IN2013MU03381A - - Google Patents
Info
- Publication number
- IN2013MU03381A IN2013MU03381A IN3381MU2013A IN2013MU03381A IN 2013MU03381 A IN2013MU03381 A IN 2013MU03381A IN 3381MU2013 A IN3381MU2013 A IN 3381MU2013A IN 2013MU03381 A IN2013MU03381 A IN 2013MU03381A
- Authority
- IN
- India
- Prior art keywords
- parameter
- techniques
- estimation
- project
- shortlisted
- Prior art date
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F8/00—Arrangements for software engineering
- G06F8/70—Software maintenance or management
- G06F8/77—Software metrics
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Business, Economics & Management (AREA)
- Software Systems (AREA)
- General Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Educational Administration (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Marketing (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Stored Programmes (AREA)
Abstract
A system and a method related to software project estimation are described. According to one embodiment, the method comprises receiving a value corresponding to at least one decision parameter including a project type, a technology, a software development life cycle (SDLC) type and a stage of the software project from user. The received value is mapped with techniques associated with each of estimation parameters including a size parameter, an effort parameter, a cost parameter, and a schedule parameter in a decision matrix. Based on the mapping, one or more techniques for each estimation parameter are shortlisted, and a success rating factor for each shortlisted technique is evaluated based on historical data (112) to identify a primary set of techniques. Compatibility of the primary set of techniques is then determined based on an interoperability factor to identify at least one secondary set of techniques providing optimum estimate of the software project.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
IN3381MU2013 IN2013MU03381A (en) | 2013-10-25 | 2013-10-25 | |
US14/208,039 US10379850B2 (en) | 2013-10-25 | 2014-03-13 | Software project estimation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
IN3381MU2013 IN2013MU03381A (en) | 2013-10-25 | 2013-10-25 |
Publications (1)
Publication Number | Publication Date |
---|---|
IN2013MU03381A true IN2013MU03381A (en) | 2015-07-17 |
Family
ID=52996968
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
IN3381MU2013 IN2013MU03381A (en) | 2013-10-25 | 2013-10-25 |
Country Status (2)
Country | Link |
---|---|
US (1) | US10379850B2 (en) |
IN (1) | IN2013MU03381A (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPWO2016021184A1 (en) * | 2014-08-06 | 2017-06-01 | 日本電気株式会社 | Information processing system, project risk detection method and program |
US10146511B2 (en) | 2015-12-01 | 2018-12-04 | Tata Consultancy Services Limited | System and method for estimating package implementation effort of SDLC activities |
CN107292578A (en) * | 2016-04-10 | 2017-10-24 | 国网山东省电力公司经济技术研究院 | The online estimating and examining system of high voltage distribution network project feasibility study and method |
US10241786B2 (en) * | 2017-01-26 | 2019-03-26 | International Business Machines Corporation | Evaluating project maturity from data sources |
US11640542B2 (en) * | 2018-03-21 | 2023-05-02 | Tata Consultancy Limited Services | Method and system for system architecture technology recommendation |
US10540573B1 (en) | 2018-12-06 | 2020-01-21 | Fmr Llc | Story cycle time anomaly prediction and root cause identification in an agile development environment |
RU2738865C1 (en) * | 2020-03-13 | 2020-12-17 | АКЦИОНЕРНОЕ ОБЩЕСТВО "ИнфоВотч" | Method of assessing compatibility of information protection means and automated process control systems for designing security systems of critical information infrastructure |
Family Cites Families (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8818756B1 (en) * | 2001-04-30 | 2014-08-26 | The Boston Consulting Group, Inc. | Method and apparatus for predicting project outcomes |
US20030018952A1 (en) * | 2001-07-13 | 2003-01-23 | Roetzheim William H. | System and method to estimate resource usage for a software development project |
US20030225470A1 (en) * | 2002-01-30 | 2003-12-04 | Demetriou John Savvas | Method and system for making a product |
US7395540B2 (en) * | 2003-03-12 | 2008-07-01 | Microsoft Corporation | Automated business software application integration |
US7617117B2 (en) * | 2003-03-19 | 2009-11-10 | International Business Machines Corporation | Using a complexity matrix for estimation |
US7328202B2 (en) * | 2004-08-18 | 2008-02-05 | Xishi Huang | System and method for software estimation |
US8375364B2 (en) * | 2006-10-11 | 2013-02-12 | Infosys Limited | Size and effort estimation in testing applications |
US8055606B2 (en) * | 2007-06-13 | 2011-11-08 | International Business Machines Corporation | Method and system for self-calibrating project estimation models for packaged software applications |
US8032404B2 (en) * | 2007-06-13 | 2011-10-04 | International Business Machines Corporation | Method and system for estimating financial benefits of packaged application service projects |
US8006223B2 (en) * | 2007-06-13 | 2011-08-23 | International Business Machines Corporation | Method and system for estimating project plans for packaged software applications |
US7991672B2 (en) * | 2007-06-29 | 2011-08-02 | William Rory Crowder | System and method of visual illustration of stock market performance |
US20090327915A1 (en) * | 2008-06-27 | 2009-12-31 | International Business Machines Corporation | Automatic GUI Reconfiguration Based On User Preferences |
US8448127B2 (en) * | 2009-01-30 | 2013-05-21 | Raytheon Company | Software forecasting system |
US8464263B2 (en) * | 2009-02-19 | 2013-06-11 | International Business Machines Corporation | Scheduling work requests to performing centers based on overall cost and duration of multiple assignment options |
US20110112882A1 (en) * | 2009-11-09 | 2011-05-12 | Summers Gary J | Method of generating feedback for project portfolio management |
US8306849B2 (en) * | 2010-09-16 | 2012-11-06 | International Business Machines Corporation | Predicting success of a proposed project |
US8713560B2 (en) * | 2011-12-22 | 2014-04-29 | Sap Ag | Compatibility check |
-
2013
- 2013-10-25 IN IN3381MU2013 patent/IN2013MU03381A/en unknown
-
2014
- 2014-03-13 US US14/208,039 patent/US10379850B2/en active Active
Also Published As
Publication number | Publication date |
---|---|
US20150121332A1 (en) | 2015-04-30 |
US10379850B2 (en) | 2019-08-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
IN2013MU03381A (en) | ||
EP3743832A4 (en) | Generating natural language recommendations based on an industrial language model | |
MX2019009393A (en) | Autonomous vehicle operational management. | |
MX2015003272A (en) | Methods and systems for estimating recoverable utility revenue. | |
GB2527009A (en) | Simulation of production systems | |
WO2011097517A3 (en) | Image tagging based upon cross domain context | |
WO2012103244A3 (en) | Systems and methods for automated model-based real-time simulation of a microgrid for market-based electric power system optimization | |
WO2012034083A8 (en) | Transportation information systems and methods | |
GB2539602A (en) | Unified modeling of technology towers | |
SG10201610585WA (en) | Passsword management system and process | |
WO2014145884A3 (en) | Syntactic tagging in a domain-specific context | |
SA518391166B1 (en) | Providing Secure Data Transfer Between Networks | |
SG11201805151WA (en) | Method for performing inter-system service operation, service platform, and target system | |
WO2018217686A3 (en) | Systems and methods for optimizing oil production | |
WO2013074001A3 (en) | Consumer information aggregator and profile generator | |
EP4080158A4 (en) | Estimation device, estimation method, program, and learned model generation device | |
GB201309785D0 (en) | Methods and systems for providing real-time information regarding objects in a network | |
IN2013MU03236A (en) | ||
IN2013MU00973A (en) | ||
WO2014075009A8 (en) | Personal energy system | |
GB2505602A (en) | Protecting a control vector in a cryptographic system | |
IN2013MU01232A (en) | ||
WO2013095415A3 (en) | System and method for assignment of virtual machines based on physical information | |
MX2016013775A (en) | Access management system, communication system, recording medium and access management method. | |
MX2014003226A (en) | Price estimation system. |