JP2000029949A - Method for managing sgml document creating process in addition and removal type publishing operation - Google Patents

Method for managing sgml document creating process in addition and removal type publishing operation

Info

Publication number
JP2000029949A
JP2000029949A JP19836798A JP19836798A JP2000029949A JP 2000029949 A JP2000029949 A JP 2000029949A JP 19836798 A JP19836798 A JP 19836798A JP 19836798 A JP19836798 A JP 19836798A JP 2000029949 A JP2000029949 A JP 2000029949A
Authority
JP
Japan
Prior art keywords
work
editing
points
day
progress
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP19836798A
Other languages
Japanese (ja)
Inventor
Kenji Yano
賢二 矢野
Takeshi Matsushima
剛 松島
Hidekazu Hara
英一 原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP19836798A priority Critical patent/JP2000029949A/en
Publication of JP2000029949A publication Critical patent/JP2000029949A/en
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • General Factory Administration (AREA)
  • Document Processing Apparatus (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

PROBLEM TO BE SOLVED: To prevent operation and operator rearrangement from being delayed by detecting an operation delay from the rate of the points of a progressed workload to the points of the total workload. SOLUTION: A progressed degree table 230 consists of an editing indication day 231, a page number 232, the total workload points 233 calculated in consideration of the time needed for operation by editing objects, progressed operation points 234 calculated as to editing objects which are completed up to proofreading, the degree 235 of progression showing the rate of the progression state points 234 to the total workload points 234, and an operation start day 236 and an end scheduled day 237 indicating the operation start day and end scheduled day of a certain process on an editing indication day which becomes unique depending upon the editing indication day 231 and page number 232. Then what day a reference day corresponds to in the period from the operation start day 236 to the end scheduled day 237, i.e., the number of necessary days is found by editing indication days 231 and page numbers 232 and the degree of progress expected in the schedule is found from the percentage to decide whether or not there is a delayed process.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明はSGML文書データ
の作成、編集、校正を行うSGML文書データ作成作業
に関し、特に国の法令、自治体の例規を扱う加除式出版
業務において複数の工程・計画にわたり、編集対象であ
る編・章・節単位に扱える本文,表,図の一元管理およ
び編集作業量が把握しづらい編集指示に対する工程管理
方法に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an SGML document data creation work for creating, editing, and proofreading SGML document data. The present invention relates to centralized management of text, tables, and figures that can be handled in units of chapters, chapters, and sections to be edited, and to a process management method for editing instructions in which the amount of editing work is difficult to grasp.

【0002】[0002]

【従来の技術】従来の出版用電子情報の作成作業の工程
管理システムの例として、特願平7−175060号公
報がある。このシステムでは、品目ごとに所要日数、納
期を考慮した生産計画の作成、作業負荷の算出による作
業許容範囲の判別を行い、作業の優先順位づけを行える
ものである。
2. Description of the Related Art Japanese Patent Application No. 7-175060 discloses an example of a conventional process management system for creating electronic information for publication. In this system, it is possible to create a production plan in consideration of the required number of days and the delivery date for each item, determine a work allowable range by calculating a work load, and prioritize work.

【0003】しかし、本発明で対象としているSGML
文書データ化した法令文、例規文等においては、本文,
表,図に対する作業効率が異なる為、同じ法令、例規で
も、官報や公報に掲載される公布・改正・廃止等の情報
に応じて作業量も異なってくる。その為、任意の複数の
法令、例規に対する更新作業における作業指示日、作業
開始終了日、担当者等を示した計画の立案では、作業の
量と質を考慮しなければならない。
[0003] However, the SGML that is the object of the present invention.
In the text of laws and regulations and example regulations written as document data, the text,
Since the work efficiency for tables and figures is different, the amount of work also varies according to information such as promulgation, revision, abolition, etc., published in the official gazette or gazette, even for the same laws and regulations. Therefore, the quantity and quality of work must be taken into consideration when drafting a work order that indicates the work instruction date, work start and end date, person in charge, and the like in updating work on a plurality of arbitrary laws and regulations.

【0004】[0004]

【発明が解決しようとする課題】一般的に現状の加除式
出版業務では、官報あるいは公報による国の法令、自治
体の例規の公布・改正・廃止により生じる編集原稿作成
作業において、編集対象原稿に対し朱書き入れを行って
いる。このような朱書き入り編集原稿では、編集入力作
業・校正作業の作業計画を立ててしまっている。つまり
同じ1法令あるいは1例規でも編集文字数、表数、図数
の違いが考慮されておらず、進捗状況も正確なものでは
ない。進捗状況が正確に把握できないことにより作業遅
延、作業者配置替えの遅れにつながる。
Generally, in the present-day publishing and publishing business, in the editing manuscript creation work caused by the promulgation, amendment, or abolition of national laws and regulations and local government regulations in the official gazette or gazette, We write in red. With such redacted manuscripts, a work plan for editing input work and proofreading work has been established. In other words, even in the same law or regulation, differences in the number of edited characters, the number of tables, and the number of figures are not taken into account, and the progress is not accurate. The inability to accurately grasp the progress situation leads to work delays and delays in reassigning workers.

【0005】また、官報や公報は毎日発行され国の法
令、自治体の例規の公布・改正・廃止情報が掲載される
為、例えば一週間単位で順次編集作業指示が出された場
合、その都度作業計画を立てなければならない。そのよ
うな場合、作業計画が複数にわたり、作業者が複数の作
業計画に携わることとなるため、作業計画を複数管理す
る必要がある。現状のワークフローによる進捗管理で
は、1つの作業計画の管理にとどまっており、複数の作
業計画を作成・更新・管理ができていない。
[0005] In addition, since the official gazette and gazette are issued daily and contain information on the promulgation, revision, and abolition of the laws and regulations of the country and the regulations of local governments, for example, if editing work instructions are issued sequentially on a weekly basis, You have to plan. In such a case, there are a plurality of work plans, and a worker is involved in a plurality of work plans. Therefore, it is necessary to manage a plurality of work plans. In the progress management by the current workflow, only one work plan is managed, and a plurality of work plans cannot be created, updated, and managed.

【0006】本発明の目的は、編集対象原稿より作業量
を見積もり、本文あるいは表、図のどの作業対象コンポ
ーネントが多いのかという作業の質を考慮し作業者を割
り当て、作業量を反映させ、ポイント換算から作業計画
を生成することにより進捗状況をポイント数で把握し、
作業遅延、作業者配置替えの遅れを防ぐことにある。ま
た、複数の作業計画を同時に管理することにより、遅延
が生じている計画に別の作業者を追加割り当てすること
により、作業計画からの極端な遅れを防ぐ。つまり、作
業計画の生成・実行、そして進捗更新という一連の進捗
管理を複数の作業計画に対し同時に行うことで上記問題
を解決する。
An object of the present invention is to estimate the amount of work from a document to be edited, assign a worker in consideration of the quality of work, which text, table, or diagram has more work objects, reflect the amount of work, and By generating a work plan from the conversion, you can grasp the progress status in points,
An object of the present invention is to prevent a work delay and a delay in reassigning workers. Also, by simultaneously managing a plurality of work plans, another worker is additionally assigned to a plan in which a delay has occurred, thereby preventing an extreme delay from the work plan. In other words, the above problem is solved by simultaneously performing a series of progress management of generation / execution of a work plan and progress update for a plurality of work plans.

【0007】[0007]

【課題を解決するための手段】本発明のSGML文書作
成工程管理システムは、編集対象の情報を登録する編集
部コンピュータと、編集対象である本文,表,図を作業
所要時間に応じポイント化し、全体の作業量をポイント
で表し、作業者情報ファイルの作業者の単位時間あたり
のポイントから、計画の作成、作業の進捗状況から計画
の再作成を行う生産管理部門コンピュータにより、従来
の法令単位の管理ではなく、ポイントで進捗を管理する
ことにより、全体作業量に対する進捗状況の把握が可能
となる。
An SGML document creation process management system according to the present invention comprises: an editing unit computer for registering information to be edited; a text, a table, and a drawing to be edited are converted into points in accordance with the required time of work; The total amount of work is expressed in points, and the production management department computer that creates a plan from the points per unit time of the worker in the worker information file and re-creates the plan from the work progress status, the conventional law-based By managing the progress not by management but by points, it is possible to grasp the progress of the overall work load.

【0008】編集部、生産管理部門、オペレータ、校正
部のそれぞれのコンピュータから各工程で、編集原稿と
して利用される編集情報ファイルは各コンピュータで共
有可能であり、各工程で行う作業状況は作業情報管理フ
ァイルで管理する。編集指示・編集入力作業・校正作業
の開始・終了の状況を管理する作業情報管理ファイルへ
の情報登録と、各工程で編集原稿として利用される編集
情報ファイルの登録・送信をシステムが行うことで工程
間での作業伝達行為の効率化を図る。
An editing information file used as an editing manuscript can be shared by each computer from each computer of the editing section, production management section, operator, and proofreading section in each process. Manage with management file. The system registers information in the work information management file that manages the start / end status of editing instructions, editing input work, and proofreading work, and registers and sends the editing information file used as the edited manuscript in each process. Improve the efficiency of work transfer between processes.

【0009】また、作業情報管理ファイルを参照するこ
とにより、作業が完了していない計画を更新対象とし、
編集指示日と各工程ごとに計画を更新し複数の計画を同
時に管理・出力できる生産管理部門コンピュータによ
り、作業進捗・作業実績を計画に反映させ作業遅延を最
小限にとどめることが可能となる。
Further, by referring to the work information management file, a plan whose work has not been completed is set as an update target,
The production management department computer, which can update the plan for each editing instruction date and each process and simultaneously manage and output a plurality of plans, reflects work progress and work results in the plan, thereby minimizing work delay.

【0010】以上のことを、作業量の把握の為に行う編
集情報ファイルの作成、ポイント換算、ポイント数や作
業者のスキルを考慮した作業計画の作成、進捗状況参照
による進捗度の算出/作業遅延の検出、作業計画の再作
成という流れで実現する。
The above operations are performed to create an editing information file for grasping the amount of work, to convert points, to create a work plan in consideration of the number of points and the skills of workers, and to calculate / work on the degree of progress by referring to the progress status. It is realized by the flow of delay detection and re-creation of work plan.

【0011】[0011]

【発明の実施の形態】以下、本発明の実施形態につい
て、図面により説明する。
Embodiments of the present invention will be described below with reference to the drawings.

【0012】図1に本発明の1実施例を示す構成図を示
す。本発明のコンピュータシステムは編集部コンピュー
タ(101)、生産管理部門コンピュータ(102)、
オペレータ用コンピュータ(103)、校正部コンピュ
ータ(104)からなり、各コンピュータは通信回線に
より接続されている。但し、1つのコンピュータでの実
現も可能である。またコンピュータネットワークを介し
て、各工程において作業の開始・終了の情報を逐次管理
するための作業情報管理ファイル(105)、作業計画
作成の際参照するために作業者の作業実績を蓄積した作
業者情報ファイル(106)、編集対象の実態であるS
GML化した電子文書データを格納したSGMLデータ
ファイル(107)、各工程で参照可能な編集原稿を格
納した編集情報ファイル(108)、生産管理部門コン
ピュータとオペレータ用コンピュータ、校正部コンピュ
ータで共有可能であり編集入力済SGMLデータが格納
された一時ファイル(109)からなる。
FIG. 1 is a block diagram showing one embodiment of the present invention. The computer system of the present invention includes an editing section computer (101), a production management section computer (102),
It comprises an operator computer (103) and a calibrating unit computer (104), and each computer is connected by a communication line. However, realization with one computer is also possible. Also, a work information management file (105) for sequentially managing work start / end information in each process via a computer network, and a worker who has accumulated work results of the worker for reference when creating a work plan. Information file (106), S which is the actual state of the object to be edited
SGML data file (107) storing electronic document data converted into GML, editing information file (108) storing edited manuscripts that can be referred to in each process, production management department computer and operator computer, and proofing section computer can be shared. It is composed of a temporary file (109) in which SGML data that has been edited and input is stored.

【0013】図2に従って作業情報管理ファイル(10
5)のデータテーブル構成について説明する。作業者情
報管理ファイル(105)は、編集対象テーブル(20
0)、工程状況テーブル(210)、作業者テーブル
(220)、進捗度テーブル(230)からなる。編集
対象テーブル(200)は編集対象の情報を格納する。
データ項目は編集部から編集指示があった年月日を表す
編集指示日(201)、法令名や例規名を示す名称(2
02)、1法令や1例規中の位置を特定する編(20
3)、章(204)、節(205)、款(206)、本
文,表,図を識別する構成要素(207)、構成要素
(207)の作業量を示す作業量(208)、また構成
要素(207)を一意に識別する構成要素ID(20
9)からなる。編集対象テーブル(200)は、編集部
コンピュータ(101)から編集対象の情報が登録され
る。また、各コンピュータから編集対象の情報をキーと
して作業情報管理ファイル(105)を検索する際に参
照される。
According to FIG. 2, the work information management file (10
The data table configuration of 5) will be described. The worker information management file (105) stores the edit target table (20).
0), a process status table (210), an operator table (220), and a progress degree table (230). The edit target table (200) stores information to be edited.
The data item is an edit instruction date (201) indicating the date when the edit instruction was issued from the edit unit, and a name (2) indicating the name of a law or regulation.
02) Part that specifies the position in one law or one regulation (20
3), a chapter (204), a section (205), a clause (206), a component (207) for identifying a text, a table, and a figure, a workload (208) indicating a workload of the component (207), and a configuration Component ID (20) that uniquely identifies the element (207)
9). In the editing target table (200), information to be edited is registered from the editing unit computer (101). It is also referred to when searching the work information management file (105) from each computer using the information to be edited as a key.

【0014】次に工程状況テーブル(210)のデータ
項目は編集指示日(211)、構成要素ID(212)
をキーに作業工程を項番付けした項番(213)、作業
工程を番号で表す工程番号(214)、作業が完了した
か、つまり校正まで完了しSGMLデータファイル(1
07)を更新し終えたかを“0”を未完了、“1”を完
了で表した完了フラグ(215)からなる。なお、工程
番号(214)は“1”が編集部コンピュータによる作
業工程、“2”が生産管理部門コンピュータによる作業
工程、“3”がオペレータ用コンピュータによる作業工
程、“4”が校正部コンピュータによる作業工程を表し
ている。
Next, the data items of the process status table (210) are the editing instruction date (211) and the component ID (212).
The item number (213) in which the work process is numbered using the key as a key, the process number (214) representing the work process by number, whether the work has been completed, that is, the calibration has been completed and the SGML data file (1)
07), a completion flag (215) indicating "0" is not completed and "1" is completed indicates whether or not the update has been completed. In the process number (214), “1” is a work process by the editing computer, “2” is a work process by the computer of the production management department, “3” is a work process by the computer for the operator, and “4” is a work process by the computer of the calibration unit. It represents a work process.

【0015】また縦(列)の構成要素ID(209)と
横(行)の項番(213)で定まる進捗状況欄(21
6)へは、“1”を作業中、“2”を作業完了とし、
“1”、“2”のいずれかで進捗状況を管理する。ここ
で、工程状況テーブル(210)は編集対象テーブル
(200)と共通のデータ項目として編集指示日(21
1)と構成要素ID(212)をもつことにより編集対
象テーブル(210)と関係づけられている。工程状況
テーブル(210)は各コンピュータから工程番号(2
14)、進捗状況(216)が登録される。また進捗状
況を管理する生産管理部門コンピュータ(102)から
参照される。
A progress column (21) determined by a vertical (column) component ID (209) and a horizontal (row) item number (213)
To 6), “1” is working, “2” is work completed,
The progress is managed by either “1” or “2”. Here, the process status table (210) is a data item common to the edit target table (200) and is designated as the edit instruction date (21).
1) and the component ID (212) are associated with the edit target table (210). The process status table (210) stores the process number (2) from each computer.
14) The progress (216) is registered. It is also referred to from the production management computer (102) that manages the progress.

【0016】次に作業者テーブル(220)は構成要素
ID(221)と項番(222)の他に、工程状況テー
ブル(210)で構成要素ID(212)と項番(21
3)で一意になる工程の作業担当者を示す担当者(22
3)、担当者(223)が作業に要した時間示す作業時
間(224)からなる。ここで作業者テーブル(22
0)は工程状況テーブル(210)と共通のデータ項目
として構成要素ID(221)と項番(222)をもつ
ことにより工程状況テーブル(210)と関係づけられ
ている。作業者テーブル(220)は、計画を作成する
生産管理部門コンピュータ(102)により担当者(2
23)が登録され、オペレータ用コンピュータ(10
3)により入力作業終了時に作業時間(224)が登録
される。
Next, in addition to the component ID (221) and the item number (222), the worker table (220) includes the component ID (212) and the item number (21) in the process status table (210).
A person (22) indicating the person in charge of the process that is unique in 3)
3) The work time (224) indicates the time required for the work by the person in charge (223). Here, the operator table (22
0) is related to the process status table (210) by having a component ID (221) and an item number (222) as common data items with the process status table (210). The worker table (220) is assigned to the person in charge (2) by the production management computer (102) for creating a plan.
23) is registered and the operator computer (10) is registered.
The work time (224) is registered at the end of the input work according to 3).

【0017】また、生産管理部門コンピュータ(10
2)により担当者(223)は参照される。次に進捗度
テーブル(230)は編集指示日(231)、項番(2
32)の他に、編集対象ごとに作業に要した時間を考慮
しポイント化した全体作業量ポイント(233)、校正
までが完了した編集対象をポイント化した進捗作業ポイ
ント(234)、全体作業量ポイント(234)に対す
る進捗状況ポイント(234)の割合を示した進捗度
(235)、編集指示日(231)と項番(232)で
一意になるある編集指示日のある工程の作業開始日、終
了予定日を示す作業開始日(236)、終了予定日(2
37)からなる。
Also, the production management department computer (10
The person in charge (223) is referred to by 2). Next, the progress degree table (230) includes an editing instruction date (231), an item number (2
32) In addition to the above, the total work point (233) which is converted into a point in consideration of the time required for the work for each edit target, the progress work point (234) which is converted to the edit target which has been completed up to the proof, the total work amount A degree of progress (235) indicating the ratio of the progress status point (234) to the point (234), a work start date of a process with a certain edit instruction date unique by an edit instruction date (231) and an item number (232), Work start date (236) indicating the scheduled end date, scheduled end date (2
37).

【0018】なお、ポイントは例えば本文300文字を
1pt、表・図1個を1ptとして全体作業量をポイン
ト換算する。進捗度テーブル(230)は、生産管理部
門コンピュータ(102)により全体作業量ポイント
(233)、作業開始日(236)、終了予定日(23
7)が登録される。進捗作業ポイント(234)は入力
オペレータ用コンピュータ(103)、校正部コンピュ
ータ(104)から逐次登録される工程状況テーブル
(210)の進捗状況欄(216)が作業完了を示す
“2”の構成要素ID(212)の作業量(208)を
ポイント化し更新される。
The points are converted into points by, for example, setting 300 characters of the text as 1 pt and a table and one figure as 1 pt. The progress degree table (230) is calculated by the production management section computer (102) using the total work amount point (233), the work start date (236), and the scheduled end date (23).
7) is registered. The progress work point (234) is a component of "2" in the progress status column (216) of the process status table (210) sequentially registered from the input operator computer (103) and the calibration unit computer (104). The work amount (208) of the ID (212) is pointed and updated.

【0019】次に計画作成の際に参照する作業者情報フ
ァイル(106)について図3に従い説明する。作業者
情報ファイル(106)は図3に示すように氏名(30
1)、本文、表中文書あるいは表、図のいずれかを示す
編集対象(302)、全作業時間(303)、全作業時
間内でこなした作業量を示す実績(304)、300文字
を1pt、表・図1個を1ptとして編集対象(302)ご
とにポイント換算したポイント(305)、単位時間あ
たりの作業量(ポイント数)を示す作業率(306)を
有する。一日一回バッチ処理で図2の作業情報管理ファ
イル(105)の編集対象テーブル(200)、作業者
テーブル(220)から作業者情報ファイルの該当する
担当者の編集対象(302)、全作業時間(303)、
実績(304)を更新する。また、実績をポイント換算
したポイント(305)を全作業時間で割り出した作業
率が登録される。
Next, the worker information file (106) referred to when creating a plan will be described with reference to FIG. The worker information file (106) stores the name (30) as shown in FIG.
1), an edit target (302) indicating any of a text, a document in a table or a table, and a figure; a total work time (303); an achievement (304) indicating the amount of work performed within the total work time; The table (1) has a point (305) converted into a point for each editing target (302) with 1 pt as a point, and a work rate (306) indicating a work amount (number of points) per unit time. In the batch processing once a day, the edit target table (200) of the work information management file (105) in FIG. 2 and the edit target (302) of the corresponding person in the worker information file from the worker table (220), all work Time (303),
The result (304) is updated. In addition, a work rate obtained by calculating the points (305) obtained by converting the results into points by the total work time is registered.

【0020】図4に従ってSGMLデータのデータテー
ブル構成について説明する。データ項目は法令名や例規
名を示す名称(401)、法令や例規が公布された年月
日を表す公布年月日(402)、1法令や1例規中の位
置を特定する編(403)、章(404)、節(40
5)、款(406)、本文や表,図のいずれかを識別す
る構成要素(407)、構成要素ID(408)と、本
文や表、図自体をデータとしてもつ実体(409)から
構成される。レイアウトがある程度定まった国の法令や
自治体の例規はSGMLで表現するのに適しており、S
GMLで表現することにより法令や例規を編・章・節・
款という単位の本文、また表、図という構成要素で管理
することが可能となる。
The data table configuration of the SGML data will be described with reference to FIG. The data item is a name indicating the name of the law or regulation (401), the promulgation date (402) indicating the date on which the law or regulation was promulgated, and the edition specifying the position in one law or regulation (403) , Chapter (404), section (40
5), a clause (406), a component (407) for identifying one of a text, a table, and a figure, a component ID (408), and an entity (409) having the text, table, and the figure itself as data. You. The laws and regulations of local governments and the rules of local governments whose layout is determined to some extent are suitable for expressing in SGML.
By expressing in GML, laws and regulations can be edited, chapters, sections,
It can be managed with the text of a unit called a clause and the constituent elements of a table and a figure.

【0021】図5に従って編集情報ファイル(108)
のデータテーブル構成について説明する。編集情報ファ
イル(108)は原稿テーブル(500)と宛先テーブ
ル(520)からなる。原稿テーブル(500)は編集
指示日(501)、名称(502)、法令・例規文書の
中での編集対象位置を示す編・章・節(503)、編集
対象を示す編集対象区分(504)、公布・改正・廃止
のいずれかを示す編集区分(506)、表あるいは図番
号を示す編集対象(507)、編集前後の記述を示す編
集前(508)、編集後(509)、ページ数(51
0)、編集回数(511)、校正回数(512)、校了
したかどうかを示す校了フラグ(513)からなる。ま
た宛先テーブル(520)はキーとなる編集指示日(5
21)と次工程の宛先を示す宛先(522)からなる。
本発明では、原稿テーブル(500)は編集部コンピュ
ータ(101)から登録され、宛先テーブル(520)
の宛先(522)は各コンピュータから登録される。
According to FIG. 5, the editing information file (108)
The data table configuration will be described. The editing information file (108) includes a document table (500) and a destination table (520). The manuscript table (500) includes an editing instruction date (501), a name (502), a chapter / section / section (503) indicating a position to be edited in a law / regulation document, and an editing target category (504) indicating an editing target. , An edit category (506) indicating any of promulgation, revision, or abolition; an edit target (507) indicating a table or figure number; a pre-edit (508) indicating a description before and after editing; a post-edit (509); 51
0), the number of edits (511), the number of proofreading (512), and a completion flag (513) indicating whether or not the completion of the completion. The destination table (520) stores the key of the edit instruction date (5
21) and a destination (522) indicating the destination of the next process.
In the present invention, the original table (500) is registered from the editing unit computer (101), and the destination table (520) is registered.
Is registered from each computer.

【0022】次に図6に従って編集部コンピュータ(1
01)について説明する。編集部コンピュータ(10
1)は始めに編集者が編集情報ファイル(108)を作
成するための入力エリアを表示する(ステップ60
1)。入力後、登録有無を促し(ステップ602)、登
録するするかどうかを判別する(ステップ603)。登
録しない場合は終了とする。登録する場合は作業情報管
理ファイル(105)の編集対象テーブル(200)の
編集指示日(201)、名称(202)、編(20
3)、章(204)、節(205)、款(206)、構
成要素(207)、作業量(208)を登録する。さら
に工程状況テーブル(210)の項番1(211)の工
程番号(212)に作業工程が編集部コンピュータによ
る作業工程であることを示す“1”を設定し、編集指示
日(201)と項番(211)で定まる進捗状況(21
4)に作業が完了したことを示す“2”を登録する(ス
テップ604)。登録処理は全レコードに対して行う
(ステップ605)。次に図5に示す編集情報ファイル
(108)の宛先テーブル(520)の宛先(521)
に次工程が生産管理部門であることを示す“1”を設定
して登録する(ステップ606)。
Next, referring to FIG. 6, the editing unit computer (1)
01) will be described. Editing department computer (10
1) First, an input area for an editor to create an editing information file (108) is displayed (step 60).
1). After the input, the user is prompted for registration (step 602), and it is determined whether or not to register (step 603). If you do not register, end. When registering, the editing instruction date (201), name (202), edition (20) of the editing target table (200) of the work information management file (105)
3) Register the chapter (204), section (205), clause (206), component (207), and workload (208). Further, the process number (212) of the item number 1 (211) of the process status table (210) is set to “1” indicating that the work process is a work process by the editing unit computer, and the edit instruction date (201) and the item are set. Progress (21)
"2" indicating that the work is completed is registered in 4) (step 604). The registration process is performed for all records (step 605). Next, the destination (521) of the destination table (520) of the editing information file (108) shown in FIG.
Then, "1" indicating that the next process is the production management section is set and registered (step 606).

【0023】次に図7に従って生産管理部門コンピュー
タ(102)について説明する。始めに編集情報ファイ
ル(108)から宛先(522)が“1”の編集情報フ
ァイルを読み込み(ステップ701)、編集指示日(5
01)、編集回数(510)から編集指示日(211)
と項番(3n+2)(213)をキーとして工程状況テーブ
ルの工程番号(214)に作業工程が生産管理部門コン
ピュータによる作業工程であることを示す“2”を設定
し、進捗状況(214)に作業中であることを示す
“1”を登録する(ステップ702)。なお、nは編集
回数を示す。
Next, the production management computer (102) will be described with reference to FIG. First, the editing information file whose destination (522) is “1” is read from the editing information file (108) (step 701), and the editing instruction date (5
01), the editing instruction date (211) from the editing count (510)
And the item number (3n + 2) (213) as a key, "2" indicating that the work process is a work process by the computer of the production management department is set in the process number (214) of the process status table, and the progress status (214 ) Is registered with "1" indicating that the operation is in progress (step 702). Note that n indicates the number of edits.

【0024】次に読み込だ編集情報ファイル(108)
の校了フラグ(512)が校了であるかどうかを判定し
(ステップ703)、校了であることを示す“1”であ
るとき、オペレータ用コンピュータ(103)より保存
された該当するSGMLデータを読み込み、SGMLデ
ータファイル(107)に登録し更新する(ステップ7
04)。次に作業情報管理ファイル(105)の編集対
象テーブル(200)の編集指示日(201)、名称
(202)、編(203)、章(204)、節(20
5)、款(206)、構成要素(207)をキーとし
て、工程状況テーブル(210)の完了フラグ(21
5)に“1”を登録する(ステップ705)。
Next, the read editing information file (108)
It is determined whether or not the school completion flag (512) is “Completion” (step 703). If “1” indicating the completion of school completion, the corresponding SGML data stored by the operator computer (103) is determined. Is read, registered and updated in the SGML data file (107) (step 7).
04). Next, the editing instruction date (201), name (202), edition (203), chapter (204), section (20) of the editing target table (200) of the work information management file (105)
5), using the clause (206) and the component (207) as keys, the completion flag (21) in the process status table (210).
"1" is registered in 5) (step 705).

【0025】校了フラグ(512)が“1”でないと
き、本文300文字を1pt、表・図1個を1ptとし
て、読み込んだ編集情報ファイル(108)の編集後
(509)をポイント換算する(ステップ706)。ス
テップ703からステップ706は読み込んだ編集情報
の全レコードに対して繰り返し行う(ステップ70
7)。全レコードの編集後(509)をポイント換算
後、編集対象全体のポイント数としてステップ706で
求めた各編集対象ごとのポイント数の総合計を求める
(ステップ708)。この総合計のポイント数から、そ
れに対する進捗状況参照日現在の進捗度を求め作業遅延
の検出を行い、作業計画の見直しに役立てる。
When the end-of-completion flag (512) is not "1", the edited text (108) of the read editing information file (108) is converted into points by setting 300 characters of the text as 1 pt and the table / FIG. Step 706). Steps 703 to 706 are repeatedly performed for all records of the read editing information (step 70).
7). After editing all the records (509), the points are converted, and the total number of points for each editing object obtained in step 706 is obtained as the number of points of the entire editing object (step 708). Based on the total points, the degree of progress as of the reference date of the progress is calculated to detect the work delay, which is useful for reviewing the work plan.

【0026】次に作業者情報ファイル(106)から図
3に示す作業者の氏名(301)、作業率(306)を
読み込む(ステップ709)。次に全体作業量のポイン
トを作業担当者の作業率の合計で割り、一日の作業時間
を例えば7時間として所要日数を求め、終了予定日を定
義する(ステップ710)。次に図2の作業者テーブル
(220)、進捗度テーブル(230)の編集指示日
(231)、項番(232)、担当者(223)、作業
開始日(236)、終了予定日(237)の情報を参照
し、ある編集指示日のある工程は作業期間がいつからい
つまでで担当者は誰である、といった計画を表示する
(ステップ711)。
Next, the worker name (301) and work rate (306) shown in FIG. 3 are read from the worker information file (106) (step 709). Next, the points of the total work amount are divided by the total work rate of the worker, the required number of days is calculated, for example, with seven hours per day, and the expected end date is defined (step 710). Next, the editing instruction date (231), the item number (232), the person in charge (223), the work start date (236), and the scheduled end date (237) of the worker table (220) and the progress table (230) in FIG. With reference to the information of (1), a plan is displayed such that the work period of a certain process on a certain editing instruction date is from when to who is the person in charge (step 711).

【0027】次に作業情報管理ファイル(105)に登
録するか利用者に指示の入力を促し(ステップ71
2)、登録する場合、編集情報管理ファイル(105)
の編集対象テーブル(200)の編集指示日(20
1)、名称(202)、編(203)、章(204)、
節(205)、款(206)、構成要素(207)をキ
ーとして、工程状況テーブル(210)の項番(3n+2)
(213)の進捗状況(216)に作業が完了したこと
を示す“2”を登録し終了する(ステップ713)。n
は読み込んだ編集情報ファイルの編集回数(511)の
値である。ステップ702からステップ713は1編集
情報ファイル単位に行われ、読み込んだ編集情報ファイ
ルの数だけ繰り返される(ステップ714)。
Next, registration in the work information management file (105) or prompting the user to input an instruction (step 71)
2) When registering, edit information management file (105)
Edit target date (20) of the edit target table (200)
1), name (202), edition (203), chapter (204),
Item number (3n + 2) of the process status table (210) using the clause (205), clause (206), and component (207) as keys
“2” indicating that the work is completed is registered in the progress status (216) of (213), and the process is terminated (step 713). n
Is the value of the number of edits (511) of the read edit information file. Steps 702 to 713 are performed for each edit information file, and are repeated by the number of read edit information files (step 714).

【0028】また、図8に従って生産管理部門コンピュ
ータで行う進捗参照について説明する。始めに図2に示
す作業情報管理ファイル(105)の進捗度テーブル
(230)から編集指示日(231)、項番(23
2)、進捗度(235)、作業開始日(236)、終了
予定日(237)を読み込む(ステップ801)。次
に、各編集指示日(231)、項番(232)別に作業
開始日(236)から終了予定日(237)の期間つま
り所要日数に対し、参照日が何日目にあたるかを求め、
そのパーセンテージからスケジュール上の進捗予定度を
求める(ステップ802)。進捗予定度は、作業計画の
見直しの指標となるものである。次に各編集指示日(2
31)、項番(232)ごとに求めた進捗予定度と読み
込んだ実際の進捗度(235)を比較する(ステップ8
04)。
Further, referring to FIG. 8, the progress reference performed by the production management section computer will be described. First, from the progress table (230) of the work information management file (105) shown in FIG. 2, the editing instruction date (231) and the item number (23)
2) The degree of progress (235), the work start date (236), and the scheduled end date (237) are read (step 801). Next, for each of the editing instruction date (231) and the item number (232), the day from the work start date (236) to the scheduled end date (237), that is, the required number of days, is calculated,
From the percentage, the degree of scheduled progress on the schedule is obtained (step 802). The degree of progress is an index for reviewing the work plan. Next, on each editing instruction date (2
31), and compare the scheduled progress degree obtained for each item number (232) with the read actual progress degree (235) (step 8).
04).

【0029】そして遅延工程が存在するかを判定する
(ステップ805)。もし遅延工程が存在しなければ終
了となる。遅延工程が存在する場合、遅延工程を知らせ
るメッセージを表示する(ステップ806)。さらに計
画の見直しをするかどうかのメッセージを出力する(ス
テップ807)。配置替えを行うか判別し(ステップ8
08)、もし作業者の配置替えを行わない場合は終了と
する。計画を見直す場合、遅延工程のうち本文,表,図
ごとに図2の工程状況テーブル(210)の完了フラグ
(215)と編集対象テーブル(200)の作業量(2
08)を参照し、構成要素ごとの進捗度ポイントを計算
する(ステップ809)。
Then, it is determined whether there is a delay step (step 805). If there is no delay step, the process ends. If a delay step exists, a message indicating the delay step is displayed (step 806). Further, a message asking whether to review the plan is output (step 807). It is determined whether or not to perform the rearrangement (step 8
08) If the rearrangement of the workers is not performed, the process ends. When reviewing the plan, the completion flag (215) of the process status table (210) in FIG. 2 and the work amount (2
08), a progress point for each component is calculated (step 809).

【0030】これにより本文,表,図のうちどの作業が
遅れているのかを求める。計算した進捗度ポイントをも
とに進捗の良い計画の工程から、本文,表,図のうち遅
れている作業を得意とする担当者を作業者情報ファイル
(106)より検索し、遅延工程に配置替えを行う(ス
テップ810)。配置替えは図2の該当する編集指示日
(211)、項番(213)から作業者テーブル(22
0)の担当者(223)の情報を別の担当者の名前に書
き換えるあるいは別の担当者を追加する。書き換えた結
果を新しい結果として、図2の作業者テーブル(22
0)、進捗度テーブル(230)の編集指示日(23
1)、項番(232)、担当者(223)、作業開始日
(236)、終了予定日(237)の情報を参照し、あ
る編集指示日のある工程は作業期間がいつからいつまで
で担当者は誰である、といった計画を再表示する(ステ
ップ811)。
In this way, it is determined which of the text, the table, and the drawing is delayed. Based on the calculated progress points, from the planning process with the best progress, the person who is good at the delayed work is searched from the worker information file (106) out of the text, table, and figure, and placed in the delayed process. The replacement is performed (step 810). The rearrangement is performed from the corresponding editing instruction date (211) and item number (213) in FIG.
The information of the person in charge (223) of (0) is rewritten to another person's name or another person is added. The rewritten result is set as a new result, and the operator table (22) in FIG.
0), the editing instruction date (23) of the progress table (230)
1), the item number (232), the person in charge (223), the work start date (236), and the scheduled end date (237) are referred to. Is displayed again (step 811).

【0031】次に図9に従ってオペレータ用コンピュー
タ(103)について説明する。始めに作業情報ファイ
ル(108)から宛先(522)が“2”の編集情報を
読み込む(ステップ901)。次に読み込んだ編集情報
の編集指示日(501)、編集回数(510)から、編
集指示日(211)と項番(3n+3)(213)をキーと
して工程状況テーブルの工程番号(214)に作業工程
がオペレータ用コンピュータによる作業工程であること
を示す“3”を設定する。また進捗状況(216)に作
業中であることを示す“1”を登録する(ステップ90
2)。次に読み込んだ編集情報の校了フラグ(512)
が“0”がどうかを判定する(ステップ903)。校了
フラグ(512)が“0”でないとき、つまり修正依頼
でないときSGMLデータファイル(107)から編集
対象のSGMLデータを読み込む(ステップ904)。
校了フラグ(512)が“1”のとき、つまり修正依頼
のとき、一時ファイル(109)から修正対象のSGM
Lデータを読み込む(ステップ905)。
Next, the operator computer (103) will be described with reference to FIG. First, the editing information whose destination (522) is "2" is read from the work information file (108) (step 901). Next, based on the edit instruction date (501) and the number of edits (510) of the read edit information, the process instruction table (211) and the item number (3n + 3) (213) are used as keys to set the process number (214) in the process status table. Is set to "3" indicating that the work process is a work process by the computer for the operator. Further, "1" indicating that the work is being performed is registered in the progress (216) (step 90).
2). Next, the completion flag of the read editing information (512)
Is determined to be "0" (step 903). If the school completion flag (512) is not "0", that is, if it is not a correction request, the SGML data to be edited is read from the SGML data file (107) (step 904).
When the school completion flag (512) is "1", that is, when a correction request is made, the SGM to be corrected is read from the temporary file (109).
The L data is read (step 905).

【0032】次に作業開始時間を記憶し(ステップ90
6)、SGMLエディタを起動する(ステップ90
7)。編集後保存するか利用者に指示の入力を促し(ス
テップ908)、保存しない場合SGMLエディタを終
了する。保存する場合、一時ファイル(109)に保存
する(ステップ909)。保存後、作業終了時間を記憶
(ステップ910)する。次に読み込んだ編集情報ファ
イル(108)の編集回数(510)に1を加算する
(ステップ911)。次に編集情報管理ファイル(10
5)の編集対象テーブル(200)の編集指示日(20
1)、名称(202)、編(203)、章(204)、
節(205)、款(206)、構成要素(207)をキ
ーとして、工程状況テーブル(210)の項番(3n)
(213)の進捗状況(216)に作業が完了したこと
を示す“2”を登録し終了する(ステップ912)。n
は読み込んだ編集情報ファイル(108)の編集回数
(510)の値である。
Next, the work start time is stored (step 90).
6), start the SGML editor (step 90)
7). After editing, save or prompt the user to input an instruction (step 908), and if not save, terminate the SGML editor. When saving, it is saved in a temporary file (109) (step 909). After saving, the work end time is stored (step 910). Next, 1 is added to the number of edits (510) of the read edit information file (108) (step 911). Next, the editing information management file (10
5) Edit instruction date (20) of edit target table (200)
1), name (202), edition (203), chapter (204),
Item number (3n) of the process status table (210) using the clause (205), clause (206), and component (207) as keys
“2” indicating the completion of the work is registered in the progress status (216) of (213), and the process is terminated (step 912). n
Is the value of the number of edits (510) of the read edit information file (108).

【0033】以上ステップ903からステップ912ま
での処理を編集対象分繰り返す(ステップ913)。全
編集が終了後、編集情報の宛先(522)に次工程であ
る校正部コンピュータ(103)による作業工程を示す
“3”を設定して編集情報ファイル(108)に登録す
る(ステップ914)。
The processing from step 903 to step 912 is repeated for the editing target (step 913). After all editing is completed, "3" indicating the work process by the proofreading computer (103), which is the next process, is set as the destination (522) of the edit information and registered in the edit information file (108) (step 914).

【0034】次に図11に従って校正部コンピュータ
(104)について説明する。始めに編集情報ファイル
(108)から宛先(522)が“3”の編集情報ファ
イルを読み込む(ステップ1001)。読み込んだ編集
情報ファイル(108)の編集指示日(501)、編集
回数(510)から作業情報管理ファイル(105)の
編集指示日(211)と項番(3n+1)(212)をキー
として工程状況テーブル(210)の工程番号(21
4)に作業工程が校正部コンピュータによる作業工程で
あることを示す“4”を設定し、進捗状況(216)に
作業中であることを示す“1”を登録する(ステップ1
002)。なお、nは編集回数を示す。次に一時ファイ
ル(109)から編集済みSGMLデータを読み込む
(ステップ1003)。次に読み込んだ編集済みSGM
Lデータを表示用データに変換する(ステップ100
4)。次に、SGMLデータファイル(107)より編
編集情報ファイル(108)から宛先(522)が
“3”の編集情報ファイルを読み込む(ステップ100
1)。読み込んだ編集情報ファイル(108)の編集指
示日(501)、編集回数(510)から作業情報管理
ファイル(105)の編集指示日(211)と項番(3n
+1)(212)をキーとして工程状況テーブル(21
0)の工程番号(214)に作業工程が校正部コンピュ
ータによる作業工程であることを示す“4”を設定し、
進捗状況(216)に作業中であることを示す“1”を
登録する(ステップ1002)。なお、nは編集回数を
示す。次に一時ファイル(109)から編集済みSGM
Lデータを読み込む(ステップ1003)。次に読み込
んだ編集済みSGMLデータを表示用データに変換する
(ステップ1004)。次に、SGMLデータファイル
(107)より編集前のSGMLデータを読み込み(ス
テップ1005)、同様に表示用データに変換する(ス
テップ1006)。
Next, the calibration section computer (104) will be described with reference to FIG. First, the editing information file whose destination (522) is "3" is read from the editing information file (108) (step 1001). Based on the edit instruction date (501) and the number of edits (510) of the read edit information file (108), the edit instruction date (211) and the item number (3n + 1) (212) of the work information management file (105) are used as keys. The process number (21) in the process status table (210)
4) is set to 4) indicating that the work process is a work process by the calibrating unit computer, and "1" indicating work is registered in the progress (216) (step 1).
002). Note that n indicates the number of edits. Next, the edited SGML data is read from the temporary file (109) (step 1003). Next read edited SGM
The L data is converted to display data (step 100)
4). Next, the editing information file whose destination (522) is "3" is read from the editing data file (108) from the SGML data file (107) (step 100).
1). Based on the edit instruction date (501) and the number of edits (510) of the read edit information file (108), the edit instruction date (211) of the work information management file (105) and the item number (3n)
+1) (212) as a key and the process status table (21)
In the process number (214) of 0), “4” indicating that the work process is a work process by the calibration unit computer is set,
"1" indicating that the work is being performed is registered in the progress status (216) (step 1002). Note that n indicates the number of edits. Next, the edited SGM from the temporary file (109)
The L data is read (step 1003). Next, the read edited SGML data is converted into display data (step 1004). Next, SGML data before editing is read from the SGML data file (107) (step 1005), and similarly converted into display data (step 1006).

【0035】変換後、編集前後のSGMLデータを差分
表示する(ステップ1007)。例えば、編集前後の本
文を並べて表示させ、編集前の情報を赤、編集後の情報
を緑というような色分けをして表示させるなどが考えら
れる。修正有無の確認メッセージを出力し(ステップ1
008)、修正が必要な場合、編集情報ファイル(10
8)の校了フラグ(512)に“0”を設定する(ステ
ップ1010)。修正が必要でない場合、編集情報ファ
イル(108)の校了フラグ(512)に“1”を設定
する(ステップ1011)。次に編集情報ファイル(1
08)の校正回数(511)に1を加算する(ステップ
1012)。さらに編集情報管理ファイル(105)の
編集対象テーブル(200)の編集指示日(201)、
名称(202)、編(203)、章(204)、節(2
05)、款(206)、構成要素(207)をキーとし
て、工程状況テーブル(210)の項番(3n+1)(21
3)の進捗状況欄(216)に作業が完了したことを示
す“2”を登録する(ステップ1013)。以上のステ
ップ1004からステップ1013は編集対象ごとに行
い、編集対象分繰り返される(ステップ1014)。全
件校正作業が終了したら宛先(522)に“1”を設定
して編集情報を編集情報ファイル(108)に登録する
(ステップ1015)。
After the conversion, the SGML data before and after editing is displayed as a difference (step 1007). For example, the text before and after editing may be displayed side by side, and the information before editing may be displayed in red, and the information after editing may be displayed in green. Output a confirmation message as to whether or not there is any modification (Step 1
008), if correction is required, the editing information file (10
The completion flag (512) of 8) is set to "0" (step 1010). If the correction is not necessary, "1" is set to the completion flag (512) of the editing information file (108) (step 1011). Next, edit information file (1
08 is added to the number of calibrations (511) (step 1012). Further, an editing instruction date (201) of the editing target table (200) of the editing information management file (105),
Name (202), Chapter (203), Chapter (204), Section (2
05), clause (206), and component (207) as keys, item numbers (3n + 1) (21) of process status table (210)
"2" indicating that the work is completed is registered in the progress status column (216) of 3) (step 1013). The above steps 1004 to 1013 are performed for each editing target, and are repeated for the editing target (step 1014). When the proofreading operation is completed, "1" is set to the destination (522), and the editing information is registered in the editing information file (108) (step 1015).

【0036】[0036]

【発明の効果】以上、説明したように本発明によれば生
産管理部門コンピュータ(102)、編集情報ファイル
(108)、作業者情報ファイル(106)を備えてお
り、編集対象の作業量をポイント換算し作業労力の異な
る本文,表,図を同等に扱う。それに伴い全体作業量の
ポイントに対する進捗作業量のポイントの割合である進
捗度で管理することにより、精度の良い進捗状況の把握
が可能となる。本発明では、計画作成・計画実行・進捗
更新の一連の工程管理を一貫してサポートすることによ
り冗長になりやすい出版業務の工程管理をポイント数に
よる進捗度で管理を行い、遅延工程に対してポイント換
算から遅延対象・担当者を検出し、作業者の割り当て変
更を作業計画にフィードバックすることによって極端な
工程遅延を防げる。
As described above, according to the present invention, the production management department computer (102), the editing information file (108), and the worker information file (106) are provided, and the amount of work to be edited is pointed out. Texts, tables, and figures with different work labor are treated equally. Along with this, by managing with the degree of progress which is the ratio of the points of the progress work amount to the points of the total work amount, it is possible to grasp the progress state with high accuracy. In the present invention, by continuously supporting a series of process management of planning, execution of a plan, and progress update, the process management of the publishing business which is likely to be redundant is managed by the progress according to the number of points, and the delay process is controlled. By detecting the delay target / person in charge from the point conversion and feeding back the change in the assignment of the worker to the work plan, extreme process delay can be prevented.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の対象であるシステム概念図。FIG. 1 is a conceptual diagram of a system which is an object of the present invention.

【図2】作業情報管理ファイルの構成を説明するデータ
テーブルを示す図。
FIG. 2 is a diagram showing a data table for explaining the configuration of a work information management file.

【図3】作業者情報データの構成を説明するデータテー
ブルを示す図。
FIG. 3 is a diagram showing a data table for explaining a configuration of worker information data.

【図4】SGMLデータファイルの構成を説明するデー
タテーブルを示す図。
FIG. 4 is a diagram showing a data table for explaining the configuration of an SGML data file.

【図5】編集情報ファイルの構成を説明するデータテー
ブルを示す図。
FIG. 5 is a view showing a data table for explaining the configuration of an editing information file.

【図6】図1における編集部コンピュータの機能を説明
するフローチャート。
FIG. 6 is a flowchart illustrating functions of an editing unit computer in FIG. 1;

【図7】生産管理部門コンピュータの作業対象ポイント
化、計画作成機能を説明するフーチャート。
FIG. 7 is a flowchart illustrating a work management point computer's work target point and plan creation function.

【図8】生産管理部門コンピュータの進捗状況参照、計
画再作成機能を説明するフォローチャート。
FIG. 8 is a follow chart illustrating a progress status reference and plan re-creation function of the computer of the production management section.

【図9】入力オペレータ用コンピュータに組み込まれた
機能を説明するフローチャート。
FIG. 9 is a flowchart illustrating functions incorporated in the computer for an input operator.

【図10】校正部コンピュータに組み込まれた機能を説
明するフローチャート。
FIG. 10 is a flowchart illustrating functions incorporated in a calibration unit computer.

【符号の説明】 101…編集部コンピュータ、 102…生産管理
部門コンピュータ、103…オペレータ用コンピュー
タ、104…校正部コンピュータ、105…作業情報管
理ファイル、 106…作業者情報ファイル、107
…SGMLデータファイル、 108…編集情報ファイ
ル、109…一時ファイル。
[Explanation of Reference Codes] 101: Computer for editing department, 102: Computer for production management department, 103: Computer for operator, 104: Computer for calibration department, 105: Work information management file, 106: Worker information file, 107
... SGML data file, 108 ... edit information file, 109 ... temporary file.

───────────────────────────────────────────────────── フロントページの続き (72)発明者 原 英一 東京都江東区新砂一丁目6番27号 株式会 社日立製作所公共情報事業部内 Fターム(参考) 5B009 TB02 VA07 5B049 BB26 CC21  ────────────────────────────────────────────────── ─── Continuing on the front page (72) Eiichi Hara Inventor, Public Information Division, Hitachi, Ltd. 1-6-27 Shinsuna, Koto-ku, Tokyo F-term (reference) 5B009 TB02 VA07 5B049 BB26 CC21

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】SGMLにより表現された編集対象である
電子文書データを本文,表,図の単位とし、それぞれの
標準的な作業所要時間により作業量をポイント換算する
ことで、全体作業量のポイント数に対する進捗作業量の
ポイント数の割合を進捗度として作業の遅れを検出する
加除式出版業務におけるSGML文書作成工程管理方
法。
An electronic document data to be edited represented by SGML is used as a unit of a text, a table, and a figure, and the amount of work is converted into points by a standard required time of work, thereby obtaining points of the total work amount. A method for managing an SGML document creation process in an addition / deletion type publishing business in which a delay in work is detected by using a ratio of the number of points of the progress work amount to the number of progresses as a progress degree.
【請求項2】請求項1の記載において、編集作業の前
に、編集対象の編集前、編集後の情報の入力を促し、入
力された編集後の文字数、図数、表数からポイント換算
し、作業者の過去の作業実績を単位時間当たりのポイン
ト数で表した作業率を考慮して担当者と作業開始日、作
業終了予定日を定めた作業計画を作成し、作業の進捗状
況の参照により作業の遅延を検出し、過去の作業実績か
ら遅延が生じている編集対象を得意とする作業者を割り
当て作業計画を再作成することを特徴とする加除式出版
業務におけるSGML文書作成工程管理方法。
2. The method according to claim 1, wherein, prior to the editing operation, the user is prompted to input information before and after editing of the object to be edited, and the points are converted into points based on the inputted number of characters, figures and tables after editing. In consideration of the work rate, which represents the worker's past work performance in points per unit time, create a work plan that defines the worker and the work start date and scheduled work end date, and refer to the work progress status A work delay is detected from the past work, and a work plan is recreated by assigning a worker who is good at the editing subject whose work has been delayed from the past work results and re-creating the work plan. .
JP19836798A 1998-07-14 1998-07-14 Method for managing sgml document creating process in addition and removal type publishing operation Pending JP2000029949A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP19836798A JP2000029949A (en) 1998-07-14 1998-07-14 Method for managing sgml document creating process in addition and removal type publishing operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP19836798A JP2000029949A (en) 1998-07-14 1998-07-14 Method for managing sgml document creating process in addition and removal type publishing operation

Publications (1)

Publication Number Publication Date
JP2000029949A true JP2000029949A (en) 2000-01-28

Family

ID=16389937

Family Applications (1)

Application Number Title Priority Date Filing Date
JP19836798A Pending JP2000029949A (en) 1998-07-14 1998-07-14 Method for managing sgml document creating process in addition and removal type publishing operation

Country Status (1)

Country Link
JP (1) JP2000029949A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009277142A (en) * 2008-05-16 2009-11-26 Canon Inc Operation information management apparatus, operation information management method, and operation information management program
JP2012226682A (en) * 2011-04-22 2012-11-15 Fuji Xerox Co Ltd Information processing system
WO2019017061A1 (en) * 2017-07-18 2019-01-24 株式会社日立製作所 Progress/operation monitoring system and method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009277142A (en) * 2008-05-16 2009-11-26 Canon Inc Operation information management apparatus, operation information management method, and operation information management program
JP2012226682A (en) * 2011-04-22 2012-11-15 Fuji Xerox Co Ltd Information processing system
WO2019017061A1 (en) * 2017-07-18 2019-01-24 株式会社日立製作所 Progress/operation monitoring system and method
JP2019021014A (en) * 2017-07-18 2019-02-07 株式会社日立製作所 System and method for monitoring progress/operation
CN110832415A (en) * 2017-07-18 2020-02-21 株式会社日立制作所 Progress operation monitoring system and method

Similar Documents

Publication Publication Date Title
US7136825B2 (en) Work assignment system and method, distributed client/server system, and computer program storage
US20030037114A1 (en) System, method and apparatus for updating electronic mail recipient lists
US5396612A (en) Data tracking arrangement for improving the quality of data stored in a database
CN101976240A (en) Form number generating method and system
JPH08212254A (en) Processing information management device
JP2000029949A (en) Method for managing sgml document creating process in addition and removal type publishing operation
JP2000039904A (en) Project management system
CN115545651A (en) Engineering construction joint surveying and mapping sharing system
JP2008299496A (en) Operation simulator and program
JPH11211515A (en) Measuring instrument management support system
EP1526466B1 (en) Composite record identifier generator
JP2002092399A (en) Printing order placing/receiving method, and printing order placing/receiving system, and information resource used for printing order placing/receiving system
JPH10154090A (en) Data management system
CN111461656A (en) Process data processing method and device of business process management system
US20030033270A1 (en) Automated system for managing drawing numbers
JPH10124561A (en) System construction job supporting device
JP2013137640A (en) Schedule management device and schedule management method
JP3234713B2 (en) Schedule management method and schedule management device
JPH11207574A (en) Production control system and method, and recording medium
JPH09305660A (en) Method and device for defining business process
JPH06266541A (en) Version management method for product
Klein Automated Documentation: A Complete Cycle
JP2024046385A (en) Cost control devices, cost control methods, and cost control programs
JP2005165476A (en) Facility data management system and method
CN117786005A (en) Method for realizing cross-database type synchronous data based on configuration parameters