材昇降装置) 36a、36b フック 38A、38B チェーン旋回装置(吊り材旋回装置) 38c 支持滑車 38e 第1の方向切換滑車 38f 第2の方向切換滑車 38h 姿勢保持車 40 補助チェーンブロック(補助吊り材昇降装置) 40a 補助チェーン(補助吊り材) 46 円環レール P 炉心 12 Furnace top charging section 14 large bell 14a Conical outer peripheral surface 15 large bell cups 18 Blast furnace stave 26 carry-in entrance 28A, 28B carry-out exit 34a, 34b Chain (elevating suspension material) 34A, 34B Chain block (Suspension lifting device) 36a, 36b hook 38A, 38B chain turning device (suspension material turning device) 38c support pulley 38e First direction switching pulley 38f Second direction switching pulley 38h Posture holding car 40 Auxiliary chain block (auxiliary suspension lifting device) 40a Auxiliary chain (auxiliary hanging material) 46 ring rail P core

Claims (4)

【特許請求の範囲】[Claims] 【請求項1】 炉頂装入部近くの炉上部に、新高炉ステ
ーブを炉内に搬入するための搬入口と、使用済みの旧高
炉ステーブを炉外に搬出するための搬出口とを設けた高
炉において高炉ステーブの交換を行う装置であって、 前記炉頂装入部の炉心近くの上方から該炉頂装入部内の
大ベルの円錐外周面に向けて昇降吊り材が下がるように
設置した吊り材昇降装置と、前記大ベルの円錐外周面に
下がってきた前記昇降吊り材を、前記円錐外周面に沿っ
て下側に導いた後に前記大ベルの外周縁から下方に垂下
させるとともに、前記円錐外周面に沿っている前記前記
昇降吊り材を水平旋回させて前記昇降吊り材の下端のフ
ックを炉内壁の所定位置まで移動自在とした吊り材旋回
装置と、前記搬入口及び搬出口に向けて補助吊り材を昇
降自在に配設し、前記昇降吊り材への高炉ステーブの受
渡しを補助する補助吊り材昇降装置と、を備えたことを
特徴とする高炉ステーブの交換装置。
1. An inlet for loading a new blast furnace stave into the furnace and an outlet for discharging a used old blast furnace stave out of the furnace near the top of the furnace. A device for replacing a blast furnace stave in a blast furnace, which is installed such that the lifting suspending member is lowered from above the core of the furnace top charging section toward the outer peripheral surface of the cone of the large bell in the furnace top charging section. With the lifting material lifting device, and the lifting lifting material that has come down to the outer peripheral surface of the cone of the large bell, and led downward from the outer peripheral edge of the large bell after guiding it downward along the outer peripheral surface of the cone, A suspending member swivel device that horizontally swivels the elevating suspending material along the outer peripheral surface of the cone to move the hook at the lower end of the elevating suspending material to a predetermined position on the inner wall of the furnace, and the carry-in port and the carry-out port. Auxiliary suspending material is arranged so that it can be raised and lowered freely. Changer blast furnace stave, characterized in that and a supplementary suspension member lifting device for assisting in delivery of the blast furnace stave to lift suspended material.
【請求項2】 前記吊り材旋回装置を、円筒形状の大ベ
ルカップの内周面に前記炉心と同軸に固定した円環レー
ルから吊り下げ、且つ当該円環レールに沿って旋回する
構造としたことを特徴とする請求項1記載の高炉ステー
ブの交換装置。
2. The suspension swinging device is structured to be suspended from an annular rail fixed coaxially with the core on an inner peripheral surface of a large cylindrical bell cup and to be swung along the annular rail. The blast furnace stave replacement device according to claim 1, wherein:
【請求項3】 前記吊り材旋回装置を、前記円環レール
上を転動する支持滑車と、前記大ベルの円錐外周面に向
けて下がってきた前記昇降吊り材を前記円錐外周面に沿
って下方に導く第1の方向切換滑車と、この第1の方向
切換滑車に支持された前記昇降吊り材を前記大ベルの外
周縁から下方に導く第2の方向切換滑車と、前記大ベル
カップの内周面に当接して装置全体の姿勢を保持する姿
勢保持車とを備えたフレーム体により構成したことを特
徴とする請求項2記載の高炉ステーブの交換装置。
3. A support pulley that rolls on the annular rail of the suspension swing device, and the lifting suspension that descends toward the cone outer peripheral surface of the large bell along the cone outer peripheral surface. A first direction switching pulley for guiding downward, a second direction switching pulley for guiding the lifting suspension member supported by the first direction switching pulley downward from an outer peripheral edge of the large bell, and a large bell cup. The blast furnace stave replacement device according to claim 2, wherein the blast furnace stave replacement device comprises a frame body that is provided with an attitude holding wheel that abuts against an inner peripheral surface of the apparatus and holds the attitude of the entire apparatus.
【請求項4】 請求項1乃至請求項3の何れかに記載の
高炉ステーブの交換装置を使用した高炉ステーブの交換
方法であって、 前記炉頂装入部近くの炉上部に、新高炉ステーブを炉内
に搬入するための一箇所の搬入口を設け、前記炉心を対
称位置とした前記搬入口の反対側に、互いに離間した2
か所の搬出口を設け、前記炉頂装入部の炉心近くの上方
から該炉頂装入部内の大ベルの円錐外周面に向けて2本
の昇降吊り材が下げるように2台の吊り材旋回装置を配
設するとともに、これら吊り材旋回装置を、互いに交錯
しないように前記搬入口と前記搬出口との間を旋回させ
て、前記吊り材昇降装置の作動により旧高炉ステーブ及
び新高炉ステーブの交換作業を行うようにしたことを特
徴とする高炉ステーブの交換方法。
4. A blast furnace stave replacement method using the blast furnace stave replacement device according to claim 1, wherein a new blast furnace stave is provided at an upper part of the furnace near the furnace top charging part. Is provided at one place for loading the gas into the furnace, and is separated from each other on the opposite side of the loading port with the core as a symmetrical position.
Two carry-out ports are provided, and two lifting suspension members are hung so that two lifting suspension members are lowered from above the core of the furnace top charging section toward the outer peripheral surface of the cone of the large bell in the furnace top charging section. A material swirling device is provided, and the suspending material swiveling devices are swung between the carry-in port and the carry-out port so as not to intersect with each other, and the suspending material lifting device operates to operate the old blast furnace stave and the new blast furnace. A blast furnace stave replacement method, characterized in that stave replacement work is performed.
JP23761098A 1998-08-24 1998-08-24 Blast furnace stave replacement device and blast furnace stave replacement method using this device Expired - Fee Related JP3743169B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP23761098A JP3743169B2 (en) 1998-08-24 1998-08-24 Blast furnace stave replacement device and blast furnace stave replacement method using this device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP23761098A JP3743169B2 (en) 1998-08-24 1998-08-24 Blast furnace stave replacement device and blast furnace stave replacement method using this device

Publications (2)

Publication Number Publication Date
JP2000063917A true JP2000063917A (en) 2000-02-29
JP3743169B2 JP3743169B2 (en) 2006-02-08

Family

ID=17017875

Family Applications (1)

Application Number Title Priority Date Filing Date
JP23761098A Expired - Fee Related JP3743169B2 (en) 1998-08-24 1998-08-24 Blast furnace stave replacement device and blast furnace stave replacement method using this device

Country Status (1)

Country Link
JP (1) JP3743169B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102443666A (en) * 2011-12-09 2012-05-09 攀钢集团工程技术有限公司 Device for rapid replacement of blast furnace cooling wall through external jacking without lowering stockline and construction method thereof
CN108342532A (en) * 2018-05-02 2018-07-31 安徽马钢设备检修有限公司 A kind of device and its replacing options for not destroying furnace shell and replacing blast furnace cooling stave

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102443666A (en) * 2011-12-09 2012-05-09 攀钢集团工程技术有限公司 Device for rapid replacement of blast furnace cooling wall through external jacking without lowering stockline and construction method thereof
CN108342532A (en) * 2018-05-02 2018-07-31 安徽马钢设备检修有限公司 A kind of device and its replacing options for not destroying furnace shell and replacing blast furnace cooling stave

Also Published As

Publication number Publication date
JP3743169B2 (en) 2006-02-08

Similar Documents

Publication Publication Date Title
CN105177202A (en) Iron-making blast furnace overhaul method
JP3743169B2 (en) Blast furnace stave replacement device and blast furnace stave replacement method using this device
US4787796A (en) Apparatus for lining the inner wall of a vessel with bricks
KR101252646B1 (en) Pig casting machine and method for manufacturing cold pig iron using the same
US3285390A (en) Apparatus for lining metallurgical vessels, such as converters
US2933918A (en) Method of lining furnaces
JP3767223B2 (en) Blast furnace repair device, method of spraying refractories in the furnace and blast furnace stave recovery method using the same
US2696663A (en) Converter supporting car
KR100958304B1 (en) Relining method of blast furnace
JP4659289B2 (en) Disassembly method of internal combustion type hot stove
JP2533423B2 (en) Electric furnace hearth bottom gas tuyere brick replacement method
US2451679A (en) Furnace lining structure
CN106348152B (en) A kind of suspender and handling method of safety jaw fortune revolving furnace sublance
JPH08260011A (en) Method for demolishing hot stove
US3495812A (en) Apparatus for removing and handling covers for converters or crucibles and for renewing the refractory lining
KR200223752Y1 (en) Capsule for repairing furnace distributor
JP5790608B2 (en) Hot metal desulfurization apparatus and hot metal desulfurization method
JP3911143B2 (en) Converter furnace mouthpiece exchange equipment
JPH01177308A (en) Method and device for discharging coke from blast furnace
KR101203642B1 (en) An apparatus for transferring splash cover
JP2016216792A (en) Device and method for laying brick in blast furnace
JP3591432B2 (en) Dismantling method of blast furnace bottom
JPH0634358Y2 (en) Replacement device for inner wall cooling device of bellless blast furnace
KR20200013463A (en) Processing apparatus of skull and method thereof
KR101767819B1 (en) Appratus for removing skull

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20040301

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20051025

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20051107

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20091125

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20101125

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111125

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20111125

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121125

Year of fee payment: 7

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131125

Year of fee payment: 8

LAPS Cancellation because of no payment of annual fees