HUT55461A - Method for the formation of connection of pile and reinforced concrete lintel being under pressure
- Google Patents
Method for the formation of connection of pile and reinforced concrete lintel being under pressure
Info
Publication number
HUT55461A
HUT55461AHU400788AHU400788AHUT55461AHU T55461 AHUT55461 AHU T55461AHU 400788 AHU400788 AHU 400788AHU 400788 AHU400788 AHU 400788AHU T55461 AHUT55461 AHU T55461A
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Koezlekedesi Metro EpitoefiledCriticalKoezlekedesi Metro Epitoe
Priority to HU400788ApriorityCriticalpatent/HU205178B/en
Publication of HUT55461ApublicationCriticalpatent/HUT55461A/en
Publication of HU205178BpublicationCriticalpatent/HU205178B/en