Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by C E R Costruzioni ElettrotecnifiledCriticalC E R Costruzioni Elettrotecni
Priority to IT04691090ApriorityCriticalpatent/IT1244261B/it
Publication of IT9046910A0publicationCriticalpatent/IT9046910A0/it
Publication of IT9046910A1publicationCriticalpatent/IT9046910A1/it
Application grantedgrantedCritical
Publication of IT1244261BpublicationCriticalpatent/IT1244261B/it