IN2014MU01043AIN1043MU2014AIN2014MU01043AIN 2014MU01043 AIN2014MU01043 AIN 2014MU01043AIN 1043MU2014 AIN1043MU2014 AIN 1043MU2014AIN 2014MU01043 AIN2014MU01043 AIN 2014MU01043A
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Larsen & Toubro LtdfiledCriticalLarsen & Toubro Ltd
Priority to IN1043MU2014priorityCriticalpatent/IN2014MU01043A/en
Publication of IN2014MU01043ApublicationCriticalpatent/IN2014MU01043A/en
Method and apparatus for the remote testing of RCDs (Residual Current Devices), ELCBs (Earth Leakage Circuit-Breakers), CBRs (Core Balance Relays) or GFIs (Ground Fault Interrupts) to remove the risk of ARC FLASH toward the operator