PROCEDURE FOR THE EXECUTION OF CONTINUOUS CONNECTIONS IN SITE REINFORCED CONCRETE STRUCTURES WITH LOAD-BEARING FRAME MADE UP OF PREFABRICATED COMPONENTS AND CONTINUOUS CONNECTION SO OBTAINED.
- Google Patents
PROCEDURE FOR THE EXECUTION OF CONTINUOUS CONNECTIONS IN SITE REINFORCED CONCRETE STRUCTURES WITH LOAD-BEARING FRAME MADE UP OF PREFABRICATED COMPONENTS AND CONTINUOUS CONNECTION SO OBTAINED.
Info
Publication number
IT8019264A0
IT8019264A0IT8019264AIT1926480AIT8019264A0IT 8019264 A0IT8019264 A0IT 8019264A0IT 8019264 AIT8019264 AIT 8019264AIT 1926480 AIT1926480 AIT 1926480AIT 8019264 A0IT8019264 A0IT 8019264A0
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Alessi Salvatore Luperini LucifiledCriticalAlessi Salvatore Luperini Luci
Priority to IT19264/80ApriorityCriticalpatent/IT1129541B/en
Publication of IT8019264A0publicationCriticalpatent/IT8019264A0/en
Application grantedgrantedCritical
Publication of IT1129541BpublicationCriticalpatent/IT1129541B/en
IT19264/80A1980-01-171980-01-17
PROCEDURE FOR THE PERFORMANCE OF CONTINUOUS CONNECTIONS IN WORK OF REINFORCED CONCRETE STRUCTURES CONSISTING OF PREFABRICATED COMPONENTS AND CONTINUOUS CONNECTION SO OBTAINED
IT1129541B
(en)
PROCEDURE FOR THE PERFORMANCE OF CONTINUOUS CONNECTIONS IN WORK OF REINFORCED CONCRETE STRUCTURES CONSISTING OF PREFABRICATED COMPONENTS AND CONTINUOUS CONNECTION SO OBTAINED
PROCEDURE FOR THE PERFORMANCE OF CONTINUOUS CONNECTIONS IN WORK OF REINFORCED CONCRETE STRUCTURES CONSISTING OF PREFABRICATED COMPONENTS AND CONTINUOUS CONNECTION SO OBTAINED
PROCEDURE FOR THE PERFORMANCE OF CONTINUOUS CONNECTIONS IN WORK OF REINFORCED CONCRETE STRUCTURES CONSISTING OF PREFABRICATED COMPONENTS AND CONTINUOUS CONNECTION SO OBTAINED
REINFORCEMENT FOR CONSTRUCTION IN REINFORCED CONGLOMERATE, SUCH AS REINFORCED CONCRETE, PARTICULARLY FOR BUILDING, AND CONSTRUCTION METHOD USING SUCH REINFORCEMENT.
PROCEDURE FOR THE EXECUTION OF CONTINUOUS CONNECTIONS IN SITE REINFORCED CONCRETE STRUCTURES WITH LOAD-BEARING FRAME MADE UP OF PREFABRICATED COMPONENTS AND CONTINUOUS CONNECTION SO OBTAINED.
PROCEDURE FOR THE CREATION OF AN ORGAN FOR THE LIFTING OF CONSTRUCTION ELEMENTS, PARTICULARLY PREFABRICATED REINFORCED CONCRETE ELEMENTS, DEVICE FOR THE IMPLEMENTATION OF THIS PROCEDURE AND ORGAN SO OBTAINED.