Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Meccaniche Di Prec E Cmp Di Fellon Costruzioni, New Fischer Di Occhiali Davide E Bertelli Paolo SfiledCriticalMeccaniche Di Prec E Cmp Di Fellon Costruzioni
Priority to ITBO920100ApriorityCriticalpatent/IT1257772B/it
Publication of ITBO920100A0publicationCriticalpatent/ITBO920100A0/it
Publication of ITBO920100A1publicationCriticalpatent/ITBO920100A1/it
Application grantedgrantedCritical
Publication of IT1257772BpublicationCriticalpatent/IT1257772B/it