Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mose MonachinofiledCriticalMose Monachino
Priority to IT93AG000003ApriorityCriticalpatent/IT1276124B1/en
Publication of ITAG930003A0publicationCriticalpatent/ITAG930003A0/en
Publication of ITAG930003A1publicationCriticalpatent/ITAG930003A1/en
Application grantedgrantedCritical
Publication of IT1276124B1publicationCriticalpatent/IT1276124B1/en
Forms Removed On Construction Sites Or Auxiliary Members Thereof
(AREA)
Abstract
Pannello prefabbricato doppio rivestito a sandwich "'autoimpalcante" in c; a.v. inventato allo scopo di eliminare casseformi, giunti di ripresa, impermeabilizzazioni e i lunghi tempi di realizzazione ottenendo ottimi risultati.Double prefabricated sandwich panel "self-scaffolding" in c; high vacuum invented for the purpose of eliminating formwork, reclaim joints, waterproofing and long construction times, obtaining excellent results.
REINFORCEMENT FOR CONSTRUCTION IN REINFORCED CONGLOMERATE, SUCH AS REINFORCED CONCRETE, PARTICULARLY FOR BUILDING, AND CONSTRUCTION METHOD USING SUCH REINFORCEMENT.
REINFORCED CONCRETE WALLS AND FLOORS MADE UP OF TWO REINFORCED AND VIBRATED CONCRETE PANELS WITH SPACERS AND REINFORCEMENT TO FORM A COMPARTMENT WITH THE ARMOR FOR THE CASTING OF THE CONCRETE, IF POSSIBLE CELLULAR.
LAYERED STRUCTURE IN REINFORCED CONCRETE, PROCEDURE FOR ITS CONSTRUCTION, PREFABRICATED CONCRETE, FORMWORK AND PROCEDURE FOR THE CREATION OF PREFABRICATED CONCRETE, FOR EXAMPLE PREFABRICATED BOXES WITH DOUBLE PLATES
Connecting and joining of large prefabricated reinforced concrete elements, folr use in the building process and in the latter reinforcement of such buildings
SUPPORTING PANEL OF PREFABRICATED REINFORCED CONCRETE FOR THE CONSTRUCTION OF AGRICULTURAL AND INDUSTRIAL BUILDINGS PARTICULARLY STABLES AND PORCILAIE EQUIPPED WITH SEWER Ditch