HUT43125A - Apparatus for load testing piles and load testing prefabricated reinforced concrete pile by internal force - Google Patents
Apparatus for load testing piles and load testing prefabricated reinforced concrete pile by internal force Download PDFInfo
- Publication number
- HUT43125A HUT43125A HU180585A HU180585A HUT43125A HU T43125 A HUT43125 A HU T43125A HU 180585 A HU180585 A HU 180585A HU 180585 A HU180585 A HU 180585A HU T43125 A HUT43125 A HU T43125A
- Authority
- HU
- Hungary
- Prior art keywords
- pile
- load testing
- piles
- internal force
- reinforced concrete
- Prior art date
Links
Landscapes
- Piles And Underground Anchors (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Description
A találmány a belső erővel történő..· próbaterhelés zavaró hatásoktól mentes végrehajtását. '. szolgálja* továbbá lehetővé .teszi kis (lÖ-.20';c®·) .•át-·.' • mérőjö fúrt injektált és Franki .'technológiával készült -/2 sőlöpők próbaterhelését is· Λ találmány továbbá előregyártót t.* vert vasbetoncőlöpr® is vonatkozik, amely két elemből van kialakítva és belső csővel működő próbat®rh@10ber@nd@zá@s©l való próbaterhelés lehstővátételé-·'re @2Olgále
Cölöpök próbaterhelésére külső és belső erőket alkalmazó eljárásokat használnak· T®rh®lő-sz©krény@s próbaterhelés során a cölöpre, a talajból kiálló felső -vágón valamely tömeg sulyerejénak felhasználásával Juttatnak terhelést· Horgony-cölöpös próbaterhelést alkalmaznak, ha a terhelt cölöp terhelőerejét más cölöpök kihúzási ellenállásából terhelSruddal, rudazat'tal, •vagy kötélzettel hárítják át·. Hasonlóan © módszerhez húzott cölöpök helyett máskor horgonyokat alkalmaznak·
Ismertek eljárások, amelyek fúrt cölöpök csúcséhoz közel beépített kettősfalú acéllsmazpárnákba injsktálócsővőn basajtolt folyadék feszítőerejének, mint;·? belső erőnek alkalmazásával a cölőpcsucsot a cölőptörzstől eltávölitvg-hajtják végra-a próbatarhelást, é© a mórt •adatokból következtetnek a csucsellenállásra és a kőpenyellenállásra küiön-külön·-.Ugyancsak a cőlőpcsucs>;rő@z.ós a-cölöptörzs-rész eltávolításával külön· béren- •dezássel.belső ©rőkat ébresztve végrehajtott próbatér-. / haláéi eljárást ismertet a 1@1·292 számon lajstromozott magyar.szabadalmi leírás·.eszerint .helyszínen ©lőálll- tolt cölöpnek a törzstől elválasztható cs.ucs^részét··:.·.· hidraulikusan·,. mechanikusan vagy preumatikusán'-a-'cölöp··· hosszirányú tengelye mohtán terhelik .óo agyidojölog a
©Ölöpasárat kinyomó ják,, vagy kihúzzák úgy», hogy ez elválasztható eSISp csucsrészr® l®f@lé kifejtett erőt a ©őlöpszárra ?©Xf©lé átsebts erővel egyensúlyozzák·
-Az ennek az eljárásnak a foganatositésár® «©Igáié berendezésre as j@ll©s2ő, hogy legalább ©@y ©®©Xőszervvel rendelkezik». a®ely @gy fámon fekszik fel» amely tá© egy ceőköpenybsn eltolható®® vsn ágyazva és amely fém a cölöp keresztmetszetének súlypontjában helyezkedik ®1·.Α berendezésnek agy huzószerv® i® van» -amelynek -felső rész® egy fémlappal» alsó része pedig © vasalással ellátott cölőőszérral van összekötve·
A fenti ismertetett megoldás hátránya, hagy @ cölöposucaot a cölöpszártól elválasztó váiasztólap mentén @ cölöp két különálló teatr® válik széf a próbaterhelés végrehajtásakor.» é® a kettéváláskor hézag keletkezik» ®a©ly hézagba, talaj és/vagy talajvíz nyomul be» majd a bejutó anyagok a tá® 'és a eeőköpeny közé fovábbhatolva sz erőjátékot meghamisító további belső ellenállást okoznak· Hátránya a megoldásnak továbbá, hegy ©löregyártott vert vaebetonoölöpőknél e@y©e és @ a csőkőpenybe való bejutásától mentesen feszi lehét-Övéi·' vert elsősorban vasbeton cölöpök esetében is· lehetővé--'4: agyéi-:
Γι
A teXáX@áiríy ®2©η & felismerésen alapul, hogy az elválasztólap' elemekből való előállítása ée @z elemek egymáshoz képset elmozdulást msgongedő tőmitett kapcsolata révén : a kedvezőtlen anyagbsáramlást * s Így a zavaró ébredését kiküszöbölhetjöfc· További fslismsré®z átérést pl·' ©lőregyártott vasbeton vert való alkalmazásra is kiterjeszthetjük, ha a cölöp egymástól különálló elemekből áll», és az elesettnek alkalmas részeg.· vannak· félépmerések alapján a kitűzött feladatot.a' találmány értelmében olyan berendezéssel oldottuk meg, ágyazott támelemr© támaszkodó @®©lősz@rv®i ® .cőlöpszárhoz kapcsolt huzószervsj a huzószervvel kapcsolatban álló támlapjai valamint a eölöpcsucsot a cőlőpszártól elválasztó szerkezet© van és amely berendezésre jellemző., hogy az elválasztőszerkezet ©Iválasztólappal, valamint ©hhez.kapcsolt dilatációs lappal» nyomólappal, és ,®z utóbbinak a részeként kialakitott töaitőpe'rawel . rendelkezik.j és hogy @ csőkőpsny az elválasztólaphoz van kapcsolva, ée tömitőolam közbeiktatáséval a nyomólap t.öaítöpereaéhez illeszkedik* Előnyök lehet'· ha a 'esőköpenynek b®horgonyzó©l@m@(ij van(nak)* továbbá ha a. esőköpeny a cölöpszár erŐsitSelemekó'nt van .kialakitva-j ’·... valamint,· ha a ceőköpeny - legalább részben - injektáló-*..'; .'.csőként. van kialakítva, 'végűi, ha a' huzószerv a .©aőköpény·» bsg van kapcsolva, és ha a eölöpszártől.elválasztott.';?-'.·' arra.
- 5 ~ célszerűen tömör * csúcséi®©® vám éa hogy a cölö^azár prébaterhelő berendezés tá©®ls®én©k bevezetését lehetővé tévő hosszanti centrális üreggel, valamint prób@t@rb@XŐ b®r®nd®^ds huzó®ls©én@k heszákapcsolását lehetővé tévő kapesolészerw®! rendelkezik·
A találmányt © továbbiakban a csatolt rajsak alapién ismertetjük részletesen« amelyek a berendezés egy -előnyős .kiviteli alakját tartalmazzák, és alkalmazáséra adnak példákat, tavibbá a ...találmány szerinti előregyártett vert'.vaebetoncőiőp egy előnyös kiviteli .példáját ábrázolják· .A rajzokon ag : 1· ábrán @ berendezés ©gyik lényege© részének, az ©lválaeztósz@rk@z®tn@k. a függőleges aetszet® láthatót á 2-6· ábrákon .az ©iválasztóssarkszet alkalmazási . ©édját érzékeltettük száraz fúrással készülő, ne© injektált cölöp próbaterhelésével kapcsolatbant.
a 7-9· ábrákon Franki cölöp készítési, é® találmány -szerinti nádon .történő prábatsrhslési fsiya.sst.ébrája láthatás . a 10-13· ábrákon öblítéssé eljárással készülő.fértábráját tüntettük fal» . a 14· .ábrán a találmány szerinti előregyártott láthatói
...'.a .15· ábra ® 14· ábrán .feltöntststt,cölöp 'felülnézet®j.
.a 16* ábrán a 14* ábra szerinti cölöp felső vége. láthatót a próba terhelő berendezés egyes .©laraeinek feltüntetésével·
Az lé ábrán látható ©Iválasztószerkezst két fő részből élle A T talajban lévő XI cölöp 10 csúcsában a 4 nyomólap* a. 11, cölöp 9 szárában pedig β 2 elválasztó*? lap van rögzít vb-· Ez utóbbihoz van csatlakoztatva a 3 dilatáció© lap* a 6 csőköpény és az ehhez a 2© varrattal kapcsolt @ bahorgonyzóel@m®k« A.'ó nyomólapnak a 19 varrattál ráhsgesztstt S tőmlt-Őpareme van·. Az 5 tömitőperym éa a 6 csőköpeny között 7 tömittőele®· he^kskedik'-el.*
A próbaterhelés végrehajtását szolgáló 12 támalsm* 14 emelőszerv* 13 huzószarv és 15 támlap kőzQl az 1« ábrán csak a 12 táwalem látható· A 2 ©Ivá-lasztólap a © esőköpenyhez -a 21 varrattal kapcsolódik.a a 3 dilatáció® laphoz, a 22 csavarok kapcsolják«
A 2-6 ábrákon bemutatott folyamat.©gyes lácaői. a. következők s a 2· ábrán a T talajban a 23 fur.ószerazámmal készített· @'helyben készülő cölöp.befogadására szolgáló .24 furat, látható· A 3· ábrán az elkészített 24 furatban a 25'.betonozótölcsér révén oda bejuttatott 26 beton ké« ·. ,p@zi a !□ cölöposucaot· A 4· ábrán látható fázisban a 10 cőlőpcsucson. az .1 elválasztószerfeézst helyezkedik el . a .hozzá kapcsolt 6 csőköpannysl és 8 h©hor§onyzóe.l®m@kk.©l* .A £4 furát további szakasza ör©s® Az Ő·.ábrán a 11.cölöp . Van 'felönfatva 9 az 1.alválasztószarkasattal 10 cölöp-.·/J ;csúcsra'''és'. 9 cölöpszárra .tagoltan· A ©* ébrén :®.'-próba-· /. < í j
terhelés közbeni állapot látható· A 12 tám@l@a@n elhelyezkedő 14 ©a@lősz®rv a 15 támlapr® támaszkodik, ás ©raját a 13 huzószarvv®! a 6 csőköpenynsk adja át* sssly g @ beh®rgonyzőez@rv®kk®l továbbija azt a © eőlőpszárnak· Az erőhatás következtében a 11 cölöp 9 ©zára ég 10 esu©@a a 27 nyilak irányában sasodul el, ®im®ll@tt. as 1 ©lválasxt©©z©rk©z©t kettéválik·
A 7-S® ábrán bemutatott folyamat agya® lépcsői .a köv®tk®zők« a 7· ábrán a 10 cőlöposus® fajhagymája a 28 au cexopcsucauii csaa sas üss mn»xye£eit a exvaias^iy· •szerkezet, á© a hozzá kapcsolt © esőköp • A 9« a $ cölöpszár betonozás közben, a £8 béléscső pedig .visszahúzás közben látható· A gyűrűsen kialakított 29 ajtős-uly a 6 csőköpeny Θ bshorgonyzóelmein. kívül « a 2© béláscaövön belül kápa® hosszirányú mozgásra· A '9 cölőpszár 2@ hstonkltöltásában a © csőkőpanyon kívül vasszereié©, armatúra nincs·
A. 19*13· ábrán.bemutatott folyamat ©gys® lépcsői @ követ kozom a 10® ábrán a T talajban a 23 furószarezámmal készített furóiszappal kitöltött 24 furat látható®
A ll· ábrán a furóiszappal kitöltött 24 furatban a részben 31 injsktálós®Ökánt kialakított 6 .©©őkőpsnyí a hozzá kapcsolt 0 hshorgonyzóolsmskkol, az injektáló )./
....... ..... ::/..4(:.4:::/70 :
' ' ' ' « 0 furatokat fsdő 30 gummimandzasftákkal és a kőzbáépitátfc .
®XváXa®2tóes©Fk©z©tt©X tüntettük f®X. A lg. ábrán β részben injskfálócsőkénf kialakított 6 cső.köpsny . í furaté©® s 27 nyilak.irányéban kilépő injektálóanyap is fal van tüntetve·. A 13. ébrén a megszilárdult injekt^XáΛ anyagbél éllé XX cölöpöt a próbaterhelés állapotéban. V ábrázoltuk· A 12 támelsnen elhelyezkedő 14 ®t»@lősz@rv'^ .· a 15 támlapra támaszkodik* ás erejét a 13 huzószsrvvel .' β S csőköpenynek adja át* am@ly a 8 l©horgonyzó9z@rv@kk©l továbbija azt a 9 cölőpszá.rnak· Az ©ráhatás kőv@tk®z®b®o a XX cölöp 9 szára á® XX csúcsa a 27 nyilak irányában mozdul ©1, miasllett az 1 ©bálasztószerkezet kettéválik.
A 14· ás 15· ábrán a részekből állá ©lőregyártott -vart XX vasbetoncölöp látható· Az egyik rász a tömör 10 cőlöpcsucs* a másik a 9 cőlöpszár* a benne kialakított X7 e@BtréXi@ üreggel. A XX cölöp fejrészén a X® kspeasló.szerv látszik* amely célszerűen harántürag felületét borító csőtag· A 16. ábrán a próbat@rh®lési állapotban van .feltüntetve a 17 centrális ürsgb© : bevezetett '12 tárnáién* valamint a rajta elhelyezkedő 14 amelőszerv, am©ly a 15 fémlapra támaszkodik* és ©raját a 13 hyzó©zervvei @ X© kapesolőszerv utján továbbítja a § .cölöp-, szárnak.
. Áz 1-13··:' ábrákon ismertetett -berendezés®®! a . próbaterhelést az alábbiak szerint hajtjuk végr@t
«a g biztonsággal felfekszik·. A 6 csőkőpsnyhez, vagy ..az ©l®r@gyártott vasbeton, cölöp (14# és IS· ábra) esető*.
bon -.18 kapcsolósssrvhes; ©rfíátadóan csatlakoztat juk @ ' huzószervet, és ehhez kapcsoljuk a 15 tá©Xap©t, a IS támelsar© bslyezzök a .14 ©aelőszervet és a 15 tá®* .
lappal.érintkezésbe hozzuk· Ezótán & 14 ©®@lSsz@rvy@l ©rőt fejtünk ki, aaivel a 10 eőiőpcsueaot á® a S cölöp* , 'szárat egyaástél a T talaj felőli f élőiét.©ken .ébredő .ΐ:4 állással szemben elmozdítani kezdjük. Az .'©lepek szét*., válását as 1-13· ábrák szerinti esetekben as 1 ©Iválsszté*. ; szerkezettel tssszük lehetővé ás bá.zt©n@ágöseé·
Ez. utóbbi esetekben ugyani® a=9 cölőpszárral ©gyött felfelé .mozogja © csőkőpenyhez kapcsolt 2 ®XvéX©@2té-..
lap é© @ hozzá cs®v@r@2©tt 3 dilatáció© lap, sig a 4 nyomólapot ® 12 támele® a 10 cőlőpcsu.cpsai agyőtt lefelé sajtolja· A .g ©Iválasztólap és .4 .nyomólap között kialakuló hfeagbs a T talajból beáramló talaj* ' vizát 'ás -szilárd részeket az 5 tömítőpsre® és 6 csökőpsny-j .közé elhelyezett 7 tösitősle® n©a engedi a .17 .csn.trélio'.·'·
Öregbe beáramlani, igy azt az egymáshoz képest ©llenkísző.! / ··'.
' ·. .' ' '· ' · ' ' '?:.'4Λ'·'18 irányba ..elmozduló 12 táselsa és S-csőköpsny közti .térből ? hatékonyan kizártuk· < '<
Az 1 slválasztészsrkezetet az ábrákon feltöntotett..., . \ ' ,4S •épitési fázisban helyezzük. @1,· majd .a cölöp elkészít és©' 'és anyagának megszilárdulása után a .próbaterhelés ; '4^ ' . ' ' · · ' ' '. . . .·..··.·· ··.-.···.. :··.·.-·.·.
©órán aöködtotjök.
Az ©lár@gyártott vasbstaneolöpöt (14· és 15* ábra) a cölöp ©leseit ©gyaáshozillssztve verjük b© a kívánt ©Ismsit ©sután hö.zztik r®nd©lt®tásss©rü mükádásr® alkalma© helyzetbe·
Az ismertetett berendezés, illstv® előregyártóit
A belül számos a
alakokcélszerű megvalósítási meghatározott oltalmi sélss©rö kiviteli alakkal • A g lőheto lőaw®e hogy általa a helybenkészölt 'próbaterhelési eljárást Franki módszerrel fúrt injektált st®chnológiával aeélarmsturával nem erősített fúrt cólőpók*·.. re is kiterjesztettük, ©őt, ®lőr@gyáüt©ii. veri sálöpők : ©sétában való alkalmazását is szolgáltattuk· Ezzel . gyakorlatilag bármilyen fajta eilöp hslsS erővel való próbaterhelés© lehstővá vált· β 11 <=» le Berendezés cölöp belső erővel történd próba* terheléséhez, a»©lyn®k a eölöpszárban (9) lévő c®ő«
The present invention relates to the application of internal stress .. · test load without interference. '. Serve * also allows small (LÖ-.20 '; c® ·). • The test load of dip-injected and / or 2-dip drills made by Franki. · The invention also relates to pre-fabricated reinforced concrete, which is composed of two elements and an internal tube tester @ 10ber @ nd @ zá @ s. Elés őv @ @......... 2. 2 2
For use on piles of test piles, using internal and external forces · In the case of a test load on the piles, using the weight of the mass on the cutter protruding from the soil. Load is applied · An anchor-pile test load is applied when the load-bearing pile load is applied. other piles are relieved from the drag resistance by a load rod, rod, or rope. Alternatively, anchors are used instead of piles that have been pulled into a © method.
Procedures are known which, in the case of double-walled steel cushions embedded in the drilled piles, near the tip of the piles, are subjected to a bursting fluid of the injected tubing as; ·? using internal force, the pile-punch is removed from the pile trowel by the test load, and the data from the puncture are deduced from the puncture resistance and the pile resistor . rő@z.ós with the removal of the pile trunk part, with a separate payroll. · his / her death procedure is described in Hungarian Patent Application No. 1 @ 1 · 292. ·...... mechanically or prematurely'-a-pile ··· longitudinal axis is loaded with mohtan.
© Jigsaws are pulled out or pulled out so that it can be separated from the eSISp jigsaw © for a punch?
-That is the process of proposing this method with at least a @ @ y © ® © XService. lying on a tree, which is embedded in a knee pad, and is a metal located in the center of gravity of the cross-section of the pile ®1, is a braiding device with a top plate with a metal plate. part of it is connected with a © stacking iron with ironing ·
The disadvantage of the solution described above, leaving the @ pile of pile piles from the pallet separating the pile @ pile two separate theaters becomes a safe when performing the test load. »And the splitting creates a gap» ® into the gap, soil and / or ground water is introduced »and then penetrating materials, which can be trapped between the ridge and the rake, cause additional internal resistance to the power strike. · The disadvantage of the solution is that the e-y @ e and @ are not reinforced concrete slabs in the case of sloped vertices. also for piles · '4: Brain :
Γι
The teXX @ is based on ² © η & recognition that the separation of the separator from the elements of the partition and the movement of elements between them by means of a snap-in connection : the unfavorable material flow * s So that the disturbing awakening can be eliminated. It can also be extended for use in cast iron reinforced concrete when the pile is made up of separate elements »and drunk for drowning. · There is a set of tasks based on semi-knotwork. @ rv®i ® pivot-coupled wire servo is connected to the retractor and the separator is separated from the pile rod and is characterized by the separator structure © with a release plate and a coupling plate coupled with a press plate, and, with the latter. price exactly as part töaitőpe'rawel formed. it has.j and that @ pipe pipe is connected to the separator board, it is fitted with a sealing ring to fit the discharge hole of the plate * Advantages' · if the raincoat is anchoring © l @ m @ (if there is a raincoat) the pile is strong. It has been developed as a pipe, at least partially injected, as a pipe. cradle · »bsg is switched on and separated from the pile. ';?'''.
- 5 ~ densely compact * tops © ® customs and the pile ^ of the longitudinal central cavity allowing the introduction of the drill device, and the test @ rb @ XOr®®® ds caproler® for connecting the cable to the cable! · has
The invention will now be described in more detail with reference to the accompanying drawings, which are exemplary embodiments of the apparatus, and exemplify its use, more preferably by way of a preferred embodiment of the prefabricated precursor sheet according to the invention. Fig . 1 is a view of the apparatus of the present invention; Fig. 2-6 · illustrates the use of the vertical tab. © her was sensed in a dry drill with a test load of a non-injected pile.
Figures 7-9 illustrate the prábatsrhslési fsiya.sst.ébrá of a reed in accordance with the invention of the pile making and invention of Frank. Figures 10-13 show a wall diagram of a rinse by rinsing process. Fig. 14 is a prefabricated view of the present invention
... '. in Fig. 15 Fig. 14 ábr Fig. 14 top plate, pile top view®j.
Fig. 16 * shows the upper end of the pile shown in Fig. 14 *. visible with the indication of some test objects of the test load device.
The illustration shown in the figure is © The separator consists of two main parts at the top 10 of the pile 10 of the soil in AT, the pressure plate 4 a. 11, and β 2 separator * on the 9 pile of the pile? The card is attached to the latter. · The latter is connected to the 3 dilatation © sheets 6 and to the 2 © sewn @ bahn anchor @ m®. The sealing edge 5 between the jacket 6 and the sealing member 7 is provided.
The test load for carrying out the test load is 14 * 14 lifting arms * 13 wire harnesses and 15 backing plates 1 in Figure 1 «showing only the feedstock 12 · A 2 © The loading plate for the © raincoat is attached with 21 stitches. to the 3 dilation® sheet, the 22 screws are connected «
Figures 2-6 illustrate the process. the. Figure 2 shows in Figure 2 a locally-produced pile .24 in the T soil with the plow 23, shown in Fig. 3. . , p @ zi a! □ pile punch · In the phase shown in Figure 4, the pile of pins 10. the .1 separator head is located. the 6 threads and the 8 h hooks and the rest of the 4 hole hole. There are 9 hooked up with the 1st choice spacing to 10 piles. · / J; 9 piles .reported · The © * awake: ® .'- trial · /. <í j
the load condition is visible · The 14 © a @ is located on the 12 rows @ a @ n is supported by the back plate 15, and the wire 13 is mounted on it! the 6 jacket passes * sssly g @ tangle @ rv® forwarding to the penguin · As a result of the force, the 9 pile of the 11 pile burns down to 10 amps. tt. as 1 © lválasxt ©
Fig. 7 shows the brainsteps of the process shown in Fig. 7-a. attached © raincoat • The 9 «a $ piles during concreting, and the £ 8 liner can be seen during retraction · The ring-shaped door-uly 29 is fitted with anchor bolts Θ 6. Outside the «2 ás inside the lining belt pa longitudinal movement · In the filling of the '9 pile-pile 2 @ outside the iron pipe ©, there is no armature ·
Figure 19 illustrates the process shown in Figure 10 in Figure 10 in Figure 10 for drilling a hole 24 in the T soil 23 with a drill bit 23.
Figure 11 shows a hole 6 in the hole 24 filled with the injector 6 in the hole 24 filled with the drill bit.
....... ..... :: / .. 4 (:. 4 ::: / 70:
'''''0' holes with 30 rubber rubber rods and rock formwork.
®XiXX®® © © We have shown this. A lg. Fig. 6 is a 6-pipe pipe formed of a partial injection tube. ap ő 27 27 27 27 27 27 27 ak ak ak ő ő ő ő ve ve fal fal fal fal ve ve ve ve ve ve ve... At wake 13, the solidified injector X is a material strain XX in the test load condition. Fig. V · The 14 backrest @ @ l @ @ rv '^. · Relies on the support plate 15 * and the power of the wire 13. Transfer to β S pipe clamps * am @ 8 8 © © anchor9z @ rk @ kk l nak · azt © © © ás ás ás ás ás ás XX XX XX XX XX XX XX ára ára ára ára ára ára ára ára moves in the direction of arrows © 1, the 1 © divider is split.
Figures 14 and 15 illustrate the following parts of the prefabricated rifle-in-cast reinforced cast iron. · One rake is the solid pile of pine * and the other pile 9 of the cavity formed therein X7 e @ BtrxX @. On the head of the pile XX, the X® kspeaser body is visible * which is preferably a tube member covering the transverse surface · In Figure 16, the probe is in the state of being depicted on the guides 12 of the central cavity 17 and the positioning device 14 thereon. , which relies on the metal plate 15 * and © the streamer © Xerver @ X © of the 13 wings, it is transmitted to the stack.
. Fig. 1-13 ··· 'the equipment®®! the . the test load is performed as described below
«Ag rests safely ·. Reinforced concrete, pile (# 14 and IS) fig.
bon -.18 switches; Connect it to the @ @ transducer and connect it to the Xap © 15, the IS support ©.
we are going to contact us · We use the so-called & 14 © ® @ lSsz @ rvy @ l, with the 10 pre-crowns a a pile *, 'the stalk on the ground edge of the soil. © ken .ébredő .ΐ : 4 to move away from the job. Figures 1-13, divorce as in Figures 1-13, Figures 1 to 13 are as follows. ; with a structure to let go of
This. in the latter cases, the same ® a = 9 pile rods are moved upwards.
Page 3 Page 3 3 dilatation ©, and the 4 pressure plates ® 12 support®, the 10 pins of the cube are pressed downwards · A .g © The selection sheet and the .4. The soil * 'and the solid parts of the soil from the soil T are allowed to be placed on the sealing nip 5 and the nozzle 7 placed on the nipple.
Flowing into the old, so it is com- fortable with each other ©! / ·· '.
'·. . ''' · ''''''?:.'4 Λ ' · '18 direction .. from the space between. effectively excluded · <'<
The slide structure 1 is illustrated in the drawings ...,. , 4S • Construction phase. @ 1, and then .a pile and © '' and after the solidification of the material, the test load ; '4 ^'. '' · · '''. . . · · · · · · · · · · · · · · · · · · · · · · · ·.
© hour to start.
© The iron bar (14 and 15 *) produced by © lar @ @ is stacked © to the desired © Ismsit © in place of the ád ás · © © · · · · ·
The described apparatus is a prefabrication device
The inside of many a
a form-tailed design with a defined protec- tive design • The firearm to be fired is that we have extended the test loading procedure for drilled shovels that are not reinforced by the Franki method, and are not reinforced with an astronomical structure. © gyáüt ii. beating shoemakers : © we've also been using it for walking • With this. practically any kind of test load with a hslsS force © has become Ø 11 <= »down Equipment for piling a pile with internal strength *, in the“ © lyn®ka pocket (9) ”
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
HU180585A HU205408B (en) | 1985-05-14 | 1985-05-14 | Apparatus for load-testing piles and prefabricated reinforced concrete pile for pile load-testing carried out by inner force |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
HU180585A HU205408B (en) | 1985-05-14 | 1985-05-14 | Apparatus for load-testing piles and prefabricated reinforced concrete pile for pile load-testing carried out by inner force |
Publications (2)
Publication Number | Publication Date |
---|---|
HUT43125A true HUT43125A (en) | 1987-09-28 |
HU205408B HU205408B (en) | 1992-04-28 |
Family
ID=10956286
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
HU180585A HU205408B (en) | 1985-05-14 | 1985-05-14 | Apparatus for load-testing piles and prefabricated reinforced concrete pile for pile load-testing carried out by inner force |
Country Status (1)
Country | Link |
---|---|
HU (1) | HU205408B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2011070199A1 (en) * | 2009-12-11 | 2011-06-16 | Grupo De Ingenieria Aceanica, S.L. | Method for the production, driving-in and injection of underwater piles |
-
1985
- 1985-05-14 HU HU180585A patent/HU205408B/en not_active IP Right Cessation
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2011070199A1 (en) * | 2009-12-11 | 2011-06-16 | Grupo De Ingenieria Aceanica, S.L. | Method for the production, driving-in and injection of underwater piles |
ES2361867A1 (en) * | 2009-12-11 | 2011-06-24 | Grupo De Ingenieria Oceanica, S.L. | Method for the production, driving-in and injection of underwater piles |
Also Published As
Publication number | Publication date |
---|---|
HU205408B (en) | 1992-04-28 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101671123B1 (en) | Tunnel construction method by using pre-support and post-support, and suitable device therefor | |
KR20090013528A (en) | The prestressed tunnel support structure | |
CN112989466B (en) | Design method of slope deep-buried shear pile supporting structure based on simple distribution method | |
US6318933B1 (en) | Foundation system for tension leg platforms | |
US4150473A (en) | Method to produce an anchor on a tendon twisted of several steel wires | |
US5730556A (en) | Removable ground anchor | |
HUT43125A (en) | Apparatus for load testing piles and load testing prefabricated reinforced concrete pile by internal force | |
US3008691A (en) | Pile jacking apparatus | |
US4237942A (en) | Apparatus to produce an anchor on a tendon twisted of several steel wires | |
US3483707A (en) | Method for reinforcing steel pipe piling in situ and the resultant piling | |
CN112989467A (en) | Simplified Bischot-based soil slope deep-buried shear pile support structure design method | |
JPS59500209A (en) | mooring device | |
NO315641B1 (en) | Plate type anchors, and method of placing them | |
CN113928477B (en) | Gravity penetration type deepwater anchor and construction method | |
US5113634A (en) | Method of producing a tension part anchorable in the earth | |
EP0084921B1 (en) | Piles | |
OA10378A (en) | A method for templateless foundation installation of a tlp | |
EP0004150A1 (en) | Improvements in and relating to an embeddable anchor and to a method of embedding such anchors | |
JP2511297B2 (en) | Pile ground reinforcement device | |
US757368A (en) | Construction of bulkheads. | |
JP6715131B2 (en) | Soil retaining work, supporting work removal method, and supporting work parts | |
CN205822199U (en) | A kind of prestressing force support system protecting existing subway | |
OA10728A (en) | Direct tendon to pile connection | |
JPS605968A (en) | Prestress introduction of pc slab in existing structure | |
JPS59233019A (en) | Method and part for forming earth anchor and automatic penetrator therefor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
HMM4 | Cancellation of final prot. due to non-payment of fee |