JP2000008545A JP10171733A JP17173398A JP2000008545A JP 2000008545 A JP2000008545 A JP 2000008545A JP 10171733 A JP10171733 A JP 10171733A JP 17173398 A JP17173398 A JP 17173398A JP 2000008545 A JP2000008545 A JP 2000008545A
Authority
JP
Japan
Prior art keywords
grout
sheath
cap
grout cap
synthetic resin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP10171733A
Other languages
Japanese (ja)
Other versions
JP3909150B2 (en
Inventor
Ryohei Kurosawa
亮平 黒沢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kurosawa Construction Co Ltd
Original Assignee
Kurosawa Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kurosawa Construction Co Ltd filed Critical Kurosawa Construction Co Ltd
Priority to JP17173398A priority Critical patent/JP3909150B2/en
Publication of JP2000008545A publication Critical patent/JP2000008545A/en
Application granted granted Critical
Publication of JP3909150B2 publication Critical patent/JP3909150B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

PROBLEM TO BE SOLVED: To prevent an excess grout from being injected by sealing a sheath of prestressed concrete or an anchor at a fixed distance from the fixed section of a PC steel wire. SOLUTION: When a PC steel wire is inserted into a sheath 3 through the hole 11 of a grout cap 1 made of a soft synthetic resin plate, the grout cap 1 is closely stuck to the PC steel wire, the peripheral edge section of the grout cap 1 is closely stuck to the inner wall of the sheath 3 to seal it, and no grout is leaked out. The grout cap 1 is made of a layered product of the soft synthetic resin plate, the diameter of the center layered product is increased, and the grout cap 1 can be closely stuck to the inner wall of the sheath 3 more strongly. A rigid holding plate is provided on one or both faces of the grout cap 1, and the grout cap 1 is prevented from inclining or turning over at the peripheral edge.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、プレストレストコ
ンクリート用の緊張用鋼材や地中アンカーの鋼材の防食
用のグラウト注入工法及びそれに使用するグラウトキャ
ップに関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a grouting method for preventing corrosion of prestressed concrete tension steel and underground anchor steel, and a grout cap used therefor.

【0002】[0002]

【従来の技術】プレストレストコンクリートや、地中ア
ンカーにおいては、PC鋼線の防食のため、PC鋼線が
配設されているシースの空間にグラウトが充填される。
注入管をシース内に挿入し、グラウト内の空気を逃しな
がらグラウトを圧入し、グラウトが充填されたことを確
認して充填作業を完了している。
2. Description of the Related Art In prestressed concrete and underground anchors, grout is filled in the space of a sheath in which a PC steel wire is disposed in order to prevent corrosion of the PC steel wire.
The filling tube is inserted into the sheath, the grout is pressed in while allowing the air in the grout to escape, and it is confirmed that the grout has been filled, thus completing the filling operation.

【0003】[0003]

【発明が解決しようとする課題】しかし、PC鋼線の腐
食を引き起こす水分はPC鋼線の定着部側から浸入して
くるものであり、シースの中間部から浸入してくること
は殆ど考えられず、シース全体をグラウトで充満する必
要はない。しかし、シースを途中で封止する手段がな
く、シース内空間をすべてグラウトで充填していたの
で、無駄なグラウトを消費するとともに、工事期間が長
引いていた。
However, the water which causes corrosion of the PC steel wire enters from the anchoring portion side of the PC steel wire, and it is almost conceivable that the moisture will enter from the middle portion of the sheath. And it is not necessary to fill the entire sheath with grout. However, there is no means for sealing the sheath in the middle, and the entire space in the sheath is filled with grout, so that unnecessary grout is consumed and the construction period is prolonged.

【0004】そこで、シースを定着部から一定の距離で
封止できるようにし、余分なグラウト注入をしないで済
むようにするグラウト注入工法とそれに使用するグラウ
トキャップを提供しようとするものである。
Therefore, an object of the present invention is to provide a grout injection method and a grout cap used for allowing the sheath to be sealed at a fixed distance from the fixing portion so that unnecessary grout is not injected.

【0005】[0005]

【課題を解決するための手段】軟質合成樹脂板に穴を設
けたグラウト用キャップを使用し、この穴に緊張鋼材を
通してシース内に挿入し、グラウト用キャップでシース
を封止するようにしたものである。グラウト用キャップ
として軟質合成樹脂板を積層したものとすることで、シ
ースの封止が完全におこなえるようにした。軟質合成樹
脂板の積層体の中央部の径を他のものより大きくし、シ
ースの内壁に密着しやすいようにした。
Means for Solving the Problems A grout cap having a hole in a soft synthetic resin plate is used, a tension steel material is inserted through the hole into a sheath, and the sheath is sealed with the grout cap. It is. The sheath was completely sealed by using a laminated soft synthetic resin plate as the grout cap. The diameter of the central portion of the laminated body of the soft synthetic resin plate was made larger than that of the other members so that the laminated body could easily adhere to the inner wall of the sheath.

【0006】グラウト用キャップを構成する軟質合成樹
脂板の片面及び/または両面に保持プレートを設け、グ
ラウト用キャップが、シース内に挿入するときや、PC
鋼線の緊張時に傾斜することなくシース内壁面に垂直に
密着するようにして、封止を完全にした。軟質合成樹脂
を発泡体とすることにより、シース内壁面への密着度を
高めた。さらに、発泡体を連続気孔とすることにより、
グラウト注入時にシース内の空気がこの孔を通って、他
方へ逃げることができるようにした。
[0006] A holding plate is provided on one side and / or both sides of a soft synthetic resin plate constituting a grouting cap, and when the grouting cap is inserted into a sheath or when a PC
The sealing was completed by making the steel wire tightly adhere to the inner wall surface of the sheath without inclining when the steel wire was tightened. The degree of adhesion to the inner wall surface of the sheath was increased by using a soft synthetic resin as a foam. Furthermore, by making the foam a continuous pore,
Air in the sheath was allowed to escape to the other through this hole during grouting.

【0007】[0007]

【作用】軟質合成樹脂板のグラウト用キャップの穴にP
C鋼線を通し、穴の内面がPC鋼線に密着し、グラウト
用キャップの周縁部はシースの内壁に密着してシースを
封止し、圧入されたグラウトが漏れ出さないようにす
る。
[Action] P is inserted into the hole of the grout cap of the soft synthetic resin plate.
Through the C steel wire, the inner surface of the hole is in close contact with the PC steel wire, the peripheral edge of the grout cap is in close contact with the inner wall of the sheath, and the sheath is sealed so that the press-fitted grout does not leak.

【0008】グラウト用キャップを軟質合成樹脂板の積
層体とし、中央の積層体の径を大きくすることにより、
シース内壁により強く密着させることができ、封止を強
固にする。PC鋼線にセットされ、シース内に設置され
たグラウト用キャップは、シースの内壁に密着する。グ
ラウト用キャップの材質が軟質合成樹脂なので、軸に対
して傾斜したり、内壁との摩擦で周縁部がめくられる場
合があり、シースの封止ができなくなる恐れがあるの
で、グラウト用キャップの片面または両面に剛性のある
保持プレートを設け、グラウト用キャップが傾斜した
り、周縁がめくれるのを防止している。
[0008] The grout cap is formed of a laminate of a soft synthetic resin plate, and the diameter of the laminate at the center is increased.
It can be more closely adhered to the inner wall of the sheath, and the sealing is strengthened. The grout cap set on the PC steel wire and installed in the sheath adheres tightly to the inner wall of the sheath. Since the material of the grout cap is a soft synthetic resin, it may be inclined with respect to the axis or the peripheral edge may be turned by friction with the inner wall, and it may not be possible to seal the sheath. Alternatively, rigid holding plates are provided on both sides to prevent the grout cap from inclining or turning around.

【0009】さらに、軟質合成樹脂を発泡体とし、連続
気泡体とすると、グラウト注入によって圧縮されたシー
ス内の空気が、連続気泡を通って他方に逃げることがで
きるので、グラウト注入がスムーズにおこなえるととも
に、グラウトがシース空間に完全に充填されることにな
る。
Further, when the soft synthetic resin is formed into a foam and is made into an open cell, the air in the sheath compressed by the grout injection can escape to the other through the open cells, so that the grout can be injected smoothly. At the same time, the grout is completely filled in the sheath space.

【0010】[0010]

【発明の実施の形態】本発明をプレキャストコンクリー
ト製のボックスカルバートに適用した例で説明する。ボ
ックスカルバート5は図5に示すように、プレキャスト
コンクリート製のボックス51が複数個連接され、接続
部はシール材でシールされている。PC鋼線2がシース
に通され、緊張状態で端部6に定着されている。PC鋼
線の定着部4付近には補強のためのラセン筋21が設置
されている。
DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described by way of an example in which the present invention is applied to a box culvert made of precast concrete. As shown in FIG. 5, the box culvert 5 has a plurality of precast concrete boxes 51 connected to each other, and a connection portion is sealed with a sealing material. The PC steel wire 2 is passed through the sheath and fixed to the end 6 in a tensioned state. A helical bar 21 for reinforcement is provided near the anchoring portion 4 of the PC steel wire.

【0011】図1に示すように、ボックスカルバート5
の長手方向にPC鋼線2を設置する穴(シース)3が設
けてあり、端部6には定着部4が形成されており、端面
側にはグラウト注入孔61と排気孔62が設けてある。
グラウト用キャップ1は、図3(1)、図4に示すよう
に、軟質合成樹脂製の円形の板材で構成されている。そ
して、PC鋼線2の本数に応じて穴11が開けてある。
図4には、上から穴が3個、6個、7個のものを示し
た。穴11の配列は、適宜レイアウトする。図示のもの
は、正多角形に配列したものである。
[0011] As shown in FIG.
A hole (sheath) 3 for installing the PC steel wire 2 is provided in the longitudinal direction, a fixing portion 4 is formed at the end 6, and a grout injection hole 61 and an exhaust hole 62 are provided at the end face side. is there.
The grout cap 1 is formed of a circular plate made of a soft synthetic resin as shown in FIGS. Holes 11 are formed according to the number of PC steel wires 2.
FIG. 4 shows three, six, and seven holes from above. The arrangement of the holes 11 is appropriately laid out. The illustrated one is arranged in a regular polygon.

【0012】グラウト用キャップ1の直径は、シース内
壁に密着させるため、シースの径よりも少し大き目と
し、95ミリ〜105ミリ程度のものを用意しておくと
便利である。PC鋼線2を通す穴11の直径は、PC鋼
線がぴったりとはまり、グラウトが漏れ出さない大きさ
とする。グラウト用キャップ1の片面、または、両面に
は、硬質プラスチック、鋼板などの厚さ5ミリ程度の保
持プレート12を軟質合成樹脂板よりも小さな径とした
ものを接着し、固着してある。保持プレート12は、軟
質合成樹脂板と同様にPC鋼線2を通す穴が形成してあ
る。
The diameter of the grout cap 1 is slightly larger than the diameter of the sheath in order to make it close to the inner wall of the sheath, and it is convenient to prepare a cap of about 95 mm to 105 mm. The diameter of the hole 11 through which the PC steel wire 2 passes is such that the PC steel wire fits tightly and the grout does not leak. On one or both sides of the grout cap 1, a holding plate 12 of a thickness of about 5 mm, such as hard plastic or steel plate, having a diameter smaller than that of the soft synthetic resin plate is bonded and fixed. The holding plate 12 has a hole through which the PC steel wire 2 passes as in the case of the soft synthetic resin plate.

【0013】施工時は、PC鋼線2をボックスカルバー
ト5のシース3に挿入してセットし、グラウト用キャッ
プ1をPC鋼線2に通し、押し込んだ距離がわかるよう
に目盛を設けた棒で所定の位置よりも奥まで押し込んで
やる。予め、導入する緊張力からPC鋼線の伸びを算定
し、伸びに応じてどれほど奥までグラウト用キャップを
押し込めばよいかを計算で確認しておく。そこで、緊張
用の油圧ジャッキをセットし、PC鋼線2を緊張する
と、PC鋼線2が緊張されるにつれてグラウト用キャッ
プ1は定着部方向へ移動し、所定の位置まで移動する。
At the time of construction, the PC steel wire 2 is inserted into the sheath 3 of the box culvert 5 and set, and the grout cap 1 is passed through the PC steel wire 2 with a bar provided with a scale so that the pushed distance can be recognized. Push it deeper than a predetermined position. The elongation of the PC steel wire is calculated in advance from the tension to be introduced, and it is confirmed by calculation how far the grout cap should be pushed in according to the elongation. Then, when the tension hydraulic jack is set and the PC steel wire 2 is tensioned, the grout cap 1 moves toward the fixing portion as the PC steel wire 2 is tensioned, and moves to a predetermined position.

【0014】PC鋼線2の緊張が完了したところでPC
鋼線をアンカープレート24に定着し、グラウト注入孔
61からグラウトをシース3内に注入し、シース内をグ
ラウトで充填する。注入されたグラウトは、シース3が
グラウト用キャップ1で封止されているのでそれより先
に行けず、また、グラウト用キャップ1は、シース内壁
面に密着しているので、グラウトが漏出しない。軟質合
成樹脂を発泡体で連続気泡のものとすると、注入された
グラウトで逃げ場のなくなったシース内の空気を連続気
泡を通して他方へ逃がすことができるので、グラウトを
シース内に完全に充填することができる。以上のように
して、グラウトがPC鋼線の防食に必要な個所だけ完全
にグラウトで充満することができる。
When the tension of the PC steel wire 2 is completed, the PC
A steel wire is fixed to the anchor plate 24, grout is injected into the sheath 3 from the grout injection hole 61, and the inside of the sheath is filled with grout. Since the sheath 3 is sealed by the grout cap 1, the injected grout cannot go further. Further, the grout does not leak since the grout cap 1 is in close contact with the inner wall surface of the sheath. If the soft synthetic resin is made of open-cell foam, the air inside the sheath that has no escape due to the injected grout can be released to the other through the open cells, so that the grout can be completely filled into the sheath. it can. As described above, the grout can be completely filled with the grout only at locations necessary for the corrosion prevention of the PC steel wire.

【0015】定着部にヘッドキャップ22を被せ、定着
部の空間に防錆剤23を充填する。グラウト用キャップ
の他の例として、図3(2)は、軟質合成樹脂板を積層
したものであり、さらに、図3(3)は、中央の部材の
直径を他のものより大きくて細かい変形を容易にし、シ
ース内壁との密着性を高めたものである。
A head cap 22 is put on the fixing portion, and a space for the fixing portion is filled with a rust preventive agent 23. As another example of the grout cap, FIG. 3 (2) shows a laminate of soft synthetic resin plates, and FIG. 3 (3) shows that the diameter of the central member is larger and smaller than that of the other members. And the adhesion to the inner wall of the sheath is improved.

【0016】[0016]

【発明の効果】軟質合成樹脂製のグラウト用キャップに
よって、シースを任意の個所で封止することができるの
で充填用グラウトを節約できるとともに、PC鋼線の防
食に必要な部分には完全にグラウトを充填することがで
きる。グラウト用キャップの材質を軟質合成樹脂の積層
体とし、中央の積層体の径を大きくすることにより、シ
ース内壁により強く密着させることができる。グラウト
用キャップの片面または両面に剛性のある保持プレート
を設けたので、グラウト用キャップが傾斜したり、周縁
のめくれが防止され、シースを完全に封止することがで
きる。
As described above, the grout cap made of a soft synthetic resin can seal the sheath at an arbitrary position, thereby saving grout for filling, and completely grouting the portion necessary for preventing corrosion of the PC steel wire. Can be filled. By making the material of the grout cap a soft synthetic resin laminate and increasing the diameter of the central laminate, it is possible to make the grout cap more closely adhere to the inner wall of the sheath. Since a rigid holding plate is provided on one or both sides of the grout cap, the grout cap is prevented from being inclined or the peripheral edge is turned up, and the sheath can be completely sealed.

【0017】さらに、軟質合成樹脂を連続気泡体の発泡
体とすると、グラウト注入によって圧縮されたシース内
の空気が、連続気泡を通って逃げることができるので、
グラウト注入がスムーズにおこなえるとともに、グラウ
トがシース空間に完全に充填されることになる。
Further, when the soft synthetic resin is made of an open-cell foam, the air in the sheath compressed by grout injection can escape through the open cells.
The grout can be smoothly injected, and the grout is completely filled in the sheath space.

【図面の簡単な説明】[Brief description of the drawings]

【図1】グラウト注入部の断面図FIG. 1 is a sectional view of a grout injection part.

【図2】ボックスカルバートの端面図FIG. 2 is an end view of a box culvert.

【図3】グラウト用キャップの側断面図FIG. 3 is a side sectional view of a grouting cap.

【図4】グラウト用キャップの穴の配置図FIG. 4 is an arrangement diagram of holes in a grout cap.

【図5】ボックスカルバートの側面図FIG. 5 is a side view of a box culvert.

【符号の説明】[Explanation of symbols]

1:グラウト用キャップ 2:PC鋼線 12:保持プレート 3:シース 61:注入孔 62:排気孔 1: Grout cap 2: PC steel wire 12: Holding plate 3: Sheath 61: Injection hole 62: Exhaust hole

Claims (8)

【特許請求の範囲】[Claims] 【請求項1】 軟質合成樹脂板に緊張鋼材挿入用の穴が
設けてあるグラウト用キャップ。
1. A grout cap in which a soft synthetic resin plate is provided with a hole for inserting a tension steel material.
【請求項2】 請求項1において、軟質合成樹脂板を積
層したものであるグラウト用キャップ。
2. The grout cap according to claim 1, wherein a soft synthetic resin plate is laminated.
【請求項3】 請求項2において、積層体の中央部に位
置する軟質合成樹脂板の径が他のものより大きいグラウ
ト用キャップ。
3. The grout cap according to claim 2, wherein the diameter of the soft synthetic resin plate located at the center of the laminate is larger than the other ones.
【請求項4】 請求項1〜3のいずれかにおいて、軟質
合成樹脂板の片面または両面に保持プレートが設けてあ
るグラウト用キャップ。
4. A grout cap according to claim 1, wherein a holding plate is provided on one or both sides of the soft synthetic resin plate.
【請求項5】 請求項1〜4のいずれかにおいて、軟質
合成樹脂が発泡体であるグラウト用キャップ。
5. The grout cap according to claim 1, wherein the soft synthetic resin is a foam.
【請求項6】 請求項5において、発泡体が連続気泡を
有するものであるグラウト用キャップ。
6. The grout cap according to claim 5, wherein the foam has open cells.
【請求項7】 請求項1〜6のいずれかのグラウト用キ
ャップを緊張鋼材に通し、グラウトを注入するPC緊張
鋼材のグラウト工法。
7. A grouting method for a PC tensioned steel material, wherein the grout cap according to claim 1 is passed through a tensioned steel material and grout is injected.
【請求項8】 請求項7において、グラウト用キャップ
を所定の位置より深い位置まで挿入し、緊張鋼材を緊張
してグラウト用キャップを所定の位置に移動させるグラ
ウト工法。
8. The grouting method according to claim 7, wherein the grout cap is inserted to a position deeper than a predetermined position, and the tension steel is tensioned to move the grout cap to the predetermined position.
JP17173398A 1998-06-18 1998-06-18 Grout cap and grout method using the same Expired - Fee Related JP3909150B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP17173398A JP3909150B2 (en) 1998-06-18 1998-06-18 Grout cap and grout method using the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP17173398A JP3909150B2 (en) 1998-06-18 1998-06-18 Grout cap and grout method using the same

Publications (2)

Publication Number Publication Date
JP2000008545A true JP2000008545A (en) 2000-01-11
JP3909150B2 JP3909150B2 (en) 2007-04-25

Family

ID=15928684

Family Applications (1)

Application Number Title Priority Date Filing Date
JP17173398A Expired - Fee Related JP3909150B2 (en) 1998-06-18 1998-06-18 Grout cap and grout method using the same

Country Status (1)

Country Link
JP (1) JP3909150B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008224010A (en) * 2007-03-15 2008-09-25 High Frequency Heattreat Co Ltd Fastening member, fastening device and fastening method
JP2011236565A (en) * 2010-05-06 2011-11-24 Ohbayashi Corp Construction method of prestressed concrete structure strained in vertical direction
JP2011241632A (en) * 2010-05-19 2011-12-01 Ohbayashi Corp Upper end part processing method of pc tendon
CN106872343A (en) * 2017-01-24 2017-06-20 中国水利水电科学研究院 A kind of internal balance type prestress anchorage cable stress corrosion (cracking) test system and its test method
CN111335165A (en) * 2020-03-04 2020-06-26 中铁第四勘察设计院集团有限公司 Construction method for sealing anchor and auxiliary anchor sealing structure thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008224010A (en) * 2007-03-15 2008-09-25 High Frequency Heattreat Co Ltd Fastening member, fastening device and fastening method
JP4700640B2 (en) * 2007-03-15 2011-06-15 高周波熱錬株式会社 Fastening device and fastening method
JP2011236565A (en) * 2010-05-06 2011-11-24 Ohbayashi Corp Construction method of prestressed concrete structure strained in vertical direction
JP2011241632A (en) * 2010-05-19 2011-12-01 Ohbayashi Corp Upper end part processing method of pc tendon
CN106872343A (en) * 2017-01-24 2017-06-20 中国水利水电科学研究院 A kind of internal balance type prestress anchorage cable stress corrosion (cracking) test system and its test method
CN111335165A (en) * 2020-03-04 2020-06-26 中铁第四勘察设计院集团有限公司 Construction method for sealing anchor and auxiliary anchor sealing structure thereof
CN111335165B (en) * 2020-03-04 2021-11-16 中铁第四勘察设计院集团有限公司 Construction method for sealing anchor and auxiliary anchor sealing structure thereof

Also Published As

Publication number Publication date
JP3909150B2 (en) 2007-04-25

Similar Documents

Publication Publication Date Title
US8683773B2 (en) System and method for leaking crack repair
JP2000008545A (en) Cap for grout and grouting method using it
JP3241344B2 (en) Tunnel waterproof structure and its construction method
JP5266584B2 (en) Corrosion-proof PC steel wire assembly and anchor structure construction method
JP2010174555A (en) Anchor structure using anticorrosive prestressed concrete strand and its construction method, anticorrosive prestressed concrete strand assembly, and composite anchor member
US6745528B2 (en) Stainless-steel floor and method of constructing the stainless-steel floor
JP2020159180A (en) Cut-off member for segment and cut-off structure for segment
JPH0270821A (en) Anchor tension member
JP2002250134A (en) Container for holding grout for crack and grouting method for filling crack
JP2009127358A (en) Wall structure reinforcing method and reinforcing structure
JP6057325B2 (en) Repair structure and repair method for existing waterways
US20050210782A1 (en) Stress end portion structure of prestressed concrete structure body and method of forming the stress end portion
KR200420494Y1 (en) precast concrete culvert block
JP3020474B2 (en) Precast concrete sound barrier
JP3987641B2 (en) Heavy duty anti-corrosion PC steel strand structure and method
JPH08209944A (en) Method and device for forming cutoff for concrete structure
JP4340018B2 (en) Joint water stop structure of straight steel sheet pile and steel sheet pile continuous wall
JPH0617859Y2 (en) Anchor bond sheath
JP5266585B2 (en) Anchor structure, anchor cable assembly, and anchor structure construction method
JP4170541B2 (en) Demolition method of concrete building
JPH0518319Y2 (en)
JPH07286317A (en) Cut-off connecting device of concrete block and cut-off connection method using the device
JP3287820B2 (en) Partial unbonding method for PC member and PC member by partial unbonding method
JP3270854B2 (en) Elastic joint structure for box culvert construction
JPH1136334A (en) Cut-off structure in connection part of pc wall and floor slab concrete

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050404

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060703

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060926

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20061109

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20070116

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20070122

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100126

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110126

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120126

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130126

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130126

Year of fee payment: 6

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140126

Year of fee payment: 7

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees